QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
Location : BR54/P2-DUO
Date of Inspection :
ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work
Name/Signature of
Designation: Date:
Contractor
Name/Signature of
Designation: Date:
Site QAQC
Name/Signature of
Designation: Date:
Supervising Consultant (SC)
Name/Signature of
MRL / ICE Designation: Date:
(OPTIONAL)
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
Location : BR54/P2-DUO
Date of Inspection :
ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work
Name/Signature of
Designation: Date:
Contractor
Name/Signature of
Designation: Date:
Site QAQC
Name/Signature of
Designation: Date:
Supervising Consultant (SC)
Name/Signature of
MRL / ICE Designation: Date:
(OPTIONAL)
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
Location : BR54/P2-DUO
ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work
Name/Signature of
Designation: Date:
Contractor
Name/Signature of
Designation: Date:
Site QAQC
Name/Signature of
Designation: Date:
Supervising Consultant (SC)
Name/Signature of
MRL / ICE Designation: Date:
(OPTIONAL)
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
Location : BR54/P2-DUO
Date of Inspection :
ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work
Name/Signature of
Designation: Date:
Contractor
Name/Signature of
Designation: Date:
Site QAQC
Name/Signature of
Designation: Date:
Supervising Consultant (SC)
Name/Signature of
MRL / ICE Designation: Date:
(OPTIONAL)
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
Location : BR54/P2-DUO
Date of Inspection :
Remove all pin shaft at rear spreader beam at outer formwork sliding
3.2
beam
Remove all the front and rear cantilever beam and fit temporary on the
3.3
external formwork.
4.0 STEP 4
4.1 Check the hydraulic shifting device is good condition.
Start the advancing ,Push the hydraulic shifting device at the same time
4.2
to move the form traveller until final position.
Lifting the front fulcrum point using hydraulic jack and separate from the
4.3
top surface of the track.
4.4 Install the block and backing plate
4.5 Install and adjust anchor bar for main truss
5.0 STEP 5
Adjust the boom, set the elevation external formwork and bottom
5.1
formwork
5.2 Tie the web and bottom bars
5.3 M&E Conduit/pipe/opening Installed Checked
5.4 Move the internal formwork into oosltion and adiust the elevation
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work
Name/Signature of
Designation: Date:
Contractor
Name/Signature of
Designation: Date:
Site QAQC
Name/Signature of
Designation: Date:
Supervising Consultant (SC)
Name/Signature of
MRL / ICE Designation: Date:
(OPTIONAL)
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
Location : BR54/P2-DUO
Date of Inspection :
The shaft and the hoist are slowly lowered, and the external formwork ls
2.7
dropped to the ground.
2.8 Remove truss connection bolt and using crane to lift too beam.
Install temporary support to hold main truss with scaffolding or bracing
2.9
strut
2.10 Remove horizontal connection between 2 main truss.
2.11 Remove the main truss
2.12 Remove tie down bar and bottom track beam.
Reason for Failure / Re-inspection
QUALITY CONTROL
SITE INSPECTION CHECKLIST
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev: 01
Construction Process: Cast In-Situ Segmental Box Girder Bridge Page 1
ALLOWED to proceed with the next stage of work NOT ALLOWED to proceed with the next stage of work
Name/Signature of
Designation: Date:
Contractor
Name/Signature of
Designation: Date:
Site QAQC
Name/Signature of
Designation: Date:
Supervising Consultant (SC)
Name/Signature of
MRL / ICE Designation: Date:
(OPTIONAL)
CONSTRUCTION RECORD SHEET
EAST COAST RAIL LINK (ECRL) PROJECT
Method Statement Ref No: ECRL-S3-BR-MS-0015 Rev:
Construction Process: Formwork Page
Type of formwork
Material
Level of formwork(mm)
Formwork dimension(mm)
Formwork verticality
Cleanliness
Design
Curing Date Start End
Strength(N/mm2)
Temperature Record
Earthing Name
Location/Chainage: Date:
Structure/
Element/Construction
Process:
1 Pre-Concreting
2 During Concreting
3 Post-Concreting