STATIC EVENTS

HANDBOOK
mBAJA & eBAJA
Static Events: Submissions
File File Submission
Event Documents File Name
Type Size Deadline
OEM Component cost 29th September
Google Form: https://bit.ly/OEMComponentCost2024
library 2023, 23:59 IST
.xlsx /
Report Template 5 MB TeamID_Cost Report.xlsx
.xls
Cost Event
Cost Documentation, Cost 1st November
PDF 10 MB TeamID_Cost Documentation.pdf
Overview 2023, 23:59 IST

Engineering Drawings PDF 10 MB TeamID_Engineering_Drawings.pdf

Team ID_Team
Design Report PDF 5 MB
Name_Design_Report.pdf
.xlsx / Team ID_Team
Design Spec. Sheet 5 MB
.xls Name_Spec_Sheet.xlsx 5th November
Design Event
Design Improvement Sheet Team ID_Team 2023, 23:59 IST
PDF 5 MB
(For Returning Teams) Name_Improve_Doc.pdf
.xlsx/ Team ID_Team
DVP&R and DFMEA 5 MB
.xls Name_DVP_DFMEA.xlsx

TeamID_Team Name_CAE 19th November


CAE Event CAE Report PDF 5 MB
Evaluation Report.pdf 2023, 23:59 IST

Go Green Event Team ID_Team Name_Go Green 25th November


Poster PDF 5 MB
(mBAJA teams) Poster.pdf 2023, 23:59 IST

TeamID_TeamName_SalesPresenta 30th November


Sales Event Sales Presentation PDF 5 MB
tion.pdf 2023, 23:59 IST

All Static Events Team ID_Team 30th November


Presentation of Each Event PDF 5 MB
PPTs Name_EventNamePresentation.pdf 2023, 23:59 IST

Virtual Static Presentation Details


Event Name Presentation & Evaluation Duration No. of Participants for Presentation
Cost Event 25 min Max - 5
Max - 12 ( 3 in each breakout room)
Design Event 35 min
Min - 4 ( 1 in each breakout room)
Go Green Event 25 min Max - 4
Sales Event 25 min Max - 4
Design Event
The objective of the engineering design event is to evaluate the engineering effort that went into the design of
the vehicle, how the engineering meets the intent of the market, and simulate real-world engineering design
projects and their related challenges.
Students will be judged on the creation of design specifications and the ability to meet those specifications,
computer-aided drafting, analysis, testing and development, manufacturability, serviceability, system
integration, and how the vehicle works together as a whole. Each of these parts of the engineering product
development cycle will be judged within the following subsystems: Vehicle Overview and Integration, Roll cage
& Ergonomics, Powertrain, Suspension, Steering & Brakes.

Scoring Pattern
Event Marks Phase
Design Report Evaluation & Design Presentation 100 Phase 2
Design Finals 30 Phase 3

Design Docket Submission Guidelines


Teams are required to follow the following procedure to submit the Design Docket to BAJA SAEINDIA.
https://bajasaeindia.org/team
Submission Link To be done on the BAJA SAEINDIA Website in the submission section in the team
profile.
Last Date of Submission 05th November 2023, 23:59 IST
Document Submission File Type File Name
Team ID_Team
Design Report Compulsory .pdf
Name_Design_Report.pdf
Design Specification Sheet Compulsory .xlsx Team ID_Team Name_Spec_Sheet.xlsx
Design Improvement Only for
.pdf Team ID_Team Name_Improve_Doc.pdf
Document Returning Teams
DVP&R and DFMEA Compulsory .xlsx Team ID_Team Name_DVP_DFMEA.xlsx

Note:
1) Refer to Rulebook - Article E.2: ENGINEERING DESIGN EVENT for details about the above-mentioned
documents.
2) No. of submissions: Only one response of Design Docket submitted by the team will be considered.
Subsequent submissions over mail will NOT be entertained/ considered. Hence teams are requested to
ensure they submit the final docket well before time to avoid inconveniences.
3) Any delays in submission of Design Docket will not be entertained and your Docket will not be considered
for evaluation.
Virtual Design Evaluation
 Design Evaluation will be carried out virtually over a Video Conferencing Platform during Phase – 2 of BAJA
SAEINDIA 2024.
 Teams will be assigned a panel-wise evaluation slot for the Design presentation. Slotting will be released
separately on the BAJA SAEINDIA Forum .
 Teams are requested to prepare accordingly and join the link 15 minutes prior to the slot timings. The link
will be sent to teams separately over mail. No request for slot change will be entertained if the team
misses their time slot.
 Teams need to join the Video Conferencing Platform link with the following name format:
 Team ID_Name_Domain Name (For example, 24001_Amit_Powertrain)
 Maximum No. of Students allowed: 12 (Max 3 members will be allowed in each breakout room)
 Minimum No. of Students allowed: 4 (Min 1 member for each breakout room)
 Breakout Rooms: Yes (4 breakout rooms)
 Duration: 40 minutes
 5 minutes for Setup & Introduction. (All members in the same room)
 25 minutes for sub-system presentation & QnA in 4 breakout rooms:
 Vehicle & Overall Packaging
 Roll Cage & Ergonomics
 Powertrain/Drivetrain
 Suspension, Steering & Brake
 5 minutes for feedback. (All members in the same room)
 5 minutes for changeover and scoring.
 4WD/AWD evaluation will be done along with the Powertrain sub-system presentation.
Design Report
 A maximum of 4 pages of text with 3 pages of drawings (Vehicle views- Front, Top & Side) & Annexure for
Design calculations (Limited to 10 Pages) are allowed in the Design report. There is an optional one page
provided to teams for images/photographs etc.
Virtual Design Presentation Guidelines
 Teams are expected (but not limited to) to capture the points mentioned in the table below. 
 Teams must submit the Phase 2 presentation PPT on BAJA SAEINDIA website. The presentation
should be the same as what teams are presenting during Phase 2.
 Deadline for Submission: 30th November 2023, 23:59 IST
 Font Style: Calibri
 Font Size: 14 or above
Note: Do not scale the page to fit, as this would reduce the effective Font size below 14.
Design Finals
 The top teams from the Design Evaluation conducted in Phase 2 will be shortlisted for the Design Finals
Round.
 The shortlisted teams will be evaluated for a total of 30 Bonus Marks.
 Design Finals will be conducted in Phase 3.
 Teams must present the same design as done in Phase 2 along with the vehicle.
 Any changes made in the final design of the vehicle, as compared to virtual design at the time of Phase-2
presentation, need to be documented with justification. This must follow the template released on the
BAJA SAEINDIA Forum and should be accompanied by your design report as an addendum and to be brought
to the event site during evaluation.

Section Slide No. Particulars


A Team Introduction

Vehicle Summary
B.1 Vehicle Objectives, Performance Targets; Features & Improvements, etc. – Slide 1
B B.2 Vehicle Objectives, Performance Targets; Features & Improvements, etc. – Slide 2
B.3 Vehicle Specifications; Vehicle Comparison
B.4 CAD Views – Front View, Side View, Top View & Isometric View

Breakout: Vehicle Overview and Integration (Specific)


C.1 Vehicle Integration - Objectives & Methodology
C.2 Exploded view of the vehicle
C.3 Lessons Learnt
C.4 Interface Requirements & Integration Improvements
C C.5 Assembly Sequence of complete vehicle & Design for Service
C.6 DFMEA/PFMEA
C.7 Design Validation
C.8 Cost & Weight Analysis
C.9 Project Timeline
C.10 Additional Slide

Breakout: Roll Cage & Ergonomics


D.1 Objectives, Performance Targets; Features & Improvements, etc.
D.2 Specifications; Design Comparison
D.3 Ergonomics
D.4 Computer-Aided Engineering Analysis – Slide 1
D D.5 Computer-Aided Engineering Analysis – Slide 2
D.6 Computer-Aided Engineering Analysis – Slide 3
D.7 Lessons Learnt; Design Validation
D.8 DFMEA/PFMEA
D.9 Additional Slide
D.10 Additional Slide
Breakout: Powertrain mBAJA
E.1 Objectives, Performance Targets; Features & Improvements, etc.
E.2 Specifications; Design Comparison; Design Matrix
E.3 Transmission System
E.4 AWD/4WD - layout & Features
E E.5 Traction Analysis
E.6 Virtual Vehicle Validation & Compliance
E.7 Lessons Learnt; Design Validation
E.8 DFMEA/PFMEA
E.9 Additional Slide
E.10 Additional Slide

Breakout: Powertrain eBAJA


E.1 Objectives, Performance Targets; Features & Improvements, etc.
E.2 Specifications; Design Comparison; Design Matrix
E.3 Powertrain/Transmission
E.4 2WD/AWD/4WD - layout & Features
E E.5 Traction Analysis, HLV Components Specifications
E.6 Virtual Vehicle Validation & Compliance
E.7 Lessons Learnt; Design Validation
E.8 DFMEA/PFMEA
E.9 GLV System & Component Analysis
E.10 Additional Slide

Breakout: Suspension, Steering & Brakes


F.1 Objectives, Performance Targets; Features & Improvements, etc.
F.2 Suspension System
F.3 Steering System
F.4 Suspension & Steering System: Specifications; Design Comparison; Design Matrix
F F.5 Suspension & Steering System – Lessons Learnt; Design Validation
F.6 Suspension & Steering System – DFMEA/PFMEA
F.7 Brakes System – Specifications; Design Comparison
F.8 Brakes System: Lessons Learnt; Design Validation
F.9 Brakes System – DFMEA/PFMEA
F.10 Additional Slide
Cost Event
Foreword:
In real life, preparing an accurate bill of materials and cost accounting gives Engineers clarity on the number
of components used, time taken for production, and calculation of cost per part. Such classification allows for
control of cost and ascertaining the profitability of processes which in turn helps make strategic decisions to
manufacture parts more efficiently.
The BAJA SAEINDIA’s cost event is an effort to put students through the same thought process and help students
learn the nuances of cost accounting and the benefits of maintaining a bill of materials in the product
development process.

Objective:
Cost is one of the most critical aspects of any commercial entity but the event here is to not only report
the most optimum cost of the component in the prototype or production stage but instead focus on how well
the team understands what has gone into their part and applying their learning of procurement and
manufacturing techniques to optimize the cost, labor, time, material wastage and various overhead costs.

Cost Event consists of two related sections:


1. Cost Report: The cost report provides all the background information to verify the vehicle’s actual cost
and also if the teams want to present any design features or fabrication processes that are innovative
or are expected to result in significant cost savings.
2. Prototype Cost: The prototype cost is the actual cost incurred in the fabrication of the vehicle and the
points related thereto.

Scoring pattern:
Event Marks Phase
Cost summary & cost saving techniques
25
Presentation Round Phase 2
Cost sheet evaluation 25
Cost finals 15 Phase 3

Cost Report (Required Submission):


The Cost Report may contain a maximum of Three sections:
Report Section 1 - Overview (Required):
This year, Cost overview submission is compulsory for all the teams. It is intended to allow each team to
point out, and briefly comment on, any design features or fabrication processes that are innovative or are
expected to result in significant cost savings. Teams may also use the overview to explain items or
processes that might appear to be discrepancies within the report. The overview section is limited to a
maximum of four (4) pages. This should be included as part of the Cost Documentation (.pdf) file.

Report Section 2 - Cost Documentation:


This section includes copies of receipts, invoices, price tags, catalogue pages, online prices, or other
documentation, to substantiate the costs of the parts and materials of any item costing more than Rs.200.
Cost documentation must be at full retail Indian prices. The use of foreign receipts, and purchases from
discount sites such as Craig's List, eBay, company brochure/pricelist or junk yards are not allowed. The
report is expected to be comprehensive, well-documented, truthful, and accurate.
Report Section 3 – Engineering drawings:
This section includes the Engineering drawings (2D) of the components which are fabricated by the team.
The drawing should consist of 3 basic views and important dimensions. The purpose of engineering
drawing is to check the understanding of teams for optimum raw material sizing and manufacturing
process selection. The drawing report should be composed sub-system-wise as given in the cost report
template.

Prototype Cost (Required Submission):


Costing Sheets:
The core of the report is the series of costing sheets. This section must contain the one-page summary
sheet broken up into the individual subsystems. A separate ‘ALL OEM sheet’ will contain all the procured
components except bearings and fasteners (bearings should be included in their respective sub-system
and all the fasteners should be included in the ‘Fasteners’ sheet). Each subsystem needs an individual
subassembly sheet which will include the fabricated parts.
Note:
 Vehicle Assembly Labor cost is for the labor it takes to assemble a subassembly to the frame.
 The sub-system assembly time is the time it takes to assemble all the parts in that assembly
together.
The team can download the costing sheet template from the BAJA SAEINDIA Forum. Using online platforms
such as Google Sheets / SharePoint may lead to errors. Hence teams should strictly use the MS Office Excel
Desktop app in offline mode to edit the Cost report template.

Refer to the instructions given in the costing sheet on how to fill the cost sheet.

OEM Component cost library:


 This year in the cost event, teams must use the cost of the OEM components mentioned in the cost
library.
 If any OEM component used by the team is not listed in the library, then the team shall fill up the
Google form released by BAJA SAEINDIA and provide the cost of that particular OEM Component with
appropriate bills in the required period. The team can fill out the Google form multiple times if 2 or
more OEM components are not listed in the library.
 If the component is already listed in the Cost library, then the team should not fill out the Google form
even if the price available at the team's end for any component is less than the price mentioned in the
library.
 The new cost report template with an updated OEM component cost library will be released at a later
stage.
 OEM cost will be automatically pulled in all OEM sheets.

Google form link: https://bit.ly/OEMComponentCost2024


Deadline: 29th September 2023, 11:59 pm IST

List of OEM Components strictly to be used from the Cost library:


 Suspension: Shock absorbers.
 Drive: Tires & Rims.
 Brakes: Calipers, Master cylinder.
 mBAJA Drivetrain: CVT, Engine, Fuel tank
 eBAJA Drivetrain: Battery HV, Motor, Controller, Throttle pedal


Note:
 Bills / Invoices of the above-mentioned OEM components are required.
 If any of the above components are designed and manufactured by the team, then it will not be
considered an OEM component.

For the OEM Component listed above, if any deviation is found between the cost mentioned in the cost
library and the cost given by the team, then the team will be penalized.
 This document should not be modified from its current form. This includes password protection and
embedding macros. Teams will receive zero (0) points for cost sheet evaluation if the report is in the
incorrect format or the files have been modified.

Penalties:
 If the judges find that the costing of some components is inadequate and unjustified where a team has
done some manipulation to reduce cost, the cost of the component whose costing is wrong will be made
3 times the actual cost projected by the teams and will be added to the summary cost.
Disclaimer: The cost of the above-mentioned OEM components in the library are indicative figures to have
uniformity amongst all the teams and should not be considered as an actual quote from the vendor / supplier.
The Supplier / Vendor names listed in the Cost library should not be considered as recommended vendors
from BAJA SAEINDIA.

Cost Component Categories:


Teams must put items that are specified in the correct component categories and subcategories or
the items will not be considered. See the Cost Template for more details on component categories.

Cost Report – Submission Format:

Submission Link https://bajasaeindia.org/team

Last Date of Submission 1st November 2023, 11:59 pm IST

Document Submission File Type File Name


Report Template Compulsory .xlsx/.xls TeamID_Cost Report.xlsx
Cost Documentation, Cost
Compulsory .pdf TeamID_Cost Documentation.pdf
Overview
Engineering Drawings Compulsory .pdf TeamID_Engineering_Drawings.pdf

Note: To be done on the BAJA SAEINDIA website in the submission section in the team profile.

The team should ensure that while submitting of report sheet it is in either .xls or .xlsx (no macros)
extension.

Phase 2 Presentation Guidelines


The presentation should include the following details:
 Summary and understanding of Cost breakup.
 Various cost-saving and optimization techniques used by the team.
 Application of Value engineering and value analysis principles in cost.


Points that can be included (but not limited to) in the presentation
• Sub-system-wise cost breakup with the chart or other visual
Summary and understanding representation
of cost breakup • Detail explanation of the cost split-up of each sub-system
• Cost comparison with the previous year’s vehicle (Old teams only)
 Justification of optimization techniques with graphs, engineering
drawings, and numbers
 Strategies for “Make or Buy” decision and supplier selection
Various cost-saving and
criteria
optimization techniques
 Techniques used to reduce material cost & labor cost
used by team
 Control of cost based on design and assembly
 Strategies used to efficiently manufacture the parts/components.

 Implementation of design for manufacturing and assembly (DFMA)


Value analysis and value  Optimization of BOM (Bill of Materials)
engineering (VAVE)  How cost reduction is done without compromising performance
and quality

Presentation Format:
 Teams have the flexibility regarding the format and pages of the presentation, but teams should
ensure that the presentation is explained within a 25-minute time period which includes
Presentation Setup, Introduction, Presentation, Q&A, and feedback by the judges.
 A maximum of 5 team members are allowed for the presentation which will be done virtually over
an online platform.
Cost Finals:
Cost Finals will be done during Phase 3 to evaluate the teams based on cost adjustments they might have
made during the fabrication of the vehicle.

Rules:
 Cost Finals will be evaluated separately in Phase 3 for 15 points.
 The top 10 teams each from mBAJA and eBAJA will be selected for Cost Finals, based on the
evaluation of the Costing sheet and presentation given by the team in phase 2. For aBAJA and
hBAJA it will be announced later.
 Teams will have to bring the costing sheet, cost documentation, and an additional cost adjustment
form, if applicable, to the event site for evaluation.
 Judges will evaluate the costing sheet along with the vehicle and any discrepancies found, that are
not reported in the cost adjustment form, will be penalized.
 Marks obtained in the Cost Final will be added to the overall score of the Cost Event.

Cost Adjustment form:


The purpose of the cost adjustment form is to make additions to the previously submitted report. Items
may be deleted, but the total adjustment for the individual component categories must be positive (cost
will not be subtracted). This gives the team the chance to add items that were not previously planned. It
is not an opportunity to redo the entire report.


 The total amount of adjustments may not exceed 10% of the total cost of the vehicle previously
submitted.
 If the adjustment exceeds 10%, the additional amount will be added with a multiplier of 2 times
(2x).
 If the adjustment exceeds 25%, the report will be considered incomplete and will not be graded.
 Teams need to bring a hard copy of the Cost Adjustment Form during the Cost Finals Event.

Judging Criteria (not limited to):


The costing sheet is to be judged based on its accuracy to the components reported and the team’s
understanding of the report. The report will be reviewed for cost accuracy regarding the material/process
tables and to ensure that the teams have followed all the procedures and report guidelines.
 Comprehensive reporting-Team must report all processes and parts utilized in the design.
 The team’s detailed explanation of the components used.
 Cost-effectiveness of part production technique/methods.
 The ability of the team to address and participate in discussion with the judges based on the
question raised by the panel.
 Implementation of manufacturing techniques that reduce the production lead time and efforts.
 Impact of the cost on design, Material Selection & rationale.
 Recyclability and Environmental Impacts.
 Ability to meet Engineering Specifications.
 Human factors considered, Cost per unit.


Sales Event
Foreword:

The Sales Presentation Event presents students with the opportunity to gain real-world experience in taking a
concept proposal and presenting it for support, be it funding or otherwise. This is a crucial skill because all
students will eventually need to present their ideas to the boardroom and compete with other organizations.

Its main goal is to provide pupils with an Entrepreneurial mindset so they may build their own ATVs. Students'
presentation abilities, creative thinking, managerial perspective, and business aptitude fundamentals like
forecasting, financing, marketing, management, etc. are tested in this engaging event, which also assesses their
knowledge of technical skills and hypotheses.

Objective:
The objective of the Sales Presentation is for the “Company” to convince the “Investors” of an investment firm
to invest in the company’s BAJA SAEINDIA vehicle design to put it into production at the rate of 4000 units per
year.

This "Company" should plan to organize its stall at an upcoming Trade Fair where it will be required to plan the
complete setup of its stall, promotional ideas, logistics, etc., and showcase its new concept and technological
ideas. (Short pitch for convincing both buyers and investors at trade fair)

Furthermore, the company is required to outline a mitigation strategy that ensures its continued sustainability
even in the event of encountering an unexpected scenario.

Here the “Company”, is the team, seeking funds from investors; the “Investors” are the judges. Teams should
assume themselves as various executives representing various verticals of a corporate entity including Finance,
Production, Marketing, Engineering, etc., and thus may not all be engineers.

The business plan of the Company should relate to the prototype of the buggy they have built for the
competition although the quality of the actual buggy would not be a part of the evaluation.


Points that can be included (but not limited to) in the presentation.
 Organization Details
Executive
 Company structure; Leadership Team
Summary
 Location of the production unit
 Product positioning, specifications, and features offered.
Products and  Customer Needs, Voice of Customer
Services  USPs
 Sales & Services offerings
 Total Available Market
 Serviceable Available Market
 Serviceable Obtainable Market
The Market
 Target Audience
 Competitor Analysis
 SWOT, PESTEL etc. Analysis
 In-house/Outsource
 Production Planning & Quality Control
Manufacturing  Supply Chain Management
Planning  Factory Setup Timelines
 Ramp up timelines
 Power Consumption
 Market value of Assets, Liabilities (Tangible & Intangible) with depreciation taken into account
Finance Model  Pricing Strategy
 Unit Economics: Materials, Machinery, Labour, CAC, Factory Lease/Power etc.
 Product Cost
Cash flow  Profit-loss Statement & Sales Forecasting (Revenues, EBITDA, Net Profit/Loss, etc.)
Analysis  Cash flow Statement
 Breakeven Analysis
 Go To Market strategy
Marketing
 Branding, Marketing campaigns
Strategy
 Distribution model(B2B, B2C, D2C)
 Funding Requirements & Allocation
 Risk Assessment & Mitigation
 Investment Breakdown
Investment
 Company Valuation with Calculation Method (DCF, Market Capitalization Method, Earning Multiplier
Analysis
etc.)
 Payback Period & ROI (XIGR, CAGR etc.)
 Exit Strategy
 Scenario Building: It is forecasting potential future situations and assessing their impact on the
business. As a result, it enables business management to proactively ready themselves for potential
Scenario challenges stemming from shifts in the prevailing circumstances.
building:  Examples:
Mitigation
o Spread of a global pandemic, leading to economic slowdown.
strategy for
o Natural Calamity at the factory location.
unforeseen
conditions
o Fuel Prices went up by a significant amount every quarter in last financial year.
o Less sales due to global recession.
o Segment change: Customers shifting to a different class of products altogether.
 Selection of Fair
 Promotional & Customer Engagement Ideas:
o Short Pitch/ AV for Visitors/ Potential Buyer
Trade Fair
o Games, Goodies, AR/VR Experience
 Converting Visitor to Buyer
 Trade Fair Financials; Stall rent & Setup, Personal Cost, Stall Running Cost


Scoring:
1. Presentation Content:
Sufficient details should be delivered to persuade the investors to invest in the company.Content includes,
but is not limited to the following areas of a business case:
 Establishing the current scenario of the company, organizational structure, and location of the
production unit.
 Understanding the market.
 Understanding Customer Requirements.
 Company Financials (Assets, Liabilities, P&L statements, Cash Flows, Margins)
 Investment Analysis
 Product positioning, pricing, and Marketing Strategy.
 Scenario building and mitigation strategy for unforeseen circumstances: Understanding of the
scenario, its impact on the business, and presenting ideal, best, and worst case business outcomes as
a result of the scenario. (Teams are expected to consider one scenario and present their content
accordingly.)
 Company Financials & Trade fair financials
 Project Schedule, Trade fair planning & logistics.
 Customer engagement, feedback, and promotional ideas for trade fair.
The proposal should be focused on the vehicle, but it may include ancillary proposals to supplement the
broader strategy. All components of the firm should be integrated into an overall strategy that takes into
account elements such as location, costs, alternatives, and assumptions.
2. Start-up Capital Strategy:
 Creativity in building the strategy for raising capital, focusing on the prospective investorpanel and a
comprehensive plan to judicially deploy capital.
 Vivid detail on the planning and execution with decided equity dilution or raising capital via debt.
 Graphical representation or Visual demo can be used to demonstrate the idea.
3. Presentation Organization and Effectiveness of Visual Aids:
 Information should be communicated in a logical, consistent order.
 The presentation structure should support what the speaker is saying and include clear, pertinent
information that integrates well with oral presentation.
 Distinct introduction and overview, as well as summary and conclusions are given with a common
theme throughout.
 Manage time constraints by utilizing the available time effectively.
 Visual aids provide the audience with compelling supporting material at the appropriatelevel of detail
and design.
 A variety of mediums can be used to reinforce the main message and integrate seamlessly.
4. Speaker Delivery/Effectiveness:
 Presenters clearly and concisely convey information in a manner appropriate to the audience; speakers
communicate in a focused and persuasive way at an appropriate pace.
 Communicate a clear message with an impact.
 Use appropriate language and adapt to the audience.
5. Responses to Judges’ Questions:
 Demonstrate thorough knowledge and understanding of factors associated with promoting their
product.
 Demonstrate good listening skills & comprehension of questions.
 Deliver appropriate, concise responses with detailed estimates.
General Guidelines:
 The presentation will be done online. The schedule for the presentation slotting will be released on
the BAJA SAEINDIA forum.
 Up to 4 members of a team are allowed to make the presentation to the judges, showing teamwork.
 Teams may use any photographs, videos, skits, slogans, drawings, plans, charts, posters, models and
binders, example components, infographics, or other materials that they believe are needed to
support the presentation.
 The Sales Presentation File name should be in the following format:
TeamID_TeamName_SalesPresentation.pdf
 The deadline for submission of the Sales Presentation is 30th November 2023, 23:59 IST.
 The Sales Presentation for BAJASAEINDIA 2024 has to be submitted under the submission section of
the team profile on the BAJA SAEINDIA website.
 Teams have the flexibility regarding the format of the presentation but teams should ensure that
thepresentation is explained within 15 Minutes.
 Each team will be evaluated over 25 Minutes time which includes the setup of the
Presentation,Introduction, Presentation, Q&A, and feedback by the judges.
 Total time for presentation:
o Presentation: 15 minutes.
o Q&A: 10 minutes.
Sr
Parameter Marks
No
1 Setting up the business situation 10
2 Market Analysis 10
3 Financials 15
4 Investment Analysis 15
5 Sales and Marketing 10
6 Scenario Building 10
7 Manufacturing Planning and Project Schedule 10
8 Presentation and QnA 10
Overall Marks 90

Note: The score obtained by the respective team, will be scaled down to 50 marks.

Sales Finals:
Top teams on the basis of sales event scores will be selected for the Sales final event, which will be held
at the physical event site for 15 Marks. The list of the shortlisted teams will be released on the BAJA
SAEINDIA forum. Guidelines for the same would be released at a later stage.
CAE Event
About CAE Event:
As part of the CAE event, teams have to submit a detailed report of various analysis done for the
components/sub-system. Based on the report evaluation, the top 30 teams from each category will get a prior
communication from BAJA SAEINDIA before phase 3 to prepare for the CAE Finals, however, only the top 15
teams from each category will be selected for the CAE Finals presentation based on Report Evaluation &
Physical Vehicle Weight.
Objective:
The aim of this event is to evaluate the team’s depth of knowledge in CAE Analysis, optimization
study, and its application to build a light and durable vehicle. The CAE report should contain details of each
analysis such as the objective, methodology used, modelling, pre-processing parameters, constraint, boundary
conditions, solver setting, and result outcome with contours, diagrams, plots, graphs, etc.
Rules:
 Participation in this event is compulsory for the teams participating in the BAJA SAEINDIA 2024 event.
 Teams have to submit a CAE report having a maximum of 10 pages arranged in the order of evaluation
criteria. Teams have the flexibility regarding the format of the report.
 CAE Report should be submitted in PDF format with the file name in the below format:
TeamID_TeamName_CAE Evaluation Report.pdf
 The deadline for submission of the CAE Evaluation Report is 19th November 2023, 23:59 IST.
 Submission of the CAE Evaluation report should be done on the BAJA SAEINDIA website under the
submission section of the team profile.
 There will not be any CAE presentation round in Phase 2 of BAJA SAEINDIA 2024.
 Teams ranking in the top 30 (based on Report Evaluation) must conduct weight checks on the first
day of the Physical Event. Failure to do so will result in disqualification from the CAE Finals Event.
 The Top 15 teams from each category will be shortlisted during the Physical Event, based on the
report evaluation and physical vehicle weight, qualifying them for the CAE Finals Presentation Round.
 The list of shortlisted teams selected for CAE Finals will be released separately on the BAJA SAEINDIA
forum by the end of Day 1 of the Physical Event.
 Teams are required, but not limited, to cover the following areas in their CAE report:
• CAE analysis objective and target – FOS, Deformation, Max Stress, Frequency, or Life, as
applicable.
• Material properties
• Mechanical – Ultimate and Yield strength, Poisson’s ratio, Thermal Properties, etc.
• Material Model – Linear/Non-linear
• CAE Process – Element type and size, order, Bolted and weld connection element type, etc.
• Elements quality and how they affect the results.
• Load Cases and boundary conditions – calculation method and point of load application.
• Images with points of max displacement and max stress highlighted.
 The Winners of the CAE Event will be determined from the following criteria:
Sr.
Description Points
No.
1 Report Evaluation 10
2 Finals Presentation 40
Total 50

Note: There is no separate score for the CAE Event, however, Finals Presentation scores of respective team will be
scaled down to 15 points for the CAE Finals Bonus.
Evaluation Criteria:
The evaluation will be based on the below criteria:
1 Roll cage Analysis 6 Multibody Dynamic Analysis
2 Static Analysis 7 Thermal Analysis
3 Dynamic Analysis 8 Fatigue Analysis
Torsional & Bending Custom Vehicle Component/
4 9
Analysis System Analysis
Overall CAE Fundamentals and
5 CFD Analysis 10
Knowledge

CAE Finals:
The top 15 teams from each category selected for CAE finals will be evaluated as per the below format,
while the evaluation criteria remain the same.

Finals Presentation:
The presentation should cover the overview of all the criteria mentioned above and need to be
presented in front of panel judges. The schedule for the presentation slotting will be released separately at the
BAJA SAEINDIA forum.

Presentation Format:
 Teams have the flexibility regarding the format of the presentation but teams should ensure that the
presentation should be explained within 15 Minutes.
 Each team will be evaluated over a 30-minute time period which includes the setup of the
Presentation, Introduction, Presentation, Q&A, and feedback by the judges.
 A maximum of 5 team members are allowed for the presentation.


Go Green Event
Forward
BAJA SAEINDIA has organized a “Go Green” event every year since 2009. This event is applicable only
to the mBAJA teams. Teams will be awarded based on Virtual Evaluation and Prototype Evaluation and
emission test conducted at the event site.

Objective
This event is organized to spread “awareness on exhaust emissions from the IC engines” and “to
reduce the exhaust emission using different technologies”.

Rules
⮚ Participation in this event is optional for the teams participating in the BAJA SAEINDIA 2024 event.
⮚ Poster file name should be named in the following format: Team ID_Team Name_Go Green
Poster.pdf
⮚ The deadline for submission of the Go Green Event Poster is 25th November 2023, 23:59 IST. The
submission should be made through the BAJA SAEINDIA Website Submission section.
⮚ Event Structure:

Sr.no Sub - Round Marks Event Phase

1 Virtual Poster Evaluation & Presentation 25 Marks


Phase 2
2 Online Quiz 25 Marks
3 Physical Prototype Evaluation 25 Marks
Phase 3
4 Emission Test Results on Prototype 25 Marks

The scores received in this event will not be considered for calculating the Overall Scores.

1. Virtual Poster Evaluation & Presentation: 25 Marks


Criteria:
⮚ Teams should strictly use the Poster Format released on BAJA SAEINDIA Forum.
⮚ The Poster should be submitted to the BAJA SAEINDIA website in PDF format and file size should
not exceed 5 MB.
⮚ Posters must be displayed by teams to judges during the Virtual Evaluation in their respective time
slot.
⮚ The following points have been sketched out to assist teams in their preparation for the Preliminary
Round. Teams are encouraged, but not limited to, include the below-mentioned points.

Abstract:
 An overview of Exhaust After-Treatment System development and its implementation and
validation in the BAJA ATV.
Objective:
 Proposed Emission Targets.
 Targeted Exhaust Pollutants.

Design Methodology:
 Design principle; Consideration; Calculation.
 Catalyst; Preparation; Reactions (PFD).

Design Validation:

 Virtual Validation.
 Emission control.

Schematic & Integration:


 System Drawing/layout / Model.
 Integration – System / Vehicle.
 Sound Engineering Practices.

Future Scope:
 Potential areas of improvement.
 Prototype Development & Implementation.

References:
 Literature/Journals
 Emissions Norms Standards

Evaluation will be based on:


 Concepts.
 Design Consideration & Calculation.
 Creativity & Originality.
 Schematic of Exhaust After treatment system and layout Integration with BAJA Buggy.
 Presentation Skills and Q&A.

Presentation Format
The presentation should cover the overview of how the team has reduced exhaust emissions from SI
Engines by using various technologies and needs to be presented in front of panel judges. The
presentation will be done virtually. The schedule for the presentation will be released separately at the
BAJA SAEINDIA forum.
● Teams have the flexibility regarding the format of the presentation, but teams should ensure
that Virtual Poster Evaluation and presentation must be explained within 20 Minutes.
● Setup of Presentation and introduction will be restricted to 5 Minutes.
● A maximum of 4 team members are allowed for the presentation.

2. Online Quiz (25 Marks):


● Twenty-five questions will be asked to each team as per the Basic Knowledge of Emission,
Health Effects, Exhaust After-Treatment Systems, Fuel Specs, Norms and testing.
● ARAI Emission Booklet is released along with the guidelines on BAJA SAEINDIA forum. Teams
must go through the following sections (title & page no) of the booklet:
o 2Wheeler: 01-16
o 3Wheeler: 17-26
o M & N Vehicle: 39-55
o Emission Control: 85-86
o Fuel Specification: 89-105
● Additionally, Students can refer following reference books to understand the same even though
it is not mandatory:
o Engine Emissions Fundamentals and Advances in Control - B.P Pundir.
o Engine Emission Control Technologies - G Amba Prasad Rao
o Internal Combustion Engine Fundamentals - John B Heywood
● A seminar on “Engine Emission & Control Strategies” will be conducted during BAJA Physical
Workshops to educate the students about the same. Teams must attend the seminar without
fail for a quick knowledge check.

3. Physical Prototype Evaluation: 25 Marks
 Teams should present their Physical Prototype in their respective time slot.
 The Prototype must be an Emission Reduction Pipe with Flange - A new pipe like the original one
but fitted with Aftertreatment Systems, which is made only to check emissions during the Go
Green Event.
 Marks will be given based on the following aspects:
a. Presence of Flange
b. Material & Build Quality
c. Correlation of CFD/CAE Results with respect to Actual Prototype
d. Number of Pollutants Targeted
e. Presentation Skills
 Please find below Schematic Diagram of Aftertreatment System

Figure 1: Schematic diagram of an Aftertreatment System


Physical Proto Evaluation Guidelines:
 Teams should ensure that Prototype Evaluation must be explained within 10 Minutes.
 Introduction & Prototype Evaluation will be restricted to 5 Minutes & another 5 mins for Judges
Feedback
 A maximum of 3 team members are allowed for Prototype Evaluation.

4. Emission Test Results on Prototype: 25 Marks


 CO (Carbon Monoxide) and HC (Hydrocarbon) emissions to be measured on the prototype at the
Event Site.
 Based on the Overall Performance in the 1st,2nd & and 3rd rounds, the Top 5 to 10 Teams (based on
the Judge’s Evaluation) will be shortlisted for Emission Testing. (Shortlisted Teams will be
communicated same day to be present for Emission Testing.)
 Teams who would not be participating in Phase 3, those teams must send their team members
along with the Prototype to the Event Site for Evaluation.
Emission Test General Rules:
A maximum of 5 team members are allowed for the Emission Test.

ALL THE BEST!!