HKN-MST-ME-0319 Rev B
HKN-MST-ME-0319 Rev B
HKN-MST-ME-0319 Rev B
To HKN *Status
A - Approved
B – Approved – subject to incorporating
comments
C - Not approved - resubmit
D - Rejected
Contractor’s Doc. Status Code* Expected
Rev. Description
Ref. No. Re-Issue Date
Comments
www.balmondstudio.com
Signature Name:
Waterfront Integrated Resort Project, 130 Glennie Street, Colombo 02, Sri Lanka
SUBMITTAL
To : Balmond Studio Date : 07/Dec/2018
Attn. : Mr. Jeremy Mayhew Response Due Date : 21/Dec/2018
[WR 19]_Method Statement for Installation of Marking and Identification for Waste & Rain Water Pipe
Subject :
Works Excluding Valves and Equipments.
Pursuant to Contract Conditions 4.1(ii), we submit herewith the following documents for the review by the Employer's Personnel. We affirm
that the Submittals are in full compliance with the Contract; and where it does not comply, they are expressly stipulated in the relevant parts
accordingly. Please furnish the requisite response with details to us on or before the Response Due Date as indicated above, failing which
there is likely to be delay or disruption to be suffered due to the delay.
Doc.
Doc. No Description Rev. No Zone
Type
Method Statement for Installation of Marking and
HKN-MST-ME-0319 MST Identification for Waste & Rain Water Pipe Works B Wide
Excluding Valves and Equipments.
From :
Mechanical Manager / Shin Won Jai
Name/Designation
Comments:
4
Page: 5/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
inside concealed areas.
5
Page: 6/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
CONTENTS
SECTION 1: GENERAL INFORMATION ...................................................................................................... 7
SECTION 2: DESCRIPTION OF WORK ...................................................................................................... 15
2.1 Purpose ................................................................................................................................ 15
2.2 Scope of Work...................................................................................................................... 15
2.3 System Description .............................................................................................................. 15
2.4. List of Materials ................................................................................................................... 16
2.5. Material Storage ................................................................................................................. 16
2.6. Key Plan of Installation ........................................................................................................ 17
2.7. Work Quality Flow Chart ..................................................................................................... 18
2.8. Method Statement Submission Plan ................................................................................... 19
SECTION 3: INSTALLATION METHODOLOGY ......................................................................................... 21
3.1 Inspect Materials ................................................................................................................. 21
3.2 Installation........................................................................................................................... 21
3.2.1 General ........................................................................................................................................... 21
3.2.2 Installation of making and identification for above ground pipes ................................................. 21
SECTION 4: PROJECT SCHEDULE ............................................................................................................ 25
SECTION 5: RISK ASSESSMENT............................................................................................................... 26
5.1 Detail Risk Assessment Sheet .............................................................................................. 26
5.2 Personal Protective Equipment ........................................................................................... 35
5.3 Confined Space Permit......................................................................................................... 36
SECTION 6: TESTING & INSPECTION PLAN ............................................................................................ 40
6.1 Terms and Definition ........................................................................................................... 40
6.2 Inspection Level ................................................................................................................... 41
6.3 Inspection List and Level ...................................................................................................... 42
6.4 Check Lists ........................................................................................................................... 43
6
Page: 7/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Equipment
Personal Protective
Tools/Plant Required
Equipment
Safety Helmet
Including Chin Compulsory
Hand tools Strap
Hi Visual Vest Compulsory
Safety Boots Compulsory
Gloves Compulsory
Eye Protection Compulsory
Dust Masks &
Compulsory
Coverall
YES. Fall
Restraint
Safety Harnesses Only
7
Page: 8/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Project Hierarchy for Health and Safety Persons Responsible for First Aid
Mr. D. M Thilakarathne (MK) Tel: 0713850115
Sub-Con Safety
Mr. Mohomed Mufaric (FG) Tel: 0775181539 HKN Safety Officer
Supervisor
Mr. S. Meril (DJ) Tel: 0718296294
Mr.Senaka 0718074325
HKN Safety Mr. Lal Tel: 0712304774
Officer Mr. Hemachandra Tel: 0779740737 Mr.Upali 0717173817
Emergency Arrangements:
HKN Emergency contact No. 0114333999
HKN to provide a first aid room
HKN Qualified First Aider – First Aid Kits Site Office & Stores.
Comply with HKN Fire Safety Plan & Fire Prevention and Evacuation Procedures.
Designated vehicle to be used for emergencies shall be available at all times. Details shall be displayed on
notice boards in a legible manner.
Vehicle No:
PC 5787, Driver: Janaka (Mob: 071-901-0009) - Night
P.G 4454, Driver: Pradeep (Mob: 078-742-6266)
PE 0146, Driver: Lio (Mob: 077-433-3684)
Task Lighting:
All task lighting will be supplied and maintained by subcontractor and used by subcontractor operatives.
The bulbs will be covered suitably against the direct emitting rays.
Waste Management:
Site: Waste materials will be placed in skips provided by HKN.
HKN will manage and control the disposal of all waste products/material accordingly
HKN will dispose hazardous waste accordingly.
8
Page: 9/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
All operatives will have undergone HKN’s relevant inductions required to work in this area.
All operatives will be fully briefed on the Method Statement to comply for this operation.
All Operatives shall receive a daily briefing of works to be carried out before works commence.
All operatives will read, acknowledge and sign this Method Statement before commencing work.
Only trained (Qualified) operatives will move or operate plant.
Welfare Facilities:
All Welfare facilities i.e. toilets, changing rooms and resting/eating areas will be provided and controlled by
HKN.
Smoking: Designated areas only. Ref Site Logistics plan HKN-PLN-CN-0001
Emergency Measures:
HKN will ensure that for all operations there will be an exclusion zone constructed with warning signs
displayed around working area where practicable.
Emergency Response Procedure HKN-PRC-HS-0002
Note: Following requirements should be achieved prior to start the site works.
9
Page: 10/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Responsibilities
HKN Sub-Contractor
Plan construction activity according to approved
construction schedule. (Master plan)
Evaluate necessary resources (Material, labour, tool
Responsible for all construction activities ensuring & machinery, technical support, etc…) as per site
that all approved materials, shop drawing, method requirement.
statement and approved procedures are Implement necessary safety measures as per site
Construction implemented and required approved permits are requirement.
Manager obtained from site authority. Implement necessary quality control procedures as
Facilitate construction staff. per site requirements.
Coordinate with necessary department in Determine necessary scaffolding/mobile scaffolding
construction site. arrangements by coordinating with site engineer
Ensures that the site engineer/ supervisor and safety
officer has sufficient resources to complete the works
correctly & safely.
Arrange resources as per the schedule.
Arrange suitable storage for materials, store
materials as recommended by manufacturer and
take material preservation procedures.
Identify suitable transportation method and arrange
facilities accordingly.
Arrange necessary training program coordinated
Coordinate with sub-contractor and consultant.
with manufacturer and share the knowledge with site
Monitoring site installations.
staff.
Arrange necessary approvals.
Site Engineer Arrange necessary mockup installations to meet
Arrange temporary protections.
quality parameters.
Continuous supervision and monitoring of
Educate technical staff.
material/system installed
Coordinate with main contractor.
Coordinate with other sub-contractor.
Coordinate with QA/QC engineer.
Ensures that the Supervisor can complete the said
works by providing the appropriate instruction &
direction to complete the said works correctly &
safely
Material inspection.
Conduct surveillance and inspection duties at Inspecting material storage condition.
various stages to ensure compliance to the Attending and verification of site inspection.
QA/QC
approved QA/QC plan and the approved method Monitoring correct application of tools and
engineer
statement. equipment’s.
Check the quality of temporary protection.
Preparation of inspection and quality check list.
10
Page: 11/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Maintain quality records.
Checking and verification of the workmanship.
Examine and verify the quality of workmanship of
labour.
Execute the construction schedule/plan provided by
the site engineer according to the approved shop
drawing & method statement.
Arrange necessary scaffolding, task lightning,
working spaces, and access and
barricades/storage/site cleanliness.
Conduct toolbox meeting and explain daily plan to
Supervisor
the labourers.
Before the start of site work check the physical
conditions of the labor.
Coordination with HSE officer.
Maintain portable first aid box.
Ensures constant supervision & control of his
workers to complete the works correctly & safely
Representative of Safety dept.
Managing the development, maintenance and
implementation of HSE manual and procedures
under the leadership of the site HSE
Assisting and reporting performance to the HKN
Project director on all HSE Matters.
Overseeing environmental activites to ensure
compliance with laws and regulations and other
relevant requirements.
Managing the HSE organization at the site.
Establishment and updating of Project HSE Plan,
Management Program,
HSE Manager Managing permit to work system, Risk assessment
of critical activities
Investigating accident, incidents, near misses and
actions taken to avoid recurrences.
Carrying out the HSE Meeting, Audit and
Promoting for HSE improvement.
Preparedness of Emergency Plan and Conduct of
Emergency Response Drill.
Ensuring that adequate inspections and reporting
on working places and practices are carried out.
Managing HSE records and documents.
Promoting HSE awareness and competence
training at all levels.]
11
Page: 12/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
12
Page: 13/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
13
Page: 14/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
14
Page: 15/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Installation of marking and identification for waste and rain water pipe works
excluding valves and equipment.
Note – Marking and Identification for valves and other accessories will be submitted as
a separate method statement. Include to the same MST once finalized
Identification tapes will be installed on all waste and rain water pipe works excluding valves and
equipment in Waterfront Integrated Resort project as described in this method statement.
15
Page: 16/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Before warning and identification tapes are placed into storage, they should be visually
inspected for scratches, and other defects.
The tapes and labels will be separated according to types and sizes.
Adequate storage space will be prepared and arranged in the most orderly manner
possible in order to place and remove materials.
16
Page: 17/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
17
Page: 18/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Approved Documents
(Material Submissions)
Not approved
Inspection Reject material
Approved
Store material
Fail
Material quality check Remove defective material from site
by QC Engineer
Pass
Cleaning
Not approved
*Check & verify status of all Resubmit
relevant documents
Approved
Installation
Repair & repaint
Not approved
Inspection
Approved
Hand over
18
Page: 19/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Conventional System
[*U/G Fully Embedded -Lesso HDPE *Man Hole & Trenches
3.1111
*Geberit HDPE & Accessories *Man Hole & Trenches *Pipe
Supports -Diamond Walraven ]
Sovent System
[*Geberit Silence db System*Geberit HDPE & Accessories *Pipe 3.111.2
Installation of Drainage pipe network Supports (Diamond Walraven) *Installation & Onsite Tests ]
building 1,3
HKN-MST-ME-0019 [WR 1] Pluvia Siphonic - Piping Status A Rev C
Installation of Drainage Pipe Network for 3.1.2.1.1
1 HKN-MST-ME-0020 [WR 2] [*GEBERIT Pipes & Acc *Installation and Onsite Testing] Status A Rev C
Building 4,5 & 6
HKN-MST-ME-0023 [WR 3] Above Ground (Roof BD 4,5 & Landscape) piping Status A Rev B
3.1.2.2.1.1
Method Statement for Installation of [*GEBERIT HDPE Pipes & Accessories *Onsite Testing]
Drainage Pipe Network for Building 02
Oil water - Piping
[*GEBERIT-HDPE up to sand box *LESSO HDPE Sand boxes to Oil 3.1.3.1
Separator *Pipe Installation & Accessories *Onsite Testing ]
Pluvia outlet
3 HKN-MST-ME-0028 [WR 6] Installation of Geberit Pluvia Rain Water 3.1.2.1.2 Status B Rev C
[*Pluvia Roof Outlet *Installation and Onsite Testing]
Drainage System for Building 4,5 & 6
Hume Pipes
Installation of Hume Pipe of Storm Water [*Installation and Leak Test*Manhole to manhole connection
4 HKN-MST-ME-0046 [WR 7] 3.2.2.2 Provisional Rev E
System for External Services. *Final connection of Manhole to Beira lake*Onsite Testing]
PP pipes (Corrugated)
PP Pipe Installation for External Waste [*Manhole to manhole connection *Expanding concrete joint
7 HKN-MST-ME-0037 [WR 10] 3.2.2.1 Status B Rev E
Pipe Network. water stop *Final connection of MH to Beira Lake *Pipe installation
and Accessories*Onsite Testing]
Sewer, Waste Water (Up to 1st Ex. M.H) - Pumping Pit &
Accessories
3.1.1.2
[*Pumps & Accessories *Agru HDPE Pressure Pipe *Electrical
Power & Control *Pressure Test]
Sewer, Waste Water (Ex. M.H to City Main) - Pumping Pit &
Accessories
3.2.1.2
[*Pumps & Accessories *Agru HDPE Pressure Pipe *Electrical
Power & Control *Pressure Test ]
Grease Separator-Installation
10 HKN-MST-ME-0055 [WR 14] Grease Separator-Installation 3.1.4.2 For Approval Rev B
[*Grease Separator-Installation *Onsite Testing]
Sewer, Waste Water (Up to 1st Ex. M.H) - Final Testing & Com. 3.1.1.4
Sewer, Waste Water (Ex. M.H to City Main) - Final Testing & Com 3.2.1.4
Rain Water (Ex MH to Beira Lk) - Final Testing & Com. 3.2.2.4
13 HKN-MST-ME-0022 [WR17] Retaining wall penetration detail Retaining wall penetration detail 3.2.3 Status A Rev D
Sewer, Waste Water (Up to 1st Ex. M.H) - Electrical Conduit
3.1.1.3
Installation for Waste & Rainwater Pumping Pit
Electrical Conduit Installation for Waste &
Conventional R.W system - Electrical Conduit Installation for
14 HKN-MST-ME-0027 [ WR 18] Rainwater Pumping Pit 3.1.2.2.3 Status B Rev B
Waste & Rainwater Pumping Pit
Sewer, Waste Water (Ex. M.H to City Main) - Electrical Conduit
3.2.1.3
Installation for Waste & Rainwater Pumping Pit
HKN-MST-ME-0320 PP pipes installation of external rain *Manhole to manhole connection *Expanding concrete joint
16 [WR20] water pipe network water stop *Pipe installation and Accessories 3.2.2.1 5 For Approval Rev A
ACO Floor Gully Installation of Buildings Above Ground (BD 4,5 & 6) Gully
18 HKN-MST-ME-0322 [WR 22] 3.1.5.2 For Approval Rev B
04, 05 & 06 [*ACO Floor Gully installation]
ACO Floor Gully Installation of Buildings Above Ground (BD 1,2& 3) Gully
19 HKN-MST-ME-0323 [WR 23] 3.1.5.3 For Approval Rev B
01, 02 & 03 [*ACO Floor Gully installation]
20 HKN-MST-ME-0324 [WR 24] GEBERIT Floor Drain Installation Geberit Floor Gully installation 3.1.5.4 For Approval Rev C
19
Page: 20/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
System breakdown of Waste and Rain Water System (Drainage System)
3.1.5 3.1.5.2 ACO Floor Gully of Buildings 04, 05 & 06 [WR 22]
waste & rain
water gully
installaion 3.1.5.3 ACO Floor Gully of Buildings 01, 02 & 03 [WR 23]
3.2.2.1 PP Pipe Installation for External Waste Pipe Network [HKN-MST-ME-0037] [ WR 10]
[*Manhole to manhole connection *Expanding concrete joint water stop *Final connection of MH to Beira
Lake *Pipe installation and Accessories*Onsite Testing]
3.2
3.2.2.4 Final Testing & Com. [ WR 16]
External
3.2.2.5 PP pipes installation of external rain water pipe network [HKN-MST-ME-0320] [ WR 20]
[*Manhole to manhole connection *Expanding concrete joint water stop *Pipe installation and Accessories]
3.2.4 HDPE pipe extension from retaining wall to external manhale [WR 21]
20
Page: 21/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
3.2 Installation
3.2.1 General
Places of pipes where the marking and identification tapes are applied will be cleaned
properly with cotton waste prior to tapes installation.
Tape will be cut to suitable length according to the pipe diameter covering the whole
perimeter of the pipe using scissors.
Tape pieces will be properly stuck to each pipe at least once in every room or enclosed
area, at intervals not exceeding fifteen meters, at every junction, at every valve, at
every inspection and access position into service shafts, false ceilings, bulkheads and
etc.
Tape will be cut to suitable length according to the pipe diameter covering the whole
perimeter of the pipe using scissors.
Tape pieces will be properly stuck to each pipe at least once in every room or enclosed
area, at intervals not exceeding fifteen meters, at every junction, at every valve, at
every inspection and access position into service shafts, false ceilings, bulkheads and
etc.
Tape will be cut to suitable length according to the pipe diameter covering the whole
perimeter of the pipe using scissors.
Tape pieces will be properly stuck to each pipe at least once in every room or enclosed
area, at intervals not exceeding fifteen meters, at every junction, at every valve, at
every inspection and access position into service shafts, false ceilings, bulkheads and
etc.
22
Page: 23/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Tape will be cut to suitable length according to the pipe diameter covering the whole
perimeter of the pipe using scissors.
Tape pieces will be properly stuck to each pipe at least once in every room or enclosed
area, at intervals not exceeding fifteen meters, at every junction, at every valve, at
every inspection and access position into service shafts, false ceilings, bulkheads and
etc.
Tape will be cut to suitable length according to the pipe diameter to ensure the whole
perimeter of the pipe using scissors.
23
Page: 24/44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B
Marking and Identification for Waste and
HKN-MST-ME-0319
Owner: HKN
Rain Water Pipe Works Excluding Valves
and Equipment
Tape pieces will be properly stuck to each pipe at least once in every room or enclosed
area, at intervals not exceeding fifteen meters, at every junction, at every valve, at
every inspection and access position into service shafts, false ceilings, bulkheads and
etc.
f) Vent pipe
Installation of marking and identification for the vent pipes will be carried out using
approved materials.
Marking and identification for above ground rain water pipes is blue colour, 400mm
width laminated tape with white colour arrows and white colour letters as “VP”. (Refer
sketch 3.2.2.f).
Tape will be cut to suitable length according to the pipe diameter covering the whole
perimeter of the pipe using scissors.
Tape pieces will be properly stuck to each pipe at least once in every room or enclosed
area, at intervals not exceeding fifteen meters, at every junction, at every valve, at
every inspection and access position into service shafts, false ceilings, bulkheads and
etc.
24
Page: 26/44 Method Statement for Installation of Marking and
Date & Version: 06-12-2018 Rev. B
Identification for Waste and Rain Water Pipe Works HKN-MST-ME-0319
Owner: HKN Excluding Valves and Equipment
Highlighted incompatible mitigation actions for the identified task to be
SECTION 5: RISK ASSESSMENT reassessed and corrected accordingly.
( See pages 28 & 29/44, item -2 part "A")
5.1 Detail Risk Assessment Sheet
D. Edges and Falling material Falling from 1. All leading edges are to be covered by guard
voids Unsuitable floor height
High
rails and toe boards
Low
3 5 15 2 2 4
protection coverings or sloping Fatality 2. Floor opening to be covered with steel net
floors, Partial/ and/or fly wood sheet where applicable and
27
Page: 28/44 Method Statement for Installation of Marking and
Date & Version: 06-12-2018 Rev. B
Identification for Waste and Rain Water Pipe Works HKN-MST-ME-0319
Owner: HKN Excluding Valves and Equipment
30
Page: 31/44 Method Statement for Installation of Marking and
Date & Version: 06-12-2018 Rev. B
Identification for Waste and Rain Water Pipe Works HKN-MST-ME-0319
Owner: HKN Excluding Valves and Equipment
LEGEND
P Probability
I Impact
V Risk Value
R Risk Class fiction
33
Page: 36/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
36
Page: 37/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
37
Page: 38/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
38
Page: 39/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
39
Page: 40/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
40
Page: 41/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
Generally, Inspection Checklist will be signed by the inspector who is involved the inspection activity only. (In case
Category A, B and C items signature column for Company shall be made “N/A”.
Classification of Field Inspection is described as below,
Type Symbol
Contractor’s Surveillance CS
Contractor’s Review CR
Contractor’s Witness CW
Contractor’s Hold Point CH
Engineer’s Witness EW
Engineer’s Hold Point EH
41
Page: 42/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
Participation by
Description of Inspection / Report Inspection
No. HKN Remarks
Test Form Level
SUB QA/ ENG
ME
QC
1 MIR Check List E H H H H
Installation and visual
2 Check List D H H H H
inspection
Note - Installation and Visual inspection for the marking and identification for waste and rain water pipes will be raised with
the installation and pressure/ leak test inspection (HKN-MST-ME-0019/0020/0023) for pipe installation inside concealed
areas.
42
Page: 43/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
Note: This document should be attached with ‘Installation and visual inspection’ inspection request is raised.
43
Page: 44/ 44 Method Statement for Installation of
Date & Version: 06-12-2018 Rev. B Marking and Identification for Waste and
HKN-MST-ME-0205
Rain Water Pipe Works Excluding Valves
Author: HKN
and Equipment
Annexure 2
HYUNDAI-KEANGNAM-NAWALOKA JV
2 Correct location
HKN
ENG. ENG / CONSULTANT
ME QA/QC
Date :
Time :
Name :
Signature :
44