Employer: Ethiopian Roads Authority Consultant: Highway Engineers &co Contractor: SUR CONSTRUCTION p.l.
TESTING OF MATERIALS
The following laboratory activities have been performed during the month under review
sampling
Existing road subgrade material quality checking
The following construction material samples are made up to the end of march 2014.
2 Subgrade EXISTING SUB GRADE IN SITU 5+480-5+600 F/W 11/03/2014 For checking the material quality
3 Subgrade EXISTING SUB GRADE IN SITU 5+700-5+820 F/W 11/03/2014 For checking the material quality
4 Borrow material for Embankment fill 10+600 RHS(250M) 17/03/2014 For checking the material quality
Subgrade material quality test, proctor and C.B.R tests have been performed.
REMARK : For all sammery test result detailed summery result be found in the appendix.
18
Contractor: SUR CONSTRUCTION p.l.c.
18
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
Employer: Ethiopian Roads Authorit Consultant: Highway Engineers &consul Contractor: SUR CONSTRUCTION p.l.c.
No.
No. Kinds of test of test Remark
Embankment 16 16 0 Pass=100%
REMARK : For all sammery test result detailed summery result be found in the appendix.
19
19
ONSTRUCTION p.l.c.
19
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
Employer: Ethiopian Roads Authority Consultant: Highway Engineers &consultan Contractor: SUR CONSTRUCTION p.l.c.
Type of Slump
Date tested Concrete (mm) 28 days Remark
REMARK : For all sammery test result detailed summery result be found in the appendix.
20
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
Employer: Ethiopian Roads Authority Consultant: Highway Engineers &consult Contractor: SUR CONSTRUCTION
TESTING OF MATERIALS
The following laboratory activities have been performed during the month under review
sampling
Existing road subgrade material quality checking
Opened borrow quality checking for subbase purpose
The following construction material samples are made up to the end of June.
4 Subgrade
5 Subgrade
6 Subgrade
7 Subgrade
8 Subgrade
Subgrade material quality test, proctor and C.B.R tests have been performed.
REMARK : For all sammery test result detailed summery result be found in the appendix.
SUR CONSTRUCTION p.l.c.
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
Employer: Ethiopian Roads Consultant: Highway Engineers &consultants /HEC /. Contractor: SUR CONSTRUCTION p.l.c.
TESTING OF MATERIALS
Mar-14
Summary of Sampling Made During the Month
N
Sampled station Type of material Purpose Remark
o.
1 84+000 LHS(100M) HIGLEY WEATHERED DECOMPOSED MATERIAL Embankment fill Pit opened by contractor
2 5+480-5+600 F/W Higley weathered with silty clay Existing bed To check the bearing capacity
3 5+700-5+820 F/W Higley weathered with silty clay Existing bed To check the bearing capacity
4 10+600 RHS(250M) HIGLEY WEATHERED DECOMPOSED MATERIAL Embankment fill Pit opened by ERA
5 8+860-9+120 F/W Higley weathered Existing bed To check the bearing capacity
6 46+130 LHS Uncrushed stone concerte work To check all the requird quality test
10
11
12
13
14
15
16
17
18
19
20
25 Red laterite with red clay Existing bed To check the bearing capacity
34 Red laterite with red clay Existing bed To check the bearing capacity
N
Sampled station Type of material Purpose Remark
o.
35 red calay with fine gravel Existing bed To check the bearing capacity
36 red calay with fine gravel Existing bed To check the bearing capacity
37 red calay with fine gravel Existing bed To check the bearing capacity
38 red calay with fine gravel Existing bed To check the bearing capacity
39 Red laterite with red clay Existing bed To check the bearing capacity
40 Red laterite with red clay Existing bed To check the bearing capacity
41 Red laterite with red clay Existing bed To check the bearing capacity
42 red calay with fine gravel Existing bed To check the bearing capacity
43 red calay with fine gravel Existing bed To check the bearing capacity
44 Red laterite with red clay Existing bed To check the bearing capacity
45 red calay with fine gravel Existing bed To check the bearing capacity
46 Red laterite with red clay Existing bed To check the bearing capacity
47 Red laterite with red clay Existing bed To check the bearing capacity
48 Red laterite with red clay Existing bed To check the bearing capacity
49 Red laterite with red clay Existing bed To check the bearing capacity
50 red calay with fine gravel Existing bed To check the bearing capacity
51 red calay with fine gravel Existing bed To check the bearing capacity
52 red calay with fine gravel Existing bed To check the bearing capacity
53 Red laterite with red clay Existing bed To check the bearing capacity
54 red calay with fine gravel Existing bed To check the bearing capacity
55 Red laterite with red clay Existing bed To check the bearing capacity
56 red calay with fine gravel Existing bed To check the bearing capacity
57 red calay with fine gravel Existing bed To check the bearing capacity
58 red calay with fine gravel Existing bed To check the bearing capacity
59 red calay with fine gravel Existing bed To check the bearing capacity
60 Red laterite with red clay Existing bed To check the bearing capacity
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
Employer: Ethiopian Roads Authority Consultant: Highway Engineers Contractor: SUR CONSTRUCTION p.l.c.
TESTING OF MATERIALS
March ~ 2014
Summary tests performed on the existing subgrade material
No.
No. Kinds of test of test Remark
Embankment - - - No activity
Subbase - - - No activity
Basecourse - - - No activity
No
No. Kinds of test of test Remark
No.
No. Kinds of test of test Remark
Employer: Ethiopian Roads Au Consultant: Highway Engineers &co Contractor: SUR CONSTRUCTION p.l.c.
TESTING OF MATERIALS
March ~ 2014
Summary tests performed on DBST & SST material
No.
No. Type of material tested Remark
of test
Prime coat [ MC ~ 30 ]
1
Bitumen [ MC ~ 3000 ]
2
Mineral aggregate
3
No.
No. Type of test Type of material tested pass Fail Remark
of test
Prime coat [ MC ~ 30 ]
1 Viscosity
Bitumen [ MC ~ 3000 ]
Employer: Ethiopian Roads Authority Consultant: Highw Contractor: SUR CONSTRUCTION p.l.c.
TESTING OF MATERIALS
March ~ 2014
Principal Materials With Total Quantities And Sources
Total
No Material Unit Source
requirement
ources
Status of tests
ok
ok
ok
ok
ok
ok
ok
ok
ok
will be tested
will be tested
will be tested
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
Employer: Ethiopian Roads Auth Consultant: Highway Engineers &c Contractor: SUR CONSTRUCTION p.l.c.
TESTING OF MATERIALS
March ~ 2014
Trial Mixes Performed during the month according to BS MIX ~ DESIGN METHOD
Compressive strength
TESTING OF MATERIALS
July ~ 2004
Concrete Aggregate, Sand & Stone Quality Tests summary
No.
No. Kinds of test Material type
of test
1 Losangeles abrasion
4 Flakiness index
5 Elongation
9 Water absorption
10 Mortar strength
11 Sieve analysis
12 Unit weight
13 Compressive strength
REMARK : -------------------------------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------------------
Contractor: SUR CONSTRUCTION p.l.c.
~ DESIGN METHOD
Remark
Remark
OSA
ests summary
Remark
------------------------------------------------------
----------------------------------------------------
----------------------------------------------------
DANSHA-ABDERAFI-MAYKADERA
ASPHALT ROAD PROJECT
TESTING OF MATERIALS
March ~ 2014
Summary tests performed on concrete structures
Specified limit Class " A " > 35 Mpa Class " C " > 19 Mpa
TESTING OF MATERIALS
25/06/2004 - 25 31
26/06/2004 - 25 29
27/06/2004 - 23 30
28/06/2004 - 25 31
29/06/2004 - 24 31
30/06/2004 14 24 30
1/7/2004 35 23 30
2/7/2004 64 24 30
3/7/2004 - 22 29
4/7/2004 14 23 29
5/7/2004 7 24 30
6/7/2004 8 23 29
7/7/2004 64 22 29
8/7/2004 12 23 28
9/7/2004 18 23 28
10/7/2004 3 24 29
11/7/2004 - 23 28
12/7/2004 17.7 22 29
13/7/2004 18 23 28
14/7/2004 3 22 29
15/7/2004 - 23 29
16/7/2004 - 23 29
17/7/2004 - 22 28
18/7/2004 14 23 29
19/7/2004 7 22 29
20/7/2004 14.5 23 29
21/7/2004 5 22 28
22/7/2004 19 23 29
23/7/2004 - 21 28
24/7/2004 - 22 29
25/7/2004 15.5 22 29
26/7/2004 14 22 28
27/7/2004 3.5 22 29
28/7/2004 3 20 33
TURE [ MAX/MIN ]
29/7/2004
30/7/2004
TEMPRATURE [ MAX/MIN ]
31/7/2004
TEMPRATURE VARIATION
35
30
25
20
15
10
DATE
25 0 25 31 6
26 0 25 29 4
27 0 23 30 7
28 0 25 31 6
29 0 24 31 7
30 14 24 30 6
1 35 23 30 7
2 64 24 30 6
3 0 22 29 7
4 14 23 29 6
5 7 24 30 6
6 8 23 29 6
7 64 22 29 7
8 12 23 28 5
9 18 23 28 5
10 3 24 29 5
11 0 23 28 5
12 17.7 22 29 7
13 18 23 28 5
14 3 22 29 7
15 0 23 29 6
16 0 23 29 6
17 0 22 28 6
18 14 23 29 6
19 7 22 29 7
20 14.5 23 29 6
21 5 22 28 6
22 19 23 29 6
23 0 21 28 7
24 0 22 29 7
25 15.5 22 29 7
26 14 22 28 6
27 3.5 22 29 7
28 3 20 33 13
RAIN FALL DATA
RAIN FALL [ MM ]
70
64 64
60
50
40
35
30
18 18 1
20 17.7
14 14 14 14.5
12
10 7 8 7
5
3 3
0
25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 2
DATE
19
14.5 15.5
14 14
7
5
3.5 3
0
6 17 18 19 20 21 22 23 24 25 26 27 28
MONTHELY WEATHER REPORT GRAPHICALLY
RAINY
23 DAYS
SUNNY
11 DAYS
TEMPERATURE [ MAX/MIN ]
TEMPERATURE VARIATION
40
30
20
10
0
25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
DATE
70
64 64
60
50
40 35
30
18 17.7 18 19
20
14 14 14 14.5 15.5 14
12
7 8 7
10
3 3 5 3.5 3
0
25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
DATE
10 7 7 5
3 3 3.5 3
0
25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
DATE
27 28
DANSHA-ABDERAFI-MAYKADERA