Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

CHANGE TO "495"

A A
CHANGE TO "80"

B B
REMOVE THESE
STRANDS

C C
CHANGE TO "4"

*
D D
CHANGE TO "60"

Show passive
reinforcement on the

File PlottedC:\SMCSW-TSE-Export\NIF - AFC ISSUE\NIF-BGE-DRG-ST-312120.dwg


section greyed out.
*
E E

Show the actual ferrules for


the epoxy mortar block

F F

* *

* *
* *
* *

Plot Date & Time22/01/2019 3:15:41 PM


G G

DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR


This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific
purpose and may not be used for any purpose other than the purpose intended by Transport for NSW.
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any KANGY ANGY
of the related information for any purpose other than the intended purpose. This drawing is protected by copyright MAIN NORTH LINE - 95.269km
and no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.

L.LUONGO 21.01.19
NEW INTERCITY FLEET MAINTENANCE FACILITY

Plotted by LUIGI.LUONGO
H DRAWN
ACCESS ROAD OVERBRIDGE SUPERSTRUCTURE H
DESIGNED R.PAN 21.01.19 PSC GIRDER REINFORCEMENT - SHEET 1
0 APPROVED FOR CONSTRUCTION R.P/21.01.19 D.F/21.01.19 M.I/21.01.19 DRG CHECK R.SAFARIAN 21.01.19 FILE No. NIF-BGE-DRG-ST-312120 SHEET: 1 OF 15 A1
AMD DESCRIPTION
DESIGNER VERIFIED APPROVED
DESIGN CHECK D.FRYIRS 21.01.19 STATUS: APPROVED FOR CONSTRUCTION C
SIGN./DATE SIGN./DATE SIGN./DATE DRG No. EDMS No.
CO-ORDINATE SYSTEM: MGA HEIGHT DATUM: AHD SCALE: 1:5 APPROVED M.ING 21.01.19 NIF-BGE-DRG-ST-312120 0 CV0698625 A
DF 801*554
APPROVED BY TfNSW: CCAN-18-129 DATED 21.01.19
1 2 3 4 5 6 7 8 9 10 11 12

You might also like