SHUTTERING & REINFORCEMENT CHECK LIST - Column

Project :

Contractor :

Tower / Villa :

Ref Drawing No. :

Location/grid :

Date of Checking :

Quantity Required Quantity Consumed Strength Acheived for 7days / Required


Item of Work : Column Reinforcement & Shuttering
S.No Description Of Item YES N/A Remarks

A STARTER

Check for Column Starter alignment, finishing, shear key, (Grade


of concrete should be equal or more than the Grade of Column
concrete)
B REINFORCEMENT
1 Check for the reinforcement dia as per drawing

2 Check for the spacing as per drawing


Have laps provided as per drawing/standards(at centre half of
3 column length and not more than 50% of bars shall be spliced at
one section)
Check Whether Sufficient cover provided/ Cover Blocks for
4
designed concrete strength are provided

5 Check reinforcement tied properly


Check Whether the sufficient bearing provided for beam and slab
6
reinforcement
7 Check Whether the reinforcement tested and passed

8 Check for the grade of the Steel

9 Check for column Reinforcement Reduction / Extension

B SHUTTERING

10 Check Whether proper access provided

11 Check for the quality of form work

12 Check for number of repetions of ply wood and thickness.

13 Check level/Height
14 Center Lines Checked

15 Check Dimensions as per Architectural drawing

16 Check for alignment

17 Check for Verticality

18 Check for the Diagonal

19 Check supports are adequately provided

20 Check the Rigidity of support

1
21 Whether extra supports required, Specify location

22 Check insert plates and embedment

C CONCRETE POUR CARD

23 Check for the grade of the concrete

24 Check for the Slump

25 Check for the availability of the Vibrator

26 Check whether the Cubes are taken as per the requirement

D POST CONCRETE CHECKING

27 Check of the Dimensions of the Column

Check for the Dimensions of the column on the Top, Middle and
28
Bottom

Check for the Arrangement of the curing with Hessian cloth and
29
Marking of the date

30 Check for line, level and plumb of the Column

31 Check for the proper Cleaning of the reinforcement

32 Check for the Shear key's

33 Check for Finishing/Any Honey combs


Comments:

CONTRACTOR ENGINEER SITE ENGINEER QC- ENGINEER P.M/ SITE INCHARGE