10-12 times manoeuvres should be carried out in order to check the mechanical
- X X
operation of the equipment
The minimum threshold (85% of Un) of the coil electrical operation should be tested - X X
10-12 times manoeuvres should be carried out in order to check the mechanical
- X X
operation of the equipment
The minimum threshold (85% of Un) of the coil electrical operation should be tested - X X
Wrap under heat sealing cloth with inspection doors to change the
1 2 3
desiccant bags
The minimum threshold (85% of Un) of the coil electrical operation should be tested - - X