BOQ GP RHD Bridge 883542 (Barshapara)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Periodic Maintenance Programme (PMP Major Bridge/Culvert) for Re-Construction of 01 No. 34.44m Long P.

C Girder Bridge (Barshapara) at Ch:13+679m on


Tungipara-Kotalipara (Majbadi)Road (Z-8430) under Gopalganj Road Division, Gopalgonj. during the Year 2023-2024. Z8430 under Gopalganj Road Division
883542
ItemGroup
no. Item Code Description of Item Measurement
Quantity
Unit Submit Rate RHD 23 Total
Bill of Quantities
1 Division-01, General and Provision,
1/2/2004 Maintenance and removal of sign Boards
Site Facilities L.S 1 11114.039 11114.04 11015.00 11,015.00
2 Division-01, General and Provision
1/2/2005 and Maintenance Survey equipment
Site Facilities Month 12 36717.001 440604.01 36717.00 440,604.00
3 Division-01, General and Progress
1/2/2007 of Photograph.
Site Facilities Month 12 996.001 11952.01 996.00 11,952.00
4 Division-01, General and Provide
.01/03/01 & Remove Site Laboratory & Equipment.
Site Facilities L.S 1 396540.001 396540.00 396540.00 396,540.00
5 Division-01, General and Maintain
1/3/2002 Site Laboratory.
Site Facilities Month 12 9200.001 110400.01 9200.00 110,400.00
6 Division
2/5/2001
2. Earthwork Excavation and back fill for Structures Cum 1350 530.001 715501.35 489.00 660,150.00
7 Division
2/5/2003
2. Earthwork Sand Back fill for Structures Cum 947.7 1438.001 1362793.55 1438.00 1,362,792.60
8 Division
02/06/02.
2. Earthwork Embankment fill from borrow pit in contractor's arranged land Cum 19590.74 620.001 12146278.39 599.00 11,734,853.26
9 Division
2/2/2002
2. Earthwork Roadway Excavation in suitable Soil Cum 241.5 256.001 61824.24 156.00 37,674.00
10 Division
2/2/2003
2. Earthwork Roadway Excavation in Existing pavement (Not reinforcement Concrete) Cum 227 267.001 60609.23 267.00 60,609.00
11 Division
2/7/2001
2. Earthwork Preparation of sub grade 300 mm depth Sqm 1730 27.001 46711.73 27.00 46,710.00
12 Division
2/8/2001
2. Earthwork Improved Sub-grade Cum 749.74 1159.001 868949.41 1159.00 868,948.66
13 Division
03/02/01a. Sub-Base
3.Pavement Work. Cum 515 6014.001 3097210.52 6014.00 3,097,210.00
14 Division
03/03/01a Aggregate Base Type-I
3.Pavement Work. Cum 460 9849.001 4530540.46 9849.00 4,530,540.00
15 Division
03/06/01b Bituminous Prime Coat (Hand Placed)
3.Pavement Work. Sqm 1840 168.001 309121.84 168.00 309,120.00
16 Division
03/10/02(b) Dense Bituminous Surfacing wearing Course(Plant Method)(Bitumen Grade 60/70).
3.Pavement Work. Cum 104.14 29811.001 3104517.64 29811.00 3,104,517.54
17 Division
03/13/01a. 125mm thick Brick on End Edging (1st class) .
3.Pavement Work. Lin.m 640 237.001 151680.64 237.00 151,680.00
18 Division
03/13/02a. Single Layer brick flat Soling i/c 75mm thick Compacted Cushion (!st Class).
3.Pavement Work. Sqm 550 765.001 420750.55 665.00 365,750.00
19 Division
03/13/03a. Herring Bond Brick Pavement i/c 12mm sand Cushion.(1st Class)
3.Pavement Work. Sqm 550 942.001 518100.55 942.00 518,100.00
20 Division
04/01/01c
5 . Structures Bored cast in place Piles (dia 750mm) Lin.m 1240 9739.001 12076361.24 9739.00 12,076,360.00
21 Division
04/02/04.
5 . Structures High yield Deformed steel Reinforcing bars Tonne 91.33 124145.001 11338162.94 124145.00 11,338,162.85
22 Division
04/04/01(c)
5 . Structures Load Test on cast in placePiles(200 Ton) Number 2 334304.001 668608.00 286804.00 573,608.00
23 Division
05/01/01.
5 . Structures Single Layer Brick Flat soling Sqm 771.22 631.001 486640.59 631.00 486,639.82
24 Division
05/01/02a
5 . Structures Concrete class as detailed on drawing (Class-10 ) Cum 64.52 9440.001 609068.86 9440.00 609,068.80
25 Division
05/01/02(g).
5 . Structures Concrete Class-25 (Foundation ) (Concrete Mixer) Cum 285.63 15155.001 4328722.94 15155.00 4,328,722.65
26 Division
05/01/02(h)
5 . Structures Concrete Class-25 (Vertical member of column, pier, abutment /wing wall, culvert etc.) (Concrete Mixer) Cum 228.77 17258.001 3948112.89 17258.00 3,948,112.66
27 Division
05/01/02(i)
5 . Structures Concrete Class-25 (Girder,beam,cross girder, and diaphram etc.) (Concrete Mixer) Cum 49.81 19743.001 983398.88 19743.00 983,398.83
28 Division
05/01/02(k)
5 . Structures Concrete Class-30 (Deck slab, Side walk, wheel guard, curb etc.)(Concrete Mixer) Cum 92.48 18751.001 1734092.57 18751.00 1,734,092.48
29 Division
05/01/02(l)
5 . Structures Concrete class-35 (Concrete Mixer) Cum 0.37 31944.001 11819.28 31944.00 11,819.28
30 Division
05/01/02(m)
5 . Structures Concrete Class-40 (Pre-stressed Girder) Cum 172 33377.001 5740844.17 33377.00 5,740,844.00
31 Division
05/02/02.
5 . Structures High yield reinforcing bar Tonne 89.75 130320.001 11696220.09 130320.00 11,696,220.00
32 Division
5/3/2001
5 . Structures Prestressing Wire or Stand Tonne 10.96 367251.001 4025070.97 367251.00 4,025,070.96
33 Division
5/5/2001
5 . Structures New and Extended Brickwork Cum 48.3 10331.001 498987.35 10331.00 498,987.30
34 Division
5/5/2002
5 . Structures Brick drainage layer Cum 210.96 6976.001 1471657.17 6976.00 1,471,656.96
35 Division
5/6/2001
5 . Structures Prepration of Painting of Existing stractures Sqm 268.98 683.001 183713.61 683.00 183,713.34
36 Division
5/8/2001
5 . Structures Expansion joint complete as detailed on the drawing in the location described in the BoQ. Lin.m 20.5 44032.001 902656.02 44032.00 902,656.00
37 Division
05/13/01(b)
5 . Structures Neoprene Rubber Bearing or Elastomeric Bearing supplying & fitting fixing, (b), etc. Number 10 20604.001 206040.01 20604.00 206,040.00
38 Division
06/02/01.
6. Incidentals Reinforced Concrete Culvert Pipe. Class A Bedding Lin.m 87.78 6569.001 576626.91 6569.00 576,626.82
39 Division
06/01/02.
6. Incidentals Concrete Slope Protection Sqm 1680 1963.001 3297841.68 1963.00 3,297,840.00
40 Division
06/12/01.
6. Incidentals Geotextile Filter Fabric(as details on drawings) Sqm 1680 232.001 389761.68 232.00 389,760.00
41 Division
06/13/01b
6. Incidentals Bullah Palisading (Local Bullah 150mm - 200mm) Lin.m 520 7744.001 4026880.52 7744.00 4,026,880.00
42 Division
6/10/2001
6. Incidentals Traffic Sign Number 20 6058.001 121160.02 6058.00 121,160.00
Periodic Maintenance Programme (PMP Major Bridge/Culvert) for Re-Construction of 01 No. 34.44m Long P.C Girder Bridge (Barshapara) at Ch:13+679m on
Tungipara-Kotalipara (Majbadi)Road (Z-8430) under Gopalganj Road Division, Gopalgonj. during the Year 2023-2024. Z8430 under Gopalganj Road Division
883542
ItemGroup
no. Item Code Description of Item Measurement
Quantity
Unit Submit Rate RHD 23 Total
43 Division
06/10/02.
6. Incidentals Sign Post Number 20 3519.001 70380.02 3519.00 70,380.00
44 Division
06/05/01.
6. Incidentals Road Marking, Thermoplastic Material (5mm avg, thickness). Sqm 48 1188.001 57024.05 1188.00 57,024.00
45 Division
06/15/01.
6. Incidentals Concrete Guide Post (1.6m long, 200mm dia) No 120 2313.001 277560.12 2313.00 277,560.00
46 Division
''Item
6. Incidentals Sand
code B.W.D.B. cement new gunny bag (75 kg, sand cement 8.1))
40-660-30'' No 32303 249.191 8049616.87 249.19 8,049,584.57
47 Division
''PWD
6. Incidentals ''Milinimum
RSoR 2022 Item 15.2'' 12 mm thict comenl sand (F.M. '1.2) plaster wilh neal cemenl finishing lo plinth wall with cement (1:4) up lo 150 mm Sqm 230 340.001 78200.23 340.00 78,200.00
below ground lovel including washing of sand, linishing the edges and corne6 and cLring al least for 7 days, mst of water,
olsctricity, scaffolding and other charges etc- all cofiplele n all respecl as per drawing and accepted by he Engineer-in-charge.
(Cement CEMIUB-M)
ground floor'' 0.001 0.00 -
48 Division
''PWD
6. Incidentals Dismantling
SoR 2022 Item 03.4.6'' of plain concrtete made pf lime or cement including anu thin finishing ?.ete all cxomplete as per Engineer -in- Cum 10.72 2408.001 25813.77 2408.00 25,813.76
Charge.
49 Division
''PWD
6. Incidentals Dismantling
SoR 2022 Item 03.4.7'' of Brick flat soling by manual means cleaning the surface by soft ?.ete all cxomplete as per Engineer -in-Charge. Sqm 107.2 34.001 3644.91 34.00 3,644.80

50 Division
''PWD
6. Incidentals
SoR 2022 ItemDismantling
03.5.1'' of RC foundation , Foundation beam, Grade Beam including any plaster ?. ?.ete all cxomplete as per Engineer -in- Cum 96.48 4767.001 459920.26 4767.00 459,920.16
Charge.
51 Division
''PWD
6. Incidentals
SoR 2022 ItemDismantling
03.5.2'' of RC Beam, Lintel, Tie Beam, Column , Wall, Drop wall Railing including any plaster ?. ?.ete all cxomplete as per Cum 109.63 5200.001 570076.11 5200.00 570,076.00
Engineer -in-Charge.
52 Division
''PWD
6. Incidentals
SoR 2022 ItemSupplying 50mm inside dia best Quality uPVC ... etc all complete (As per attached approved drawing) as per direction of
No 26.43'' Lin.m 56 541.001 30296.06 541.00 30,296.00
Engineer - in - charge.
53 Division
'Special -1 (AnalysisProviding
6. Incidentals 100 mm
Rate following PWDdiaSoR
GI Pipe Railing
2022 with16
approved mm thick MS plate , Nut and Bolts with Required welding and synthetic enamel
Rate)'' Lin.m 92 3671.001 337732.09 3671.00 337,732.00
painting including loading , unloading carrying, fitting and fixing etc all complete (As per attached approved drawing) as per
direction of Engineer - in - charge.
Total 107647913.050 Total 107,006,838.10

Defference 0.000 APP 107,658,000.00


Office estm. 107,647,913.050

10% Less 96,883,121.745

Deff B2in Office and ratecode 641,074.950