Appendix C - Laboratory Test Result

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 395

DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,20 13,98 gram
2 Mass of wet soil + can M2 114,97 117,46 gram
3 Mass of dry soil + can M3 89,44 91,57 gram
4 Mass of moisture = M2 - M3 25,53 25,89 gram
5 Mass of dry soil = M3 - M1 75,24 77,59 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 33,93 33,37 %
7 Average water content, (w) 33,65 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 30,61 32,44 gram
2 Mass of dry soil + piknometer M2 49,99 50,86 gram
3 Mass of dry soil + water + piknometer M3 93,13 94,34 gram
4 Mass of water + piknometer M4 81,01 82,89 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,38 18,42
7 B = M3 - M4 12,12 11,45
8 C=A-B 7,26 6,97
9 Specific Gravity, Gs = A / C 2,67 2,64
10 Average specific gravity, Gs 2,66
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,66

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,66

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 28 20 18
Mass of can (gr) 13,96 14,28 11,76 14,31 14,38 14,59 14,10 11,34 14,11 13,57
Mass of wet soil + can (gr) 31,19 31,39 31,27 31,74 37,24 33,86 32,51 30,32 30,63 28,66
Mass of dry soil + can (gr) 25,98 26,22 25,42 26,45 30,16 27,95 26,55 24,22 26,72 25,10
Mass of dry soil (gr) 12,02 11,94 13,66 12,14 15,78 13,36 12,45 12,88 12,61 11,53
Mass of moisture (gr) 5,21 5,17 5,85 5,29 7,08 5,91 5,96 6,10 3,91 3,56
Water content, w (%) 43,34 43,30 42,83 43,57 44,87 44,24 47,87 47,36 31,01 30,88
43,32 43,20 44,55 47,62 30,94

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 44,48 %
80
Plastic Limit, PL = 30,94 %
Non Cohesive Plasticity Index, PI = 13,54
70 %
60 CH Natural Water Content wN = 33,65 %
PLASTIC INDEX

50 Liquid Index LI = 0,20


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,20 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,66 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,2 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,20 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,20 100,00 e3 = e2 - d3
8 2,360 d4 = 0,48 e4 = 74,72 99,36 e4 = e3 - d4
20 0,850 d5 = 1,68 e5 = 73,04 97,13 e5 = e4 - d5
30 0,600 d6 = 1,26 e6 = 71,78 95,45 e6 = e5 - d6
50 0,300 d7 = 2,68 e7 = 69,10 91,89 e7 = e6 - d7
100 0,150 d8 = 6,35 e8 = 62,75 83,44 e8 = e7 - d8
200 0,075 d9 = 4,18 e9 = 58,57 77,89 e9 = e8 - d9
Sd = 16,63

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 46,0 -3,0 27,0 47,0 8,59 0,0126 0,0261 49,0 65,08
5 44,0 -3,0 27,0 45,0 8,92 0,0126 0,0168 47,0 62,42
30 39,5 -3,0 27,0 40,5 9,65 0,0126 0,0071 42,5 56,45
60 35,0 -3,0 27,0 36,0 10,39 0,0126 0,0052 38,0 50,47
250 22,0 -3,0 27,0 23,0 12,52 0,0126 0,0028 25,0 33,20
1440 19,0 -3,0 27,0 20,0 13,02 0,0126 0,0012 22,0 29,22

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,66

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0012 0,0120 80,00 0,800

Finer #200 = 77,89 %


Gravel = 0,00 %
Sand = 22,11 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 122,67 gr s3 = 100,00 kN/m2 W= 123,68 gr s3 = 200,00 kN/m2 W= 122,20 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample= 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 9,75 0,10 9,63 4,64 0,482 7 5,80 0,10 9,63 2,76 0,287 7 9,30 0,10 9,63 4,43 0,460
Height of Sample = 7,00 cm 14 14,60 0,20 9,64 6,95 0,721 14 8,70 0,20 9,64 4,14 0,430 14 14,00 0,20 9,64 6,67 0,692
Volume of Sampel = 67,35 cm3 21 16,25 0,30 9,65 7,74 0,802 21 10,00 0,30 9,65 4,76 0,494 21 24,80 0,30 9,65 11,81 1,224
Speed = 0,70 mm/menit 28 17,80 0,40 9,66 8,48 0,878 28 17,40 0,40 9,66 8,29 0,858 28 32,50 0,40 9,66 15,48 1,602
Kalibrasi = 0,476 kg/div 35 19,50 0,50 9,67 9,29 0,961 35 26,10 0,50 9,67 12,43 1,286 35 40,30 0,50 9,67 19,19 1,985
70 22,70 1,00 9,72 10,81 1,113 70 29,00 1,00 9,72 13,81 1,421 70 43,40 1,00 9,72 20,67 2,127
105 24,40 1,50 9,77 11,62 1,190 105 30,40 1,50 9,77 14,48 1,482 105 45,00 1,50 9,77 21,43 2,194
140 26,00 2,00 9,82 12,38 1,261 140 33,30 2,00 9,82 15,86 1,616 140 46,50 2,00 9,82 22,15 2,256
175 27,30 2,50 9,87 13,00 1,318 175 34,80 2,50 9,87 16,58 1,680 175 48,30 2,50 9,87 23,01 2,331
210 27,60 3,00 9,92 13,15 1,325 210 36,00 3,00 9,92 17,15 1,729 210 50,80 3,00 9,92 24,20 2,439
280 30,90 4,00 10,02 14,72 1,469 280 37,00 4,00 10,02 17,62 1,758 280 52,70 4,00 10,02 25,10 2,505
350 32,50 5,00 10,13 15,48 1,528 350 39,00 5,00 10,13 18,58 1,834 350 55,80 5,00 10,13 26,58 2,624
420 33,80 6,00 10,24 16,10 1,573 420 42,00 6,00 10,24 20,00 1,954 420 58,90 6,00 10,24 28,05 2,741
490 35,10 7,00 10,35 16,72 1,616 490 44,00 7,00 10,35 20,96 2,026 490 60,70 7,00 10,35 28,91 2,795
560 36,40 8,00 10,46 17,34 1,658 560 45,00 8,00 10,46 21,43 2,050 560 62,00 8,00 10,46 29,53 2,824
630 37,00 9,00 10,57 17,62 1,667 630 46,40 9,00 10,57 22,10 2,090 630 63,20 9,00 10,57 30,10 2,847
700 37,70 10,00 10,69 17,96 1,680 700 47,00 10,00 10,69 22,39 2,094 700 65,50 10,00 10,69 31,20 2,918
840 37,00 12,00 10,93 17,62 1,612 840 46,40 12,00 10,93 22,10 2,021 840 67,00 12,00 10,93 31,91 2,919
980 36,40 14,00 11,19 17,34 1,550 980 45,20 14,00 11,19 21,53 1,924 980 66,70 14,00 11,19 31,77 2,840
1120 1120 45,00 16,00 11,45 21,43 1,871 1120 66,30 16,00 11,45 31,58 2,757
1260 1260 1260 65,00 18,00 11,73 30,96 2,639
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 122,67 123,68 122,20
2,5
3
INITIAL Density, gr/cm 1,82 1,84 1,81
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 33,65 33,65 33,65


Dry Density, gr/cm
3
1,36 1,37 1,36
2,0 Weight, gr
AFTER 3
Density, gr/cm
CONSOLIDATION Moisture, %
3
1,5 Dry Density, gr/cm
2
COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
1,0
Strain, % 10,00 10,00 18,00
2
FAILURE
(s1-s3)f kg/cm 1,68 2,09 2,92
2
CONDITIONS uf, kg/cm
2
0,5 s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 2,18 3,09 4,92
SHEAR STRENGTH c: 0,496 kg/cm2
PARAMETERS j: 14,75 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 33.650
SPECIFIC GRAVITY (G) 2.660 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 1.116
LIQUID LIMIT (LL%) 44.480 DRY WEIGHT Wd (gr) 45.690 DEGREE OF INITIAL SAT. So % 90%
PLASTIC LIMIT (PL%) 30.940 SUBSTANCE HEIGHT Hs (cm) 0.888

PRESSURE
GRADATION

Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 1.1156 1.9000


1 1.00 1.00 0.0210 0.0210 0.0236 1.1156 1.8790 0.9448 2.3 0.00238 1.1053 0.0111 0.000026
2 2.00 1.00 0.0810 0.0600 0.0676 1.0481 1.8190 0.9245 3.0 0.00134 3.1932 0.0319 0.000043
3 4.00 2.00 0.1790 0.0980 0.1103 0.9377 1.7210 0.8850 3.0 0.00123 5.3876 0.0269 0.000033
4 8.00 4.00 0.2720 0.0930 0.1047 0.8330 1.6280 0.8373 3.5 0.00081 5.4038 0.0135 0.000011
5 2.00 0.2443 -0.0278 -0.0312 0.8643 1.6558 0.8209
6 0.25 0.2185 -0.0258 -0.0290 0.8933 1.6815 0.8343

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ration (e)


1.2

1.1
e0
1.0

0.9
Void Ratio, e

0.8

0.7

0.6

0.5
eb
0.4
s sc' sb
0.1 0 1 10 100 1000
Pressure, s kg/cm2

Relationship Between Cv and Stress s


0.0030
0.0025
Cv (cm/second 2)

0.0020
0.0015
0.0010
0.0005
0.0000
1 10
Stress, s (kg/cm2)

2
so = 0.165 kg/cm
2
sc = 1.700 kg/cm
Cr = 0.045
Cc = 0.349
eo = 1.120
ec = 1.070
2
Cv avg = 0.001 cm /sec
K avg = 0.000028 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,29 14,07 gram
2 Mass of wet soil + can M2 112,76 114,73 gram
3 Mass of dry soil + can M3 93,93 99,28 gram
4 Mass of moisture = M2 - M3 18,83 15,45 gram
5 Mass of dry soil = M3 - M1 81,64 85,21 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 23,06 18,13 %
7 Average water content, (w) 20,60 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,20 30,55 gram
2 Mass of dry soil + piknometer M2 50,21 48,70 gram
3 Mass of dry soil + water + piknometer M3 93,96 92,42 gram
4 Mass of water + piknometer M4 82,83 81,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,01 18,15
7 B = M3 - M4 11,13 11,17
8 C=A-B 6,88 6,98
9 Specific Gravity, Gs = A / C 2,62 2,60
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,61

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 26 20 19
Mass of can (gr) 14,07 14,25 14,09 14,60 14,28 11,43 12,95 14,22 12,31 13,78
Mass of wet soil + can (gr) 34,30 34,36 38,56 36,69 34,30 33,47 32,57 31,81 26,30 28,82
Mass of dry soil + can (gr) 29,90 30,00 33,26 31,88 29,73 28,44 27,82 27,71 24,89 26,43
Mass of dry soil (gr) 15,83 15,75 19,17 17,28 15,45 17,01 14,87 13,49 12,58 12,65
Mass of moisture (gr) 4,40 4,36 5,30 4,81 4,57 5,03 4,75 4,10 1,41 2,39
Water content, w (%) 27,80 27,68 27,65 27,84 29,58 29,57 31,94 30,39 11,21 18,89
27,74 27,74 29,58 31,17 15,05

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 28,90 %
80
Plastic Limit, PL = 15,05 %
Non Cohesive Plasticity Index, PI = 13,85
70 %
60 CH Natural Water Content wN = 20,60 %
PLASTIC INDEX

50 Liquid Index LI = 0,40


40
30
OH or MH `
20 CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,38 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,61 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,38 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,38 100,00 e2 = e1 - d2
4 4,750 d3 = 5,88 e3 = 69,50 92,20 e3 = e2 - d3
10 2,000 d4 = 1,30 e4 = 68,20 90,47 e4 = e3 - d4
20 0,850 d5 = 3,61 e5 = 64,59 85,69 e5 = e4 - d5
40 0,425 d6 = 9,51 e6 = 55,08 73,07 e6 = e5 - d6
60 0,250 d7 = 3,74 e7 = 51,34 68,11 e7 = e6 - d7
140 0,106 d8 = 4,79 e8 = 46,55 61,75 e8 = e7 - d8
200 0,075 d9 = 0,73 e9 = 45,82 60,79 e9 = e8 - d9
Sd = 29,56

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 35,0 -5,0 27,0 36,0 10,39 0,0127 0,0291 40,0 53,50
5 31,0 -5,0 27,0 32,0 11,05 0,0127 0,0189 36,0 48,15
30 26,5 -5,0 27,0 27,5 11,79 0,0127 0,0080 31,5 42,13
60 22,0 -5,0 27,0 23,0 12,52 0,0127 0,0058 27,0 36,11
250 16,0 -5,0 27,0 17,0 13,51 0,0127 0,0030 21,0 28,09
1440 10,0 -5,0 27,0 11,0 14,49 0,0127 0,0013 15,0 20,06

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.50 - 10.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,61

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,0035 0,0650 185,71 0,538

Finer #200 = 60,79 %


Gravel = 7,80 %
Sand = 31,41 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra , Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.5 - 10
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.22 Wet Weight Speciment, gr 117.00
1
2 Height of Speciment, L0 (cm) 7.2 Volume of Speciment, V (cm 3) 58.63
2 3
3 Cross Sectional Area A (cm ) 8.14 Weight Volume of Speciment, gb (gr/cm ) 2.00

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 10.00 0.972 4.76 8.223 0.579
140 0.14 15.00 1.944 7.14 8.305 0.860
210 0.21 17.00 2.917 8.10 8.388 0.965
280 0.28 20.00 3.889 9.53 8.473 1.124
350 0.35 22.00 4.861 10.48 8.559 1.224
420 0.42 24.00 5.833 11.43 8.648 1.322
490 0.49 25.50 6.806 12.15 8.738 1.390
560 0.56 26.00 7.778 12.38 8.830 1.402
630 0.63 25.50 8.750 12.15 8.924 1.361
700 0.7 25.00 9.722 11.91 9.020 1.320
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra , Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 9.5 - 10
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.6

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11
Strain (%)

Maximum Axial Load 12.38 kg


Compressive Stress 1.40 kg/cm2
Cohesion, c 0.70 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,77 13,69 gram
2 Mass of wet soil + can M2 113,41 113,17 gram
3 Mass of dry soil + can M3 104,50 103,69 gram
4 Mass of moisture = M2 - M3 8,91 9,48 gram
5 Mass of dry soil = M3 - M1 90,73 90,00 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 9,82 10,53 %
7 Average water content, (w) 10,18 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,34 32,26 gram
2 Mass of dry soil + piknometer M2 50,36 50,64 gram
3 Mass of dry soil + water + piknometer M3 92,91 93,25 gram
4 Mass of water + piknometer M4 81,83 81,87 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,02 18,38
7 B = M3 - M4 11,08 11,38
8 C=A-B 6,94 7,00
9 Specific Gravity, Gs = A / C 2,60 2,63
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,61

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 29 23 19
Mass of can (gr) 13,06 11,34 11,40 11,65 12,68 14,16 13,79 14,26 11,52 11,37
Mass of wet soil + can (gr) 33,75 29,90 30,73 32,19 32,37 32,82 34,61 31,91 26,60 28,73
Mass of dry soil + can (gr) 29,52 26,11 26,82 28,02 28,34 28,97 30,00 28,07 23,55 25,22
Mass of dry soil (gr) 16,46 14,77 15,42 16,37 15,66 14,81 16,21 13,81 12,03 13,85
Mass of moisture (gr) 4,23 3,79 3,91 4,17 4,03 3,85 4,61 3,84 3,05 3,51
Water content, w (%) 25,70 25,66 25,36 25,47 25,73 26,00 28,44 27,81 25,35 25,34
25,68 25,42 25,87 28,12 25,35

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 26,34 %
80
Plastic Limit, PL = 25,35 %
Non Cohesive Plasticity Index, PI = 0,99
70 %
60 CH Natural Water Content wN = 10,18 %
PLASTIC INDEX

50 Liquid Index LI = -15,25


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,35 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,61 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,35 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,35 100,00 e2 = e1 - d2
4 4,750 d3 = 0,37 e3 = 74,98 99,51 e3 = e2 - d3
8 2,360 d4 = 0,72 e4 = 74,26 98,55 e4 = e3 - d4
20 0,850 d5 = 3,72 e5 = 70,54 93,62 e5 = e4 - d5
30 0,600 d6 = 6,58 e6 = 63,96 84,88 e6 = e5 - d6
50 0,300 d7 = 17,67 e7 = 46,29 61,43 e7 = e6 - d7
100 0,150 d8 = 16,64 e8 = 29,65 39,35 e8 = e7 - d8
200 0,075 d9 = 5,28 e9 = 24,37 32,34 e9 = e8 - d9
Sd = 50,98

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 19,0 -5,0 27,0 20,0 13,02 0,0127 0,0325 24,0 32,10
5 19,0 -5,0 27,0 20,0 13,02 0,0127 0,0206 24,0 32,10
30 14,0 -5,0 27,0 15,0 13,84 0,0127 0,0087 19,0 25,41
60 11,5 -5,0 27,0 12,5 14,25 0,0127 0,0062 16,5 22,07
250 8,0 -5,0 27,0 9,0 14,82 0,0127 0,0031 13,0 17,39
1440 4,0 -5,0 27,0 5,0 15,48 0,0127 0,0013 9,0 12,04

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.5 - 12.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,61

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0009 0,018 0,3000 333,33 1,200

Finer #200 = 32,34 %


Gravel = 0,49 %
Sand = 67,17 %
Soil Description = SM (Silty Sand)

PT, SOILTAMA INDOKARYA PERSADA


DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.50 - 12.00
Date : 18 Agustus 2023
Made by : Tim Laboran PT. Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear
Time Horiz. Time Horiz. Time Horiz.
displace. ring Shear stress displace. ring Shear stress displace. ring Shear stress
Dial Dial Dial
∆H dial force, τ ∆H dial force, τ ∆H dial force, τ
sec reading sec reading sec reading
mm reading kg kg/cm2 mm reading kg kg/cm
2
mm reading kg kg/cm
2

0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000


15 15 0.15 2.5 1.68 0.054 15 15 0.15 0 0.00 0.000 15 15 0.15 5 3.35 0.108
30 30 0.30 3.75 2.52 0.081 30 30 0.30 1.5 1.01 0.032 30 30 0.30 5.5 3.69 0.118
45 45 0.45 5 3.35 0.108 45 45 0.45 7 4.70 0.151 45 45 0.45 8.5 5.70 0.183
60 60 0.60 5.75 3.86 0.124 60 60 0.60 8.75 5.87 0.188 60 60 0.60 11 7.38 0.237
90 90 0.90 6.75 4.53 0.145 90 90 0.90 11 7.38 0.237 90 90 0.90 14 9.39 0.301
120 120 1.20 7.75 5.20 0.167 120 120 1.20 12 8.05 0.258 120 120 1.20 17.25 11.57 0.371
150 150 1.50 8.25 5.53 0.178 150 150 1.50 13 8.72 0.280 150 150 1.50 21 14.09 0.452
180 180 1.80 9 6.04 0.194 180 180 1.80 13.5 9.06 0.291 180 180 1.80 24 16.10 0.517
210 210 2.10 9 6.04 0.194 210 210 2.10 13.75 9.22 0.296 210 210 2.10 25.5 17.11 0.549
240 240 2.40 9.25 6.21 0.199 240 240 2.40 13.75 9.22 0.296 240 240 2.40 26.25 17.61 0.565
270 270 2.70 9.5 6.37 0.204 270 270 2.70 13.75 9.22 0.296 270 270 2.70 26.25 17.61 0.565
300 300 3.00 9.5 6.37 0.204 300 300 3.00 13.5 9.06 0.291 300 300 3.00 26 17.44 0.560
330 330 3.30 9.5 6.37 0.204 330 330 3.30 13.25 8.89 0.285 330 330 3.30 25.25 16.94 0.543
360 360 3.60 9.5 6.37 0.204 360 360 3.60 13 8.72 0.280 360 360 3.60 24.75 16.60 0.533
390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000
420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000
450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000
480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000
510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000
540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000
570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000
600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000
DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 6
Depth : 11.50 - 12.00
Date : 18 Agustus 2023
Made by : Tim laboran PT Soiltama

Dimensions of sample :
Diameter 6.30 cm
2
Area 31.17 cm
Ht. 2.00 cm
3
Volume 62.34 cm
Kalibrasi 0.671 kg/div

Specimen no. 1 2 3
Mass of soil + ring gr 197.08 199.92 203.19
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 131.62 134.62 137.78
Initial water content wN (%) 10.18
Bulk density γb (gr/cm3) 2.11 2.16 2.21
Dry density γd (gr/cm3) 1.92 1.96 2.01
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.20 0.30 0.56

1.00

0.75
Shear stress, τ kg/cm2

0.50

0.25

0.00
0.000 0.500 1.000 1.500 2.000

Normal Stress, σn kg/cm2


Angle of Internal Friction φ = 50.11 o
2
Cohesion c = 0.07 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,72 12,68 gram
2 Mass of wet soil + can M2 112,87 113,44 gram
3 Mass of dry soil + can M3 99,81 99,65 gram
4 Mass of moisture = M2 - M3 13,06 13,79 gram
5 Mass of dry soil = M3 - M1 87,09 86,97 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 15,00 15,86 %
7 Average water content, (w) 15,43 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,44 31,50 gram
2 Mass of dry soil + piknometer M2 51,94 49,15 gram
3 Mass of dry soil + water + piknometer M3 94,89 92,73 gram
4 Mass of water + piknometer M4 83,64 82,12 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,50 17,65
7 B = M3 - M4 11,25 10,61
8 C=A-B 7,25 7,04
9 Specific Gravity, Gs = A / C 2,55 2,51
10 Average specific gravity, Gs 2,53
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,53

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,53

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 32 20 18
Mass of can (gr) 11,39 13,64 14,32 13,88 12,38 12,01 11,49 13,81 11,59 13,60
Mass of wet soil + can (gr) 31,44 39,22 32,45 34,35 31,39 34,16 36,39 32,54 26,00 26,03
Mass of dry soil + can (gr) 25,44 31,61 27,12 28,33 25,78 27,39 29,28 26,09 23,40 23,51
Mass of dry soil (gr) 14,05 17,97 12,80 14,45 13,40 15,38 17,79 12,28 11,81 9,91
Mass of moisture (gr) 6,00 7,61 5,33 6,02 5,61 6,77 7,11 6,45 2,60 2,52
Water content, w (%) 42,70 42,35 41,64 41,66 41,87 44,02 39,97 52,52 22,02 25,43
42,53 41,65 42,94 46,25 23,72

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 43,34 %
80
Plastic Limit, PL = 23,72 %
Non Cohesive Plasticity Index, PI = 19,62
70 %
60 CH Natural Water Content wN = 15,43 %
PLASTIC INDEX

50 Liquid Index LI = -0,42


40
30
OH or MH `
20 CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,38 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,53 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,38 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,38 100,00 e2 = e1 - d2
4 4,750 d3 = 0,19 e3 = 75,19 99,75 e3 = e2 - d3
10 2,000 d4 = 0,21 e4 = 74,98 99,47 e4 = e3 - d4
20 0,850 d5 = 0,49 e5 = 74,49 98,82 e5 = e4 - d5
40 0,425 d6 = 1,65 e6 = 72,84 96,63 e6 = e5 - d6
60 0,250 d7 = 1,19 e7 = 71,65 95,05 e7 = e6 - d7
140 0,106 d8 = 2,60 e8 = 69,05 91,60 e8 = e7 - d8
200 0,075 d9 = 0,52 e9 = 68,53 90,91 e9 = e8 - d9
Sd = 6,85

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 46,0 -3,0 27,0 47,0 8,59 0,0130 0,0270 49,0 66,57
5 42,0 -3,0 27,0 43,0 9,24 0,0130 0,0177 45,0 61,14
30 36,0 -3,0 27,0 37,0 10,23 0,0130 0,0076 39,0 52,99
60 31,0 -3,0 27,0 32,0 11,05 0,0130 0,0056 34,0 46,19
250 23,0 -3,0 27,0 24,0 12,36 0,0130 0,0029 26,0 35,32
1440 16,0 -3,0 27,0 17,0 13,51 0,0130 0,0013 19,0 25,81

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.50 - 4.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,53

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,002 0,0180 100,00 1,235

Finer #200 = 90,91 %


Gravel = 0,25 %
Sand = 8,84 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.5 - 4.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,30 gr s3 = 100,00 kN/m2 W= 122,44 gr s3 = 200,00 kN/m2 W= 123,21 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 25,60 0,10 9,63 12,19 1,266 7 33,60 0,10 9,63 16,00 1,662 7 33,20 0,10 9,63 15,81 1,642
Height of Sample = 7,00 cm 14 38,40 0,20 9,64 18,29 1,897 14 44,80 0,20 9,64 21,34 2,213 14 42,75 0,20 9,64 20,36 2,112
Volume of Sampel = 67,35 cm3 21 41,60 0,30 9,65 19,81 2,053 21 50,40 0,30 9,65 24,01 2,488 21 52,30 0,30 9,65 24,91 2,581
Speed = 0,70 mm/menit 28 44,80 0,40 9,66 21,34 2,209 28 56,00 0,40 9,66 26,67 2,761 28 57,00 0,40 9,66 27,15 2,811
Kalibrasi = 0,476 kg/div 35 48,00 0,50 9,67 22,86 2,364 35 58,20 0,50 9,67 27,72 2,867 35 61,75 0,50 9,67 29,41 3,042
70 53,70 1,00 9,72 25,58 2,632 70 63,80 1,00 9,72 30,39 3,127 70 71,25 1,00 9,72 33,94 3,492
105 57,60 1,50 9,77 27,43 2,809 105 67,20 1,50 9,77 32,01 3,277 105 74,10 1,50 9,77 35,29 3,613
140 61,40 2,00 9,82 29,24 2,979 140 69,40 2,00 9,82 33,06 3,367 140 76,00 2,00 9,82 36,20 3,687
175 64,00 2,50 9,87 30,48 3,089 175 72,80 2,50 9,87 34,67 3,514 175 79,80 2,50 9,87 38,01 3,852
210 66,50 3,00 9,92 31,67 3,193 210 75,00 3,00 9,92 35,72 3,602 210 81,70 3,00 9,92 38,91 3,923
280 70,00 4,00 10,02 33,34 3,327 280 76,00 4,00 10,02 36,20 3,612 280 85,50 4,00 10,02 40,72 4,063
350 70,40 5,00 10,13 33,53 3,311 350 78,40 5,00 10,13 37,34 3,687 350 90,25 5,00 10,13 42,99 4,244
420 73,00 6,00 10,24 34,77 3,397 420 80,60 6,00 10,24 38,39 3,751 420 93,10 6,00 10,24 44,34 4,332
490 72,00 7,00 10,35 34,29 3,315 490 81,70 7,00 10,35 38,91 3,761 490 95,00 7,00 10,35 45,25 4,374
560 70,40 8,00 10,46 33,53 3,206 560 84,00 8,00 10,46 40,01 3,826 560 99,75 8,00 10,46 47,51 4,543
630 70,00 9,00 10,57 33,34 3,154 630 83,00 9,00 10,57 39,53 3,739 630 100,70 9,00 10,57 47,96 4,537
700 10,00 700 80,40 10,00 10,69 38,29 3,582 700 99,75 10,00 10,69 47,51 4,444
840 12,00 840 78,40 12,00 10,93 37,34 3,415 840 98,80 12,00 10,93 47,06 4,304
980 14,00 980 980 96,90 14,00 11,19 46,15 4,126
1120 16,00 1120 1120

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 3.5 - 4.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama

5,0
Test conditon : UU
SPECIMEN 1 2 3
4,5 Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
4,0 Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 121,30 122,44 123,21
3,5 3
1,80 1,82 1,83
INITIAL Density, gr/cm
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 15,43 15,43 15,43


3,0 Dry Density, gr/cm
3
1,56 1,58 1,58
Weight, gr
AFTER 3
Density, gr/cm
2,5 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2,0 Cell pressure, kg/cm
2
0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
1,5 Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 9,00 8,00 14,00
2
FAILURE
(s1-s3)f kg/cm 3,40 3,83 4,54
1,0 2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
2
0,5 s1'f, kg/cm 3,90 4,83 6,54
SHEAR STRENGTH c: 1,320 kg/cm2
PARAMETERS j: 14,50 
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3

5,0

4,5

4,0

3,5
Shear Stress, kg/cm2

3,0

2,5

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0 8,5 9,0 9,5 10,0
Principal Stress, kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,21 14,20 gram
2 Mass of wet soil + can M2 113,51 113,98 gram
3 Mass of dry soil + can M3 100,25 99,56 gram
4 Mass of moisture = M2 - M3 13,26 14,42 gram
5 Mass of dry soil = M3 - M1 86,04 85,36 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 15,41 16,89 %
7 Average water content, (w) 16,15 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 30,00 31,73 gram
2 Mass of dry soil + piknometer M2 48,22 49,81 gram
3 Mass of dry soil + water + piknometer M3 91,41 93,16 gram
4 Mass of water + piknometer M4 80,09 81,99 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,22 18,08
7 B = M3 - M4 11,32 11,17
8 C=A-B 6,90 6,91
9 Specific Gravity, Gs = A / C 2,64 2,62
10 Average specific gravity, Gs 2,63
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,63

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,63

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 31 27 20 18
Mass of can (gr) 14,46 13,18 11,30 11,46 14,61 14,35 13,42 14,17 12,96 13,95
Mass of wet soil + can (gr) 34,72 32,37 33,58 33,25 37,71 35,79 34,43 37,53 28,11 29,05
Mass of dry soil + can (gr) 29,96 27,76 28,19 28,00 32,04 30,46 29,17 32,00 25,29 26,27
Mass of dry soil (gr) 15,50 14,58 16,89 16,54 17,43 16,11 15,75 17,83 12,33 12,32
Mass of moisture (gr) 4,76 4,61 5,39 5,25 5,67 5,33 5,26 5,53 2,82 2,78
Water content, w (%) 30,71 31,62 31,91 31,74 32,53 33,09 33,40 31,02 22,87 22,56
31,16 31,83 32,81 32,21 22,72

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 31,85 %
80
Plastic Limit, PL = 22,72 %
Non Cohesive Plasticity Index, PI = 9,14
70 %
60 CH Natural Water Content wN = 16,15 %
PLASTIC INDEX

50 Liquid Index LI = -0,72


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,10 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,63 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,1 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,10 100,00 e2 = e1 - d2
4 4,750 d3 = 3,33 e3 = 71,77 95,57 e3 = e2 - d3
8 2,360 d4 = 0,95 e4 = 70,82 94,30 e4 = e3 - d4
20 0,850 d5 = 1,16 e5 = 69,66 92,76 e5 = e4 - d5
30 0,600 d6 = 0,87 e6 = 68,79 91,60 e6 = e5 - d6
50 0,300 d7 = 1,43 e7 = 67,36 89,69 e7 = e6 - d7
100 0,150 d8 = 2,50 e8 = 64,86 86,36 e8 = e7 - d8
200 0,075 d9 = 1,03 e9 = 63,83 84,99 e9 = e8 - d9
Sd = 11,27

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 43,0 -5,0 27,0 44,0 9,08 0,0127 0,0270 48,0 64,19
5 40,0 -5,0 27,0 41,0 9,57 0,0127 0,0175 45,0 60,18
30 30,5 -5,0 27,0 31,5 11,13 0,0127 0,0077 35,5 47,47
60 25,5 -5,0 27,0 26,5 11,95 0,0127 0,0057 30,5 40,79
250 18,0 -5,0 27,0 19,0 13,18 0,0127 0,0029 23,0 30,76
1440 12,0 -5,0 27,0 13,0 14,16 0,0127 0,0013 17,0 22,73

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,63

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,003 0,0180 60,00 1,667

Finer #200 = 84,99 %


Gravel = 4,43 %
Sand = 10,57 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.5 - 8
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.37 Wet Weight Speciment, gr 126.62
1
2 Height of Speciment, L0 (cm) 7.5 Volume of Speciment, V (cm 3) 66.90
2 3
3 Cross Sectional Area A (cm ) 8.92 Weight Volume of Speciment, gb (gr/cm ) 1.89

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 4.00 0.933 1.91 9.004 0.212
140 0.14 7.00 1.867 3.33 9.089 0.367
210 0.21 9.00 2.800 4.29 9.177 0.467
280 0.28 11.00 3.733 5.24 9.266 0.565
350 0.35 13.00 4.667 6.19 9.356 0.662
420 0.42 15.00 5.600 7.14 9.449 0.756
490 0.49 16.00 6.533 7.62 9.543 0.799
560 0.56 17.00 7.467 8.10 9.639 0.840
630 0.63 18.00 8.400 8.57 9.738 0.880
700 0.7 19.20 9.333 9.14 9.838 0.930
770 0.77 20.00 10.267 9.53 9.940 0.958
840 0.84 21.00 11.200 10.00 10.045 0.996
910 0.91 22.00 12.133 10.48 10.151 1.032
980 0.98 23.00 13.067 10.95 10.260 1.068
1050 1.05 24.00 14.000 11.43 10.372 1.102
1120 1.12 25.00 14.933 11.91 10.486 1.136
1190 1.19 26.00 15.867 12.38 10.602 1.168
1260 1.26 26.00 16.800 12.38 10.721 1.155
1330 1.33 25.60 17.733 12.19 10.842 1.125
1400 1.4 25.00 18.667 11.91 10.967 1.086
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 7.5- 8
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Strain (%)

Maximum Axial Load 12.38 kg


Compressive Stress 1.17 kg/cm2
Cohesion, c 0.58 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,08 12,50 gram
2 Mass of wet soil + can M2 113,23 112,90 gram
3 Mass of dry soil + can M3 108,96 92,22 gram
4 Mass of moisture = M2 - M3 4,27 20,68 gram
5 Mass of dry soil = M3 - M1 95,88 79,72 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 4,45 25,94 %
7 Average water content, (w) 15,20 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,60 32,12 gram
2 Mass of dry soil + piknometer M2 51,70 50,51 gram
3 Mass of dry soil + water + piknometer M3 94,09 93,69 gram
4 Mass of water + piknometer M4 82,34 82,40 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,10 18,39
7 B = M3 - M4 11,75 11,29
8 C=A-B 7,35 7,10
9 Specific Gravity, Gs = A / C 2,60 2,59
10 Average specific gravity, Gs 2,59
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,59

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 27 19 18
Mass of can (gr) 13,77 14,02 13,79 14,32 12,65 11,15 13,76 14,03 12,95 13,95
Mass of wet soil + can (gr) 35,81 38,35 42,29 36,92 32,76 32,66 40,00 35,22 28,05 28,95
Mass of dry soil + can (gr) 30,06 32,05 34,86 31,06 27,32 26,83 33,12 29,61 25,00 26,17
Mass of dry soil (gr) 16,29 18,03 21,07 16,74 14,67 15,68 19,36 15,58 12,05 12,22
Mass of moisture (gr) 5,75 6,30 7,43 5,86 5,44 5,83 6,88 5,61 3,05 2,78
Water content, w (%) 35,30 34,94 35,26 35,01 37,08 37,18 35,54 36,01 25,31 22,75
35,12 35,13 37,13 35,77 24,03

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100,00
90,00 Liquid Limit, LL = 35,64 %
80,00
Plastic Limit, PL = 24,03 %
Non Cohesive Plasticity Index, PI = 11,61
70,00 %
60,00 CH Natural Water Content wN = 15,20 %
PLASTIC INDEX

50,00 Liquid Index LI = -0,76


40,00
30,00
OH or MH `
20,00 CL
10,00 ML
0,00
0,00 10,00 20,00 30,00 40,00 50,00 60,00 70,00 80,00 90,00 100,00110,00120,00130,00140,00150,00160,00

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,16 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,59 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,35 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,16 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,16 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,16 100,00 e3 = e2 - d3
10 2,000 d4 = 0,00 e4 = 75,16 100,00 e4 = e3 - d4
20 0,850 d5 = 0,52 e5 = 74,64 99,31 e5 = e4 - d5
40 0,425 d6 = 2,49 e6 = 72,15 96,00 e6 = e5 - d6
60 0,250 d7 = 1,36 e7 = 70,79 94,19 e7 = e6 - d7
140 0,106 d8 = 2,93 e8 = 67,86 90,29 e8 = e7 - d8
200 0,075 d9 = 0,89 e9 = 66,97 89,10 e9 = e8 - d9
Sd = 8,19

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 31,0 -3,0 27,0 32,0 11,05 0,0128 0,0301 34,0 45,74
5 28,5 -3,0 27,0 29,5 11,46 0,0128 0,0194 31,5 42,38
30 22,0 -3,0 27,0 23,0 12,52 0,0128 0,0083 25,0 33,63
60 18,5 -3,0 27,0 19,5 13,10 0,0128 0,0060 21,5 28,92
250 13,0 -3,0 27,0 14,0 14,00 0,0128 0,0030 16,0 21,52
1440 9,0 -3,0 27,0 10,0 14,66 0,0128 0,0013 12,0 16,14

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.50 - 13.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,59

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,0065 0,0400 80,00 2,113

Finer #200 = 89,10 %


Gravel = 0,00 %
Sand = 10,90 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.5 - 13
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.46 Wet Weight Speciment, gr 136.61
1
2 Height of Speciment, L0 (cm) 7.46 Volume of Speciment, V (cm 3) 70.14
2 3
3 Cross Sectional Area A (cm ) 9.40 Weight Volume of Speciment, gb (gr/cm ) 1.95

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 9.75 0.938 4.64 9.492 0.489
140 0.14 13.50 1.877 6.43 9.582 0.671
210 0.21 15.75 2.815 7.50 9.675 0.775
280 0.28 18.75 3.753 8.93 9.769 0.914
350 0.35 21.75 4.692 10.36 9.865 1.050
420 0.42 24.00 5.630 11.43 9.963 1.147
490 0.49 26.25 6.568 12.50 10.063 1.242
560 0.56 28.50 7.507 13.57 10.166 1.335
630 0.63 30.00 8.445 14.29 10.270 1.391
700 0.7 31.50 9.383 15.00 10.376 1.446
770 0.77 33.00 10.322 15.72 10.485 1.499
840 0.84 34.50 11.260 16.43 10.596 1.551
910 0.91 36.00 12.198 17.15 10.709 1.601
980 0.98 36.75 13.137 17.50 10.824 1.617
1050 1.05 38.25 14.075 18.22 10.943 1.665
1120 1.12 39.00 15.013 18.58 11.063 1.679
1190 1.19 39.60 15.952 18.86 11.187 1.686
1260 1.26 40.50 16.890 19.29 11.313 1.705
1330 1.33 39.90 17.828 19.00 11.442 1.661
1400 1.4 39.60 18.767 18.86 11.575 1.630
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 7
Depth : 12.5-13
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.8

1.6

1.4

1.2
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Strain (%)

Maximum Axial Load 19.29 kg


Compressive Stress 1.71 kg/cm2
Cohesion, c 0.85 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,55 14,10 gram
2 Mass of wet soil + can M2 112,67 114,10 gram
3 Mass of dry soil + can M3 101,83 104,83 gram
4 Mass of moisture = M2 - M3 10,84 9,27 gram
5 Mass of dry soil = M3 - M1 90,28 90,73 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,01 10,21 %
7 Average water content, (w) 11,11 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,92 31,71 gram
2 Mass of dry soil + piknometer M2 49,93 49,78 gram
3 Mass of dry soil + water + piknometer M3 93,48 92,98 gram
4 Mass of water + piknometer M4 82,12 82,12 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,01 18,07
7 B = M3 - M4 11,36 10,86
8 C=A-B 6,65 7,21
9 Specific Gravity, Gs = A / C 2,71 2,51
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,61

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 19 23 29 31
Mass of can (gr) 14,27 13,17 14,04 14,41 14,10 14,55 13,02 12,41 12,68 13,04
Mass of wet soil + can (gr) 34,85 33,01 32,73 30,64 35,02 40,11 33,86 32,66 28,14 28,68
Mass of dry soil + can (gr) 30,28 28,38 28,58 26,92 30,37 34,40 31,33 27,69 25,23 25,85
Mass of dry soil (gr) 16,01 15,21 14,54 12,51 16,27 19,85 18,31 15,28 12,55 12,81
Mass of moisture (gr) 4,57 4,63 4,15 3,72 4,65 5,71 2,53 4,97 2,91 2,83
Water content, w (%) 28,54 30,44 28,54 29,74 28,58 28,77 13,82 32,53 23,19 22,09
29,49 29,14 28,67 23,17 22,64

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 27,63 %
80
Plastic Limit, PL = 22,64 %
Non Cohesive Plasticity Index, PI = 4,99
70 %
60 CH Natural Water Content wN = 11,11 %
PLASTIC INDEX

50 Liquid Index LI = -2,31


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,61 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,43 e4 = 74,57 99,43 e4 = e3 - d4
20 0,850 d5 = 6,71 e5 = 67,86 90,48 e5 = e4 - d5
30 0,600 d6 = 10,55 e6 = 57,31 76,41 e6 = e5 - d6
50 0,300 d7 = 9,05 e7 = 48,26 64,35 e7 = e6 - d7
100 0,150 d8 = 6,94 e8 = 41,32 55,09 e8 = e7 - d8
200 0,075 d9 = 3,75 e9 = 37,57 50,09 e9 = e8 - d9
Sd = 37,43

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 25,0 -3,0 27,0 26,0 12,03 0,0128 0,0313 28,0 37,65
5 23,0 -3,0 27,0 24,0 12,36 0,0128 0,0201 26,0 34,96
30 20,0 -3,0 27,0 21,0 12,85 0,0128 0,0083 23,0 30,93
60 18,0 -3,0 27,0 19,0 13,18 0,0128 0,0060 21,0 28,24
250 12,0 -3,0 27,0 13,0 14,16 0,0128 0,0030 15,0 20,17
1440 8,0 -3,0 27,0 9,0 14,82 0,0128 0,0013 11,0 14,79

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.50 - 2.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,61

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0006 0,008 0,2200 400,00 0,529

Finer #200 = 50,09 %


Gravel = 0,00 %
Sand = 49,91 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.5 - 2
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.21 Wet Weight Speciment, gr 125.93
1
2 Height of Speciment, L0 (cm) 7.12 Volume of Speciment, V (cm 3) 57.62
2 3
3 Cross Sectional Area A (cm ) 8.09 Weight Volume of Speciment, gb (gr/cm ) 2.19

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 7.00 0.983 3.33 8.173 0.408
140 0.14 11.75 1.966 5.60 8.255 0.678
210 0.21 14.50 2.949 6.91 8.339 0.828
280 0.28 17.00 3.933 8.10 8.424 0.961
350 0.35 18.50 4.916 8.81 8.511 1.035
420 0.42 19.75 5.899 9.41 8.600 1.094
490 0.49 21.00 6.882 10.00 8.691 1.151
560 0.56 21.75 7.865 10.36 8.784 1.179
630 0.63 22.50 8.848 10.72 8.878 1.207
700 0.7 23.00 9.831 10.95 8.975 1.221
770 0.77 24.00 10.815 11.43 9.074 1.260
840 0.84 25.00 11.798 11.91 9.175 1.298
910 0.91 25.75 12.781 12.26 9.279 1.322
980 0.98 26.50 13.764 12.62 9.385 1.345
1050 1.05 27.25 14.747 12.98 9.493 1.367
1120 1.12 27.75 15.730 13.22 9.603 1.376
1190 1.19 28.25 16.713 13.46 9.717 1.385
1260 1.26 29.00 17.697 13.81 9.833 1.405
1330 1.33 28.75 18.680 13.69 9.952 1.376
1400 1.4 28.50 19.663 13.57 10.074 1.348
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 1.5 - 2
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.6

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)

Maximum Axial Load 13.81 kg


Compressive Stress 1.40 kg/cm2
Cohesion, c 0.70 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,40 13,85 gram
2 Mass of wet soil + can M2 113,00 114,19 gram
3 Mass of dry soil + can M3 97,13 102,52 gram
4 Mass of moisture = M2 - M3 15,87 11,67 gram
5 Mass of dry soil = M3 - M1 84,73 88,67 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 18,73 13,16 %
7 Average water content, (w) 15,95 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,22 32,90 gram
2 Mass of dry soil + piknometer M2 40,63 40,41 gram
3 Mass of dry soil + water + piknometer M3 87,31 87,10 gram
4 Mass of water + piknometer M4 82,13 82,58 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 8,41 7,51
7 B = M3 - M4 5,18 4,52
8 C=A-B 3,23 2,99
9 Specific Gravity, Gs = A / C 2,60 2,51
10 Average specific gravity, Gs 2,56
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,56

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,56

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 33 19 17
Mass of can (gr) 14,15 12,54 13,78 11,31 13,97 14,07 13,62 14,50 13,86 11,58
Mass of wet soil + can (gr) 36,62 33,47 34,06 28,64 34,62 33,12 33,01 36,55 28,96 26,62
Mass of dry soil + can (gr) 31,01 27,89 29,05 24,34 28,92 27,79 27,59 30,54 25,93 23,51
Mass of dry soil (gr) 16,86 15,35 15,27 13,03 14,95 13,72 13,97 16,04 12,07 11,93
Mass of moisture (gr) 5,61 5,58 5,01 4,30 5,70 5,33 5,42 6,01 3,03 3,11
Water content, w (%) 33,27 36,35 32,81 33,00 38,13 38,85 38,80 37,47 25,10 26,07
34,81 32,91 38,49 38,13 25,59

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 36,01 %
80
Plastic Limit, PL = 25,59 %
Non Cohesive Plasticity Index, PI = 10,42
70 %
60 CH Natural Water Content wN = 15,95 %
PLASTIC INDEX

50 Liquid Index LI = -0,93


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,07 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,56 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,07 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,07 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,07 100,00 e3 = e2 - d3
10 2,000 d4 = 0,00 e4 = 75,07 100,00 e4 = e3 - d4
20 0,850 d5 = 0,04 e5 = 75,03 99,95 e5 = e4 - d5
40 0,425 d6 = 0,00 e6 = 75,03 99,95 e6 = e5 - d6
60 0,250 d7 = 0,06 e7 = 74,97 99,87 e7 = e6 - d7
140 0,106 d8 = 0,88 e8 = 74,09 98,69 e8 = e7 - d8
200 0,075 d9 = 2,77 e9 = 71,32 95,00 e9 = e8 - d9
Sd = 3,75

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 57,0 -3,0 27,0 58,0 6,78 0,0129 0,0238 60,0 81,40
5 53,0 -3,0 27,0 54,0 7,44 0,0129 0,0158 56,0 75,97
30 45,0 -3,0 27,0 46,0 8,75 0,0129 0,0070 48,0 65,12
60 40,0 -3,0 27,0 41,0 9,57 0,0129 0,0052 43,0 58,34
250 30,5 -3,0 27,0 31,5 11,13 0,0129 0,0027 33,5 45,45
1440 20,0 -3,0 27,0 21,0 12,85 0,0129 0,0012 23,0 31,20

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.50 - 8.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,56

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0007 0,008 0,0900 138,46 1,094

Finer #200 = 95,00 %


Gravel = 0,00 %
Sand = 5,00 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.5 - 8
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
1 Diamater of Speciment , D (cm) 3.5 Wet Weight Speciment, gr 130.62

2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 67.35


2 3
3 Cross Sectional Area A (cm ) 9.62 Weight Volume of Speciment, gb (gr/cm ) 1.94

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 10.00 1.000 4.76 9.718 0.490
140 0.14 20.00 2.000 9.53 9.817 0.970
210 0.21 35.00 3.000 16.67 9.919 1.681
280 0.28 45.00 4.000 21.43 10.022 2.139
350 0.35 50.00 5.000 23.82 10.128 2.352
420 0.42 55.00 6.000 26.20 10.235 2.559
490 0.49 60.00 7.000 28.58 10.345 2.762
560 0.56 65.00 8.000 30.96 10.458 2.960
630 0.63 70.00 9.000 33.34 10.573 3.154
700 0.7 72.50 10.000 34.53 10.690 3.230
770 0.77 73.00 11.000 34.77 10.810 3.216
840 0.84 72.00 12.000 34.29 10.933 3.137
910 0.91 70.00 13.000 33.34 11.059 3.015
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 7.5 - 8
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

3.5

2.5
Compressive Stress (kg/cm2)

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strain (%)

Maximum Axial Load 34.77 kg


Compressive Stress 3.23 kg/cm2
Cohesion, c 1.62 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,42 12,27 gram
2 Mass of wet soil + can M2 111,80 112,77 gram
3 Mass of dry soil + can M3 104,13 100,63 gram
4 Mass of moisture = M2 - M3 7,67 12,14 gram
5 Mass of dry soil = M3 - M1 92,71 88,36 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 8,27 13,74 %
7 Average water content, (w) 11,01 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,34 30,39 gram
2 Mass of dry soil + piknometer M2 51,60 48,77 gram
3 Mass of dry soil + water + piknometer M3 94,43 92,30 gram
4 Mass of water + piknometer M4 83,21 81,01 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,26 18,38
7 B = M3 - M4 11,22 11,29
8 C=A-B 7,04 7,09
9 Specific Gravity, Gs = A / C 2,59 2,59
10 Average specific gravity, Gs 2,59
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,59

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 32 24 16
Mass of can (gr) 14,35 11,56 11,33 14,11 13,91 12,54 12,45 13,95 13,73 14,05
Mass of wet soil + can (gr) 30,26 32,87 39,05 35,00 41,37 36,17 48,53 44,48 29,59 30,56
Mass of dry soil + can (gr) 28,26 30,18 34,63 31,67 36,87 32,62 42,30 39,11 27,19 28,13
Mass of dry soil (gr) 13,91 18,62 23,30 17,56 22,96 20,08 29,85 25,16 13,46 14,08
Mass of moisture (gr) 2,00 2,69 4,42 3,33 4,50 3,55 6,23 5,37 2,40 2,43
Water content, w (%) 14,38 14,45 18,97 18,96 19,60 17,68 20,87 21,34 17,83 17,26
14,41 18,97 18,64 21,11 17,54

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 18,34 %
80
Plastic Limit, PL = 17,54 %
Non Cohesive Plasticity Index, PI = 0,80
70 %
60 CH Natural Water Content wN = 11,01 %
PLASTIC INDEX

50 Liquid Index LI = -8,20


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,13 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,59 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,35 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,13 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,13 100,00 e2 = e1 - d2
4 4,750 d3 = 10,11 e3 = 65,02 86,54 e3 = e2 - d3
8 2,360 d4 = 13,64 e4 = 51,38 68,39 e4 = e3 - d4
20 0,850 d5 = 15,30 e5 = 36,08 48,02 e5 = e4 - d5
30 0,600 d6 = 4,22 e6 = 31,86 42,41 e6 = e5 - d6
50 0,300 d7 = 4,02 e7 = 27,84 37,06 e7 = e6 - d7
100 0,150 d8 = 4,68 e8 = 23,16 30,83 e8 = e7 - d8
200 0,075 d9 = 2,45 e9 = 20,71 27,57 e9 = e8 - d9
Sd = 54,42

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 15,0 -3,0 27,0 16,0 13,67 0,0128 0,0335 18,0 24,23
5 15,0 -3,0 27,0 16,0 13,67 0,0128 0,0212 18,0 24,23
30 14,0 -3,0 27,0 15,0 13,84 0,0128 0,0087 17,0 22,89
60 12,0 -3,0 27,0 13,0 14,16 0,0128 0,0062 15,0 20,19
250 9,5 -3,0 27,0 10,5 14,57 0,0128 0,0031 12,5 16,83
1440 6,0 -3,0 27,0 7,0 15,15 0,0128 0,0013 9,0 12,12

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.50 - 15.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,59

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0008 0,15 1,6000 2000,00 17,578

Finer #200 = 27,57 %


Gravel = 13,46 %
Sand = 58,98 %
Soil Description = SM (Silty Sand)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.5 - 15
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
1 Diamater of Speciment , D (cm) 3.42 Wet Weight Speciment, gr 125.71
2 Height of Speciment, L0 (cm) 7.23 Volume of Speciment, V (cm )
3
66.42
2 3
3 Cross Sectional Area A (cm ) 9.19 Weight Volume of Speciment, gb (gr/cm ) 1.89
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 9.00 0.968 4.29 9.276 0.462
140 0.14 16.00 1.936 7.62 9.368 0.814
210 0.21 22.50 2.905 10.72 9.461 1.133
280 0.28 29.00 3.873 13.81 9.556 1.445
350 0.35 37.00 4.841 17.62 9.654 1.826
420 0.42 47.50 5.809 22.62 9.753 2.320
490 0.49 60.00 6.777 28.58 9.854 2.900
560 0.56 65.00 7.746 30.96 9.958 3.109
630 0.63 77.50 8.714 36.91 10.063 3.668
700 0.7 84.50 9.682 40.25 10.171 3.957
770 0.77 88.50 10.650 42.15 10.281 4.100
840 0.84 89.00 11.618 42.39 10.394 4.078
910 0.91 87.00 12.586 41.44 10.509 3.943
980 0.98 85.00 13.555 40.49 10.627 3.810
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BAP 8
Depth : 14.5 - 15
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

4.5

3.5

3
Compressive Stress (kg/cm2)

2.5

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Strain (%)

Maximum Axial Load 42.39 kg


Compressive Stress 4.10 kg/cm2
Cohesion, c 2.05 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,23 11,08 gram
2 Mass of wet soil + can M2 131,65 126,24 gram
3 Mass of dry soil + can M3 108,20 103,16 gram
4 Mass of moisture = M2 - M3 23,45 23,08 gram
5 Mass of dry soil = M3 - M1 93,97 92,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,95 25,07 %
7 Average water content, (w) 25,01 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,46 31,52 gram
2 Mass of dry soil + piknometer M2 52,97 51,90 gram
3 Mass of dry soil + water + piknometer M3 95,67 94,27 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,51 20,38
7 B = M3 - M4 12,78 12,53
8 C=A-B 7,73 7,85
9 Specific Gravity, Gs = A / C 2,65 2,60
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,62

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,62

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 32 23 18
Mass of can (gr) 14,02 13,69 13,84 11,33 14,61 13,98 14,13 11,36 13,94 13,62
Mass of wet soil + can (gr) 38,80 32,47 31,97 29,44 33,76 32,49 44,10 34,33 28,94 28,62
Mass of dry soil + can (gr) 32,00 27,33 26,67 24,12 27,89 26,76 34,88 27,24 26,18 25,71
Mass of dry soil (gr) 17,98 13,64 12,83 12,79 13,28 12,78 20,75 15,88 12,24 12,09
Mass of moisture (gr) 6,80 5,14 5,30 5,32 5,87 5,73 9,22 7,09 2,76 2,91
Water content, w (%) 37,82 37,68 41,31 41,59 44,20 44,84 44,43 44,65 22,55 24,07
37,75 41,45 44,52 44,54 23,31

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 42,46 %
80
Plastic Limit, PL = 23,31 %
Non Cohesive Plasticity Index, PI = 19,16
70 %
60 CH Natural Water Content wN = 25,01 %
PLASTIC INDEX

50 Liquid Index LI = 0,09


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,62 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 1,25 e8 = 73,75 98,33 e8 = e7 - d8
200 0,075 d9 = 6,48 e9 = 67,27 89,69 e9 = e8 - d9
Sd = 7,73

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 31,0 -3,0 27,0 32,0 11,05 0,0127 0,0298 34,0 45,56
5 30,0 -3,0 27,0 31,0 11,21 0,0127 0,0190 33,0 44,22
30 29,0 -3,0 27,0 30,0 11,38 0,0127 0,0078 32,0 42,88
60 28,0 -3,0 27,0 29,0 11,54 0,0127 0,0056 31,0 41,54
250 24,0 -3,0 27,0 25,0 12,20 0,0127 0,0028 27,0 36,18
1440 20,0 -3,0 27,0 21,0 12,85 0,0127 0,0012 23,0 30,82

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,62

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0012 0,0420 210,00 0,171

Finer #200 = 89,69 %


Gravel = 0,00 %
Sand = 10,31 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,07 gr s3 = 100,00 kN/m2 W= 122,52 gr s3 = 200,00 kN/m2 W= 123,60 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 5,00 0,10 9,63 2,38 0,247 7 7,50 0,10 9,63 3,57 0,371 7 10,00 0,10 9,63 4,76 0,495
Height of Sample = 7,00 cm 14 10,00 0,20 9,64 4,76 0,494 14 12,50 0,20 9,64 5,95 0,618 14 17,50 0,20 9,64 8,34 0,865
3
Volume of Sampel = 67,35 cm 21 12,50 0,30 9,65 5,95 0,617 21 17,50 0,30 9,65 8,34 0,864 21 22,50 0,30 9,65 10,72 1,111
Speed = 0,70 mm/menit 28 17,50 0,40 9,66 8,34 0,863 28 22,50 0,40 9,66 10,72 1,109 28 30,00 0,40 9,66 14,29 1,479
Kalibrasi = 0,476 kg/div 35 19,40 0,50 9,67 9,24 0,956 35 25,00 0,50 9,67 11,91 1,231 35 32,50 0,50 9,67 15,48 1,601
70 21,20 1,00 9,72 10,10 1,039 70 27,50 1,00 9,72 13,10 1,348 70 36,25 1,00 9,72 17,27 1,777
105 24,40 1,50 9,77 11,62 1,190 105 30,00 1,50 9,77 14,29 1,463 105 37,50 1,50 9,77 17,86 1,829
140 26,25 2,00 9,82 12,50 1,274 140 33,75 2,00 9,82 16,08 1,637 140 41,25 2,00 9,82 19,65 2,001
175 27,50 2,50 9,87 13,10 1,327 175 35,00 2,50 9,87 16,67 1,689 175 43,70 2,50 9,87 20,81 2,109
210 28,00 3,00 9,92 13,34 1,345 210 36,25 3,00 9,92 17,27 1,741 210 45,00 3,00 9,92 21,43 2,161
280 28,75 4,00 10,02 13,69 1,366 280 37,50 4,00 10,02 17,86 1,782 280 47,50 4,00 10,02 22,62 2,257
350 28,50 5,00 10,13 13,57 1,340 350 38,75 5,00 10,13 18,46 1,822 350 50,00 5,00 10,13 23,82 2,352
420 28,00 6,00 10,24 13,34 1,303 420 40,00 6,00 10,24 19,05 1,861 420 52,50 6,00 10,24 25,01 2,443
490 28,00 7,00 10,35 13,34 1,289 490 39,50 7,00 10,35 18,81 1,819 490 53,70 7,00 10,35 25,58 2,472
560 560 39,20 8,00 10,46 18,67 1,785 560 55,00 8,00 10,46 26,20 2,505
630 630 39,00 9,00 10,57 18,58 1,757 630 54,50 9,00 10,57 25,96 2,455
700 700 700 54,30 10,00 10,69 25,86 2,419
840 840 840 54,00 12,00 10,93 25,72 2,353
980 980 980
1120 1120 1120
1260 1260 1260
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

3,0 Test conditon : UU


SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION
Area, cm2 9,62 9,62 9,62
Volume, cm3 67,35 67,35 67,35
Weight, gr 121,07 122,52 123,60

2,0 Density, gr/cm3 1,80 1,82 1,84


Deviator Stress (s1 - s3), kg/cm2

INITIAL
Moisture, % 25,01 25,01 25,01
Dry Density, gr/cm3 1,44 1,46 1,47
Weight, gr
1,5 AFTER Density, gr/cm3
CONSOLIDATION Moisture, %

Dry Density, gr/cm3


Cell pressure, kg/cm2 0,50 1,00 2,00
1,0 COMPRESSION
STAGE initial pwp, kg/cm2
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 4,00 9,00 12,00
0,5 (s1-s3)f kg/cm2 1,37 1,86 2,50
FAILURE
CONDITIONS uf, kg/cm2
s3'f, kg/cm2 0,50 1,00 2,00
s1'f, kg/cm2 1,87 2,86 4,50
0,0 SHEAR STRENGTH c: 0,420 2
kg/cm
0 5 10 15 PARAMETERS j: 14,75 
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
o
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.630 INIT. WATER CONTENT Wo % 26.520
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.580
LIQUID LIMIT (LL%) 42.460 DRY WEIGHT Wd (gr) 61.770 DEGREE OF INITIAL SAT. So % 69.476
PLASTIC LIMIT (PL%) 23.310 SUBSTANCE HEIGHT Hs (cm) 1.200
GRADATION

PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) (cm/sec)

0 0.00 0.5800 1.9000


1 0.50 0.50 0.0070 0.0070 0.0058 0.5765 1.8930 0.9483 5.3 0.00240 0.3684 0.0074 0.0000177
2 1.00 0.50 0.0110 0.0040 0.0033 0.5732 1.8890 0.9455 9.0 0.00140 0.2113 0.0042 0.0000059
3 2.00 1.00 0.0230 0.0120 0.0100 0.5632 1.8770 0.9415 9.0 0.00139 0.6353 0.0064 0.0000088
4 4.00 2.00 0.0403 0.0173 0.0144 0.5488 1.8598 0.9342 9.0 0.00137 0.9190 0.0046 0.0000063
5 8.00 4.00 0.0840 0.0438 0.0365 0.5123 1.8160 0.9189 12.3 0.00097 2.3525 0.0059 0.0000057
6 2.00 0.0513 -0.0328 -0.0273 0.5396 1.8488 0.9162
7 0.25 0.0328 -0.0185 -0.0154 0.5550 1.8673 0.9290

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ratio (e)


0.65

0.6e0

0.55

0.5
Void Ratio, e

0.45

0.4

0.35

0.3

0.25e
b

0.2
0.1 s0 1 sc' 10 100 1000 sb
10000
Pressure, s kg/cm2

Relationship between Cv dan Stress


0.003
Cv (cm/second2)

0.002

0.001

0
0.1 1 10
Stress (kg/cm2)

po = 0.209 kg/cm2
pc = 1.700 kg/cm2
Cr = 0.047
Cc = 0.078
eo = 0.582
ec = 0.540
CV avg = 0.0015086 cm2/sec
K = 0.0000089 cm/sec

PT. SOILTAMA INDOKARYA PERSDADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,43 13,53 gram
2 Mass of wet soil + can M2 123,44 160,01 gram
3 Mass of dry soil + can M3 104,86 133,82 gram
4 Mass of moisture = M2 - M3 18,58 26,19 gram
5 Mass of dry soil = M3 - M1 90,43 120,29 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,55 21,77 %
7 Average water content, (w) 21,16 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,36 29,24 gram
2 Mass of dry soil + piknometer M2 52,51 49,44 gram
3 Mass of dry soil + water + piknometer M3 94,66 91,86 gram
4 Mass of water + piknometer M4 82,25 79,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,15 20,20
7 B = M3 - M4 12,41 12,64
8 C=A-B 7,74 7,56
9 Specific Gravity, Gs = A / C 2,60 2,67
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,64

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 27 22 19
Mass of can (gr) 14,05 13,86 13,59 14,19 14,19 14,39 14,02 14,07 13,90 14,16
Mass of wet soil + can (gr) 36,25 32,08 32,66 31,02 40,01 40,98 44,96 36,44 28,67 29,11
Mass of dry soil + can (gr) 31,42 28,07 28,35 27,29 34,50 35,05 37,72 31,25 26,52 26,69
Mass of dry soil (gr) 17,37 14,21 14,76 13,10 20,31 20,66 23,70 17,18 12,62 12,53
Mass of moisture (gr) 4,83 4,01 4,31 3,73 5,51 5,93 7,24 5,19 2,15 2,42
Water content, w (%) 27,81 28,22 29,20 28,47 27,13 28,70 30,55 30,21 17,04 19,31
28,01 28,84 27,92 30,38 18,18

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 28,79 %
80
Plastic Limit, PL = 18,18 %
Non Cohesive Plasticity Index, PI = 10,62
70 %
60 CH Natural Water Content wN = 21,16 %
PLASTIC INDEX

50 Liquid Index LI = 0,28


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,64 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,52 e5 = 74,48 99,31 e5 = e4 - d5
30 0,600 d6 = 0,79 e6 = 73,69 98,25 e6 = e5 - d6
50 0,300 d7 = 1,51 e7 = 72,18 96,24 e7 = e6 - d7
100 0,150 d8 = 6,66 e8 = 65,52 87,36 e8 = e7 - d8
200 0,075 d9 = 8,89 e9 = 56,63 75,51 e9 = e8 - d9
Sd = 18,37

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 23,0 -3,0 27,0 24,0 12,36 0,0126 0,0314 26,0 34,75
5 22,0 -3,0 27,0 23,0 12,52 0,0126 0,0200 25,0 33,42
30 21,0 -3,0 27,0 22,0 12,69 0,0126 0,0082 24,0 32,08
60 20,0 -3,0 27,0 21,0 12,85 0,0126 0,0059 23,0 30,74
250 16,0 -3,0 27,0 17,0 13,51 0,0126 0,0029 19,0 25,40
1440 13,0 -3,0 27,0 14,0 14,00 0,0126 0,0012 16,0 21,39

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,64

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0055 0,0550 275,00 2,750

Finer #200 = 75,51 %


Gravel = 0,00 %
Sand = 24,49 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,46 gr s3 = 100,00 kN/m 2
W= 122,98 gr s3 = 200,00 kN/m2 W= 123,17 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 5,00 0,10 9,63 2,38 0,247 7 6,00 0,10 9,63 2,86 0,297 7 7,50 0,10 9,63 3,57 0,371
Height of Sample = 7,00 cm 14 12,80 0,20 9,64 6,10 0,632 14 13,20 0,20 9,64 6,29 0,652 14 15,00 0,20 9,64 7,14 0,741
Volume of Sampel = 67,35 cm3 21 13,50 0,30 9,65 6,43 0,666 21 19,20 0,30 9,65 9,14 0,948 21 20,00 0,30 9,65 9,53 0,987
Speed = 0,70 mm/menit 28 16,20 0,40 9,66 7,72 0,799 28 21,60 0,40 9,66 10,29 1,065 28 25,00 0,40 9,66 11,91 1,233
Kalibrasi = 0,476 kg/div 35 20,25 0,50 9,67 9,65 0,997 35 26,40 0,50 9,67 12,57 1,300 35 30,00 0,50 9,67 14,29 1,478
70 21,60 1,00 9,72 10,29 1,059 70 33,60 1,00 9,72 16,00 1,647 70 37,50 1,00 9,72 17,86 1,838
105 24,30 1,50 9,77 11,57 1,185 105 33,60 1,50 9,77 16,00 1,638 105 42,50 1,50 9,77 20,24 2,072
140 25,70 2,00 9,82 12,24 1,247 140 33,60 2,00 9,82 16,00 1,630 140 45,00 2,00 9,82 21,43 2,183
175 27,00 2,50 9,87 12,86 1,303 175 34,80 2,50 9,87 16,58 1,680 175 47,50 2,50 9,87 22,62 2,293
210 27,50 3,00 9,92 13,10 1,321 210 36,00 3,00 9,92 17,15 1,729 210 50,00 3,00 9,92 23,82 2,401
280 28,60 4,00 10,02 13,62 1,359 280 37,20 4,00 10,02 17,72 1,768 280 55,00 4,00 10,02 26,20 2,614
350 29,70 5,00 10,13 14,15 1,397 350 37,80 5,00 10,13 18,00 1,778 350 56,20 5,00 10,13 26,77 2,643
420 31,00 6,00 10,24 14,77 1,443 420 38,40 6,00 10,24 18,29 1,787 420 57,50 6,00 10,24 27,39 2,676
490 31,70 7,00 10,35 15,10 1,459 490 39,00 7,00 10,35 18,58 1,796 490 58,75 7,00 10,35 27,98 2,705
560 31,30 8,00 10,46 14,91 1,426 560 39,60 8,00 10,46 18,86 1,804 560 60,00 8,00 10,46 28,58 2,733
630 31,00 9,00 10,57 14,77 1,397 630 42,00 9,00 10,57 20,00 1,892 630 61,75 9,00 10,57 29,41 2,782
700 30,70 10,00 10,69 14,62 1,368 700 44,40 10,00 10,69 21,15 1,978 700 62,50 10,00 10,69 29,77 2,785
840 840 45,60 12,00 10,93 21,72 1,987 840 63,00 12,00 10,93 30,01 2,745
980 980 45,00 14,00 11,19 21,43 1,916 980 63,75 14,00 11,19 30,36 2,714
1120 1120 44,60 16,00 11,45 21,24 1,855 1120 63,50 16,00 11,45 30,25 2,641
1260 1260 44,40 18,00 11,73 21,15 1,802 1260 63,00 18,00 11,73 30,01 2,557
1400 1400 1400 62,50 20,00 12,03 29,77 2,475

PT. SOILTAMA INDDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

3,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,46 122,98 123,17
3
Density, gr/cm 1,80 1,83 1,83
2,0 INITIAL
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 21,16 21,16 21,16


3
Dry Density, gr/cm 1,49 1,51 1,51
Weight, gr
AFTER Density, gr/cm
3
1,5 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
1,0
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 18,00 20,00
2
(s1-s3)f kg/cm 1,46 1,99 2,78
FAILURE 2
CONDITIONS uf, kg/cm
0,5 2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 1,96 2,99 4,78
2
SHEAR STRENGTH c: 0,455 kg/cm
PARAMETERS j: 14,85 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

3,0

2,5

2,0
Shear Stress, kg/cm2

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 20.535
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.430
LIQUID LIMIT (LL%) 28.790 DRY WEIGHT Wd (gr) 68.893 DEGREE OF INITIAL SAT. So % 54.212
PLASTIC LIMIT (PL%) 18.180 SUBSTANCE HEIGHT Hs (cm) 1.327
GRADATION

PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute 2
cm / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.4313 1.9000


1 0.50 0.50 0.0055 0.0055 0.0041 0.4272 1.8945 0.9486 1.0 0.01272 0.2895 0.0058 0.000074
2 1.00 0.50 0.0100 0.0045 0.0034 0.4238 1.8900 0.9461 9.0 0.00141 0.2375 0.0048 0.000007
3 2.00 1.00 0.0240 0.0140 0.0106 0.4133 1.8760 0.9415 9.0 0.00139 0.7407 0.0074 0.000010
4 4.00 2.00 0.0613 0.0373 0.0281 0.3852 1.8388 0.9287 9.0 0.00135 1.9856 0.0099 0.000013
5 8.00 4.00 0.1190 0.0578 0.0435 0.3417 1.7810 0.9049 10.2 0.00113 3.1407 0.0079 0.000009
6 2.00 0.1028 -0.0163 -0.0122 0.3539 1.7973 0.8946
7 0.25 0.0883 -0.0145 -0.0109 0.3648 1.8118 0.9023

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ration (e)


0.6

0.5

e0
Void Ratio, e

0.4

0.3

0.2
eb

0.1
0.1 1 sc' 10 100 sb 1000
Pressure, s kg/cm2

Relationship Beetwen Cv dan Stress s


0.01400
0.01200
Cv (cm/second2)

0.01000
0.00800
0.00600
0.00400
0.00200
0.00000
0.1 1 10
Stress, s (kg/cm2)

po = 0.222 kg/cm2
pc = 1.800 kg/cm2
Cr = 0.027
Cc = 0.127
eo = 0.431
ec = 0.407
2
Cv avg = 0.003600 cm /sec
K avg = 0.000023 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,57 13,89 gram
2 Mass of wet soil + can M2 149,97 159,98 gram
3 Mass of dry soil + can M3 121,60 131,91 gram
4 Mass of moisture = M2 - M3 28,37 28,07 gram
5 Mass of dry soil = M3 - M1 108,03 118,02 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,26 23,78 %
7 Average water content, (w) 25,02 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,98 31,26 gram
2 Mass of dry soil + piknometer M2 52,37 51,62 gram
3 Mass of dry soil + water + piknometer M3 94,92 94,62 gram
4 Mass of water + piknometer M4 82,12 82,04 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,39 20,36
7 B = M3 - M4 12,80 12,58
8 C=A-B 7,59 7,78
9 Specific Gravity, Gs = A / C 2,69 2,62
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,65

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,65

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 30 27 18 16
Mass of can (gr) 13,91 14,00 11,69 13,76 14,02 14,21 14,02 14,57 14,08 13,24
Mass of wet soil + can (gr) 36,70 36,70 31,26 34,59 37,81 36,70 35,52 35,64 30,03 28,37
Mass of dry soil + can (gr) 32,93 32,96 28,08 31,11 33,68 32,90 31,43 31,66 27,62 26,20
Mass of dry soil (gr) 19,02 18,96 16,39 17,35 19,66 18,69 17,41 17,09 13,54 12,96
Mass of moisture (gr) 3,77 3,74 3,18 3,48 4,13 3,80 4,09 3,98 2,41 2,17
Water content, w (%) 19,82 19,73 19,40 20,06 21,01 20,33 23,49 23,29 17,80 16,74
19,77 19,73 20,67 23,39 17,27

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 20,28 %
80
Plastic Limit, PL = 17,27 %
Non Cohesive Plasticity Index, PI = 3,00
70 %
60 CH Natural Water Content wN = 25,02 %
PLASTIC INDEX

50 Liquid Index LI = 2,58


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,65 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 10,92 e8 = 64,08 85,44 e8 = e7 - d8
200 0,075 d9 = 13,55 e9 = 50,53 67,37 e9 = e8 - d9
Sd = 24,47

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 18,0 -3,0 27,0 19,0 13,18 0,0126 0,0323 21,0 27,99
5 18,0 -3,0 27,0 19,0 13,18 0,0126 0,0204 21,0 27,99
30 17,0 -3,0 27,0 18,0 13,34 0,0126 0,0084 20,0 26,66
60 16,0 -3,0 27,0 17,0 13,51 0,0126 0,0060 19,0 25,32
250 14,0 -3,0 27,0 15,0 13,84 0,0126 0,0030 17,0 22,66
1440 10,0 -3,0 27,0 11,0 14,49 0,0126 0,0013 13,0 17,33

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,65

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,025 0,0650 162,50 24,038

Finer #200 = 67,37 %


Gravel = 0,00 %
Sand = 32,63 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,67 gr s3 = 100,00 kN/m 2
W= 122,99 gr s3 = 200,00 kN/m2 W= 123,28 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 7,40 0,10 9,63 3,52 0,366 7 5,80 0,10 9,63 2,76 0,287 7 7,50 0,10 9,63 3,57 0,371
Height of Sample = 7,00 cm 14 11,60 0,20 9,64 5,53 0,573 14 8,70 0,20 9,64 4,14 0,430 14 12,00 0,20 9,64 5,72 0,593
Volume of Sampel = 67,35 cm3 21 13,20 0,30 9,65 6,29 0,652 21 11,60 0,30 9,65 5,53 0,573 21 18,00 0,30 9,65 8,57 0,888
Speed = 0,70 mm/menit 28 14,00 0,40 9,66 6,67 0,690 28 16,00 0,40 9,66 7,62 0,789 28 21,00 0,40 9,66 10,00 1,035
Kalibrasi = 0,476 kg/div 35 14,80 0,50 9,67 7,05 0,729 35 17,40 0,50 9,67 8,29 0,857 35 24,00 0,50 9,67 11,43 1,182
70 16,50 1,00 9,72 7,86 0,809 70 21,75 1,00 9,72 10,36 1,066 70 28,50 1,00 9,72 13,57 1,397
105 17,30 1,50 9,77 8,24 0,844 105 24,60 1,50 9,77 11,72 1,200 105 33,00 1,50 9,77 15,72 1,609
140 19,80 2,00 9,82 9,43 0,961 140 26,70 2,00 9,82 12,72 1,295 140 36,00 2,00 9,82 17,15 1,747
175 21,50 2,50 9,87 10,24 1,038 175 28,20 2,50 9,87 13,43 1,361 175 39,00 2,50 9,87 18,58 1,882
210 23,00 3,00 9,92 10,95 1,104 210 30,40 3,00 9,92 14,48 1,460 210 45,00 3,00 9,92 21,43 2,161
280 26,40 4,00 10,02 12,57 1,255 280 33,60 4,00 10,02 16,00 1,597 280 48,00 4,00 10,02 22,86 2,281
350 28,00 5,00 10,13 13,34 1,317 350 34,80 5,00 10,13 16,58 1,637 350 51,00 5,00 10,13 24,29 2,399
420 29,70 6,00 10,24 14,15 1,382 420 37,70 6,00 10,24 17,96 1,754 420 54,00 6,00 10,24 25,72 2,513
490 31,30 7,00 10,35 14,91 1,441 490 40,00 7,00 10,35 19,05 1,842 490 57,00 7,00 10,35 27,15 2,624
560 33,00 8,00 10,46 15,72 1,503 560 42,00 8,00 10,46 20,00 1,913 560 59,25 8,00 10,46 28,22 2,699
630 34,60 9,00 10,57 16,48 1,559 630 43,50 9,00 10,57 20,72 1,960 630 61,50 9,00 10,57 29,29 2,771
700 35,50 10,00 10,69 16,91 1,582 700 45,00 10,00 10,69 21,43 2,005 700 63,00 10,00 10,69 30,01 2,807
840 35,00 12,00 10,93 16,67 1,525 840 47,60 12,00 10,93 22,67 2,074 840 66,00 12,00 10,93 31,44 2,875
980 34,60 14,00 11,19 16,48 1,473 980 47,00 14,00 11,19 22,39 2,001 980 65,40 14,00 11,19 31,15 2,784
1120 1120 46,40 16,00 11,45 22,10 1,930 1120 64,80 16,00 11,45 30,86 2,695
1260 1260 1260 64,50 18,00 11,73 30,72 2,618
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION
Area, cm2 9,62 9,62 9,62
Volume, cm3 67,35 67,35 67,35
2,5 Weight, gr 121,67 122,99 123,28
Density, gr/cm3 1,81 1,83 1,83
Deviator Stress (s1 - s3), kg/cm2

INITIAL
Moisture, % 25,02 25,02 25,02

2,0 Dry Density, gr/cm3 1,45 1,46 1,46


Weight, gr
AFTER Density, gr/cm3
CONSOLIDATION Moisture, %
1,5
Dry Density, gr/cm3
Cell pressure, kg/cm2 0,50 1,00 2,00
COMPRESSION
STAGE initial pwp, kg/cm2
1,0 Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 16,00 18,00
(s1-s3)f kg/cm2 1,58 2,07 2,88
FAILURE
0,5 CONDITIONS uf, kg/cm2
s3'f, kg/cm2 0,50 1,00 2,00
s1'f, kg/cm2 2,08 3,07 4,88

0,0 SHEAR STRENGTH c: 0,495 kg/cm2


PARAMETERS j: 15,75 
0 2 4 6 8 10 12 14 16 18 20 22
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2


PT. SOILTAMA INDOKARYA PERSADA
CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boringo No : BGP 1
Depth : 11.50.12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 22.960
SPECIFIC GRAVITY (G) 2.650 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.570
LIQUID LIMIT (LL%) 20.280 DRY WEIGHT Wd (gr) 62.970 DEGREE OF INITIAL SAT. So % 60.852
PLASTIC LIMIT (PL%) 17.270 SUBSTANCE HEIGHT Hs (cm) 1.210
GRADATION

PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% 2
mv (cm /kg) (cm/sec)

0 0.00 0.5700 1.9000


1 0.50 0.50 0.0680 0.0680 0.0562 0.5138 1.8320 0.9330 12.3 0.00100 3.5789 0.0716 0.0000719
2 1.00 0.50 0.0918 0.0238 0.0196 0.4942 1.8083 0.9101 12.3 0.00096 1.2964 0.0259 0.0000248
3 2.00 1.00 0.1320 0.0403 0.0333 0.4609 1.7680 0.8941 16.0 0.00071 2.2259 0.0223 0.0000157
4 4.00 2.00 0.1713 0.0393 0.0324 0.4285 1.7288 0.8742 16.0 0.00068 2.2200 0.0111 0.0000075
5 8.00 4.00 0.2100 0.0388 0.0320 0.3964 1.6900 0.8547 16.0 0.00065 2.2415 0.0056 0.0000036
6 2.00 0.1983 -0.0118 -0.0097 0.4062 1.7018 0.8479
7 0.25 0.1898 -0.0085 -0.0070 0.4132 1.7103 0.8530

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11.50 - 12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ration (e)


0.6
e0

0.5
Void Ratio, e

0.4

0.3

eb
0.2

0.1
0.1 s0 1 sc' 10 100 sb 1000
Pressure, s kg/cm2

Relationship Between Cv and Stress s


0.0012
0.0010
Cv (cm/second2)

0.0008
0.0006
0.0004
0.0002
0.0000
0.1 1 10
Stress, s (kg/cm2)

po = 0.208 kg/cm2
pc = 1.200 kg/cm2
Cr = 0.017
Cc = 0.162
eo = 0.570
ec = 0.557
2
CV avg = 0.00079725 cm /sec
K = 0.0000247 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,08 14,02 gram
2 Mass of wet soil + can M2 113,53 126,35 gram
3 Mass of dry soil + can M3 112,77 111,59 gram
4 Mass of moisture = M2 - M3 0,76 14,76 gram
5 Mass of dry soil = M3 - M1 100,69 97,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 0,75 15,13 %
7 Average water content, (w) 7,94 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,69 32,59 gram
2 Mass of dry soil + piknometer M2 49,77 51,10 gram
3 Mass of dry soil + water + piknometer M3 92,78 93,58 gram
4 Mass of water + piknometer M4 81,99 82,54 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,08 18,51
7 B = M3 - M4 10,79 11,04
8 C=A-B 7,29 7,47
9 Specific Gravity, Gs = A / C 2,48 2,48
10 Average specific gravity, Gs 2,48
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,48

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,48

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 28 25 20
Mass of can (gr) 13,97 14,59 14,62 11,39 12,54 12,99 14,27 14,07 14,43 14,29
Mass of wet soil + can (gr) 39,99 37,20 35,47 39,61 36,84 37,84 42,50 40,32 30,94 30,08
Mass of dry soil + can (gr) 32,30 30,67 29,16 30,93 29,49 30,25 32,47 31,00 26,99 26,14
Mass of dry soil (gr) 18,33 16,08 14,54 19,54 16,95 17,26 18,20 16,93 12,56 11,85
Mass of moisture (gr) 7,69 6,53 6,31 8,68 7,35 7,59 10,03 9,32 3,95 3,94
Water content, w (%) 41,95 40,61 43,40 44,42 43,36 43,97 55,11 55,05 31,45 33,25
41,28 43,91 43,67 55,08 32,35

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100 Liquid Limit, LL = 47,23 %
90 Plastic Limit, PL = 32,35 %
80 Non Cohesive Plasticity Index, PI = 14,88 %
70 wN = 7,94
Natural Water Content %
60 CH Liquid Index LI = -1,64
PLASTIC INDEX

50
40
30 OH or MH `
20 CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,30 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,48 Hydrometer correction, a = 1,03
K2 = a/W x 100 = 1,37 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,3 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,30 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,30 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,30 100,00 e4 = e3 - d4
20 0,850 d5 = 1,17 e5 = 74,13 98,45 e5 = e4 - d5
30 0,600 d6 = 1,50 e6 = 72,63 96,45 e6 = e5 - d6
50 0,300 d7 = 1,19 e7 = 71,44 94,87 e7 = e6 - d7
100 0,150 d8 = 1,49 e8 = 69,95 92,90 e8 = e7 - d8
200 0,075 d9 = 0,74 e9 = 69,21 91,91 e9 = e8 - d9
Sd = 6,09

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 42,0 -3,0 27,0 43,0 9,24 0,0132 0,0284 45,0 61,80
5 35,0 -3,0 27,0 36,0 10,39 0,0132 0,0191 38,0 52,19
30 30,0 -3,0 27,0 31,0 11,21 0,0132 0,0081 33,0 45,32
60 26,0 -3,0 27,0 27,0 11,87 0,0132 0,0059 29,0 39,83
250 19,0 -3,0 27,0 20,0 13,02 0,0132 0,0030 22,0 30,22
1440 13,0 -3,0 27,0 14,0 14,00 0,0132 0,0013 16,0 21,97

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,48

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,003 0,0280 93,33 1,071

Finer #200 = 91,91 %


Gravel = 0,00 %
Sand = 8,09 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,52 gr s3 = 100,00 kN/m2 W= 121,60 gr s3 = 200,00 kN/m2 W= 122,07 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 6,00 0,10 9,63 2,86 0,297 7 10,00 0,10 9,63 4,76 0,495 7 12,60 0,10 9,63 6,00 0,623
Height of Sample = 7,00 cm 14 10,00 0,20 9,64 4,76 0,494 14 15,00 0,20 9,64 7,14 0,741 14 25,20 0,20 9,64 12,00 1,245
Volume of Sampel = 67,35 cm3 21 18,00 0,30 9,65 8,57 0,888 21 25,00 0,30 9,65 11,91 1,234 21 31,50 0,30 9,65 15,00 1,555
Speed = 0,70 mm/menit 28 23,00 0,40 9,66 10,95 1,134 28 31,00 0,40 9,66 14,77 1,529 28 44,10 0,40 9,66 21,00 2,174
Kalibrasi = 0,476 kg/div 35 27,00 0,50 9,67 12,86 1,330 35 35,00 0,50 9,67 16,67 1,724 35 48,80 0,50 9,67 23,24 2,404
70 34,00 1,00 9,72 16,19 1,666 70 43,00 1,00 9,72 20,48 2,107 70 54,00 1,00 9,72 25,72 2,647
105 39,00 1,50 9,77 18,58 1,902 105 46,20 1,50 9,77 22,01 2,253 105 55,50 1,50 9,77 26,43 2,706
140 42,80 2,00 9,82 20,39 2,076 140 48,10 2,00 9,82 22,91 2,334 140 57,00 2,00 9,82 27,15 2,765
175 43,70 2,50 9,87 20,81 2,109 175 50,00 2,50 9,87 23,82 2,413 175 57,90 2,50 9,87 27,58 2,795
210 44,90 3,00 9,92 21,39 2,156 210 51,80 3,00 9,92 24,67 2,487 210 58,50 3,00 9,92 27,86 2,809
280 48,30 4,00 10,02 23,01 2,295 280 53,90 4,00 10,02 25,67 2,562 280 60,75 4,00 10,02 28,94 2,887
350 50,60 5,00 10,13 24,10 2,380 350 56,00 5,00 10,13 26,67 2,634 350 63,00 5,00 10,13 30,01 2,963
420 51,75 6,00 10,24 24,65 2,408 420 57,75 6,00 10,24 27,51 2,687 420 65,25 6,00 10,24 31,08 3,036
490 53,40 7,00 10,35 25,43 2,459 490 59,50 7,00 10,35 28,34 2,739 490 68,10 7,00 10,35 32,44 3,135
560 52,90 8,00 10,46 25,20 2,409 560 60,50 8,00 10,46 28,82 2,755 560 69,30 8,00 10,46 33,01 3,156
630 52,00 9,00 10,57 24,77 2,343 630 61,60 9,00 10,57 29,34 2,775 630 70,80 9,00 10,57 33,72 3,190
700 51,50 10,00 10,69 24,53 2,295 700 61,25 10,00 10,69 29,17 2,729 700 72,00 10,00 10,69 34,29 3,208
840 840 60,90 12,00 10,93 29,01 2,653 840 71,40 12,00 10,93 34,01 3,111
980 980 60,20 14,00 11,19 28,67 2,563 980 70,50 14,00 11,19 33,58 3,002
1120 1120 1120 69,90 16,00 11,45 33,29 2,907
1260 1260 1260

1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama

4,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,5
DIMENSION
Length, cm 7,00 7,00 7,00
2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
3,0
Weight, gr 121,52 121,60 122,07
3
INITIAL Density, gr/cm 1,80 1,81 1,81
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 7,94 7,94 7,94


2,5
Dry Density, gr/cm
3
1,67 1,67 1,68
Weight, gr
AFTER 3
Density, gr/cm
2,0 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
1,5 COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 14,00 10,00
1,0 2
FAILURE
(s1-s3)f kg/cm 2,46 2,78 3,21
2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,5 2
s1'f, kg/cm 2,96 3,78 5,21
SHEAR STRENGTH c: 0,975 kg/cm2
PARAMETERS j: 10,10 
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 32.220
SPECIFIC GRAVITY (G) 2.480 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.518
LIQUID LIMIT (LL%) 47.230 DRY WEIGHT Wd (gr) 62.670 DEGREE OF INITIAL SAT. So % 84%
PLASTIC LIMIT (PL%) 32.350 SUBSTANCE HEIGHT Hs (cm) 1.218

PRESSURE
GRADATION

Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.5178 1.9000


1 1.00 1.00 0.0510 0.0510 0.0419 0.5178 1.8490 0.9373 1.2 0.00862 2.6842 0.0268 0.000231
2 2.00 1.00 0.0898 0.0388 0.0318 0.4860 1.8103 0.9148 3.0 0.00131 2.0957 0.0210 0.000028
3 4.00 2.00 0.1570 0.0673 0.0552 0.4308 1.7430 0.8883 4.0 0.00070 3.7150 0.0186 0.000013
4 8.00 4.00 0.2210 0.0640 0.0525 0.3782 1.6790 0.8555 4.0 0.00065 3.6718 0.0092 0.000006
5 2.00 0.1738 -0.0473 -0.0388 0.4170 1.7263 0.8513
6 0.25 0.1058 -0.0680 -0.0558 0.4730 1.7943 0.8801

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

e0

eb
s0 sc' sb

2
so = 0.220 kg/cm
2
sc = 1.700 kg/cm
Cr = 0.077
Cc = 0.139
eo = 0.520
ec = 0.450
2
Cv avg = 0.003 cm /sec
K avg = 0.000069 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,26 14,45 gram
2 Mass of wet soil + can M2 114,40 114,81 gram
3 Mass of dry soil + can M3 100,00 100,02 gram
4 Mass of moisture = M2 - M3 14,40 14,79 gram
5 Mass of dry soil = M3 - M1 85,74 85,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 16,79 17,28 %
7 Average water content, (w) 17,04 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,18 31,83 gram
2 Mass of dry soil + piknometer M2 50,83 50,00 gram
3 Mass of dry soil + water + piknometer M3 93,85 93,39 gram
4 Mass of water + piknometer M4 82,83 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,65 18,17
7 B = M3 - M4 11,02 11,26
8 C=A-B 7,63 6,91
9 Specific Gravity, Gs = A / C 2,44 2,63
10 Average specific gravity, Gs 2,54
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,54

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,54

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 24 19
Mass of can (gr) 13,62 13,99 13,79 13,87 12,74 14,21 13,83 13,20 14,06 14,06
Mass of wet soil + can (gr) 31,01 32,33 35,96 36,79 37,03 35,28 34,91 35,86 29,48 29,69
Mass of dry soil + can (gr) 25,82 26,87 29,11 29,65 29,40 28,73 28,45 28,91 25,78 25,69
Mass of dry soil (gr) 12,20 12,88 15,32 15,78 16,66 14,52 14,62 15,71 11,72 11,63
Mass of moisture (gr) 5,19 5,46 6,85 7,14 7,63 6,55 6,46 6,95 3,70 4,00
Water content, w (%) 42,54 42,39 44,71 45,25 45,80 45,11 44,19 44,24 31,57 34,39
42,47 44,98 45,45 44,21 32,98

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 44,33 %
80
Plastic Limit, PL = 32,98 %
Non Cohesive Plasticity Index, PI = 11,35
70 %
60 CH Natural Water Content wN = 17,04 %
PLASTIC INDEX

50 Liquid Index LI = -1,40


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,19 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,54 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,19 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,19 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,19 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,19 100,00 e4 = e3 - d4
20 0,850 d5 = 0,03 e5 = 75,16 99,96 e5 = e4 - d5
30 0,600 d6 = 0,03 e6 = 75,13 99,92 e6 = e5 - d6
50 0,300 d7 = 0,17 e7 = 74,96 99,69 e7 = e6 - d7
100 0,150 d8 = 1,99 e8 = 72,97 97,05 e8 = e7 - d8
200 0,075 d9 = 3,07 e9 = 69,90 92,96 e9 = e8 - d9
Sd = 5,29

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 56,0 -3,0 27,0 57,0 6,95 0,0130 0,0243 59,0 80,24
5 52,0 -3,0 27,0 53,0 7,60 0,0130 0,0160 55,0 74,80
30 40,0 -3,0 27,0 41,0 9,57 0,0130 0,0074 43,0 58,48
60 35,0 -3,0 27,0 36,0 10,39 0,0130 0,0054 38,0 51,68
250 26,0 -3,0 27,0 27,0 11,87 0,0130 0,0028 29,0 39,44
1440 15,0 -3,0 27,0 16,0 13,67 0,0130 0,0013 18,0 24,48

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,54

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,002 0,0080 26,67 1,667

Finer #200 = 92,96 %


Gravel = 0,00 %
Sand = 7,04 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,49 gr s3 = 100,00 kN/m2 W= 122,60 gr s3 = 200,00 kN/m2 W= 123,07 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
2
Area = 9,62 cm 7 10,00 0,10 9,63 4,76 0,495 7 12,00 0,10 9,63 5,72 0,593 7 20,00 0,10 9,63 9,53 0,989

Height of Sample = 7,00 cm 14 15,00 0,20 9,64 7,14 0,741 14 18,00 0,20 9,64 8,57 0,889 14 43,20 0,20 9,64 20,58 2,134

Volume of Sampel = 67,35 cm3 21 20,00 0,30 9,65 9,53 0,987 21 27,00 0,30 9,65 12,86 1,333 21 57,60 0,30 9,65 27,43 2,843

Speed = 0,70 mm/menit 28 25,00 0,40 9,66 11,91 1,233 28 36,00 0,40 9,66 17,15 1,775 28 64,00 0,40 9,66 30,48 3,156

Kalibrasi = 0,476 kg/div 35 30,00 0,50 9,67 14,29 1,478 35 45,00 0,50 9,67 21,43 2,217 35 70,00 0,50 9,67 33,34 3,448

70 48,00 1,00 9,72 22,86 2,353 70 58,00 1,00 9,72 27,63 2,843 70 78,00 1,00 9,72 37,15 3,823

105 55,00 1,50 9,77 26,20 2,682 105 66,00 1,50 9,77 31,44 3,218 105 83,00 1,50 9,77 39,53 4,047

140 58,00 2,00 9,82 27,63 2,814 140 70,00 2,00 9,82 33,34 3,396 140 88,00 2,00 9,82 41,91 4,269

175 62,00 2,50 9,87 29,53 2,993 175 75,00 2,50 9,87 35,72 3,620 175 93,00 2,50 9,87 44,30 4,489

210 65,00 3,00 9,92 30,96 3,121 210 80,00 3,00 9,92 38,10 3,842 210 97,00 3,00 9,92 46,20 4,658

280 70,00 4,00 10,02 33,34 3,327 280 87,00 4,00 10,02 41,44 4,135 280 105,00 4,00 10,02 50,01 4,990

350 75,00 5,00 10,13 35,72 3,527 350 92,00 5,00 10,13 43,82 4,327 350 110,00 5,00 10,13 52,39 5,173

420 80,00 6,00 10,24 38,10 3,723 420 96,60 6,00 10,24 46,01 4,495 420 115,00 6,00 10,24 54,77 5,352

490 83,00 7,00 10,35 39,53 3,821 490 100,00 7,00 10,35 47,63 4,604 490 119,00 7,00 10,35 56,68 5,479

560 85,00 8,00 10,46 40,49 3,871 560 102,00 8,00 10,46 48,58 4,646 560 122,00 8,00 10,46 58,11 5,557

630 84,00 9,00 10,57 40,01 3,784 630 101,00 9,00 10,57 48,11 4,550 630 123,00 9,00 10,57 58,58 5,541

700 83,00 10,00 10,69 39,53 3,698 700 100,00 10,00 10,69 47,63 4,456 700 122,80 10,00 10,69 58,49 5,471

840 12,00 10,93 0,00 0,000 840 98,00 12,00 10,93 46,68 4,269 840 122,60 12,00 10,93 58,39 5,341

980 14,00 11,19 0,00 0,000 980 14,00 11,19 0,00 0,000 980 122,40 14,00 11,19 58,30 5,211

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

6,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
5,0 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,49 122,60 123,07
3
INITIAL Density, gr/cm 1,80 1,82 1,83
4,0
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 17,04 17,04 17,04


3
Dry Density, gr/cm 1,54 1,56 1,56
Weight, gr
AFTER 3
Density, gr/cm
3,0 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
2,0
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 12,00 14,00
2
FAILURE
(s1-s3)f kg/cm 3,87 4,65 5,56
2
CONDITIONS uf, kg/cm
1,0 2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 4,37 5,65 7,56
SHEAR STRENGTH c: 1,255 kg/cm2
PARAMETERS j: 18,85 
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3

4,0

3,5

3,0
Shear Stress, kg/cm2

2,5

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,62 12,07 gram
2 Mass of wet soil + can M2 112,35 112,28 gram
3 Mass of dry soil + can M3 94,87 96,70 gram
4 Mass of moisture = M2 - M3 17,48 15,58 gram
5 Mass of dry soil = M3 - M1 83,25 84,63 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 21,00 18,41 %
7 Average water content, (w) 19,70 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,32 31,30 gram
2 Mass of dry soil + piknometer M2 50,93 49,38 gram
3 Mass of dry soil + water + piknometer M3 93,86 92,64 gram
4 Mass of water + piknometer M4 82,25 81,31 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,61 18,08
7 B = M3 - M4 11,61 11,33
8 C=A-B 7,00 6,75
9 Specific Gravity, Gs = A / C 2,66 2,68
10 Average specific gravity, Gs 2,67
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,67

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,67

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 27 23 18
Mass of can (gr) 13,87 12,54 12,00 13,16 13,71 12,60 14,16 13,54 14,01 11,64
Mass of wet soil + can (gr) 33,51 33,58 31,50 29,54 38,57 33,43 38,96 36,14 29,99 26,76
Mass of dry soil + can (gr) 29,05 28,61 26,85 25,59 32,39 28,27 32,73 30,36 26,97 24,24
Mass of dry soil (gr) 15,18 16,07 14,85 12,43 18,68 15,67 18,57 16,82 12,96 12,60
Mass of moisture (gr) 4,46 4,97 4,65 3,95 6,18 5,16 6,23 5,78 3,02 2,52
Water content, w (%) 29,38 30,93 31,31 31,78 33,08 32,93 33,55 34,36 23,30 20,00
30,15 31,55 33,01 33,96 21,65

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 32,07 %
80
Plastic Limit, PL = 21,65 %
Non Cohesive Plasticity Index, PI = 10,42
70 %
60 CH Natural Water Content wN = 19,70 %
PLASTIC INDEX

50 Liquid Index LI = -0,19


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,57 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,67 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,32 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,57 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,57 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,57 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,57 100,00 e4 = e3 - d4
20 0,850 d5 = 0,15 e5 = 75,42 99,80 e5 = e4 - d5
30 0,600 d6 = 0,24 e6 = 75,18 99,48 e6 = e5 - d6
50 0,300 d7 = 0,57 e7 = 74,61 98,73 e7 = e6 - d7
100 0,150 d8 = 2,79 e8 = 71,82 95,04 e8 = e7 - d8
200 0,075 d9 = 2,63 e9 = 69,19 91,56 e9 = e8 - d9
Sd = 6,38

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 60,0 -3,0 27,0 61,0 6,29 0,0125 0,0222 63,0 83,06
5 57,5 -3,0 27,0 58,5 6,70 0,0125 0,0145 60,5 79,76
30 52,0 -3,0 27,0 53,0 7,60 0,0125 0,0063 55,0 72,51
60 48,0 -3,0 27,0 49,0 8,26 0,0125 0,0046 51,0 67,24
250 39,0 -3,0 27,0 40,0 9,74 0,0125 0,0025 42,0 55,37
1440 29,0 -3,0 27,0 30,0 11,38 0,0125 0,0011 32,0 42,19

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,67

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,00055 0,0033 18,33 0,509

Finer #200 = 91,56 %


Gravel = 0,00 %
Sand = 8,44 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3.50 - 4.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.37 Wet Weight Speciment, gr 122.27
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm 3) 61.55
2 3
3 Cross Sectional Area A (cm ) 8.92 Weight Volume of Speciment, gb (gr/cm ) 1.99

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 4.00 1.014 1.91 9.011 0.211
140 0.14 6.80 2.029 3.24 9.104 0.356
210 0.21 9.20 3.043 4.38 9.200 0.476
280 0.28 10.50 4.058 5.00 9.297 0.538
350 0.35 10.30 5.072 4.91 9.396 0.522
420 0.42 10.00 6.087 4.76 9.498 0.501
490 0.49 9.80 7.101 4.67 9.602 0.486
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 3.50 - 4.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

0.6

0.5

0.4
Compressive Stress (kg/cm2)

0.3

0.2

0.1

0
0 1 2 3 4 5 6 7 8
Strain (%)

Maximum Axial Load 5.00 kg


Compressive Stress 0.54 kg/cm2
Cohesion, c 0.27 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,03 14,06 gram
2 Mass of wet soil + can M2 115,62 114,95 gram
3 Mass of dry soil + can M3 104,93 102,72 gram
4 Mass of moisture = M2 - M3 10,69 12,23 gram
5 Mass of dry soil = M3 - M1 90,90 88,66 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,76 13,79 %
7 Average water content, (w) 12,78 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,08 29,23 gram
2 Mass of dry soil + piknometer M2 51,64 47,71 gram
3 Mass of dry soil + water + piknometer M3 94,40 90,86 gram
4 Mass of water + piknometer M4 82,78 79,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,56 18,48
7 B = M3 - M4 11,62 11,64
8 C=A-B 6,94 6,84
9 Specific Gravity, Gs = A / C 2,67 2,70
10 Average specific gravity, Gs 2,69
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,69

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,69

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 28 20 15
Mass of can (gr) 11,47 14,13 11,56 11,55 12,95 14,05 14,39 14,25 14,44 14,48
Mass of wet soil + can (gr) 39,18 38,78 35,79 31,39 38,46 31,93 38,00 36,96 31,12 30,26
Mass of dry soil + can (gr) 32,72 31,62 29,20 25,99 31,36 29,72 31,18 30,38 28,76 27,85
Mass of dry soil (gr) 21,25 17,49 17,64 14,44 18,41 15,67 16,79 16,13 14,32 13,37
Mass of moisture (gr) 6,46 7,16 6,59 5,40 7,10 2,21 6,82 6,58 2,36 2,41
Water content, w (%) 30,40 40,94 37,36 37,40 38,57 14,10 40,62 40,79 16,48 18,03
35,67 37,38 26,33 40,71 17,25

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 34,90 %
80
Plastic Limit, PL = 17,25 %
Non Cohesive Plasticity Index, PI = 17,65
70 %
60 CH Natural Water Content wN = 12,78 %
PLASTIC INDEX

50 Liquid Index LI = -0,25


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,11 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,69 Hydrometer correction, a = 0,99
K2 = a/W x 100 = 1,32 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,11 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,11 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,11 100,00 e3 = e2 - d3
8 2,360 d4 = 0,53 e4 = 74,58 99,29 e4 = e3 - d4
20 0,850 d5 = 0,08 e5 = 74,50 99,19 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 74,50 99,19 e6 = e5 - d6
50 0,300 d7 = 0,16 e7 = 74,34 98,97 e7 = e6 - d7
100 0,150 d8 = 0,35 e8 = 73,99 98,51 e8 = e7 - d8
200 0,075 d9 = 0,34 e9 = 73,65 98,06 e9 = e8 - d9
Sd = 1,46

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 59,0 -3,0 27,0 60,0 6,46 0,0125 0,0224 62,0 81,92
5 54,0 -3,0 27,0 55,0 7,28 0,0125 0,0150 57,0 75,31
30 42,5 -3,0 27,0 43,5 9,16 0,0125 0,0069 45,5 60,12
60 36,0 -3,0 27,0 37,0 10,23 0,0125 0,0051 39,0 51,53
250 27,0 -3,0 27,0 28,0 11,70 0,0125 0,0027 30,0 39,64
1440 19,0 -3,0 27,0 20,0 13,02 0,0125 0,0012 22,0 29,07

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18,50 - 19,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,69

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0012 0,0070 31,82 0,935

Finer #200 = 98,06 %


Gravel = 0,00 %
Sand = 1,94 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18.50 - 19.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.39 Wet Weight Speciment, gr 132.15
1
2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 63.18
2 3
3 Cross Sectional Area A (cm ) 9.03 Weight Volume of Speciment, gb (gr/cm ) 2.09

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 5.00 1.000 2.38 9.117 0.261
140 0.14 10.00 2.000 4.76 9.210 0.517
210 0.21 14.00 3.000 6.67 9.305 0.717
280 0.28 17.50 4.000 8.34 9.402 0.887
350 0.35 20.00 5.000 9.53 9.501 1.003
420 0.42 22.50 6.000 10.72 9.602 1.116
490 0.49 24.20 7.000 11.53 9.705 1.188
560 0.56 25.00 8.000 11.91 9.811 1.214
630 0.63 26.00 9.000 12.38 9.919 1.249
700 0.7 26.70 10.000 12.72 10.029 1.268
770 0.77 27.00 11.000 12.86 10.141 1.268
840 0.84 27.50 12.000 13.10 10.257 1.277
910 0.91 28.00 13.000 13.34 10.375 1.285
980 0.98 28.50 14.000 13.57 10.495 1.293
1050 1.05 28.75 15.000 13.69 10.619 1.290
1120 1.12 28.80 16.000 13.72 10.745 1.277
1190 1.19 29.00 17.000 13.81 10.875 1.270
1260 1.26 29.00 18.000 13.81 11.007 1.255
1330 1.33 29.00 19.000 13.81 11.143 1.240
1400 1.4 28.80 20.000 13.72 11.282 1.216
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 18.50 - 19.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)

Maximum Axial Load 13.81 kg


Compressive Stress 1.29 kg/cm2
Cohesion, c 0.65 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,09 13,76 gram
2 Mass of wet soil + can M2 112,31 115,94 gram
3 Mass of dry soil + can M3 101,13 101,37 gram
4 Mass of moisture = M2 - M3 11,18 14,57 gram
5 Mass of dry soil = M3 - M1 90,04 87,61 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,42 16,63 %
7 Average water content, (w) 14,52 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,97 31,48 gram
2 Mass of dry soil + piknometer M2 49,59 49,78 gram
3 Mass of dry soil + water + piknometer M3 92,67 93,04 gram
4 Mass of water + piknometer M4 82,12 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 17,62 18,30
7 B = M3 - M4 10,55 11,30
8 C=A-B 7,07 7,00
9 Specific Gravity, Gs = A / C 2,49 2,61
10 Average specific gravity, Gs 2,55
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,56

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,55

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 26 24 21
Mass of can (gr) 13,11 14,12 14,14 13,00 14,23 14,27 13,60 13,98 14,63 14,10
Mass of wet soil + can (gr) 35,56 41,02 38,99 38,98 37,21 41,39 41,62 43,34 29,84 29,24
Mass of dry soil + can (gr) 29,99 33,88 31,94 32,53 31,15 34,31 33,57 34,83 27,14 26,65
Mass of dry soil (gr) 16,88 19,76 17,80 19,53 16,92 20,04 19,97 20,85 12,51 12,55
Mass of moisture (gr) 5,57 7,14 7,05 6,45 6,06 7,08 8,05 8,51 2,70 2,59
Water content, w (%) 33,00 36,13 39,61 33,03 35,82 35,33 40,31 40,82 21,58 20,64
34,57 36,32 35,57 40,56 21,11

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 37,05 %
80
Plastic Limit, PL = 21,11 %
Non Cohesive Plasticity Index, PI = 15,94
70 %
60 CH Natural Water Content wN = 14,52 %
PLASTIC INDEX

50 Liquid Index LI = -0,41


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,26 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,55 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,35 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,26 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,26 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,26 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,26 100,00 e4 = e3 - d4
20 0,850 d5 = 0,31 e5 = 74,95 99,59 e5 = e4 - d5
30 0,600 d6 = 0,35 e6 = 74,60 99,12 e6 = e5 - d6
50 0,300 d7 = 0,53 e7 = 74,07 98,42 e7 = e6 - d7
100 0,150 d8 = 0,83 e8 = 73,24 97,32 e8 = e7 - d8
200 0,075 d9 = 1,62 e9 = 71,62 95,16 e9 = e8 - d9
Sd = 3,64

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 58,0 -3,0 27,0 59,0 6,62 0,0130 0,0236 61,0 82,62
5 49,0 -3,0 27,0 50,0 8,10 0,0130 0,0165 52,0 70,43
30 37,0 -3,0 27,0 38,0 10,06 0,0130 0,0075 40,0 54,18
60 30,0 -3,0 27,0 31,0 11,21 0,0130 0,0056 33,0 44,70
250 20,0 -3,0 27,0 21,0 12,85 0,0130 0,0029 23,0 31,15
1440 9,0 -3,0 27,0 10,0 14,66 0,0130 0,0013 12,0 16,25

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29,50 - 30,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,55

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,003 0,0100 20,00 1,800

Finer #200 = 95,16 %


Gravel = 0,00 %
Sand = 4,84 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29.5 - 30.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.42 Wet Weight Speciment, gr 134.15
1
2 Height of Speciment, L0 (cm) 7.11 Volume of Speciment, V (cm3) 65.31

3 Cross Sectional Area A (cm2) 9.19 Weight Volume of Speciment, gb (gr/cm3) 2.05

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 18.50 0.985 8.81 9.278 0.950
140 0.14 26.00 1.969 12.38 9.371 1.322
210 0.21 30.50 2.954 14.53 9.466 1.535
280 0.28 35.00 3.938 16.67 9.563 1.743
350 0.35 37.00 4.923 17.62 9.662 1.824
420 0.42 39.50 5.907 18.81 9.763 1.927
490 0.49 41.00 6.892 19.53 9.866 1.979
560 0.56 42.50 7.876 20.24 9.972 2.030
630 0.63 43.00 8.861 20.48 10.079 2.032
700 0.7 45.00 9.845 21.43 10.190 2.103
770 0.77 44.20 10.830 21.05 10.302 2.044
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 3
Depth : 29.5 - 30.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

2.5

2
Compressive Stress (kg/cm2)

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12
Strain (%)

Maximum Axial Load 21.43 kg


Compressive Stress 2.10 kg/cm2
2
Cohesion, c 1.05 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,60 14,52 gram
2 Mass of wet soil + can M2 119,13 122,08 gram
3 Mass of dry soil + can M3 101,20 104,38 gram
4 Mass of moisture = M2 - M3 17,93 17,70 gram
5 Mass of dry soil = M3 - M1 86,60 89,86 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,70 19,70 %
7 Average water content, (w) 20,20 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,35 31,00 gram
2 Mass of dry soil + piknometer M2 50,48 49,41 gram
3 Mass of dry soil + water + piknometer M3 93,71 92,52 gram
4 Mass of water + piknometer M4 81,75 81,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,13 18,41
7 B = M3 - M4 11,96 11,30
8 C=A-B 6,17 7,11
9 Specific Gravity, Gs = A / C 2,94 2,59
10 Average specific gravity, Gs 2,76
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,77

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,76

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 32 27 20 14
Mass of can (gr) 14,62 14,05 11,40 13,95 14,29 13,73 14,04 14,25 14,32 13,76
Mass of wet soil + can (gr) 41,08 39,00 32,26 34,87 35,37 39,87 37,72 39,01 30,44 28,89
Mass of dry soil + can (gr) 33,61 31,83 26,02 28,59 29,39 32,66 32,82 33,97 26,63 25,16
Mass of dry soil (gr) 18,99 17,78 14,62 14,64 15,10 18,93 18,78 19,72 12,31 11,40
Mass of moisture (gr) 7,47 7,17 6,24 6,28 5,98 7,21 4,90 5,04 3,81 3,73
Water content, w (%) 39,34 40,33 42,68 42,90 39,60 38,09 26,09 25,56 30,95 32,72
39,83 42,79 38,85 25,82 31,83

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 38,98 %
80
Plastic Limit, PL = 31,83 %
Non Cohesive Plasticity Index, PI = 7,15
70 %
60 CH Natural Water Content wN = 20,20 %
PLASTIC INDEX

50 Liquid Index LI = -1,63


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,18 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,76 Hydrometer correction, a = 0,98
K2 = a/W x 100 = 1,30 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,18 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,18 100,00 e2 = e1 - d2
4 4,750 d3 = 0,33 e3 = 74,85 99,56 e3 = e2 - d3
8 2,360 d4 = 1,17 e4 = 73,68 98,00 e4 = e3 - d4
20 0,850 d5 = 10,12 e5 = 63,56 84,54 e5 = e4 - d5
30 0,600 d6 = 3,81 e6 = 59,75 79,48 e6 = e5 - d6
50 0,300 d7 = 2,51 e7 = 57,24 76,14 e7 = e6 - d7
100 0,150 d8 = 3,12 e8 = 54,12 71,99 e8 = e7 - d8
200 0,075 d9 = 2,32 e9 = 51,80 68,90 e9 = e8 - d9
Sd = 23,38

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 40,0 -3,0 27,0 41,0 9,57 0,0122 0,0266 43,0 55,89
5 36,0 -3,0 27,0 37,0 10,23 0,0122 0,0174 39,0 50,69
30 28,5 -3,0 27,0 29,5 11,46 0,0122 0,0075 31,5 40,95
60 25,0 -3,0 27,0 26,0 12,03 0,0122 0,0055 28,0 36,40
250 18,0 -3,0 27,0 19,0 13,18 0,0122 0,0028 21,0 27,30
1440 11,0 -3,0 27,0 12,0 14,33 0,0122 0,0012 14,0 18,20

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,76

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,0035 0,0350 87,50 0,875

Finer #200 = 68,90 %


Gravel = 0,44 %
Sand = 30,66 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 119,38 gr s3 = 100,00 kN/m2 W= 120,50 gr s3 = 200,00 kN/m2 W= 123,31 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm 2
kg kg/cm 2
mm reading % cm 2
kg kg/cm 2
mm reading % cm 2
kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 4,00 0,10 9,63 1,91 0,198 7 6,90 0,10 9,63 3,29 0,341 7 24,20 0,10 9,63 11,53 1,197
Height of Sample = 7,00 cm 14 5,40 0,20 9,64 2,57 0,267 14 9,20 0,20 9,64 4,38 0,455 14 26,40 0,20 9,64 12,57 1,304
Volume of Sampel = 67,35 cm3 21 8,10 0,30 9,65 3,86 0,400 21 13,80 0,30 9,65 6,57 0,681 21 30,80 0,30 9,65 14,67 1,520
Speed = 0,70 mm/menit 28 13,50 0,40 9,66 6,43 0,666 28 16,10 0,40 9,66 7,67 0,794 28 33,00 0,40 9,66 15,72 1,627
Kalibrasi = 0,476 kg/div 35 16,20 0,50 9,67 7,72 0,798 35 20,70 0,50 9,67 9,86 1,020 35 37,40 0,50 9,67 17,81 1,842
70 21,60 1,00 9,72 10,29 1,059 70 27,60 1,00 9,72 13,15 1,353 70 44,00 1,00 9,72 20,96 2,156
105 27,00 1,50 9,77 12,86 1,317 105 33,60 1,50 9,77 16,00 1,638 105 49,70 1,50 9,77 23,67 2,424
140 32,40 2,00 9,82 15,43 1,572 140 39,10 2,00 9,82 18,62 1,897 140 55,00 2,00 9,82 26,20 2,668
175 35,10 2,50 9,87 16,72 1,694 175 44,85 2,50 9,87 21,36 2,165 175 60,50 2,50 9,87 28,82 2,920
210 37,80 3,00 9,92 18,00 1,815 210 47,20 3,00 9,92 22,48 2,267 210 62,70 3,00 9,92 29,86 3,011
280 40,50 4,00 10,02 19,29 1,925 280 50,60 4,00 10,02 24,10 2,405 280 66,00 4,00 10,02 31,44 3,137
350 43,20 5,00 10,13 20,58 2,032 350 52,90 5,00 10,13 25,20 2,488 350 68,20 5,00 10,13 32,48 3,207
420 44,50 6,00 10,24 21,20 2,071 420 55,20 6,00 10,24 26,29 2,569 420 70,40 6,00 10,24 33,53 3,276
490 45,40 7,00 10,35 21,62 2,090 490 56,30 7,00 10,35 26,82 2,592 490 71,50 7,00 10,35 34,06 3,292
560 45,90 8,00 10,46 21,86 2,091 560 57,50 8,00 10,46 27,39 2,619 560 72,60 8,00 10,46 34,58 3,307
630 45,40 9,00 10,57 21,62 2,045 630 58,70 9,00 10,57 27,96 2,644 630 73,70 9,00 10,57 35,10 3,320
700 44,80 10,00 10,69 21,34 1,996 700 59,10 10,00 10,69 28,15 2,633 700 74,10 10,00 10,69 35,29 3,302
840 44,50 12,00 10,93 21,20 1,939 840 59,80 12,00 10,93 28,48 2,605 840 74,80 12,00 10,93 35,63 3,259
980 980 59,60 14,00 11,19 28,39 2,537 980 74,60 14,00 11,19 35,53 3,176
1120 1120 1120 74,40 16,00 11,45 35,44 3,094
1260 1260 1260 73,90 18,00 11,73 35,20 3,000
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 119,38 120,50 123,31
2,5
3
INITIAL Density, gr/cm 1,77 1,79 1,83
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 20,20 20,20 20,20


Dry Density, gr/cm
3
1,47 1,49 1,52
2,0 Weight, gr
AFTER 3
Density, gr/cm
CONSOLIDATION Moisture, %
3
1,5 Dry Density, gr/cm
2
COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
1,0
Strain, % 12,00 12,00 18,00
2
FAILURE
(s1-s3)f kg/cm 2,09 2,64 3,32
2
CONDITIONS uf, kg/cm
2
0,5 s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 2,59 3,64 5,32
SHEAR STRENGTH c: 0,715 kg/cm2
PARAMETERS j: 13,50 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,83 13,51 gram
2 Mass of wet soil + can M2 129,29 135,60 gram
3 Mass of dry soil + can M3 114,23 121,97 gram
4 Mass of moisture = M2 - M3 15,06 13,63 gram
5 Mass of dry soil = M3 - M1 101,40 108,46 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 14,85 12,57 %
7 Average water content, (w) 13,71 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,50 31,67 gram
2 Mass of dry soil + piknometer M2 49,70 49,88 gram
3 Mass of dry soil + water + piknometer M3 93,58 93,79 gram
4 Mass of water + piknometer M4 82,12 82,44 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,20 18,21
7 B = M3 - M4 11,46 11,35
8 C=A-B 6,74 6,86
9 Specific Gravity, Gs = A / C 2,70 2,65
10 Average specific gravity, Gs 2,68
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,68

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,68

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 22 17
Mass of can (gr) 13,99 13,94 14,01 12,45 13,75 13,60 14,09 13,91 11,60 11,54
Mass of wet soil + can (gr) 37,69 36,08 39,14 37,00 44,49 39,60 39,99 37,81 26,87 26,91
Mass of dry soil + can (gr) 31,87 30,71 32,14 30,79 36,65 32,60 33,18 31,63 24,09 24,02
Mass of dry soil (gr) 17,88 16,77 18,13 18,34 22,90 19,00 19,09 17,72 12,49 12,48
Mass of moisture (gr) 5,82 5,37 7,00 6,21 7,84 7,00 6,81 6,18 2,78 2,89
Water content, w (%) 32,55 32,02 38,61 33,86 34,24 36,84 35,67 34,88 22,26 23,16
32,29 36,24 35,54 35,27 22,71

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 34,72 %
80
Plastic Limit, PL = 22,71 %
Non Cohesive Plasticity Index, PI = 12,01
70 %
60 CH Natural Water Content wN = 13,71 %
PLASTIC INDEX

50 Liquid Index LI = -0,75


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,23 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,68 Hydrometer correction, a = 0,99
K2 = a/W x 100 = 1,32 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,23 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,23 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,23 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,23 100,00 e4 = e3 - d4
20 0,850 d5 = 0,54 e5 = 74,69 99,28 e5 = e4 - d5
30 0,600 d6 = 1,71 e6 = 72,98 97,01 e6 = e5 - d6
50 0,300 d7 = 3,77 e7 = 69,21 92,00 e7 = e6 - d7
100 0,150 d8 = 7,53 e8 = 61,68 81,99 e8 = e7 - d8
200 0,075 d9 = 4,05 e9 = 57,63 76,61 e9 = e8 - d9
Sd = 17,60

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 41,0 -3,0 27,0 42,0 9,41 0,0125 0,0271 44,0 58,17
5 38,0 -3,0 27,0 39,0 9,90 0,0125 0,0176 41,0 54,20
30 32,5 -3,0 27,0 33,5 10,80 0,0125 0,0075 35,5 46,93
60 28,0 -3,0 27,0 29,0 11,54 0,0125 0,0055 31,0 40,98
250 19,0 -3,0 27,0 20,0 13,02 0,0125 0,0029 22,0 29,08
1440 12,0 -3,0 27,0 13,0 14,16 0,0125 0,0012 15,0 19,83

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9,50 - 10,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,68

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,003 0,0300 85,71 0,857

Finer #200 = 76,61 %


Gravel = 0,00 %
Sand = 23,39 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9.5 - 10
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.2 Wet Weight Speciment, gr 113.12
1
2 Height of Speciment, L0 (cm) 6.3 Volume of Speciment, V (cm )3
50.67

3 Cross Sectional Area A (cm2) 8.04 Weight Volume of Speciment, gb (gr/cm3) 2.23

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 8.00 1.111 3.81 8.133 0.469
140 0.14 16.00 2.222 7.62 8.225 0.927
210 0.21 17.60 3.333 8.38 8.320 1.008
280 0.28 20.80 4.444 9.91 8.417 1.177
350 0.35 24.00 5.556 11.43 8.516 1.342
420 0.42 24.80 6.667 11.81 8.617 1.371
490 0.49 26.40 7.778 12.57 8.721 1.442
560 0.56 28.00 8.889 13.34 8.827 1.511
630 0.63 30.00 10.000 14.29 8.936 1.599
700 0.7 31.20 11.111 14.86 9.048 1.642
770 0.77 32.00 12.222 15.24 9.162 1.664
840 0.84 32.80 13.333 15.62 9.280 1.684
910 0.91 33.60 14.444 16.00 9.400 1.702
980 0.98 34.40 15.556 16.38 9.524 1.720
1050 1.05 36.00 16.667 17.15 9.651 1.777
1120 1.12 37.60 17.778 17.91 9.781 1.831
1190 1.19 38.40 18.889 18.29 9.915 1.845
1260 1.26 40.00 20.000 19.05 10.053 1.895
1330 1.33 40.00 21.111 19.05 10.195 1.869
1400 1.4 39.20 22.222 18.67 10.340 1.806
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 9.5 - 10
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.8

1.6

1.4
Compressive Stress (kg/cm2)

1.2

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Strain (%)

Maximum Axial Load 19.05 kg


Compressive Stress 1.90 kg/cm2
2
Cohesion, c 0.95 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,70 12,71 gram
2 Mass of wet soil + can M2 121,17 131,74 gram
3 Mass of dry soil + can M3 106,53 117,14 gram
4 Mass of moisture = M2 - M3 14,64 14,60 gram
5 Mass of dry soil = M3 - M1 94,83 104,43 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 15,44 13,98 %
7 Average water content, (w) 14,71 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,91 32,01 gram
2 Mass of dry soil + piknometer M2 51,10 50,01 gram
3 Mass of dry soil + water + piknometer M3 93,79 93,00 gram
4 Mass of water + piknometer M4 82,58 82,51 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,19 18,00
7 B = M3 - M4 11,21 10,49
8 C=A-B 6,98 7,51
9 Specific Gravity, Gs = A / C 2,61 2,40
10 Average specific gravity, Gs 2,50
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,50

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,50

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 21 15
Mass of can (gr) 14,32 13,75 14,48 14,09 13,98 14,02 13,29 11,48 14,02 12,97
Mass of wet soil + can (gr) 34,78 33,37 41,27 37,15 38,78 36,19 42,90 36,69 29,19 28,17
Mass of dry soil + can (gr) 29,88 28,61 34,59 31,44 32,32 30,41 35,21 29,89 26,74 25,64
Mass of dry soil (gr) 15,56 14,86 20,11 17,35 18,34 16,39 21,92 18,41 12,72 12,67
Mass of moisture (gr) 4,90 4,76 6,68 5,71 6,46 5,78 7,69 6,80 2,45 2,53
Water content, w (%) 31,49 32,03 33,22 32,91 35,22 35,27 35,08 36,94 19,26 19,97
31,76 33,06 35,24 36,01 19,61

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 33,61 %
80
Plastic Limit, PL = 19,61 %
Non Cohesive Plasticity Index, PI = 14,00
70 %
60 CH Natural Water Content wN = 14,71 %
PLASTIC INDEX

50 Liquid Index LI = -0,35


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,64 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,50 Hydrometer correction, a = 1,03
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,64 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,64 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,64 100,00 e3 = e2 - d3
8 2,360 d4 = 0,62 e4 = 75,02 99,18 e4 = e3 - d4
20 0,850 d5 = 10,09 e5 = 64,93 85,84 e5 = e4 - d5
30 0,600 d6 = 7,02 e6 = 57,91 76,56 e6 = e5 - d6
50 0,300 d7 = 4,75 e7 = 53,16 70,28 e7 = e6 - d7
100 0,150 d8 = 3,52 e8 = 49,64 65,63 e8 = e7 - d8
200 0,075 d9 = 1,12 e9 = 48,52 64,15 e9 = e8 - d9
Sd = 27,12

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 31,5 -3,0 27,0 32,5 10,97 0,0131 0,0308 34,5 46,97
5 29,0 -3,0 27,0 30,0 11,38 0,0131 0,0198 32,0 43,56
30 23,5 -3,0 27,0 24,5 12,28 0,0131 0,0084 26,5 36,08
60 20,5 -3,0 27,0 21,5 12,77 0,0131 0,0061 23,5 31,99
250 15,0 -3,0 27,0 16,0 13,67 0,0131 0,0031 18,0 24,50
1440 9,0 -3,0 27,0 10,0 14,66 0,0131 0,0013 12,0 16,34

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11,50 - 12,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,50

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,0055 0,0600 120,00 1,008

Finer #200 = 64,15 %


Gravel = 0,00 %
Sand = 35,85 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11.5 - 12.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 136.68
1
2 Height of Speciment, L0 (cm) 7.1 Volume of Speciment, V (cm 3) 64.46
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 2.12

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 8.00 0.986 3.81 9.170 0.416
140 0.14 12.50 1.972 5.95 9.262 0.643
210 0.21 17.00 2.958 8.10 9.356 0.865
280 0.28 20.50 3.944 9.76 9.452 1.033
350 0.35 24.50 4.930 11.67 9.550 1.222
420 0.42 28.50 5.915 13.57 9.650 1.407
490 0.49 32.00 6.901 15.24 9.752 1.563
560 0.56 35.80 7.887 17.05 9.857 1.730
630 0.63 41.20 8.873 19.62 9.963 1.970
700 0.7 45.00 9.859 21.43 10.072 2.128
770 0.77 47.50 10.845 22.62 10.184 2.222
840 0.84 49.50 11.831 23.58 10.297 2.290
910 0.91 50.00 12.817 23.82 10.414 2.287
980 0.98 48.00 13.803 22.86 10.533 2.171
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 4
Depth : 11.5 - 12.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

2.5

2
Compressive Stress (kg/cm2)

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strain (%)

Maximum Axial Load 23.82 kg


Compressive Stress 2.29 kg/cm2
Cohesion, c 1.14 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,06 12,92 gram
2 Mass of wet soil + can M2 114,32 112,97 gram
3 Mass of dry soil + can M3 90,73 90,00 gram
4 Mass of moisture = M2 - M3 23,59 22,97 gram
5 Mass of dry soil = M3 - M1 76,67 77,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 30,77 29,80 %
7 Average water content, (w) 30,28 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,73 33,35 gram
2 Mass of dry soil + piknometer M2 50,00 52,02 gram
3 Mass of dry soil + water + piknometer M3 93,37 94,66 gram
4 Mass of water + piknometer M4 81,97 83,21 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,27 18,67
7 B = M3 - M4 11,40 11,45
8 C=A-B 6,87 7,22
9 Specific Gravity, Gs = A / C 2,66 2,59
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,62

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,62

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 27 20 15
Mass of can (gr) 14,16 13,95 13,80 13,76 13,93 13,62 11,33 14,29 14,12 13,64
Mass of wet soil + can (gr) 39,33 36,81 41,51 39,94 31,47 38,76 34,82 36,56 29,99 29,60
Mass of dry soil + can (gr) 32,40 30,46 33,32 32,33 28,80 31,56 27,62 29,75 26,45 26,30
Mass of dry soil (gr) 18,24 16,51 19,52 18,57 14,87 17,94 16,29 15,46 12,33 12,66
Mass of moisture (gr) 6,93 6,35 8,19 7,61 2,67 7,20 7,20 6,81 3,54 3,30
Water content, w (%) 37,99 38,46 41,96 40,98 17,96 40,13 44,20 44,05 28,71 26,07
38,23 41,47 29,04 44,12 27,39

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 38,03 %
80
Plastic Limit, PL = 27,39 %
Non Cohesive Plasticity Index, PI = 10,64
70 %
60 CH Natural Water Content wN = 30,28 %
PLASTIC INDEX

50 Liquid Index LI = 0,27


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,56 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,62 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,56 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,56 100,00 e2 = e1 - d2
4 4,750 d3 = 0,56 e3 = 75,00 99,26 e3 = e2 - d3
8 2,360 d4 = 2,60 e4 = 72,40 95,82 e4 = e3 - d4
20 0,850 d5 = 2,95 e5 = 69,45 91,91 e5 = e4 - d5
30 0,600 d6 = 1,16 e6 = 68,29 90,38 e6 = e5 - d6
50 0,300 d7 = 1,38 e7 = 66,91 88,55 e7 = e6 - d7
100 0,150 d8 = 3,31 e8 = 63,60 84,17 e8 = e7 - d8
200 0,075 d9 = 4,79 e9 = 58,81 77,83 e9 = e8 - d9
Sd = 16,75

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 43,0 -3,0 27,0 44,0 9,08 0,0127 0,0271 46,0 61,21
5 34,0 -3,0 27,0 35,0 10,56 0,0127 0,0184 37,0 49,24
30 31,0 -3,0 27,0 32,0 11,05 0,0127 0,0077 34,0 45,24
60 30,0 -3,0 27,0 31,0 11,21 0,0127 0,0055 33,0 43,91
250 24,0 -3,0 27,0 25,0 12,20 0,0127 0,0028 27,0 35,93
1440 21,0 -3,0 27,0 22,0 12,69 0,0127 0,0012 24,0 31,94

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,62

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,001 0,0280 140,00 0,179

Finer #200 = 77,83 %


Gravel = 0,74 %
Sand = 21,43 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama
Sample no. 1 Sample no. 2 Sample no. 3
s3 = 50,00 kN/m 2
W= 120,94 gr s3 = 100,00 kN/m 2
W= 121,33 gr s3 = 200,00 kN/m2 W= 122,34 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 3,90 0,10 9,63 1,86 0,193 7 15,00 0,10 9,63 7,14 0,742 7 24,75 0,10 9,63 11,79 1,224
Height of Sample = 7,00 cm 14 9,10 0,20 9,64 4,33 0,450 14 16,90 0,20 9,64 8,05 0,835 14 30,00 0,20 9,64 14,29 1,482
3
Volume of Sampel = 67,35 cm 21 10,40 0,30 9,65 4,95 0,513 21 20,20 0,30 9,65 9,62 0,997 21 33,00 0,30 9,65 15,72 1,629
Speed = 0,70 mm/menit 28 11,00 0,40 9,66 5,24 0,542 28 20,80 0,40 9,66 9,91 1,026 28 36,00 0,40 9,66 17,15 1,775
Kalibrasi = 0,476 kg/div 35 11,70 0,50 9,67 5,57 0,576 35 23,40 0,50 9,67 11,15 1,153 35 39,00 0,50 9,67 18,58 1,921
70 14,30 1,00 9,72 6,81 0,701 70 26,70 1,00 9,72 12,72 1,309 70 42,00 1,00 9,72 20,00 2,058
105 15,90 1,50 9,77 7,57 0,775 105 28,30 1,50 9,77 13,48 1,380 105 45,00 1,50 9,77 21,43 2,194
140 17,90 2,00 9,82 8,53 0,868 140 29,25 2,00 9,82 13,93 1,419 140 48,00 2,00 9,82 22,86 2,329
175 18,80 2,50 9,87 8,95 0,907 175 30,60 2,50 9,87 14,57 1,477 175 49,50 2,50 9,87 23,58 2,389
210 20,50 3,00 9,92 9,76 0,984 210 31,90 3,00 9,92 15,19 1,532 210 51,00 3,00 9,92 24,29 2,449
280 23,40 4,00 10,02 11,15 1,112 280 33,50 4,00 10,02 15,96 1,592 280 52,50 4,00 10,02 25,01 2,495
350 24,70 5,00 10,13 11,76 1,162 350 35,10 5,00 10,13 16,72 1,651 350 54,00 5,00 10,13 25,72 2,540
420 26,00 6,00 10,24 12,38 1,210 420 37,00 6,00 10,24 17,62 1,722 420 55,50 6,00 10,24 26,43 2,583
490 26,70 7,00 10,35 12,72 1,229 490 39,00 7,00 10,35 18,58 1,796 490 57,00 7,00 10,35 27,15 2,624
560 27,30 8,00 10,46 13,00 1,243 560 40,30 8,00 10,46 19,19 1,835 560 59,60 8,00 10,46 28,39 2,714
630 29,25 9,00 10,57 13,93 1,318 630 41,00 9,00 10,57 19,53 1,847 630 60,75 9,00 10,57 28,94 2,737
700 30,90 10,00 10,69 14,72 1,377 700 41,60 10,00 10,69 19,81 1,853 700 63,00 10,00 10,69 30,01 2,807
840 31,20 12,00 10,93 14,86 1,359 840 43,40 12,00 10,93 20,67 1,891 840 66,00 12,00 10,93 31,44 2,875
980 31,10 14,00 11,19 14,81 1,324 980 45,50 14,00 11,19 21,67 1,937 980 67,50 14,00 11,19 32,15 2,874
1120 30,90 16,00 11,45 14,72 1,285 1120 45,40 16,00 11,45 21,62 1,888 1120 67,20 16,00 11,45 32,01 2,794
1260 1260 45,20 18,00 11,73 21,53 1,835 1260 67,00 18,00 11,73 31,91 2,720
1400 1400 1400 66,90 20,00 12,03 31,86 2,650

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1,00 - 1,50
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 120,94 121,33 122,34
2,5
3
INITIAL Density, gr/cm 1,80 1,80 1,82
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 30,28 30,28 30,28


Dry Density, gr/cm
3
1,38 1,38 1,39
2,0 Weight, gr
AFTER 3
Density, gr/cm
CONSOLIDATION Moisture, %
3
1,5 Dry Density, gr/cm
2
COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
1,0
Strain, % 16,00 18,00 20,00
2
FAILURE
(s1-s3)f kg/cm 1,38 1,94 2,88
2
CONDITIONS uf, kg/cm
2
0,5 s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 1,88 2,94 4,88
SHEAR STRENGTH c: 0,415 kg/cm2
PARAMETERS j: 16,75 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3
3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1.00 - 1.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 30.280
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.759
LIQUID LIMIT (LL%) 38.030 DRY WEIGHT Wd (gr) 54.900 DEGREE OF INITIAL SAT. So % 79%
PLASTIC LIMIT (PL%) 27.390 SUBSTANCE HEIGHT Hs (cm) 1.067

PRESSURE
GRADATION

Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY
2 2 2
kg/cm kg/cm r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.7586 1.9000


1 1.00 1.00 0.0233 0.0233 0.0218 0.7586 1.8768 0.9442 1.5 0.00560 1.2237 0.0122 0.000069
2 2.00 1.00 0.0468 0.0235 0.0220 0.7366 1.8533 0.9325 2.3 0.00232 1.2522 0.0125 0.000029
3 4.00 2.00 0.0675 0.0208 0.0194 0.7171 1.8325 0.9214 2.3 0.00227 1.1197 0.0056 0.000013
4 8.00 4.00 0.1875 0.1200 0.1124 0.6047 1.7125 0.8863 2.5 0.00178 6.5484 0.0164 0.000029
5 2.00 0.1653 -0.0223 -0.0208 0.6255 1.7348 0.8618
6 0.25 0.1440 -0.0213 -0.0199 0.6450 1.7560 0.8727

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 1.00 - 1.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ratio (e)


0.80

0.75
e0
0.70

0.65

0.60
Void Ratio, e

0.55

0.50

0.45

0.40

0.35
eb
0.30 s0 sc' sb
0.1 1 10 100
Pressure, s kg/cm2

Relationship Between Cv and Stress s


0.006
0.005
Cv (cm/second2)

0.004
0.003
0.002
0.001
0.000
1 10
Stress, s (kg/cm 2)

2
so = 0.192 kg/cm
2
sc = 3.700 kg/cm
Cr = 0.011
Cc = 0.377
eo = 0.760
ec = 0.745
2
Cv avg = 0.003 cm /sec
K avg = 0.000035 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,58 14,07 gram
2 Mass of wet soil + can M2 113,38 115,43 gram
3 Mass of dry soil + can M3 93,45 99,96 gram
4 Mass of moisture = M2 - M3 19,93 15,47 gram
5 Mass of dry soil = M3 - M1 80,87 85,89 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,64 18,01 %
7 Average water content, (w) 21,33 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,41 33,35 gram
2 Mass of dry soil + piknometer M2 51,51 51,61 gram
3 Mass of dry soil + water + piknometer M3 94,56 94,28 gram
4 Mass of water + piknometer M4 83,64 83,21 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,10 18,26
7 B = M3 - M4 10,92 11,07
8 C=A-B 7,18 7,19
9 Specific Gravity, Gs = A / C 2,52 2,54
10 Average specific gravity, Gs 2,53
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,53

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,53

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 33 18 16
Mass of can (gr) 14,03 13,98 14,04 14,21 13,07 12,64 12,95 13,01 14,18 11,75
Mass of wet soil + can (gr) 44,21 37,89 36,44 35,13 45,86 42,86 30,84 30,15 29,65 26,78
Mass of dry soil + can (gr) 37,04 32,33 31,44 30,55 37,38 35,23 26,07 25,65 27,18 26,78
Mass of dry soil (gr) 23,01 18,35 17,40 16,34 24,31 22,59 13,01 12,64 13,00 15,03
Mass of moisture (gr) 7,17 5,56 5,00 4,58 8,48 7,63 4,77 4,50 2,47 0,00
Water content, w (%) 31,16 30,30 28,74 28,03 34,88 33,78 36,66 35,60 19,00 0,00
30,73 28,38 34,33 36,13 9,50

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 32,07 %
80
Plastic Limit, PL = 9,50 %
Non Cohesive Plasticity Index, PI = 22,57
70 %
60 CH Natural Water Content wN = 21,33 %
PLASTIC INDEX

50 Liquid Index LI = 0,52


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,06 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,53 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,06 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,06 100,00 e2 = e1 - d2
4 4,750 d3 = 2,40 e3 = 72,66 96,80 e3 = e2 - d3
8 2,360 d4 = 1,35 e4 = 71,31 95,00 e4 = e3 - d4
20 0,850 d5 = 1,16 e5 = 70,15 93,46 e5 = e4 - d5
30 0,600 d6 = 1,13 e6 = 69,02 91,95 e6 = e5 - d6
50 0,300 d7 = 1,86 e7 = 67,16 89,48 e7 = e6 - d7
100 0,150 d8 = 2,80 e8 = 64,36 85,74 e8 = e7 - d8
200 0,075 d9 = 1,81 e9 = 62,55 83,33 e9 = e8 - d9
Sd = 12,51

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 37,5 -3,0 27,0 38,5 9,98 0,0130 0,0291 40,5 55,25
5 30,5 -3,0 27,0 31,5 11,13 0,0130 0,0195 33,5 45,70
30 24,0 -3,0 27,0 25,0 12,20 0,0130 0,0083 27,0 36,83
60 20,0 -3,0 27,0 21,0 12,85 0,0130 0,0060 23,0 31,38
250 14,0 -3,0 27,0 15,0 13,84 0,0130 0,0031 17,0 23,19
1440 9,0 -3,0 27,0 10,0 14,66 0,0130 0,0013 12,0 16,37

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5,00 - 5,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,53

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,0055 0,0350 70,00 1,729

Finer #200 = 83,33 %


Gravel = 3,20 %
Sand = 13,47 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5.00 - 5.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.37 Wet Weight Speciment, gr 122.27
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm 3) 61.55
2 3
3 Cross Sectional Area A (cm ) 8.92 Weight Volume of Speciment, gb (gr/cm ) 1.99

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 2.60 1.014 1.24 9.011 0.137
140 0.14 5.00 2.029 2.38 9.104 0.262
210 0.21 7.00 3.043 3.33 9.200 0.362
280 0.28 8.25 4.058 3.93 9.297 0.423
350 0.35 9.80 5.072 4.67 9.396 0.497
420 0.42 10.50 6.087 5.00 9.498 0.527
490 0.49 11.10 7.101 5.29 9.602 0.551
560 0.56 12.00 8.116 5.72 9.708 0.589
630 0.63 12.50 9.130 5.95 9.816 0.607
700 0.7 13.00 10.145 6.19 9.927 0.624
770 0.77 13.10 11.159 6.24 10.040 0.621
840 0.84 13.30 12.174 6.33 10.156 0.624
910 0.91 13.80 13.188 6.57 10.275 0.640
980 0.98 13.90 14.203 6.62 10.396 0.637
1050 1.05 14.00 15.217 6.67 10.521 0.634
1120 1.12 14.00 16.232 6.67 10.648 0.626
1190 1.19 14.10 17.246 6.72 10.779 0.623
1260 1.26 14.15 18.261 6.74 10.912 0.618
1330 1.33 14.25 19.275 6.79 11.050 0.614
1400 1.4 14.50 20.290 6.91 11.190 0.617
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 5.00 - 5.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

0.7

0.6

0.5
Compressive Stress (kg/cm2)

0.4

0.3

0.2

0.1

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Strain (%)

Maximum Axial Load 6.91 kg


Compressive Stress 0.64 kg/cm2
Cohesion, c 0.32 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,79 12,63 gram
2 Mass of wet soil + can M2 112,83 130,66 gram
3 Mass of dry soil + can M3 102,07 115,39 gram
4 Mass of moisture = M2 - M3 10,76 15,27 gram
5 Mass of dry soil = M3 - M1 89,28 102,76 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,05 14,86 %
7 Average water content, (w) 13,46 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,43 31,70 gram
2 Mass of dry soil + piknometer M2 50,80 49,76 gram
3 Mass of dry soil + water + piknometer M3 93,56 93,31 gram
4 Mass of water + piknometer M4 82,07 82,03 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,37 18,06
7 B = M3 - M4 11,49 11,28
8 C=A-B 6,88 6,78
9 Specific Gravity, Gs = A / C 2,67 2,66
10 Average specific gravity, Gs 2,67
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,67

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,67

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 28 21 19
Mass of can (gr) 13,74 14,04 13,92 14,15 11,37 13,90 11,83 11,13 14,51 14,08
Mass of wet soil + can (gr) 36,10 42,47 42,86 42,66 32,55 37,24 33,15 33,15 30,60 29,28
Mass of dry soil + can (gr) 32,60 37,48 37,51 37,46 28,26 32,49 28,11 27,97 28,79 27,16
Mass of dry soil (gr) 18,86 23,44 23,59 23,31 16,89 18,59 16,28 16,84 14,28 13,08
Mass of moisture (gr) 3,50 4,99 5,35 5,20 4,29 4,75 5,04 5,18 1,81 2,12
Water content, w (%) 18,56 21,29 22,68 22,31 25,40 25,55 30,96 30,76 12,68 16,21
19,92 22,49 25,48 30,86 14,44

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 24,57 %
80
Plastic Limit, PL = 14,44 %
Non Cohesive Plasticity Index, PI = 10,13
70 %
60 CH Natural Water Content wN = 13,46 %
PLASTIC INDEX

50 Liquid Index LI = -0,10


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,46 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,67 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,32 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,46 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,46 100,00 e2 = e1 - d2
4 4,750 d3 = 3,43 e3 = 72,03 95,45 e3 = e2 - d3
8 2,360 d4 = 3,61 e4 = 68,42 90,67 e4 = e3 - d4
20 0,850 d5 = 6,47 e5 = 61,95 82,10 e5 = e4 - d5
30 0,600 d6 = 4,82 e6 = 57,13 75,71 e6 = e5 - d6
50 0,300 d7 = 7,64 e7 = 49,49 65,58 e7 = e6 - d7
100 0,150 d8 = 8,71 e8 = 40,78 54,04 e8 = e7 - d8
200 0,075 d9 = 2,05 e9 = 38,73 51,33 e9 = e8 - d9
Sd = 36,73

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 21,0 -3,0 27,0 22,0 12,69 0,0125 0,0316 24,0 31,70
5 15,0 -3,0 27,0 16,0 13,67 0,0125 0,0207 18,0 23,77
30 13,0 -3,0 27,0 14,0 14,00 0,0125 0,0086 16,0 21,13
60 11,5 -3,0 27,0 12,5 14,25 0,0125 0,0061 14,5 19,15
250 7,0 -3,0 27,0 8,0 14,98 0,0125 0,0031 10,0 13,21
1440 5,0 -3,0 27,0 6,0 15,31 0,0125 0,0013 8,0 10,57

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Ccoalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14,50 - 15,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,67

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0010 0,03 0,2200 220,00 4,091

Finer #200 = 51,33 %


Gravel = 4,55 %
Sand = 44,13 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14.50 - 15.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 129.38
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm )3
62.65

3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 2.07

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 7.00 1.014 3.33 9.172 0.363
140 0.14 16.00 2.029 7.62 9.267 0.822
210 0.21 23.00 3.043 10.95 9.364 1.170
280 0.28 28.00 4.058 13.34 9.463 1.409
350 0.35 31.50 5.072 15.00 9.564 1.569
420 0.42 33.00 6.087 15.72 9.668 1.626
490 0.49 34.50 7.101 16.43 9.773 1.681
560 0.56 35.00 8.116 16.67 9.881 1.687
630 0.63 35.00 9.130 16.67 9.991 1.668
700 0.7 34.75 10.145 16.55 10.104 1.638
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 5
Depth : 14.50 - 15.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.8

1.6

1.4

1.2
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11
Strain (%)

Maximum Axial Load 16.67 kg


Compressive Stress 1.69 kg/cm2
2
Cohesion, c 0.84 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,68 13,63 gram
2 Mass of wet soil + can M2 133,48 140,61 gram
3 Mass of dry soil + can M3 108,19 113,80 gram
4 Mass of moisture = M2 - M3 25,29 26,81 gram
5 Mass of dry soil = M3 - M1 94,51 100,17 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,76 26,76 %
7 Average water content, (w) 26,76 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,22 32,18 gram
2 Mass of dry soil + piknometer M2 50,60 50,53 gram
3 Mass of dry soil + water + piknometer M3 93,08 93,22 gram
4 Mass of water + piknometer M4 81,87 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,38 18,35
7 B = M3 - M4 11,21 11,09
8 C=A-B 7,17 7,26
9 Specific Gravity, Gs = A / C 2,56 2,53
10 Average specific gravity, Gs 2,55
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,55

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,55

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 29 24 16
Mass of can (gr) 14,22 13,98 11,09 14,06 12,67 13,99 14,48 13,79 14,46 12,68
Mass of wet soil + can (gr) 33,65 32,91 28,82 33,70 36,86 35,63 39,35 33,29 29,54 27,79
Mass of dry soil + can (gr) 28,69 28,09 24,10 28,41 30,33 29,56 31,90 27,53 26,76 24,88
Mass of dry soil (gr) 14,47 14,11 13,01 14,35 17,66 15,57 17,42 13,74 12,30 12,20
Mass of moisture (gr) 4,96 4,82 4,72 5,29 6,53 6,07 7,45 5,76 2,78 2,91
Water content, w (%) 34,28 34,16 36,28 36,86 36,98 38,99 42,77 41,92 22,60 23,85
34,22 36,57 37,98 42,34 23,23

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 37,70 %
80
Plastic Limit, PL = 23,23 %
Non Cohesive Plasticity Index, PI = 14,47
70 %
60 CH Natural Water Content wN = 26,76 %
PLASTIC INDEX

50 Liquid Index LI = 0,24


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,55 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,55 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,35 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,55 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,55 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,55 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,55 100,00 e4 = e3 - d4
20 0,850 d5 = 0,12 e5 = 75,43 99,84 e5 = e4 - d5
30 0,600 d6 = 0,23 e6 = 75,20 99,54 e6 = e5 - d6
50 0,300 d7 = 0,41 e7 = 74,79 98,99 e7 = e6 - d7
100 0,150 d8 = 1,52 e8 = 73,27 96,98 e8 = e7 - d8
200 0,075 d9 = 1,24 e9 = 72,03 95,34 e9 = e8 - d9
Sd = 3,52

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 52,5 -3,0 27,0 53,5 7,52 0,0130 0,0252 55,5 75,00
5 39,0 -3,0 27,0 40,0 9,74 0,0130 0,0181 42,0 56,75
30 35,5 -3,0 27,0 36,5 10,31 0,0130 0,0076 38,5 52,02
60 31,5 -3,0 27,0 32,5 10,97 0,0130 0,0055 34,5 46,62
250 23,0 -3,0 27,0 24,0 12,36 0,0130 0,0029 26,0 35,13
1440 15,0 -3,0 27,0 16,0 13,67 0,0130 0,0013 18,0 24,32

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,55

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,002 0,0200 66,67 0,667

Finer #200 = 95,34 %


Gravel = 0,00 %
Sand = 4,66 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.32 Wet Weight Speciment, gr 112.17
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm )3
59.73

3 Cross Sectional Area A (cm2) 8.66 Weight Volume of Speciment, gb (gr/cm3) 1.88

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 4.00 1.014 1.91 8.746 0.218
140 0.14 9.50 2.029 4.52 8.836 0.512
210 0.21 14.00 3.043 6.67 8.929 0.747
280 0.28 18.75 4.058 8.93 9.023 0.990
350 0.35 22.50 5.072 10.72 9.120 1.175
420 0.42 25.50 6.087 12.15 9.218 1.318
490 0.49 25.20 7.101 12.00 9.319 1.288
560 0.56 22.00 8.116 10.48 9.422 1.112
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9
Strain (%)

Maximum Axial Load 12.15 kg


Compressive Stress 1.32 kg/cm2
2
Cohesion, c 0.66 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,66 14,09 gram
2 Mass of wet soil + can M2 129,55 117,22 gram
3 Mass of dry soil + can M3 110,01 100,00 gram
4 Mass of moisture = M2 - M3 19,54 17,22 gram
5 Mass of dry soil = M3 - M1 96,35 85,91 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,28 20,04 %
7 Average water content, (w) 20,16 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,12 32,32 gram
2 Mass of dry soil + piknometer M2 50,33 50,88 gram
3 Mass of dry soil + water + piknometer M3 93,57 93,22 gram
4 Mass of water + piknometer M4 82,40 81,75 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,21 18,56
7 B = M3 - M4 11,17 11,47
8 C=A-B 7,04 7,09
9 Specific Gravity, Gs = A / C 2,59 2,62
10 Average specific gravity, Gs 2,60
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,60

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 28 21 16
Mass of can (gr) 13,71 12,75 13,56 11,55 13,95 12,58 11,56 14,41 14,23 11,51
Mass of wet soil + can (gr) 32,55 31,88 35,27 35,75 35,56 31,65 36,65 34,25 31,32 27,63
Mass of dry soil + can (gr) 28,29 27,68 29,86 29,83 29,95 26,58 29,55 28,69 28,80 25,12
Mass of dry soil (gr) 14,58 14,93 16,30 18,28 16,00 14,00 17,99 14,28 14,57 13,61
Mass of moisture (gr) 4,26 4,20 5,41 5,92 5,61 5,07 7,10 5,56 2,52 2,51
Water content, w (%) 29,22 28,13 33,19 32,39 35,06 36,21 39,47 38,94 17,30 18,44
28,67 32,79 35,64 39,20 17,87

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 33,41 %
80
Plastic Limit, PL = 17,87 %
Non Cohesive Plasticity Index, PI = 15,54
70 %
60 CH Natural Water Content wN = 20,16 %
PLASTIC INDEX

50 Liquid Index LI = 0,15


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,58 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,60 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,58 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,58 100,00 e2 = e1 - d2
4 4,750 d3 = 0,06 e3 = 75,52 99,92 e3 = e2 - d3
8 2,360 d4 = 0,98 e4 = 74,54 98,62 e4 = e3 - d4
20 0,850 d5 = 0,58 e5 = 73,96 97,86 e5 = e4 - d5
30 0,600 d6 = 0,68 e6 = 73,28 96,96 e6 = e5 - d6
50 0,300 d7 = 1,06 e7 = 72,22 95,55 e7 = e6 - d7
100 0,150 d8 = 1,20 e8 = 71,02 93,97 e8 = e7 - d8
200 0,075 d9 = 0,43 e9 = 70,59 93,40 e9 = e8 - d9
Sd = 4,99

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 41,5 -3,0 27,0 42,5 9,33 0,0128 0,0276 44,5 59,44
5 31,5 -3,0 27,0 32,5 10,97 0,0128 0,0189 34,5 46,08
30 27,5 -3,0 27,0 28,5 11,62 0,0128 0,0079 30,5 40,74
60 24,5 -3,0 27,0 25,5 12,11 0,0128 0,0057 27,5 36,73
250 17,0 -3,0 27,0 18,0 13,34 0,0128 0,0030 20,0 26,71
1440 11,5 -3,0 27,0 12,5 14,25 0,0128 0,0013 14,5 19,37

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10,50 - 11,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,60

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,004 0,0300 75,00 1,333

Finer #200 = 93,40 %


Gravel = 0,08 %
Sand = 6,52 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10.5 - 11.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 131.87
1
2 Height of Speciment, L0 (cm) 7.1 Volume of Speciment, V (cm 3) 64.46
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 2.05

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 6.00 0.986 2.86 9.170 0.312
140 0.14 10.50 1.972 5.00 9.262 0.540
210 0.21 13.60 2.958 6.48 9.356 0.692
280 0.28 16.00 3.944 7.62 9.452 0.806
350 0.35 18.00 4.930 8.57 9.550 0.898
420 0.42 19.25 5.915 9.17 9.650 0.950
490 0.49 20.25 6.901 9.65 9.752 0.989
560 0.56 21.25 7.887 10.12 9.857 1.027
630 0.63 22.00 8.873 10.48 9.963 1.052
700 0.7 23.00 9.859 10.95 10.072 1.088
770 0.77 23.50 10.845 11.19 10.184 1.099
840 0.84 24.00 11.831 11.43 10.297 1.110
910 0.91 24.50 12.817 11.67 10.414 1.121
980 0.98 25.00 13.803 11.91 10.533 1.130
1050 1.05 25.50 14.789 12.15 10.655 1.140
1120 1.12 26.00 15.775 12.38 10.780 1.149
1190 1.19 26.00 16.761 12.38 10.907 1.135
1260 1.26 26.50 17.746 12.62 11.038 1.143
1330 1.33 26.50 18.732 12.62 11.172 1.130
1400 1.4 26.80 19.718 12.76 11.309 1.129
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 10.5 - 11.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)

Maximum Axial Load 12.76 kg


Compressive Stress 1.15 kg/cm2
Cohesion, c 0.57 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,25 14,07 gram
2 Mass of wet soil + can M2 127,43 132,12 gram
3 Mass of dry soil + can M3 110,03 114,45 gram
4 Mass of moisture = M2 - M3 17,40 17,67 gram
5 Mass of dry soil = M3 - M1 95,78 100,38 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 18,17 17,60 %
7 Average water content, (w) 17,88 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,43 30,59 gram
2 Mass of dry soil + piknometer M2 50,71 48,67 gram
3 Mass of dry soil + water + piknometer M3 93,56 91,46 gram
4 Mass of water + piknometer M4 82,89 81,01 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,28 18,08
7 B = M3 - M4 10,67 10,45
8 C=A-B 7,61 7,63
9 Specific Gravity, Gs = A / C 2,40 2,37
10 Average specific gravity, Gs 2,39
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,39

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,39

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 24 21
Mass of can (gr) 14,27 14,08 13,99 14,21 12,33 14,62 14,19 12,05 14,35 13,01
Mass of wet soil + can (gr) 37,18 31,30 39,25 37,57 34,76 43,56 40,67 34,90 29,84 28,41
Mass of dry soil + can (gr) 32,38 27,79 33,36 32,16 29,19 36,28 34,68 29,47 27,36 26,05
Mass of dry soil (gr) 18,11 13,71 19,37 17,95 16,86 21,66 20,49 17,42 13,01 13,04
Mass of moisture (gr) 4,80 3,51 5,89 5,41 5,57 7,28 5,99 5,43 2,48 2,36
Water content, w (%) 26,50 25,60 30,41 30,14 33,04 33,61 29,23 31,17 19,06 18,10
26,05 30,27 33,32 30,20 18,58

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 30,42 %
80
Plastic Limit, PL = 18,58 %
Non Cohesive Plasticity Index, PI = 11,84
70 %
60 CH Natural Water Content wN = 17,88 %
PLASTIC INDEX

50 Liquid Index LI = -0,06


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,33 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,39 Hydrometer correction, a = 1,05
K2 = a/W x 100 = 1,40 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,33 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,33 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,33 100,00 e3 = e2 - d3
8 2,360 d4 = 0,82 e4 = 74,51 98,91 e4 = e3 - d4
20 0,850 d5 = 1,73 e5 = 72,78 96,61 e5 = e4 - d5
30 0,600 d6 = 1,66 e6 = 71,12 94,41 e6 = e5 - d6
50 0,300 d7 = 2,12 e7 = 69,00 91,60 e7 = e6 - d7
100 0,150 d8 = 2,48 e8 = 66,52 88,30 e8 = e7 - d8
200 0,075 d9 = 0,80 e9 = 65,72 87,24 e9 = e8 - d9
Sd = 9,61

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 46,0 -3,0 27,0 47,0 8,59 0,0136 0,0281 49,0 68,48
5 42,0 -3,0 27,0 43,0 9,24 0,0136 0,0185 45,0 62,89
30 33,0 -3,0 27,0 34,0 10,72 0,0136 0,0081 36,0 50,31
60 29,5 -3,0 27,0 30,5 11,29 0,0136 0,0059 32,5 45,42
250 22,5 -3,0 27,0 23,5 12,44 0,0136 0,0030 25,5 35,64
1440 15,0 -3,0 27,0 16,0 13,67 0,0136 0,0013 18,0 25,16

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coalpads Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22,50 - 23,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,39

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,002 0,0180 60,00 0,741

Finer #200 = 87,24 %


Gravel = 0,00 %
Sand = 12,76 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22.5 - 23.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 132.94
1
2 Height of Speciment, L0 (cm) 6.95 Volume of Speciment, V (cm )3
63.10

3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 2.11

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 8.25 1.007 3.93 9.172 0.428
140 0.14 15.75 2.014 7.50 9.266 0.810
210 0.21 22.20 3.022 10.57 9.362 1.129
280 0.28 27.30 4.029 13.00 9.460 1.374
350 0.35 30.30 5.036 14.43 9.561 1.510
420 0.42 33.00 6.043 15.72 9.663 1.627
490 0.49 35.25 7.050 16.79 9.768 1.719
560 0.56 36.75 8.058 17.50 9.875 1.773
630 0.63 39.00 9.065 18.58 9.984 1.861
700 0.7 39.75 10.072 18.93 10.096 1.875
770 0.77 40.80 11.079 19.43 10.210 1.903
840 0.84 42.00 12.086 20.00 10.327 1.937
910 0.91 42.75 13.094 20.36 10.447 1.949
980 0.98 43.80 14.101 20.86 10.570 1.974
1050 1.05 45.00 15.108 21.43 10.695 2.004
1120 1.12 45.30 16.115 21.58 10.823 1.993
1190 1.19 46.50 17.122 22.15 10.955 2.022
1260 1.26 46.75 18.129 22.27 11.090 2.008
1330 1.33 45.00 19.137 21.43 11.228 1.909
1400 1.4 44.25 20.144 21.08 11.369 1.854
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 6
Depth : 22.5 - 23.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

2.5

2
Compressive Stress (kg/cm2)

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Strain (%)

Maximum Axial Load 22.27 kg


Compressive Stress 2.02 kg/cm2
2
Cohesion, c 1.01 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,58 12,72 gram
2 Mass of wet soil + can M2 113,02 113,17 gram
3 Mass of dry soil + can M3 91,33 89,99 gram
4 Mass of moisture = M2 - M3 21,69 23,18 gram
5 Mass of dry soil = M3 - M1 78,75 77,27 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 27,54 30,00 %
7 Average water content, (w) 28,77 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,41 31,65 gram
2 Mass of dry soil + piknometer M2 51,73 50,01 gram
3 Mass of dry soil + water + piknometer M3 95,15 94,06 gram
4 Mass of water + piknometer M4 83,64 82,44 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,32 18,36
7 B = M3 - M4 11,51 11,62
8 C=A-B 6,81 6,74
9 Specific Gravity, Gs = A / C 2,69 2,72
10 Average specific gravity, Gs 2,71
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,71

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,71

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 24 16
Mass of can (gr) 14,07 14,03 14,26 12,96 14,02 14,02 11,51 11,31 12,61 11,66
Mass of wet soil + can (gr) 34,68 30,00 33,89 38,25 34,75 36,43 32,68 33,97 28,44 26,66
Mass of dry soil + can (gr) 28,93 27,98 28,07 30,83 29,21 30,40 26,44 27,27 24,21 23,13
Mass of dry soil (gr) 14,86 13,95 13,81 17,87 15,19 16,38 14,93 15,96 11,60 11,47
Mass of moisture (gr) 5,75 2,02 5,82 7,42 5,54 6,03 6,24 6,70 4,23 3,53
Water content, w (%) 38,69 14,48 42,14 41,52 36,47 36,81 41,80 41,98 36,47 30,78
26,59 41,83 36,64 41,89 33,62

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 36,31 %
80
Plastic Limit, PL = 33,62 %
Non Cohesive Plasticity Index, PI = 2,69
70 %
60 CH Natural Water Content wN = 28,77 %
PLASTIC INDEX

50 Liquid Index LI = -1,81


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,10 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,71 Hydrometer correction, a = 0,99
K2 = a/W x 100 = 1,32 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,1 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,10 100,00 e2 = e1 - d2
4 4,750 d3 = 0,20 e3 = 74,90 99,73 e3 = e2 - d3
8 2,360 d4 = 1,18 e4 = 73,72 98,16 e4 = e3 - d4
20 0,850 d5 = 2,46 e5 = 71,26 94,89 e5 = e4 - d5
30 0,600 d6 = 0,94 e6 = 70,32 93,64 e6 = e5 - d6
50 0,300 d7 = 0,89 e7 = 69,43 92,45 e7 = e6 - d7
100 0,150 d8 = 1,79 e8 = 67,64 90,07 e8 = e7 - d8
200 0,075 d9 = 1,93 e9 = 65,71 87,50 e9 = e8 - d9
Sd = 9,39

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 47,5 -3,0 27,0 48,5 8,34 0,0124 0,0253 50,5 66,48
5 43,0 -3,0 27,0 44,0 9,08 0,0124 0,0167 46,0 60,55
30 36,0 -3,0 27,0 37,0 10,23 0,0124 0,0072 39,0 51,34
60 33,0 -3,0 27,0 34,0 10,72 0,0124 0,0052 36,0 47,39
250 26,0 -3,0 27,0 27,0 11,87 0,0124 0,0027 29,0 38,17
1440 20,0 -3,0 27,0 21,0 12,85 0,0124 0,0012 23,0 30,28

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,71

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0012 0,0180 81,82 0,364

Finer #200 = 87,50 %


Gravel = 0,27 %
Sand = 12,24 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3

s3 = 50,00 kN/m2 W= 121,86 gr s3 = 100,00 kN/m2 W= 122,72 gr s3 = 200,00 kN/m2 W= 123,12 gr


DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
reading reading reading
mm % cm2 kg kg/cm2 mm % cm2 kg kg/cm2 mm % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 5,00 0,10 9,63 2,38 0,247 7 4,50 0,10 9,63 2,14 0,223 7 7,50 0,10 9,63 3,57 0,371
Height of Sample = 7,00 cm 14 7,50 0,20 9,64 3,57 0,371 14 6,75 0,20 9,64 3,22 0,333 14 15,00 0,20 9,64 7,14 0,741
3
Volume of Sampel = 67,35 cm 21 8,00 0,30 9,65 3,81 0,395 21 11,20 0,30 9,65 5,33 0,553 21 22,50 0,30 9,65 10,72 1,111
Speed = 0,70 mm/menit 28 9,40 0,40 9,66 4,48 0,463 28 13,00 0,40 9,66 6,19 0,641 28 25,90 0,40 9,66 12,34 1,277
Kalibrasi = 0,476 kg/div 35 11,25 0,50 9,67 5,36 0,554 35 15,30 0,50 9,67 7,29 0,754 35 27,75 0,50 9,67 13,22 1,367
70 15,00 1,00 9,72 7,14 0,735 70 20,25 1,00 9,72 9,65 0,992 70 31,90 1,00 9,72 15,19 1,563
105 17,50 1,50 9,77 8,34 0,853 105 26,00 1,50 9,77 12,38 1,268 105 36,75 1,50 9,77 17,50 1,792
140 20,00 2,00 9,82 9,53 0,970 140 27,90 2,00 9,82 13,29 1,354 140 39,00 2,00 9,82 18,58 1,892
175 22,50 2,50 9,87 10,72 1,086 175 32,00 2,50 9,87 15,24 1,545 175 43,50 2,50 9,87 20,72 2,100
210 25,00 3,00 9,92 11,91 1,201 210 34,20 3,00 9,92 16,29 1,642 210 48,00 3,00 9,92 22,86 2,305
280 27,50 4,00 10,02 13,10 1,307 280 36,90 4,00 10,02 17,58 1,754 280 53,25 4,00 10,02 25,36 2,531
350 28,75 5,00 10,13 13,69 1,352 350 39,60 5,00 10,13 18,86 1,862 350 55,50 5,00 10,13 26,43 2,610
420 30,00 6,00 10,24 14,29 1,396 420 40,90 6,00 10,24 19,48 1,903 420 56,60 6,00 10,24 26,96 2,634
490 32,50 7,00 10,35 15,48 1,496 490 42,00 7,00 10,35 20,00 1,934 490 57,40 7,00 10,35 27,34 2,643
560 33,75 8,00 10,46 16,08 1,537 560 43,20 8,00 10,46 20,58 1,968 560 58,50 8,00 10,46 27,86 2,664
630 35,00 9,00 10,57 16,67 1,577 630 44,50 9,00 10,57 21,20 2,005 630 59,60 9,00 10,57 28,39 2,685
700 34,75 10,00 10,69 16,55 1,548 700 45,90 10,00 10,69 21,86 2,045 700 60,75 10,00 10,69 28,94 2,707
840 34,25 12,00 10,93 16,31 1,492 840 45,50 12,00 10,93 21,67 1,982 840 60,90 12,00 10,93 29,01 2,653
980 34,00 14,00 11,19 16,19 1,448 980 45,00 14,00 11,19 21,43 1,916 980 60,00 14,00 11,19 28,58 2,554
1120 1120 44,60 16,00 11,45 21,24 1,855 1120 59,70 16,00 11,45 28,44 2,483
1260 1260 1260 59,60 18,00 11,73 28,39 2,419
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1,50 - 2,00
Date : 13 Agustus 2023
Made by : Tim laboran PT Soiltama

3,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,86 122,72 123,12
3
INITIAL Density, gr/cm 1,81 1,82 1,83
2,0
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 28,77 28,77 28,77


3
Dry Density, gr/cm 1,41 1,42 1,42
Weight, gr
AFTER 3
Density, gr/cm
1,5 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
1,0
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 14,00 10,00 18,00
2
FAILURE
(s1-s3)f kg/cm 1,58 2,05 2,71
2
CONDITIONS uf, kg/cm
0,5 2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 2,08 3,05 4,71
SHEAR STRENGTH c: 0,495 kg/cm2
PARAMETERS j: 13,50 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 28.770
SPECIFIC GRAVITY (G) 2.710 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.615
LIQUID LIMIT (LL%) 36.310 DRY WEIGHT Wd (gr) 59.630 DEGREE OF INITIAL SAT. So % 77%
PLASTIC LIMIT (PL%) 33.620 SUBSTANCE HEIGHT Hs (cm) 1.159

PRESSURE
GRADATION

Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.6150 1.9000


1 1.00 1.00 0.0280 0.0280 0.0242 0.6150 1.8720 0.9430 2.0 0.00314 1.4737 0.0147 0.000046
2 2.00 1.00 0.0718 0.0438 0.0377 0.5773 1.8283 0.9251 3.0 0.00134 2.3371 0.0234 0.000031
3 4.00 2.00 0.1350 0.0633 0.0546 0.5227 1.7650 0.8983 3.8 0.00079 3.4596 0.0173 0.000014
4 8.00 4.00 0.2188 0.0838 0.0723 0.4504 1.6813 0.8616 4.0 0.00066 4.7450 0.0119 0.000008
5 2.00 0.1903 -0.0285 -0.0246 0.4750 1.7098 0.8478
6 0.25 0.1405 -0.0498 -0.0429 0.5180 1.7595 0.8673

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 1.50 - 2.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ratio (e)


0.65
e0
0.6

0.55

0.5
Void Ratio, e

0.45

0.4

0.35

0.3
eb
0.25

0.2
s0 sc ' sb
0.1 1 10 100 1000
Pressure, s kg/cm2

Relationship Between Cv and Stress s


0.0035
0.0030
Cv (cm/second2)

0.0025
0.0020
0.0015
0.0010
0.0005
0.0000
1 10
Stress, s (kg/cm2)

2
so = 0.207 kg/cm
2
sc = 1.850 kg/cm
Cr = 0.047
Cc = 0.198
eo = 0.615
ec = 0.570
2
Cv avg = 0.001 cm /sec
K avg = 0.000025 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,77 12,68 gram
2 Mass of wet soil + can M2 112,78 122,44 gram
3 Mass of dry soil + can M3 102,08 113,76 gram
4 Mass of moisture = M2 - M3 10,70 8,68 gram
5 Mass of dry soil = M3 - M1 89,31 101,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,98 8,59 %
7 Average water content, (w) 10,28 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,46 31,50 gram
2 Mass of dry soil + piknometer M2 50,49 49,51 gram
3 Mass of dry soil + water + piknometer M3 94,10 92,86 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,03 18,01
7 B = M3 - M4 11,21 11,12
8 C=A-B 6,82 6,89
9 Specific Gravity, Gs = A / C 2,64 2,61
10 Average specific gravity, Gs 2,63
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,63

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,63

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 31 19 17
Mass of can (gr) 14,08 13,87 11,43 13,69 14,02 13,98 14,54 11,76 13,15 14,01
Mass of wet soil + can (gr) 32,54 34,74 30,16 39,19 36,96 40,42 33,60 37,18 28,31 29,04
Mass of dry soil + can (gr) 28,53 30,25 25,90 33,46 31,52 34,16 28,26 31,65 25,56 26,36
Mass of dry soil (gr) 14,45 16,38 14,47 19,77 17,50 20,18 13,72 19,89 12,41 12,35
Mass of moisture (gr) 4,01 4,49 4,26 5,73 5,44 6,26 5,34 5,53 2,75 2,68
Water content, w (%) 27,75 27,41 29,44 28,98 31,09 31,02 38,92 27,80 22,16 21,70
27,58 29,21 31,05 33,36 21,93

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 30,01 %
80
Plastic Limit, PL = 21,93 %
Non Cohesive Plasticity Index, PI = 8,08
70 %
60 CH Natural Water Content wN = 10,28 %
PLASTIC INDEX

50 Liquid Index LI = -1,44


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,56 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,63 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,56 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,56 100,00 e2 = e1 - d2
4 4,750 d3 = 1,33 e3 = 74,23 98,24 e3 = e2 - d3
8 2,360 d4 = 0,16 e4 = 74,07 98,03 e4 = e3 - d4
20 0,850 d5 = 0,15 e5 = 73,92 97,83 e5 = e4 - d5
30 0,600 d6 = 0,36 e6 = 73,56 97,35 e6 = e5 - d6
50 0,300 d7 = 0,82 e7 = 72,74 96,27 e7 = e6 - d7
100 0,150 d8 = 1,87 e8 = 70,87 93,79 e8 = e7 - d8
200 0,075 d9 = 1,26 e9 = 69,61 92,13 e9 = e8 - d9
Sd = 5,95

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 56,0 -5,0 27,0 57,0 6,95 0,0127 0,0236 61,0 81,07
5 49,0 -5,0 27,0 50,0 8,10 0,0127 0,0161 54,0 71,77
30 36,0 -5,0 27,0 37,0 10,23 0,0127 0,0074 41,0 54,49
60 30,0 -5,0 27,0 31,0 11,21 0,0127 0,0055 35,0 46,52
250 20,5 -5,0 27,0 21,5 12,77 0,0127 0,0029 25,5 33,89
1440 13,5 -5,0 27,0 14,5 13,92 0,0127 0,0012 18,5 24,59

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.50 - 6.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,63

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,002 0,0100 35,71 1,429

Finer #200 = 92,13 %


Gravel = 1,76 %
Sand = 6,11 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.5 - 6.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
1 Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 143.81
2 Height of Speciment, L0 (cm) 7.23 Volume of Speciment, V (cm )
3
65.64
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 2.19
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 3.00 0.968 1.43 9.168 0.156
140 0.14 5.75 1.936 2.74 9.258 0.296
210 0.21 9.50 2.905 4.52 9.351 0.484
280 0.28 13.00 3.873 6.19 9.445 0.656
350 0.35 17.00 4.841 8.10 9.541 0.849
420 0.42 19.75 5.809 9.41 9.639 0.976
490 0.49 24.00 6.777 11.43 9.739 1.174
560 0.56 28.00 7.746 13.34 9.841 1.355
630 0.63 29.00 8.714 13.81 9.946 1.389
700 0.7 30.25 9.682 14.41 10.052 1.433
770 0.77 31.75 10.650 15.12 10.161 1.488
840 0.84 32.75 11.618 15.60 10.273 1.518
910 0.91 33.00 12.586 15.72 10.386 1.513
980 0.98 33.25 13.555 15.84 10.503 1.508
1050 1.05 32.25 14.523 15.36 10.622 1.446
1120 1.12 32.00 15.491 15.24 10.743 1.419
1190 1.19 31.00 16.459 14.77 10.868 1.359
1260 1.26 29.75 17.427 14.17 10.995 1.289
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 5.5 - 6.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.6

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Strain (%)

Maximum Axial Load 15.84 kg


Compressive Stress 1.52 kg/cm2
Cohesion, c 0.76 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,24 11,68 gram
2 Mass of wet soil + can M2 114,82 111,74 gram
3 Mass of dry soil + can M3 105,00 100,02 gram
4 Mass of moisture = M2 - M3 9,82 11,72 gram
5 Mass of dry soil = M3 - M1 90,76 88,34 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 10,82 13,27 %
7 Average water content, (w) 12,04 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,99 33,02 gram
2 Mass of dry soil + piknometer M2 49,47 51,95 gram
3 Mass of dry soil + water + piknometer M3 92,30 94,47 gram
4 Mass of water + piknometer M4 82,51 82,86 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 17,48 18,93
7 B = M3 - M4 9,79 11,61
8 C=A-B 7,69 7,32
9 Specific Gravity, Gs = A / C 2,27 2,59
10 Average specific gravity, Gs 2,43
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,43

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,43

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 27 22 18
Mass of can (gr) 14,21 14,28 13,07 12,63 12,73 14,02 13,61 12,73 12,84 14,05
Mass of wet soil + can (gr) 33,75 35,04 41,12 36,58 36,08 39,34 37,33 35,10 26,87 28,08
Mass of dry soil + can (gr) 28,46 29,47 33,51 30,17 29,22 31,91 30,39 28,49 24,57 25,59
Mass of dry soil (gr) 14,25 15,19 20,44 17,54 16,49 17,89 16,78 15,76 11,73 11,54
Mass of moisture (gr) 5,29 5,57 7,61 6,41 6,86 7,43 6,94 6,61 2,30 2,49
Water content, w (%) 37,12 36,67 37,23 36,55 41,60 41,53 41,36 41,94 19,61 21,58
36,90 36,89 41,57 41,65 20,59

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 39,16 %
80
Plastic Limit, PL = 20,59 %
Non Cohesive Plasticity Index, PI = 18,57
70 %
60 CH Natural Water Content wN = 12,04 %
PLASTIC INDEX

50 Liquid Index LI = -0,46


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,53 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,43 Hydrometer correction, a = 1,04
K2 = a/W x 100 = 1,38 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,53 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,53 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,53 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,53 100,00 e4 = e3 - d4
20 0,850 d5 = 0,45 e5 = 75,08 99,40 e5 = e4 - d5
30 0,600 d6 = 0,38 e6 = 74,70 98,90 e6 = e5 - d6
50 0,300 d7 = 0,35 e7 = 74,35 98,44 e7 = e6 - d7
100 0,150 d8 = 0,36 e8 = 73,99 97,96 e8 = e7 - d8
200 0,075 d9 = 0,21 e9 = 73,78 97,68 e9 = e8 - d9
Sd = 1,75

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 53,0 -3,0 27,0 54,0 7,44 0,0134 0,0259 56,0 77,41
5 48,0 -3,0 27,0 49,0 8,26 0,0134 0,0172 51,0 70,50
30 38,0 -3,0 27,0 39,0 9,90 0,0134 0,0077 41,0 56,68
60 32,0 -3,0 27,0 33,0 10,88 0,0134 0,0057 35,0 48,38
250 22,0 -3,0 27,0 23,0 12,52 0,0134 0,0030 25,0 34,56
1440 16,0 -3,0 27,0 17,0 13,51 0,0134 0,0013 19,0 26,26

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14.00 - 14.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,43

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,002 0,0100 35,71 1,429

Finer #200 = 97,68 %


Gravel = 0,00 %
Sand = 2,32 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14 - 14.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.3 Wet Weight Speciment, gr 127.52
1
2 Height of Speciment, L0 (cm) 7.23 Volume of Speciment, V (cm 3) 61.84
2 3
3 Cross Sectional Area A (cm ) 8.55 Weight Volume of Speciment, gb (gr/cm ) 2.06

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 8.00 0.968 3.81 8.637 0.441
140 0.14 14.50 1.936 6.91 8.722 0.792
210 0.21 21.00 2.905 10.00 8.809 1.135
280 0.28 24.00 3.873 11.43 8.898 1.285
350 0.35 28.00 4.841 13.34 8.988 1.484
420 0.42 30.00 5.809 14.29 9.080 1.574
490 0.49 31.00 6.777 14.77 9.175 1.609
560 0.56 32.00 7.746 15.24 9.271 1.644
630 0.63 32.50 8.714 15.48 9.369 1.652
700 0.7 33.00 9.682 15.72 9.470 1.660
770 0.77 32.00 10.650 15.24 9.572 1.592
840 0.84 31.00 11.618 14.77 9.677 1.526
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 7
Depth : 14 - 14.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.8

1.6

1.4

1.2
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)

Maximum Axial Load 15.72 kg


Compressive Stress 1.66 kg/cm2
Cohesion, c 0.83 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,62 13,98 gram
2 Mass of wet soil + can M2 117,00 122,48 gram
3 Mass of dry soil + can M3 94,42 100,02 gram
4 Mass of moisture = M2 - M3 22,58 22,46 gram
5 Mass of dry soil = M3 - M1 81,80 86,04 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 27,60 26,10 %
7 Average water content, (w) 26,85 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 29,86 30,49 gram
2 Mass of dry soil + piknometer M2 47,94 48,63 gram
3 Mass of dry soil + water + piknometer M3 91,10 92,50 gram
4 Mass of water + piknometer M4 80,09 81,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,08 18,14
7 B = M3 - M4 11,01 11,25
8 C=A-B 7,07 6,89
9 Specific Gravity, Gs = A / C 2,56 2,63
10 Average specific gravity, Gs 2,60
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,60

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,60

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 23 19
Mass of can (gr) 13,81 13,98 12,70 12,58 12,83 13,96 12,70 14,40 14,03 11,64
Mass of wet soil + can (gr) 39,24 36,35 43,28 39,57 48,82 44,85 39,60 48,02 29,13 26,80
Mass of dry soil + can (gr) 33,26 31,19 36,47 33,52 40,78 37,94 32,22 38,80 26,84 24,48
Mass of dry soil (gr) 19,45 17,21 23,77 20,94 27,95 23,98 19,52 24,40 12,81 12,84
Mass of moisture (gr) 5,98 5,16 6,81 6,05 8,04 6,91 7,38 9,22 2,29 2,32
Water content, w (%) 30,75 29,98 28,65 28,89 28,77 28,82 37,81 37,79 17,88 18,07
30,36 28,77 28,79 37,80 17,97

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 31,51 %
80
Plastic Limit, PL = 17,97 %
Non Cohesive Plasticity Index, PI = 13,53
70 %
60 CH Natural Water Content wN = 26,85 %
PLASTIC INDEX

50 Liquid Index LI = 0,66


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,68 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,60 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,68 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,68 100,00 e2 = e1 - d2
4 4,750 d3 = 4,72 e3 = 70,96 93,76 e3 = e2 - d3
8 2,360 d4 = 2,24 e4 = 68,72 90,80 e4 = e3 - d4
20 0,850 d5 = 1,07 e5 = 67,65 89,39 e5 = e4 - d5
30 0,600 d6 = 1,02 e6 = 66,63 88,04 e6 = e5 - d6
50 0,300 d7 = 1,04 e7 = 65,59 86,67 e7 = e6 - d7
100 0,150 d8 = 1,67 e8 = 63,92 84,46 e8 = e7 - d8
200 0,075 d9 = 1,37 e9 = 62,55 82,65 e9 = e8 - d9
Sd = 13,13

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 32,0 -3,0 27,0 33,0 10,88 0,0128 0,0299 35,0 46,76
5 27,0 -3,0 27,0 28,0 11,70 0,0128 0,0196 30,0 40,08
30 19,5 -3,0 27,0 20,5 12,93 0,0128 0,0084 22,5 30,06
60 17,0 -3,0 27,0 18,0 13,34 0,0128 0,0060 20,0 26,72
250 12,0 -3,0 27,0 13,0 14,16 0,0128 0,0030 15,0 20,04
1440 7,0 -3,0 27,0 8,0 14,98 0,0128 0,0013 10,0 13,36

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3,50 - 4,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,60

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0007 0,008 0,0400 57,14 2,286

Finer #200 = 82,65 %


Gravel = 6,24 %
Sand = 11,11 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3.5 - 4.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.46 Wet Weight Speciment, gr 132.36
1
2 Height of Speciment, L0 (cm) 7.1 Volume of Speciment, V (cm 3) 66.76
2 3
3 Cross Sectional Area A (cm ) 9.40 Weight Volume of Speciment, gb (gr/cm ) 1.98

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 2.00 0.986 0.95 9.496 0.100
140 0.14 3.50 1.972 1.67 9.592 0.174
210 0.21 4.50 2.958 2.14 9.689 0.221
280 0.28 5.00 3.944 2.38 9.788 0.243
350 0.35 5.50 4.930 2.62 9.890 0.265
420 0.42 6.00 5.915 2.86 9.994 0.286
490 0.49 6.25 6.901 2.98 10.099 0.295
560 0.56 6.50 7.887 3.10 10.208 0.303
630 0.63 6.50 8.873 3.10 10.318 0.300
700 0.7 6.80 9.859 3.24 10.431 0.311
770 0.77 7.00 10.845 3.33 10.546 0.316
840 0.84 7.00 11.831 3.33 10.664 0.313
910 0.91 7.00 12.817 3.33 10.785 0.309
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 3.5 - 4.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

0.35

0.3

0.25
Compressive Stress (kg/cm2)

0.2

0.15

0.1

0.05

0
0 1 2 3 4 5 6 7 8 9 10 11 12
Strain (%)

Maximum Axial Load 3.33 kg


Compressive Stress 0.32 kg/cm2
Cohesion, c 0.16 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,93 13,12 gram
2 Mass of wet soil + can M2 113,08 110,51 gram
3 Mass of dry soil + can M3 102,08 99,59 gram
4 Mass of moisture = M2 - M3 11,00 10,92 gram
5 Mass of dry soil = M3 - M1 89,15 86,47 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,34 12,63 %
7 Average water content, (w) 12,48 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,74 31,83 gram
2 Mass of dry soil + piknometer M2 49,84 49,94 gram
3 Mass of dry soil + water + piknometer M3 93,30 93,40 gram
4 Mass of water + piknometer M4 82,03 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,10 18,11
7 B = M3 - M4 11,27 11,27
8 C=A-B 6,83 6,84
9 Specific Gravity, Gs = A / C 2,65 2,65
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,65

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,65

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 34 22 18
Mass of can (gr) 14,07 13,78 12,98 12,71 14,08 12,67 11,35 12,67 14,18 14,02
Mass of wet soil + can (gr) 34,41 35,84 32,90 34,75 35,19 33,41 30,11 29,96 29,22 29,04
Mass of dry soil + can (gr) 30,00 30,65 28,33 26,69 30,10 29,38 25,63 25,86 26,29 26,15
Mass of dry soil (gr) 15,93 16,87 15,35 13,98 16,02 16,71 14,28 13,19 12,11 12,13
Mass of moisture (gr) 4,41 5,19 4,57 8,06 5,09 4,03 4,48 4,10 2,93 2,89
Water content, w (%) 27,68 30,76 29,77 57,65 31,77 24,12 31,37 31,08 24,19 23,83
29,22 43,71 27,95 31,23 24,01

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 32,56 %
80
Plastic Limit, PL = 24,01 %
Non Cohesive Plasticity Index, PI = 8,55
70 %
60 CH Natural Water Content wN = 12,48 %
PLASTIC INDEX

50 Liquid Index LI = -1,35


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,33 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,65 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,33 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,33 100,00 e2 = e1 - d2
4 4,750 d3 = 0,72 e3 = 74,61 99,04 e3 = e2 - d3
8 2,360 d4 = 2,10 e4 = 72,51 96,26 e4 = e3 - d4
20 0,850 d5 = 0,98 e5 = 71,53 94,96 e5 = e4 - d5
30 0,600 d6 = 0,70 e6 = 70,83 94,03 e6 = e5 - d6
50 0,300 d7 = 0,89 e7 = 69,94 92,84 e7 = e6 - d7
100 0,150 d8 = 1,22 e8 = 68,72 91,23 e8 = e7 - d8
200 0,075 d9 = 1,90 e9 = 66,82 88,70 e9 = e8 - d9
Sd = 8,51

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 48,0 -5,0 27,0 49,0 8,26 0,0126 0,0256 53,0 70,37
5 43,0 -5,0 27,0 44,0 9,08 0,0126 0,0170 48,0 63,73
30 30,5 -5,0 27,0 31,5 11,13 0,0126 0,0077 35,5 47,14
60 26,5 -5,0 27,0 27,5 11,79 0,0126 0,0056 31,5 41,83
250 12,5 -5,0 27,0 13,5 14,08 0,0126 0,0030 17,5 23,24
1440 8,0 -5,0 27,0 9,0 14,82 0,0126 0,0013 13,0 17,26

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,65

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,004 0,0150 37,50 2,667

Finer #200 = 88,70 %


Gravel = 0,96 %
Sand = 10,34 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.5 - 18.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.5 Wet Weight Speciment, gr 114.26
1
2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 67.35
2 3
3 Cross Sectional Area A (cm ) 9.62 Weight Volume of Speciment, gb (gr/cm ) 1.70

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 23.00 1.000 10.95 9.718 1.127
140 0.14 55.00 2.000 26.20 9.817 2.668
210 0.21 90.00 3.000 42.87 9.919 4.322
280 0.28 100.00 4.000 47.63 10.022 4.753
350 0.35 110.00 5.000 52.39 10.128 5.173
420 0.42 116.00 6.000 55.25 10.235 5.398
490 0.49 120.00 7.000 57.16 10.345 5.525
560 0.56 125.00 8.000 59.54 10.458 5.693
630 0.63 129.00 9.000 61.44 10.573 5.811
700 0.70 132.00 10.000 62.87 10.690 5.881
770 0.77 130.00 11.000 61.92 10.810 5.728
840 0.84 128.00 12.000 60.97 10.933 5.576
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 17.5 - 18.0
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

5
Compressive Stress (kg/cm2)

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)

Maximum Axial Load 62.87 kg


Compressive Stress 5.88 kg/cm2
Cohesion, c 2.94 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,20 12,56 gram
2 Mass of wet soil + can M2 111,53 112,86 gram
3 Mass of dry soil + can M3 96,22 109,87 gram
4 Mass of moisture = M2 - M3 15,31 2,99 gram
5 Mass of dry soil = M3 - M1 85,02 97,31 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 18,01 3,07 %
7 Average water content, (w) 10,54 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,64 32,43 gram
2 Mass of dry soil + piknometer M2 50,82 50,56 gram
3 Mass of dry soil + water + piknometer M3 93,24 93,21 gram
4 Mass of water + piknometer M4 82,09 82,07 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,18 18,13
7 B = M3 - M4 11,15 11,14
8 C=A-B 7,03 6,99
9 Specific Gravity, Gs = A / C 2,59 2,59
10 Average specific gravity, Gs 2,59
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,59

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,59

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 32 30 26 19
Mass of can (gr) 11,31 13,97 11,51 12,83 11,50 11,67 11,13 14,53 13,96 13,99
Mass of wet soil + can (gr) 34,34 34,85 30,61 29,33 28,71 28,30 35,08 32,36 28,99 29,04
Mass of dry soil + can (gr) 27,48 28,60 24,53 24,08 23,63 23,32 28,63 25,74 25,66 25,73
Mass of dry soil (gr) 16,17 14,63 13,02 11,25 12,13 11,65 17,50 11,21 11,70 11,74
Mass of moisture (gr) 6,86 6,25 6,08 5,25 5,08 4,98 6,45 6,62 3,33 3,31
Water content, w (%) 42,42 42,72 46,70 46,67 41,88 42,75 36,86 59,05 28,46 28,19
42,57 46,68 42,31 47,96 28,33

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 45,24 %
80
Plastic Limit, PL = 28,33 %
Non Cohesive Plasticity Index, PI = 16,91
70 %
60 CH Natural Water Content wN = 10,54 %
PLASTIC INDEX

50 Liquid Index LI = -1,05


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,45 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,59 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,45 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,45 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,45 100,00 e3 = e2 - d3
8 2,360 d4 = 0,10 e4 = 75,35 99,87 e4 = e3 - d4
20 0,850 d5 = 0,41 e5 = 74,94 99,32 e5 = e4 - d5
30 0,600 d6 = 0,30 e6 = 74,64 98,93 e6 = e5 - d6
50 0,300 d7 = 0,21 e7 = 74,43 98,65 e7 = e6 - d7
100 0,150 d8 = 0,23 e8 = 74,20 98,34 e8 = e7 - d8
200 0,075 d9 = 0,13 e9 = 74,07 98,17 e9 = e8 - d9
Sd = 1,38

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 52,5 -3,0 27,0 53,5 7,52 0,0128 0,0249 55,5 74,44
5 47,0 -3,0 27,0 48,0 8,42 0,0128 0,0166 50,0 67,07
30 36,0 -3,0 27,0 37,0 10,23 0,0128 0,0075 39,0 52,31
60 30,0 -3,0 27,0 31,0 11,21 0,0128 0,0055 33,0 44,26
250 19,5 -3,0 27,0 20,5 12,93 0,0128 0,0029 22,5 30,18
1440 13,0 -3,0 27,0 14,0 14,00 0,0128 0,0013 16,0 21,46

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22.00 - 22.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,59

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,003 0,0120 40,00 2,500

Finer #200 = 98,17 %


Gravel = 0,00 %
Sand = 1,83 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22 - 22.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
1 Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 125.71
2 Height of Speciment, L0 (cm) 7.2 Volume of Speciment, V (cm )
3
65.37
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 1.92
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 5.50 0.972 2.62 9.168 0.286
140 0.14 8.25 1.944 3.93 9.259 0.424
210 0.21 10.75 2.917 5.12 9.352 0.548
280 0.28 12.50 3.889 5.95 9.447 0.630
350 0.35 14.25 4.861 6.79 9.543 0.711
420 0.42 16.00 5.833 7.62 9.642 0.790
490 0.49 18.25 6.806 8.69 9.742 0.892
560 0.56 19.00 7.778 9.05 9.845 0.919
630 0.63 19.75 8.750 9.41 9.950 0.945
700 0.7 20.00 9.722 9.53 10.057 0.947
770 0.77 20.50 10.694 9.76 10.166 0.960
840 0.84 20.75 11.667 9.88 10.278 0.962
910 0.91 21.00 12.639 10.00 10.393 0.962
980 0.98 21.50 13.611 10.24 10.510 0.974
1050 1.05 22.00 14.583 10.48 10.629 0.986
1120 1.12 22.50 15.556 10.72 10.752 0.997
1190 1.19 23.00 16.528 10.95 10.877 1.007
1260 1.26 23.25 17.500 11.07 11.005 1.006
1330 1.33 22.00 18.472 10.48 11.136 0.941
1400 1.4 21.00 19.444 10.00 11.271 0.887
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Workshop Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BKB 8
Depth : 22 - 22.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.2

0.8
Compressive Stress (kg/cm2)

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Strain (%)

Maximum Axial Load 11.07 kg


Compressive Stress 1.01 kg/cm2
Cohesion, c 0.50 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,23 11,08 gram
2 Mass of wet soil + can M2 131,65 126,24 gram
3 Mass of dry soil + can M3 108,20 103,16 gram
4 Mass of moisture = M2 - M3 23,45 23,08 gram
5 Mass of dry soil = M3 - M1 93,97 92,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,95 25,07 %
7 Average water content, (w) 25,01 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,46 31,52 gram
2 Mass of dry soil + piknometer M2 52,97 51,90 gram
3 Mass of dry soil + water + piknometer M3 95,67 94,27 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,51 20,38
7 B = M3 - M4 12,78 12,53
8 C=A-B 7,73 7,85
9 Specific Gravity, Gs = A / C 2,65 2,60
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,62

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,62

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 32 23 18
Mass of can (gr) 14,02 13,69 13,84 11,33 14,61 13,98 14,13 11,36 13,94 13,62
Mass of wet soil + can (gr) 38,80 32,47 31,97 29,44 33,76 32,49 44,10 34,33 28,94 28,62
Mass of dry soil + can (gr) 32,00 27,33 26,67 24,12 27,89 26,76 34,88 27,24 26,18 25,71
Mass of dry soil (gr) 17,98 13,64 12,83 12,79 13,28 12,78 20,75 15,88 12,24 12,09
Mass of moisture (gr) 6,80 5,14 5,30 5,32 5,87 5,73 9,22 7,09 2,76 2,91
Water content, w (%) 37,82 37,68 41,31 41,59 44,20 44,84 44,43 44,65 22,55 24,07
37,75 41,45 44,52 44,54 23,31

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 42,46 %
80
Plastic Limit, PL = 23,31 %
Non Cohesive Plasticity Index, PI = 19,16
70 %
60 CH Natural Water Content wN = 25,01 %
PLASTIC INDEX

50 Liquid Index LI = 0,09


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,62 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 1,25 e8 = 73,75 98,33 e8 = e7 - d8
200 0,075 d9 = 6,48 e9 = 67,27 89,69 e9 = e8 - d9
Sd = 7,73

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 31,0 -3,0 27,0 32,0 11,05 0,0127 0,0298 34,0 45,56
5 30,0 -3,0 27,0 31,0 11,21 0,0127 0,0190 33,0 44,22
30 29,0 -3,0 27,0 30,0 11,38 0,0127 0,0078 32,0 42,88
60 28,0 -3,0 27,0 29,0 11,54 0,0127 0,0056 31,0 41,54
250 24,0 -3,0 27,0 25,0 12,20 0,0127 0,0028 27,0 36,18
1440 20,0 -3,0 27,0 21,0 12,85 0,0127 0,0012 23,0 30,82

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,62

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0012 0,0420 210,00 0,171

Finer #200 = 89,69 %


Gravel = 0,00 %
Sand = 10,31 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,07 gr s3 = 100,00 kN/m2 W= 122,52 gr s3 = 200,00 kN/m2 W= 123,60 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 5,00 0,10 9,63 2,38 0,247 7 7,50 0,10 9,63 3,57 0,371 7 10,00 0,10 9,63 4,76 0,495
Height of Sample = 7,00 cm 14 10,00 0,20 9,64 4,76 0,494 14 12,50 0,20 9,64 5,95 0,618 14 17,50 0,20 9,64 8,34 0,865
3
Volume of Sampel = 67,35 cm 21 12,50 0,30 9,65 5,95 0,617 21 17,50 0,30 9,65 8,34 0,864 21 22,50 0,30 9,65 10,72 1,111
Speed = 0,70 mm/menit 28 17,50 0,40 9,66 8,34 0,863 28 22,50 0,40 9,66 10,72 1,109 28 30,00 0,40 9,66 14,29 1,479
Kalibrasi = 0,476 kg/div 35 19,40 0,50 9,67 9,24 0,956 35 25,00 0,50 9,67 11,91 1,231 35 32,50 0,50 9,67 15,48 1,601
70 21,20 1,00 9,72 10,10 1,039 70 27,50 1,00 9,72 13,10 1,348 70 36,25 1,00 9,72 17,27 1,777
105 24,40 1,50 9,77 11,62 1,190 105 30,00 1,50 9,77 14,29 1,463 105 37,50 1,50 9,77 17,86 1,829
140 26,25 2,00 9,82 12,50 1,274 140 33,75 2,00 9,82 16,08 1,637 140 41,25 2,00 9,82 19,65 2,001
175 27,50 2,50 9,87 13,10 1,327 175 35,00 2,50 9,87 16,67 1,689 175 43,70 2,50 9,87 20,81 2,109
210 28,00 3,00 9,92 13,34 1,345 210 36,25 3,00 9,92 17,27 1,741 210 45,00 3,00 9,92 21,43 2,161
280 28,75 4,00 10,02 13,69 1,366 280 37,50 4,00 10,02 17,86 1,782 280 47,50 4,00 10,02 22,62 2,257
350 28,50 5,00 10,13 13,57 1,340 350 38,75 5,00 10,13 18,46 1,822 350 50,00 5,00 10,13 23,82 2,352
420 28,00 6,00 10,24 13,34 1,303 420 40,00 6,00 10,24 19,05 1,861 420 52,50 6,00 10,24 25,01 2,443
490 28,00 7,00 10,35 13,34 1,289 490 39,50 7,00 10,35 18,81 1,819 490 53,70 7,00 10,35 25,58 2,472
560 560 39,20 8,00 10,46 18,67 1,785 560 55,00 8,00 10,46 26,20 2,505
630 630 39,00 9,00 10,57 18,58 1,757 630 54,50 9,00 10,57 25,96 2,455
700 700 700 54,30 10,00 10,69 25,86 2,419
840 840 840 54,00 12,00 10,93 25,72 2,353
980 980 980
1120 1120 1120
1260 1260 1260
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

3,0 Test conditon : UU


SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION
Area, cm2 9,62 9,62 9,62
Volume, cm3 67,35 67,35 67,35
Weight, gr 121,07 122,52 123,60

2,0 Density, gr/cm3 1,80 1,82 1,84


Deviator Stress (s1 - s3), kg/cm2

INITIAL
Moisture, % 25,01 25,01 25,01
Dry Density, gr/cm3 1,44 1,46 1,47
Weight, gr
1,5 AFTER Density, gr/cm3
CONSOLIDATION Moisture, %

Dry Density, gr/cm3


Cell pressure, kg/cm2 0,50 1,00 2,00
1,0 COMPRESSION
STAGE initial pwp, kg/cm2
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 4,00 9,00 12,00
0,5 (s1-s3)f kg/cm2 1,37 1,86 2,50
FAILURE
CONDITIONS uf, kg/cm2
s3'f, kg/cm2 0,50 1,00 2,00
s1'f, kg/cm2 1,87 2,86 4,50
0,0 SHEAR STRENGTH c: 0,420 2
kg/cm
0 5 10 15 PARAMETERS j: 14,75 
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
o
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.630 INIT. WATER CONTENT Wo % 26.520
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.580
LIQUID LIMIT (LL%) 42.460 DRY WEIGHT Wd (gr) 61.770 DEGREE OF INITIAL SAT. So % 69.476
PLASTIC LIMIT (PL%) 23.310 SUBSTANCE HEIGHT Hs (cm) 1.200
GRADATION

PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) (cm/sec)

0 0.00 0.5800 1.9000


1 0.50 0.50 0.0070 0.0070 0.0058 0.5765 1.8930 0.9483 5.3 0.00240 0.3684 0.0074 0.0000177
2 1.00 0.50 0.0110 0.0040 0.0033 0.5732 1.8890 0.9455 9.0 0.00140 0.2113 0.0042 0.0000059
3 2.00 1.00 0.0230 0.0120 0.0100 0.5632 1.8770 0.9415 9.0 0.00139 0.6353 0.0064 0.0000088
4 4.00 2.00 0.0403 0.0173 0.0144 0.5488 1.8598 0.9342 9.0 0.00137 0.9190 0.0046 0.0000063
5 8.00 4.00 0.0840 0.0438 0.0365 0.5123 1.8160 0.9189 12.3 0.00097 2.3525 0.0059 0.0000057
6 2.00 0.0513 -0.0328 -0.0273 0.5396 1.8488 0.9162
7 0.25 0.0328 -0.0185 -0.0154 0.5550 1.8673 0.9290

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ratio (e)


0.65

0.6e0

0.55

0.5
Void Ratio, e

0.45

0.4

0.35

0.3

0.25e
b

0.2
0.1 s0 1 sc' 10 100 1000 sb
10000
Pressure, s kg/cm2

Relationship between Cv dan Stress


0.003
Cv (cm/second2)

0.002

0.001

0
0.1 1 10
Stress (kg/cm2)

po = 0.209 kg/cm2
pc = 1.700 kg/cm2
Cr = 0.047
Cc = 0.078
eo = 0.582
ec = 0.540
CV avg = 0.0015086 cm2/sec
K = 0.0000089 cm/sec

PT. SOILTAMA INDOKARYA PERSDADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,43 13,53 gram
2 Mass of wet soil + can M2 123,44 160,01 gram
3 Mass of dry soil + can M3 104,86 133,82 gram
4 Mass of moisture = M2 - M3 18,58 26,19 gram
5 Mass of dry soil = M3 - M1 90,43 120,29 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 20,55 21,77 %
7 Average water content, (w) 21,16 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,36 29,24 gram
2 Mass of dry soil + piknometer M2 52,51 49,44 gram
3 Mass of dry soil + water + piknometer M3 94,66 91,86 gram
4 Mass of water + piknometer M4 82,25 79,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,15 20,20
7 B = M3 - M4 12,41 12,64
8 C=A-B 7,74 7,56
9 Specific Gravity, Gs = A / C 2,60 2,67
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,64

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 27 22 19
Mass of can (gr) 14,05 13,86 13,59 14,19 14,19 14,39 14,02 14,07 13,90 14,16
Mass of wet soil + can (gr) 36,25 32,08 32,66 31,02 40,01 40,98 44,96 36,44 28,67 29,11
Mass of dry soil + can (gr) 31,42 28,07 28,35 27,29 34,50 35,05 37,72 31,25 26,52 26,69
Mass of dry soil (gr) 17,37 14,21 14,76 13,10 20,31 20,66 23,70 17,18 12,62 12,53
Mass of moisture (gr) 4,83 4,01 4,31 3,73 5,51 5,93 7,24 5,19 2,15 2,42
Water content, w (%) 27,81 28,22 29,20 28,47 27,13 28,70 30,55 30,21 17,04 19,31
28,01 28,84 27,92 30,38 18,18

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 28,79 %
80
Plastic Limit, PL = 18,18 %
Non Cohesive Plasticity Index, PI = 10,62
70 %
60 CH Natural Water Content wN = 21,16 %
PLASTIC INDEX

50 Liquid Index LI = 0,28


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,64 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,52 e5 = 74,48 99,31 e5 = e4 - d5
30 0,600 d6 = 0,79 e6 = 73,69 98,25 e6 = e5 - d6
50 0,300 d7 = 1,51 e7 = 72,18 96,24 e7 = e6 - d7
100 0,150 d8 = 6,66 e8 = 65,52 87,36 e8 = e7 - d8
200 0,075 d9 = 8,89 e9 = 56,63 75,51 e9 = e8 - d9
Sd = 18,37

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 23,0 -3,0 27,0 24,0 12,36 0,0126 0,0314 26,0 34,75
5 22,0 -3,0 27,0 23,0 12,52 0,0126 0,0200 25,0 33,42
30 21,0 -3,0 27,0 22,0 12,69 0,0126 0,0082 24,0 32,08
60 20,0 -3,0 27,0 21,0 12,85 0,0126 0,0059 23,0 30,74
250 16,0 -3,0 27,0 17,0 13,51 0,0126 0,0029 19,0 25,40
1440 13,0 -3,0 27,0 14,0 14,00 0,0126 0,0012 16,0 21,39

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,64

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0055 0,0550 275,00 2,750

Finer #200 = 75,51 %


Gravel = 0,00 %
Sand = 24,49 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,46 gr s3 = 100,00 kN/m 2
W= 122,98 gr s3 = 200,00 kN/m2 W= 123,17 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 5,00 0,10 9,63 2,38 0,247 7 6,00 0,10 9,63 2,86 0,297 7 7,50 0,10 9,63 3,57 0,371
Height of Sample = 7,00 cm 14 12,80 0,20 9,64 6,10 0,632 14 13,20 0,20 9,64 6,29 0,652 14 15,00 0,20 9,64 7,14 0,741
Volume of Sampel = 67,35 cm3 21 13,50 0,30 9,65 6,43 0,666 21 19,20 0,30 9,65 9,14 0,948 21 20,00 0,30 9,65 9,53 0,987
Speed = 0,70 mm/menit 28 16,20 0,40 9,66 7,72 0,799 28 21,60 0,40 9,66 10,29 1,065 28 25,00 0,40 9,66 11,91 1,233
Kalibrasi = 0,476 kg/div 35 20,25 0,50 9,67 9,65 0,997 35 26,40 0,50 9,67 12,57 1,300 35 30,00 0,50 9,67 14,29 1,478
70 21,60 1,00 9,72 10,29 1,059 70 33,60 1,00 9,72 16,00 1,647 70 37,50 1,00 9,72 17,86 1,838
105 24,30 1,50 9,77 11,57 1,185 105 33,60 1,50 9,77 16,00 1,638 105 42,50 1,50 9,77 20,24 2,072
140 25,70 2,00 9,82 12,24 1,247 140 33,60 2,00 9,82 16,00 1,630 140 45,00 2,00 9,82 21,43 2,183
175 27,00 2,50 9,87 12,86 1,303 175 34,80 2,50 9,87 16,58 1,680 175 47,50 2,50 9,87 22,62 2,293
210 27,50 3,00 9,92 13,10 1,321 210 36,00 3,00 9,92 17,15 1,729 210 50,00 3,00 9,92 23,82 2,401
280 28,60 4,00 10,02 13,62 1,359 280 37,20 4,00 10,02 17,72 1,768 280 55,00 4,00 10,02 26,20 2,614
350 29,70 5,00 10,13 14,15 1,397 350 37,80 5,00 10,13 18,00 1,778 350 56,20 5,00 10,13 26,77 2,643
420 31,00 6,00 10,24 14,77 1,443 420 38,40 6,00 10,24 18,29 1,787 420 57,50 6,00 10,24 27,39 2,676
490 31,70 7,00 10,35 15,10 1,459 490 39,00 7,00 10,35 18,58 1,796 490 58,75 7,00 10,35 27,98 2,705
560 31,30 8,00 10,46 14,91 1,426 560 39,60 8,00 10,46 18,86 1,804 560 60,00 8,00 10,46 28,58 2,733
630 31,00 9,00 10,57 14,77 1,397 630 42,00 9,00 10,57 20,00 1,892 630 61,75 9,00 10,57 29,41 2,782
700 30,70 10,00 10,69 14,62 1,368 700 44,40 10,00 10,69 21,15 1,978 700 62,50 10,00 10,69 29,77 2,785
840 840 45,60 12,00 10,93 21,72 1,987 840 63,00 12,00 10,93 30,01 2,745
980 980 45,00 14,00 11,19 21,43 1,916 980 63,75 14,00 11,19 30,36 2,714
1120 1120 44,60 16,00 11,45 21,24 1,855 1120 63,50 16,00 11,45 30,25 2,641
1260 1260 44,40 18,00 11,73 21,15 1,802 1260 63,00 18,00 11,73 30,01 2,557
1400 1400 1400 62,50 20,00 12,03 29,77 2,475

PT. SOILTAMA INDDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8,50 - 9,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

3,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,5 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,46 122,98 123,17
3
Density, gr/cm 1,80 1,83 1,83
2,0 INITIAL
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 21,16 21,16 21,16


3
Dry Density, gr/cm 1,49 1,51 1,51
Weight, gr
AFTER Density, gr/cm
3
1,5 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
1,0
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 18,00 20,00
2
(s1-s3)f kg/cm 1,46 1,99 2,78
FAILURE 2
CONDITIONS uf, kg/cm
0,5 2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 1,96 2,99 4,78
2
SHEAR STRENGTH c: 0,455 kg/cm
PARAMETERS j: 14,85 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

3,0

2,5

2,0
Shear Stress, kg/cm2

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 20.535
SPECIFIC GRAVITY (G) 2.620 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.430
LIQUID LIMIT (LL%) 28.790 DRY WEIGHT Wd (gr) 68.893 DEGREE OF INITIAL SAT. So % 54.212
PLASTIC LIMIT (PL%) 18.180 SUBSTANCE HEIGHT Hs (cm) 1.327
GRADATION

PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute 2
cm / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.4313 1.9000


1 0.50 0.50 0.0055 0.0055 0.0041 0.4272 1.8945 0.9486 1.0 0.01272 0.2895 0.0058 0.000074
2 1.00 0.50 0.0100 0.0045 0.0034 0.4238 1.8900 0.9461 9.0 0.00141 0.2375 0.0048 0.000007
3 2.00 1.00 0.0240 0.0140 0.0106 0.4133 1.8760 0.9415 9.0 0.00139 0.7407 0.0074 0.000010
4 4.00 2.00 0.0613 0.0373 0.0281 0.3852 1.8388 0.9287 9.0 0.00135 1.9856 0.0099 0.000013
5 8.00 4.00 0.1190 0.0578 0.0435 0.3417 1.7810 0.9049 10.2 0.00113 3.1407 0.0079 0.000009
6 2.00 0.1028 -0.0163 -0.0122 0.3539 1.7973 0.8946
7 0.25 0.0883 -0.0145 -0.0109 0.3648 1.8118 0.9023

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 8.50 - 9.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ration (e)


0.6

0.5

e0
Void Ratio, e

0.4

0.3

0.2
eb

0.1
0.1 1 sc' 10 100 sb 1000
Pressure, s kg/cm2

Relationship Beetwen Cv dan Stress s


0.01400
0.01200
Cv (cm/second2)

0.01000
0.00800
0.00600
0.00400
0.00200
0.00000
0.1 1 10
Stress, s (kg/cm2)

po = 0.222 kg/cm2
pc = 1.800 kg/cm2
Cr = 0.027
Cc = 0.127
eo = 0.431
ec = 0.407
2
Cv avg = 0.003600 cm /sec
K avg = 0.000023 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,57 13,89 gram
2 Mass of wet soil + can M2 149,97 159,98 gram
3 Mass of dry soil + can M3 121,60 131,91 gram
4 Mass of moisture = M2 - M3 28,37 28,07 gram
5 Mass of dry soil = M3 - M1 108,03 118,02 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,26 23,78 %
7 Average water content, (w) 25,02 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,98 31,26 gram
2 Mass of dry soil + piknometer M2 52,37 51,62 gram
3 Mass of dry soil + water + piknometer M3 94,92 94,62 gram
4 Mass of water + piknometer M4 82,12 82,04 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,39 20,36
7 B = M3 - M4 12,80 12,58
8 C=A-B 7,59 7,78
9 Specific Gravity, Gs = A / C 2,69 2,62
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,65

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,65

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 30 27 18 16
Mass of can (gr) 13,91 14,00 11,69 13,76 14,02 14,21 14,02 14,57 14,08 13,24
Mass of wet soil + can (gr) 36,70 36,70 31,26 34,59 37,81 36,70 35,52 35,64 30,03 28,37
Mass of dry soil + can (gr) 32,93 32,96 28,08 31,11 33,68 32,90 31,43 31,66 27,62 26,20
Mass of dry soil (gr) 19,02 18,96 16,39 17,35 19,66 18,69 17,41 17,09 13,54 12,96
Mass of moisture (gr) 3,77 3,74 3,18 3,48 4,13 3,80 4,09 3,98 2,41 2,17
Water content, w (%) 19,82 19,73 19,40 20,06 21,01 20,33 23,49 23,29 17,80 16,74
19,77 19,73 20,67 23,39 17,27

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 20,28 %
80
Plastic Limit, PL = 17,27 %
Non Cohesive Plasticity Index, PI = 3,00
70 %
60 CH Natural Water Content wN = 25,02 %
PLASTIC INDEX

50 Liquid Index LI = 2,58


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,65 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 10,92 e8 = 64,08 85,44 e8 = e7 - d8
200 0,075 d9 = 13,55 e9 = 50,53 67,37 e9 = e8 - d9
Sd = 24,47

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 18,0 -3,0 27,0 19,0 13,18 0,0126 0,0323 21,0 27,99
5 18,0 -3,0 27,0 19,0 13,18 0,0126 0,0204 21,0 27,99
30 17,0 -3,0 27,0 18,0 13,34 0,0126 0,0084 20,0 26,66
60 16,0 -3,0 27,0 17,0 13,51 0,0126 0,0060 19,0 25,32
250 14,0 -3,0 27,0 15,0 13,84 0,0126 0,0030 17,0 22,66
1440 10,0 -3,0 27,0 11,0 14,49 0,0126 0,0013 13,0 17,33

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,65

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,025 0,0650 162,50 24,038

Finer #200 = 67,37 %


Gravel = 0,00 %
Sand = 32,63 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,67 gr s3 = 100,00 kN/m 2
W= 122,99 gr s3 = 200,00 kN/m2 W= 123,28 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 7,40 0,10 9,63 3,52 0,366 7 5,80 0,10 9,63 2,76 0,287 7 7,50 0,10 9,63 3,57 0,371
Height of Sample = 7,00 cm 14 11,60 0,20 9,64 5,53 0,573 14 8,70 0,20 9,64 4,14 0,430 14 12,00 0,20 9,64 5,72 0,593
Volume of Sampel = 67,35 cm3 21 13,20 0,30 9,65 6,29 0,652 21 11,60 0,30 9,65 5,53 0,573 21 18,00 0,30 9,65 8,57 0,888
Speed = 0,70 mm/menit 28 14,00 0,40 9,66 6,67 0,690 28 16,00 0,40 9,66 7,62 0,789 28 21,00 0,40 9,66 10,00 1,035
Kalibrasi = 0,476 kg/div 35 14,80 0,50 9,67 7,05 0,729 35 17,40 0,50 9,67 8,29 0,857 35 24,00 0,50 9,67 11,43 1,182
70 16,50 1,00 9,72 7,86 0,809 70 21,75 1,00 9,72 10,36 1,066 70 28,50 1,00 9,72 13,57 1,397
105 17,30 1,50 9,77 8,24 0,844 105 24,60 1,50 9,77 11,72 1,200 105 33,00 1,50 9,77 15,72 1,609
140 19,80 2,00 9,82 9,43 0,961 140 26,70 2,00 9,82 12,72 1,295 140 36,00 2,00 9,82 17,15 1,747
175 21,50 2,50 9,87 10,24 1,038 175 28,20 2,50 9,87 13,43 1,361 175 39,00 2,50 9,87 18,58 1,882
210 23,00 3,00 9,92 10,95 1,104 210 30,40 3,00 9,92 14,48 1,460 210 45,00 3,00 9,92 21,43 2,161
280 26,40 4,00 10,02 12,57 1,255 280 33,60 4,00 10,02 16,00 1,597 280 48,00 4,00 10,02 22,86 2,281
350 28,00 5,00 10,13 13,34 1,317 350 34,80 5,00 10,13 16,58 1,637 350 51,00 5,00 10,13 24,29 2,399
420 29,70 6,00 10,24 14,15 1,382 420 37,70 6,00 10,24 17,96 1,754 420 54,00 6,00 10,24 25,72 2,513
490 31,30 7,00 10,35 14,91 1,441 490 40,00 7,00 10,35 19,05 1,842 490 57,00 7,00 10,35 27,15 2,624
560 33,00 8,00 10,46 15,72 1,503 560 42,00 8,00 10,46 20,00 1,913 560 59,25 8,00 10,46 28,22 2,699
630 34,60 9,00 10,57 16,48 1,559 630 43,50 9,00 10,57 20,72 1,960 630 61,50 9,00 10,57 29,29 2,771
700 35,50 10,00 10,69 16,91 1,582 700 45,00 10,00 10,69 21,43 2,005 700 63,00 10,00 10,69 30,01 2,807
840 35,00 12,00 10,93 16,67 1,525 840 47,60 12,00 10,93 22,67 2,074 840 66,00 12,00 10,93 31,44 2,875
980 34,60 14,00 11,19 16,48 1,473 980 47,00 14,00 11,19 22,39 2,001 980 65,40 14,00 11,19 31,15 2,784
1120 1120 46,40 16,00 11,45 22,10 1,930 1120 64,80 16,00 11,45 30,86 2,695
1260 1260 1260 64,50 18,00 11,73 30,72 2,618
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11,50 - 12,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

3,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,0 Length, cm 7,00 7,00 7,00
DIMENSION
Area, cm2 9,62 9,62 9,62
Volume, cm3 67,35 67,35 67,35
2,5 Weight, gr 121,67 122,99 123,28
Density, gr/cm3 1,81 1,83 1,83
Deviator Stress (s1 - s3), kg/cm2

INITIAL
Moisture, % 25,02 25,02 25,02

2,0 Dry Density, gr/cm3 1,45 1,46 1,46


Weight, gr
AFTER Density, gr/cm3
CONSOLIDATION Moisture, %
1,5
Dry Density, gr/cm3
Cell pressure, kg/cm2 0,50 1,00 2,00
COMPRESSION
STAGE initial pwp, kg/cm2
1,0 Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 16,00 18,00
(s1-s3)f kg/cm2 1,58 2,07 2,88
FAILURE
0,5 CONDITIONS uf, kg/cm2
s3'f, kg/cm2 0,50 1,00 2,00
s1'f, kg/cm2 2,08 3,07 4,88

0,0 SHEAR STRENGTH c: 0,495 kg/cm2


PARAMETERS j: 15,75 
0 2 4 6 8 10 12 14 16 18 20 22
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2


PT. SOILTAMA INDOKARYA PERSADA
CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boringo No : BGP 1
Depth : 11.50.12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.625 INIT. WATER CONTENT Wo % 22.960
SPECIFIC GRAVITY (G) 2.650 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.570
LIQUID LIMIT (LL%) 20.280 DRY WEIGHT Wd (gr) 62.970 DEGREE OF INITIAL SAT. So % 60.852
PLASTIC LIMIT (PL%) 17.270 SUBSTANCE HEIGHT Hs (cm) 1.210
GRADATION

PRESSURE Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm 2
kg/cm 2
r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% 2
mv (cm /kg) (cm/sec)

0 0.00 0.5700 1.9000


1 0.50 0.50 0.0680 0.0680 0.0562 0.5138 1.8320 0.9330 12.3 0.00100 3.5789 0.0716 0.0000719
2 1.00 0.50 0.0918 0.0238 0.0196 0.4942 1.8083 0.9101 12.3 0.00096 1.2964 0.0259 0.0000248
3 2.00 1.00 0.1320 0.0403 0.0333 0.4609 1.7680 0.8941 16.0 0.00071 2.2259 0.0223 0.0000157
4 4.00 2.00 0.1713 0.0393 0.0324 0.4285 1.7288 0.8742 16.0 0.00068 2.2200 0.0111 0.0000075
5 8.00 4.00 0.2100 0.0388 0.0320 0.3964 1.6900 0.8547 16.0 0.00065 2.2415 0.0056 0.0000036
6 2.00 0.1983 -0.0118 -0.0097 0.4062 1.7018 0.8479
7 0.25 0.1898 -0.0085 -0.0070 0.4132 1.7103 0.8530

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 11.50 - 12.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ration (e)


0.6
e0

0.5
Void Ratio, e

0.4

0.3

eb
0.2

0.1
0.1 s0 1 sc' 10 100 sb 1000
Pressure, s kg/cm2

Relationship Between Cv and Stress s


0.0012
0.0010
Cv (cm/second2)

0.0008
0.0006
0.0004
0.0002
0.0000
0.1 1 10
Stress, s (kg/cm2)

po = 0.208 kg/cm2
pc = 1.200 kg/cm2
Cr = 0.017
Cc = 0.162
eo = 0.570
ec = 0.557
2
CV avg = 0.00079725 cm /sec
K = 0.0000247 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,23 11,08 gram
2 Mass of wet soil + can M2 131,65 126,24 gram
3 Mass of dry soil + can M3 108,20 103,16 gram
4 Mass of moisture = M2 - M3 23,45 23,08 gram
5 Mass of dry soil = M3 - M1 93,97 92,08 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 24,95 25,07 %
7 Average water content, (w) 25,01 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,46 31,52 gram
2 Mass of dry soil + piknometer M2 52,97 51,90 gram
3 Mass of dry soil + water + piknometer M3 95,67 94,27 gram
4 Mass of water + piknometer M4 82,89 81,74 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,51 20,38
7 B = M3 - M4 12,78 12,53
8 C=A-B 7,73 7,85
9 Specific Gravity, Gs = A / C 2,65 2,60
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,62

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,62

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 32 23 18
Mass of can (gr) 14,02 13,69 13,84 11,33 14,61 13,98 14,13 11,36 13,94 13,62
Mass of wet soil + can (gr) 38,80 32,47 31,97 29,44 33,76 32,49 44,10 34,33 28,94 28,62
Mass of dry soil + can (gr) 32,00 27,33 26,67 24,12 27,89 26,76 34,88 27,24 26,18 25,71
Mass of dry soil (gr) 17,98 13,64 12,83 12,79 13,28 12,78 20,75 15,88 12,24 12,09
Mass of moisture (gr) 6,80 5,14 5,30 5,32 5,87 5,73 9,22 7,09 2,76 2,91
Water content, w (%) 37,82 37,68 41,31 41,59 44,20 44,84 44,43 44,65 22,55 24,07
37,75 41,45 44,52 44,54 23,31

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 42,46 %
80
Plastic Limit, PL = 23,31 %
Non Cohesive Plasticity Index, PI = 19,16
70 %
60 CH Natural Water Content wN = 25,01 %
PLASTIC INDEX

50 Liquid Index LI = 0,09


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,62 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,00 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,00 100,00 e5 = e4 - d5
30 0,600 d6 = 0,00 e6 = 75,00 100,00 e6 = e5 - d6
50 0,300 d7 = 0,00 e7 = 75,00 100,00 e7 = e6 - d7
100 0,150 d8 = 1,25 e8 = 73,75 98,33 e8 = e7 - d8
200 0,075 d9 = 6,48 e9 = 67,27 89,69 e9 = e8 - d9
Sd = 7,73

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 31,0 -3,0 27,0 32,0 11,05 0,0127 0,0298 34,0 45,56
5 30,0 -3,0 27,0 31,0 11,21 0,0127 0,0190 33,0 44,22
30 29,0 -3,0 27,0 30,0 11,38 0,0127 0,0078 32,0 42,88
60 28,0 -3,0 27,0 29,0 11,54 0,0127 0,0056 31,0 41,54
250 24,0 -3,0 27,0 25,0 12,20 0,0127 0,0028 27,0 36,18
1440 20,0 -3,0 27,0 21,0 12,85 0,0127 0,0012 23,0 30,82

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.00 - 2.50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,62

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,0012 0,0420 210,00 0,171

Finer #200 = 89,69 %


Gravel = 0,00 %
Sand = 10,31 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 2,50 - 3,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,69 gr s3 = 100,00 kN/m 2
W= 122,87 gr s3 = 180,01 kN/m2 W= 123,01 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
2
Area = 9,62 cm 7 2,00 0,10 9,63 0,95 0,099 7 4,00 0,10 9,63 1,91 0,198 7 5,00 0,10 9,63 2,38 0,247
Height of Sample = 7,00 cm 14 4,00 0,20 9,64 1,91 0,198 14 6,00 0,20 9,64 2,86 0,296 14 9,00 0,20 9,64 4,29 0,445
Volume of Sampel = 67,35 cm3 21 5,10 0,30 9,65 2,43 0,252 21 8,50 0,30 9,65 4,05 0,420 21 10,50 0,30 9,65 5,00 0,518
Speed = 0,70 mm/menit 28 6,80 0,40 9,66 3,24 0,335 28 11,50 0,40 9,66 5,48 0,567 28 13,50 0,40 9,66 6,43 0,666
Kalibrasi = 0,476 kg/div 35 8,50 0,50 9,67 4,05 0,419 35 12,70 0,50 9,67 6,05 0,626 35 15,00 0,50 9,67 7,14 0,739
70 11,90 1,00 9,72 5,67 0,583 70 15,30 1,00 9,72 7,29 0,750 70 18,00 1,00 9,72 8,57 0,882
105 13,60 1,50 9,77 6,48 0,663 105 17,40 1,50 9,77 8,29 0,848 105 21,00 1,50 9,77 10,00 1,024
140 15,30 2,00 9,82 7,29 0,742 140 19,00 2,00 9,82 9,05 0,922 140 22,50 2,00 9,82 10,72 1,092
175 16,00 2,50 9,87 7,62 0,772 175 20,00 2,50 9,87 9,53 0,965 175 25,50 2,50 9,87 12,15 1,231
210 17,00 3,00 9,92 8,10 0,816 210 21,20 3,00 9,92 10,10 1,018 210 27,00 3,00 9,92 12,86 1,297
280 18,30 4,00 10,02 8,72 0,870 280 23,40 4,00 10,02 11,15 1,112 280 30,00 4,00 10,02 14,29 1,426
350 19,00 5,00 10,13 9,05 0,894 350 25,00 5,00 10,13 11,91 1,176 350 31,50 5,00 10,13 15,00 1,481
420 19,50 6,00 10,24 9,29 0,907 420 26,70 6,00 10,24 12,72 1,242 420 33,00 6,00 10,24 15,72 1,536
490 20,00 7,00 10,35 9,53 0,921 490 28,00 7,00 10,35 13,34 1,289 490 33,70 7,00 10,35 16,05 1,552
560 19,50 8,00 10,46 9,29 0,888 560 28,90 8,00 10,46 13,77 1,316 560 34,50 8,00 10,46 16,43 1,571
630 19,40 9,00 10,57 9,24 0,874 630 29,30 9,00 10,57 13,96 1,320 630 35,20 9,00 10,57 16,77 1,586
700 19,20 10,00 10,69 9,14 0,855 700 29,10 10,00 10,69 13,86 1,297 700 36,00 10,00 10,69 17,15 1,604
840 28,80 12,00 10,93 13,72 1,255 840 37,20 12,00 10,93 17,72 1,621
980 28,60 14,00 11,19 13,62 1,218 980 36,70 14,00 11,19 17,48 1,562
1120 1120 36,60 16,00 11,45 17,43 1,522
1260 1260
1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 2,50 - 3,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

1,8
Test conditon : UU
SPECIMEN 1 2 3
1,6 Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
DIMENSION 2
Area, cm 9,62 9,62 9,62
1,4 3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,69 122,87 123,01
1,2 3
Deviator Stress (s1 - s3), kg/cm2

Density, gr/cm 1,81 1,82 1,83


INITIAL
Moisture, % 20,12 20,12 20,12
3
Dry Density, gr/cm 1,50 1,52 1,52
1,0
Weight, gr
AFTER Density, gr/cm
3

0,8 CONSOLIDATION Moisture, %


3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 1,80
0,6 COMPRESSION 2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
0,4 Strain, % 4,10 14,00 16,00
2
(s1-s3)f kg/cm 0,92 1,32 1,62
FAILURE 2
0,2 CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 1,42 2,32 3,62
0,0 SHEAR STRENGTH c: 0,340 kg/cm
2

0 5 10 15 20 PARAMETERS j: 13,46 
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,08 14,02 gram
2 Mass of wet soil + can M2 113,53 126,35 gram
3 Mass of dry soil + can M3 112,77 111,59 gram
4 Mass of moisture = M2 - M3 0,76 14,76 gram
5 Mass of dry soil = M3 - M1 100,69 97,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 0,75 15,13 %
7 Average water content, (w) 7,94 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,69 32,59 gram
2 Mass of dry soil + piknometer M2 49,77 51,10 gram
3 Mass of dry soil + water + piknometer M3 92,78 93,58 gram
4 Mass of water + piknometer M4 81,99 82,54 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,08 18,51
7 B = M3 - M4 10,79 11,04
8 C=A-B 7,29 7,47
9 Specific Gravity, Gs = A / C 2,48 2,48
10 Average specific gravity, Gs 2,48
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,48

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,48

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 28 25 20
Mass of can (gr) 13,97 14,59 14,62 11,39 12,54 12,99 14,27 14,07 14,43 14,29
Mass of wet soil + can (gr) 39,99 37,20 35,47 39,61 36,84 37,84 42,50 40,32 30,94 30,08
Mass of dry soil + can (gr) 32,30 30,67 29,16 30,93 29,49 30,25 32,47 31,00 26,99 26,14
Mass of dry soil (gr) 18,33 16,08 14,54 19,54 16,95 17,26 18,20 16,93 12,56 11,85
Mass of moisture (gr) 7,69 6,53 6,31 8,68 7,35 7,59 10,03 9,32 3,95 3,94
Water content, w (%) 41,95 40,61 43,40 44,42 43,36 43,97 55,11 55,05 31,45 33,25
41,28 43,91 43,67 55,08 32,35

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100 Liquid Limit, LL = 47,23 %
90 Plastic Limit, PL = 32,35 %
80 Non Cohesive Plasticity Index, PI = 14,88 %
70 wN = 7,94
Natural Water Content %
60 CH Liquid Index LI = -1,64
PLASTIC INDEX

50
40
30 OH or MH `
20 CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,30 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,48 Hydrometer correction, a = 1,03
K2 = a/W x 100 = 1,37 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,3 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,30 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,30 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,30 100,00 e4 = e3 - d4
20 0,850 d5 = 1,17 e5 = 74,13 98,45 e5 = e4 - d5
30 0,600 d6 = 1,50 e6 = 72,63 96,45 e6 = e5 - d6
50 0,300 d7 = 1,19 e7 = 71,44 94,87 e7 = e6 - d7
100 0,150 d8 = 1,49 e8 = 69,95 92,90 e8 = e7 - d8
200 0,075 d9 = 0,74 e9 = 69,21 91,91 e9 = e8 - d9
Sd = 6,09

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 42,0 -3,0 27,0 43,0 9,24 0,0132 0,0284 45,0 61,80
5 35,0 -3,0 27,0 36,0 10,39 0,0132 0,0191 38,0 52,19
30 30,0 -3,0 27,0 31,0 11,21 0,0132 0,0081 33,0 45,32
60 26,0 -3,0 27,0 27,0 11,87 0,0132 0,0059 29,0 39,83
250 19,0 -3,0 27,0 20,0 13,02 0,0132 0,0030 22,0 30,22
1440 13,0 -3,0 27,0 14,0 14,00 0,0132 0,0013 16,0 21,97

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17,00 - 17,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,48

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,003 0,0280 93,33 1,071

Finer #200 = 91,91 %


Gravel = 0,00 %
Sand = 8,09 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,52 gr s3 = 100,00 kN/m2 W= 121,60 gr s3 = 200,00 kN/m2 W= 122,07 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 6,00 0,10 9,63 2,86 0,297 7 10,00 0,10 9,63 4,76 0,495 7 12,60 0,10 9,63 6,00 0,623
Height of Sample = 7,00 cm 14 10,00 0,20 9,64 4,76 0,494 14 15,00 0,20 9,64 7,14 0,741 14 25,20 0,20 9,64 12,00 1,245
Volume of Sampel = 67,35 cm3 21 18,00 0,30 9,65 8,57 0,888 21 25,00 0,30 9,65 11,91 1,234 21 31,50 0,30 9,65 15,00 1,555
Speed = 0,70 mm/menit 28 23,00 0,40 9,66 10,95 1,134 28 31,00 0,40 9,66 14,77 1,529 28 44,10 0,40 9,66 21,00 2,174
Kalibrasi = 0,476 kg/div 35 27,00 0,50 9,67 12,86 1,330 35 35,00 0,50 9,67 16,67 1,724 35 48,80 0,50 9,67 23,24 2,404
70 34,00 1,00 9,72 16,19 1,666 70 43,00 1,00 9,72 20,48 2,107 70 54,00 1,00 9,72 25,72 2,647
105 39,00 1,50 9,77 18,58 1,902 105 46,20 1,50 9,77 22,01 2,253 105 55,50 1,50 9,77 26,43 2,706
140 42,80 2,00 9,82 20,39 2,076 140 48,10 2,00 9,82 22,91 2,334 140 57,00 2,00 9,82 27,15 2,765
175 43,70 2,50 9,87 20,81 2,109 175 50,00 2,50 9,87 23,82 2,413 175 57,90 2,50 9,87 27,58 2,795
210 44,90 3,00 9,92 21,39 2,156 210 51,80 3,00 9,92 24,67 2,487 210 58,50 3,00 9,92 27,86 2,809
280 48,30 4,00 10,02 23,01 2,295 280 53,90 4,00 10,02 25,67 2,562 280 60,75 4,00 10,02 28,94 2,887
350 50,60 5,00 10,13 24,10 2,380 350 56,00 5,00 10,13 26,67 2,634 350 63,00 5,00 10,13 30,01 2,963
420 51,75 6,00 10,24 24,65 2,408 420 57,75 6,00 10,24 27,51 2,687 420 65,25 6,00 10,24 31,08 3,036
490 53,40 7,00 10,35 25,43 2,459 490 59,50 7,00 10,35 28,34 2,739 490 68,10 7,00 10,35 32,44 3,135
560 52,90 8,00 10,46 25,20 2,409 560 60,50 8,00 10,46 28,82 2,755 560 69,30 8,00 10,46 33,01 3,156
630 52,00 9,00 10,57 24,77 2,343 630 61,60 9,00 10,57 29,34 2,775 630 70,80 9,00 10,57 33,72 3,190
700 51,50 10,00 10,69 24,53 2,295 700 61,25 10,00 10,69 29,17 2,729 700 72,00 10,00 10,69 34,29 3,208
840 840 60,90 12,00 10,93 29,01 2,653 840 71,40 12,00 10,93 34,01 3,111
980 980 60,20 14,00 11,19 28,67 2,563 980 70,50 14,00 11,19 33,58 3,002
1120 1120 1120 69,90 16,00 11,45 33,29 2,907
1260 1260 1260

1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 15 Agustus 2023
Made by : Tim laboran PT Soiltama

4,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
3,5
DIMENSION
Length, cm 7,00 7,00 7,00
2
Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
3,0
Weight, gr 121,52 121,60 122,07
3
INITIAL Density, gr/cm 1,80 1,81 1,81
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 7,94 7,94 7,94


2,5
Dry Density, gr/cm
3
1,67 1,67 1,68
Weight, gr
AFTER 3
Density, gr/cm
2,0 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
1,5 COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 14,00 10,00
1,0 2
FAILURE
(s1-s3)f kg/cm 2,46 2,78 3,21
2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,5 2
s1'f, kg/cm 2,96 3,78 5,21
SHEAR STRENGTH c: 0,975 kg/cm2
PARAMETERS j: 10,10 
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 32.220
SPECIFIC GRAVITY (G) 2.480 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.518
LIQUID LIMIT (LL%) 47.230 DRY WEIGHT Wd (gr) 62.670 DEGREE OF INITIAL SAT. So % 84%
PLASTIC LIMIT (PL%) 32.350 SUBSTANCE HEIGHT Hs (cm) 1.218

PRESSURE
GRADATION

Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.5178 1.9000


1 1.00 1.00 0.0510 0.0510 0.0419 0.5178 1.8490 0.9373 1.2 0.00862 2.6842 0.0268 0.000231
2 2.00 1.00 0.0898 0.0388 0.0318 0.4860 1.8103 0.9148 3.0 0.00131 2.0957 0.0210 0.000028
3 4.00 2.00 0.1570 0.0673 0.0552 0.4308 1.7430 0.8883 4.0 0.00070 3.7150 0.0186 0.000013
4 8.00 4.00 0.2210 0.0640 0.0525 0.3782 1.6790 0.8555 4.0 0.00065 3.6718 0.0092 0.000006
5 2.00 0.1738 -0.0473 -0.0388 0.4170 1.7263 0.8513
6 0.25 0.1058 -0.0680 -0.0558 0.4730 1.7943 0.8801

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 17.00 - 17.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

e0

eb
s0 sc' sb

2
so = 0.220 kg/cm
2
sc = 1.700 kg/cm
Cr = 0.077
Cc = 0.139
eo = 0.520
ec = 0.450
2
Cv avg = 0.003 cm /sec
K avg = 0.000069 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,26 14,45 gram
2 Mass of wet soil + can M2 114,40 114,81 gram
3 Mass of dry soil + can M3 100,00 100,02 gram
4 Mass of moisture = M2 - M3 14,40 14,79 gram
5 Mass of dry soil = M3 - M1 85,74 85,57 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 16,79 17,28 %
7 Average water content, (w) 17,04 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,18 31,83 gram
2 Mass of dry soil + piknometer M2 50,83 50,00 gram
3 Mass of dry soil + water + piknometer M3 93,85 93,39 gram
4 Mass of water + piknometer M4 82,83 82,13 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,65 18,17
7 B = M3 - M4 11,02 11,26
8 C=A-B 7,63 6,91
9 Specific Gravity, Gs = A / C 2,44 2,63
10 Average specific gravity, Gs 2,54
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,54

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,54

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 24 19
Mass of can (gr) 13,62 13,99 13,79 13,87 12,74 14,21 13,83 13,20 14,06 14,06
Mass of wet soil + can (gr) 31,01 32,33 35,96 36,79 37,03 35,28 34,91 35,86 29,48 29,69
Mass of dry soil + can (gr) 25,82 26,87 29,11 29,65 29,40 28,73 28,45 28,91 25,78 25,69
Mass of dry soil (gr) 12,20 12,88 15,32 15,78 16,66 14,52 14,62 15,71 11,72 11,63
Mass of moisture (gr) 5,19 5,46 6,85 7,14 7,63 6,55 6,46 6,95 3,70 4,00
Water content, w (%) 42,54 42,39 44,71 45,25 45,80 45,11 44,19 44,24 31,57 34,39
42,47 44,98 45,45 44,21 32,98

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 44,33 %
80
Plastic Limit, PL = 32,98 %
Non Cohesive Plasticity Index, PI = 11,35
70 %
60 CH Natural Water Content wN = 17,04 %
PLASTIC INDEX

50 Liquid Index LI = -1,40


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,19 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,54 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,19 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,19 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,19 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,19 100,00 e4 = e3 - d4
20 0,850 d5 = 0,03 e5 = 75,16 99,96 e5 = e4 - d5
30 0,600 d6 = 0,03 e6 = 75,13 99,92 e6 = e5 - d6
50 0,300 d7 = 0,17 e7 = 74,96 99,69 e7 = e6 - d7
100 0,150 d8 = 1,99 e8 = 72,97 97,05 e8 = e7 - d8
200 0,075 d9 = 3,07 e9 = 69,90 92,96 e9 = e8 - d9
Sd = 5,29

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 56,0 -3,0 27,0 57,0 6,95 0,0130 0,0243 59,0 80,24
5 52,0 -3,0 27,0 53,0 7,60 0,0130 0,0160 55,0 74,80
30 40,0 -3,0 27,0 41,0 9,57 0,0130 0,0074 43,0 58,48
60 35,0 -3,0 27,0 36,0 10,39 0,0130 0,0054 38,0 51,68
250 26,0 -3,0 27,0 27,0 11,87 0,0130 0,0028 29,0 39,44
1440 15,0 -3,0 27,0 16,0 13,67 0,0130 0,0013 18,0 24,48

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22,00 - 22,50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,54

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,002 0,0080 26,67 1,667

Finer #200 = 92,96 %


Gravel = 0,00 %
Sand = 7,04 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,49 gr s3 = 100,00 kN/m2 W= 122,60 gr s3 = 200,00 kN/m2 W= 123,07 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
2
Area = 9,62 cm 7 10,00 0,10 9,63 4,76 0,495 7 12,00 0,10 9,63 5,72 0,593 7 20,00 0,10 9,63 9,53 0,989

Height of Sample = 7,00 cm 14 15,00 0,20 9,64 7,14 0,741 14 18,00 0,20 9,64 8,57 0,889 14 43,20 0,20 9,64 20,58 2,134

Volume of Sampel = 67,35 cm3 21 20,00 0,30 9,65 9,53 0,987 21 27,00 0,30 9,65 12,86 1,333 21 57,60 0,30 9,65 27,43 2,843

Speed = 0,70 mm/menit 28 25,00 0,40 9,66 11,91 1,233 28 36,00 0,40 9,66 17,15 1,775 28 64,00 0,40 9,66 30,48 3,156

Kalibrasi = 0,476 kg/div 35 30,00 0,50 9,67 14,29 1,478 35 45,00 0,50 9,67 21,43 2,217 35 70,00 0,50 9,67 33,34 3,448

70 48,00 1,00 9,72 22,86 2,353 70 58,00 1,00 9,72 27,63 2,843 70 78,00 1,00 9,72 37,15 3,823

105 55,00 1,50 9,77 26,20 2,682 105 66,00 1,50 9,77 31,44 3,218 105 83,00 1,50 9,77 39,53 4,047

140 58,00 2,00 9,82 27,63 2,814 140 70,00 2,00 9,82 33,34 3,396 140 88,00 2,00 9,82 41,91 4,269

175 62,00 2,50 9,87 29,53 2,993 175 75,00 2,50 9,87 35,72 3,620 175 93,00 2,50 9,87 44,30 4,489

210 65,00 3,00 9,92 30,96 3,121 210 80,00 3,00 9,92 38,10 3,842 210 97,00 3,00 9,92 46,20 4,658

280 70,00 4,00 10,02 33,34 3,327 280 87,00 4,00 10,02 41,44 4,135 280 105,00 4,00 10,02 50,01 4,990

350 75,00 5,00 10,13 35,72 3,527 350 92,00 5,00 10,13 43,82 4,327 350 110,00 5,00 10,13 52,39 5,173

420 80,00 6,00 10,24 38,10 3,723 420 96,60 6,00 10,24 46,01 4,495 420 115,00 6,00 10,24 54,77 5,352

490 83,00 7,00 10,35 39,53 3,821 490 100,00 7,00 10,35 47,63 4,604 490 119,00 7,00 10,35 56,68 5,479

560 85,00 8,00 10,46 40,49 3,871 560 102,00 8,00 10,46 48,58 4,646 560 122,00 8,00 10,46 58,11 5,557

630 84,00 9,00 10,57 40,01 3,784 630 101,00 9,00 10,57 48,11 4,550 630 123,00 9,00 10,57 58,58 5,541

700 83,00 10,00 10,69 39,53 3,698 700 100,00 10,00 10,69 47,63 4,456 700 122,80 10,00 10,69 58,49 5,471

840 12,00 10,93 0,00 0,000 840 98,00 12,00 10,93 46,68 4,269 840 122,60 12,00 10,93 58,39 5,341

980 14,00 11,19 0,00 0,000 980 14,00 11,19 0,00 0,000 980 122,40 14,00 11,19 58,30 5,211

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 2
Depth : 22.0 - 22.5
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

6,0
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
5,0 DIMENSION 2
Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,49 122,60 123,07
3
INITIAL Density, gr/cm 1,80 1,82 1,83
4,0
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 17,04 17,04 17,04


3
Dry Density, gr/cm 1,54 1,56 1,56
Weight, gr
AFTER 3
Density, gr/cm
3,0 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
2,0
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 12,00 14,00
2
FAILURE
(s1-s3)f kg/cm 3,87 4,65 5,56
2
CONDITIONS uf, kg/cm
1,0 2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 4,37 5,65 7,56
SHEAR STRENGTH c: 1,255 kg/cm2
PARAMETERS j: 18,85 
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3

4,0

3,5

3,0
Shear Stress, kg/cm2

2,5

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,63 14,04 gram
2 Mass of wet soil + can M2 144,91 147,67 gram
3 Mass of dry soil + can M3 120,04 122,30 gram
4 Mass of moisture = M2 - M3 24,87 25,37 gram
5 Mass of dry soil = M3 - M1 106,41 108,26 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 23,37 23,43 %
7 Average water content, (w) 23,40 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,30 30,58 gram
2 Mass of dry soil + piknometer M2 51,46 51,00 gram
3 Mass of dry soil + water + piknometer M3 94,15 93,30 gram
4 Mass of water + piknometer M4 81,31 81,01 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,16 20,42
7 B = M3 - M4 12,84 12,29
8 C=A-B 7,32 8,13
9 Specific Gravity, Gs = A / C 2,75 2,51
10 Average specific gravity, Gs 2,63
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,63

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,63

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 31 24 20
Mass of can (gr) 14,18 13,88 14,18 14,07 14,26 13,67 14,01 14,51 12,76 11,13
Mass of wet soil + can (gr) 34,74 35,41 32,10 37,07 36,59 32,01 35,61 33,92 27,84 26,22
Mass of dry soil + can (gr) 30,30 30,85 28,15 32,03 31,43 27,85 30,50 29,17 25,04 23,49
Mass of dry soil (gr) 16,12 16,97 13,97 17,96 17,17 14,18 16,49 14,66 12,28 12,36
Mass of moisture (gr) 4,44 4,56 3,95 5,04 5,16 4,16 5,11 4,75 2,80 2,73
Water content, w (%) 27,54 26,87 28,27 28,06 30,05 29,34 30,99 32,40 22,80 22,09
27,21 28,17 29,69 31,69 22,44

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 29,67 %
80
Plastic Limit, PL = 22,44 %
Non Cohesive Plasticity Index, PI = 7,22
70 %
60 CH Natural Water Content wN = 23,40 %
PLASTIC INDEX

50 Liquid Index LI = 0,13


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,63 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,77 e3 = 74,23 98,97 e3 = e2 - d3
8 2,360 d4 = 3,84 e4 = 70,39 93,85 e4 = e3 - d4
20 0,850 d5 = 6,41 e5 = 63,98 85,31 e5 = e4 - d5
30 0,600 d6 = 3,34 e6 = 60,64 80,85 e6 = e5 - d6
50 0,300 d7 = 3,20 e7 = 57,44 76,59 e7 = e6 - d7
100 0,150 d8 = 3,43 e8 = 54,01 72,01 e8 = e7 - d8
200 0,075 d9 = 2,33 e9 = 51,68 68,91 e9 = e8 - d9
Sd = 23,32

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 28,0 -3,0 27,0 29,0 11,54 0,0127 0,0304 31,0 41,47
5 27,0 -3,0 27,0 28,0 11,70 0,0127 0,0194 30,0 40,14
30 25,0 -3,0 27,0 26,0 12,03 0,0127 0,0080 28,0 37,46
60 23,0 -3,0 27,0 24,0 12,36 0,0127 0,0057 26,0 34,79
250 16,5 -3,0 27,0 17,5 13,43 0,0127 0,0029 19,5 26,09
1440 11,0 -3,0 27,0 12,0 14,33 0,0127 0,0013 14,0 18,73

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,63

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,004 0,0550 137,50 0,727

Finer #200 = 68,91 %


Gravel = 1,03 %
Sand = 30,07 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,94 gr s3 = 100,00 kN/m2 W= 122,80 gr s3 = 200,00 kN/m2 W= 123,01 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000

Area = 9,62 cm2 7 5,70 0,10 9,63 2,71 0,282 7 3,00 0,10 9,63 1,43 0,148 7 6,90 0,10 9,63 3,29 0,341

Height of Sample = 7,00 cm 14 8,80 0,20 9,64 4,19 0,435 14 6,00 0,20 9,64 2,86 0,296 14 11,50 0,20 9,64 5,48 0,568

Volume of Sampel = 67,35 cm3 21 11,90 0,30 9,65 5,67 0,587 21 10,00 0,30 9,65 4,76 0,494 21 16,10 0,30 9,65 7,67 0,795

Speed = 0,70 mm/menit 28 12,70 0,40 9,66 6,05 0,626 28 12,00 0,40 9,66 5,72 0,592 28 20,70 0,40 9,66 9,86 1,021

Kalibrasi = 0,476 kg/div 35 13,60 0,50 9,67 6,48 0,670 35 14,00 0,50 9,67 6,67 0,690 35 23,00 0,50 9,67 10,95 1,133

70 15,60 1,00 9,72 7,43 0,765 70 18,00 1,00 9,72 8,57 0,882 70 27,00 1,00 9,72 12,86 1,323

105 17,60 1,50 9,77 8,38 0,858 105 20,00 1,50 9,77 9,53 0,975 105 31,00 1,50 9,77 14,77 1,512

140 19,20 2,00 9,82 9,14 0,931 140 22,00 2,00 9,82 10,48 1,067 140 34,50 2,00 9,82 16,43 1,674

175 20,50 2,50 9,87 9,76 0,989 175 24,00 2,50 9,87 11,43 1,158 175 39,10 2,50 9,87 18,62 1,887

210 22,00 3,00 9,92 10,48 1,056 210 26,00 3,00 9,92 12,38 1,249 210 41,40 3,00 9,92 19,72 1,988

280 24,75 4,00 10,02 11,79 1,176 280 30,00 4,00 10,02 14,29 1,426 280 46,00 4,00 10,02 21,91 2,186

350 26,40 5,00 10,13 12,57 1,242 350 32,00 5,00 10,13 15,24 1,505 350 48,30 5,00 10,13 23,01 2,272

420 28,00 6,00 10,24 13,34 1,303 420 33,00 6,00 10,24 15,72 1,536 420 49,50 6,00 10,24 23,58 2,303

490 28,60 7,00 10,35 13,62 1,317 490 34,00 7,00 10,35 16,19 1,565 490 50,00 7,00 10,35 23,82 2,302

560 29,00 8,00 10,46 13,81 1,321 560 35,40 8,00 10,46 16,86 1,612 560 50,60 8,00 10,46 24,10 2,305

630 29,70 9,00 10,57 14,15 1,338 630 36,40 9,00 10,57 17,34 1,640 630 51,50 9,00 10,57 24,53 2,320

700 29,50 10,00 10,69 14,05 1,314 700 37,50 10,00 10,69 17,86 1,671 700 52,20 10,00 10,69 24,86 2,326

840 29,20 12,00 10,93 13,91 1,272 840 38,00 12,00 10,93 18,10 1,655 840 52,70 12,00 10,93 25,10 2,296

980 29,00 14,00 11,19 13,81 1,235 980 37,60 14,00 11,19 17,91 1,601 980 52,90 14,00 11,19 25,20 2,252

1120 1120 37,20 16,00 11,45 17,72 1,547 1120 52,40 16,00 11,45 24,96 2,179

1260 1260 37,00 18,00 11,73 17,62 1,502 1260 52,00 18,00 11,73 24,77 2,111

1400 1400 1400 51,75 20,00 12,03 24,65 2,050

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

2,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
2,0 DIMENSION
Area, cm
2
9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 121,94 122,80 123,01
Deviator Stress (s1 - s3), kg/cm2

INITIAL Density, gr/cm


3
1,81 1,82 1,83
1,5 Moisture, % 23,40 23,40 23,40
Dry Density, gr/cm
3
1,47 1,48 1,48
Weight, gr
AFTER 3
Density, gr/cm
CONSOLIDATION Moisture, %
1,0
3
Dry Density, gr/cm
2
COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
0,5
Strain, % 14,00 18,00 20,00
2
FAILURE
(s1-s3)f kg/cm 1,34 1,67 2,33
2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,0 s1'f, kg/cm
2
1,84 2,67 4,33
0 5 10 15 20 25 SHEAR STRENGTH c: 0,475 kg/cm2
Strain, % PARAMETERS j: 14,50 
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2
PT. SOILTAMA INDOKARYA PERSADA
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,62 13,08 gram
2 Mass of wet soil + can M2 114,81 115,44 gram
3 Mass of dry soil + can M3 104,10 104,25 gram
4 Mass of moisture = M2 - M3 10,71 11,19 gram
5 Mass of dry soil = M3 - M1 90,48 91,17 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,84 12,27 %
7 Average water content, (w) 12,06 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,50 33,35 gram
2 Mass of dry soil + piknometer M2 50,57 51,77 gram
3 Mass of dry soil + water + piknometer M3 94,09 95,17 gram
4 Mass of water + piknometer M4 82,12 83,60 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,07 18,42
7 B = M3 - M4 11,97 11,57
8 C=A-B 7,10 6,85
9 Specific Gravity, Gs = A / C 2,68 2,69
10 Average specific gravity, Gs 2,69
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,69

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,69

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 26 23 15
Mass of can (gr) 14,05 11,50 14,54 12,42 14,55 14,17 12,75 11,68 14,07 14,06
Mass of wet soil + can (gr) 42,72 32,74 39,45 34,97 41,06 37,94 44,56 38,70 32,54 30,98
Mass of dry soil + can (gr) 37,91 29,35 34,77 30,77 36,17 33,62 38,55 33,55 29,87 28,55
Mass of dry soil (gr) 23,86 17,85 20,23 18,35 21,62 19,45 25,80 21,87 15,80 14,49
Mass of moisture (gr) 4,81 3,39 4,68 4,20 4,89 4,32 6,01 5,15 2,67 2,43
Water content, w (%) 20,16 18,99 23,13 22,89 22,62 22,21 23,29 23,55 16,90 16,77
19,58 23,01 22,41 23,42 16,83

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 21,85 %
80
Plastic Limit, PL = 16,83 %
Non Cohesive Plasticity Index, PI = 5,02
70 %
60 CH Natural Water Content wN = 12,06 %
PLASTIC INDEX

50 Liquid Index LI = -0,95


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,45 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,69 Hydrometer correction, a = 0,99
K2 = a/W x 100 = 1,32 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,45 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,45 100,00 e2 = e1 - d2
4 4,750 d3 = 9,35 e3 = 66,10 87,61 e3 = e2 - d3
8 2,360 d4 = 11,78 e4 = 54,32 71,99 e4 = e3 - d4
20 0,850 d5 = 10,89 e5 = 43,43 57,56 e5 = e4 - d5
30 0,600 d6 = 3,47 e6 = 39,96 52,96 e6 = e5 - d6
50 0,300 d7 = 3,54 e7 = 36,42 48,27 e7 = e6 - d7
100 0,150 d8 = 5,13 e8 = 31,29 41,47 e8 = e7 - d8
200 0,075 d9 = 2,87 e9 = 28,42 37,67 e9 = e8 - d9
Sd = 47,03

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 23,0 -3,0 27,0 24,0 12,36 0,0125 0,0310 26,0 34,21
5 22,0 -3,0 27,0 23,0 12,52 0,0125 0,0197 25,0 32,89
30 20,0 -3,0 27,0 21,0 12,85 0,0125 0,0082 23,0 30,26
60 17,0 -3,0 27,0 18,0 13,34 0,0125 0,0059 20,0 26,31
250 13,0 -3,0 27,0 14,0 14,00 0,0125 0,0029 16,0 21,05
1440 10,0 -3,0 27,0 11,0 14,49 0,0125 0,0012 13,0 17,10

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7,50 - 8,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,69

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,008 1,0000 2500,00 0,160

Finer #200 = 37,67 %


Gravel = 12,39 %
Sand = 49,94 %
Soil Description = SM - SC (Silty Sand - Clayey Sand)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7.50 - 8.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 120,52 gr s3 = 100,00 kN/m2 W= 121,25 gr s3 = 200,00 kN/m2 W= 122,43 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 11,20 0,10 9,63 5,33 0,554 7 12,00 0,10 9,63 5,72 0,593 7 13,50 0,10 9,63 6,43 0,668
Height of Sample = 7,00 cm 14 14,00 0,20 9,64 6,67 0,692 14 24,00 0,20 9,64 11,43 1,186 14 27,00 0,20 9,64 12,86 1,334
Volume of Sampel = 67,35 cm3 21 22,40 0,30 9,65 10,67 1,106 21 30,00 0,30 9,65 14,29 1,481 21 45,00 0,30 9,65 21,43 2,221
Speed = 0,70 mm/menit 28 28,00 0,40 9,66 13,34 1,381 28 42,00 0,40 9,66 20,00 2,071 28 54,00 0,40 9,66 25,72 2,663
Kalibrasi = 0,476 kg/div 35 33,60 0,50 9,67 16,00 1,655 35 48,00 0,50 9,67 22,86 2,364 35 63,00 0,50 9,67 30,01 3,103
70 42,00 1,00 9,72 20,00 2,058 70 51,00 1,00 9,72 24,29 2,500 70 67,50 1,00 9,72 32,15 3,308
105 44,80 1,50 9,77 21,34 2,185 105 58,50 1,50 9,77 27,86 2,853 105 72,00 1,50 9,77 34,29 3,511
140 50,40 2,00 9,82 24,01 2,445 140 60,00 2,00 9,82 28,58 2,911 140 74,25 2,00 9,82 35,37 3,602
175 53,70 2,50 9,87 25,58 2,592 175 63,00 2,50 9,87 30,01 3,041 175 75,60 2,50 9,87 36,01 3,649
210 56,00 3,00 9,92 26,67 2,689 210 66,00 3,00 9,92 31,44 3,169 210 76,50 3,00 9,92 36,44 3,674
280 58,20 4,00 10,02 27,72 2,766 280 67,20 4,00 10,02 32,01 3,194 280 78,75 4,00 10,02 37,51 3,743
350 60,50 5,00 10,13 28,82 2,845 350 68,40 5,00 10,13 32,58 3,217 350 79,20 5,00 10,13 37,72 3,725
420 58,20 6,00 10,24 27,72 2,708 420 69,00 6,00 10,24 32,86 3,211 420 80,10 6,00 10,24 38,15 3,727
490 57,80 7,00 10,35 27,53 2,661 490 69,60 7,00 10,35 33,15 3,204 490 83,25 7,00 10,35 39,65 3,833
560 57,50 8,00 10,46 27,39 2,619 560 72,00 8,00 10,46 34,29 3,279 560 84,60 8,00 10,46 40,29 3,853
630 630 70,80 9,00 10,57 33,72 3,190 630 85,50 9,00 10,57 40,72 3,852
700 700 70,20 10,00 10,69 33,44 3,128 700 84,60 10,00 10,69 40,29 3,769
840 840 69,00 12,00 10,93 32,86 3,006 840 83,70 12,00 10,93 39,87 3,646
980 980 980 82,80 14,00 11,19 39,44 3,525
1120 1120 1120
1260 1260 1260
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 7.50 - 8.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

4,5
Test conditon : UU
SPECIMEN 1 2 3
4,0 Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
Area, cm 9,62 9,62 9,62
3,5 Volume, cm
3
67,35 67,35 67,35
Weight, gr 120,52 121,25 122,43
3
INITIAL Density, gr/cm 1,79 1,80 1,82
3,0
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 12,06 12,06 12,06


Dry Density, gr/cm
3
1,60 1,61 1,62
2,5 Weight, gr
AFTER 3
Density, gr/cm
CONSOLIDATION Moisture, %
2,0 Dry Density, gr/cm
3

2
COMPRESSION
Cell pressure, kg/cm 0,50 1,00 2,00
2
STAGE initial pwp, kg/cm
1,5
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 8,00 12,00 14,00
2
1,0 FAILURE
(s1-s3)f kg/cm 2,85 3,28 3,85
2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,5 s1'f, kg/cm
2
3,35 4,28 5,85
SHEAR STRENGTH c: 1,075 kg/cm2
PARAMETERS j: 11,45 
0,0
0 5 10 15
Strain, %
s3.1 s3.2 s3.3

4,0

3,5

3,0
Shear Stress, kg/cm2

2,5

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,15 14,02 gram
2 Mass of wet soil + can M2 112,07 114,10 gram
3 Mass of dry soil + can M3 102,18 104,82 gram
4 Mass of moisture = M2 - M3 9,89 9,28 gram
5 Mass of dry soil = M3 - M1 91,03 90,80 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 10,86 10,22 %
7 Average water content, (w) 10,54 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,81 31,25 gram
2 Mass of dry soil + piknometer M2 50,88 49,67 gram
3 Mass of dry soil + water + piknometer M3 94,00 93,66 gram
4 Mass of water + piknometer M4 82,87 82,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,07 18,42
7 B = M3 - M4 11,13 11,41
8 C=A-B 6,94 7,01
9 Specific Gravity, Gs = A / C 2,60 2,63
10 Average specific gravity, Gs 2,62
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,62

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,62

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 26 22 16
Mass of can (gr) 14,15 13,94 14,29 11,45 14,04 14,05 13,92 11,59 14,68 14,63
Mass of wet soil + can (gr) 39,84 37,15 39,26 35,93 38,31 35,83 35,63 35,17 29,96 29,64
Mass of dry soil + can (gr) 34,38 32,82 34,62 31,12 33,32 31,29 30,95 30,05 27,29 27,08
Mass of dry soil (gr) 20,23 18,88 20,33 19,67 19,28 17,24 17,03 18,46 12,61 12,45
Mass of moisture (gr) 5,46 4,33 4,64 4,81 4,99 4,54 4,68 5,12 2,67 2,56
Water content, w (%) 26,99 22,93 22,82 24,45 25,88 26,33 27,48 27,74 21,17 20,56
24,96 23,64 26,11 27,61 20,87

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 25,34 %
80
Plastic Limit, PL = 20,87 %
Non Cohesive Plasticity Index, PI = 4,48
70 %
60 CH Natural Water Content wN = 10,54 %
PLASTIC INDEX

50 Liquid Index LI = -2,31


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,91 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,62 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,91 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,91 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,91 100,00 e3 = e2 - d3
8 2,360 d4 = 0,82 e4 = 75,09 98,92 e4 = e3 - d4
20 0,850 d5 = 3,98 e5 = 71,11 93,68 e5 = e4 - d5
30 0,600 d6 = 3,80 e6 = 67,31 88,67 e6 = e5 - d6
50 0,300 d7 = 5,90 e7 = 61,41 80,90 e7 = e6 - d7
100 0,150 d8 = 12,61 e8 = 48,80 64,29 e8 = e7 - d8
200 0,075 d9 = 11,50 e9 = 37,30 49,14 e9 = e8 - d9
Sd = 38,61

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 27,0 -5,0 27,0 28,0 11,70 0,0127 0,0308 32,0 42,44
5 25,0 -5,0 27,0 26,0 12,03 0,0127 0,0197 30,0 39,79
30 19,0 -5,0 27,0 20,0 13,02 0,0127 0,0084 24,0 31,83
60 16,0 -5,0 27,0 17,0 13,51 0,0127 0,0060 21,0 27,85
250 10,5 -5,0 27,0 11,5 14,41 0,0127 0,0031 15,5 20,56
1440 6,5 -5,0 27,0 7,5 15,07 0,0127 0,0013 11,5 15,25

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.50 - 16.00
Date : 17 Agustus 2013
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,62

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,007 0,1000 200,00 0,980

Finer #200 = 49,14 %


Gravel = 0,00 %
Sand = 50,86 %
Soil Description = SM - SC (Silty Sand - Clayey Sand)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.5 - 16
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 147.68
1
2 Height of Speciment, L0 (cm) 7.41 Volume of Speciment, V (cm )3
67.28

3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 2.20

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 8.00 0.945 3.81 9.166 0.416
140 0.14 12.50 1.889 5.95 9.254 0.643
210 0.21 15.50 2.834 7.38 9.344 0.790
280 0.28 18.50 3.779 8.81 9.436 0.934
350 0.35 22.00 4.723 10.48 9.529 1.100
420 0.42 24.50 5.668 11.67 9.625 1.212
490 0.49 27.00 6.613 12.86 9.722 1.323
560 0.56 29.00 7.557 13.81 9.821 1.406
630 0.63 30.00 8.502 14.29 9.923 1.440
700 0.7 30.50 9.447 14.53 10.026 1.449
770 0.77 31.00 10.391 14.77 10.132 1.457
840 0.84 30.50 11.336 14.53 10.240 1.419
910 0.91 30.00 12.281 14.29 10.350 1.381
980 0.98 30.00 13.225 14.29 10.463 1.366
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 1
Depth : 15.5 - 16
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.6

1.4

1.2

1
Compressive Stress (kg/cm2)

0.8

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Strain (%)

Maximum Axial Load 14.77 kg


Compressive Stress 1.46 kg/cm2
2
Cohesion, c 0.73 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,99 12,78 gram
2 Mass of wet soil + can M2 113,22 114,40 gram
3 Mass of dry soil + can M3 102,27 105,36 gram
4 Mass of moisture = M2 - M3 10,95 9,04 gram
5 Mass of dry soil = M3 - M1 89,28 92,58 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 12,26 9,76 %
7 Average water content, (w) 11,01 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,76 33,36 gram
2 Mass of dry soil + piknometer M2 49,86 51,44 gram
3 Mass of dry soil + water + piknometer M3 92,48 93,74 gram
4 Mass of water + piknometer M4 82,09 83,60 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,10 18,08
7 B = M3 - M4 10,39 10,14
8 C=A-B 7,71 7,94
9 Specific Gravity, Gs = A / C 2,35 2,28
10 Average specific gravity, Gs 2,31
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,31

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,31

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 28 24 21
Mass of can (gr) 12,84 13,13 14,79 12,64 12,37 14,35 11,46 12,38 14,72 11,62
Mass of wet soil + can (gr) 34,53 31,89 31,60 31,20 26,12 33,84 25,36 27,13 29,99 26,94
Mass of dry soil + can (gr) 27,97 26,21 26,49 25,40 21,48 27,30 20,72 22,23 25,85 23,11
Mass of dry soil (gr) 15,13 13,08 11,70 12,76 9,11 12,95 9,26 9,85 11,13 11,49
Mass of moisture (gr) 6,56 5,68 5,11 5,80 4,64 6,54 4,64 4,90 4,14 3,83
Water content, w (%) 43,36 43,43 43,68 45,45 50,93 50,50 50,11 49,75 37,20 33,33
43,39 44,56 50,72 49,93 35,27

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 48,04 %
80
Plastic Limit, PL = 35,27 %
Non Cohesive Plasticity Index, PI = 12,77
70 %
60 CH Natural Water Content wN = 11,01 %
PLASTIC INDEX

50 Liquid Index LI = -1,90


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,17 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,31 Hydrometer correction, a = 1,07
K2 = a/W x 100 = 1,42 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,17 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,17 100,00 e2 = e1 - d2
4 4,750 d3 = 0,44 e3 = 74,73 99,41 e3 = e2 - d3
8 2,360 d4 = 0,08 e4 = 74,65 99,31 e4 = e3 - d4
20 0,850 d5 = 0,36 e5 = 74,29 98,83 e5 = e4 - d5
30 0,600 d6 = 0,35 e6 = 73,94 98,36 e6 = e5 - d6
50 0,300 d7 = 0,69 e7 = 73,25 97,45 e7 = e6 - d7
100 0,150 d8 = 2,23 e8 = 71,02 94,48 e8 = e7 - d8
200 0,075 d9 = 2,08 e9 = 68,94 91,71 e9 = e8 - d9
Sd = 6,23

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 47,0 -5,0 27,0 48,0 8,42 0,0138 0,0284 52,0 73,85
5 45,0 -5,0 27,0 46,0 8,75 0,0138 0,0183 50,0 71,01
30 39,0 -5,0 27,0 40,0 9,74 0,0138 0,0079 44,0 62,49
60 36,0 -5,0 27,0 37,0 10,23 0,0138 0,0057 41,0 58,23
250 29,5 -5,0 27,0 30,5 11,29 0,0138 0,0029 34,5 49,00
1440 20,0 -5,0 27,0 21,0 12,85 0,0138 0,0013 25,0 35,50

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 2.50 - 3.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,31

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,001 0,0080 40,00 0,625

Finer #200 = 91,71 %


Gravel = 0,59 %
Sand = 7,70 %
Soil Description = ML (Silt with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 2.5 - 3.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 120,50 gr s3 = 100,00 kN/m2 W= 120,99 gr s3 = 200,00 kN/m2 W= 122,39 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 2,50 0,10 9,63 1,19 0,124 7 4,00 0,10 9,63 1,91 0,198 7 7,70 0,10 9,63 3,67 0,381
Height of Sample = 7,00 cm 14 8,00 0,20 9,64 3,81 0,395 14 7,00 0,20 9,64 3,33 0,346 14 11,00 0,20 9,64 5,24 0,543
Volume of Sampel = 67,35 cm3 21 10,00 0,30 9,65 4,76 0,494 21 9,00 0,30 9,65 4,29 0,444 21 16,50 0,30 9,65 7,86 0,814
Speed = 0,70 mm/menit 28 12,00 0,40 9,66 5,72 0,592 28 12,00 0,40 9,66 5,72 0,592 28 18,70 0,40 9,66 8,91 0,922
Kalibrasi = 0,476 kg/div 35 12,50 0,50 9,67 5,95 0,616 35 14,00 0,50 9,67 6,67 0,690 35 22,00 0,50 9,67 10,48 1,084
70 16,20 1,00 9,72 7,72 0,794 70 18,00 1,00 9,72 8,57 0,882 70 24,20 1,00 9,72 11,53 1,186
105 17,50 1,50 9,77 8,34 0,853 105 20,00 1,50 9,77 9,53 0,975 105 26,40 1,50 9,77 12,57 1,287
140 17,50 2,00 9,82 8,34 0,849 140 22,00 2,00 9,82 10,48 1,067 140 27,50 2,00 9,82 13,10 1,334
175 18,00 2,50 9,87 8,57 0,869 175 22,50 2,50 9,87 10,72 1,086 175 29,70 2,50 9,87 14,15 1,434
210 19,40 3,00 9,92 9,24 0,932 210 23,00 3,00 9,92 10,95 1,104 210 30,80 3,00 9,92 14,67 1,479
280 20,00 4,00 10,02 9,53 0,951 280 25,00 4,00 10,02 11,91 1,188 280 33,00 4,00 10,02 15,72 1,568
350 20,60 5,00 10,13 9,81 0,969 350 26,50 5,00 10,13 12,62 1,246 350 34,00 5,00 10,13 16,19 1,599
420 20,00 6,00 10,24 9,53 0,931 420 27,00 6,00 10,24 12,86 1,256 420 37,40 6,00 10,24 17,81 1,740
490 19,75 7,00 10,35 9,41 0,909 490 27,50 7,00 10,35 13,10 1,266 490 39,60 7,00 10,35 18,86 1,823
560 19,50 8,00 10,46 9,29 0,888 560 29,00 8,00 10,46 13,81 1,321 560 40,00 8,00 10,46 19,05 1,822
630 630 30,00 9,00 10,57 14,29 1,352 630 40,70 9,00 10,57 19,39 1,834
700 700 29,50 10,00 10,69 14,05 1,314 700 41,80 10,00 10,69 19,91 1,862
840 840 29,00 12,00 10,93 13,81 1,263 840 44,00 12,00 10,93 20,96 1,917
980 980 28,50 14,00 11,19 13,57 1,213 980 43,75 14,00 11,19 20,84 1,863
1120 1120 1120 43,00 16,00 11,45 20,48 1,788

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 2.5 - 3.0
Date : 17 Agustus 2023
Made by : Tim laboran PT Soiltama

2,5
Test conditon : UU
SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
2,0 Area, cm 9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 120,50 120,99 122,39
3
INITIAL Density, gr/cm 1,79 1,80 1,82
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 11,01 11,01 11,01


1,5 Dry Density, gr/cm
3
1,61 1,62 1,64
Weight, gr
AFTER 3
Density, gr/cm
CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
1,0 Cell pressure, kg/cm
2
0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 8,00 14,00 12,00
2
FAILURE
(s1-s3)f kg/cm 0,97 1,35 1,92
0,5 2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
2
s1'f, kg/cm 1,47 2,35 3,92
SHEAR STRENGTH c: 0,365 kg/cm2
PARAMETERS j: 10,85 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0
Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 11,45 14,02 gram
2 Mass of wet soil + can M2 135,41 137,51 gram
3 Mass of dry soil + can M3 112,44 112,43 gram
4 Mass of moisture = M2 - M3 22,97 25,08 gram
5 Mass of dry soil = M3 - M1 100,99 98,41 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 22,74 25,49 %
7 Average water content, (w) 24,12 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,50 34,63 gram
2 Mass of dry soil + piknometer M2 51,48 54,87 gram
3 Mass of dry soil + water + piknometer M3 94,62 95,08 gram
4 Mass of water + piknometer M4 82,12 82,53 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 19,98 20,24
7 B = M3 - M4 12,50 12,55
8 C=A-B 7,48 7,69
9 Specific Gravity, Gs = A / C 2,67 2,63
10 Average specific gravity, Gs 2,65
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,65

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,65

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 27 23 15
Mass of can (gr) 13,94 13,46 14,06 13,87 14,32 12,69 11,67 14,41 14,56 13,65
Mass of wet soil + can (gr) 32,35 35,05 39,99 33,16 37,78 30,44 35,83 32,35 29,56 28,65
Mass of dry soil + can (gr) 27,63 29,47 32,71 27,87 31,22 25,51 28,81 27,15 27,39 25,65
Mass of dry soil (gr) 13,69 16,01 18,65 14,00 16,90 12,82 17,14 12,74 12,83 12,00
Mass of moisture (gr) 4,72 5,58 7,28 5,29 6,56 4,93 7,02 5,20 2,17 3,00
Water content, w (%) 34,48 34,85 39,03 37,79 38,82 38,46 40,96 40,82 16,91 25,00
34,67 38,41 38,64 40,89 20,96

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 37,84 %
80
Plastic Limit, PL = 20,96 %
Non Cohesive Plasticity Index, PI = 16,88
70 %
60 CH Natural Water Content wN = 24,12 %
PLASTIC INDEX

50 Liquid Index LI = 0,19


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,65 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 6,94 e3 = 68,06 90,75 e3 = e2 - d3
8 2,360 d4 = 3,46 e4 = 64,60 86,13 e4 = e3 - d4
20 0,850 d5 = 9,29 e5 = 55,31 73,75 e5 = e4 - d5
30 0,600 d6 = 2,33 e6 = 52,98 70,64 e6 = e5 - d6
50 0,300 d7 = 2,24 e7 = 50,74 67,65 e7 = e6 - d7
100 0,150 d8 = 4,14 e8 = 46,60 62,13 e8 = e7 - d8
200 0,075 d9 = 2,87 e9 = 43,73 58,31 e9 = e8 - d9
Sd = 31,27

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 21,0 -3,0 27,0 22,0 12,69 0,0126 0,0317 24,0 31,99
5 21,0 -3,0 27,0 22,0 12,69 0,0126 0,0201 24,0 31,99
30 20,0 -3,0 27,0 21,0 12,85 0,0126 0,0082 23,0 30,66
60 18,0 -3,0 27,0 19,0 13,18 0,0126 0,0059 21,0 27,99
250 14,0 -3,0 27,0 15,0 13,84 0,0126 0,0030 17,0 22,66
1440 12,5 -3,0 27,0 13,5 14,08 0,0126 0,0012 15,5 20,66

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,65

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,007 0,0090 30,00 18,148

Finer #200 = 58,31 %


Gravel = 9,25 %
Sand = 32,44 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m 2
W= 121,42 gr s3 = 100,00 kN/m 2
W= 122,25 gr s3 = 200,00 kN/m2 W= 122,76 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 4,80 0,10 9,63 2,29 0,237 7 7,50 0,10 9,63 3,57 0,371 7 9,00 0,10 9,63 4,29 0,445
Height of Sample = 7,00 cm 14 12,00 0,20 9,64 5,72 0,593 14 12,50 0,20 9,64 5,95 0,618 14 15,80 0,20 9,64 7,53 0,781
Volume of Sampel = 67,35 cm3 21 12,60 0,30 9,65 6,00 0,622 21 16,25 0,30 9,65 7,74 0,802 21 20,20 0,30 9,65 9,62 0,997
Speed = 0,70 mm/menit 28 13,80 0,40 9,66 6,57 0,680 28 17,50 0,40 9,66 8,34 0,863 28 21,70 0,40 9,66 10,34 1,070
Kalibrasi = 0,476 kg/div 35 14,40 0,50 9,67 6,86 0,709 35 19,40 0,50 9,67 9,24 0,956 35 22,50 0,50 9,67 10,72 1,108
70 15,60 1,00 9,72 7,43 0,765 70 22,50 1,00 9,72 10,72 1,103 70 30,00 1,00 9,72 14,29 1,470
105 16,80 1,50 9,77 8,00 0,819 105 25,60 1,50 9,77 12,19 1,248 105 37,50 1,50 9,77 17,86 1,829
140 17,40 2,00 9,82 8,29 0,844 140 26,25 2,00 9,82 12,50 1,274 140 40,50 2,00 9,82 19,29 1,965
175 18,00 2,50 9,87 8,57 0,869 175 27,50 2,50 9,87 13,10 1,327 175 41,25 2,50 9,87 19,65 1,991
210 18,70 3,00 9,92 8,91 0,898 210 28,75 3,00 9,92 13,69 1,381 210 42,00 3,00 9,92 20,00 2,017
280 19,70 4,00 10,02 9,38 0,936 280 30,00 4,00 10,02 14,29 1,426 280 43,50 4,00 10,02 20,72 2,067
350 21,20 5,00 10,13 10,10 0,997 350 30,60 5,00 10,13 14,57 1,439 350 44,25 5,00 10,13 21,08 2,081
420 21,60 6,00 10,24 10,29 1,005 420 31,25 6,00 10,24 14,88 1,454 420 45,00 6,00 10,24 21,43 2,094
490 22,20 7,00 10,35 10,57 1,022 490 31,90 7,00 10,35 15,19 1,469 490 45,60 7,00 10,35 21,72 2,099
560 22,50 8,00 10,46 10,72 1,025 560 32,00 8,00 10,46 15,24 1,457 560 46,50 8,00 10,46 22,15 2,118
630 23,40 9,00 10,57 11,15 1,054 630 32,50 9,00 10,57 15,48 1,464 630 47,40 9,00 10,57 22,58 2,135
700 24,00 10,00 10,69 11,43 1,069 700 33,20 10,00 10,69 15,81 1,479 700 47,70 10,00 10,69 22,72 2,125
840 24,60 12,00 10,93 11,72 1,072 840 33,75 12,00 10,93 16,08 1,470 840 48,00 12,00 10,93 22,86 2,091
980 24,60 14,00 11,19 11,72 1,047 980 33,20 14,00 11,19 15,81 1,413 980 47,40 14,00 11,19 22,58 2,018
1120 24,60 16,00 11,45 11,72 1,023 1120 32,75 16,00 11,45 15,60 1,362 1120 46,80 16,00 11,45 22,29 1,946
1260 24,00 18,00 11,73 11,43 0,974 1260 32,50 18,00 11,73 15,48 1,319 1260 46,50 18,00 11,73 22,15 1,888
1400 1400 1400 20,00 12,03 0,00 0,000

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

2,5 Test conditon : UU


SPECIMEN 1 2 3
Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
DIMENSION
2,0 Area, cm
2
9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,42 122,25 122,76
Deviator Stress (s1 - s3), kg/cm2

3
Density, gr/cm 1,80 1,82 1,82
INITIAL
1,5 Moisture, % 24,12 24,12 24,12
3
Dry Density, gr/cm 1,45 1,46 1,47
Weight, gr
AFTER Density, gr/cm
3

CONSOLIDATION Moisture, %
1,0 3
Dry Density, gr/cm
2
Cell pressure, kg/cm 0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
Rate of Strain, %/hour 60,00 60,00 60,00
0,5
Strain, % 16,00 18,00 18,00
2
(s1-s3)f kg/cm 1,07 1,48 2,14
FAILURE 2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,0 s1'f, kg/cm
2
1,57 2,48 4,14
0 10 20 30 SHEAR STRENGTH c: 0,386 kg/cm
2

Strain, % PARAMETERS j: 14,28 


s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,72 13,84 gram
2 Mass of wet soil + can M2 113,57 114,77 gram
3 Mass of dry soil + can M3 93,08 92,15 gram
4 Mass of moisture = M2 - M3 20,49 22,62 gram
5 Mass of dry soil = M3 - M1 80,36 78,31 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 25,50 28,89 %
7 Average water content, (w) 27,19 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,35 32,35 gram
2 Mass of dry soil + piknometer M2 50,72 50,79 gram
3 Mass of dry soil + water + piknometer M3 93,33 93,73 gram
4 Mass of water + piknometer M4 82,25 82,31 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,37 18,44
7 B = M3 - M4 11,08 11,42
8 C=A-B 7,29 7,02
9 Specific Gravity, Gs = A / C 2,52 2,63
10 Average specific gravity, Gs 2,57
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,58

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,57

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 23 19
Mass of can (gr) 13,59 14,05 13,95 13,71 14,02 14,20 11,14 13,00 14,56 11,66
Mass of wet soil + can (gr) 33,04 32,99 33,75 31,25 29,42 28,68 26,80 29,14 29,74 26,79
Mass of dry soil + can (gr) 28,55 28,53 29,30 27,22 25,27 25,18 22,86 25,28 26,91 23,87
Mass of dry soil (gr) 14,96 14,48 15,35 13,51 11,25 10,98 11,72 12,28 12,35 12,21
Mass of moisture (gr) 4,49 4,46 4,45 4,03 4,15 3,50 3,94 3,86 2,83 2,92
Water content, w (%) 30,01 30,80 28,99 29,83 36,89 31,88 33,62 31,43 22,91 23,91
30,41 29,41 34,38 32,53 23,41

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 31,72 %
80
Plastic Limit, PL = 23,41 %
Non Cohesive Plasticity Index, PI = 8,30
70 %
60 CH Natural Water Content wN = 27,19 %
PLASTIC INDEX

50 Liquid Index LI = 0,45


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,11 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,57 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,35 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,11 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,11 100,00 e2 = e1 - d2
4 4,750 d3 = 10,17 e3 = 64,94 86,46 e3 = e2 - d3
8 2,360 d4 = 2,70 e4 = 62,24 82,87 e4 = e3 - d4
20 0,850 d5 = 2,36 e5 = 59,88 79,72 e5 = e4 - d5
30 0,600 d6 = 2,06 e6 = 57,82 76,98 e6 = e5 - d6
50 0,300 d7 = 2,64 e7 = 55,18 73,47 e7 = e6 - d7
100 0,150 d8 = 13,96 e8 = 41,22 54,88 e8 = e7 - d8
200 0,075 d9 = 4,22 e9 = 37,00 49,26 e9 = e8 - d9
Sd = 38,11

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 27,0 -5,0 27,0 28,0 11,70 0,0129 0,0312 32,0 43,26
5 23,5 -5,0 27,0 24,5 12,28 0,0129 0,0202 28,5 38,53
30 20,0 -5,0 27,0 21,0 12,85 0,0129 0,0084 25,0 33,79
60 17,0 -5,0 27,0 18,0 13,34 0,0129 0,0061 22,0 29,74
250 12,0 -5,0 27,0 13,0 14,16 0,0129 0,0031 17,0 22,98
1440 7,0 -5,0 27,0 8,0 14,98 0,0129 0,0013 12,0 16,22

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BGP 1
Depth : 26.50 - 27.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,57

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,001 0,0050 25,00 1,000

Finer #200 = 49,26 %


Gravel = 13,54 %
Sand = 37,20 %
Soil Description = SC (Clayey Sand)

PT, SOILTAMA INDOKARYA PERSADA


DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 26.50 - 27.00
Date : 18 Agustus 2023
Made by : Tim Laboran PT. Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear
Time Horiz. Time Horiz. Time Horiz.
displace. ring Shear stress displace. ring Shear stress displace. ring Shear stress
Dial Dial Dial
∆H dial force, τ ∆H dial force, τ ∆H dial force, τ
sec reading sec reading sec reading
mm reading kg kg/cm2 mm reading kg kg/cm2 mm reading kg kg/cm2
0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000
15 15 0.15 1 0.67 0.022 15 15 0.15 1.25 0.84 0.027 15 15 0.15 0.25 0.17 0.005
30 30 0.30 1 0.67 0.022 30 30 0.30 3 2.01 0.065 30 30 0.30 3.5 2.35 0.075
45 45 0.45 1.25 0.84 0.027 45 45 0.45 4 2.68 0.086 45 45 0.45 5.75 3.86 0.124
60 60 0.60 2.25 1.51 0.048 60 60 0.60 5.75 3.86 0.124 60 60 0.60 7 4.70 0.151
90 90 0.90 6 4.03 0.129 90 90 0.90 7 4.70 0.151 90 90 0.90 9 6.04 0.194
120 120 1.20 7 4.70 0.151 120 120 1.20 9 6.04 0.194 120 120 1.20 9.5 6.37 0.204
150 150 1.50 7.75 5.20 0.167 150 150 1.50 9.5 6.37 0.204 150 150 1.50 9.75 6.54 0.210
180 180 1.80 9 6.04 0.194 180 180 1.80 10 6.71 0.215 180 180 1.80 10 6.71 0.215
210 210 2.10 10 6.71 0.215 210 210 2.10 11 7.38 0.237 210 210 2.10 10 6.71 0.215
240 240 2.40 11 7.38 0.237 240 240 2.40 12.75 8.55 0.274 240 240 2.40 10 6.71 0.215
270 270 2.70 12 8.05 0.258 270 270 2.70 14 9.39 0.301 270 270 2.70 10 6.71 0.215
300 300 3.00 12.5 8.39 0.269 300 300 3.00 15 10.06 0.323 300 300 3.00 10.25 6.88 0.221
330 330 3.30 13 8.72 0.280 330 330 3.30 16.5 11.07 0.355 330 330 3.30 11.5 7.72 0.248
360 360 3.60 13.25 8.89 0.285 360 360 3.60 17.5 11.74 0.377 360 360 3.60 14 9.39 0.301
390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000 390 390 3.90 17.25 11.57 0.371
420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000 420 420 4.20 22.75 15.26 0.490
450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000 450 450 4.50 27.75 18.62 0.597
480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000
510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000
540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000
570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000
600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000
DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 2
Depth : 26.50 - 27.00
Date : 18 Agustus 2023
Made by : Tim laboran PT Soiltama

Dimensions of sample :
Diameter 6.30 cm
2
Area 31.17 cm
Ht. 2.00 cm
3
Volume 62.34 cm
Kalibrasi 0.671 kg/div

Specimen no. 1 2 3
Mass of soil + ring gr 172.30 174.71 174.76
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 106.84 109.41 109.35
Initial water content wN (%) 27.19
Bulk density γb (gr/cm3) 1.71 1.75 1.75
Dry density γd (gr/cm3) 1.35 1.38 1.38
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.29 0.38 0.60

1.00

0.75
Shear stress, τ kg/cm2

0.50

0.25

0.00
0.000 0.500 1.000 1.500 2.000

Normal Stress, σn kg/cm2


Angle of Internal Friction φ = 45.78 o
2
Cohesion c = 0.07 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,35 14,55 gram
2 Mass of wet soil + can M2 136,52 126,41 gram
3 Mass of dry soil + can M3 123,69 117,59 gram
4 Mass of moisture = M2 - M3 12,83 8,82 gram
5 Mass of dry soil = M3 - M1 109,34 103,04 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,73 8,56 %
7 Average water content, (w) 10,15 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,37 30,98 gram
2 Mass of dry soil + piknometer M2 52,56 51,13 gram
3 Mass of dry soil + water + piknometer M3 95,30 93,49 gram
4 Mass of water + piknometer M4 82,51 81,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,19 20,15
7 B = M3 - M4 12,79 12,27
8 C=A-B 7,40 7,88
9 Specific Gravity, Gs = A / C 2,73 2,56
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,64

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 30 27 21 19
Mass of can (gr) 14,07 14,04 13,98 13,90 14,17 14,16 14,25 13,58 13,68 13,51
Mass of wet soil + can (gr) 32,21 33,39 34,18 36,87 33,03 32,21 31,79 34,52 28,68 28,51
Mass of dry soil + can (gr) 28,90 29,99 30,32 32,53 29,15 28,50 28,53 30,69 26,54 26,16
Mass of dry soil (gr) 14,83 15,95 16,34 18,63 14,98 14,34 14,28 17,11 12,86 12,65
Mass of moisture (gr) 3,31 3,40 3,86 4,34 3,88 3,71 3,26 3,83 2,14 2,35
Water content, w (%) 22,32 21,32 23,62 23,30 25,90 25,87 22,83 22,38 16,64 18,58
21,82 23,46 25,89 22,61 17,61

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 23,27 %
80
Plastic Limit, PL = 17,61 %
Non Cohesive Plasticity Index, PI = 5,66
70 %
60 CH Natural Water Content wN = 10,15 %
PLASTIC INDEX

50 Liquid Index LI = -1,32


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,64 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 1,64 e3 = 73,36 97,81 e3 = e2 - d3
8 2,360 d4 = 6,16 e4 = 67,20 89,60 e4 = e3 - d4
20 0,850 d5 = 8,88 e5 = 58,32 77,76 e5 = e4 - d5
30 0,600 d6 = 3,44 e6 = 54,88 73,17 e6 = e5 - d6
50 0,300 d7 = 5,20 e7 = 49,68 66,24 e7 = e6 - d7
100 0,150 d8 = 8,96 e8 = 40,72 54,29 e8 = e7 - d8
200 0,075 d9 = 4,51 e9 = 36,21 48,28 e9 = e8 - d9
Sd = 38,79

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 14,0 -3,0 27,0 15,0 13,84 0,0126 0,0332 17,0 22,70
5 13,0 -3,0 27,0 14,0 14,00 0,0126 0,0211 16,0 21,36
30 12,0 -3,0 27,0 13,0 14,16 0,0126 0,0087 15,0 20,03
60 11,0 -3,0 27,0 12,0 14,33 0,0126 0,0062 14,0 18,69
250 9,0 -3,0 27,0 10,0 14,66 0,0126 0,0031 12,0 16,02
1440 7,5 -3,0 27,0 8,5 14,90 0,0126 0,0013 10,5 14,02

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,64

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,045 0,22 440,00 18,409

Finer #200 = 48,28 %


Gravel = 2,19 %
Sand = 49,53 %
Soil Description = SM - SC (Silty Sand-Clayey Sand)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,6 gr s3 = 100,00 kN/m2 W= 121,95 gr s3 = 200,00 kN/m2 W= 122,03 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000

Area = 9,62 cm2 7 4,00 0,10 9,63 1,91 0,198 7 5,00 0,10 9,63 2,38 0,247 7 10,00 0,10 9,63 4,76 0,495

Height of Sample = 7,00 cm 14 8,50 0,20 9,64 4,05 0,420 14 9,00 0,20 9,64 4,29 0,445 14 15,00 0,20 9,64 7,14 0,741

Volume of Sampel = 67,35 cm3 21 10,00 0,30 9,65 4,76 0,494 21 14,00 0,30 9,65 6,67 0,691 21 20,00 0,30 9,65 9,53 0,987

Speed = 0,70 mm/menit 28 10,50 0,40 9,66 5,00 0,518 28 16,00 0,40 9,66 7,62 0,789 28 25,00 0,40 9,66 11,91 1,233

Kalibrasi = 0,476 kg/div 35 11,50 0,50 9,67 5,48 0,566 35 16,50 0,50 9,67 7,86 0,813 35 30,00 0,50 9,67 14,29 1,478

70 14,00 1,00 9,72 6,67 0,686 70 20,00 1,00 9,72 9,53 0,980 70 32,00 1,00 9,72 15,24 1,568

105 15,00 1,50 9,77 7,14 0,731 105 21,50 1,50 9,77 10,24 1,048 105 33,00 1,50 9,77 15,72 1,609

140 16,25 2,00 9,82 7,74 0,788 140 22,75 2,00 9,82 10,84 1,104 140 33,50 2,00 9,82 15,96 1,625

175 17,00 2,50 9,87 8,10 0,821 175 23,00 2,50 9,87 10,95 1,110 175 34,00 2,50 9,87 16,19 1,641

210 17,50 3,00 9,92 8,34 0,840 210 23,25 3,00 9,92 11,07 1,116 210 34,25 3,00 9,92 16,31 1,645

280 17,75 4,00 10,02 8,45 0,844 280 23,50 4,00 10,02 11,19 1,117 280 34,50 4,00 10,02 16,43 1,640

350 18,00 5,00 10,13 8,57 0,847 350 23,75 5,00 10,13 11,31 1,117 350 35,00 5,00 10,13 16,67 1,646

420 17,80 6,00 10,24 8,48 0,828 420 23,50 6,00 10,24 11,19 1,094 420 35,50 6,00 10,24 16,91 1,652

490 17,50 7,00 10,35 8,34 0,806 490 23,25 7,00 10,35 11,07 1,070 490 35,75 7,00 10,35 17,03 1,646

560 17,30 8,00 10,46 8,24 0,788 560 23,00 8,00 10,46 10,95 1,048 560 36,00 8,00 10,46 17,15 1,640

630 630 22,80 9,00 10,57 10,86 1,027 630 35,75 9,00 10,57 17,03 1,611

700 700 22,75 10,00 10,69 10,84 1,014 700 35,60 10,00 10,69 16,96 1,586

840 840 12,00 10,93 0,00 0,000 840 35,50 12,00 10,93 16,91 1,547

980 980 14,00 11,19 0,00 0,000 980 35,40 14,00 11,19 16,86 1,507

1120 1120 16,00 11,45 0,00 0,000 1120

1260 1260 18,00 11,73 0,00 0,000 1260

1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 3,00 - 3,50
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

1,8
Test conditon : UU
SPECIMEN 1 2 3
1,6 Diameter, cm 3,50 3,50 3,50
Length, cm 7,00 7,00 7,00
DIMENSION
1,4 Area, cm
2
9,62 9,62 9,62
Volume, cm
3
67,35 67,35 67,35
Weight, gr 121,56 121,95 122,03
1,2
Deviator Stress (s1 - s3), kg/cm2

INITIAL Density, gr/cm


3
1,81 1,81 1,81
Moisture, % 10,15 10,15 10,15
1,0 Dry Density, gr/cm
3
1,64 1,64 1,64
Weight, gr
AFTER 3
0,8 Density, gr/cm
CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
0,6
Cell pressure, kg/cm
2
0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
0,4 Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 8,00 10,00 14,00
2
0,2 FAILURE
(s1-s3)f kg/cm 0,85 1,12 1,65
2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
0,0 2
s1'f, kg/cm 1,35 2,12 3,65
0 2 4 6 8 10 12 14
SHEAR STRENGTH c: 0,358 kg/cm2
Strain, % PARAMETERS j: 11,11 
s3.1 s3.2 s3.3

3,0

2,5
Shear Stress, kg/cm2

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0

Principal Stress, kg/cm2

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,39 14,13 gram
2 Mass of wet soil + can M2 126,39 128,79 gram
3 Mass of dry soil + can M3 108,04 108,72 gram
4 Mass of moisture = M2 - M3 18,35 20,07 gram
5 Mass of dry soil = M3 - M1 93,65 94,59 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 19,59 21,22 %
7 Average water content, (w) 20,41 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 30,49 32,63 gram
2 Mass of dry soil + piknometer M2 48,85 50,83 gram
3 Mass of dry soil + water + piknometer M3 92,36 92,99 gram
4 Mass of water + piknometer M4 80,75 82,09 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,36 18,20
7 B = M3 - M4 11,61 10,90
8 C=A-B 6,75 7,30
9 Specific Gravity, Gs = A / C 2,72 2,49
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,61

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 32 24 22
Mass of can (gr) 11,61 11,33 14,04 12,64 13,76 13,66 13,08 14,22 14,51 14,13
Mass of wet soil + can (gr) 53,44 45,51 39,46 37,37 45,48 42,31 41,30 38,70 29,81 29,70
Mass of dry soil + can (gr) 43,82 37,63 33,76 31,71 37,04 34,66 33,89 32,21 27,03 26,70
Mass of dry soil (gr) 32,21 26,30 19,72 19,07 23,28 21,00 20,81 17,99 12,52 12,57
Mass of moisture (gr) 9,62 7,88 5,70 5,66 8,44 7,65 7,41 6,49 2,78 3,00
Water content, w (%) 29,87 29,96 28,90 29,68 36,25 36,43 35,61 36,08 22,20 23,87
29,91 29,29 36,34 35,84 23,04

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 34,43 %
80
Plastic Limit, PL = 23,04 %
Non Cohesive Plasticity Index, PI = 11,40
70 %
60 CH Natural Water Content wN = 20,41 %
PLASTIC INDEX

50 Liquid Index LI = -0,23


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,48 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,61 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,48 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,48 100,00 e2 = e1 - d2
4 4,750 d3 = 6,00 e3 = 69,48 92,05 e3 = e2 - d3
8 2,360 d4 = 4,87 e4 = 64,61 85,60 e4 = e3 - d4
20 0,850 d5 = 6,54 e5 = 58,07 76,93 e5 = e4 - d5
30 0,600 d6 = 3,22 e6 = 54,85 72,67 e6 = e5 - d6
50 0,300 d7 = 3,49 e7 = 51,36 68,04 e7 = e6 - d7
100 0,150 d8 = 4,21 e8 = 47,15 62,47 e8 = e7 - d8
200 0,075 d9 = 3,42 e9 = 43,73 57,94 e9 = e8 - d9
Sd = 31,75

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 35,0 -3,0 27,0 36,0 10,39 0,0128 0,0291 38,0 50,78
5 31,0 -3,0 27,0 32,0 11,05 0,0128 0,0190 34,0 45,44
30 28,0 -3,0 27,0 29,0 11,54 0,0128 0,0079 31,0 41,43
60 25,0 -3,0 27,0 26,0 12,03 0,0128 0,0057 28,0 37,42
250 20,0 -3,0 27,0 21,0 12,85 0,0128 0,0029 23,0 30,74
1440 15,0 -3,0 27,0 16,0 13,67 0,0128 0,0012 18,0 24,05

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17,50 - 18,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,61

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,003 0,1000 333,33 0,300

Finer #200 = 57,94 %


Gravel = 7,95 %
Sand = 34,11 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17.50 -18.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 124.23
1
2 Height of Speciment, L0 (cm) 6.9 Volume of Speciment, V (cm )3
62.65

3 Cross Sectional Area A (cm2) 9.08 Weight Volume of Speciment, gb (gr/cm3) 1.98

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 2.50 1.014 1.19 9.172 0.130
140 0.14 5.50 2.029 2.62 9.267 0.283
210 0.21 8.00 3.043 3.81 9.364 0.407
280 0.28 9.75 4.058 4.64 9.463 0.491
350 0.35 11.75 5.072 5.60 9.564 0.585
420 0.42 13.10 6.087 6.24 9.668 0.645
490 0.49 14.50 7.101 6.91 9.773 0.707
560 0.56 15.25 8.116 7.26 9.881 0.735
630 0.63 16.00 9.130 7.62 9.991 0.763
700 0.7 16.75 10.145 7.98 10.104 0.790
770 0.77 17.00 11.159 8.10 10.220 0.792
840 0.84 17.25 12.174 8.22 10.338 0.795
910 0.91 17.25 13.188 8.22 10.459 0.786
980 0.98 17.25 14.203 8.22 10.582 0.776
1050 1.05 17.75 15.217 8.45 10.709 0.789
1120 1.12 17.25 16.232 8.22 10.838 0.758
1190 1.19 17.25 17.246 8.22 10.971 0.749
1260 1.26 17.00 18.261 8.10 11.108 0.729
1330 1.33 17.00 19.275 8.10 11.247 0.720
1400 1.4 17.00 20.290 8.10 11.390 0.711
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 17.50 -18.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

0.9

0.8

0.7

0.6
Compressive Stress (kg/cm2)

0.5

0.4

0.3

0.2

0.1

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Strain (%)

Maximum Axial Load 8.45 kg


Compressive Stress 0.79 kg/cm2
2
Cohesion, c 0.40 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,54 14,24 gram
2 Mass of wet soil + can M2 114,02 115,03 gram
3 Mass of dry soil + can M3 103,88 106,71 gram
4 Mass of moisture = M2 - M3 10,14 8,32 gram
5 Mass of dry soil = M3 - M1 91,34 92,47 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 11,10 9,00 %
7 Average water content, (w) 10,05 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,71 30,97 gram
2 Mass of dry soil + piknometer M2 50,02 49,04 gram
3 Mass of dry soil + water + piknometer M3 93,17 92,45 gram
4 Mass of water + piknometer M4 81,97 81,22 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,31 18,07
7 B = M3 - M4 11,20 11,23
8 C=A-B 7,11 6,84
9 Specific Gravity, Gs = A / C 2,58 2,64
10 Average specific gravity, Gs 2,61
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,61

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,61

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 34 27 19 17
Mass of can (gr) 14,10 13,76 12,98 11,74 13,72 12,93 12,50 13,67 12,81 11,19
Mass of wet soil + can (gr) 38,05 38,70 35,56 35,91 36,17 36,17 35,35 35,23 28,30 27,15
Mass of dry soil + can (gr) 34,69 35,26 32,32 32,43 32,65 32,55 31,40 31,45 26,27 25,11
Mass of dry soil (gr) 20,59 21,50 19,34 20,69 18,93 19,62 18,90 17,78 13,46 13,92
Mass of moisture (gr) 3,36 3,44 3,24 3,48 3,52 3,62 3,95 3,78 2,03 2,04
Water content, w (%) 16,32 16,00 16,75 16,82 18,59 18,45 20,90 21,26 15,08 14,66
16,16 16,79 18,52 21,08 14,87

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 17,70 %
80
Plastic Limit, PL = 14,87 %
Non Cohesive Plasticity Index, PI = 2,83
70 %
60 CH Natural Water Content wN = 10,05 %
PLASTIC INDEX

50 Liquid Index LI = -1,70


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,61 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,61 Hydrometer correction, a = 1,01
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,61 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,61 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,61 100,00 e3 = e2 - d3
8 2,360 d4 = 1,30 e4 = 74,31 98,28 e4 = e3 - d4
20 0,850 d5 = 1,18 e5 = 73,13 96,72 e5 = e4 - d5
30 0,600 d6 = 2,17 e6 = 70,96 93,85 e6 = e5 - d6
50 0,300 d7 = 5,04 e7 = 65,92 87,18 e7 = e6 - d7
100 0,150 d8 = 27,05 e8 = 38,87 51,41 e8 = e7 - d8
200 0,075 d9 = 8,85 e9 = 30,02 39,70 e9 = e8 - d9
Sd = 45,59

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 24,0 -5,0 27,0 25,0 12,20 0,0127 0,0315 29,0 38,67
5 22,0 -5,0 27,0 23,0 12,52 0,0127 0,0202 27,0 36,01
30 18,0 -5,0 27,0 19,0 13,18 0,0127 0,0084 23,0 30,67
60 16,0 -5,0 27,0 17,0 13,51 0,0127 0,0060 21,0 28,00
250 11,0 -5,0 27,0 12,0 14,33 0,0127 0,0031 16,0 21,34
1440 7,0 -5,0 27,0 8,0 14,98 0,0127 0,0013 12,0 16,00

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja and Power House, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,61

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0005 0,0085 0,1800 360,00 0,803

Finer #200 = 39,70 %


Gravel = 0,00 %
Sand = 60,30 %
Soil Description = SM (Silty Sand)

PT, SOILTAMA INDOKARYA PERSADA


DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 18 Agustus 2023
Made by : Tim Laboran PT. Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear
Time Horiz. Time Horiz. Time Horiz.
displace. ring Shear stress displace. ring Shear stress displace. ring Shear stress
Dial Dial Dial
∆H dial force, τ ∆H dial force, τ ∆H dial force, τ
sec reading sec reading sec reading
mm reading kg kg/cm2 mm reading kg kg/cm
2
mm reading kg kg/cm
2

0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000


15 15 0.15 2.5 1.68 0.054 15 15 0.15 3.75 2.52 0.081 15 15 0.15 4 2.68 0.086
30 30 0.30 2.5 1.68 0.054 30 30 0.30 4.5 3.02 0.097 30 30 0.30 6.5 4.36 0.140
45 45 0.45 4.5 3.02 0.097 45 45 0.45 6.5 4.36 0.140 45 45 0.45 9.5 6.37 0.204
60 60 0.60 4.5 3.02 0.097 60 60 0.60 7 4.70 0.151 60 60 0.60 11 7.38 0.237
90 90 0.90 4.5 3.02 0.097 90 90 0.90 10 6.71 0.215 90 90 0.90 12 8.05 0.258
120 120 1.20 4.75 3.19 0.102 120 120 1.20 11 7.38 0.237 120 120 1.20 13.75 9.22 0.296
150 150 1.50 5 3.35 0.108 150 150 1.50 14.5 9.73 0.312 150 150 1.50 15.5 10.40 0.334
180 180 1.80 5.25 3.52 0.113 180 180 1.80 16.75 11.24 0.360 180 180 1.80 16.75 11.24 0.360
210 210 2.10 5.75 3.86 0.124 210 210 2.10 18.25 12.24 0.393 210 210 2.10 17.75 11.91 0.382
240 240 2.40 6 4.03 0.129 240 240 2.40 19.25 12.91 0.414 240 240 2.40 18.25 12.24 0.393
270 270 2.70 6 4.03 0.129 270 270 2.70 19.75 13.25 0.425 270 270 2.70 19.25 12.91 0.414
300 300 3.00 6.75 4.53 0.145 300 300 3.00 19.75 13.25 0.425 300 300 3.00 20 13.42 0.430
330 330 3.30 7.5 5.03 0.161 330 330 3.30 19 12.75 0.409 330 330 3.30 20.5 13.75 0.441
360 360 3.60 7.75 5.20 0.167 360 360 3.60 18 12.08 0.387 360 360 3.60 21 14.09 0.452
390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000
420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000
450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000
480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000
510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000
540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000
570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000
600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000
DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPH 3
Depth : 21.00 - 21.50
Date : 18 Agustus 2023
Made by : Tim laboran PT Soiltama

Dimensions of sample :
Diameter 6.30 cm
2
Area 31.17 cm
Ht. 2.00 cm
3
Volume 62.34 cm
Kalibrasi 0.671 kg/div

Specimen no. 1 2 3
Mass of soil + ring gr 190.71 208.09 212.12
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 125.25 142.79 146.71
Initial water content wN (%) 10.05
Bulk density γb (gr/cm3) 2.01 2.29 2.35
Dry density γd (gr/cm3) 1.83 2.08 2.14
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.17 0.43 0.45

1.00

0.75
Shear stress, τ kg/cm2

0.50

0.25

0.00
0.000 0.500 1.000 1.500 2.000

Normal Stress, σn kg/cm2


Angle of Internal Friction φ = 41.22 o
2
Cohesion c = 0.15 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,97 14,22 gram
2 Mass of wet soil + can M2 139,96 122,61 gram
3 Mass of dry soil + can M3 113,01 99,96 gram
4 Mass of moisture = M2 - M3 26,95 22,65 gram
5 Mass of dry soil = M3 - M1 99,04 85,74 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 27,21 26,42 %
7 Average water content, (w) 26,81 %
SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,35 34,05 gram
2 Mass of dry soil + piknometer M2 53,72 54,32 gram
3 Mass of dry soil + water + piknometer M3 95,85 96,85 gram
4 Mass of water + piknometer M4 83,21 84,25 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 20,37 20,27
7 B = M3 - M4 12,64 12,60
8 C=A-B 7,73 7,67
9 Specific Gravity, Gs = A / C 2,64 2,64
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 27,5 °C = G = (Gwater at t °C) / (Gwater at 27,5 °C) 2,64

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,64

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 30 20 18
Mass of can (gr) 13,88 13,81 13,10 14,02 13,87 13,71 13,85 13,91 14,14 11,63
Mass of wet soil + can (gr) 31,00 36,83 30,68 38,31 38,25 32,38 40,36 43,85 29,99 28,78
Mass of dry soil + can (gr) 28,33 33,21 28,33 35,05 34,19 29,19 35,86 38,80 27,44 26,35
Mass of dry soil (gr) 14,45 19,40 15,23 21,03 20,32 15,48 22,01 24,89 13,30 14,72
Mass of moisture (gr) 2,67 3,62 2,35 3,26 4,06 3,19 4,50 5,05 2,55 2,43
Water content, w (%) 18,48 18,66 15,43 15,50 19,98 20,61 20,45 20,29 19,17 16,51
18,57 15,47 20,29 20,37 17,84

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 18,63 %
80
Plastic Limit, PL = 17,84 %
Non Cohesive Plasticity Index, PI = 0,79
70 %
60 CH Natural Water Content wN = 26,81 %
PLASTIC INDEX

50 Liquid Index LI = 11,33


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS
GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,00 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,64 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,34 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,00 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,00 100,00 e3 = e2 - d3
8 2,360 d4 = 0,07 e4 = 74,93 99,91 e4 = e3 - d4
20 0,850 d5 = 0,21 e5 = 74,72 99,63 e5 = e4 - d5
30 0,600 d6 = 0,27 e6 = 74,45 99,27 e6 = e5 - d6
50 0,300 d7 = 9,52 e7 = 64,93 86,57 e7 = e6 - d7
100 0,150 d8 = 29,11 e8 = 35,82 47,76 e8 = e7 - d8
200 0,075 d9 = 6,56 e9 = 29,26 39,01 e9 = e8 - d9
Sd = 45,74

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 8,0 -3,0 27,0 9,0 14,82 0,0126 0,0344 11,0 14,70
5 7,0 -3,0 27,0 8,0 14,98 0,0126 0,0219 10,0 13,36
30 7,0 -3,0 27,0 8,0 14,98 0,0126 0,0089 10,0 13,36
60 6,0 -3,0 27,0 7,0 15,15 0,0126 0,0063 9,0 12,03
250 4,0 -3,0 27,0 5,0 15,48 0,0126 0,0031 7,0 9,35
1440 3,0 -3,0 27,0 4,0 15,64 0,0126 0,0013 6,0 8,02
GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3,50 - 4,00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,64

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0033 0,055 0,2000 60,61 4,583

Finer #200 = 39,01 %


Gravel = 0,00 %
Sand = 60,99 %
Soil Description = SM (Pasir berlanau)
DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3.50 - 4.00
Date : 5 Agustus 2023
Made by : Tim Laboran PT. Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear Horiz. Load Horiz. Shear
Time Horiz. Time Horiz. Time Horiz.
displace. ring Shear stress displace. ring Shear stress displace. ring Shear stress
Dial Dial Dial
∆H dial force, τ ∆H dial force, τ ∆H dial force, τ
sec reading sec reading sec reading
mm reading kg kg/cm2 mm reading kg kg/cm
2
mm reading kg kg/cm
2

0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000 0 0 0.00 0 0.00 0.000


15 15 0.15 0 0.00 0.000 15 15 0.15 0.25 0.17 0.005 15 15 0.15 2.3 1.54 0.050
30 30 0.30 0.25 0.17 0.005 30 30 0.30 0.25 0.17 0.005 30 30 0.30 4.05 2.72 0.087
45 45 0.45 0.5 0.34 0.011 45 45 0.45 0.5 0.34 0.011 45 45 0.45 4.3 2.88 0.093
60 60 0.60 0.5 0.34 0.011 60 60 0.60 0.75 0.50 0.016 60 60 0.60 5.3 3.56 0.114
90 90 0.90 1 0.67 0.022 90 90 0.90 1 0.67 0.022 90 90 0.90 7.3 4.90 0.157
120 120 1.20 1.5 1.01 0.032 120 120 1.20 2.25 1.51 0.048 120 120 1.20 8.3 5.57 0.179
150 150 1.50 2.25 1.51 0.048 150 150 1.50 3 2.01 0.065 150 150 1.50 8.8 5.90 0.189
180 180 1.80 3 2.01 0.065 180 180 1.80 4.5 3.02 0.097 180 180 1.80 9.3 6.24 0.200
210 210 2.10 3.25 2.18 0.070 210 210 2.10 5.5 3.69 0.118 210 210 2.10 9.8 6.57 0.211
240 240 2.40 4 2.68 0.086 240 240 2.40 6 4.03 0.129 240 240 2.40 10.05 6.74 0.216
270 270 2.70 4.25 2.85 0.091 270 270 2.70 6.25 4.19 0.135 270 270 2.70 10.05 6.74 0.216
300 300 3.00 4.5 3.02 0.097 300 300 3.00 6.75 4.53 0.145 300 300 3.00 10.55 7.08 0.227
330 330 3.30 4.75 3.19 0.102 330 330 3.30 7 4.70 0.151 330 330 3.30 10.8 7.25 0.232
360 360 3.60 5.25 3.52 0.113 360 360 3.60 7.5 5.03 0.161 360 360 3.60 10.8 7.25 0.232
390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000 390 390 3.90 0.00 0.000
420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000 420 420 4.20 0.00 0.000
450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000 450 450 4.50 0.00 0.000
480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000 480 480 4.80 0.00 0.000
510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000 510 510 5.10 0.00 0.000
540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000 540 540 5.40 0.00 0.000
570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000 570 570 5.70 0.00 0.000
600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000 600 600 6.00 0.00 0.000
DIRECT SHEAR TEST

Project : Geothecnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 3.50 - 4.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Dimensions of sample :
Diameter 6.30 cm
Area 31.17 cm2
Ht. 2.00 cm
Volume 62.34 cm3
Kalibrasi 0.671 kg/div

Specimen no. 1 2 3
Mass of soil + ring gr 201.47 185.31 182.86
Mass of ring gr 65.46 65.30 65.41
Mass of soil gr 136.01 120.01 117.45
Initial water content wN (%) 26.81
3
Bulk density γb (gr/cm ) 2.18 1.92 1.88
3
Dry density γd (gr/cm ) 1.72 1.52 1.49
Normal stress σn (kg/cm2) 0.10 0.21 0.41
Shear stress at failure τ (kg/cm2) 0.11 0.16 0.23

1.00

0.75
Shear stress, τ kg/cm2

0.50

0.25

0.00
0.000 0.500 1.000 1.500 2.000

Normal Stress, σn kg/cm2


Angle of Internal Friction φ = 21.05 o
2
Cohesion c = 0.08 kg/cm
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,74 13,97 gram
2 Mass of wet soil + can M2 117,77 119,03 gram
3 Mass of dry soil + can M3 109,57 104,17 gram
4 Mass of moisture = M2 - M3 8,20 14,86 gram
5 Mass of dry soil = M3 - M1 96,83 90,20 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 8,47 16,47 %
7 Average water content, (w) 12,47 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 33,05 31,27 gram
2 Mass of dry soil + piknometer M2 51,07 49,42 gram
3 Mass of dry soil + water + piknometer M3 94,29 92,53 gram
4 Mass of water + piknometer M4 82,78 81,31 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,02 18,15
7 B = M3 - M4 11,51 11,22
8 C=A-B 6,51 6,93
9 Specific Gravity, Gs = A / C 2,77 2,62
10 Average specific gravity, Gs 2,69
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,70

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,69

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 28 18 15
Mass of can (gr) 13,11 13,23 14,25 11,46 14,27 13,77 14,41 14,26 13,88 14,41
Mass of wet soil + can (gr) 29,88 36,44 35,17 34,97 35,55 33,63 32,25 32,25 29,04 29,41
Mass of dry soil + can (gr) 26,38 31,54 30,59 29,80 30,36 28,80 27,46 27,37 26,42 26,72
Mass of dry soil (gr) 13,27 18,31 16,34 18,34 16,09 15,03 13,05 13,11 12,54 12,31
Mass of moisture (gr) 3,50 4,90 4,58 5,17 5,19 4,83 4,79 4,88 2,62 2,69
Water content, w (%) 26,38 26,76 28,03 28,19 32,26 32,14 36,70 37,22 20,89 21,85
26,57 28,11 32,20 36,96 21,37

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 29,84 %
80
Plastic Limit, PL = 21,37 %
Non Cohesive Plasticity Index, PI = 8,46
70 %
60 CH Natural Water Content wN = 12,47 %
PLASTIC INDEX

50 Liquid Index LI = -1,05


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,83 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,69 Hydrometer correction, a = 0,99
K2 = a/W x 100 = 1,31 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,83 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,83 100,00 e2 = e1 - d2
4 4,750 d3 = 0,80 e3 = 75,03 98,95 e3 = e2 - d3
8 2,360 d4 = 0,24 e4 = 74,79 98,63 e4 = e3 - d4
20 0,850 d5 = 0,34 e5 = 74,45 98,18 e5 = e4 - d5
30 0,600 d6 = 0,10 e6 = 74,35 98,05 e6 = e5 - d6
50 0,300 d7 = 0,29 e7 = 74,06 97,67 e7 = e6 - d7
100 0,150 d8 = 2,99 e8 = 71,07 93,72 e8 = e7 - d8
200 0,075 d9 = 1,07 e9 = 70,00 92,31 e9 = e8 - d9
Sd = 5,83

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 54,0 -5,0 27,0 55,0 7,28 0,0124 0,0237 59,0 77,13
5 47,0 -5,0 27,0 48,0 8,42 0,0124 0,0161 52,0 67,98
30 38,0 -5,0 27,0 39,0 9,90 0,0124 0,0071 43,0 56,21
60 34,5 -5,0 27,0 35,5 10,47 0,0124 0,0052 39,5 51,64
250 27,5 -5,0 27,0 28,5 11,62 0,0124 0,0027 32,5 42,49
1440 20,0 -5,0 27,0 21,0 12,85 0,0124 0,0012 25,0 32,68

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 21.00 - 21.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,69

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,001 0,0100 50,00 0,500

Finer #200 = 92,31 %


Gravel = 1,05 %
Sand = 6,63 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM
Depth : 21.0 - 21.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.42 Wet Weight Speciment, gr 147.27
1
2 Height of Speciment, L0 (cm) 7.57 Volume of Speciment, V (cm 3) 69.54
2 3
3 Cross Sectional Area A (cm ) 9.19 Weight Volume of Speciment, gb (gr/cm ) 2.12

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 4.75 0.925 2.26 9.272 0.244
140 0.14 8.50 1.849 4.05 9.359 0.433
210 0.21 12.50 2.774 5.95 9.448 0.630
280 0.28 17.25 3.699 8.22 9.539 0.861
350 0.35 21.00 4.624 10.00 9.632 1.038
420 0.42 25.50 5.548 12.15 9.726 1.249
490 0.49 29.75 6.473 14.17 9.822 1.443
560 0.56 34.50 7.398 16.43 9.920 1.656
630 0.63 39.00 8.322 18.58 10.020 1.854
700 0.7 43.50 9.247 20.72 10.122 2.047
770 0.77 46.00 10.172 21.91 10.227 2.142
840 0.84 50.00 11.096 23.82 10.333 2.305
910 0.91 52.00 12.021 24.77 10.442 2.372
980 0.98 53.75 12.946 25.60 10.552 2.426
1050 1.05 54.75 13.871 26.08 10.666 2.445
1120 1.12 55.75 14.795 26.55 10.781 2.463
1190 1.19 56.00 15.720 26.67 10.900 2.447
1260 1.26 55.00 16.645 26.20 11.021 2.377
1330 1.33 51.00 17.569 24.29 11.144 2.180
1400 1.4 45.50 18.494 21.67 11.271 1.923
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Agra, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM
Depth : 21.0 - 21.5
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

2.5

2
Compressive Stress (kg/cm2)

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Strain (%)

Maximum Axial Load 26.67 kg


Compressive Stress 2.46 kg/cm2
Cohesion, c 1.23 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,01 14,10 gram
2 Mass of wet soil + can M2 119,56 119,91 gram
3 Mass of dry soil + can M3 109,39 110,51 gram
4 Mass of moisture = M2 - M3 10,17 9,40 gram
5 Mass of dry soil = M3 - M1 95,38 96,41 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 10,66 9,75 %
7 Average water content, (w) 10,21 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 29,21 30,98 gram
2 Mass of dry soil + piknometer M2 47,39 49,02 gram
3 Mass of dry soil + water + piknometer M3 90,45 92,52 gram
4 Mass of water + piknometer M4 79,22 81,85 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,18 18,04
7 B = M3 - M4 11,23 10,67
8 C=A-B 6,95 7,37
9 Specific Gravity, Gs = A / C 2,62 2,45
10 Average specific gravity, Gs 2,53
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,53

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,53

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 33 31 24 15
Mass of can (gr) 13,14 13,86 13,97 13,75 14,14 11,83 13,65 12,80 11,03 12,64
Mass of wet soil + can (gr) 36,90 38,84 34,63 39,03 36,47 39,21 37,28 33,56 28,11 28,04
Mass of dry soil + can (gr) 31,45 33,24 30,00 33,38 31,48 32,92 31,46 28,31 25,10 25,21
Mass of dry soil (gr) 18,31 19,38 16,03 19,63 17,34 21,09 17,81 15,51 14,07 12,57
Mass of moisture (gr) 5,45 5,60 4,63 5,65 4,99 6,29 5,82 5,25 3,01 2,83
Water content, w (%) 29,77 28,90 28,88 28,78 28,78 29,82 32,68 33,85 21,39 22,51
29,33 28,83 29,30 33,26 21,95

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 30,10 %
80
Plastic Limit, PL = 21,95 %
Non Cohesive Plasticity Index, PI = 8,15
70 %
60 CH Natural Water Content wN = 10,21 %
PLASTIC INDEX

50 Liquid Index LI = -1,44


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,54 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,53 Hydrometer correction, a = 1,02
K2 = a/W x 100 = 1,36 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,54 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,54 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,54 100,00 e3 = e2 - d3
10 2,000 d4 = 0,00 e4 = 75,54 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,54 100,00 e5 = e4 - d5
40 0,425 d6 = 0,00 e6 = 75,54 100,00 e6 = e5 - d6
60 0,250 d7 = 0,00 e7 = 75,54 100,00 e7 = e6 - d7
140 0,106 d8 = 1,10 e8 = 74,44 98,54 e8 = e7 - d8
200 0,075 d9 = 2,32 e9 = 72,12 95,47 e9 = e8 - d9
Sd = 3,42

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 45,0 -3,0 27,0 46,0 8,75 0,0130 0,0273 48,0 65,04
5 40,0 -3,0 27,0 41,0 9,57 0,0130 0,0180 43,0 58,27
30 33,0 -3,0 27,0 34,0 10,72 0,0130 0,0078 36,0 48,78
60 29,5 -3,0 27,0 30,5 11,29 0,0130 0,0057 32,5 44,04
250 22,0 -3,0 27,0 23,0 12,52 0,0130 0,0029 25,0 33,88
1440 15,0 -3,0 27,0 16,0 13,67 0,0130 0,0013 18,0 24,39

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,53

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0003 0,0022 0,0200 66,67 0,807

Finer #200 = 95,47 %


Gravel = 0,00 %
Sand = 4,53 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.39 Wet Weight Speciment, gr 130.13
1
2 Height of Speciment, L0 (cm) 7 Volume of Speciment, V (cm 3) 63.18
2 3
3 Cross Sectional Area A (cm ) 9.03 Weight Volume of Speciment, gb (gr/cm ) 2.06

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Sectional Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 10.00 1.000 4.76 9.117 0.522
140 0.14 15.00 2.000 7.14 9.210 0.776
210 0.21 20.00 3.000 9.53 9.305 1.024
280 0.28 25.00 4.000 11.91 9.402 1.266
350 0.35 30.00 5.000 14.29 9.501 1.504
420 0.42 35.00 6.000 16.67 9.602 1.736
490 0.49 40.00 7.000 19.05 9.705 1.963
560 0.56 45.00 8.000 21.43 9.811 2.185
630 0.63 48.00 9.000 22.86 9.919 2.305
700 0.7 50.00 10.000 23.82 10.029 2.375
770 0.77 49.00 11.000 23.34 10.141 2.301
840 0.84 48.00 12.000 22.86 10.257 2.229
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Coal Pad Pertiwi, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM A
Depth : 29.00 - 29.50
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

2.5

2
Compressive Stress (kg/cm2)

1.5

0.5

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)

Maximum Axial Load 23.82 kg


Compressive Stress 2.37 kg/cm2
Cohesion, c 1.19 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 12,51 13,96 gram
2 Mass of wet soil + can M2 114,07 116,86 gram
3 Mass of dry soil + can M3 92,60 96,36 gram
4 Mass of moisture = M2 - M3 21,47 20,50 gram
5 Mass of dry soil = M3 - M1 80,09 82,40 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,81 24,88 %
7 Average water content, (w) 25,84 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 31,52 31,96 gram
2 Mass of dry soil + piknometer M2 49,54 50,00 gram
3 Mass of dry soil + water + piknometer M3 93,31 93,49 gram
4 Mass of water + piknometer M4 81,74 82,12 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,02 18,04
7 B = M3 - M4 11,57 11,37
8 C=A-B 6,45 6,67
9 Specific Gravity, Gs = A / C 2,79 2,70
10 Average specific gravity, Gs 2,75
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,75

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,75

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 27 24 22
Mass of can (gr) 11,46 11,30 13,73 12,90 13,77 11,53 13,69 13,01 12,44 14,59
Mass of wet soil + can (gr) 35,14 33,76 41,05 33,89 32,78 27,40 37,83 33,38 28,35 30,08
Mass of dry soil + can (gr) 28,26 27,29 32,29 27,15 26,78 22,40 30,39 27,07 27,22 26,54
Mass of dry soil (gr) 16,80 15,99 18,56 14,25 13,01 10,87 16,70 14,06 14,78 11,95
Mass of moisture (gr) 6,88 6,47 8,76 6,74 6,00 5,00 7,44 6,31 1,13 3,54
Water content, w (%) 40,95 40,46 47,20 47,30 46,12 46,00 44,55 44,88 7,65 29,62
40,71 47,25 46,06 44,71 18,63

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 45,28 %
80 Plastic Limit, PL = 18,63 %
70
Non Cohesive Plasticity Index, PI = 26,65 %
60 CH Natural Water Content wN = 25,84
PLASTIC INDEX

%
50 Liquid Index LI = 0,27
40
30
20 OH or MH `
CL
10
ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,72 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,75 Hydrometer correction, a = 0,98
K2 = a/W x 100 = 1,29 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = 0,00 e1 = 75,72 100,00 e1 = W
3/8' 9,500 d2 = 0,00 e2 = 75,72 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,72 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,72 100,00 e4 = e3 - d4
20 0,850 d5 = 0,00 e5 = 75,72 100,00 e5 = e4 - d5
30 0,600 d6 = 0,03 e6 = 75,69 99,96 e6 = e5 - d6
50 0,300 d7 = 0,19 e7 = 75,50 99,71 e7 = e6 - d7
100 0,150 d8 = 2,45 e8 = 73,05 96,47 e8 = e7 - d8
200 0,075 d9 = 1,15 e9 = 71,90 94,96 e9 = e8 - d9
Sd = 3,82

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 59,0 -3,0 27,0 60,0 6,46 0,0122 0,0220 62,0 80,26
5 56,0 -3,0 27,0 57,0 6,95 0,0122 0,0144 59,0 76,37
30 54,0 -3,0 27,0 55,0 7,28 0,0122 0,0060 57,0 73,78
60 52,0 -3,0 27,0 53,0 7,60 0,0122 0,0044 55,0 71,19
250 44,5 -3,0 27,0 45,5 8,83 0,0122 0,0023 47,5 61,49
1440 34,0 -3,0 27,0 35,0 10,56 0,0122 0,0010 37,0 47,89

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B-1
Depth : 13,50 - 14,00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,75

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0007 0,00045 0,0020 2,86 0,145

Finer #200 = 94,96 %


Gravel = 0,00 %
Sand = 5,04 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

Sample no. 1 Sample no. 2 Sample no. 3


s3 = 50,00 kN/m2 W= 121,52 gr s3 = 100,00 kN/m2 W= 121,60 gr s3 = 200,00 kN/m2 W= 123,22 gr
DH Dial e A P s1 - s3 DH Dial e A P s1 - s3 DH Dial e A P s1 - s3
mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2 mm reading % cm2 kg kg/cm2
Diametre of Sample = 3,50 cm 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000 0 0,00 0,00 0,00 0,00 0,000
Area = 9,62 cm2 7 16,25 0,10 9,63 7,74 0,804 7 13,60 0,10 9,63 6,48 0,673 7 17,40 0,10 9,63 8,29 0,861
Height of Sample = 7,00 cm 14 22,75 0,20 9,64 10,84 1,124 14 27,20 0,20 9,64 12,96 1,344 14 34,80 0,20 9,64 16,58 1,719
Volume of Sampel = 67,35 cm3 21 26,00 0,30 9,65 12,38 1,283 21 34,00 0,30 9,65 16,19 1,678 21 46,40 0,30 9,65 22,10 2,290
Speed = 0,70 mm/menit 28 29,25 0,40 9,66 13,93 1,442 28 37,40 0,40 9,66 17,81 1,844 28 58,00 0,40 9,66 27,63 2,860
Kalibrasi = 0,476 kg/div 35 32,50 0,50 9,67 15,48 1,601 35 40,80 0,50 9,67 19,43 2,010 35 63,80 0,50 9,67 30,39 3,143
70 39,00 1,00 9,72 18,58 1,911 70 51,00 1,00 9,72 24,29 2,500 70 69,60 1,00 9,72 33,15 3,411
105 45,50 1,50 9,77 21,67 2,219 105 57,10 1,50 9,77 27,20 2,784 105 75,40 1,50 9,77 35,91 3,677
140 48,75 2,00 9,82 23,22 2,365 140 60,00 2,00 9,82 28,58 2,911 140 78,30 2,00 9,82 37,29 3,799
175 52,00 2,50 9,87 24,77 2,510 175 64,00 2,50 9,87 30,48 3,089 175 81,20 2,50 9,87 38,68 3,919
210 54,60 3,00 9,92 26,01 2,622 210 65,30 3,00 9,92 31,10 3,136 210 84,10 3,00 9,92 40,06 4,039
280 60,00 4,00 10,02 28,58 2,852 280 71,40 4,00 10,02 34,01 3,393 280 87,00 4,00 10,02 41,44 4,135
350 65,00 5,00 10,13 30,96 3,057 350 74,80 5,00 10,13 35,63 3,518 350 89,30 5,00 10,13 42,53 4,200
420 68,25 6,00 10,24 32,51 3,176 420 78,20 6,00 10,24 37,25 3,639 420 92,80 6,00 10,24 44,20 4,318
490 70,20 7,00 10,35 33,44 3,232 490 80,20 7,00 10,35 38,20 3,692 490 95,00 7,00 10,35 45,25 4,374
560 68,90 8,00 10,46 32,82 3,138 560 81,60 8,00 10,46 38,87 3,716 560 97,40 8,00 10,46 46,39 4,436
630 67,60 9,00 10,57 32,20 3,045 630 83,00 9,00 10,57 39,53 3,739 630 98,00 9,00 10,57 46,68 4,415
700 66,30 10,00 10,69 31,58 2,954 700 81,60 10,00 10,69 38,87 3,636 700 98,60 10,00 10,69 46,96 4,393
840 840 80,20 12,00 10,93 38,20 3,494 840 99,70 12,00 10,93 47,49 4,343
980 980 79,00 14,00 11,19 37,63 3,363 980 97,40 14,00 11,19 46,39 4,147
1120 1120 1120 97,00 16,00 11,45 46,20 4,034
1260 1260 1260 95,70 18,00 11,73 45,58 3,885
1400 1400 1400

PT. SOILTAMA INDOKARYA PERSADA


TRIAXIAL UU TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 5 Agustus 2023
Made by : Tim laboran PT Soiltama

5,0
Test conditon : UU
SPECIMEN 1 2 3
4,5 Diameter, cm 3,50 3,50 3,50
DIMENSION
Length, cm 7,00 7,00 7,00
2
4,0 Area, cm 9,62 9,62 9,62
3
Volume, cm 67,35 67,35 67,35
Weight, gr 121,52 121,60 123,22
3,5 3
1,80 1,81 1,83
INITIAL Density, gr/cm
Deviator Stress (s1 - s3), kg/cm2

Moisture, % 25,84 25,84 25,84


3
3,0 Dry Density, gr/cm 1,43 1,43 1,45
Weight, gr
AFTER 3
Density, gr/cm
2,5 CONSOLIDATION Moisture, %
3
Dry Density, gr/cm
2,0 Cell pressure, kg/cm
2
0,50 1,00 2,00
COMPRESSION 2
STAGE initial pwp, kg/cm
1,5 Rate of Strain, %/hour 60,00 60,00 60,00
Strain, % 10,00 14,00 18,00
2
FAILURE
(s1-s3)f kg/cm 3,23 3,74 4,44
1,0 2
CONDITIONS uf, kg/cm
2
s3'f, kg/cm 0,50 1,00 2,00
2
0,5 s1'f, kg/cm 3,73 4,74 6,44
SHEAR STRENGTH c: 1,150 kg/cm2
PARAMETERS j: 15,50 
0,0
0 5 10 15 20
Strain, %
s3.1 s3.2 s3.3

4,0

3,5

3,0
Shear Stress, kg/cm2

2,5

2,0

1,5

1,0

0,5

0,0
0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0
Principal Stress, kg/cm2
CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

PROPERTIES SPECIMEN
CLASSIFICATION CROSS SECTIONAL AREA A (cm2) 19.635 INIT. WATER CONTENT Wo % 25.840
SPECIFIC GRAVITY (G) 2.750 HEIGHT OF SPECIMEN Ho (cm) 1.900 INITIAL VOID RATIO eo 0.548
LIQUID LIMIT (LL%) 45.280 DRY WEIGHT Wd (gr) 62.670 DEGREE OF INITIAL SAT. So % 81%
PLASTIC LIMIT (PL%) 18.630 SUBSTANCE HEIGHT Hs (cm) 1.218

PRESSURE
GRADATION

Dial reading at Change of Ht Change in void Void ratio Final Ht. at 1/2 * Average COMPRESSIVE COEFF. OF COEFF. OF
OF LOAD

t90 CV
P DP end of load DH = r - r' ratio e = e' - De end of load of Ht STRAIN VOL. COMP. PERMEABILITY

kg/cm2 kg/cm2 r, cm cm De=(DH/Hs) H = H' -DH d = (H+H')/4 minute cm2 / sec. De% mv (cm2/kg) K (cm/sec)

0 0.00 0.5479 1.9000


1 1.00 1.00 0.0143 0.0143 0.0117 0.5479 1.8858 0.9464 2.0 0.00316 0.7500 0.0075 0.000024
2 2.00 1.00 0.0440 0.0298 0.0244 0.5235 1.8560 0.9354 4.0 0.00077 1.5776 0.0158 0.000012
3 4.00 2.00 0.0923 0.0483 0.0396 0.4839 1.8078 0.9159 4.0 0.00074 2.5997 0.0130 0.000010
4 8.00 4.00 0.1560 0.0638 0.0523 0.4316 1.7440 0.8879 6.0 0.00031 3.5265 0.0088 0.000003
5 2.00 0.1088 -0.0473 -0.0388 0.4704 1.7913 0.8838
6 0.25 0.0400 -0.0688 -0.0564 0.5270 1.8600 0.9128

PT. SOILTAMA INDOKARYA PERSADA


CONSOLIDATION TEST

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 13.50 - 14.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Relationship Between Stress (s) and Void Ratio (e)


0.60

0.55e0

0.50

0.45
Void Ratio, e

0.40

0.35

0.30

0.25
eb
0.20
sb
0.1 s0 1 sc' 10 100 1000
Pressure, s kg/cm2

Relationship Between Cv and Stress s

0.0035
0.0030
Cv (cm/second2)

0.0025
0.0020
0.0015
0.0010
0.0005
0.0000
1 10
Stress, s (kg/cm2)

2
so = 0.220 kg/cm
2
sc = 1.850 kg/cm
Cr = 0.074
Cc = 0.141
eo = 0.550
ec = 0.480
2
Cv avg = 0.001 cm /sec
K avg = 0.000012 cm/sec

PT. SOILTAMA INDOKARYA PERSADA


DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 14,58 11,37 gram
2 Mass of wet soil + can M2 115,28 111,65 gram
3 Mass of dry soil + can M3 94,25 90,08 gram
4 Mass of moisture = M2 - M3 21,03 21,57 gram
5 Mass of dry soil = M3 - M1 79,67 78,71 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 26,40 27,40 %
7 Average water content, (w) 26,90 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 32,60 31,02 gram
2 Mass of dry soil + piknometer M2 50,52 49,05 gram
3 Mass of dry soil + water + piknometer M3 93,23 92,25 gram
4 Mass of water + piknometer M4 81,93 81,24 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 17,92 18,03
7 B = M3 - M4 11,30 11,01
8 C=A-B 6,62 7,02
9 Specific Gravity, Gs = A / C 2,71 2,57
10 Average specific gravity, Gs 2,64
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,64

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,64

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 32 29 21 19
Mass of can (gr) 14,12 12,37 11,39 12,72 14,04 13,93 11,40 14,53 14,02 14,43
Mass of wet soil + can (gr) 30,84 30,36 26,17 32,41 33,53 30,55 27,85 28,38 28,13 28,53
Mass of dry soil + can (gr) 25,45 24,50 21,30 25,83 27,05 25,08 22,47 23,68 25,32 25,71
Mass of dry soil (gr) 11,33 12,13 9,91 13,11 13,01 11,15 11,07 9,15 11,30 11,28
Mass of moisture (gr) 5,39 5,86 4,87 6,58 6,48 5,47 5,38 4,70 2,81 2,82
Water content, w (%) 47,57 48,31 49,14 50,19 49,81 49,06 48,60 51,37 24,87 25,00
47,94 49,67 49,43 49,98 24,93

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 49,22 %
80
Plastic Limit, PL = 24,93 %
Non Cohesive Plasticity Index, PI = 24,29
70 %
60 CH Natural Water Content wN = 26,90 %
PLASTIC INDEX

50 Liquid Index LI = 0,08


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,21 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,64 Hydrometer correction, a = 1,00
K2 = a/W x 100 = 1,33 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,21 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,21 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,21 100,00 e3 = e2 - d3
8 2,360 d4 = 0,00 e4 = 75,21 100,00 e4 = e3 - d4
20 0,850 d5 = 0,07 e5 = 75,14 99,91 e5 = e4 - d5
30 0,600 d6 = 0,04 e6 = 75,10 99,85 e6 = e5 - d6
50 0,300 d7 = 0,27 e7 = 74,83 99,49 e7 = e6 - d7
100 0,150 d8 = 2,43 e8 = 72,40 96,26 e8 = e7 - d8
200 0,075 d9 = 0,62 e9 = 71,78 95,44 e9 = e8 - d9
Sd = 3,43

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 65,0 -5,0 27,0 66,0 5,47 0,0126 0,0209 70,0 93,30
5 64,0 -5,0 27,0 65,0 5,64 0,0126 0,0134 69,0 91,97
30 61,0 -5,0 27,0 62,0 6,13 0,0126 0,0057 66,0 87,97
60 56,5 -5,0 27,0 57,5 6,87 0,0126 0,0043 61,5 81,97
250 45,0 -5,0 27,0 46,0 8,75 0,0126 0,0024 50,0 66,64
1440 32,0 -5,0 27,0 33,0 10,88 0,0126 0,0011 37,0 49,32

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.50 - 18.00
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,64

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0002 0,00045 0,0018 10,00 0,625

Finer #200 = 95,44 %


Gravel = 0,00 %
Sand = 4,56 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.5 - 18
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 123.19
1
2 Height of Speciment, L0 (cm) 7.27 Volume of Speciment, V (cm 3) 66.01
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 1.87

Proving Ring Calibration 0.4763 kg/div

Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)

cm (div) % kg (cm2) (kg/cm2)


0 0 0 0 0 0 0
70 0.07 7.50 0.963 3.57 9.167 0.390
140 0.14 10.50 1.926 5.00 9.257 0.540
210 0.21 12.75 2.889 6.07 9.349 0.650
280 0.28 15.00 3.851 7.14 9.443 0.757
350 0.35 18.00 4.814 8.57 9.538 0.899
420 0.42 19.50 5.777 9.29 9.636 0.964
490 0.49 20.25 6.740 9.65 9.735 0.991
560 0.56 21.00 7.703 10.00 9.837 1.017
630 0.63 20.75 8.666 9.88 9.941 0.994
700 0.7 20.00 9.629 9.53 10.047 0.948
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : Griya Praja, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 17.5 - 18
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

1.2

0.8
Compressive Stress (kg/cm2)

0.6

0.4

0.2

0
0 1 2 3 4 5 6 7 8 9 10 11
Strain (%)

Maximum Axial Load 10.00 kg


Compressive Stress 1.02 kg/cm2
Cohesion, c 0.51 kg/cm2
DETERMINATION OF WATER CONTENT

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Can No, 1 2
1 Mass of can M1 13,00 14,35 gram
2 Mass of wet soil + can M2 113,19 114,74 gram
3 Mass of dry soil + can M3 112,52 96,22 gram
4 Mass of moisture = M2 - M3 0,67 18,52 gram
5 Mass of dry soil = M3 - M1 99,52 81,87 gram
6 Water content, (w) = (M2 - M3) : (M3 - M1) x 100 % 0,67 22,62 %
7 Average water content, (w) 11,65 %

PT, SOILTAMA INDOKARYA PERSADA


SPECIFIC GRAVITY

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Piknometer No, A B
1 Mass of piknometer M1 34,03 31,27 gram
2 Mass of dry soil + piknometer M2 52,06 49,24 gram
3 Mass of dry soil + water + piknometer M3 95,03 92,90 gram
4 Mass of water + piknometer M4 82,40 82,04 gram
5 Temperature t C 27,00 °C
6 A = M2 - M1 18,03 17,97
7 B = M3 - M4 12,63 10,86
8 C=A-B 5,40 7,11
9 Specific Gravity, Gs = A / C 3,34 2,53
10 Average specific gravity, Gs 2,93
11 Gwater at t °C 0,9965
12 G for 20 °C = G x (Gwater at t °C) / (Gwater at 20 °C) 2,94

PT, SOILTAMA INDOKARYA PERSADA


ATTERBERG LIMITS (ASTM D 4318-00 & ASTM D 427-98)

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity, Gs = 2,93

Liquid Limit Determination Plastic Limit Determination


Can no. 1 2 3 4
1 2
No. of blows, N 35 30 23 21
Mass of can (gr) 12,95 12,65 14,13 13,03 14,30 13,86 12,22 13,11 12,99 12,93
Mass of wet soil + can (gr) 31,83 31,77 29,89 31,48 30,69 31,98 31,73 31,07 27,00 27,70
Mass of dry soil + can (gr) 25,90 25,61 24,89 25,64 25,50 26,00 26,00 24,50 24,10 24,71
Mass of dry soil (gr) 12,95 12,96 10,76 12,61 11,20 12,14 13,78 11,39 11,11 11,78
Mass of moisture (gr) 5,93 6,16 5,00 5,84 5,19 5,98 5,73 6,57 2,90 2,99
Water content, w (%) 45,79 47,53 46,47 46,31 46,34 49,26 41,58 57,68 26,10 25,38
46,66 46,39 47,80 49,63 25,74

75

65
Water content, %

55

45

35

25

15

5
1 10 25 100
No. of blows, N

U.S.C. SOIL CLASSIFICATIONS


100
90 Liquid Limit, LL = 47,98 %
80
Plastic Limit, PL = 25,74 %
Non Cohesive Plasticity Index, PI = 22,24
70 %
60 CH Natural Water Content wN = 11,65 %
PLASTIC INDEX

50 Liquid Index LI = -0,63


40
30
OH or MH `
20 CL
10 ML
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

LIQUID LIMITS

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Mass of soil, W = 75,26 gr Hydrometer no. = 152 H


Specific Gravity, Gs = 2,93 Hydrometer correction, a = 0,94
K2 = a/W x 100 = 1,25 Meniscus correction, m = 1,00
Dispersing agent = 1,50 mL Amount =

% finer
Opening Mass retained Mass passing
Sieve No. by mass
(mm) (gr) (gr)
e/W x 100%
3/4' 19,000 d1 = e1 = 75,26 100,00 e1 = W
3/8' 9,500 d2 = e2 = 75,26 100,00 e2 = e1 - d2
4 4,750 d3 = 0,00 e3 = 75,26 100,00 e3 = e2 - d3
8 2,360 d4 = 0,47 e4 = 74,79 99,38 e4 = e3 - d4
20 0,850 d5 = 0,43 e5 = 74,36 98,80 e5 = e4 - d5
30 0,600 d6 = 0,19 e6 = 74,17 98,55 e6 = e5 - d6
50 0,300 d7 = 1,14 e7 = 73,03 97,04 e7 = e6 - d7
100 0,150 d8 = 3,28 e8 = 69,75 92,68 e8 = e7 - d8
200 0,075 d9 = 0,31 e9 = 69,44 92,27 e9 = e8 - d9
Sd = 5,82

Elapsed time R' = D= P=


R1 R2 t L K R = R1 - R2
min. R1 + m K * L /T K2 * R %
2 39,0 -3,0 27,0 40,0 9,74 0,0115 0,0255 42,0 52,65
5 32,0 -3,0 27,0 33,0 10,88 0,0115 0,0170 35,0 43,87
30 25,5 -3,0 27,0 26,5 11,95 0,0115 0,0073 28,5 35,72
60 22,5 -3,0 27,0 23,5 12,44 0,0115 0,0053 25,5 31,96
250 18,0 -3,0 27,0 19,0 13,18 0,0115 0,0027 21,0 26,32
1440 12,0 -3,0 27,0 13,0 14,16 0,0115 0,0011 15,0 18,80

PT, SOILTAMA INDOKARYA PERSADA


GRAIN SIZE ANALYSIS

Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM Busang, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B
Depth : 29.00 - 29.50
Date : 17/08/2023
Made by : Tim laboran PT Soiltama

Specific Gravity = 2,93

A.S.T.M. standard sieve sizes

No.140
No.200
No.60
= Mechanical analysis
3/4 in.

3/8 in.

No.40
No.10

No.20
No.4

= Hydrometer analysis
100

90

80
Percent Finer, %

70

60

50

40

30

20

10

0
100 10 1 0,1 0,01 0,001 0,0001
Grain Diameter, mm

4.76 2.0 0.42 0.075 0.005 0.001


Krikil Pasir Lempung
Kas sedang halus Lanau Lempung Lempung koloidal

D10 D30 D60 Cu = D60/D10 Cc =(D30)2/(D10 x D60)


0,0004 0,0042 0,0300 85,71 1,680

Finer #200 = 92,27 %


Gravel = 0,00 %
Sand = 7,73 %
Soil Description = CL (Clay with Low Plasticity)

PT, SOILTAMA INDOKARYA PERSADA


Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B 29-29.5
Depth : 18.50 - 19.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

No Parameter
1 Diamater of Speciment , D (cm) 3.4 Wet Weight Speciment, gr 125.71
2 Height of Speciment, L0 (cm) 7.2 Volume of Speciment, V (cm )
3
65.37
2 3
3 Cross Sectional Area A (cm ) 9.08 Weight Volume of Speciment, gb (gr/cm ) 1.92
Proving Ring Calibration 0.4763 kg/div
Dial Dial
Corrected Compressive
reading reading Load dial reading Strain, ε Axial Load, (P)
Sectional Area, A' Strength (σ')
(ΔL) (ΔL)
cm (div) % kg (cm2) (kg/cm2)
0 0 0 0 0 0 0
70 0.07 6.00 0.972 2.86 9.168 0.312
140 0.14 13.00 1.944 6.19 9.259 0.669
210 0.21 22.50 2.917 10.72 9.352 1.146
280 0.28 31.25 3.889 14.88 9.447 1.576
350 0.35 36.00 4.861 17.15 9.543 1.797
420 0.42 38.50 5.833 18.34 9.642 1.902
490 0.49 39.50 6.806 18.81 9.742 1.931
560 0.56 40.00 7.778 19.05 9.845 1.935
630 0.63 39.00 8.750 18.58 9.950 1.867
700 0.7 38.00 9.722 18.10 10.057 1.800
Unconfined Compressive Strength
Project : Geotechnical Investigation Coal Pads, Housing, Powerhouse dan Jembatan Pipa Air Bersih
Location : PDAM, Busang Distric, East Kutai Regency, East Kalimantan
Owner : PT. Sembada Wangi Pertiwi (PT. SWP)
Boring No : BPM B 29-29.5
Depth : 18.50 - 19.00
Date : 12 Agustus 2023
Made by : Tim laboran PT Soiltama

Strain Stress Chart

2.5
1.6

1.4

2
1.2

1
Compressive Stress (kg/cm2)

1.5

0.8

1
0.6

0.4
0.5

0.2

0
0 1 12 3 24 5 36 7 48 9 510 116 12 137 14 158 16 17
9 18 19
10 20 21
11
Strain (%)

Maximum Axial Load 19.05 kg


Compressive Stress 1.94 kg/cm2
Cohesion, c 0.97 kg/cm2

You might also like