NOTES:-

Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12


2215 2875 3085 3590 3100 4460 2895 3430 1960 800
FLAT SLAB
690
+5950
T.O.C

X1

550
900
DN B4 B5 450

300
25 23 21 19 17 15 13 B3 IN ELEVATION
150mm SUNK B8 +4150
4865

150mm SUNK T.O.C

900
1 3 5 7 9 11 13
RC COLUMN RC COLUMN

550
UP B3 IN ELEVATION

900

900
B8 B3
+5950 300

450
X2 SECTION 1-1 RC COLUMN
(SCALE 1:50)
2345

X3
1070

X4 +5950 +5950
TOC LVL. T.O.C FLOOR SLAB
T.O.C
+5950
3165

450
B2 B2 B6a
2

550
300 B6a IN ELEVATION
B2 IN ELEVATION B2 B2 B2
B6 IN ELEVATION

X5 +4150

450
+4150 B6a IN ELEVATION FLOOR SLAB T.O.C
B8
DRAWN

600
T.O.C ST1 IN ELEVATION
REV BY & DATE STATUS
SLOPE

600
TOC LVL.

450
+5950
300 B2 SECTION 3-3 ST3 IN ELEVATION
300
5180

RC COLUMN B8 B6a
(SCALE 1:50)
SECTION 2-2
(SCALE 1:50)
SLOPE

X6
1 1 BEAM SCHEDULE FOR FIRST FLOOR
FLAT SLAB SPACING AT SUPPORT (L/4) SPACING AT CENTER
300 MM THK
5220

LEVEL SIZE BOTTOM MAIN BOTTOM TOP MAIN TOP REINF TOP REINF SIDE FACE ( LEG & DIA OF STRRUPS ( LEG & DIA OF STRRUPS
BEAM
(WxD) BAR REINF EXTRA BAR LEFT RIGHT BAR
MARK
(a) (b) (c) (d) (e) (f)

SLOPE TOC LVL.


+4,150 B1 AS/PLAN 300X750 4-25 2-20 4-20 4-25 4-25 2-16 4L-T10@100c/c 4L-T10@150c/c
B1a AS/PLAN 200X750 2-25 2-20 2-20 2-25 2-25 - 2L-T10@100c/c 2L-T10@150c/c
B2 AS/PLAN 300X450 4-20 2-16 4-20 2-25 2-25 - 4L-T10@100c/c 4L-T10@150c/c
B3 AS/PLAN 450X900 4-25 4-20 4-25 4-25+4-25 4-25+4-25 2-16 4L-T10@100c/c 4L-T10@150c/c

X7 B4
B5
AS/PLAN
AS/PLAN
300X900
450X550
4-25
4-25
2-25
2-20
4-20
4-16
4-25
2-25
4-25
2-25
2-16
-
4L-T10@100c/c
4L-T10@100c/c
4L-T10@150c/c
4L-T10@150c/c
B5a AS/PLAN 400X550 4-25 2-20 4-16 2-25 2-25 - 4L-T10@100c/c 4L-T10@150c/c
B6 AS/PLAN 300X550 4-25 2-16 4-20 4-20 4-20 - 4L-T10@100c/c 4L-T10@150c/c
TOC LVL. -
+5950 B6a AS/PLAN 300X600 4-25 2-16 4-20 4-20 4-20 4L-T10@100c/c 4L-T10@150c/c
B7 AS/PLAN 200X450 2-25 2-20 2-20 2-25 2-25 - 2L-T10@100c/c 2L-T10@150c/c
B8 AS/PLAN 300X550 4-20 2-16 4-16 4-20 4-25 - 4L-T10@100c/c 4L-T10@150c/c
5175

ST1 AS/PLAN 300X450 4-20 2-16 4-20 2-25 2-25 - 4L-T10@100c/c 4L-T10@150c/c
ST2 AS/PLAN 300X550 4-25 2-16 4-20 4-20 4-20 - 4L-T10@100c/c 4L-T10@150c/c
ST3 AS/PLAN 300X600 4-25 2-16 4-20 4-20 4-20 - 4L-T10@100c/c 4L-T10@150c/c
TOC LVL. SLOPE
+5950

X8 SLAB REINF. SCHEDULE

SLAB SLAB BOTTOM REINFORCEMENT TOP REINFORCEMENT SPACING OF STIRRUPS NOT MORE THAN 100mm
MARK THK
SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN OVER LAPPING LAP LENGTH = 60 X BAR DIAMETER. LECTURE THEATRE AT WEST KIDWAI
3100

4 S1 150 T12@150 c/c T10@200 c/c T12@150 c/c T10@200 c/c


NAGAR, VMMC COLLEGE & SAFDARJUNG
S2 175 T12@150 c/c T12@200 c/c T12@150 c/c T12@200 c/c
TOC LVL. HOSPITAL, NEW DELHI

Ld+10d
TOP CONTINUOUS BAR
+4,150
EXTRA REINF. TOP

X9 NOTE:-
SHEAR REINF.AS/SCHEDULE

Ld+10d
1115

Ld = 49d
3
EXTRA REINF. BOTTOM
+5950
FLOOR SLAB
X10 DN
T.O.C
300 BOTTOM CONTINUOUS BAR
4 IS PROHIBITED IN THIS REGIONS SECTION X-X
TOC LVL.

450
2530

+5950 TYPICAL BEAM LAPPING DETAIL

B2

X
X11 ARCHITECTS

550
+4150 d+c d c f e e+c d+c d c
B5a IN ELEVATION FLOOR SLAB

Ld+10d
T.O.C 300
3
2200

B6 IN ELEVATION

450

600

Ld+10d
ST2 IN ELEVATION ARINEM
B2 a a
X12 SECTION 4-4 300
b
a+b
X b b
a+b
1st Floor Akash II,
B7 B6a TYPICAL BEAM ELEVATION 31, Gokhle Marg,
(SCALE 1:50) B - 1/3,Hauz Khas,
Lucknow-226001 U.P. (INDIA) New Delhi-110016(INDIA)
UP TOC LVL. UP
X Ph.: +91 522-4107252 Ph.: 011-41525299,
+5950
Fax: +91 522-2209800
4595

E-mail : delhi@arinem.com
d+c d c f e e+c e+c
E-mail : admin@arinem.com

Ld+10d
5 TOC LVL. TOC LVL. 5
+5050 +5950

Ld+10d
DN DN DN
DN
a
b X b
X13 a+b a Engineering Design & Research Pvt. Ltd.
1220

Corporate Office:
5050 TYPICAL CANTILEVER BEAM ELEVATION E D-152 (First Floor)
Galaxy North Avenue-2; Gaur City-2
X14
DR Sector-16C Greater Noida (UP)
Cell: +91-9971122470
FIRST FLOOR CONSULTING
ENGINEERS
Email: santosh.singh@edr-group.com
Web: www.edr-group.com
(SCALE 1:100)

+5950 +5950
T.O.C T.O.C
600

600
+5050
T.O.C DESIGN BY : BKJ DATE: 11-07-2023
300 B6a 300
STEEL BEAM IN ELEVATION B6a
450

450

+4150 +4150
T.O.C T.O.C
B2
+3850 STEEL BEAM IN ELEVATION
300
B2
300
+3850
DRAWN BY : MDI CHKD : SKS
T.O.C T.O.C

LIFT WALL IN ELEVATION DRAWING TITLE :-


B6a B6a

FRAMING PLAN & SLAB REINF. DETAIL AT


FIRST FLOOR LEVEL

RC COLUMN
TYPICAL CUTOUT DETAIL SECTION 5-5 DRAWING NO:- MISC. REV. NO. - R0
(SCALE 1:50)