Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TIME SHEET

NAME : Dion \ LOCATION : PSF


EMPLOYEE No. : D1832 MONTH/YR : Mar 2023 - April 2023
SIGNATURE
SECTION : Mining APPROVED : Ismail Marzuki

APPROVED by Project Owner :-


(Only applicable if charged to other default project/cost center)

PRODUCTIVE TIME NON PRODUCTIVE TIME


ORDER
WORK

NO.
CODE
COST

0013D

4304C

0021C

4854C

LEVEE 4924C

5000C

5140C

C0026
PROJECT

(C / S / O)
NUMBER

ANNUAL
LEAVE)
( R&R,

LEAVE WITHOUT PAY


R & R (rest & recreation)

PUBLIC HOLIDAYS
ANNUAL LEAVE

SICK LEAVE
LAMPUNUT

CK- MHU

TRAVELLING
LOCATION
POSB
HCBS
SECTION

BMB
TBG
KJA

IAC
CODE

OTHER
HO
16
17
18
19
20
21
22 8 HO
23 8 HO
24 8 HO
25 8.5 PSF √
26 √
27 8.5 PSF
28 8.5 PSF
29 8.5 PSF
30 8.5 PSF
31 8.5 PSF
01 8.5 PSF
02 8.5 PSF
03 8.5 BIZHUB
04 8.5 BIZHUB
05 8.5 BIZHUB
06 8.5 BIZHUB
07 8.5 PSF
08 8.5 PSF
09 √
10 8.5 PSF
11 8.5 BIZHUB
12 8.5 BIZHUB
13 8.5 BIZHUB
14 8.5 BIZHUB
15 8.5 PSF
16 8.5 PSF
17 8.5 BIZHUB
18 8.5 PSF
19 8.5 BIZHUB
20 8.5 BIZHUB
21 8.5 BIZHUB
22 √

Once printed this document becomes uncontrolled, Refer to Petrosea Intranet for controlled copy.
FORM No.: PTP-FA-FO-G-0066 REV No.: 0 2 of 2
TIME SHEET
23 √
24 11.0 PSF
25 11.0 PSF
26 11.0 PSF
27 11.0 PSF
28 11.0 PSF
29 11.0 PSF
30 11.0 PSF
01 √
02 8.0 BIZHUB
03 8.0 BIZHUB

1. LOCATION : C = City, SC = Site City, S = Site, O = Offshore, SR = Site Remote. Please specify only if
your location changes during the month.
2. W.O.N = Work Order Number : Required for all jobs performed for other Petrosea entities
: Employees must attach a work report - Doc No. PR - 00 - A - 1112, Attachment 4.

Once printed this document becomes uncontrolled, Refer to Petrosea Intranet for controlled copy.
FORM No.: PTP-FA-FO-G-0066 REV No.: 0 2 of 2

You might also like