This document contains summary information for two projects, including the project name and status, building type and location, energy and water savings, material savings, costs, and dates. Project one is an office building in Vietnam achieving 41.4% energy savings and project two is also an office in Vietnam achieving 4.56% energy savings. Key metrics provided include energy savings, water savings, embodied carbon and energy savings in materials, CO2 savings, costs, and dates for creation and last activity.
This document contains summary information for two projects, including the project name and status, building type and location, energy and water savings, material savings, costs, and dates. Project one is an office building in Vietnam achieving 41.4% energy savings and project two is also an office in Vietnam achieving 4.56% energy savings. Key metrics provided include energy savings, water savings, embodied carbon and energy savings in materials, CO2 savings, costs, and dates for creation and last activity.
This document contains summary information for two projects, including the project name and status, building type and location, energy and water savings, material savings, costs, and dates. Project one is an office building in Vietnam achieving 41.4% energy savings and project two is also an office in Vietnam achieving 4.56% energy savings. Key metrics provided include energy savings, water savings, embodied carbon and energy savings in materials, CO2 savings, costs, and dates for creation and last activity.
Subproject Name Project Name Project Status Auditor Name Certifier Building Type Country
Office IFC Office IFC Self-Review Office Vietnam
DfGE HUCE Oct2023 DfGE HUCE Oct2023 Self-Review Office Vietnam Version Number File Number Project Number Share with Bank(s) Energy Water Material v3.0.0 23102010175639 1001369494 Yes 41.40% 35.38% 38.00% v3.0.0 23101910175494 1001368135 Yes 4.56% 0.00% 1.00% Energy Savings(MWh/Year) Water Savings(m³/Year) Embodied Energy in Material Savings(GJ) 863.43 11549.14 20 0 Embodied Carbon in Material Savings(tCO₂e) CO2 Savings(tCO₂/Year) Total Project Floor Area(m²) 2713.16 726.36 3802 3.15 17.7 4000 Total Subroject Floor Area(m²) Total Building Construction Cost Total Building Construction Cost Unit 3802 64,151.00 Million VND 4000 67,491.90 Million VND Incremental Cost Incremental Cost Unit Local Currency Unit Increase In Cost (%) Payback In Years 3,365,336.49 Million VND VND 5245.96% 1900-02-18 00:00 547.55 Million VND VND 0.81% 1900-01-17 12:00 Preliminary Created Date Post Construction Created Date Last Activity Last Opened 2023-10-20 23:42 10/21/2023 2:17 10/21/2023 2:03 2023-10-19 02:41 10/20/2023 0:01 10/19/2023 23:57