RISK / IMPACT ASSESSMENT

CONTROL SHEET

Contract No. HFM-Q-0994-09-23


Project Title 200mm Headwall Removal at DIC
RA Reference RA/0994/09/23/HJ
RA Date 08/09/2023
RA Revision No.
‫٭‬Scope / Activity 200mm Headwall Removal at DIC

SEVERITY RATING: MATRIX


Please Note
If the severity rating lies between 4 to 25, then corrective actions needs to
People/Equipment/Production be taken by concerned persons with documentary evidence provided in
conjunction with WI HSE 07 and 45
Health Safety Loss & Environmental Impact
Probability (P)
OH&S Environmental 1 2 3 4 5
1 1 2 3 4 5

Severity (S)
1-3 Acceptable Low – L Minor / <3 Days Injury Minor 2 2 4 6 8 10
4-9 Before task commences Medium - M Moderate / >3 Days Injury Moderate 3 3 6 9 12 15
Major / Permanent Disability
10-16 Before task commences High - H Injury Major 4 4 8 12 16 20
20-25 Immediate Very High - VH Catastrophic / Fatality Catastrophic 5 5 10 15 20 25
Working group Designation May Very
Unlikely Likely Certain or Imminent
Happen Likely
Fill in & enclosed herewith WI HSE 07 and 45
Note: *Mandatory

Verified by: Approved by:


HSE Officer : Client

Saim Ali Signature :___________Date 08/09/2023 Name:______________________Signature:_____________Date: / /

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 1 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET

‫ ٭‬Scope / Activity: 200mm Headwall Removal at DIC Risk Assessment Date 08/09/2023

Severity
Control Measures Residual Risk Monitored By
of Risk
No. Hazard /Aspect Risk / Impact People at Risk

H&S H&S
H&S Environmental

Ergonomic – Training on how to avoid Detect and expose the


Repetitive Motion ergonomic risks, Ability to vary under-ground services
Engineering
Injuries, working from workers position i.e. chair height, prior to machine

LOW
and staff Site Supervisor/Site

HIGH
01 Engineering Services a fixed position for work surfaces angles etc. Ability excavation. PTW, craft
associated with Rep
prolonged periods of to take breaks as needed to Training, System in
this work
time alleviate stress place for disposal of
contaminated earth.

Where possible utilize


mechanical means to
move large materials
1. Training regarding good lifting
Stress good lifting
techniques and how to recognize
From erecting techniques during tools
Workers as your own limitations.
hoardings, traffic box talk prior to and

HIGH

LOW
signed as 2. Team work if it looks like two or Site Supervisor/Site
02 Site Preparation barriers, barricades during this project. This
material even three workers would do the Rep
and posting safety training should include
handlers job more effectively and safe
signage lifting with the legs while
than one, then that is probably
keeping the back
true.
straight and keeping the
load as close the body
as possible
All personnel to be fully briefed
Unfamiliar with site
Damage to the on task & Risk Assessment, TBT
property, Injury (tool box tool) should be

LOW
situation, roles & re – Site Supervisor/Site
HIGH

03 Workers conducting prior to start the task


possibilities, process to work Rep
& must cover emergency
steps involved in the task
personnel. preparedness. IMS induction to
be given to all staff

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 2 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET

MEDIUM
Use mechanical aid for handling

LOW
Site Supervisor/Site
04 Manual Handling Personal Injury Workers materials Tool Box Talk use of
Rep
appropriate PPE

Full time skilled and experienced Site Supervisor/Site

MEDIUM
Improper barricading and Property supervision in the work All activities should be

LOW
Workers Rep
05 closure of area during damage/serious injury area .HSE assistant shall be carried out in the day
works present in the work area ,the area time busy hours to
should be properly cordon off and reduce noise.
closed
Wear proper PPE, Equipment
should be protection cover and
good working condition needs to

MEDIUM
Site Supervisor/Site

LOW
Construction Tools and Workers be check prior to application. Rep
06 accessories, Jack electrical cable and accessories
hammer, air compressor, Injury/sharp edge should be without damage and
& etc. plugging way should be proper,

Periodical maintenance and If any leakage identified


MEDIUM inspection shall be carried out the machine shall be Site Supervisor/Site
Poor maintenance of Property damage Workers every month. Visual checks shall moved to the Rep

LOW
07 machinery /serious injury/soil be done by operator daily prior to maintenance area. Spill
contamination start work. Defective plant or kit shall be used to
equipment shall be immediately clean up in case of any
stopped and rectified. spillage

Proper cleaning to be done at all


MEDIUM

Affect working Site Supervisor/Site


times, flammable material to be

LOW
Poor house keeping environmental, injury Workers Rep
08 to slips and trips regularly removed, material keep
hazard it designated storage areas.

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 3 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET

No person shall be
required to enter any
confined spaces unless
positive steps have
Inspection and tests as below been taken. Gas test at
Fatality. Severe injury Workers needs to be conducted and
Hazardous gasses atmosphere shall be
09 to body. Explosion, certified.
explosions and

MEDIUM
suffocation, fatality, done before and during

VERY
HIGH
environment. Lack of progress of work by Site Supervisor/Site
severe injury to body, Rep
oxygen Works supervisor to issue permit trained gas tester. All
death
after preventive. entry shall be controlled
by a permit to work
system specifying the
description of work and
hazard and should be
clearly understood and
followed.

Correct measures
Suffocation. Burns to Workers Nobody is allowed to enter until should have done. Gas

MEDIUM
Hazardous environment, body- fatality, coma the testing is over

VERY
HIGH
test at atmosphere shall Site Supervisor/Site
10 lack of oxygen less than and death be done before and Rep
19.5% and above 23.5%
Measures and checks have been during progress of work
done. by trained gas tester.

Space must be
Ensure that H2S Less than adequately well
Explosion, ventilated tested and

MEDIUM
Harmful gasses (H2S, 10ppm permissible exposure
VERY

suffocation, fatality,
HIGH

level 8hrs, Ventilation Fans to be certified for toxic Site Supervisor/Site


11 CO) reducing oxygen severe injury to body Workers
positioned such that they are allowable limits, Rep
level. from flames, coma,
effective. Supervisor to check if flammable atmosphere
death or oxygen level in the
ventilation is up to standard
air.

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 4 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET

Gas test at atmosphere


shall be done before
Oxygen readings to be taken on and during progress of

MEDIUM
work by trained gas

VERY
HIGH
a continuous basis. Site Supervisor/Site
12 Changing conditions. Suffocation Workers tester ensure that gases Rep
all allowable limit O2
Foreman to monitor. level, Toxic gas level,
LEL ,monitor 8hrs once
every day.

Not being able to Anyone entering


remove worker from confined space must
hazardous working Safety harnesses to be made wear safety

MEDIUM
area in time. Other Fatality. Workers available and used. harness/safety belt with

VERY
HIGH
Site Supervisor/Site
13 employees exposing life line and second Rep
themselves in attempt Foreman to check if this is done person as a standby to
to so do. and included in the procedure. assist him in case of
emergency.

A breathing apparatus
and oxygen resuscitator
Not using correct Fatality. Workers Users to be trained/instructed as should be made

MEDIUM
personal protective to use of equipment. available as standby.
VERY
HIGH
Site Supervisor/Site
14 equipment Rep
Foreman to comply with use
page instructions.

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 5 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET

First aider to be aware


of completeness

HIGH

LOW
Not receiving first aid Foreman to instruct and check if Site Supervisor/Site
15 Fatality. Workers procedures.
treatment immediately. a procedure is complied with. Rep

Entry in confined space


for a any purpose
The number of persons in the should be only
confined space should always be

MEDIUM
Knowing the amount considered when all

VERY
HIGH
known. reasonably practicable Site Supervisor/Site
16 workers in the confined Fatality. Workers
steps have been taken Rep
space at all times.
Supply first aider with register to deal with.
makes sure it is used.

No unauthorised

MEDIUM
Foreman might require persons to be allowed
VERY
HIGH
Untrained persons in barricading of work area. put all in working area. Ensure Site Supervisor/Site
17 Fatality. Workers
confined space. related warning signage around that people trained and Rep
working site yard. having valid safety
certificate.

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 6 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET

Check if equipment is useable Check if equipment is


and pressures are correct. useable and pressures

HIGH

LOW
Not having fire Fatality. Increases Site Supervisor/Site
18 Workers are correct. Expired
extinguishers available. injury to people. Rep
Foreman to check if all is in date need to be check.
order.

1.Isolate the power supply prior


to start the task
2. Wear appropriate PPEs.
3.non-electrical tools to be used
inside the Manholes
4. Fitter, contractors and
relevant others discuss
Electrocution / electrical safety before each job
Electrical shock / begins to ensure that relevant
Fire / Fatality. Fitter/ machinery, circuits etc. are

HIGH

LOW
Worker may suffer Workers isolated and locked off Site Supervisor/Site
19 Working with Electricity shock and burns throughout the job. Rep
injuries from faulty 5. Contractors told to inspect all
electrical equipment electrical appliances pre-use
or installation. and not to bring any equipment
on site where condition of
cables, switches etc. give rise
to concern.
6. Electrical installation and all
equipment (including machinery
in fitter’s workshop) is inspected
to a planned schedule.

Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 7 of 7