Project Details
Project Name Address Line1
Office IFC Office IFC
Number of Distinct Buildings Address Line2
0
Number of EDGE Subproject(s) associated City
1 VietNam
Total Project Floor Area (m²) State/ Province
3,802 Office IFC
Project Owner Name Postal Code
Office IFC 000000
Project Owner Email Country
tuan1234@gmail.com Vietnam
Project Owner Phone Project Number
Mobile - 1001369494
Share project name and basic information to potential investors or banks? Do you intend to certify?
Yes No
Is this Project created for Training Purpose?
Yes
Associated Subproject(s)
Total associated subprojects: 1
The complete list of Associated Subprojects is available in the last section of this document.
Subproject Details
Location
Country City
Vietnam Ha Noi
Building Type
Building Data
Operational Details
Default User Entry Default User Entry
Gross Internal Area (m²) Working Days (Days/Week)
10,000 3,802 5.00
No. of Floors Above Grade No. of Holidays (Days/Year)
10 6 24.00
No. of Floors Below Grade Hours of Operation (Hrs/Day)
2 0 8.00
Default (m²) User Entry (m²) Area with Exterior Lighting (m²)
3,000
Open Plan Office External Carparking Area (m²)
2,091.1 228
Private/Closed Office Water End Uses
380.2 Irrigated Area (m²)
Corridor
1,000
190.1 Swimming Pool Type (m²)
Conference Indoor Heated Pool and None
152.1 Outdoor Unheated Pool
Building Dimensions
Default Building Length (m) User Entry (m) Façade Area Exposed to Outside
Air (%)
North
12.8 0 100
North East
12.8 480 100
East
12.8 0 100
South East
12.8 600 100
South
12.8 0 100
South West
12.8 480 100
West
12.8 0 100
North West
12.8 600 100
Select Input Type Does the Building Design Include Purchased Chilled Water and Heating Supply
Simplified Inputs (District Cooling or Heating)?
None
Fuel Usage
Cost Input
Default User Entry Default User Entry
Hot Water Electricity (VND/kWh)
Electricity Electricity 1,394.46
Space Heating Diesel (VND/Lt)
Electricity Electricity 13,247.37
Generator Natural Gas (VND/kg)
Diesel Diesel 16,268.70
% of Electricity Generation Using LPG (VND/kg)
Diesel
16,268.70
5.00%
Coal (VND/kg)
Fuel Used for Cooking 1,882.5
Electricity Electricity
Fuel Oil (VND/Lt)
7,093.7
CO₂ Emissions Factor Water (VND/KL)
Default User Entry 12,782.55
Electricity (kg of CO₂/kWh)
Conversion from USD (VND/USD)
0.91 23,241.00
Diesel (kg of CO₂/kWh)
0.25
Natural Gas (kg of CO₂/kWh)
0.18
LPG (kg of CO₂/kWh)
0.24
Coal (kg of CO₂/kWh)
0.32
Fuel Oil (kg of CO₂/kWh)
0.25
Climate Data
Default User Entry Default User Entry
Temperature (˚C)
Default (Monthly Max.) User Entry (Monthly Max.) Default (Monthly Max.) User Entry (Monthly Max.)
Default (Monthly Min.) User Entry (Monthly Min.) Default (Monthly Min.) User Entry (Monthly Min.)
Climate Data
Default (Monthly Avg.) User Entry (Monthly Avg.) Default (Monthly Avg.) User Entry (Monthly Avg.)
EEM22 Efficient Lighting for Internal Areas EEM36 Carbon Offsets: 100% Annual Operational CO₂
WATER SAVINGS
Water Efficiency Measures 35.63% Meets EDGE Water Standard
WEM04* Efficient Water Closets for All Bathrooms: 6 L/High volume flush and 3 L/Low volume flush
U-Value Embodied
Improved Case Selection Building Material Proportion % Thickness (mm)
(W/m²·K) Carbon(kg/m²)
MEM01* Bottom Floor Construction Type 1 Concrete Slab | In-situ Reinforced 100 % 100 0.55
Base Case Material: Concrete Slab with >25% GGBS
Slab | In-situ Reinforced
Conventional Slab
Thickness : 100mm & Steel :
35kg/m²
MEM02* Intermediate Floor Type 1 Concrete Slab | In-situ Reinforced 100 % 100
Construction Conventional Slab
Base Case Material: Concrete
Slab | In-situ Reinforced
Conventional Slab
Thickness : 300mm & Steel :
35kg/m²
MEM04* Roof Construction Type 1 Default Base Case Material 100 % 100 0.41
Base Case Material : Concrete
Slab | In-situ Reinforced
Conventional Slab
Thickness : 300mm & Steel :
35kg/m²
MEM05* Exterior Walls Type 1 Brick Wall | Cored brick (25-40% 100 % 200 1.06
Base Case Material: Brick Wall voids) Exposed with Internal Plaster only
| Solid brick (0-25% voids) with
external and internal plaster
Thickness : 200mm
MEM06* Interior Walls Type 1 Brick Wall | Cored Brick (25-40% 100 % 100
Base Case Material : Brick voids) Exposed with no Plaster
Wall | Solid brick (0-25% voids)
with external and internal
plaster
U-Value Embodied
Improved Case Selection Building Material Proportion % Thickness (mm)
(W/m²·K) Carbon(kg/m²)
WEM01 Water-efficient Showerheads Plumbing drawings/specifications including make, model, and flow rate of the
showerhead(s); and
Manufacturer’s data sheets for the specified showerhead(s) confirming the flow rate at a
standard pressure of 3 bar.
WEM02 Water-efficient Faucets for all Plumbing drawings/specifications including make, model, and flow rate of the washbasin
Bathrooms faucet(s); and
Manufacturer’s data sheets for the specified faucet(s)/flow aerator(s) confirming the flow
rate at a standard pressure of 3 bar
WEM06 Water-efficient Bidet Plumbing drawings/specifications including make, model and flush volumes of water
closet(s); and
Manufacturer’s data sheets for water closet(s) with information on the flush volume of
the main and reduced flushes.
WEM07 Water-efficient Urinals Plumbing drawings/specifications including make, model and flush volume of the urinal
(s); and
Manufacturer’s data sheets for urinal(s) with information on the flush volume.
WEM13 Water-efficient Landscape Irrigation A landscape plan showing the zoning for plants and the type of plants used, highlighting
System native species and the irrigation system selected; and
Note that protected green areas cannot be counted towards landscaped area.
WEM15 Waste Water Treatment and A schematic layout of the system showing the plumbing including the dual plumbing
Recycling System lines; and
Manufacturer’s data sheets of the specified black water treatment plant; and
WEM16 Condensate Water Recovery Calculations for condensate water recovery specifying cooling load and water collected
in liters per day; and
Hydraulic layout showing the location and technology of the recovery, collection, and
reuse components.
EEM01 Window-to-Wall Ratio Calculation of “Glazing Area” and “Gross Exterior Wall Area” for each façade of the
building, and the average area-weighted WWR; and
All façade eleva on drawin s showin lazin dimensions and eneral buildin
dimensions.
EEM07 Green Roof Building plans highlighting the area of green roof; and
Section drawing(s) showing the layers of roof materials and soil depth; and
EEM09 Efficiency of Glass Manufacturer’s data sheets showing the seasonal average U-value for the window
(including glass and frame) and the solar heat gain coefficient (SHGC) of the glass and
frame types; and
EEM12 Ceiling Fans Mechanical and electrical layout drawings showing the location and number of ceiling
fans; and
Manufacturer’s data sheets showing the energy consumption and diameter of ceiling
fans selected.
EEM24 Lighting Controls Electrical layout drawings showing the location and type of all lighting controls; and
Lighting schedule listing the specifications for all controls, if applicable; and
EEM25 Skylights Building plans and sections showing the Daylight Zones with the location and size of
skylight(s) and any obstructions; and
Lighting plans showing the photosensitive lighting controls in the Daylight Zones.
EEM31 Smart Meters for Energy Electric drawings/specifications showing the make and model of the smart energy
meters and the connection with the electric system; and
MEM01 Bottom Floor Construction Floor sections showing the materials and thicknesses of the floor(s)
Building plans marking the area of major floor types if more than one type of floor is
present; and
Building plans marking the area of major floor types if more than one type of floor is
present; and
MEM03 Floor Finish Drawings showing the flooring specifications selected; and
Building plans highlighting the area of major flooring types if more than one type of
flooring is present; and
Bill of quantities with the specifications for the flooring materials clearly highlighted.
MEM04 Roof Construction Roof sections showing the materials and thicknesses of the roof(s); and
Building plans marking the area of major roof types if more than one type of roof is
present; and
Building plans or elevations highlighting the area of major external wall types if more
than one type of external wall is present; and
Bill of quantities with the specifications for the materials used for the walls clearly
highlighted.
Building plans or elevations highlighting the area of major internal wall types if more
than one type of internal wall is present; and
Bill of quantities with the specifications for the materials used for the walls clearly
highlighted.
MEM07 Window Frames Building elevations marking the window frame(s) specifications; or
A window schedule for the building showing the major window frame types if more than
one type of window frame is present; and
Bill of quantities with the specifications for the windows/window frames highlighted.
MEM08 Window Glazing Building elevations marking the window glass specifications; or
Bill of quantities with the specifications for the window glass highlighted.
MEM09 Roof Insulation Drawings marking the type(s) of insulation specified; and
Building plans marking the area of major insulation types if more than one type of
insulation is present; and
Bill of quantities with the specifications for the insulation materials highlighted.
MEM10 Wall Insulation Drawings marking the type(s) of insulation specified; and
Building plans marking the area of major insulation types if more than one type of
insulation is present; and
Bill of quantities with the specifications for the insulation materials highlighted.
MEM11 Floor Insulation Drawings marking the type(s) of insulation specified; and
Building plans marking the area of major insulation types if more than one type of
insulation is present; and
Bill of quantities with the specifications for the insulation materials highlighted.
Associated Subproject(s)