Professional Documents
Culture Documents
Columns
Columns
Project :
Contractor :
Tower / Villa :
Location/grid :
Date of Checking :
A STARTER
B SHUTTERING
13 Check level/Height
14 Center Lines Checked
1
21 Whether extra supports required, Specify location
Check for the Dimensions of the column on the Top, Middle and
28
Bottom
Check for the Arrangement of the curing with Hessian cloth and
29
Marking of the date