1 2 3 4 5

GENERAL KEY PLAN:


N

AL
QIB
E

SUPERVISORS SUPERVISORS LINE STAFF LINE STAFF LINE STAFF


CLUSTER-TYPE 02 CLUSTER-TYPE 03 CLUSTER-TYPE 01 CLUSTER-TYPE 01 CLUSTER-TYPE 03

SUPERVISORS SUPERVISORS SUPERVISORS SUPERVISORS SUPERVISORS COMMON F&B SUPERVISORS RECREATIONAL HUB SPORTS SUPERVISORS LINE STAFF
CLUSTER-TYPE 02 CLUSTER-TYPE 01 CLUSTER-TYPE 01 CLUSTER-TYPE 02 CLUSTER-TYPE 01 BUILDING CLUSTER-TYPE 01 AND PLAYGROUND CLUSTER-TYPE 03 CLUSTER-TYPE 02
GYM BUILDING NOTES:
DINING HALL SUPERVISORS LINE STAFF
N 3,113,163.990 CLUSTER-TYPE 01 CLUSTER-TYPE 01 N 3,113,501.230
1. FOR GRAPHICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES REFER TO DWG NO.
E 660,458.109 E 660,846.669 13-253002-4200000151-PCC-ELE-DRG-020001.
2. FOR TYPICAL DETAILS REFER TO DWG NO. 13-253002-4200000151-PCC-ELE-DRG-520001 TO 520004.
3. FOR LV SINGLE LINE DIAGRAM REFER TO DWG NO. 13-253002-4200000151-PCC-ELE-DRG-620011 AND
620012.
4. FOR MEDIUM VOLTAGE SINGLE LINE DIAGRAM REFER TO DWG NO.
13-253002-4200000151-PCC-ELE-DRG-620001.
4. CABLES ARE TO BE INSTALLED DIRECTLY BURIED UNLESS OTHERWISE INDICATED. HOWEVER, CONCRETE
ENCASED DUCT BANKS TO BE PROVIDED AT ALL ROAD CROSSINGS.
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
5. CONTRACTOR SHALL COORDINATE CABLE ROUTES WITH OTHER SERVICES DURING LAYING OF CABLES.
M

MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV

MV
6. INDICATIVE CABLE ROUTING IS SHOWN ON THE LAYOUT. FOR UTILITY DISPOSITION, REFER TO WE

MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
V

MV

MV
MV MV

M
M
MV

V
V
MV
MV

MV
MV
MV
MV
MV

SS-07 2Ø 150mm DRAWINGS.


MV

2Ø 150mm
V

2Ø 150mm

MV
2Ø 150mm

MV
2Ø 150mm

M
HDPE DUCT BANK
MV

V
7. CONTRACTOR TO ENSURE THAT VOLTAGE DROP FROM SUBSTATION TO THE LAST EQUIPMENT SHALL NOT

MV
MV
HDPE DUCT BANK HDPE DUCT BANK HDPE DUCT BANK

MV
HDPE DUCT BANK
MV

MV
MV

MV
EXCEED 5%.
MV

SS-08

MV

MV
MV
MV

MV

MV
MV
8. FOR BUILDINGS SUBSTATIONS AND DISTRIBUTION PANELS, REFER TO BUILDING PACKAGE.
MV

MV

MV
MV
MV

9. CONTRACTOR TO REFER SPECIFIC BUILDING PACKAGES FOR EXACT TIE IN POINTS OF THE BUILDINGS.

MV
MV

SS-06

MV
10. FOR EACH CABLE (MV AND LV) CONNECTING TO BUILDING ELECTRICAL SPACES (SUBSTATIONS, ELECTRICAL
MV

MV
MV

ROOMS), PROVIDE EXTRA LENGTH OF 20 M IN ORDER TO REACH THE CONNECTION POINT INSIDE THE

MV
MV

MV
BUILDING. INFRA CONTRACTOR SHALL COORDINATE WITH BUILDING PACKAGE FOR THE EXACT LOCATION

REFER TO DWG NO. 120004

REFER TO DWG NO. 120002


MV

MV
MV

MV
OF TIE IN POINT AND FOR THE REQUIRED EXTRA LENGTH BASED ON THE FINAL EQUIPMENT LOCATION
MV

MV
INSIDE THE BUILDING.
MV

MV
D
MV

MV
LEGEND:
MV

MV
MV

MV
MV

MV
MV MV MV MV CABLE
MV

MV
MV

MV
MV

OUTDOOR UNIT SUBSTATION

MV
MV

MV
MV

MV
MV

MV
INDOOR BUILDING SUBSTATION
MV

MV
MV

MV
MV

MV
MV

MV
MV

MV
MV

MV
MV

MV
MV

REFERENCE NUMBER DESCRIPTION

MV
MV

MV
MV

MV
MV

LINE STAFF CLUSTER-TYPE 02

MV
MV

MV
MV

MV
MV

MV
MV

LINE STAFF CLUSTER-TYPE 01

MV
MV

MV
MV

MV
0m 20m 40m 60m 80m 100m
MV

MV
LINE STAFF CLUSTER-TYPE 02
MV

MV
MV

MV
LINE STAFF CLUSTER-TYPE 01
MV

MV
MV

MV
MV

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
MV
MV

MV
MV

VISUAL SCALE 1:1000 @ A1

MV
MV

SS-05

MV
MV

MV
MV
MV

MV

MV
MV

MV MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV

MV
MV

STAGE:

MV
MV

MV
MV

MV MV
SS-26

MV
MV MV

MV MV
MV

LINE STAFF CLUSTER-TYPE 01


3D - ISSUE FOR CONSTRUCTION

MV
MV
MV

MV

MV
MV
MV

MV
FACILITY MANAGEMENT-

MV
MV
MV

MV
COMMON

MV
MV
MV

MV
OFFICES BUILDING

MV
MV
MV

DINING HALL F&B

MV

MV
MV
MV

RECREATIONAL HUB

MV

MV
MV
MV

BUILDING

MV

MV
AND GYM BUILDING

MV
MV

SS-25

MV

MV
MV
MV

MV

MV
MV
MV

G.S.

MV
02 SECOND ISSUE 24.08.2023

MV
MV
MV

MV

MV
MV
MV

MV
MV

MV
MV
V
MV

G.S.
M

01 FIRST ISSUE 14.07.2023

MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
MV MV MV

MV
MV
MV

MV
V
M

MV
M
V

MV

MV
REFER TO DWG NO. 120003 SWIMMING POOL REV DESCRIPTION APP DATE
MV

2Ø 150mm

MV

MV
MV

HDPE DUCT BANK

MV

MV
MV

MV
REFER TO DWG NO. 120002

MV
PURPOSE OF ISSUE:
MV

MV
C

MV
MV

MV

MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
MV MV
MV MV

MV
MV

2Ø 150mm
V
MV

MV
MV

FOR APPROVAL
M
V

MV

MV
HDPE DUCT BANK
MV

M
V
SS-24 SS-09

MV
MV

MV
MV

MV
MV

M
V
MV

MV
MV
V
M
MV

MV MV MV MV
MV MV MV MV
MV

MV
MV
MV

CLIENT: PROJECT MANAGEMENT CONSULTANT:

MV

MV
MV

REFER TO DWG NO. 120005

MV
MV
MV

DINING HALL

MV

MV
LINE STAFF
MV

MV
MV
MV

MV

MV
CLUSTER-TYPE 01 REFER TO DWG NO. 120004
MV

MV
MV
MV

M
V
MV
MV

WELCOME BUILDING
MV
MV MV MV MV MV MV MV MV MV MV

MV
MV
MV

MV

2Ø 150mm

MV
MV
V
M
MV

V
HDPE DUCT BANK

MV
RECREATIONAL HUB

MV
MV
MV

MV MV MV MV MV MV MV MV MV MV MV MV MV

MV

MV
MV
MV

MV
AND GYM BUILDING

MV
MV

MV

MV
MV

MV
2Ø 150mm

MV
MV

MV
HOUSE KEEPING BUILDING

MV
HDPE DUCT BANK

MV

MV

MV
MV

MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV

MV
V

MV
M

MV
MV
MV
MV

MV
MV

MV
MV
MV
MV

MV
MV

MV
MV

MV
MV

MV
MV

SS-04

MV
MV

MV
MV

MV
MV

MV
2Ø 150mm
MV

MV
MV

MV
HDPE DUCT BANK
MV

MV
MV
H
MV
MV

MV
MV

MV
MV

MV
MV
SS-23 LV OUTDOOR GENERATOR

MV
MV MV
MV
MV

MV
V

MV
M

MV
FOR FIRE STATION

MV
MV

MV

MV
MV

MV
MV
LEAD ENGINEER : CONTRACTOR NAME & LOGO (s):
MV

MV

MV
MV

MV
MV
MV

GEN-02
MV

MV
MV

MV
MV
MV

MV

MV
MV

MV
MV
MV

MV

MV
V

MV
MV
MV
MV

MV

MV
MV MV

MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
MV

MV

MV
MV
SUPERVISORS GEN-01
MV

MV

MV
MV
MV

MV

2Ø 150mm

MV
MV
CLUSTER-TYPE 03
MV

MV

MV
MV
HDPE DUCT BANK
UTILITY BUILDING
MV

MV

MV
MV
MV

MV

MV
MV
LV OUTDOOR GENERATOR
MV

MV

MV MV

MV
MV MV MV MV MV MV MV MV MV MV

MV
MV MV MV MV MV MV MV MV MV MV

MV

MV
MV

FOR CLINIC BUILDING

V
MV

AREA TO BE

MV
MV

MV

MV
MV

SS-21
MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV
UNDER ANOTHER

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

LINE STAFF
MV

CONTRACT

MV
MV

MV

MV
MV

MV

MV
MV

MV
CLUSTER-TYPE 01

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV
(BY OTHERS)

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV
DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:

MV
B
MV

MV

MV
MV
LOOP1 (FEEDER 1&2)

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

FROM UTILITY BUILDING

MV
MV
LOOP1 (FEEDER 1)

MV
LINE STAFF

MV
MV

MV

DRAWN: J.K. 24.08.2023

MV
MV

MV

MV
MV

MV

MV
MV
CLUSTER-TYPE 01

MV

MV
MV

MV

MV
MV

MV

MV
MV

MV

MV

MV
MV

CHECKED: W.J. 24.08.2023 CHECKED:


MV MV

MV
MV MV MVMV

MV

MV
MV
M
V

MV
MV

MV

MV

MV
MV MV MV MV

LOOP1 (FEEDER 2)
MV

MV MV MV MV

MV
SS-01
MV
REFER TO DWG NO. 120005

REFER TO DWG NO. 120003


MV

MV
MV

MV
MV

SS-22

MV
SS-03
MV
MV

MV
APPROVED: APPROVED:

MV
G.S. 24.08.2023
MV

MV
MV
MV

MV

MV
MV

MV
MV
MV

MV
MV
MV

MV
MV

MV
MV

MV

MV
MV
MV

MV
MV

MV
MV
MV

MV
MV

MV
MV
MV

MV
SS-02

MV
MV
MV

MV
MV
MV
MV

V
M
M

M
V M
MV

V
MV
MV

MV
MV
M MV MV
V MV
MV

1 : 1000
MV

SHEET SIZE: A1
MV MV
MV
MV

MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV

SCALE:
M

M MV MV
V

MV MV

MV
MV V MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
MV MV MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV
MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV MV

DISCIPLINE NAME:
ELECTRICAL
N 3,112,929.872 N 3,113,267.112
E 660,661.305 E 661,049.865
4200000151
PLOT LIMITS LINE STAFF SUPERVISORS SUPERVISORS CLINIC AND RETAIL MULTIPURPOSE HALL FIRE STATION BUILDING MAINTAINCE BUILDING
CLUSTER-TYPE 01 CLUSTER-TYPE 03 CLUSTER-TYPE 01 BUILDING SITE PLAN - MEDIUM VOLTAGE LAYOUT
COMMON F&B LINE STAFF LINE STAFF LINE STAFF CLUSTER-TYPE 02
BUILDING CLUSTER-TYPE 03 CLUSTER-TYPE 01
PROJECT NAME:
SUPERVISORS
CLUSTER-TYPE 01 4200000151-DAR-JETTY AND STAFF
ACCOMMODATION
13 - SINDALAH ISLAND
NEOM
A
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

13 253002 4200000151
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

PCC ELE DRG 120001 02


NEOM-NEN-PRC-009_TMP13_02.00