The document outlines planned and completed construction works across multiple bridges and overpasses over a given time period. It lists the bridge name, location, planned works, and volume completed each week. A total of 27 construction items were planned for the month, with 15 completed between the 3rd and 16th of April.
The document outlines planned and completed construction works across multiple bridges and overpasses over a given time period. It lists the bridge name, location, planned works, and volume completed each week. A total of 27 construction items were planned for the month, with 15 completed between the 3rd and 16th of April.
The document outlines planned and completed construction works across multiple bridges and overpasses over a given time period. It lists the bridge name, location, planned works, and volume completed each week. A total of 27 construction items were planned for the month, with 15 completed between the 3rd and 16th of April.
works total 1 M1 BRIDGE km 45+208 Piles 88 2 M1 BRIDGE km 45+208 Foundations 12 3 M1 BRIDGE km 45+208 Middle piers 12 4 M4 BRIDGE km 50+816 Pedestrian walkways 4 5 M5 OVERPASS km 51+438 transverse girders 4 6 M5 OVERPASS km 51+438 Bridge deck 1 7 M6 OVERPASS km 54+014 Middle Piers 2 8 M6 OVERPASS km 54+014 Precast girders 18 9 M6 OVERPASS km 54+014 Bearing beams 4 10 M7 OVERPASS km 56+354 Pedestrian walkways 2 11 M9 OVERPASS km 58+170 Transition slabs 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 32 33 Volume of planned works in Volume of executed production from April 3rd of April to 30th of April 20 19 3 1 2 2 4 4 4 1 1 1 1 1 2 2 1 2 Volume of executed production from 10th of Description of executed production from 10th of April to April to 16th of April 16th of April 4 Concreted 4 piles. 1 Concreted 1 foundation