Professional Documents
Culture Documents
Appendix C - Laboratory Test Result
Appendix C - Laboratory Test Result
Appendix C - Laboratory Test Result
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,20 13,98 gram
2 Mass of wet soil + can M2 114,97 117,46 gram
3 Mass of dry soil + can M3 89,44 91,57 gram
4 Mass of moisture = M2 - M3 25,53 25,89 gram
5 Mass of dry soil = M3 - M1 75,24 77,59 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 33,93 33,37 %
7 Average water content, (w) 33,65 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 30,61 32,44 gram
2 Mass of dry soil + piknometer M2 49,99 50,86 gram
3 Mass of dry soil + water + piknometer M3 93,13 94,34 gram
4 Mass of water + piknometer M4 81,01 82,89 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,38 18,42
7 B = M3 - M4 12,12 11,45
8 C=A-B 7,26 6,97
9 Specific Gravity, Gs = A / C 2,67 2,64
10 Average specific gravity, Gs 2,66
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,66
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,2 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,20 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,20 100,00 e3 = e2 - d3
8 2,360 d4 = 0,48 e4 = 74,72 99,36 e4 = e3 - d4
20 0,850 d5 = 1,68 e5 = 73,04 97,13 e5 = e4 - d5
30 0,600 d6 = 1,26 e6 = 71,78 95,45 e6 = e5 - d6
50 0,300 d7 = 2,68 e7 = 69,10 91,89 e7 = e6 - d7
100 0,150 d8 = 6,35 e8 = 62,75 83,44 e8 = e7 - d8
200 0,075 d9 = 4,18 e9 = 58,57 77,89 e9 = e8 - d9
Sd = 16,63
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 122,67 123,68 122,20
2,5
3
INITIAL Density, gr/cm 1,82 1,84 1,81
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 33.650
SPECIFIC GRAVITY (G) 2.660 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 1.116
LIQUID LIMIT (LL%) 44.480 DRY WEIGHT Wd (gr) 45.690 DEGREE OF INITIAL SAT. So % 90%
PLASTIC LIMIT (PL%) 30.940 SUBSTANCE HEIGHT Hs (cm) 0.888
PRESSURE
GRADATION
Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
1.1
e0
1.0
0.9
Void Ratio, e
0.8
0.7
0.6
0.5
eb
0.4
s sc' sb
0.1 0 1 10 100 1000
Pressure, s kg/cm2
0.0020
0.0015
0.0010
0.0005
0.0000
1 10
Stress, s (kg/cm2)
2
so = 0.165 kg/cm
2
sc = 1.700 kg/cm
Cr = 0.045
Cc = 0.349
eo = 1.120
ec = 1.070
2
Cv avg = 0.001 cm /sec
K avg = 0.000028 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,29 14,07 gram
2 Mass of wet soil + can M2 112,76 114,73 gram
3 Mass of dry soil + can M3 93,93 99,28 gram
4 Mass of moisture = M2 - M3 18,83 15,45 gram
5 Mass of dry soil = M3 - M1 81,64 85,21 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 23,06 18,13 %
7 Average water content, (w) 20,60 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,20 30,55 gram
2 Mass of dry soil + piknometer M2 50,21 48,70 gram
3 Mass of dry soil + water + piknometer M3 93,96 92,42 gram
4 Mass of water + piknometer M4 82,83 81,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,01 18,15
7 B = M3 - M4 11,13 11,17
8 C=A-B 6,88 6,98
9 Specific Gravity, Gs = A / C 2,62 2,60
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,38 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,38 100,00 e2 = e1 - d2
4 4,750 d3 = 5,88 e3 = 69,50 92,20 e3 = e2 - d3
10 2,000 d4 = 1,30 e4 = 68,20 90,47 e4 = e3 - d4
20 0,850 d5 = 3,61 e5 = 64,59 85,69 e5 = e4 - d5
40 0,425 d6 = 9,51 e6 = 55,08 73,07 e6 = e5 - d6
60 0,250 d7 = 3,74 e7 = 51,34 68,11 e7 = e6 - d7
140 0,106 d8 = 4,79 e8 = 46,55 61,75 e8 = e7 - d8
200 0,075 d9 = 0,73 e9 = 45,82 60,79 e9 = e8 - d9
Sd = 29,56
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.22 Wet Weight Speciment, gr 117.00
1
2 Height of Speciment, L0 (cm) 7.2 Volume of Speciment, V (cm 3) 58.63
2 3
3 Cross Sectional Area A (cm ) 8.14 Weight Volume of Speciment, gb (gr/cm ) 2.00
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.6
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,77 13,69 gram
2 Mass of wet soil + can M2 113,41 113,17 gram
3 Mass of dry soil + can M3 104,50 103,69 gram
4 Mass of moisture = M2 - M3 8,91 9,48 gram
5 Mass of dry soil = M3 - M1 90,73 90,00 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 9,82 10,53 %
7 Average water content, (w) 10,18 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,34 32,26 gram
2 Mass of dry soil + piknometer M2 50,36 50,64 gram
3 Mass of dry soil + water + piknometer M3 92,91 93,25 gram
4 Mass of water + piknometer M4 81,83 81,87 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,02 18,38
7 B = M3 - M4 11,08 11,38
8 C=A-B 6,94 7,00
9 Specific Gravity, Gs = A / C 2,60 2,63
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,35 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,35 100,00 e2 = e1 - d2
4 4,750 d3 = 0,37 e3 = 74,98 99,51 e3 = e2 - d3
8 2,360 d4 = 0,72 e4 = 74,26 98,55 e4 = e3 - d4
20 0,850 d5 = 3,72 e5 = 70,54 93,62 e5 = e4 - d5
30 0,600 d6 = 6,58 e6 = 63,96 84,88 e6 = e5 - d6
50 0,300 d7 = 17,67 e7 = 46,29 61,43 e7 = e6 - d7
100 0,150 d8 = 16,64 e8 = 29,65 39,35 e8 = e7 - d8
200 0,075 d9 = 5,28 e9 = 24,37 32,34 e9 = e8 - d9
Sd = 50,98
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.50 - 12.00
Date : 18 Agustus 2023
Made by : Tim Laboran PT. Soiltama
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.50 - 12.00
Date : 18 Agustus 2023
Made by : Tim laboran PT Soiltama
Dimensions of sample :
Diameter 6.30 cm
2
Area 31.17 cm
Ht. 2.00 cm
3
Volume 62.34 cm
Kalibrasi 0.671 kg/div
Specimen no. 1 2 3
Mass of soil + ring gr 197.08 199.92 203.19
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 131.62 134.62 137.78
Initial water content wN (%) 10.18
Bulk density γb (gr/cm3) 2.11 2.16 2.21
Dry density γd (gr/cm3) 1.92 1.96 2.01
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.20 0.30 0.56
1.00
0.75
Shear stress, τ kg/cm2
0.50
0.25
0.00
0.000 0.500 1.000 1.500 2.000
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,72 12,68 gram
2 Mass of wet soil + can M2 112,87 113,44 gram
3 Mass of dry soil + can M3 99,81 99,65 gram
4 Mass of moisture = M2 - M3 13,06 13,79 gram
5 Mass of dry soil = M3 - M1 87,09 86,97 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 15,00 15,86 %
7 Average water content, (w) 15,43 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,44 31,50 gram
2 Mass of dry soil + piknometer M2 51,94 49,15 gram
3 Mass of dry soil + water + piknometer M3 94,89 92,73 gram
4 Mass of water + piknometer M4 83,64 82,12 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,50 17,65
7 B = M3 - M4 11,25 10,61
8 C=A-B 7,25 7,04
9 Specific Gravity, Gs = A / C 2,55 2,51
10 Average specific gravity, Gs 2,53
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,53
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,38 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,38 100,00 e2 = e1 - d2
4 4,750 d3 = 0,19 e3 = 75,19 99,75 e3 = e2 - d3
10 2,000 d4 = 0,21 e4 = 74,98 99,47 e4 = e3 - d4
20 0,850 d5 = 0,49 e5 = 74,49 98,82 e5 = e4 - d5
40 0,425 d6 = 1,65 e6 = 72,84 96,63 e6 = e5 - d6
60 0,250 d7 = 1,19 e7 = 71,65 95,05 e7 = e6 - d7
140 0,106 d8 = 2,60 e8 = 69,05 91,60 e8 = e7 - d8
200 0,075 d9 = 0,52 e9 = 68,53 90,91 e9 = e8 - d9
Sd = 6,85
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.5 - 4.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.5 - 4.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama
5,0
Test conditon : UU
SPECIMEN 1 2 3
4,5 Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
4,0 Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 121,30 122,44 123,21
3,5 3
1,80 1,82 1,83
INITIAL Density, gr/cm
Deviator Stress (s1 - s3), kg/cm2
5,0
4,5
4,0
3,5
Shear Stress, kg/cm2
3,0
2,5
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0 8,5 9,0 9,5 10,0
Principal Stress, kg/cm2
DETERMINATION OF WATER CONTENT
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,21 14,20 gram
2 Mass of wet soil + can M2 113,51 113,98 gram
3 Mass of dry soil + can M3 100,25 99,56 gram
4 Mass of moisture = M2 - M3 13,26 14,42 gram
5 Mass of dry soil = M3 - M1 86,04 85,36 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 15,41 16,89 %
7 Average water content, (w) 16,15 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 30,00 31,73 gram
2 Mass of dry soil + piknometer M2 48,22 49,81 gram
3 Mass of dry soil + water + piknometer M3 91,41 93,16 gram
4 Mass of water + piknometer M4 80,09 81,99 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,22 18,08
7 B = M3 - M4 11,32 11,17
8 C=A-B 6,90 6,91
9 Specific Gravity, Gs = A / C 2,64 2,62
10 Average specific gravity, Gs 2,63
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,63
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,1 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,10 100,00 e2 = e1 - d2
4 4,750 d3 = 3,33 e3 = 71,77 95,57 e3 = e2 - d3
8 2,360 d4 = 0,95 e4 = 70,82 94,30 e4 = e3 - d4
20 0,850 d5 = 1,16 e5 = 69,66 92,76 e5 = e4 - d5
30 0,600 d6 = 0,87 e6 = 68,79 91,60 e6 = e5 - d6
50 0,300 d7 = 1,43 e7 = 67,36 89,69 e7 = e6 - d7
100 0,150 d8 = 2,50 e8 = 64,86 86,36 e8 = e7 - d8
200 0,075 d9 = 1,03 e9 = 63,83 84,99 e9 = e8 - d9
Sd = 11,27
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.37 Wet Weight Speciment, gr 126.62
1
2 Height of Speciment, L0 (cm) 7.5 Volume of Speciment, V (cm 3) 66.90
2 3
3 Cross Sectional Area A (cm ) 8.92 Weight Volume of Speciment, gb (gr/cm ) 1.89
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,08 12,50 gram
2 Mass of wet soil + can M2 113,23 112,90 gram
3 Mass of dry soil + can M3 108,96 92,22 gram
4 Mass of moisture = M2 - M3 4,27 20,68 gram
5 Mass of dry soil = M3 - M1 95,88 79,72 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 4,45 25,94 %
7 Average water content, (w) 15,20 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,60 32,12 gram
2 Mass of dry soil + piknometer M2 51,70 50,51 gram
3 Mass of dry soil + water + piknometer M3 94,09 93,69 gram
4 Mass of water + piknometer M4 82,34 82,40 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,10 18,39
7 B = M3 - M4 11,75 11,29
8 C=A-B 7,35 7,10
9 Specific Gravity, Gs = A / C 2,60 2,59
10 Average specific gravity, Gs 2,59
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,16 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,16 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,16 100,00 e3 = e2 - d3
10 2,000 d4 = 0,00 e4 = 75,16 100,00 e4 = e3 - d4
20 0,850 d5 = 0,52 e5 = 74,64 99,31 e5 = e4 - d5
40 0,425 d6 = 2,49 e6 = 72,15 96,00 e6 = e5 - d6
60 0,250 d7 = 1,36 e7 = 70,79 94,19 e7 = e6 - d7
140 0,106 d8 = 2,93 e8 = 67,86 90,29 e8 = e7 - d8
200 0,075 d9 = 0,89 e9 = 66,97 89,10 e9 = e8 - d9
Sd = 8,19
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.46 Wet Weight Speciment, gr 136.61
1
2 Height of Speciment, L0 (cm) 7.46 Volume of Speciment, V (cm 3) 70.14
2 3
3 Cross Sectional Area A (cm ) 9.40 Weight Volume of Speciment, gb (gr/cm ) 1.95
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
1.8
1.6
1.4
1.2
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,55 14,10 gram
2 Mass of wet soil + can M2 112,67 114,10 gram
3 Mass of dry soil + can M3 101,83 104,83 gram
4 Mass of moisture = M2 - M3 10,84 9,27 gram
5 Mass of dry soil = M3 - M1 90,28 90,73 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,01 10,21 %
7 Average water content, (w) 11,11 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,92 31,71 gram
2 Mass of dry soil + piknometer M2 49,93 49,78 gram
3 Mass of dry soil + water + piknometer M3 93,48 92,98 gram
4 Mass of water + piknometer M4 82,12 82,12 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,01 18,07
7 B = M3 - M4 11,36 10,86
8 C=A-B 6,65 7,21
9 Specific Gravity, Gs = A / C 2,71 2,51
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,43 e4 = 74,57 99,43 e4 = e3 - d4
20 0,850 d5 = 6,71 e5 = 67,86 90,48 e5 = e4 - d5
30 0,600 d6 = 10,55 e6 = 57,31 76,41 e6 = e5 - d6
50 0,300 d7 = 9,05 e7 = 48,26 64,35 e7 = e6 - d7
100 0,150 d8 = 6,94 e8 = 41,32 55,09 e8 = e7 - d8
200 0,075 d9 = 3,75 e9 = 37,57 50,09 e9 = e8 - d9
Sd = 37,43
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.21 Wet Weight Speciment, gr 125.93
1
2 Height of Speciment, L0 (cm) 7.12 Volume of Speciment, V (cm 3) 57.62
2 3
3 Cross Sectional Area A (cm ) 8.09 Weight Volume of Speciment, gb (gr/cm ) 2.19
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.6
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,40 13,85 gram
2 Mass of wet soil + can M2 113,00 114,19 gram
3 Mass of dry soil + can M3 97,13 102,52 gram
4 Mass of moisture = M2 - M3 15,87 11,67 gram
5 Mass of dry soil = M3 - M1 84,73 88,67 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 18,73 13,16 %
7 Average water content, (w) 15,95 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,22 32,90 gram
2 Mass of dry soil + piknometer M2 40,63 40,41 gram
3 Mass of dry soil + water + piknometer M3 87,31 87,10 gram
4 Mass of water + piknometer M4 82,13 82,58 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 8,41 7,51
7 B = M3 - M4 5,18 4,52
8 C=A-B 3,23 2,99
9 Specific Gravity, Gs = A / C 2,60 2,51
10 Average specific gravity, Gs 2,56
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,56
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,07 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,07 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,07 100,00 e3 = e2 - d3
10 2,000 d4 = 0,00 e4 = 75,07 100,00 e4 = e3 - d4
20 0,850 d5 = 0,04 e5 = 75,03 99,95 e5 = e4 - d5
40 0,425 d6 = 0,00 e6 = 75,03 99,95 e6 = e5 - d6
60 0,250 d7 = 0,06 e7 = 74,97 99,87 e7 = e6 - d7
140 0,106 d8 = 0,88 e8 = 74,09 98,69 e8 = e7 - d8
200 0,075 d9 = 2,77 e9 = 71,32 95,00 e9 = e8 - d9
Sd = 3,75
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
1 Diamater of Speciment , D (cm) 3.5 Wet Weight Speciment, gr 130.62
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
3.5
2.5
Compressive Stress (kg/cm2)
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,42 12,27 gram
2 Mass of wet soil + can M2 111,80 112,77 gram
3 Mass of dry soil + can M3 104,13 100,63 gram
4 Mass of moisture = M2 - M3 7,67 12,14 gram
5 Mass of dry soil = M3 - M1 92,71 88,36 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 8,27 13,74 %
7 Average water content, (w) 11,01 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,34 30,39 gram
2 Mass of dry soil + piknometer M2 51,60 48,77 gram
3 Mass of dry soil + water + piknometer M3 94,43 92,30 gram
4 Mass of water + piknometer M4 83,21 81,01 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,26 18,38
7 B = M3 - M4 11,22 11,29
8 C=A-B 7,04 7,09
9 Specific Gravity, Gs = A / C 2,59 2,59
10 Average specific gravity, Gs 2,59
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,13 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,13 100,00 e2 = e1 - d2
4 4,750 d3 = 10,11 e3 = 65,02 86,54 e3 = e2 - d3
8 2,360 d4 = 13,64 e4 = 51,38 68,39 e4 = e3 - d4
20 0,850 d5 = 15,30 e5 = 36,08 48,02 e5 = e4 - d5
30 0,600 d6 = 4,22 e6 = 31,86 42,41 e6 = e5 - d6
50 0,300 d7 = 4,02 e7 = 27,84 37,06 e7 = e6 - d7
100 0,150 d8 = 4,68 e8 = 23,16 30,83 e8 = e7 - d8
200 0,075 d9 = 2,45 e9 = 20,71 27,57 e9 = e8 - d9
Sd = 54,42
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
1 Diamater of Speciment , D (cm) 3.42 Wet Weight Speciment, gr 125.71
2 Height of Speciment, L0 (cm) 7.23 Volume of Speciment, V (cm )
3
66.42
2 3
3 Cross Sectional Area A (cm ) 9.19 Weight Volume of Speciment, gb (gr/cm ) 1.89
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 9.00 0.968 4.29 9.276 0.462
140 0.14 16.00 1.936 7.62 9.368 0.814
210 0.21 22.50 2.905 10.72 9.461 1.133
280 0.28 29.00 3.873 13.81 9.556 1.445
350 0.35 37.00 4.841 17.62 9.654 1.826
420 0.42 47.50 5.809 22.62 9.753 2.320
490 0.49 60.00 6.777 28.58 9.854 2.900
560 0.56 65.00 7.746 30.96 9.958 3.109
630 0.63 77.50 8.714 36.91 10.063 3.668
700 0.7 84.50 9.682 40.25 10.171 3.957
770 0.77 88.50 10.650 42.15 10.281 4.100
840 0.84 89.00 11.618 42.39 10.394 4.078
910 0.91 87.00 12.586 41.44 10.509 3.943
980 0.98 85.00 13.555 40.49 10.627 3.810
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.5 - 15
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
4.5
3.5
3
Compressive Stress (kg/cm2)
2.5
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,23 11,08 gram
2 Mass of wet soil + can M2 131,65 126,24 gram
3 Mass of dry soil + can M3 108,20 103,16 gram
4 Mass of moisture = M2 - M3 23,45 23,08 gram
5 Mass of dry soil = M3 - M1 93,97 92,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,95 25,07 %
7 Average water content, (w) 25,01 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,46 31,52 gram
2 Mass of dry soil + piknometer M2 52,97 51,90 gram
3 Mass of dry soil + water + piknometer M3 95,67 94,27 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,51 20,38
7 B = M3 - M4 12,78 12,53
8 C=A-B 7,73 7,85
9 Specific Gravity, Gs = A / C 2,65 2,60
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,62
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 1,25 e8 = 73,75 98,33 e8 = e7 - d8
200 0,075 d9 = 6,48 e9 = 67,27 89,69 e9 = e8 - d9
Sd = 7,73
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
INITIAL
Moisture, % 25,01 25,01 25,01
Dry Density, gr/cm3 1,44 1,46 1,47
Weight, gr
1,5 AFTER Density, gr/cm3
CONSOLIDATION Moisture, %
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
o
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.630 INIT. WATER CONTENT Wo % 26.520
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.580
LIQUID LIMIT (LL%) 42.460 DRY WEIGHT Wd (gr) 61.770 DEGREE OF INITIAL SAT. So % 69.476
PLASTIC LIMIT (PL%) 23.310 SUBSTANCE HEIGHT Hs (cm) 1.200
GRADATION
PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
0.6e0
0.55
0.5
Void Ratio, e
0.45
0.4
0.35
0.3
0.25e
b
0.2
0.1 s0 1 sc' 10 100 1000 sb
10000
Pressure, s kg/cm2
0.002
0.001
0
0.1 1 10
Stress (kg/cm2)
po = 0.209 kg/cm2
pc = 1.700 kg/cm2
Cr = 0.047
Cc = 0.078
eo = 0.582
ec = 0.540
CV avg = 0.0015086 cm2/sec
K = 0.0000089 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,43 13,53 gram
2 Mass of wet soil + can M2 123,44 160,01 gram
3 Mass of dry soil + can M3 104,86 133,82 gram
4 Mass of moisture = M2 - M3 18,58 26,19 gram
5 Mass of dry soil = M3 - M1 90,43 120,29 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,55 21,77 %
7 Average water content, (w) 21,16 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,36 29,24 gram
2 Mass of dry soil + piknometer M2 52,51 49,44 gram
3 Mass of dry soil + water + piknometer M3 94,66 91,86 gram
4 Mass of water + piknometer M4 82,25 79,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,15 20,20
7 B = M3 - M4 12,41 12,64
8 C=A-B 7,74 7,56
9 Specific Gravity, Gs = A / C 2,60 2,67
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,52 e5 = 74,48 99,31 e5 = e4 - d5
30 0,600 d6 = 0,79 e6 = 73,69 98,25 e6 = e5 - d6
50 0,300 d7 = 1,51 e7 = 72,18 96,24 e7 = e6 - d7
100 0,150 d8 = 6,66 e8 = 65,52 87,36 e8 = e7 - d8
200 0,075 d9 = 8,89 e9 = 56,63 75,51 e9 = e8 - d9
Sd = 18,37
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
3,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,46 122,98 123,17
3
Density, gr/cm 1,80 1,83 1,83
2,0 INITIAL
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
2,0
Shear Stress, kg/cm2
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 20.535
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.430
LIQUID LIMIT (LL%) 28.790 DRY WEIGHT Wd (gr) 68.893 DEGREE OF INITIAL SAT. So % 54.212
PLASTIC LIMIT (PL%) 18.180 SUBSTANCE HEIGHT Hs (cm) 1.327
GRADATION
PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute 2
cm / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
0.5
e0
Void Ratio, e
0.4
0.3
0.2
eb
0.1
0.1 1 sc' 10 100 sb 1000
Pressure, s kg/cm2
0.01000
0.00800
0.00600
0.00400
0.00200
0.00000
0.1 1 10
Stress, s (kg/cm2)
po = 0.222 kg/cm2
pc = 1.800 kg/cm2
Cr = 0.027
Cc = 0.127
eo = 0.431
ec = 0.407
2
Cv avg = 0.003600 cm /sec
K avg = 0.000023 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,57 13,89 gram
2 Mass of wet soil + can M2 149,97 159,98 gram
3 Mass of dry soil + can M3 121,60 131,91 gram
4 Mass of moisture = M2 - M3 28,37 28,07 gram
5 Mass of dry soil = M3 - M1 108,03 118,02 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,26 23,78 %
7 Average water content, (w) 25,02 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,98 31,26 gram
2 Mass of dry soil + piknometer M2 52,37 51,62 gram
3 Mass of dry soil + water + piknometer M3 94,92 94,62 gram
4 Mass of water + piknometer M4 82,12 82,04 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,39 20,36
7 B = M3 - M4 12,80 12,58
8 C=A-B 7,59 7,78
9 Specific Gravity, Gs = A / C 2,69 2,62
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,65
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 10,92 e8 = 64,08 85,44 e8 = e7 - d8
200 0,075 d9 = 13,55 e9 = 50,53 67,37 e9 = e8 - d9
Sd = 24,47
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION
Area, cm2 9,62 9,62 9,62
Volume, cm3 67,35 67,35 67,35
2,5 Weight, gr 121,67 122,99 123,28
Density, gr/cm3 1,81 1,83 1,83
Deviator Stress (s1 - s3), kg/cm2
INITIAL
Moisture, % 25,02 25,02 25,02
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boringo No : BGP 1
Depth : 11.50.12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 22.960
SPECIFIC GRAVITY (G) 2.650 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.570
LIQUID LIMIT (LL%) 20.280 DRY WEIGHT Wd (gr) 62.970 DEGREE OF INITIAL SAT. So % 60.852
PLASTIC LIMIT (PL%) 17.270 SUBSTANCE HEIGHT Hs (cm) 1.210
GRADATION
PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% 2
mv (cm /kg) (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11.50 - 12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
0.5
Void Ratio, e
0.4
0.3
eb
0.2
0.1
0.1 s0 1 sc' 10 100 sb 1000
Pressure, s kg/cm2
0.0008
0.0006
0.0004
0.0002
0.0000
0.1 1 10
Stress, s (kg/cm2)
po = 0.208 kg/cm2
pc = 1.200 kg/cm2
Cr = 0.017
Cc = 0.162
eo = 0.570
ec = 0.557
2
CV avg = 0.00079725 cm /sec
K = 0.0000247 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,08 14,02 gram
2 Mass of wet soil + can M2 113,53 126,35 gram
3 Mass of dry soil + can M3 112,77 111,59 gram
4 Mass of moisture = M2 - M3 0,76 14,76 gram
5 Mass of dry soil = M3 - M1 100,69 97,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 0,75 15,13 %
7 Average water content, (w) 7,94 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,69 32,59 gram
2 Mass of dry soil + piknometer M2 49,77 51,10 gram
3 Mass of dry soil + water + piknometer M3 92,78 93,58 gram
4 Mass of water + piknometer M4 81,99 82,54 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,08 18,51
7 B = M3 - M4 10,79 11,04
8 C=A-B 7,29 7,47
9 Specific Gravity, Gs = A / C 2,48 2,48
10 Average specific gravity, Gs 2,48
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,48
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
50
40
30 OH or MH `
20 CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,3 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,30 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,30 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,30 100,00 e4 = e3 - d4
20 0,850 d5 = 1,17 e5 = 74,13 98,45 e5 = e4 - d5
30 0,600 d6 = 1,50 e6 = 72,63 96,45 e6 = e5 - d6
50 0,300 d7 = 1,19 e7 = 71,44 94,87 e7 = e6 - d7
100 0,150 d8 = 1,49 e8 = 69,95 92,90 e8 = e7 - d8
200 0,075 d9 = 0,74 e9 = 69,21 91,91 e9 = e8 - d9
Sd = 6,09
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama
4,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,5
DIMENSION
Length, cm 7,00 7,00 7,00
2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
3,0
Weight, gr 121,52 121,60 122,07
3
INITIAL Density, gr/cm 1,80 1,81 1,81
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 32.220
SPECIFIC GRAVITY (G) 2.480 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.518
LIQUID LIMIT (LL%) 47.230 DRY WEIGHT Wd (gr) 62.670 DEGREE OF INITIAL SAT. So % 84%
PLASTIC LIMIT (PL%) 32.350 SUBSTANCE HEIGHT Hs (cm) 1.218
PRESSURE
GRADATION
Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
e0
eb
s0 sc' sb
2
so = 0.220 kg/cm
2
sc = 1.700 kg/cm
Cr = 0.077
Cc = 0.139
eo = 0.520
ec = 0.450
2
Cv avg = 0.003 cm /sec
K avg = 0.000069 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,26 14,45 gram
2 Mass of wet soil + can M2 114,40 114,81 gram
3 Mass of dry soil + can M3 100,00 100,02 gram
4 Mass of moisture = M2 - M3 14,40 14,79 gram
5 Mass of dry soil = M3 - M1 85,74 85,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 16,79 17,28 %
7 Average water content, (w) 17,04 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,18 31,83 gram
2 Mass of dry soil + piknometer M2 50,83 50,00 gram
3 Mass of dry soil + water + piknometer M3 93,85 93,39 gram
4 Mass of water + piknometer M4 82,83 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,65 18,17
7 B = M3 - M4 11,02 11,26
8 C=A-B 7,63 6,91
9 Specific Gravity, Gs = A / C 2,44 2,63
10 Average specific gravity, Gs 2,54
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,54
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,19 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,19 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,19 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,19 100,00 e4 = e3 - d4
20 0,850 d5 = 0,03 e5 = 75,16 99,96 e5 = e4 - d5
30 0,600 d6 = 0,03 e6 = 75,13 99,92 e6 = e5 - d6
50 0,300 d7 = 0,17 e7 = 74,96 99,69 e7 = e6 - d7
100 0,150 d8 = 1,99 e8 = 72,97 97,05 e8 = e7 - d8
200 0,075 d9 = 3,07 e9 = 69,90 92,96 e9 = e8 - d9
Sd = 5,29
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Height of Sample = 7,00 cm 14 15,00 0,20 9,64 7,14 0,741 14 18,00 0,20 9,64 8,57 0,889 14 43,20 0,20 9,64 20,58 2,134
Volume of Sampel = 67,35 cm3 21 20,00 0,30 9,65 9,53 0,987 21 27,00 0,30 9,65 12,86 1,333 21 57,60 0,30 9,65 27,43 2,843
Speed = 0,70 mm/menit 28 25,00 0,40 9,66 11,91 1,233 28 36,00 0,40 9,66 17,15 1,775 28 64,00 0,40 9,66 30,48 3,156
Kalibrasi = 0,476 kg/div 35 30,00 0,50 9,67 14,29 1,478 35 45,00 0,50 9,67 21,43 2,217 35 70,00 0,50 9,67 33,34 3,448
70 48,00 1,00 9,72 22,86 2,353 70 58,00 1,00 9,72 27,63 2,843 70 78,00 1,00 9,72 37,15 3,823
105 55,00 1,50 9,77 26,20 2,682 105 66,00 1,50 9,77 31,44 3,218 105 83,00 1,50 9,77 39,53 4,047
140 58,00 2,00 9,82 27,63 2,814 140 70,00 2,00 9,82 33,34 3,396 140 88,00 2,00 9,82 41,91 4,269
175 62,00 2,50 9,87 29,53 2,993 175 75,00 2,50 9,87 35,72 3,620 175 93,00 2,50 9,87 44,30 4,489
210 65,00 3,00 9,92 30,96 3,121 210 80,00 3,00 9,92 38,10 3,842 210 97,00 3,00 9,92 46,20 4,658
280 70,00 4,00 10,02 33,34 3,327 280 87,00 4,00 10,02 41,44 4,135 280 105,00 4,00 10,02 50,01 4,990
350 75,00 5,00 10,13 35,72 3,527 350 92,00 5,00 10,13 43,82 4,327 350 110,00 5,00 10,13 52,39 5,173
420 80,00 6,00 10,24 38,10 3,723 420 96,60 6,00 10,24 46,01 4,495 420 115,00 6,00 10,24 54,77 5,352
490 83,00 7,00 10,35 39,53 3,821 490 100,00 7,00 10,35 47,63 4,604 490 119,00 7,00 10,35 56,68 5,479
560 85,00 8,00 10,46 40,49 3,871 560 102,00 8,00 10,46 48,58 4,646 560 122,00 8,00 10,46 58,11 5,557
630 84,00 9,00 10,57 40,01 3,784 630 101,00 9,00 10,57 48,11 4,550 630 123,00 9,00 10,57 58,58 5,541
700 83,00 10,00 10,69 39,53 3,698 700 100,00 10,00 10,69 47,63 4,456 700 122,80 10,00 10,69 58,49 5,471
840 12,00 10,93 0,00 0,000 840 98,00 12,00 10,93 46,68 4,269 840 122,60 12,00 10,93 58,39 5,341
980 14,00 11,19 0,00 0,000 980 14,00 11,19 0,00 0,000 980 122,40 14,00 11,19 58,30 5,211
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
6,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
5,0 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,49 122,60 123,07
3
INITIAL Density, gr/cm 1,80 1,82 1,83
4,0
Deviator Stress (s1 - s3), kg/cm2
4,0
3,5
3,0
Shear Stress, kg/cm2
2,5
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,62 12,07 gram
2 Mass of wet soil + can M2 112,35 112,28 gram
3 Mass of dry soil + can M3 94,87 96,70 gram
4 Mass of moisture = M2 - M3 17,48 15,58 gram
5 Mass of dry soil = M3 - M1 83,25 84,63 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 21,00 18,41 %
7 Average water content, (w) 19,70 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,32 31,30 gram
2 Mass of dry soil + piknometer M2 50,93 49,38 gram
3 Mass of dry soil + water + piknometer M3 93,86 92,64 gram
4 Mass of water + piknometer M4 82,25 81,31 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,61 18,08
7 B = M3 - M4 11,61 11,33
8 C=A-B 7,00 6,75
9 Specific Gravity, Gs = A / C 2,66 2,68
10 Average specific gravity, Gs 2,67
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,67
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,57 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,57 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,57 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,57 100,00 e4 = e3 - d4
20 0,850 d5 = 0,15 e5 = 75,42 99,80 e5 = e4 - d5
30 0,600 d6 = 0,24 e6 = 75,18 99,48 e6 = e5 - d6
50 0,300 d7 = 0,57 e7 = 74,61 98,73 e7 = e6 - d7
100 0,150 d8 = 2,79 e8 = 71,82 95,04 e8 = e7 - d8
200 0,075 d9 = 2,63 e9 = 69,19 91,56 e9 = e8 - d9
Sd = 6,38
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.37 Wet Weight Speciment, gr 122.27
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm 3) 61.55
2 3
3 Cross Sectional Area A (cm ) 8.92 Weight Volume of Speciment, gb (gr/cm ) 1.99
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
0.6
0.5
0.4
Compressive Stress (kg/cm2)
0.3
0.2
0.1
0
0 1 2 3 4 5 6 7 8
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,03 14,06 gram
2 Mass of wet soil + can M2 115,62 114,95 gram
3 Mass of dry soil + can M3 104,93 102,72 gram
4 Mass of moisture = M2 - M3 10,69 12,23 gram
5 Mass of dry soil = M3 - M1 90,90 88,66 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,76 13,79 %
7 Average water content, (w) 12,78 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,08 29,23 gram
2 Mass of dry soil + piknometer M2 51,64 47,71 gram
3 Mass of dry soil + water + piknometer M3 94,40 90,86 gram
4 Mass of water + piknometer M4 82,78 79,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,56 18,48
7 B = M3 - M4 11,62 11,64
8 C=A-B 6,94 6,84
9 Specific Gravity, Gs = A / C 2,67 2,70
10 Average specific gravity, Gs 2,69
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,69
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,11 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,11 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,11 100,00 e3 = e2 - d3
8 2,360 d4 = 0,53 e4 = 74,58 99,29 e4 = e3 - d4
20 0,850 d5 = 0,08 e5 = 74,50 99,19 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 74,50 99,19 e6 = e5 - d6
50 0,300 d7 = 0,16 e7 = 74,34 98,97 e7 = e6 - d7
100 0,150 d8 = 0,35 e8 = 73,99 98,51 e8 = e7 - d8
200 0,075 d9 = 0,34 e9 = 73,65 98,06 e9 = e8 - d9
Sd = 1,46
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.39 Wet Weight Speciment, gr 132.15
1
2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 63.18
2 3
3 Cross Sectional Area A (cm ) 9.03 Weight Volume of Speciment, gb (gr/cm ) 2.09
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,09 13,76 gram
2 Mass of wet soil + can M2 112,31 115,94 gram
3 Mass of dry soil + can M3 101,13 101,37 gram
4 Mass of moisture = M2 - M3 11,18 14,57 gram
5 Mass of dry soil = M3 - M1 90,04 87,61 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,42 16,63 %
7 Average water content, (w) 14,52 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,97 31,48 gram
2 Mass of dry soil + piknometer M2 49,59 49,78 gram
3 Mass of dry soil + water + piknometer M3 92,67 93,04 gram
4 Mass of water + piknometer M4 82,12 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 17,62 18,30
7 B = M3 - M4 10,55 11,30
8 C=A-B 7,07 7,00
9 Specific Gravity, Gs = A / C 2,49 2,61
10 Average specific gravity, Gs 2,55
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,56
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,26 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,26 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,26 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,26 100,00 e4 = e3 - d4
20 0,850 d5 = 0,31 e5 = 74,95 99,59 e5 = e4 - d5
30 0,600 d6 = 0,35 e6 = 74,60 99,12 e6 = e5 - d6
50 0,300 d7 = 0,53 e7 = 74,07 98,42 e7 = e6 - d7
100 0,150 d8 = 0,83 e8 = 73,24 97,32 e8 = e7 - d8
200 0,075 d9 = 1,62 e9 = 71,62 95,16 e9 = e8 - d9
Sd = 3,64
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.42 Wet Weight Speciment, gr 134.15
1
2 Height of Speciment, L0 (cm) 7.11 Volume of Speciment, V (cm3) 65.31
3 Cross Sectional Area A (cm2) 9.19 Weight Volume of Speciment, gb (gr/cm3) 2.05
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
2.5
2
Compressive Stress (kg/cm2)
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,60 14,52 gram
2 Mass of wet soil + can M2 119,13 122,08 gram
3 Mass of dry soil + can M3 101,20 104,38 gram
4 Mass of moisture = M2 - M3 17,93 17,70 gram
5 Mass of dry soil = M3 - M1 86,60 89,86 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,70 19,70 %
7 Average water content, (w) 20,20 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,35 31,00 gram
2 Mass of dry soil + piknometer M2 50,48 49,41 gram
3 Mass of dry soil + water + piknometer M3 93,71 92,52 gram
4 Mass of water + piknometer M4 81,75 81,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,13 18,41
7 B = M3 - M4 11,96 11,30
8 C=A-B 6,17 7,11
9 Specific Gravity, Gs = A / C 2,94 2,59
10 Average specific gravity, Gs 2,76
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,77
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,18 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,18 100,00 e2 = e1 - d2
4 4,750 d3 = 0,33 e3 = 74,85 99,56 e3 = e2 - d3
8 2,360 d4 = 1,17 e4 = 73,68 98,00 e4 = e3 - d4
20 0,850 d5 = 10,12 e5 = 63,56 84,54 e5 = e4 - d5
30 0,600 d6 = 3,81 e6 = 59,75 79,48 e6 = e5 - d6
50 0,300 d7 = 2,51 e7 = 57,24 76,14 e7 = e6 - d7
100 0,150 d8 = 3,12 e8 = 54,12 71,99 e8 = e7 - d8
200 0,075 d9 = 2,32 e9 = 51,80 68,90 e9 = e8 - d9
Sd = 23,38
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 119,38 120,50 123,31
2,5
3
INITIAL Density, gr/cm 1,77 1,79 1,83
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,83 13,51 gram
2 Mass of wet soil + can M2 129,29 135,60 gram
3 Mass of dry soil + can M3 114,23 121,97 gram
4 Mass of moisture = M2 - M3 15,06 13,63 gram
5 Mass of dry soil = M3 - M1 101,40 108,46 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 14,85 12,57 %
7 Average water content, (w) 13,71 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,50 31,67 gram
2 Mass of dry soil + piknometer M2 49,70 49,88 gram
3 Mass of dry soil + water + piknometer M3 93,58 93,79 gram
4 Mass of water + piknometer M4 82,12 82,44 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,20 18,21
7 B = M3 - M4 11,46 11,35
8 C=A-B 6,74 6,86
9 Specific Gravity, Gs = A / C 2,70 2,65
10 Average specific gravity, Gs 2,68
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,68
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,23 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,23 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,23 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,23 100,00 e4 = e3 - d4
20 0,850 d5 = 0,54 e5 = 74,69 99,28 e5 = e4 - d5
30 0,600 d6 = 1,71 e6 = 72,98 97,01 e6 = e5 - d6
50 0,300 d7 = 3,77 e7 = 69,21 92,00 e7 = e6 - d7
100 0,150 d8 = 7,53 e8 = 61,68 81,99 e8 = e7 - d8
200 0,075 d9 = 4,05 e9 = 57,63 76,61 e9 = e8 - d9
Sd = 17,60
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.2 Wet Weight Speciment, gr 113.12
1
2 Height of Speciment, L0 (cm) 6.3 Volume of Speciment, V (cm )3
50.67
3 Cross Sectional Area A (cm2) 8.04 Weight Volume of Speciment, gb (gr/cm3) 2.23
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.8
1.6
1.4
Compressive Stress (kg/cm2)
1.2
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,70 12,71 gram
2 Mass of wet soil + can M2 121,17 131,74 gram
3 Mass of dry soil + can M3 106,53 117,14 gram
4 Mass of moisture = M2 - M3 14,64 14,60 gram
5 Mass of dry soil = M3 - M1 94,83 104,43 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 15,44 13,98 %
7 Average water content, (w) 14,71 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,91 32,01 gram
2 Mass of dry soil + piknometer M2 51,10 50,01 gram
3 Mass of dry soil + water + piknometer M3 93,79 93,00 gram
4 Mass of water + piknometer M4 82,58 82,51 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,19 18,00
7 B = M3 - M4 11,21 10,49
8 C=A-B 6,98 7,51
9 Specific Gravity, Gs = A / C 2,61 2,40
10 Average specific gravity, Gs 2,50
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,50
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,64 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,64 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,64 100,00 e3 = e2 - d3
8 2,360 d4 = 0,62 e4 = 75,02 99,18 e4 = e3 - d4
20 0,850 d5 = 10,09 e5 = 64,93 85,84 e5 = e4 - d5
30 0,600 d6 = 7,02 e6 = 57,91 76,56 e6 = e5 - d6
50 0,300 d7 = 4,75 e7 = 53,16 70,28 e7 = e6 - d7
100 0,150 d8 = 3,52 e8 = 49,64 65,63 e8 = e7 - d8
200 0,075 d9 = 1,12 e9 = 48,52 64,15 e9 = e8 - d9
Sd = 27,12
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 136.68
1
2 Height of Speciment, L0 (cm) 7.1 Volume of Speciment, V (cm 3) 64.46
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 2.12
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
2.5
2
Compressive Stress (kg/cm2)
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,06 12,92 gram
2 Mass of wet soil + can M2 114,32 112,97 gram
3 Mass of dry soil + can M3 90,73 90,00 gram
4 Mass of moisture = M2 - M3 23,59 22,97 gram
5 Mass of dry soil = M3 - M1 76,67 77,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 30,77 29,80 %
7 Average water content, (w) 30,28 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,73 33,35 gram
2 Mass of dry soil + piknometer M2 50,00 52,02 gram
3 Mass of dry soil + water + piknometer M3 93,37 94,66 gram
4 Mass of water + piknometer M4 81,97 83,21 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,27 18,67
7 B = M3 - M4 11,40 11,45
8 C=A-B 6,87 7,22
9 Specific Gravity, Gs = A / C 2,66 2,59
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,62
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,56 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,56 100,00 e2 = e1 - d2
4 4,750 d3 = 0,56 e3 = 75,00 99,26 e3 = e2 - d3
8 2,360 d4 = 2,60 e4 = 72,40 95,82 e4 = e3 - d4
20 0,850 d5 = 2,95 e5 = 69,45 91,91 e5 = e4 - d5
30 0,600 d6 = 1,16 e6 = 68,29 90,38 e6 = e5 - d6
50 0,300 d7 = 1,38 e7 = 66,91 88,55 e7 = e6 - d7
100 0,150 d8 = 3,31 e8 = 63,60 84,17 e8 = e7 - d8
200 0,075 d9 = 4,79 e9 = 58,81 77,83 e9 = e8 - d9
Sd = 16,75
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
Sample no. 1 Sample no. 2 Sample no. 3
s3 = 50,00 kN/m 2
W= 120,94 gr s3 = 100,00 kN/m 2
W= 121,33 gr s3 = 200,00 kN/m2 W= 122,34 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 3,90 0,10 9,63 1,86 0,193 7 15,00 0,10 9,63 7,14 0,742 7 24,75 0,10 9,63 11,79 1,224
Height of Sample = 7,00 cm 14 9,10 0,20 9,64 4,33 0,450 14 16,90 0,20 9,64 8,05 0,835 14 30,00 0,20 9,64 14,29 1,482
3
Volume of Sampel = 67,35 cm 21 10,40 0,30 9,65 4,95 0,513 21 20,20 0,30 9,65 9,62 0,997 21 33,00 0,30 9,65 15,72 1,629
Speed = 0,70 mm/menit 28 11,00 0,40 9,66 5,24 0,542 28 20,80 0,40 9,66 9,91 1,026 28 36,00 0,40 9,66 17,15 1,775
Kalibrasi = 0,476 kg/div 35 11,70 0,50 9,67 5,57 0,576 35 23,40 0,50 9,67 11,15 1,153 35 39,00 0,50 9,67 18,58 1,921
70 14,30 1,00 9,72 6,81 0,701 70 26,70 1,00 9,72 12,72 1,309 70 42,00 1,00 9,72 20,00 2,058
105 15,90 1,50 9,77 7,57 0,775 105 28,30 1,50 9,77 13,48 1,380 105 45,00 1,50 9,77 21,43 2,194
140 17,90 2,00 9,82 8,53 0,868 140 29,25 2,00 9,82 13,93 1,419 140 48,00 2,00 9,82 22,86 2,329
175 18,80 2,50 9,87 8,95 0,907 175 30,60 2,50 9,87 14,57 1,477 175 49,50 2,50 9,87 23,58 2,389
210 20,50 3,00 9,92 9,76 0,984 210 31,90 3,00 9,92 15,19 1,532 210 51,00 3,00 9,92 24,29 2,449
280 23,40 4,00 10,02 11,15 1,112 280 33,50 4,00 10,02 15,96 1,592 280 52,50 4,00 10,02 25,01 2,495
350 24,70 5,00 10,13 11,76 1,162 350 35,10 5,00 10,13 16,72 1,651 350 54,00 5,00 10,13 25,72 2,540
420 26,00 6,00 10,24 12,38 1,210 420 37,00 6,00 10,24 17,62 1,722 420 55,50 6,00 10,24 26,43 2,583
490 26,70 7,00 10,35 12,72 1,229 490 39,00 7,00 10,35 18,58 1,796 490 57,00 7,00 10,35 27,15 2,624
560 27,30 8,00 10,46 13,00 1,243 560 40,30 8,00 10,46 19,19 1,835 560 59,60 8,00 10,46 28,39 2,714
630 29,25 9,00 10,57 13,93 1,318 630 41,00 9,00 10,57 19,53 1,847 630 60,75 9,00 10,57 28,94 2,737
700 30,90 10,00 10,69 14,72 1,377 700 41,60 10,00 10,69 19,81 1,853 700 63,00 10,00 10,69 30,01 2,807
840 31,20 12,00 10,93 14,86 1,359 840 43,40 12,00 10,93 20,67 1,891 840 66,00 12,00 10,93 31,44 2,875
980 31,10 14,00 11,19 14,81 1,324 980 45,50 14,00 11,19 21,67 1,937 980 67,50 14,00 11,19 32,15 2,874
1120 30,90 16,00 11,45 14,72 1,285 1120 45,40 16,00 11,45 21,62 1,888 1120 67,20 16,00 11,45 32,01 2,794
1260 1260 45,20 18,00 11,73 21,53 1,835 1260 67,00 18,00 11,73 31,91 2,720
1400 1400 1400 66,90 20,00 12,03 31,86 2,650
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 120,94 121,33 122,34
2,5
3
INITIAL Density, gr/cm 1,80 1,80 1,82
Deviator Stress (s1 - s3), kg/cm2
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1.00 - 1.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 30.280
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.759
LIQUID LIMIT (LL%) 38.030 DRY WEIGHT Wd (gr) 54.900 DEGREE OF INITIAL SAT. So % 79%
PLASTIC LIMIT (PL%) 27.390 SUBSTANCE HEIGHT Hs (cm) 1.067
PRESSURE
GRADATION
Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
2 2 2
kg/cm kg/cm r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1.00 - 1.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
0.75
e0
0.70
0.65
0.60
Void Ratio, e
0.55
0.50
0.45
0.40
0.35
eb
0.30 s0 sc' sb
0.1 1 10 100
Pressure, s kg/cm2
0.004
0.003
0.002
0.001
0.000
1 10
Stress, s (kg/cm 2)
2
so = 0.192 kg/cm
2
sc = 3.700 kg/cm
Cr = 0.011
Cc = 0.377
eo = 0.760
ec = 0.745
2
Cv avg = 0.003 cm /sec
K avg = 0.000035 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,58 14,07 gram
2 Mass of wet soil + can M2 113,38 115,43 gram
3 Mass of dry soil + can M3 93,45 99,96 gram
4 Mass of moisture = M2 - M3 19,93 15,47 gram
5 Mass of dry soil = M3 - M1 80,87 85,89 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,64 18,01 %
7 Average water content, (w) 21,33 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,41 33,35 gram
2 Mass of dry soil + piknometer M2 51,51 51,61 gram
3 Mass of dry soil + water + piknometer M3 94,56 94,28 gram
4 Mass of water + piknometer M4 83,64 83,21 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,10 18,26
7 B = M3 - M4 10,92 11,07
8 C=A-B 7,18 7,19
9 Specific Gravity, Gs = A / C 2,52 2,54
10 Average specific gravity, Gs 2,53
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,53
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,06 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,06 100,00 e2 = e1 - d2
4 4,750 d3 = 2,40 e3 = 72,66 96,80 e3 = e2 - d3
8 2,360 d4 = 1,35 e4 = 71,31 95,00 e4 = e3 - d4
20 0,850 d5 = 1,16 e5 = 70,15 93,46 e5 = e4 - d5
30 0,600 d6 = 1,13 e6 = 69,02 91,95 e6 = e5 - d6
50 0,300 d7 = 1,86 e7 = 67,16 89,48 e7 = e6 - d7
100 0,150 d8 = 2,80 e8 = 64,36 85,74 e8 = e7 - d8
200 0,075 d9 = 1,81 e9 = 62,55 83,33 e9 = e8 - d9
Sd = 12,51
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.37 Wet Weight Speciment, gr 122.27
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm 3) 61.55
2 3
3 Cross Sectional Area A (cm ) 8.92 Weight Volume of Speciment, gb (gr/cm ) 1.99
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
0.7
0.6
0.5
Compressive Stress (kg/cm2)
0.4
0.3
0.2
0.1
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,79 12,63 gram
2 Mass of wet soil + can M2 112,83 130,66 gram
3 Mass of dry soil + can M3 102,07 115,39 gram
4 Mass of moisture = M2 - M3 10,76 15,27 gram
5 Mass of dry soil = M3 - M1 89,28 102,76 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,05 14,86 %
7 Average water content, (w) 13,46 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,43 31,70 gram
2 Mass of dry soil + piknometer M2 50,80 49,76 gram
3 Mass of dry soil + water + piknometer M3 93,56 93,31 gram
4 Mass of water + piknometer M4 82,07 82,03 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,37 18,06
7 B = M3 - M4 11,49 11,28
8 C=A-B 6,88 6,78
9 Specific Gravity, Gs = A / C 2,67 2,66
10 Average specific gravity, Gs 2,67
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,67
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,46 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,46 100,00 e2 = e1 - d2
4 4,750 d3 = 3,43 e3 = 72,03 95,45 e3 = e2 - d3
8 2,360 d4 = 3,61 e4 = 68,42 90,67 e4 = e3 - d4
20 0,850 d5 = 6,47 e5 = 61,95 82,10 e5 = e4 - d5
30 0,600 d6 = 4,82 e6 = 57,13 75,71 e6 = e5 - d6
50 0,300 d7 = 7,64 e7 = 49,49 65,58 e7 = e6 - d7
100 0,150 d8 = 8,71 e8 = 40,78 54,04 e8 = e7 - d8
200 0,075 d9 = 2,05 e9 = 38,73 51,33 e9 = e8 - d9
Sd = 36,73
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 129.38
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm )3
62.65
3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 2.07
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.8
1.6
1.4
1.2
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,68 13,63 gram
2 Mass of wet soil + can M2 133,48 140,61 gram
3 Mass of dry soil + can M3 108,19 113,80 gram
4 Mass of moisture = M2 - M3 25,29 26,81 gram
5 Mass of dry soil = M3 - M1 94,51 100,17 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,76 26,76 %
7 Average water content, (w) 26,76 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,22 32,18 gram
2 Mass of dry soil + piknometer M2 50,60 50,53 gram
3 Mass of dry soil + water + piknometer M3 93,08 93,22 gram
4 Mass of water + piknometer M4 81,87 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,38 18,35
7 B = M3 - M4 11,21 11,09
8 C=A-B 7,17 7,26
9 Specific Gravity, Gs = A / C 2,56 2,53
10 Average specific gravity, Gs 2,55
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,55
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,55 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,55 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,55 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,55 100,00 e4 = e3 - d4
20 0,850 d5 = 0,12 e5 = 75,43 99,84 e5 = e4 - d5
30 0,600 d6 = 0,23 e6 = 75,20 99,54 e6 = e5 - d6
50 0,300 d7 = 0,41 e7 = 74,79 98,99 e7 = e6 - d7
100 0,150 d8 = 1,52 e8 = 73,27 96,98 e8 = e7 - d8
200 0,075 d9 = 1,24 e9 = 72,03 95,34 e9 = e8 - d9
Sd = 3,52
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.32 Wet Weight Speciment, gr 112.17
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm )3
59.73
3 Cross Sectional Area A (cm2) 8.66 Weight Volume of Speciment, gb (gr/cm3) 1.88
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,66 14,09 gram
2 Mass of wet soil + can M2 129,55 117,22 gram
3 Mass of dry soil + can M3 110,01 100,00 gram
4 Mass of moisture = M2 - M3 19,54 17,22 gram
5 Mass of dry soil = M3 - M1 96,35 85,91 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,28 20,04 %
7 Average water content, (w) 20,16 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,12 32,32 gram
2 Mass of dry soil + piknometer M2 50,33 50,88 gram
3 Mass of dry soil + water + piknometer M3 93,57 93,22 gram
4 Mass of water + piknometer M4 82,40 81,75 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,21 18,56
7 B = M3 - M4 11,17 11,47
8 C=A-B 7,04 7,09
9 Specific Gravity, Gs = A / C 2,59 2,62
10 Average specific gravity, Gs 2,60
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,58 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,58 100,00 e2 = e1 - d2
4 4,750 d3 = 0,06 e3 = 75,52 99,92 e3 = e2 - d3
8 2,360 d4 = 0,98 e4 = 74,54 98,62 e4 = e3 - d4
20 0,850 d5 = 0,58 e5 = 73,96 97,86 e5 = e4 - d5
30 0,600 d6 = 0,68 e6 = 73,28 96,96 e6 = e5 - d6
50 0,300 d7 = 1,06 e7 = 72,22 95,55 e7 = e6 - d7
100 0,150 d8 = 1,20 e8 = 71,02 93,97 e8 = e7 - d8
200 0,075 d9 = 0,43 e9 = 70,59 93,40 e9 = e8 - d9
Sd = 4,99
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 131.87
1
2 Height of Speciment, L0 (cm) 7.1 Volume of Speciment, V (cm 3) 64.46
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 2.05
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,25 14,07 gram
2 Mass of wet soil + can M2 127,43 132,12 gram
3 Mass of dry soil + can M3 110,03 114,45 gram
4 Mass of moisture = M2 - M3 17,40 17,67 gram
5 Mass of dry soil = M3 - M1 95,78 100,38 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 18,17 17,60 %
7 Average water content, (w) 17,88 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,43 30,59 gram
2 Mass of dry soil + piknometer M2 50,71 48,67 gram
3 Mass of dry soil + water + piknometer M3 93,56 91,46 gram
4 Mass of water + piknometer M4 82,89 81,01 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,28 18,08
7 B = M3 - M4 10,67 10,45
8 C=A-B 7,61 7,63
9 Specific Gravity, Gs = A / C 2,40 2,37
10 Average specific gravity, Gs 2,39
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,39
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,33 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,33 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,33 100,00 e3 = e2 - d3
8 2,360 d4 = 0,82 e4 = 74,51 98,91 e4 = e3 - d4
20 0,850 d5 = 1,73 e5 = 72,78 96,61 e5 = e4 - d5
30 0,600 d6 = 1,66 e6 = 71,12 94,41 e6 = e5 - d6
50 0,300 d7 = 2,12 e7 = 69,00 91,60 e7 = e6 - d7
100 0,150 d8 = 2,48 e8 = 66,52 88,30 e8 = e7 - d8
200 0,075 d9 = 0,80 e9 = 65,72 87,24 e9 = e8 - d9
Sd = 9,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 132.94
1
2 Height of Speciment, L0 (cm) 6.95 Volume of Speciment, V (cm )3
63.10
3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 2.11
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
2.5
2
Compressive Stress (kg/cm2)
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,58 12,72 gram
2 Mass of wet soil + can M2 113,02 113,17 gram
3 Mass of dry soil + can M3 91,33 89,99 gram
4 Mass of moisture = M2 - M3 21,69 23,18 gram
5 Mass of dry soil = M3 - M1 78,75 77,27 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 27,54 30,00 %
7 Average water content, (w) 28,77 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,41 31,65 gram
2 Mass of dry soil + piknometer M2 51,73 50,01 gram
3 Mass of dry soil + water + piknometer M3 95,15 94,06 gram
4 Mass of water + piknometer M4 83,64 82,44 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,32 18,36
7 B = M3 - M4 11,51 11,62
8 C=A-B 6,81 6,74
9 Specific Gravity, Gs = A / C 2,69 2,72
10 Average specific gravity, Gs 2,71
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,71
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,1 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,10 100,00 e2 = e1 - d2
4 4,750 d3 = 0,20 e3 = 74,90 99,73 e3 = e2 - d3
8 2,360 d4 = 1,18 e4 = 73,72 98,16 e4 = e3 - d4
20 0,850 d5 = 2,46 e5 = 71,26 94,89 e5 = e4 - d5
30 0,600 d6 = 0,94 e6 = 70,32 93,64 e6 = e5 - d6
50 0,300 d7 = 0,89 e7 = 69,43 92,45 e7 = e6 - d7
100 0,150 d8 = 1,79 e8 = 67,64 90,07 e8 = e7 - d8
200 0,075 d9 = 1,93 e9 = 65,71 87,50 e9 = e8 - d9
Sd = 9,39
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
3,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,86 122,72 123,12
3
INITIAL Density, gr/cm 1,81 1,82 1,83
2,0
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 28.770
SPECIFIC GRAVITY (G) 2.710 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.615
LIQUID LIMIT (LL%) 36.310 DRY WEIGHT Wd (gr) 59.630 DEGREE OF INITIAL SAT. So % 77%
PLASTIC LIMIT (PL%) 33.620 SUBSTANCE HEIGHT Hs (cm) 1.159
PRESSURE
GRADATION
Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
0.55
0.5
Void Ratio, e
0.45
0.4
0.35
0.3
eb
0.25
0.2
s0 sc ' sb
0.1 1 10 100 1000
Pressure, s kg/cm2
0.0025
0.0020
0.0015
0.0010
0.0005
0.0000
1 10
Stress, s (kg/cm2)
2
so = 0.207 kg/cm
2
sc = 1.850 kg/cm
Cr = 0.047
Cc = 0.198
eo = 0.615
ec = 0.570
2
Cv avg = 0.001 cm /sec
K avg = 0.000025 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,77 12,68 gram
2 Mass of wet soil + can M2 112,78 122,44 gram
3 Mass of dry soil + can M3 102,08 113,76 gram
4 Mass of moisture = M2 - M3 10,70 8,68 gram
5 Mass of dry soil = M3 - M1 89,31 101,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,98 8,59 %
7 Average water content, (w) 10,28 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,46 31,50 gram
2 Mass of dry soil + piknometer M2 50,49 49,51 gram
3 Mass of dry soil + water + piknometer M3 94,10 92,86 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,03 18,01
7 B = M3 - M4 11,21 11,12
8 C=A-B 6,82 6,89
9 Specific Gravity, Gs = A / C 2,64 2,61
10 Average specific gravity, Gs 2,63
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,63
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,56 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,56 100,00 e2 = e1 - d2
4 4,750 d3 = 1,33 e3 = 74,23 98,24 e3 = e2 - d3
8 2,360 d4 = 0,16 e4 = 74,07 98,03 e4 = e3 - d4
20 0,850 d5 = 0,15 e5 = 73,92 97,83 e5 = e4 - d5
30 0,600 d6 = 0,36 e6 = 73,56 97,35 e6 = e5 - d6
50 0,300 d7 = 0,82 e7 = 72,74 96,27 e7 = e6 - d7
100 0,150 d8 = 1,87 e8 = 70,87 93,79 e8 = e7 - d8
200 0,075 d9 = 1,26 e9 = 69,61 92,13 e9 = e8 - d9
Sd = 5,95
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
1 Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 143.81
2 Height of Speciment, L0 (cm) 7.23 Volume of Speciment, V (cm )
3
65.64
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 2.19
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 3.00 0.968 1.43 9.168 0.156
140 0.14 5.75 1.936 2.74 9.258 0.296
210 0.21 9.50 2.905 4.52 9.351 0.484
280 0.28 13.00 3.873 6.19 9.445 0.656
350 0.35 17.00 4.841 8.10 9.541 0.849
420 0.42 19.75 5.809 9.41 9.639 0.976
490 0.49 24.00 6.777 11.43 9.739 1.174
560 0.56 28.00 7.746 13.34 9.841 1.355
630 0.63 29.00 8.714 13.81 9.946 1.389
700 0.7 30.25 9.682 14.41 10.052 1.433
770 0.77 31.75 10.650 15.12 10.161 1.488
840 0.84 32.75 11.618 15.60 10.273 1.518
910 0.91 33.00 12.586 15.72 10.386 1.513
980 0.98 33.25 13.555 15.84 10.503 1.508
1050 1.05 32.25 14.523 15.36 10.622 1.446
1120 1.12 32.00 15.491 15.24 10.743 1.419
1190 1.19 31.00 16.459 14.77 10.868 1.359
1260 1.26 29.75 17.427 14.17 10.995 1.289
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.5 - 6.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
1.6
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,24 11,68 gram
2 Mass of wet soil + can M2 114,82 111,74 gram
3 Mass of dry soil + can M3 105,00 100,02 gram
4 Mass of moisture = M2 - M3 9,82 11,72 gram
5 Mass of dry soil = M3 - M1 90,76 88,34 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 10,82 13,27 %
7 Average water content, (w) 12,04 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,99 33,02 gram
2 Mass of dry soil + piknometer M2 49,47 51,95 gram
3 Mass of dry soil + water + piknometer M3 92,30 94,47 gram
4 Mass of water + piknometer M4 82,51 82,86 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 17,48 18,93
7 B = M3 - M4 9,79 11,61
8 C=A-B 7,69 7,32
9 Specific Gravity, Gs = A / C 2,27 2,59
10 Average specific gravity, Gs 2,43
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,43
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,53 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,53 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,53 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,53 100,00 e4 = e3 - d4
20 0,850 d5 = 0,45 e5 = 75,08 99,40 e5 = e4 - d5
30 0,600 d6 = 0,38 e6 = 74,70 98,90 e6 = e5 - d6
50 0,300 d7 = 0,35 e7 = 74,35 98,44 e7 = e6 - d7
100 0,150 d8 = 0,36 e8 = 73,99 97,96 e8 = e7 - d8
200 0,075 d9 = 0,21 e9 = 73,78 97,68 e9 = e8 - d9
Sd = 1,75
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.3 Wet Weight Speciment, gr 127.52
1
2 Height of Speciment, L0 (cm) 7.23 Volume of Speciment, V (cm 3) 61.84
2 3
3 Cross Sectional Area A (cm ) 8.55 Weight Volume of Speciment, gb (gr/cm ) 2.06
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.8
1.6
1.4
1.2
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,62 13,98 gram
2 Mass of wet soil + can M2 117,00 122,48 gram
3 Mass of dry soil + can M3 94,42 100,02 gram
4 Mass of moisture = M2 - M3 22,58 22,46 gram
5 Mass of dry soil = M3 - M1 81,80 86,04 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 27,60 26,10 %
7 Average water content, (w) 26,85 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 29,86 30,49 gram
2 Mass of dry soil + piknometer M2 47,94 48,63 gram
3 Mass of dry soil + water + piknometer M3 91,10 92,50 gram
4 Mass of water + piknometer M4 80,09 81,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,08 18,14
7 B = M3 - M4 11,01 11,25
8 C=A-B 7,07 6,89
9 Specific Gravity, Gs = A / C 2,56 2,63
10 Average specific gravity, Gs 2,60
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,68 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,68 100,00 e2 = e1 - d2
4 4,750 d3 = 4,72 e3 = 70,96 93,76 e3 = e2 - d3
8 2,360 d4 = 2,24 e4 = 68,72 90,80 e4 = e3 - d4
20 0,850 d5 = 1,07 e5 = 67,65 89,39 e5 = e4 - d5
30 0,600 d6 = 1,02 e6 = 66,63 88,04 e6 = e5 - d6
50 0,300 d7 = 1,04 e7 = 65,59 86,67 e7 = e6 - d7
100 0,150 d8 = 1,67 e8 = 63,92 84,46 e8 = e7 - d8
200 0,075 d9 = 1,37 e9 = 62,55 82,65 e9 = e8 - d9
Sd = 13,13
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.46 Wet Weight Speciment, gr 132.36
1
2 Height of Speciment, L0 (cm) 7.1 Volume of Speciment, V (cm 3) 66.76
2 3
3 Cross Sectional Area A (cm ) 9.40 Weight Volume of Speciment, gb (gr/cm ) 1.98
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
0.35
0.3
0.25
Compressive Stress (kg/cm2)
0.2
0.15
0.1
0.05
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,93 13,12 gram
2 Mass of wet soil + can M2 113,08 110,51 gram
3 Mass of dry soil + can M3 102,08 99,59 gram
4 Mass of moisture = M2 - M3 11,00 10,92 gram
5 Mass of dry soil = M3 - M1 89,15 86,47 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,34 12,63 %
7 Average water content, (w) 12,48 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,74 31,83 gram
2 Mass of dry soil + piknometer M2 49,84 49,94 gram
3 Mass of dry soil + water + piknometer M3 93,30 93,40 gram
4 Mass of water + piknometer M4 82,03 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,10 18,11
7 B = M3 - M4 11,27 11,27
8 C=A-B 6,83 6,84
9 Specific Gravity, Gs = A / C 2,65 2,65
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,65
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,33 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,33 100,00 e2 = e1 - d2
4 4,750 d3 = 0,72 e3 = 74,61 99,04 e3 = e2 - d3
8 2,360 d4 = 2,10 e4 = 72,51 96,26 e4 = e3 - d4
20 0,850 d5 = 0,98 e5 = 71,53 94,96 e5 = e4 - d5
30 0,600 d6 = 0,70 e6 = 70,83 94,03 e6 = e5 - d6
50 0,300 d7 = 0,89 e7 = 69,94 92,84 e7 = e6 - d7
100 0,150 d8 = 1,22 e8 = 68,72 91,23 e8 = e7 - d8
200 0,075 d9 = 1,90 e9 = 66,82 88,70 e9 = e8 - d9
Sd = 8,51
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.5 Wet Weight Speciment, gr 114.26
1
2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 67.35
2 3
3 Cross Sectional Area A (cm ) 9.62 Weight Volume of Speciment, gb (gr/cm ) 1.70
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
5
Compressive Stress (kg/cm2)
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,20 12,56 gram
2 Mass of wet soil + can M2 111,53 112,86 gram
3 Mass of dry soil + can M3 96,22 109,87 gram
4 Mass of moisture = M2 - M3 15,31 2,99 gram
5 Mass of dry soil = M3 - M1 85,02 97,31 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 18,01 3,07 %
7 Average water content, (w) 10,54 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,64 32,43 gram
2 Mass of dry soil + piknometer M2 50,82 50,56 gram
3 Mass of dry soil + water + piknometer M3 93,24 93,21 gram
4 Mass of water + piknometer M4 82,09 82,07 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,18 18,13
7 B = M3 - M4 11,15 11,14
8 C=A-B 7,03 6,99
9 Specific Gravity, Gs = A / C 2,59 2,59
10 Average specific gravity, Gs 2,59
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,59
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,45 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,45 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,45 100,00 e3 = e2 - d3
8 2,360 d4 = 0,10 e4 = 75,35 99,87 e4 = e3 - d4
20 0,850 d5 = 0,41 e5 = 74,94 99,32 e5 = e4 - d5
30 0,600 d6 = 0,30 e6 = 74,64 98,93 e6 = e5 - d6
50 0,300 d7 = 0,21 e7 = 74,43 98,65 e7 = e6 - d7
100 0,150 d8 = 0,23 e8 = 74,20 98,34 e8 = e7 - d8
200 0,075 d9 = 0,13 e9 = 74,07 98,17 e9 = e8 - d9
Sd = 1,38
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
1 Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 125.71
2 Height of Speciment, L0 (cm) 7.2 Volume of Speciment, V (cm )
3
65.37
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 1.92
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 5.50 0.972 2.62 9.168 0.286
140 0.14 8.25 1.944 3.93 9.259 0.424
210 0.21 10.75 2.917 5.12 9.352 0.548
280 0.28 12.50 3.889 5.95 9.447 0.630
350 0.35 14.25 4.861 6.79 9.543 0.711
420 0.42 16.00 5.833 7.62 9.642 0.790
490 0.49 18.25 6.806 8.69 9.742 0.892
560 0.56 19.00 7.778 9.05 9.845 0.919
630 0.63 19.75 8.750 9.41 9.950 0.945
700 0.7 20.00 9.722 9.53 10.057 0.947
770 0.77 20.50 10.694 9.76 10.166 0.960
840 0.84 20.75 11.667 9.88 10.278 0.962
910 0.91 21.00 12.639 10.00 10.393 0.962
980 0.98 21.50 13.611 10.24 10.510 0.974
1050 1.05 22.00 14.583 10.48 10.629 0.986
1120 1.12 22.50 15.556 10.72 10.752 0.997
1190 1.19 23.00 16.528 10.95 10.877 1.007
1260 1.26 23.25 17.500 11.07 11.005 1.006
1330 1.33 22.00 18.472 10.48 11.136 0.941
1400 1.4 21.00 19.444 10.00 11.271 0.887
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22 - 22.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
1.2
0.8
Compressive Stress (kg/cm2)
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,23 11,08 gram
2 Mass of wet soil + can M2 131,65 126,24 gram
3 Mass of dry soil + can M3 108,20 103,16 gram
4 Mass of moisture = M2 - M3 23,45 23,08 gram
5 Mass of dry soil = M3 - M1 93,97 92,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,95 25,07 %
7 Average water content, (w) 25,01 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,46 31,52 gram
2 Mass of dry soil + piknometer M2 52,97 51,90 gram
3 Mass of dry soil + water + piknometer M3 95,67 94,27 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,51 20,38
7 B = M3 - M4 12,78 12,53
8 C=A-B 7,73 7,85
9 Specific Gravity, Gs = A / C 2,65 2,60
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,62
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 1,25 e8 = 73,75 98,33 e8 = e7 - d8
200 0,075 d9 = 6,48 e9 = 67,27 89,69 e9 = e8 - d9
Sd = 7,73
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
INITIAL
Moisture, % 25,01 25,01 25,01
Dry Density, gr/cm3 1,44 1,46 1,47
Weight, gr
1,5 AFTER Density, gr/cm3
CONSOLIDATION Moisture, %
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
o
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.630 INIT. WATER CONTENT Wo % 26.520
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.580
LIQUID LIMIT (LL%) 42.460 DRY WEIGHT Wd (gr) 61.770 DEGREE OF INITIAL SAT. So % 69.476
PLASTIC LIMIT (PL%) 23.310 SUBSTANCE HEIGHT Hs (cm) 1.200
GRADATION
PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
0.6e0
0.55
0.5
Void Ratio, e
0.45
0.4
0.35
0.3
0.25e
b
0.2
0.1 s0 1 sc' 10 100 1000 sb
10000
Pressure, s kg/cm2
0.002
0.001
0
0.1 1 10
Stress (kg/cm2)
po = 0.209 kg/cm2
pc = 1.700 kg/cm2
Cr = 0.047
Cc = 0.078
eo = 0.582
ec = 0.540
CV avg = 0.0015086 cm2/sec
K = 0.0000089 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,43 13,53 gram
2 Mass of wet soil + can M2 123,44 160,01 gram
3 Mass of dry soil + can M3 104,86 133,82 gram
4 Mass of moisture = M2 - M3 18,58 26,19 gram
5 Mass of dry soil = M3 - M1 90,43 120,29 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,55 21,77 %
7 Average water content, (w) 21,16 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,36 29,24 gram
2 Mass of dry soil + piknometer M2 52,51 49,44 gram
3 Mass of dry soil + water + piknometer M3 94,66 91,86 gram
4 Mass of water + piknometer M4 82,25 79,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,15 20,20
7 B = M3 - M4 12,41 12,64
8 C=A-B 7,74 7,56
9 Specific Gravity, Gs = A / C 2,60 2,67
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,52 e5 = 74,48 99,31 e5 = e4 - d5
30 0,600 d6 = 0,79 e6 = 73,69 98,25 e6 = e5 - d6
50 0,300 d7 = 1,51 e7 = 72,18 96,24 e7 = e6 - d7
100 0,150 d8 = 6,66 e8 = 65,52 87,36 e8 = e7 - d8
200 0,075 d9 = 8,89 e9 = 56,63 75,51 e9 = e8 - d9
Sd = 18,37
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
3,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,46 122,98 123,17
3
Density, gr/cm 1,80 1,83 1,83
2,0 INITIAL
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
2,0
Shear Stress, kg/cm2
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 20.535
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.430
LIQUID LIMIT (LL%) 28.790 DRY WEIGHT Wd (gr) 68.893 DEGREE OF INITIAL SAT. So % 54.212
PLASTIC LIMIT (PL%) 18.180 SUBSTANCE HEIGHT Hs (cm) 1.327
GRADATION
PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute 2
cm / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
0.5
e0
Void Ratio, e
0.4
0.3
0.2
eb
0.1
0.1 1 sc' 10 100 sb 1000
Pressure, s kg/cm2
0.01000
0.00800
0.00600
0.00400
0.00200
0.00000
0.1 1 10
Stress, s (kg/cm2)
po = 0.222 kg/cm2
pc = 1.800 kg/cm2
Cr = 0.027
Cc = 0.127
eo = 0.431
ec = 0.407
2
Cv avg = 0.003600 cm /sec
K avg = 0.000023 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,57 13,89 gram
2 Mass of wet soil + can M2 149,97 159,98 gram
3 Mass of dry soil + can M3 121,60 131,91 gram
4 Mass of moisture = M2 - M3 28,37 28,07 gram
5 Mass of dry soil = M3 - M1 108,03 118,02 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,26 23,78 %
7 Average water content, (w) 25,02 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,98 31,26 gram
2 Mass of dry soil + piknometer M2 52,37 51,62 gram
3 Mass of dry soil + water + piknometer M3 94,92 94,62 gram
4 Mass of water + piknometer M4 82,12 82,04 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,39 20,36
7 B = M3 - M4 12,80 12,58
8 C=A-B 7,59 7,78
9 Specific Gravity, Gs = A / C 2,69 2,62
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,65
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 10,92 e8 = 64,08 85,44 e8 = e7 - d8
200 0,075 d9 = 13,55 e9 = 50,53 67,37 e9 = e8 - d9
Sd = 24,47
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION
Area, cm2 9,62 9,62 9,62
Volume, cm3 67,35 67,35 67,35
2,5 Weight, gr 121,67 122,99 123,28
Density, gr/cm3 1,81 1,83 1,83
Deviator Stress (s1 - s3), kg/cm2
INITIAL
Moisture, % 25,02 25,02 25,02
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boringo No : BGP 1
Depth : 11.50.12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 22.960
SPECIFIC GRAVITY (G) 2.650 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.570
LIQUID LIMIT (LL%) 20.280 DRY WEIGHT Wd (gr) 62.970 DEGREE OF INITIAL SAT. So % 60.852
PLASTIC LIMIT (PL%) 17.270 SUBSTANCE HEIGHT Hs (cm) 1.210
GRADATION
PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% 2
mv (cm /kg) (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11.50 - 12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
0.5
Void Ratio, e
0.4
0.3
eb
0.2
0.1
0.1 s0 1 sc' 10 100 sb 1000
Pressure, s kg/cm2
0.0008
0.0006
0.0004
0.0002
0.0000
0.1 1 10
Stress, s (kg/cm2)
po = 0.208 kg/cm2
pc = 1.200 kg/cm2
Cr = 0.017
Cc = 0.162
eo = 0.570
ec = 0.557
2
CV avg = 0.00079725 cm /sec
K = 0.0000247 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,23 11,08 gram
2 Mass of wet soil + can M2 131,65 126,24 gram
3 Mass of dry soil + can M3 108,20 103,16 gram
4 Mass of moisture = M2 - M3 23,45 23,08 gram
5 Mass of dry soil = M3 - M1 93,97 92,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,95 25,07 %
7 Average water content, (w) 25,01 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,46 31,52 gram
2 Mass of dry soil + piknometer M2 52,97 51,90 gram
3 Mass of dry soil + water + piknometer M3 95,67 94,27 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,51 20,38
7 B = M3 - M4 12,78 12,53
8 C=A-B 7,73 7,85
9 Specific Gravity, Gs = A / C 2,65 2,60
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,62
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 1,25 e8 = 73,75 98,33 e8 = e7 - d8
200 0,075 d9 = 6,48 e9 = 67,27 89,69 e9 = e8 - d9
Sd = 7,73
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 2,50 - 3,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 2,50 - 3,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
1,8
Test conditon : UU
SPECIMEN 1 2 3
1,6 Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
1,4 3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,69 122,87 123,01
1,2 3
Deviator Stress (s1 - s3), kg/cm2
0 5 10 15 20 PARAMETERS j: 13,46
Strain, %
s3.1 s3.2 s3.3
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,08 14,02 gram
2 Mass of wet soil + can M2 113,53 126,35 gram
3 Mass of dry soil + can M3 112,77 111,59 gram
4 Mass of moisture = M2 - M3 0,76 14,76 gram
5 Mass of dry soil = M3 - M1 100,69 97,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 0,75 15,13 %
7 Average water content, (w) 7,94 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,69 32,59 gram
2 Mass of dry soil + piknometer M2 49,77 51,10 gram
3 Mass of dry soil + water + piknometer M3 92,78 93,58 gram
4 Mass of water + piknometer M4 81,99 82,54 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,08 18,51
7 B = M3 - M4 10,79 11,04
8 C=A-B 7,29 7,47
9 Specific Gravity, Gs = A / C 2,48 2,48
10 Average specific gravity, Gs 2,48
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,48
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
50
40
30 OH or MH `
20 CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,3 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,30 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,30 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,30 100,00 e4 = e3 - d4
20 0,850 d5 = 1,17 e5 = 74,13 98,45 e5 = e4 - d5
30 0,600 d6 = 1,50 e6 = 72,63 96,45 e6 = e5 - d6
50 0,300 d7 = 1,19 e7 = 71,44 94,87 e7 = e6 - d7
100 0,150 d8 = 1,49 e8 = 69,95 92,90 e8 = e7 - d8
200 0,075 d9 = 0,74 e9 = 69,21 91,91 e9 = e8 - d9
Sd = 6,09
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama
4,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,5
DIMENSION
Length, cm 7,00 7,00 7,00
2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
3,0
Weight, gr 121,52 121,60 122,07
3
INITIAL Density, gr/cm 1,80 1,81 1,81
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 32.220
SPECIFIC GRAVITY (G) 2.480 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.518
LIQUID LIMIT (LL%) 47.230 DRY WEIGHT Wd (gr) 62.670 DEGREE OF INITIAL SAT. So % 84%
PLASTIC LIMIT (PL%) 32.350 SUBSTANCE HEIGHT Hs (cm) 1.218
PRESSURE
GRADATION
Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
e0
eb
s0 sc' sb
2
so = 0.220 kg/cm
2
sc = 1.700 kg/cm
Cr = 0.077
Cc = 0.139
eo = 0.520
ec = 0.450
2
Cv avg = 0.003 cm /sec
K avg = 0.000069 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,26 14,45 gram
2 Mass of wet soil + can M2 114,40 114,81 gram
3 Mass of dry soil + can M3 100,00 100,02 gram
4 Mass of moisture = M2 - M3 14,40 14,79 gram
5 Mass of dry soil = M3 - M1 85,74 85,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 16,79 17,28 %
7 Average water content, (w) 17,04 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,18 31,83 gram
2 Mass of dry soil + piknometer M2 50,83 50,00 gram
3 Mass of dry soil + water + piknometer M3 93,85 93,39 gram
4 Mass of water + piknometer M4 82,83 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,65 18,17
7 B = M3 - M4 11,02 11,26
8 C=A-B 7,63 6,91
9 Specific Gravity, Gs = A / C 2,44 2,63
10 Average specific gravity, Gs 2,54
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,54
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,19 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,19 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,19 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,19 100,00 e4 = e3 - d4
20 0,850 d5 = 0,03 e5 = 75,16 99,96 e5 = e4 - d5
30 0,600 d6 = 0,03 e6 = 75,13 99,92 e6 = e5 - d6
50 0,300 d7 = 0,17 e7 = 74,96 99,69 e7 = e6 - d7
100 0,150 d8 = 1,99 e8 = 72,97 97,05 e8 = e7 - d8
200 0,075 d9 = 3,07 e9 = 69,90 92,96 e9 = e8 - d9
Sd = 5,29
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Height of Sample = 7,00 cm 14 15,00 0,20 9,64 7,14 0,741 14 18,00 0,20 9,64 8,57 0,889 14 43,20 0,20 9,64 20,58 2,134
Volume of Sampel = 67,35 cm3 21 20,00 0,30 9,65 9,53 0,987 21 27,00 0,30 9,65 12,86 1,333 21 57,60 0,30 9,65 27,43 2,843
Speed = 0,70 mm/menit 28 25,00 0,40 9,66 11,91 1,233 28 36,00 0,40 9,66 17,15 1,775 28 64,00 0,40 9,66 30,48 3,156
Kalibrasi = 0,476 kg/div 35 30,00 0,50 9,67 14,29 1,478 35 45,00 0,50 9,67 21,43 2,217 35 70,00 0,50 9,67 33,34 3,448
70 48,00 1,00 9,72 22,86 2,353 70 58,00 1,00 9,72 27,63 2,843 70 78,00 1,00 9,72 37,15 3,823
105 55,00 1,50 9,77 26,20 2,682 105 66,00 1,50 9,77 31,44 3,218 105 83,00 1,50 9,77 39,53 4,047
140 58,00 2,00 9,82 27,63 2,814 140 70,00 2,00 9,82 33,34 3,396 140 88,00 2,00 9,82 41,91 4,269
175 62,00 2,50 9,87 29,53 2,993 175 75,00 2,50 9,87 35,72 3,620 175 93,00 2,50 9,87 44,30 4,489
210 65,00 3,00 9,92 30,96 3,121 210 80,00 3,00 9,92 38,10 3,842 210 97,00 3,00 9,92 46,20 4,658
280 70,00 4,00 10,02 33,34 3,327 280 87,00 4,00 10,02 41,44 4,135 280 105,00 4,00 10,02 50,01 4,990
350 75,00 5,00 10,13 35,72 3,527 350 92,00 5,00 10,13 43,82 4,327 350 110,00 5,00 10,13 52,39 5,173
420 80,00 6,00 10,24 38,10 3,723 420 96,60 6,00 10,24 46,01 4,495 420 115,00 6,00 10,24 54,77 5,352
490 83,00 7,00 10,35 39,53 3,821 490 100,00 7,00 10,35 47,63 4,604 490 119,00 7,00 10,35 56,68 5,479
560 85,00 8,00 10,46 40,49 3,871 560 102,00 8,00 10,46 48,58 4,646 560 122,00 8,00 10,46 58,11 5,557
630 84,00 9,00 10,57 40,01 3,784 630 101,00 9,00 10,57 48,11 4,550 630 123,00 9,00 10,57 58,58 5,541
700 83,00 10,00 10,69 39,53 3,698 700 100,00 10,00 10,69 47,63 4,456 700 122,80 10,00 10,69 58,49 5,471
840 12,00 10,93 0,00 0,000 840 98,00 12,00 10,93 46,68 4,269 840 122,60 12,00 10,93 58,39 5,341
980 14,00 11,19 0,00 0,000 980 14,00 11,19 0,00 0,000 980 122,40 14,00 11,19 58,30 5,211
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
6,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
5,0 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,49 122,60 123,07
3
INITIAL Density, gr/cm 1,80 1,82 1,83
4,0
Deviator Stress (s1 - s3), kg/cm2
4,0
3,5
3,0
Shear Stress, kg/cm2
2,5
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,63 14,04 gram
2 Mass of wet soil + can M2 144,91 147,67 gram
3 Mass of dry soil + can M3 120,04 122,30 gram
4 Mass of moisture = M2 - M3 24,87 25,37 gram
5 Mass of dry soil = M3 - M1 106,41 108,26 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 23,37 23,43 %
7 Average water content, (w) 23,40 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,30 30,58 gram
2 Mass of dry soil + piknometer M2 51,46 51,00 gram
3 Mass of dry soil + water + piknometer M3 94,15 93,30 gram
4 Mass of water + piknometer M4 81,31 81,01 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,16 20,42
7 B = M3 - M4 12,84 12,29
8 C=A-B 7,32 8,13
9 Specific Gravity, Gs = A / C 2,75 2,51
10 Average specific gravity, Gs 2,63
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,63
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,77 e3 = 74,23 98,97 e3 = e2 - d3
8 2,360 d4 = 3,84 e4 = 70,39 93,85 e4 = e3 - d4
20 0,850 d5 = 6,41 e5 = 63,98 85,31 e5 = e4 - d5
30 0,600 d6 = 3,34 e6 = 60,64 80,85 e6 = e5 - d6
50 0,300 d7 = 3,20 e7 = 57,44 76,59 e7 = e6 - d7
100 0,150 d8 = 3,43 e8 = 54,01 72,01 e8 = e7 - d8
200 0,075 d9 = 2,33 e9 = 51,68 68,91 e9 = e8 - d9
Sd = 23,32
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Area = 9,62 cm2 7 5,70 0,10 9,63 2,71 0,282 7 3,00 0,10 9,63 1,43 0,148 7 6,90 0,10 9,63 3,29 0,341
Height of Sample = 7,00 cm 14 8,80 0,20 9,64 4,19 0,435 14 6,00 0,20 9,64 2,86 0,296 14 11,50 0,20 9,64 5,48 0,568
Volume of Sampel = 67,35 cm3 21 11,90 0,30 9,65 5,67 0,587 21 10,00 0,30 9,65 4,76 0,494 21 16,10 0,30 9,65 7,67 0,795
Speed = 0,70 mm/menit 28 12,70 0,40 9,66 6,05 0,626 28 12,00 0,40 9,66 5,72 0,592 28 20,70 0,40 9,66 9,86 1,021
Kalibrasi = 0,476 kg/div 35 13,60 0,50 9,67 6,48 0,670 35 14,00 0,50 9,67 6,67 0,690 35 23,00 0,50 9,67 10,95 1,133
70 15,60 1,00 9,72 7,43 0,765 70 18,00 1,00 9,72 8,57 0,882 70 27,00 1,00 9,72 12,86 1,323
105 17,60 1,50 9,77 8,38 0,858 105 20,00 1,50 9,77 9,53 0,975 105 31,00 1,50 9,77 14,77 1,512
140 19,20 2,00 9,82 9,14 0,931 140 22,00 2,00 9,82 10,48 1,067 140 34,50 2,00 9,82 16,43 1,674
175 20,50 2,50 9,87 9,76 0,989 175 24,00 2,50 9,87 11,43 1,158 175 39,10 2,50 9,87 18,62 1,887
210 22,00 3,00 9,92 10,48 1,056 210 26,00 3,00 9,92 12,38 1,249 210 41,40 3,00 9,92 19,72 1,988
280 24,75 4,00 10,02 11,79 1,176 280 30,00 4,00 10,02 14,29 1,426 280 46,00 4,00 10,02 21,91 2,186
350 26,40 5,00 10,13 12,57 1,242 350 32,00 5,00 10,13 15,24 1,505 350 48,30 5,00 10,13 23,01 2,272
420 28,00 6,00 10,24 13,34 1,303 420 33,00 6,00 10,24 15,72 1,536 420 49,50 6,00 10,24 23,58 2,303
490 28,60 7,00 10,35 13,62 1,317 490 34,00 7,00 10,35 16,19 1,565 490 50,00 7,00 10,35 23,82 2,302
560 29,00 8,00 10,46 13,81 1,321 560 35,40 8,00 10,46 16,86 1,612 560 50,60 8,00 10,46 24,10 2,305
630 29,70 9,00 10,57 14,15 1,338 630 36,40 9,00 10,57 17,34 1,640 630 51,50 9,00 10,57 24,53 2,320
700 29,50 10,00 10,69 14,05 1,314 700 37,50 10,00 10,69 17,86 1,671 700 52,20 10,00 10,69 24,86 2,326
840 29,20 12,00 10,93 13,91 1,272 840 38,00 12,00 10,93 18,10 1,655 840 52,70 12,00 10,93 25,10 2,296
980 29,00 14,00 11,19 13,81 1,235 980 37,60 14,00 11,19 17,91 1,601 980 52,90 14,00 11,19 25,20 2,252
1120 1120 37,20 16,00 11,45 17,72 1,547 1120 52,40 16,00 11,45 24,96 2,179
1260 1260 37,00 18,00 11,73 17,62 1,502 1260 52,00 18,00 11,73 24,77 2,111
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
2,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,0 DIMENSION
Area, cm
2
9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 121,94 122,80 123,01
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
PT. SOILTAMA INDOKARYA PERSADA
DETERMINATION OF WATER CONTENT
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,62 13,08 gram
2 Mass of wet soil + can M2 114,81 115,44 gram
3 Mass of dry soil + can M3 104,10 104,25 gram
4 Mass of moisture = M2 - M3 10,71 11,19 gram
5 Mass of dry soil = M3 - M1 90,48 91,17 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,84 12,27 %
7 Average water content, (w) 12,06 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,50 33,35 gram
2 Mass of dry soil + piknometer M2 50,57 51,77 gram
3 Mass of dry soil + water + piknometer M3 94,09 95,17 gram
4 Mass of water + piknometer M4 82,12 83,60 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,07 18,42
7 B = M3 - M4 11,97 11,57
8 C=A-B 7,10 6,85
9 Specific Gravity, Gs = A / C 2,68 2,69
10 Average specific gravity, Gs 2,69
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,69
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,45 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,45 100,00 e2 = e1 - d2
4 4,750 d3 = 9,35 e3 = 66,10 87,61 e3 = e2 - d3
8 2,360 d4 = 11,78 e4 = 54,32 71,99 e4 = e3 - d4
20 0,850 d5 = 10,89 e5 = 43,43 57,56 e5 = e4 - d5
30 0,600 d6 = 3,47 e6 = 39,96 52,96 e6 = e5 - d6
50 0,300 d7 = 3,54 e7 = 36,42 48,27 e7 = e6 - d7
100 0,150 d8 = 5,13 e8 = 31,29 41,47 e8 = e7 - d8
200 0,075 d9 = 2,87 e9 = 28,42 37,67 e9 = e8 - d9
Sd = 47,03
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7.50 - 8.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7.50 - 8.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
4,5
Test conditon : UU
SPECIMEN 1 2 3
4,0 Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
Area, cm 9,62 9,62 9,62
3,5 Volume, cm
3
67,35 67,35 67,35
Weight, gr 120,52 121,25 122,43
3
INITIAL Density, gr/cm 1,79 1,80 1,82
3,0
Deviator Stress (s1 - s3), kg/cm2
2
COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
1,5
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 8,00 12,00 14,00
2
1,0 FAILURE
(s1-s3)f kg/cm 2,85 3,28 3,85
2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,5 s1'f, kg/cm
2
3,35 4,28 5,85
SHEAR STRENGTH c: 1,075 kg/cm2
PARAMETERS j: 11,45
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3
4,0
3,5
3,0
Shear Stress, kg/cm2
2,5
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,15 14,02 gram
2 Mass of wet soil + can M2 112,07 114,10 gram
3 Mass of dry soil + can M3 102,18 104,82 gram
4 Mass of moisture = M2 - M3 9,89 9,28 gram
5 Mass of dry soil = M3 - M1 91,03 90,80 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 10,86 10,22 %
7 Average water content, (w) 10,54 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,81 31,25 gram
2 Mass of dry soil + piknometer M2 50,88 49,67 gram
3 Mass of dry soil + water + piknometer M3 94,00 93,66 gram
4 Mass of water + piknometer M4 82,87 82,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,07 18,42
7 B = M3 - M4 11,13 11,41
8 C=A-B 6,94 7,01
9 Specific Gravity, Gs = A / C 2,60 2,63
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,62
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,91 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,91 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,91 100,00 e3 = e2 - d3
8 2,360 d4 = 0,82 e4 = 75,09 98,92 e4 = e3 - d4
20 0,850 d5 = 3,98 e5 = 71,11 93,68 e5 = e4 - d5
30 0,600 d6 = 3,80 e6 = 67,31 88,67 e6 = e5 - d6
50 0,300 d7 = 5,90 e7 = 61,41 80,90 e7 = e6 - d7
100 0,150 d8 = 12,61 e8 = 48,80 64,29 e8 = e7 - d8
200 0,075 d9 = 11,50 e9 = 37,30 49,14 e9 = e8 - d9
Sd = 38,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 147.68
1
2 Height of Speciment, L0 (cm) 7.41 Volume of Speciment, V (cm )3
67.28
3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 2.20
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.6
1.4
1.2
1
Compressive Stress (kg/cm2)
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,99 12,78 gram
2 Mass of wet soil + can M2 113,22 114,40 gram
3 Mass of dry soil + can M3 102,27 105,36 gram
4 Mass of moisture = M2 - M3 10,95 9,04 gram
5 Mass of dry soil = M3 - M1 89,28 92,58 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,26 9,76 %
7 Average water content, (w) 11,01 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,76 33,36 gram
2 Mass of dry soil + piknometer M2 49,86 51,44 gram
3 Mass of dry soil + water + piknometer M3 92,48 93,74 gram
4 Mass of water + piknometer M4 82,09 83,60 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,10 18,08
7 B = M3 - M4 10,39 10,14
8 C=A-B 7,71 7,94
9 Specific Gravity, Gs = A / C 2,35 2,28
10 Average specific gravity, Gs 2,31
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,31
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,17 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,17 100,00 e2 = e1 - d2
4 4,750 d3 = 0,44 e3 = 74,73 99,41 e3 = e2 - d3
8 2,360 d4 = 0,08 e4 = 74,65 99,31 e4 = e3 - d4
20 0,850 d5 = 0,36 e5 = 74,29 98,83 e5 = e4 - d5
30 0,600 d6 = 0,35 e6 = 73,94 98,36 e6 = e5 - d6
50 0,300 d7 = 0,69 e7 = 73,25 97,45 e7 = e6 - d7
100 0,150 d8 = 2,23 e8 = 71,02 94,48 e8 = e7 - d8
200 0,075 d9 = 2,08 e9 = 68,94 91,71 e9 = e8 - d9
Sd = 6,23
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 2.5 - 3.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 2.5 - 3.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama
2,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
2,0 Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 120,50 120,99 122,39
3
INITIAL Density, gr/cm 1,79 1,80 1,82
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 11,45 14,02 gram
2 Mass of wet soil + can M2 135,41 137,51 gram
3 Mass of dry soil + can M3 112,44 112,43 gram
4 Mass of moisture = M2 - M3 22,97 25,08 gram
5 Mass of dry soil = M3 - M1 100,99 98,41 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 22,74 25,49 %
7 Average water content, (w) 24,12 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,50 34,63 gram
2 Mass of dry soil + piknometer M2 51,48 54,87 gram
3 Mass of dry soil + water + piknometer M3 94,62 95,08 gram
4 Mass of water + piknometer M4 82,12 82,53 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,98 20,24
7 B = M3 - M4 12,50 12,55
8 C=A-B 7,48 7,69
9 Specific Gravity, Gs = A / C 2,67 2,63
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,65
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 6,94 e3 = 68,06 90,75 e3 = e2 - d3
8 2,360 d4 = 3,46 e4 = 64,60 86,13 e4 = e3 - d4
20 0,850 d5 = 9,29 e5 = 55,31 73,75 e5 = e4 - d5
30 0,600 d6 = 2,33 e6 = 52,98 70,64 e6 = e5 - d6
50 0,300 d7 = 2,24 e7 = 50,74 67,65 e7 = e6 - d7
100 0,150 d8 = 4,14 e8 = 46,60 62,13 e8 = e7 - d8
200 0,075 d9 = 2,87 e9 = 43,73 58,31 e9 = e8 - d9
Sd = 31,27
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
3
Density, gr/cm 1,80 1,82 1,82
INITIAL
1,5 Moisture, % 24,12 24,12 24,12
3
Dry Density, gr/cm 1,45 1,46 1,47
Weight, gr
AFTER Density, gr/cm
3
CONSOLIDATION Moisture, %
1,0 3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
0,5
Strain, % 16,00 18,00 18,00
2
(s1-s3)f kg/cm 1,07 1,48 2,14
FAILURE 2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,0 s1'f, kg/cm
2
1,57 2,48 4,14
0 10 20 30 SHEAR STRENGTH c: 0,386 kg/cm
2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,72 13,84 gram
2 Mass of wet soil + can M2 113,57 114,77 gram
3 Mass of dry soil + can M3 93,08 92,15 gram
4 Mass of moisture = M2 - M3 20,49 22,62 gram
5 Mass of dry soil = M3 - M1 80,36 78,31 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 25,50 28,89 %
7 Average water content, (w) 27,19 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,35 32,35 gram
2 Mass of dry soil + piknometer M2 50,72 50,79 gram
3 Mass of dry soil + water + piknometer M3 93,33 93,73 gram
4 Mass of water + piknometer M4 82,25 82,31 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,37 18,44
7 B = M3 - M4 11,08 11,42
8 C=A-B 7,29 7,02
9 Specific Gravity, Gs = A / C 2,52 2,63
10 Average specific gravity, Gs 2,57
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,58
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,11 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,11 100,00 e2 = e1 - d2
4 4,750 d3 = 10,17 e3 = 64,94 86,46 e3 = e2 - d3
8 2,360 d4 = 2,70 e4 = 62,24 82,87 e4 = e3 - d4
20 0,850 d5 = 2,36 e5 = 59,88 79,72 e5 = e4 - d5
30 0,600 d6 = 2,06 e6 = 57,82 76,98 e6 = e5 - d6
50 0,300 d7 = 2,64 e7 = 55,18 73,47 e7 = e6 - d7
100 0,150 d8 = 13,96 e8 = 41,22 54,88 e8 = e7 - d8
200 0,075 d9 = 4,22 e9 = 37,00 49,26 e9 = e8 - d9
Sd = 38,11
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 26.50 - 27.00
Date : 18 Agustus 2023
Made by : Tim Laboran PT. Soiltama
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 26.50 - 27.00
Date : 18 Agustus 2023
Made by : Tim laboran PT Soiltama
Dimensions of sample :
Diameter 6.30 cm
2
Area 31.17 cm
Ht. 2.00 cm
3
Volume 62.34 cm
Kalibrasi 0.671 kg/div
Specimen no. 1 2 3
Mass of soil + ring gr 172.30 174.71 174.76
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 106.84 109.41 109.35
Initial water content wN (%) 27.19
Bulk density γb (gr/cm3) 1.71 1.75 1.75
Dry density γd (gr/cm3) 1.35 1.38 1.38
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.29 0.38 0.60
1.00
0.75
Shear stress, τ kg/cm2
0.50
0.25
0.00
0.000 0.500 1.000 1.500 2.000
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,35 14,55 gram
2 Mass of wet soil + can M2 136,52 126,41 gram
3 Mass of dry soil + can M3 123,69 117,59 gram
4 Mass of moisture = M2 - M3 12,83 8,82 gram
5 Mass of dry soil = M3 - M1 109,34 103,04 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,73 8,56 %
7 Average water content, (w) 10,15 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,37 30,98 gram
2 Mass of dry soil + piknometer M2 52,56 51,13 gram
3 Mass of dry soil + water + piknometer M3 95,30 93,49 gram
4 Mass of water + piknometer M4 82,51 81,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,19 20,15
7 B = M3 - M4 12,79 12,27
8 C=A-B 7,40 7,88
9 Specific Gravity, Gs = A / C 2,73 2,56
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 1,64 e3 = 73,36 97,81 e3 = e2 - d3
8 2,360 d4 = 6,16 e4 = 67,20 89,60 e4 = e3 - d4
20 0,850 d5 = 8,88 e5 = 58,32 77,76 e5 = e4 - d5
30 0,600 d6 = 3,44 e6 = 54,88 73,17 e6 = e5 - d6
50 0,300 d7 = 5,20 e7 = 49,68 66,24 e7 = e6 - d7
100 0,150 d8 = 8,96 e8 = 40,72 54,29 e8 = e7 - d8
200 0,075 d9 = 4,51 e9 = 36,21 48,28 e9 = e8 - d9
Sd = 38,79
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Area = 9,62 cm2 7 4,00 0,10 9,63 1,91 0,198 7 5,00 0,10 9,63 2,38 0,247 7 10,00 0,10 9,63 4,76 0,495
Height of Sample = 7,00 cm 14 8,50 0,20 9,64 4,05 0,420 14 9,00 0,20 9,64 4,29 0,445 14 15,00 0,20 9,64 7,14 0,741
Volume of Sampel = 67,35 cm3 21 10,00 0,30 9,65 4,76 0,494 21 14,00 0,30 9,65 6,67 0,691 21 20,00 0,30 9,65 9,53 0,987
Speed = 0,70 mm/menit 28 10,50 0,40 9,66 5,00 0,518 28 16,00 0,40 9,66 7,62 0,789 28 25,00 0,40 9,66 11,91 1,233
Kalibrasi = 0,476 kg/div 35 11,50 0,50 9,67 5,48 0,566 35 16,50 0,50 9,67 7,86 0,813 35 30,00 0,50 9,67 14,29 1,478
70 14,00 1,00 9,72 6,67 0,686 70 20,00 1,00 9,72 9,53 0,980 70 32,00 1,00 9,72 15,24 1,568
105 15,00 1,50 9,77 7,14 0,731 105 21,50 1,50 9,77 10,24 1,048 105 33,00 1,50 9,77 15,72 1,609
140 16,25 2,00 9,82 7,74 0,788 140 22,75 2,00 9,82 10,84 1,104 140 33,50 2,00 9,82 15,96 1,625
175 17,00 2,50 9,87 8,10 0,821 175 23,00 2,50 9,87 10,95 1,110 175 34,00 2,50 9,87 16,19 1,641
210 17,50 3,00 9,92 8,34 0,840 210 23,25 3,00 9,92 11,07 1,116 210 34,25 3,00 9,92 16,31 1,645
280 17,75 4,00 10,02 8,45 0,844 280 23,50 4,00 10,02 11,19 1,117 280 34,50 4,00 10,02 16,43 1,640
350 18,00 5,00 10,13 8,57 0,847 350 23,75 5,00 10,13 11,31 1,117 350 35,00 5,00 10,13 16,67 1,646
420 17,80 6,00 10,24 8,48 0,828 420 23,50 6,00 10,24 11,19 1,094 420 35,50 6,00 10,24 16,91 1,652
490 17,50 7,00 10,35 8,34 0,806 490 23,25 7,00 10,35 11,07 1,070 490 35,75 7,00 10,35 17,03 1,646
560 17,30 8,00 10,46 8,24 0,788 560 23,00 8,00 10,46 10,95 1,048 560 36,00 8,00 10,46 17,15 1,640
630 630 22,80 9,00 10,57 10,86 1,027 630 35,75 9,00 10,57 17,03 1,611
700 700 22,75 10,00 10,69 10,84 1,014 700 35,60 10,00 10,69 16,96 1,586
840 840 12,00 10,93 0,00 0,000 840 35,50 12,00 10,93 16,91 1,547
980 980 14,00 11,19 0,00 0,000 980 35,40 14,00 11,19 16,86 1,507
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
1,8
Test conditon : UU
SPECIMEN 1 2 3
1,6 Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
DIMENSION
1,4 Area, cm
2
9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 121,56 121,95 122,03
1,2
Deviator Stress (s1 - s3), kg/cm2
3,0
2,5
Shear Stress, kg/cm2
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,39 14,13 gram
2 Mass of wet soil + can M2 126,39 128,79 gram
3 Mass of dry soil + can M3 108,04 108,72 gram
4 Mass of moisture = M2 - M3 18,35 20,07 gram
5 Mass of dry soil = M3 - M1 93,65 94,59 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 19,59 21,22 %
7 Average water content, (w) 20,41 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 30,49 32,63 gram
2 Mass of dry soil + piknometer M2 48,85 50,83 gram
3 Mass of dry soil + water + piknometer M3 92,36 92,99 gram
4 Mass of water + piknometer M4 80,75 82,09 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,36 18,20
7 B = M3 - M4 11,61 10,90
8 C=A-B 6,75 7,30
9 Specific Gravity, Gs = A / C 2,72 2,49
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,48 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,48 100,00 e2 = e1 - d2
4 4,750 d3 = 6,00 e3 = 69,48 92,05 e3 = e2 - d3
8 2,360 d4 = 4,87 e4 = 64,61 85,60 e4 = e3 - d4
20 0,850 d5 = 6,54 e5 = 58,07 76,93 e5 = e4 - d5
30 0,600 d6 = 3,22 e6 = 54,85 72,67 e6 = e5 - d6
50 0,300 d7 = 3,49 e7 = 51,36 68,04 e7 = e6 - d7
100 0,150 d8 = 4,21 e8 = 47,15 62,47 e8 = e7 - d8
200 0,075 d9 = 3,42 e9 = 43,73 57,94 e9 = e8 - d9
Sd = 31,75
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 124.23
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm )3
62.65
3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 1.98
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
0.9
0.8
0.7
0.6
Compressive Stress (kg/cm2)
0.5
0.4
0.3
0.2
0.1
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,54 14,24 gram
2 Mass of wet soil + can M2 114,02 115,03 gram
3 Mass of dry soil + can M3 103,88 106,71 gram
4 Mass of moisture = M2 - M3 10,14 8,32 gram
5 Mass of dry soil = M3 - M1 91,34 92,47 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,10 9,00 %
7 Average water content, (w) 10,05 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,71 30,97 gram
2 Mass of dry soil + piknometer M2 50,02 49,04 gram
3 Mass of dry soil + water + piknometer M3 93,17 92,45 gram
4 Mass of water + piknometer M4 81,97 81,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,31 18,07
7 B = M3 - M4 11,20 11,23
8 C=A-B 7,11 6,84
9 Specific Gravity, Gs = A / C 2,58 2,64
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,61 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,61 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,61 100,00 e3 = e2 - d3
8 2,360 d4 = 1,30 e4 = 74,31 98,28 e4 = e3 - d4
20 0,850 d5 = 1,18 e5 = 73,13 96,72 e5 = e4 - d5
30 0,600 d6 = 2,17 e6 = 70,96 93,85 e6 = e5 - d6
50 0,300 d7 = 5,04 e7 = 65,92 87,18 e7 = e6 - d7
100 0,150 d8 = 27,05 e8 = 38,87 51,41 e8 = e7 - d8
200 0,075 d9 = 8,85 e9 = 30,02 39,70 e9 = e8 - d9
Sd = 45,59
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 18 Agustus 2023
Made by : Tim Laboran PT. Soiltama
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 18 Agustus 2023
Made by : Tim laboran PT Soiltama
Dimensions of sample :
Diameter 6.30 cm
2
Area 31.17 cm
Ht. 2.00 cm
3
Volume 62.34 cm
Kalibrasi 0.671 kg/div
Specimen no. 1 2 3
Mass of soil + ring gr 190.71 208.09 212.12
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 125.25 142.79 146.71
Initial water content wN (%) 10.05
Bulk density γb (gr/cm3) 2.01 2.29 2.35
Dry density γd (gr/cm3) 1.83 2.08 2.14
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.17 0.43 0.45
1.00
0.75
Shear stress, τ kg/cm2
0.50
0.25
0.00
0.000 0.500 1.000 1.500 2.000
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,97 14,22 gram
2 Mass of wet soil + can M2 139,96 122,61 gram
3 Mass of dry soil + can M3 113,01 99,96 gram
4 Mass of moisture = M2 - M3 26,95 22,65 gram
5 Mass of dry soil = M3 - M1 99,04 85,74 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 27,21 26,42 %
7 Average water content, (w) 26,81 %
SPECIFIC GRAVITY
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,35 34,05 gram
2 Mass of dry soil + piknometer M2 53,72 54,32 gram
3 Mass of dry soil + water + piknometer M3 95,85 96,85 gram
4 Mass of water + piknometer M4 83,21 84,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,37 20,27
7 B = M3 - M4 12,64 12,60
8 C=A-B 7,73 7,67
9 Specific Gravity, Gs = A / C 2,64 2,64
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
GRAIN SIZE ANALYSIS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,07 e4 = 74,93 99,91 e4 = e3 - d4
20 0,850 d5 = 0,21 e5 = 74,72 99,63 e5 = e4 - d5
30 0,600 d6 = 0,27 e6 = 74,45 99,27 e6 = e5 - d6
50 0,300 d7 = 9,52 e7 = 64,93 86,57 e7 = e6 - d7
100 0,150 d8 = 29,11 e8 = 35,82 47,76 e8 = e7 - d8
200 0,075 d9 = 6,56 e9 = 29,26 39,01 e9 = e8 - d9
Sd = 45,74
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3.50 - 4.00
Date : 5 Agustus 2023
Made by : Tim Laboran PT. Soiltama
Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3.50 - 4.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Dimensions of sample :
Diameter 6.30 cm
Area 31.17 cm2
Ht. 2.00 cm
Volume 62.34 cm3
Kalibrasi 0.671 kg/div
Specimen no. 1 2 3
Mass of soil + ring gr 201.47 185.31 182.86
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 136.01 120.01 117.45
Initial water content wN (%) 26.81
3
Bulk density γb (gr/cm ) 2.18 1.92 1.88
3
Dry density γd (gr/cm ) 1.72 1.52 1.49
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.11 0.16 0.23
1.00
0.75
Shear stress, τ kg/cm2
0.50
0.25
0.00
0.000 0.500 1.000 1.500 2.000
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,74 13,97 gram
2 Mass of wet soil + can M2 117,77 119,03 gram
3 Mass of dry soil + can M3 109,57 104,17 gram
4 Mass of moisture = M2 - M3 8,20 14,86 gram
5 Mass of dry soil = M3 - M1 96,83 90,20 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 8,47 16,47 %
7 Average water content, (w) 12,47 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 33,05 31,27 gram
2 Mass of dry soil + piknometer M2 51,07 49,42 gram
3 Mass of dry soil + water + piknometer M3 94,29 92,53 gram
4 Mass of water + piknometer M4 82,78 81,31 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,02 18,15
7 B = M3 - M4 11,51 11,22
8 C=A-B 6,51 6,93
9 Specific Gravity, Gs = A / C 2,77 2,62
10 Average specific gravity, Gs 2,69
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,70
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,83 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,83 100,00 e2 = e1 - d2
4 4,750 d3 = 0,80 e3 = 75,03 98,95 e3 = e2 - d3
8 2,360 d4 = 0,24 e4 = 74,79 98,63 e4 = e3 - d4
20 0,850 d5 = 0,34 e5 = 74,45 98,18 e5 = e4 - d5
30 0,600 d6 = 0,10 e6 = 74,35 98,05 e6 = e5 - d6
50 0,300 d7 = 0,29 e7 = 74,06 97,67 e7 = e6 - d7
100 0,150 d8 = 2,99 e8 = 71,07 93,72 e8 = e7 - d8
200 0,075 d9 = 1,07 e9 = 70,00 92,31 e9 = e8 - d9
Sd = 5,83
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.42 Wet Weight Speciment, gr 147.27
1
2 Height of Speciment, L0 (cm) 7.57 Volume of Speciment, V (cm 3) 69.54
2 3
3 Cross Sectional Area A (cm ) 9.19 Weight Volume of Speciment, gb (gr/cm ) 2.12
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
2.5
2
Compressive Stress (kg/cm2)
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,01 14,10 gram
2 Mass of wet soil + can M2 119,56 119,91 gram
3 Mass of dry soil + can M3 109,39 110,51 gram
4 Mass of moisture = M2 - M3 10,17 9,40 gram
5 Mass of dry soil = M3 - M1 95,38 96,41 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 10,66 9,75 %
7 Average water content, (w) 10,21 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 29,21 30,98 gram
2 Mass of dry soil + piknometer M2 47,39 49,02 gram
3 Mass of dry soil + water + piknometer M3 90,45 92,52 gram
4 Mass of water + piknometer M4 79,22 81,85 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,18 18,04
7 B = M3 - M4 11,23 10,67
8 C=A-B 6,95 7,37
9 Specific Gravity, Gs = A / C 2,62 2,45
10 Average specific gravity, Gs 2,53
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,53
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,54 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,54 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,54 100,00 e3 = e2 - d3
10 2,000 d4 = 0,00 e4 = 75,54 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,54 100,00 e5 = e4 - d5
40 0,425 d6 = 0,00 e6 = 75,54 100,00 e6 = e5 - d6
60 0,250 d7 = 0,00 e7 = 75,54 100,00 e7 = e6 - d7
140 0,106 d8 = 1,10 e8 = 74,44 98,54 e8 = e7 - d8
200 0,075 d9 = 2,32 e9 = 72,12 95,47 e9 = e8 - d9
Sd = 3,42
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.39 Wet Weight Speciment, gr 130.13
1
2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 63.18
2 3
3 Cross Sectional Area A (cm ) 9.03 Weight Volume of Speciment, gb (gr/cm ) 2.06
Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)
2.5
2
Compressive Stress (kg/cm2)
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 12,51 13,96 gram
2 Mass of wet soil + can M2 114,07 116,86 gram
3 Mass of dry soil + can M3 92,60 96,36 gram
4 Mass of moisture = M2 - M3 21,47 20,50 gram
5 Mass of dry soil = M3 - M1 80,09 82,40 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,81 24,88 %
7 Average water content, (w) 25,84 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 31,52 31,96 gram
2 Mass of dry soil + piknometer M2 49,54 50,00 gram
3 Mass of dry soil + water + piknometer M3 93,31 93,49 gram
4 Mass of water + piknometer M4 81,74 82,12 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,02 18,04
7 B = M3 - M4 11,57 11,37
8 C=A-B 6,45 6,67
9 Specific Gravity, Gs = A / C 2,79 2,70
10 Average specific gravity, Gs 2,75
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,75
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
%
50 Liquid Index LI = 0,27
40
30
20 OH or MH `
CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,72 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,72 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,72 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,72 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,72 100,00 e5 = e4 - d5
30 0,600 d6 = 0,03 e6 = 75,69 99,96 e6 = e5 - d6
50 0,300 d7 = 0,19 e7 = 75,50 99,71 e7 = e6 - d7
100 0,150 d8 = 2,45 e8 = 73,05 96,47 e8 = e7 - d8
200 0,075 d9 = 1,15 e9 = 71,90 94,96 e9 = e8 - d9
Sd = 3,82
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama
5,0
Test conditon : UU
SPECIMEN 1 2 3
4,5 Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
4,0 Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,52 121,60 123,22
3,5 3
1,80 1,81 1,83
INITIAL Density, gr/cm
Deviator Stress (s1 - s3), kg/cm2
4,0
3,5
3,0
Shear Stress, kg/cm2
2,5
2,0
1,5
1,0
0,5
0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2
CONSOLIDATION TEST
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 25.840
SPECIFIC GRAVITY (G) 2.750 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.548
LIQUID LIMIT (LL%) 45.280 DRY WEIGHT Wd (gr) 62.670 DEGREE OF INITIAL SAT. So % 81%
PLASTIC LIMIT (PL%) 18.630 SUBSTANCE HEIGHT Hs (cm) 1.218
PRESSURE
GRADATION
Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD
t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
0.55e0
0.50
0.45
Void Ratio, e
0.40
0.35
0.30
0.25
eb
0.20
sb
0.1 s0 1 sc' 10 100 1000
Pressure, s kg/cm2
0.0035
0.0030
Cv (cm/second2)
0.0025
0.0020
0.0015
0.0010
0.0005
0.0000
1 10
Stress, s (kg/cm2)
2
so = 0.220 kg/cm
2
sc = 1.850 kg/cm
Cr = 0.074
Cc = 0.141
eo = 0.550
ec = 0.480
2
Cv avg = 0.001 cm /sec
K avg = 0.000012 cm/sec
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 14,58 11,37 gram
2 Mass of wet soil + can M2 115,28 111,65 gram
3 Mass of dry soil + can M3 94,25 90,08 gram
4 Mass of moisture = M2 - M3 21,03 21,57 gram
5 Mass of dry soil = M3 - M1 79,67 78,71 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,40 27,40 %
7 Average water content, (w) 26,90 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 32,60 31,02 gram
2 Mass of dry soil + piknometer M2 50,52 49,05 gram
3 Mass of dry soil + water + piknometer M3 93,23 92,25 gram
4 Mass of water + piknometer M4 81,93 81,24 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 17,92 18,03
7 B = M3 - M4 11,30 11,01
8 C=A-B 6,62 7,02
9 Specific Gravity, Gs = A / C 2,71 2,57
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,64
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,21 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,21 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,21 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,21 100,00 e4 = e3 - d4
20 0,850 d5 = 0,07 e5 = 75,14 99,91 e5 = e4 - d5
30 0,600 d6 = 0,04 e6 = 75,10 99,85 e6 = e5 - d6
50 0,300 d7 = 0,27 e7 = 74,83 99,49 e7 = e6 - d7
100 0,150 d8 = 2,43 e8 = 72,40 96,26 e8 = e7 - d8
200 0,075 d9 = 0,62 e9 = 71,78 95,44 e9 = e8 - d9
Sd = 3,43
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 123.19
1
2 Height of Speciment, L0 (cm) 7.27 Volume of Speciment, V (cm 3) 66.01
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 1.87
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
1.2
0.8
Compressive Stress (kg/cm2)
0.6
0.4
0.2
0
0 1 2 3 4 5 6 7 8 9 10 11
Strain (%)
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Can No, 1 2
1 Mass of can M1 13,00 14,35 gram
2 Mass of wet soil + can M2 113,19 114,74 gram
3 Mass of dry soil + can M3 112,52 96,22 gram
4 Mass of moisture = M2 - M3 0,67 18,52 gram
5 Mass of dry soil = M3 - M1 99,52 81,87 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 0,67 22,62 %
7 Average water content, (w) 11,65 %
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
Piknometer No, A B
1 Mass of piknometer M1 34,03 31,27 gram
2 Mass of dry soil + piknometer M2 52,06 49,24 gram
3 Mass of dry soil + water + piknometer M3 95,03 92,90 gram
4 Mass of water + piknometer M4 82,40 82,04 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,03 17,97
7 B = M3 - M4 12,63 10,86
8 C=A-B 5,40 7,11
9 Specific Gravity, Gs = A / C 3,34 2,53
10 Average specific gravity, Gs 2,93
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,94
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
75
65
Water content, %
55
45
35
25
15
5
1 10 25 100
No. of blows, N
LIQUID LIMITS
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,26 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,26 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,26 100,00 e3 = e2 - d3
8 2,360 d4 = 0,47 e4 = 74,79 99,38 e4 = e3 - d4
20 0,850 d5 = 0,43 e5 = 74,36 98,80 e5 = e4 - d5
30 0,600 d6 = 0,19 e6 = 74,17 98,55 e6 = e5 - d6
50 0,300 d7 = 1,14 e7 = 73,03 97,04 e7 = e6 - d7
100 0,150 d8 = 3,28 e8 = 69,75 92,68 e8 = e7 - d8
200 0,075 d9 = 0,31 e9 = 69,44 92,27 e9 = e8 - d9
Sd = 5,82
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama
No.140
No.200
No.60
= Mechanical analysis
3/4 in.
3/8 in.
No.40
No.10
No.20
No.4
= Hydrometer analysis
100
90
80
Percent Finer, %
70
60
50
40
30
20
10
0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm
No Parameter
1 Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 125.71
2 Height of Speciment, L0 (cm) 7.2 Volume of Speciment, V (cm )
3
65.37
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 1.92
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 6.00 0.972 2.86 9.168 0.312
140 0.14 13.00 1.944 6.19 9.259 0.669
210 0.21 22.50 2.917 10.72 9.352 1.146
280 0.28 31.25 3.889 14.88 9.447 1.576
350 0.35 36.00 4.861 17.15 9.543 1.797
420 0.42 38.50 5.833 18.34 9.642 1.902
490 0.49 39.50 6.806 18.81 9.742 1.931
560 0.56 40.00 7.778 19.05 9.845 1.935
630 0.63 39.00 8.750 18.58 9.950 1.867
700 0.7 38.00 9.722 18.10 10.057 1.800
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B 29-29.5
Depth : 18.50 - 19.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama
2.5
1.6
1.4
2
1.2
1
Compressive Stress (kg/cm2)
1.5
0.8
1
0.6
0.4
0.5
0.2
0
0 1 12 3 24 5 36 7 48 9 510 116 12 137 14 158 16 17
9 18 19
10 20 21
11
Strain (%)