Combined HPR To Gayal

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6

HOLD:

1. REQUIREMENT FOR SURGE VESSEL (QUANTITY


AND SIZE) SHALL BE FURTHER UPDATED BASED
ON SURGE ANALYSIS DURING DETAILED DESIGN
STAGE.

M
EXISTING DN1200 PIPELINE EXISTING PIPELINE AT
NEOM PALACE
MBV614

E
GV 604
PW-1503-DN1200-04CSTR

MBV615

AV207
AV201

AV202

AV205
FROM PIPE LINE CONT. M M GV 603 M M M M TO PIPE LINE CONT.

DN 2000 PIPELINE B
ICA-DRG-610116-A ICA-DRG-610202-A
N.C
MBV602 MBV620 MBV630 MBV639 MBV640
MBV601

MBV621
MBV619

MBV631
MBV629
GV 601 GV 602 GV 605 GV 606 GV 607 GV 608

M
NC

M
NC

MBV641
FROM PIPE LINE CONT.

M
ICA-DRG-610114-A

D
NOTES:

1. THE FOUR (4) DN3000 MM SUCTION MAINS FROM


THE TANK FARM SPLIT INTO 4 HEADERS INSIDE

AV208
AV204
AV203

AV206
FROM PIPE LINE CONT. M M M M M M M TO PIPE LINE CONT. THE PUMP ROOM:
A)FIRST HEADER IS SUPPLYING TO THE SUCTION
DN2000 PIPELINE C SIDE OF THE 3 PUMPS OF GROUP 1B AND 5
ICA-DRG-610116-A ICA-DRG-610202-A
N.C
MBV603 MBV604 MBV618 MBV623 MBV633 MBV642 MBV643 PUMPS OF GROUP 1A PUMPS
B) THE SECOND HEADER IS FOR 4 PUMPS OF

MBV634
MBV624

MBV632
GROUP 1A AND THE 3 FUTURE PUMPS OF

MBV622
GV 616 GV 617

PW-1518-DN500-04CSTR
GV 609 GV 610 GV 613 GV 614 GV 615

M
M
NC NC
GROUP 2.
MBV616

C) THE THIRD HEADER IS A FUTURE HEADER TO


GV 611
M

THE SUCTION SIDE OF THE RED DESERT


(GROUP 4) PUMP SETS.
PW-1512-DN500-04CSTR D) THE FOURTH HEADER IS ALSO A FUTURE
MBV617

GV 612
M

PW-1505-DN500-04CSTR
PW-1511-DN500-04CSTR HEADER TO THE NIC SOUTH (GROUP 3) PUMP
SET.

SLOPE

SLOPE

SLOPE

SLOPE
FROM PIPE LINE CONT.
PW-1504-DN1200-04CSTR
2. THE REQUIREMENT FOR SUCTION TANKS
ICA-DRG-610114-A
SURGE PROTECTION WILL BE VERIFIED BY THE
CONTRACTOR DURING TRANSIENT ANALYSIS
FOR THE SUCTION SYSTEM. DETAILED
INFORMATION FOR THE SUCTION PIPING IN
PW-1501-DN500-04CSTR
PW-1500-DN500-04CSTR

PW-1506-DN500-04CSTR

PW-1507-DN500-04CSTR

PW-1513-DN500-04CSTR

PW-1514-DN500-04CSTR
ADDITION TO TANK FARM OPERATION
SCENARIOS ARE NEEDED FOR TRANSIENT
MODELING.

3. PROPER AIR MANAGEMENT FOR SUCTION


C HEADER LINES IS OUTSIDE THE CONTRACTOR'S
SCOPE AND ASSUMED TO BE CONSIDERED BY
FROM PIPE LINE CONT. TO PIPE LINE CONT. THE SUCTION TANK FARM DESIGNER
FUTURE DN2000 PIPELINE
ESPECIALLY AS THE PUMP STATION IS AT
ICA-DRG-610116-A ICA-DRG-610202-A
LOWER ELEVATION.

M
M

M
HOLD HOLD
STATION POINT :
HOLD HOLD HOLD HOLD
FROM ( HPR ) TO ( 5+250.00 KM )

GV 634
GV 631
GV 628

GV 637
STAGE:
MBV605

03B - DEVELOPMENT DESIGN PHASE


MBV606

GV 621
GV 618
M

PW-1508-DN300-04CSTR PW-1515-DN300-04CSTR
FCV 301

FCV 302

FCV 303

FCV 304
GV 636
GV 627

GV 633
GV 630
NC

NC

NC

NC
CULVERT CULVERT A ISSUED FOR REVIEW S.A 15/05/2023
DRAIN DRAIN REV DESCRIPTION APP DATE
GV 629

GV 635
GV 632

GV 638
MBV609

GV 626

PURPOSE OF ISSUE:
M

NRV 301 NRV 302


ISSUED FOR REVIEW
CLIENT: PROJECT MANAGEMENT CONSULTANT:
MBV607

MBV608
GV 619

GV 622

PW-1509-DN500-04CSTR PW-1516-DN500-04CSTR
M
M

B M M M M

MBV625 MBV628 MBV635 MBV638


M
MBV627

MBV637
MBV626

MBV636
DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
M

M
MBV610 TP
M 21 PW-1510-DN500-04CSTR PW-1517-DN500-04CSTR
PW-1502-DN500-04CSTR GV 624

MBV611
FROM PIPE LINE CONT.
www .ecgsa. com
GV 625
ICA-DRG-610114-A

DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


MBV612

MBV613
GV 620

GV 623

DRAWN: Y.S 15/05/2023


M

CHECKED: A.T 15/05/2023 CHECKED: ...... ......


APPROVED: S.A 15/05/2023 APPROVED: ....... .......
SCOPE
CONTRACTOR

SCALE: NTS SHEET SIZE: A0


DN2000

DN2000

DISCIPLINE NAME:
PROCESS
DN1200

SUCTION HEADER
OTHERS
SCOPE

P&ID - PUMP STATION


PROJECT NAME:

A Design&Build of Water Transmission

OXAGON (Desalination Plant - Main Pumping Station) to GAYAL


EXISTING HPR NEOM
KINGDOM OF SAUDI ARABIA
FROM NEW HPR SRs REGION ASSET CODE CONTRACT CODE

11 152110 4800000644
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

PET PIP DRG 621201 A