Details of GST & Seigneorage Charges which are not included in ECV but chargeable to estimate
As per G.O.Ms.No. 57, dated. 19.02.2008 of PR & RD (progs.II) Department, the GST component shall be added in each bill of the
contractors who opt for composition scheme and recovered. In respect of those contractors, who do not opt for composition scheme, the
GST component shall not be released with the bills and GST however shall be recovered and for the recovery made, a deduction
certificate will be issued based on which the contractor has to claim adjustment through their returns submitted to their respective
assessing authorities.
Per Unit
Agreement Quantity in figures of
Sl. No Description of Item APDSS No. Rate in Figures & words Amount
& words measure
ment
1 2 3 4 5 6 7
Earth work excavation and depositing on bank with initial lead of 10 meters and
initial lift of 2.00 in loamy and clayey soils like B.C. Soils, red earth & Ordinary Rupees Two
Fifty Six Point Gravel (SS 20-B) including shoring, strutting, sheeting, planking including cost of
APSS NO Hundred Thirty
1 56.69 Six Nine Cubic hire charges of T & P, labour charges, contractors profit and overhead charges 231.59 1 Cum 13129
308 One and Fifty
Metres Only etc., complete for finished item of work for foundation of buildings. (APSS No.
Nine Paise Only
308)
Plain Cement concrete (1:4:8) using size 40 mm HBG metal from an approved
quarry including cost and conveyance of allmaterials like cement, sand, coarse Rupees Five
Four Point Six aggregate, water etc., to site including machine mixing charges and curing Thousand Fifty
APSS NO
2 4.64 Four Cubic charges etc., complete including contractors profit and overhead charges for 402 5059.46 Nine and 1 Cum 23476
Metres Only finished item of work for foundation concrete. (APSS No.402) Fourty Six
Paise Only
Plain Cement concrete (1:5:10) using 40 mm size HBG metal from an approved
quarry including cost and conveyance of all materials like Cement, Sand, coarse Rupees Four
Eight Point One aggregate, water etc., to site including machine mixing charges and curing Thousand Nine
3 8.12 Two Cubic charges etc., complete including contractors profit and overhead charges for APSS 4904.11 Hundred Four 1 Cum 39821
Metres Only finished item of work for foundations and flooring bed. and Eleven
Paise Only
Brick Masonry in CM (1:6) with Non-modular traditional bricks of size 23 x 11 x 7 Rupees Seven
cm including cost and conveyance of all materials, all labour charges, curing Thousand Four
Five Point Five charges and contactors profit and ovehead charges etc complete for finished item
Hundred
4 5.54 Four Cubic of work for basement construction. APSS 7428.32 1 Cum 41153
Twenty Eight
Metres Only
and Thirty two
Paise Only
Filling in basement with HBG stone chips of 2.36 mm and below from approved
quarry/ available sources including all operational, incidenal, labour charges,
Rupees One
sales tax and other taxes, hire charges of T & P etc., complete (excluding rock)
Thousand Two
Sixty Eight Point in trenches, sides of foundations and basement with initial lead in layers not
APSS NO Hundred Ninty
5 68.11 One one Cubic exceeding 15 cm thick, consolidating each deposited layer by watering and 1292.83 1 Cum 88055
309 &310 Two and Eighty
Metres Only ramming including cost and cost and conveyance of water to site, contractors
Three Paise
profit and overhead charges etc., complete for finished item of work. (APSS NO.
Only
309 & 310) for finished item of work.
Reinforced Cement concrete (1:3:6) using 20 mm HBG Metal from an approved Rupees Eleven
quarry including cost and conveyance of allmaterials like Cement, Sand, coarse Thousand Nine
One Cubic aggregate, water etc., to site including machine mixing charges and curing Hundred
15 1.00 charges, lift charges and centring charges and including contractors profit and APSS 11917.78 1 Cum 11918
Metres Seventeen and
overhead charges etc., complete for finished item of work for dummy columns Seventy Eight
over ground floor roof slab. Paise Only
Providing impervious coat over RCC roof slab to required slopes with CM (1:3)
Rupees FIve
One Hundred prop. 20 mm thickness (average) mixed with water proofing compound @ 1Kg/1
Hundred Four
Four Point Seven bag of cement, laid over roof slab when it is green, finished smooth with a
16 104.74 APSS 504.78 and Seventy 1 Sqm 52871
Four Square floating coat of neat cement and thread lining at regular intervals of 45 cm x 45
cm including cost and conveyance of all materials and all labour charges etc., Eight Paise
Metres Only
complete for finished item of work (APSS No. 901 & 903). (CSSR). Only
Normal Plastering in CM (1:5) mix 12 mm thick single coat for superstructure for
Rupees Three
Seventy three internal and external walls with neat finish including cost and conveyance of all
APSS NO Hundred Eighty
and Nine One materials like cement, sand, water etc., to site, other taxes on all materials, all
21 73.91 operational, incidental such as scaffolding charges, lift charges, including cutting 901,903 & 381.11 One and 1 Sqm 28168
Square Metres
Only of grooves, finishing, curing, etc., complete for for finished item of work. (APSS 904 Eleven Paise
901, 903 & 904) (CSSR) Only
Providing 20 mm thick plain cement mortar bands in cement mortar (1:3) mix
upto 300 mm in width including cost and conveyance of all materials and all Rupees Thirty
Sixty Point
Eight and
22 60.36 Three Six Meters labour charges etc., complete for bottom of roof slabs projections and APSS 38.34 1 Mtr/ Cm 2314
sunshades botom including contractors profit and over head charges for finished Thirty Four
Only
item of work. Paise Only
Supply and fixing of best teak fully panelled door of size 1.52 m x 2.13 meters
including labour charges for wrought and put up including fixing of shutters in Rupees Thirty
position, fixing of necessary fixtures etc., for best teak wood fully panelled door Eight Seven
One Number external or internal including cost and conveyance of all materials, all labour APSS NO Hundred
23 1.00
Only charges, all fixtures and including contactors profit and ovehead charges etc., 1001 & 38711.99
Eleven and
1 No's 38712
complete for frames and shutters for finished item of work as per standard 1002 Ninty Nine
specifications (APSS NO.1001 & 1002) (CSSR) Paise Only
Painting to New iron work with two coats of ready mixed synthetic enamel paint
Grade-I first quality all shades over a base coat of red oxide primer making total 3
coats in all to give an even shade after thouroughly brushing the surface to
Seventeen Point APSS NO Rupees One
remove all remains of loose powdered materials, including cost and conveyance
28 17.55 Five Five Square 1201, 1207 181.00 Hundred Eighty 1 Sqm 3177
of all materials, site and other taxes, all operational, incidental and labour
Metres Only & 1212 One Only
charges and contactors profit and ovehead charges etc., complete for finished
item of work.. (APSS No.1201, 1207 & 1212) (CSSR)
Providing Flooring with double charged / multi charged stain free full body Rupees One
Seventy Seven porcelain vitrified tiles with double layer pigment of Size 600 x 600 mm and Thousand Two
Point Nine Nine thickness between 8-10 mm and 1st quality conforming to IS:13711, IS:13712, Hundred
29 77.99 APSS 1219.44 1 Sqm 95104
Square Metres IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs etc., Ninteen and
Only complete for finished item of work. Fourty Four
Paise Only
Providing skirting to internal walls with double charged / multi charged stain
free full body porcelain vitrified tiles with double layer pigment of Size 600 x 600
mm and thickness between 8-10 mm and 1st quality conforming to IS:13711, Rupees One
Three Point IS:13712, IS:13630 of any colour and finish in all shades and designs etc., Thousand Two
Three Nine complete, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey Hundred
30 3.39 APSS 1214.30 1 Sqm 4116
Square Metres like consistency spread at the rate of 3.30 kgs per sqm and jointed with white Fourteen and
Only cement paste mixed with pigment of matching shade to full depth, including cost Thirty Paise
of all materials like tiles, cement, sand and water etc., complete for finished Only
item of work.
Painting to new exterior walls with two coats of plastic Emulsion Paints Asian /
berger/ Nerolac or equavalent quality of approved shade over base coat of
cement primer grade 2 making total three coats in all to give an even shade after
Two Hundred thoroughly brushing the surface to remove all loose powdered materials, including Rupees Two
Fifty three and cost and conveyance of all materials, cost of brushes, water to site, etc., sales & Hundred
APSS NO
34 253.48 Four Eight other taxes, all operational, incidental and labour charges such as scaffolding 912 243.79 Fourty Three 1 Sqm 61796
Square Meters charges, lift charges, curing and contactors profit and ovehead charges etc., and Seventy
Only complete for finished item of work for External Walls.(APSS No. 912) Nine Paise Only
Supply and erecting fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab
with making the slab as original and including contractors profit and overhead Rupees Two
Eight Numbers charges etc., complete. Hundred Eighty
36 8.00 APSS 287.56 1 No's 2300
Only Seven and Fifty
Six Paise Only
Total 1993576