This document provides a checklist for inspecting tile work during and after installation. It lists checks to perform before tiles are laid such as ensuring the floor surface is clean and concrete work is complete. It also includes checks during tile laying like proper mortar mixing and tile fixing patterns. Finally, it outlines post installation checks like flush pointing of joints and cleaning of the tiled surface. The goal is to ensure the tile work meets specifications and is properly installed and finished.
This document provides a checklist for inspecting tile work during and after installation. It lists checks to perform before tiles are laid such as ensuring the floor surface is clean and concrete work is complete. It also includes checks during tile laying like proper mortar mixing and tile fixing patterns. Finally, it outlines post installation checks like flush pointing of joints and cleaning of the tiled surface. The goal is to ensure the tile work meets specifications and is properly installed and finished.
This document provides a checklist for inspecting tile work during and after installation. It lists checks to perform before tiles are laid such as ensuring the floor surface is clean and concrete work is complete. It also includes checks during tile laying like proper mortar mixing and tile fixing patterns. Finally, it outlines post installation checks like flush pointing of joints and cleaning of the tiled surface. The goal is to ensure the tile work meets specifications and is properly installed and finished.
Check for Test Report Quantity Required Quantity Consumed
Before Tiles Laying SL No. DESCRIPTION YES NO REMARKS 1 Check the floor surface whether concrete lumps chipped and cleaned and wet the floor properly. 2 Check for all masion works completion, Putty Base coat finishings done 3 Check for all floor conduits and wiring completion 4 Check for Drainage pipes Installation. 5 Check for material Quality,Polishing, Design and code finalised 6 Check for Drawing with site conditions for material preparation 7 Check for levels and dimensions of FFL
During Tiles laying
4 Check for proper mixing and specified mortar mix proportion . 5 Check for roughening of plaster bed. 6 Check for following during fixing of tiles a) wetting of tiles. b) wetting of surface c) Pattern of fixing d) Coat of cement slurry for fixing. e) Thickness of joints between tiles. f) True level of surface and plumb g) True horizontal top tiles surface h) Matching of tile joints i) Finishing of edges for cut tiles j) Right angles k) Check whether skirting tile fix on flooring tile with over lap of minimum 5mm or gap is there. L)Required slope in toilets into floor trap. M)Regular shape cutting at electrical and plumbings openings POST CHECKING OF TILES WORK: SL No. DESCRIPTION YES NO REMARKS 1 Check for flush pointing of joints with cement or pigmented cement. 2 Check for cleaning of joints 3 Final check for pattern, plumb, right angles, surface finish, level surface, etc. 4 Check for cleaning of Tiled surface. 5 Check for curing of tiled surface for specified period 6 Check the all the tiles joints are in stright line 7 Check the tiles hollowness , specify no. of tiles 8 Check for slopes Non Confirmation report:-
Contractor Engineer Site Engineer QC Engineer P.M/Site Incharge.