Risk / Impact Assessment Control Sheet: Severity Rating: Matrix
Risk / Impact Assessment Control Sheet: Severity Rating: Matrix
CONTROL SHEET
Severity (S)
1-3 Acceptable Low – L Minor / <3 Days Injury Minor 2 2 4 6 8 10
4-9 Before task commences Medium - M Moderate / >3 Days Injury Moderate 3 3 6 9 12 15
Major / Permanent Disability
10-16 Before task commences High - H Injury Major 4 4 8 12 16 20
20-25 Immediate Very High - VH Catastrophic / Fatality Catastrophic 5 5 10 15 20 25
Working group Designation May Very
Unlikely Likely Certain or Imminent
Happen Likely
Fill in & enclosed herewith WI HSE 07 and 45
Note: *Mandatory
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 1 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
٭Scope / Activity: 200mm Headwall Removal at DIC Risk Assessment Date 08/09/2023
Severity
Control Measures Residual Risk Monitored By
of Risk
No. Hazard /Aspect Risk / Impact People at Risk
H&S H&S
H&S Environmental
LOW
and staff Site Supervisor/Site
HIGH
01 Engineering Services a fixed position for work surfaces angles etc. Ability excavation. PTW, craft
associated with Rep
prolonged periods of to take breaks as needed to Training, System in
this work
time alleviate stress place for disposal of
contaminated earth.
HIGH
LOW
signed as 2. Team work if it looks like two or Site Supervisor/Site
02 Site Preparation barriers, barricades during this project. This
material even three workers would do the Rep
and posting safety training should include
handlers job more effectively and safe
signage lifting with the legs while
than one, then that is probably
keeping the back
true.
straight and keeping the
load as close the body
as possible
All personnel to be fully briefed
Unfamiliar with site
Damage to the on task & Risk Assessment, TBT
property, Injury (tool box tool) should be
LOW
situation, roles & re – Site Supervisor/Site
HIGH
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 2 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
MEDIUM
Use mechanical aid for handling
LOW
Site Supervisor/Site
04 Manual Handling Personal Injury Workers materials Tool Box Talk use of
Rep
appropriate PPE
MEDIUM
Improper barricading and Property supervision in the work All activities should be
LOW
Workers Rep
05 closure of area during damage/serious injury area .HSE assistant shall be carried out in the day
works present in the work area ,the area time busy hours to
should be properly cordon off and reduce noise.
closed
Wear proper PPE, Equipment
should be protection cover and
good working condition needs to
MEDIUM
Site Supervisor/Site
LOW
Construction Tools and Workers be check prior to application. Rep
06 accessories, Jack electrical cable and accessories
hammer, air compressor, Injury/sharp edge should be without damage and
& etc. plugging way should be proper,
LOW
07 machinery /serious injury/soil be done by operator daily prior to maintenance area. Spill
contamination start work. Defective plant or kit shall be used to
equipment shall be immediately clean up in case of any
stopped and rectified. spillage
LOW
Poor house keeping environmental, injury Workers Rep
08 to slips and trips regularly removed, material keep
hazard it designated storage areas.
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 3 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
No person shall be
required to enter any
confined spaces unless
positive steps have
Inspection and tests as below been taken. Gas test at
Fatality. Severe injury Workers needs to be conducted and
Hazardous gasses atmosphere shall be
09 to body. Explosion, certified.
explosions and
MEDIUM
suffocation, fatality, done before and during
VERY
HIGH
environment. Lack of progress of work by Site Supervisor/Site
severe injury to body, Rep
oxygen Works supervisor to issue permit trained gas tester. All
death
after preventive. entry shall be controlled
by a permit to work
system specifying the
description of work and
hazard and should be
clearly understood and
followed.
Correct measures
Suffocation. Burns to Workers Nobody is allowed to enter until should have done. Gas
MEDIUM
Hazardous environment, body- fatality, coma the testing is over
VERY
HIGH
test at atmosphere shall Site Supervisor/Site
10 lack of oxygen less than and death be done before and Rep
19.5% and above 23.5%
Measures and checks have been during progress of work
done. by trained gas tester.
Space must be
Ensure that H2S Less than adequately well
Explosion, ventilated tested and
MEDIUM
Harmful gasses (H2S, 10ppm permissible exposure
VERY
suffocation, fatality,
HIGH
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 4 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
MEDIUM
work by trained gas
VERY
HIGH
a continuous basis. Site Supervisor/Site
12 Changing conditions. Suffocation Workers tester ensure that gases Rep
all allowable limit O2
Foreman to monitor. level, Toxic gas level,
LEL ,monitor 8hrs once
every day.
MEDIUM
area in time. Other Fatality. Workers available and used. harness/safety belt with
VERY
HIGH
Site Supervisor/Site
13 employees exposing life line and second Rep
themselves in attempt Foreman to check if this is done person as a standby to
to so do. and included in the procedure. assist him in case of
emergency.
A breathing apparatus
and oxygen resuscitator
Not using correct Fatality. Workers Users to be trained/instructed as should be made
MEDIUM
personal protective to use of equipment. available as standby.
VERY
HIGH
Site Supervisor/Site
14 equipment Rep
Foreman to comply with use
page instructions.
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 5 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
HIGH
LOW
Not receiving first aid Foreman to instruct and check if Site Supervisor/Site
15 Fatality. Workers procedures.
treatment immediately. a procedure is complied with. Rep
MEDIUM
Knowing the amount considered when all
VERY
HIGH
known. reasonably practicable Site Supervisor/Site
16 workers in the confined Fatality. Workers
steps have been taken Rep
space at all times.
Supply first aider with register to deal with.
makes sure it is used.
No unauthorised
MEDIUM
Foreman might require persons to be allowed
VERY
HIGH
Untrained persons in barricading of work area. put all in working area. Ensure Site Supervisor/Site
17 Fatality. Workers
confined space. related warning signage around that people trained and Rep
working site yard. having valid safety
certificate.
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 6 of 7
RISK / IMPACT ASSESSMENT
CONTROL SHEET
HIGH
LOW
Not having fire Fatality. Increases Site Supervisor/Site
18 Workers are correct. Expired
extinguishers available. injury to people. Rep
Foreman to check if all is in date need to be check.
order.
HIGH
LOW
Worker may suffer Workers isolated and locked off Site Supervisor/Site
19 Working with Electricity shock and burns throughout the job. Rep
injuries from faulty 5. Contractors told to inspect all
electrical equipment electrical appliances pre-use
or installation. and not to bring any equipment
on site where condition of
cables, switches etc. give rise
to concern.
6. Electrical installation and all
equipment (including machinery
in fitter’s workshop) is inspected
to a planned schedule.
Document Name: Risk / Impact Assessment Control Sheet – 800mm Headwall Removal at Bur Dubai Page 7 of 7