CHECKLIST FOR DURING AND AFTER TILES LAYING WORK

Project :

Contractor :

Tower / Villa :

Ref Drawing No. :

Location/grid :

Date of Checking :

Check for Test Report Quantity Required Quantity Consumed


Before Tiles Laying
SL No. DESCRIPTION YES NO REMARKS
1 Check the floor surface whether concrete
lumps chipped and cleaned and wet the floor
properly.
2 Check for all masion works completion, Putty
Base coat finishings done
3 Check for all floor conduits and wiring
completion
4 Check for Drainage pipes Installation.
5 Check for material Quality,Polishing, Design
and code finalised
6 Check for Drawing with site conditions for
material preparation
7 Check for levels and dimensions of FFL

During Tiles laying


4 Check for proper mixing and specified mortar
mix proportion .
5 Check for roughening of plaster bed.
6 Check for following during fixing of tiles a)
wetting of tiles.
b) wetting of surface
c) Pattern of fixing
d) Coat of cement slurry for fixing.
e) Thickness of joints between tiles.
f) True level of surface and plumb
g) True horizontal top tiles surface
h) Matching of tile joints
i) Finishing of edges for cut tiles
j) Right angles
k) Check whether skirting tile fix on flooring
tile with over lap of minimum 5mm or gap is
there.
L)Required slope in toilets into floor trap.
M)Regular shape cutting at electrical and
plumbings openings
POST CHECKING OF TILES WORK:
SL No. DESCRIPTION YES NO REMARKS
1 Check for flush pointing of joints with cement
or pigmented cement.
2 Check for cleaning of joints
3 Final check for pattern, plumb, right angles,
surface finish, level surface, etc.
4 Check for cleaning of Tiled surface.
5 Check for curing of tiled surface for specified
period
6 Check the all the tiles joints are in stright line
7 Check the tiles hollowness , specify no. of
tiles
8 Check for slopes
Non Confirmation report:-

Contractor Engineer Site Engineer QC Engineer P.M/Site Incharge.