2018 = 150.00 m3/s Q1 = 261.

91 m3/s
No Description Unit
Stage-1 Stage-2 Stage-1 Stage-2
1 2 3 4 5 6 7
1 Flood discharge m3/s 150.00 150.00 261.91 261.91
2 Flood water level m +767.39 +770.10 +767.95 +772.74
3 River bed level m +765.50 +765.50 +765.50 +765.50
4 Water Depth m 1.89 4.60 2.45 7.24
5 Freeboard m 1.00 1.00 1.00 1.00
6 Cofferdam height m 2.90 5.70 3.50 8.30

River Flood Recapitulation for Cofferdam Design


2018 = 150.00 m3/s Q1 = 261.91 m3/s
No Description Unit
Stage-1 Stage-2 Stage-1 Stage-2
1 2 3 4 5 6 7
1 Flood discharge m3/s 150.00 150.00 261.91 261.91
2 Flood water level m +767.39 +771.97 +767.95 +773.78
3 River bed level m +765.50 +765.50 +765.50 +765.50
4 Settling Basin Spillway level m
5 Water Depth m 1.89 6.47 2.45 8.28
6 Freeboard m 1.00 1.00 1.00 1.00
7 Cofferdam height m 2.90 7.50 3.50 9.30
Note:
1. Intake Gate, Maintenance gate, and Scouring Gate Construction as Stage-1
2. Weir Construction as Stage-2
3. At the first stage, river flood flow through the river right side of the cofferdam of the Intake Gate, Maintenance Ga
At this stage, the width of the river side approx 25m
4. At the second stage, river flood run through the Intake Gate, Maintenance Gate, and Scouring gate
At this stage, the river flood flow depend on only to Intake Gate, Maintenance Gate, and Scouring Gate discharge c
5. Compare to this two stage, the critical stage is the second stage, which the discharge capacity is the lowest
Due to above condition, the basic design of cofferdam height is the second stage as the above table
Q2 = 327.39 m3/s Settling Basin
Stage-1 Stage-2 2018 Q1 Q2
8 9 10 11 12
327.98 327.98 150.00 261.91 327.98
+768.21 +775.27 +770.95 +771.49 +771.76
+765.50 +765.50 +764.50 +764.50 +764.50
2.71 9.77 6.45 6.99 7.26
1.00 1.00
3.80 10.80

Settling Basin
2018 Q1
8 9
150.00 261.91
+771.30 +772.25

+770.00 +770.00
1.30 2.25

of the Intake Gate, Maintenance Gate, and Scouring Gate construction work area

e, and Scouring gate


Gate, and Scouring Gate discharge capacity
harge capacity is the lowest
e as the above table

You might also like