Construction Method Statement
Wynn Palace Project (Macau)
| C2604
Method Statement
For Red roof & External Fagade GRC
Prepared by: Yee Wai Ping (ie |
Safety Officer - LCAL Date 2/f/2m0 |
Reviewed by: Terence Leung She :
Supervisor - LCAL Date Sb AU& sooo
Approved by: Simon Watson Se
Project Leader - LCAL Date \ea\20eo
Construction Method Statement
LEIGHT
CONTENTS
4. Scope
1.4 Limitations
2. References
3. Programme
4, Leighton/Subcontractor Details
5. Construction Method and Sequence of Works
6. Construction Risk Assessment
7. Quantities and Resources
8. Class One Risk Summary
Rennes
oioc
4, SCOPE
4A.
GOuerue secs
oar evouenn
This method statement outlines the Cleaning Works at the Red roof Awning Paint system &
External Facade GRC. The installation work will follow the approved shop drawings and this,
installation method statement.
Limitations:
The content of this document will be subject to review during the course of the works after
60 days of the commencement of works and may be amended if so required to suit actual
site conditions. Any change of scope shall be reassessed to identify new risks associated
to the works.
38 CIMICIN
Construction Method Statement
2. REFERENCE
The installation works for Cleaning Works at the Red roof Awning Paint system & External
Facade GRC will be in full compliance with the Construction Drawings, Project
Specifications, and other relevant specifications relating to this work
3. PROGRAMME
‘The works are scheduled to commence in September 2020.
(Please see attached)
4, LEIGHTON/SUBCONTRACTOR DETAILS
{Name Position Contact No. |
‘Simon Watson _| Project Leader | | 66125503 |
Terence Leung | Supervisor Leighton | 66952931
Yee WaiPing _| Safety Officer Leighton 68721360
| Jason Wong _ ‘Person in-charge | Mei Cheong 66557338
| (subcontractor)
Poe 38 CIMICEM
Construction Method Statement
5. CONSTRUCTION METHOD AND SEQUENCE OF WORKS
Procedures of cleaning work
1, Scaffold platform erection in the work location
2. Transport tool and materials to the work location
3. Personal protective equipment ( Safety Helmet, Safety Harness, Protective gloves,
eye protector) will be worn by workers
Install the protection
Use dry cloth to wipe away dust and dirt
Use mild detergent with water to remove debris, or foreign materials
Noos
For damp areas with fungus or algae on the coating will be removed with mild detergent
and small brush/ sponge for vigorous cleaning,
8. Rinse the area thoroughly afterward
9. Use dry cloth to wipe away the remaining water drops
10. Final finishing by powered polisher
11. Carry out the final cleaning by using water and cloth
12. Final cleaning and removal of protection
13. Handover inspection with Client representatives.
6. CONSTRUCTION RISK ASSESSMENT
Construction risk assessment (CRA) describes sequentially the operational tasks along
with the associated risks and their corresponding mitigating control measures to be
implemented for the works. ( Please see attachement )i
Construction Method Statement
7. QUANTITIES AND RESOURCES
Provide details in the table below:
aah aes
Foreman
4 days
Laborer
aes al
Powered Polisher
‘Scaffold Working Platform 1 ‘4 days
Tere CUE |
SWIPE (Cleaning detergent) , cloth, sponge 2days
Fear = CIMICConstruction Method Statement
8. CLASS ONE RISK SUMMARY.
The information below is a high level summary only. See the related Construction Risk Assessment (CRA) for further
details of the specific risks and hazards, and the proposed control measures.
[EGUUEIGHTON SAFETY DOCUMENTS Tia ESSEN TIALS TIN [== CLASS ONE PRACTICES [= COMMENTIDETALS IN]
se proper werk platform
v v When werkrg a Rag 0.
Werkng at Height ‘Seater
Pant and Equeeent v Peruse chek by foreman,
NA Na
Teoston & Hazarous Energies NA a
‘worn win Live Servces Hh. al
v (Check Before une of hand
etic! Werk foo
Task lation willbe ranged
Fines For Work ie ferpreventon atreat sess
TLIPOTENTIRURISKS! Contra MERU Raman
‘Alseafol shal ba especiod and cored by GP. Alworkers
‘must wea uted hares wit doubo lanyard cpp on
Falitom Heiont {nor pint when werag on Mh ve pate / ea
“Rworars shat be Waied io use pope’ marwathanding | — 5
‘mathed and supervise by eramen dara work
Marval Handg - ss
a ~ | ana toi shat b propo stored tol boro contain
Baricaded werks area and ipsy warning sign provert
Hand Toots Gnautorzes entance,
End