Title of Assessment: Structural safety of car parks towards the transitions to electric vehicles
Date assessment issued: 9th October 2023 Description of area or activity being assessed:
Planned review date: FEA Modelling for a Car Park - Looking at Impact loading/live loading
2nd November 2023
Retention period (+4 yrs from issue): of electric Vehicles
Summary of assessment: The area / activity have been assessed against the existing control measures. The assessment has identified
(number) issues and made (number) non-H&S recommendations. These findings are detailed in the action plan.
James Rhodes
Signature of assessor ………………………….… Name (print)……………………………………………………. Date: 02/11/2023
Managers Approval:
I have reviewed this risk assessment in consultation with the assessor and accept the issues identified. The actions defined in this risk
assessment will be taken in order to reduce residual risks to a level that is as low as reasonably practicable.
Health and Safety Adviser Approval: (Only required when a High Residual Risk is identified within the assessment. Work must not be
started until advice from H&S has been sought):
I have reviewed this risk assessment in consultation with the assessor and HoD. The actions defined in this risk assessment will be taken in
order to reduce residual risks to a level that is as low as reasonably practicable.
Version Control: Risk assessments require review and in some cases revision to ensure the assessment continues to reflect current working
practices e.g. a review should be initiated in response to significant changes to the area / activity or if an accident / incident has occurred.
1
General Risk Assessment (January 2017)
GENERAL RISK ASSESSMENT Assessment Ref:
2
General Risk Assessment (January 2017)
GENERAL RISK ASSESSMENT Assessment Ref:
FEA Modelling for a Car Park, Looking at Impact loading/live loading of electric Vehicles. Requires the use of a computer with
modelling software. Reading and reviewing documentation in hand and on a computer.
Key Findings:
Key Comments:
3
General Risk Assessment (January 2017)
GENERAL RISK ASSESSMENT Assessment Ref:
4
General Risk Assessment (January 2017)
GENERAL RISK ASSESSMENT Assessment Ref:
ACTION PLAN
Develop a prioritised action plan to support the risk assessment
Action to be taken to further reduce risk Person responsible for Target completion date Action closure
completing action (Prioritized on risk)
Date Priority Signature Date
5
General Risk Assessment (January 2017)
GENERAL RISK ASSESSMENT Assessment Ref:
RISK MATRIX
Use the Risk Matrix to classify the perceived level of risk and to prioritise the action plan
SEVERITY
Likely
(Easily Foreseeable)
LOW MEDIUM MEDIUM HIGH
Possible
NOT
(Foreseeable under certain LOW MEDIUM MEDIUM
circumstances) SIGNIFICANT
Unlikely
NOT NOT
(Unlikely sequence of LOW MEDIUM
events/ Unexplained event) SIGNIFICANT SIGNIFICANT
Medium Risk – More controls may be required to adequately control the hazard
High Risk – Task must be stopped immediately. Consult Health and Safety Adviser for further advice.
6
General Risk Assessment (January 2017)
GENERAL RISK ASSESSMENT Assessment Ref:
NOTES for Lone and Hazardous Working (see Lone and Hazardous Working Policy for full details)
e.g.
Low Hazard - Office based lone working, Lone working collecting routine data/non-hazardous procedure in Laboratory (Avoid use of hazardous materials,
sharps, chemicals, etc)
Medium Hazard – Working within Workshop/Laboratory
High Hazard - Work within specialised Unit e.g. Containment Level 3, High Toxicity, High Voltage
7
General Risk Assessment (January 2017)