NetEngine 8000 F1A-8H20Q Quick Installation Guide 02

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NetEngine 8000 F1A-8H20Q

Quick Installation Guide Issue: 06


Scan to Watch Quick Installation Guide Part Number:31500AAE

1 Device Overview 2 Safety Guidelines 3 Site Requirements 4 Cabinet Requirements


Observe all safety regulations and precautions The routers must be used indoors. To ensure normal operations and Huawei A66E cabinets are recommended. A self-pur-
long service life of the router, the installation site must meet the
To ensure personal and equipment safety, observe all the safety following requirements:
chased cabinet must meet the following requirements:
Power module precautions on the equipment and in this document. The equipment must be installed in a clean, dry, and well ventilated A 19-inch standard cabinet must be used, with a
Ground Fan module DANGER WARNING CAUTION and NOTICE items do not cover all standard equipment room where temperature can be controlled
terminal
depth of greater than or equal to 600 mm(23.62 in.)
the safety precautions and are only supplementary to the safety within a proper range. The equipment room must be free from
precautions. leaking or dripping water, heavy dew, and humidity. The device panel must be at least 105 mm(4.13 in.)
Follow all the safety precautions and instructions provided by Take dustproof measures in the equipment room. Dust will cause away from the cabinet door if any.
Huawei. The safety precautions outlined in this document are only electrostatic charges on the chassis and affect connections of metal
Each cabinet door must have 50% or higher porosity.
54 55
52 53
50 51
48 49
47
44 45 46
42 43
40 41
38 39
37
34 35 36
32 33
30 31
28 29
26 27 3
24 25

requirements of Huawei and do not cover general safety regulations.


23 2
21 22 1

connectors and joints. This shortens equipment service life and may
19 20 0
17 18
15 16 BREAKOUT
13 14
11 12
9 10
7 8
5 6
3 4
1 2
0

Huawei is not liable for any consequence that results from violation
STAT

cause failures of the router.


NetEngine 8000 F1A-8H20Q of regulations pertaining to safe operations or safety codes The installation site must be free from acidic, alkaline, or other
pertaining to design, production, and equipment use. corrosive gases.
Installation accessories: The temperature and humidity in the installation site must be within
allowed ranges.
Operator qualifications
Cable tie Panel screw Corrugated pipe Requirement
Item
ESD wrist strap Serial cable Insulation tape Only trained and qualified personnel are allowed to install, operate or
maintain the equipment. Familiarize yourself with all safety
Port-side Intake:-5°C ~ 45°C(23°F to 113°F) Dimensions without packaging
Floating nut Signal cable label Label cable tie Port-side Exhaust:-5°C ~ 40°C(23°F to 104°F)
precautions before performing any operation on the equipment. (H x W x D)
Power cable label Fiber binding tape NOTE 2200 mm x 600 mm x 650 mm
Long-term operating H
When the altitude is between 1800 m and
temperature [°C(°F)]
NOTE
DANGER 4000 m, the highest operating temperature Dimensions with packaging (H x
Do not install or remove the equipment or power cables while reduces by 1ºC every time the altitude W x D)
Figures in the document are for reference only and may be increases by 220 m.
power is on. 2320 mm x 720 mm x 890 mm
different from actual devices.
A heat dissipation space of at least 1U must be reserved above To ensure equipment and personal safety, ground the equipment Storage temperature
and below the F1A-8H20Q. before powering it on. [°C(°F)] -40°C ~ 70°C(-40°F to 158°F)

Storage relative
WARNING 5% to 95% RH, non-condensing
NetEngine 8000 F1A-8H20Q humidity [RH] D
Item (front-to-back and back-to-front W
Laser beams will cause eye damage. Do not look into bores of
airflow direction) Long-term operating
optical modules or optical fibers without eye protection. 5% to 90% RH, non-condensing
relative humidity [RH] NOTE
Chassis height [U] 1U
Short-term operating The device adopts two heat dissipation modes: front-to-back and
Dimensions without packaging 43.6 mm x 442 mm x 420 mm 5% to 95% RH, non-condensing
NOTICE relative humidity [RH] back-to front. Before device installation, check the heat dissipation
(H x W x D) [mm(in.)] (1.72 in. x 17.4 in. x 16.54 in.) condition of the equipment room to prevent hot air from flowing
Keep an unpacked device upright and handle it with care when Storage altitude into the air intake vent.
Dimensions with packaging 175 mm x 550 mm x 650 mm < 5000 m(< 16404.2 ft.)
carrying it or installing it into a cabinet. [m(ft.)]
(H x W x D) [mm(in.)] The device is air-cooled. The air intake and air exhaust vents must
(6.89 in. x 21.65 in. x 25.59 in.) Do not touch unpainted surfaces of the equipment with wet or
be free from obstacles, such as labels, to prevent the air intake and
Weight without contaminated gloves. NOTE air exhaust vents from being blocked.
DC: 8.4 kg(18.52 lb)
packaging (full When installing a router in a cabinet, ensure that the router's heat You are advised to select the power cable's cross-sectional area
AC: 8.75 kg(19.29 lb)
configuration) [kg(lb)] dissipation requirements are met and the router has the same airflow and the device's circuit breaker according to the site survey result.
Rated input voltage: ESD protection direction as other devices in the cabinet.
DC: -48 V/-60 V
Before installing, operating, or maintaining the
AC: 100 V to 240 V AC,

5
equipment, wear an ESD wrist strap and insert
Power Distribution Requirement
support 240 V HVDC
Power Parameter the other end into the ESD jack on the chassis
Input voltage range:
DC: -40 V to -72 V or cabinet. Remove conductive objects like
AC: 90 V to 290 V jewelry and watches to prevent damages to
For hierarchical power supply protection, the current of each circuit breaker must be at least 10 A when the router adopts AC
Maximum input current: the equipment caused by electrostatic
discharge. power supply. If a less than 10 A circuit breaker is used, replace it. Similarly, the current of each circuit breaker must be at least
DC: 30 A AC: 8 A
32 A if the router adopts DC power supply. If a less than 32 A circuit breaker is used, replace it.

6 Installing the Device into a Cabinet


6.1 Install floating nuts. 6.2 Install mounting brackets on the device.
1 Fix floating nuts and M6 screws in the correct holes. 1 Use a torque screwdriver to install the front mounting brackets using 2 Use a torque screwdriver to install the extension rails of the
three screws. expandable mounting brackets on the rear of the chassis
using four screws.

54 55
52 53
50 51
48 49
47
44 45 46
42 43
40 41
38 39
36 37
34 35
32 33
30 31
28 29 STAT

2
26 27 3
24 25
2

48-60V;30A
22 23
21 1 RTN(+)
19 20 0 AIR OUT
17 18
15 16 BREAKOUT STAT
13 14
11 12

PWR
48-60V;30A

PDC1000S12-CB
9 10 RTN(+)
NEG(-)
7 8 AIR OUT
5 6
3 4
1 2
0

PWR
PDC1000S12-CB
NEG(-)

FAN 1-4

M4
FAN
MGMT-ETH

AIR OUT
031A-B
CON/AUX CLK
TOD FAN

AIR OUT
031A-B
FAN

AIR OUT
031A-B
FAN

AIR OUT
STAT 031A-B

M4
1.2N•m
L/A
GE1 STAT

1
RST GE0

1.2N•m

floating nuts.
6.3 Install the device into the cabinet.
1 Use a torque screwdriver to install the extension runners of the 2 Horizontally insert the chassis into the cabinet from the front of
expandable mounting brackets on the rear posts of the cabinet the cabinet until the extension rails are fully inserted into the
using screws. extension runners.
M6
3N•m

54 55
52 53
50 51
48 49

3
47
44 45 46
42 43
40 41
38 39
37
34 35 36
32 33
30 31
28 29
26 27 3
24 25
23 2
21 22 1

M6
19 20 0
17 18
15 16 BREAKOUT
13 14
11 12
9 10
7 8
5 6
3 4
1 2
0

3N•m
STAT

NOTE

If the device is installed in an A66E cabinet, the default distance between


mounting bars is 375 mm.
NOTE NOTICE
Keep any objects or obstructions at least 75 mm away from the air intake
and exhaust vents to facilitate heat dissipation. The device is inserted into the cabinet from the front of he cabinet. Check the air intake and air exhaust vents of the installation site to ensure airflow is
channeled into the device from the air intake vent to the air exhaust vent.

7 Installing Cables
Install ground cables Install network cables Route cables (AC power supply)

1 Install the ground cable between the device 2 Install the cabinet ground cable.
and cabinet.
NOTICE

Before bundling network cables, use a network


cable tester to test cable connectivity.
M8
7.8N•m
54 55
52 53
50 51
48 49
47
44 45 46
42 43
40 41
38 39

NOTE
36 37
34 35
32 33
30 31
28 29
26 27 3
24 25
23 2
21 22 1
19 20 0
17 18
15 16 BREAKOUT
13 14
11 12
9 10
7 8
5 6
3 4
1 2
0

STAT

Bundle the network cables in a rectangle shape.


M5
Ensure that the cable ties are evenly spaced and
3N•m
face the same direction.
It is recommended that AC power cables be routed on the left side of the cabinet.
MGMT-ET
H FAN 1-4 Route cables at a proper distance from each
CON/AUX
TOD
CLK
other. Otherwise, the installation of other cables It is recommended that cables, such as optical fibers and ethernet cables, be routed
on the left and right sides of the cabinet as the circumstances may require.
STAT
48-60V;30A

may be affected.
RTN(+)
AIR OUT

STAT
PWR
48-60V;30A

PDC1000S12-CB

NEG(-)
RTN(+)
AIR OUT
PWR
PDC1000S12-CB

NEG(-)

FAN 1-4 FAN


MGMT-ETH
AIR OUT

031A-B
CON/AUX CLK
TOD FAN
AIR OUT

031A-B
FAN
AIR OUT

031A-B
FAN
AIR OUT

031A-B

Route Ethernet cables, power cables, and


L/A
GE1 STAT
RST GE0

GE1 STAT
L/A ground cables separately. The Ethernet cables NOTICE
must not be damaged or broken or have joints.
RST GE0

STAT Do not bundle or route outdoor cables (such as outdoor antenna feeders and
48-60V;30A

RTN(+)
AIR OUT

STAT

outdoor power cables) and indoor cables together in the cabinet or on the
PWR
48-60V;30A

PDC1000S12-CB

NEG(-)
RTN(+)
AIR OUT
PWR
PDC1000S12-CB

NEG(-)

FAN 1-4 FAN


MGMT-ETH
AIR OUT

031A-B
CON/AUX CLK
TOD FAN
AIR OUT

031A-B
FAN
AIR OUT

031A-B
FAN
AIR OUT

031A-B

L/A
GE1 STAT
RST GE0

cable tray.
Install optical fibers.
54 55
52 53
50 51
48 49
47
44 45 46
43
41 42

M4
38 39 40
37
34 35 36
33
31 32
28 29 30
27
24 25 26 3
23 2
21 22 1
19 20 0
16 17 18 BREAKOUT
14 15
12 13
10 11
8 9
6 7
4 5
2 3
0 1

STAT

1.2N•m Cable connection table


1 Install corrugated pipes. 2 Install optical fibers.
No. Item Connect To Remarks

One end of a chassis ground cable is


Install power cables. 1
Chassis connected to the ground screw on the
1 ground right-side cabinet column, and the other end
is connected to the ground screw on the
Chassis Ground Cable point
1 Install DC power cables. 2 Install AC or high-voltage DC power cables. chassis.

Select AC/HVDC power cable based on the


types of power sockets used in your
54 55
52 53
50 51
48 49
47
44 45 46
43
40 41 42
38 39
37
34 35 36
33
30 31 32
28 29
27
24 25 26 3
23 2
21 22 1
55 18 19 20 0
53 54 16 17 BREAKOUT
52 14 15
51 12 13
49 50 10 11
48 8 9
47 7
44 45 46 4 5 6
43 3
40 41 42 0 1 2
38 39
37
34 35 36
33

AC/HVDC
30 31 32
29

2
27 28
25 26 3

equipment room. For more information, see


23 24 2
21 22 1
18 19 20 0
16 17 BREAKOUT
14 15
12 13 STAT
10 11
8 9
6 7
4 5
2 3
0 1

2
STAT

AC/HVDC power cable power cable "AC Power Cable" in the NetEngine 8000
F1A-8H20Q Hardware Description.
48-60V;30A

PWR PWR
RTN(+)
PAC150S12-R

PAC150S12-R

AIR OUT
PWR
PDC1000S12-CB

NEG(-)
1
2 Select DC power cables based on the types of
1
Power socket power sockets used in your equipment room.
3 on the DC For more information, see "AC Power Cable"
PEM in the NetEngine 8000F1A-8H20Q Hardware
DC power cable
Description.

NOTICE ETH
This port connects the router to an operation
Wear an ESD wrist strap or ESD gloves before installing optical modules. 4 management
terminal or a network management station.
Ethernet cable port
The bending radius of a single-mode G.657A2 optical fiber is greater than or equal
STAT

STAT
48-60V;30A

RTN(+) STAT PWR


AIR OUT
PAC150S12-R

STAT
PWR
48-60V;30A

PDC1000S12-CB

NEG(-) PWR
RTN(+)
AIR OUT
PAC150S12-R
PWR
PDC1000S12-CB

to 10 mm, and the bending radius of a multi-mode A1b optical fiber is greater than
NEG(-) FAN 1-4 FAN
AIR OUT

MGMT-ETH 031A-B
CON/AUX CLK
FAN 1-4 FAN
TOD FAN
MGMT-ETH
AIR OUT
AIR OUT

031A-B 031A-B
CON/AUX CLK
TOD FAN FAN
AIR OUT

AIR OUT

031A-B 031A-B
FAN FAN
AIR OUT
AIR OUT

031A-B 031A-B

1A 2A
FAN
AIR OUT

031A-B

1B 2B
L/A
STAT

or equal to 30 mm.
L/A GE0 GE1
RST
GE1 STAT
RST GE0

Select appropriate fibers for optical modules.


Cover empty optical interfaces and idle optical modules with dust caps. For more information, see "Optical Fiber"
Do not bundle optical fibers too tightly. You must be able to conveniently remove a
5
Optical port and "Optical Module" in the NetEngine 8000
single fiber from the bundle. F1A-8H20Q Hardware Description.
CATUION Optical Modules+
Properly fix optical fibers onto the cabinet columns to prevent impact on the
Ensure that the positive and negative poles of the input cable are correctly connected to the device. surrounding devices. Fiber Jumpers

8 Checking After the Installation 9 Performing a Power-on Check


10 Obtaining Product Documentation
and Technical Support
WARNING
No. Check Item
Before performing a power-on check, ensure that power switches on the external
All bolts and screws are firmly fastened, especially on electrical connections. Flat and spring power supply system and the router are turned off. For enterprise users:
1
washers are used with each bolt, and spring washers are placed on the top of flat washers.
Log in to Huawei enterprise technical support website
Turn on the external power supply and check whether the output voltage
All assembled PGND cables are copper-based, with correct wire diameters. No switch or fuse (https://support.huawei..com/enterprise), and select a specific
2 meets the power supply requirements of the device.
is allowed on the cables, and no short circuit occurs. product model and version to find its documentation.
Check whether the voltage of the input terminal on each power module is
All ground cables, AC input cables, and intra-cabinet cables are connected correctly Log in to Huawei enterprise support community
within the normal range. (DC: –40 V to –72 V; AC: 90 V AC to 290 V AC)
3 according to the wiring diagram, and all screws are fastened. The input and output cables (https://forum.huawei.com/enterprise) and post your
Power on the device and check whether indicators on the device are normal. Huawei Enterprise
are not short-circuited. questions in the community.
Technical Support
4 Any redundant parts of power cables or PGND cables are trimmed off.
NOTE
5 The terminals at both ends of each power cable or PGND cable are crimped securely. For more information about indicators, see the F1A-8H20Q Hardware Description. For carrier usesrs:
6 The wiring terminals on cables are wrapped tightly using PVC insulation tapes or heat
Log in to Huawei carrier technical support website
shrink tubes.
Indicator status when the router is working normally (https://support.huawei.com/carrier), and select a specific
7 The wiring terminals with heat shrink tubes are heated using a heat gun. product model and version to find its documentation.
8 Flat and spring washers are properly installed on each bolt of a wiring terminal. Module Indicator Status Log in to carrier enterprise support community
(https://forum.huawei.com/carrier) and post your questions in
9 All cables, especially the cables in the lower area of the cabinet, are securely connected. Power supply STAT Steady green
the community. Huawei Carrier
10 Power and ground cables are bundled and separated from other cables.
Fan module — Steady green Technical Support
11 The cable layout facilitates future maintenance and expansion.
Management panel STAT Steady green
12 The labels at both ends of each cable are correct and legible.
Front system indicator STAT Steady green

Trademarks and Permissions Supplier’s Declaration of Conformity (SDoC)


Unique Identifier: trade name: HUAWEI; product name: Router;
model number: NetEngine 8000 F1A-8H20Q routers
Party issuing Supplier’s Declaration of Conformity
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. Huawei Technologies Co., Ltd.
Bantian, Longgang District,
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Shenzhen, 518129, P.R.C
Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved. Tel: +86 755 28780808
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Responsible Party- U.S. Contact Information
Huawei Technologies USA Inc.
5700 Tennyson Parkway, Suite 500
Plano, Texas 75024
Main: 214-919-6000 / TAC Hotline: 877-448-2934
Open Source Software Notice FCC Compliance Statement ( for products subject to Part 15)
This device complies with part 15 of the FCC Rules. Operation is subject to the following
two conditions: (1) This device may not cause harmful interference, and (2) this device
must accept any interference received, including interference that may cause undesired
You can view the open source software notice by running the display copyright command in the user view.
operation.

You might also like