40 KLD MBR Quote
40 KLD MBR Quote
40 KLD MBR Quote
Techno Commercial Offer for Sewage Treatment Plant (25 KLD based on
Membrane Biorector Technology.
Ref:AIT/ECB/04-07/2023 Visakhapatnam
Date: 03-07-2023
To
Dear Sir,
Sub:
Techno Commercial Offer for Sewage Treatment Plant (25 KLD based on Mem
.
Greetings of the Day! As per our discussion, we are herewith submitting our offer for Sewage
Treatment Plant of capacity 45 m 3 per day which can cater to treat the wastewater. Our offer
is as follows:
Section A Design Basis
Section B Introduction
Section C Process Details
Section D Technical Details and Scope of Supply
Section E Make and Material of Construction
Section F Price and Commercial terms
Section G Schedule of Exclusions
We hope the above is in line with your requirement. Please revert for any further
information / clarifications.
Thanking you,
ForAkshaya InnoTech
1. The MBR technology aims to remove organic compounds (COD and BOD),
suspended matter, nutrients (nitrogen and phosphorous) and bio-accumulative or bio-
degradable micro pollutants.
2. The biological conversion processes are the same as those described for active
sludge systems for COD removal, nitrifying active sludge and nitrifying/denitrifying active
sludge.
3. The presence of membranes ensures complete retention of the biology and for
complete removal of the suspended matter
4. Because bacteria are kept longer in the reactor, the likelihood is greater that difficult to
degrade or larger components are degraded. Compared to a conventional system, the
removal of suspended matter almost always results in a low COD value in the effluent.
The absolute COD value is determined by the quality of the influent.
Treatment Efficiency
80- 90 % Reduction 90-95 % Reduction Reduction
(COD, BOD, TSS)
Water quality & Low quality & Moderate quality & Excellent quality with
Consistency Consistency consistency High consistency
Enhancement of Treatment
Low chances Enhances by 5-10 % Enhances by > 3 X
capacity
Section B
Treatment scheme:
SCOPE OF WORK
The proposed system for treatment of the effluent is based on Natural Biological
augmentation based on a fixed film bioreactor which works on a very low power
requirement. It works on a combination of Biological phenomena which include solids to bio
gasification in a primary settling medium, followed by an aerobic biological oxidation,
clarification and polishing by natural filters of sand and fibers. The treatment will be done at
the rate of 45 Kilo Liters per day.
The system includes Pretreatment of effluent using a primary clarifier, Oil and grease
skimmer, MBR based Biological treatment of the sewage, and reuse for gardening or
washing. Civil works include a collection tank of 50 KL, and 50 KL Final Treated water tank.
STP shall be compact, have minimum Moving Parts and be odor free.
The microbial growth in this stage is mostly suspended growth in MBR tank.
The blower is a low power consuming, high efficiency equipment, and the aeration grid is
a non-clog type system.
Collection cum equalization tank in RCC is placed below the ground level.
All other tanks of STP in MS Prefabricated structure can be built above the ground as
required.
A metered dosing system is provided to have better control on dosing rate and to avoid
the wastage of chemical.
All electro-mechanical equipment’s are proposed with standby units. Pumps, blowers
shall be operational in auto mode through level controllers, timers etc. for easier
operation.
Section C
Treatment Process:
(a) Screen Chamber: The sewage from the unit shall pass through the manually cleaned
SS – 304 Screen (02 no) with different pore sizes to remove suspended materials from
the sewage.
(b) Oil & Grease Trap: Here oil and grease present in the sewage will be trapped and
taken out manually. It will be done in a baffled tank put below the inward water level.
(c) Equalization Tank: The screened sewage shall be collected by gravity into the
equalization tank. A customized consortia of anaerobic microbes which convert the
oil, grease, fats, organic matter, fecal solids into methane, which can be harvested or
flared.
(d) MBR Tank:The Sewage then flows into a MBBR tank where suspended as well as
fixed growth of microbial biomass converts the remaining organic matter into
carbondioxide and water. As most of the growth in this aeration system is attached
growth very little sludge is formed. Also the sludge formed is from the sloughed off
biofilms after maturation stage. The biologically treated sewage will then over flow
into a secondary settling tank for the separation of biomass from the clear supernatant.
(e) Tertiary Treatment: After the biological treatment, the treated effluent will be
collected into treated water collection tank. The treated effluent will then be fed to Dual
media filter & activated carbon filter for the further removal of residual Suspended solids,
BOD/COD, color, odor etc. The filtered clear effluent will then re-used in secondary
application as mentioned.
(f) Sludge handling: The primary & secondary sludge removed from tube settler tank shall
be taken on Sludge Holding tank and then pumped to sludge dewatering bags.
(h) Sludge Dewatering System – Sludge collected in the Secondary clarifier shall be fed to a
sludge dewatering system consisting of bag filters where water content is reduced to less
than 30% in the sludge. Dried sludge can be use as manure and supernatant can be taken
beck in collection tank.
Section D
Scope of work & supply:
Scope of work:
STP shall require the following RCC/brick work (which shall be beyond our scope):
equalization tank 1no
MBBR Bioreactor 1 no
Secondary settling tank 1 no
Filtered water storage tank 1 no
Foundation for equipment’s 1 job
Plant room / shedding for equipment 1 job
6 UV Treated PVC media for SAFF reactor (1.5 L x 0.8 m H) media with 1 lot
corrugations and surface area of 250 m2/ CuM, with supports and holders
made of PVC, and MBBR Reactor media (virgin plastic, double cylindrical
media with surface ribs for increased surface area, 70000 pieces per cuM,
surface area of 500Sq M per cu M.
7 Sludge disposal pump, centrifugal-horizontal non-clog type (Technical 1 no
literature attached)
8 Metering type Chlorine dosing pumps, cap.0-6 lph with dosing tank in PVC 1 no.
construction, capacity-100 lt.) with piping
9 Filter feed pump, 2 no’s (1 working +1 standby) centrifugal-horizontal non- 1 set
clog type. (Technical Details from Manufacturer attached)
10 Activated Sand Media filter with frontal piping and first charge of filter 1 set
media. (Pentair Make, Technical Details are provided in the following
section)
11 Activated Carbon filter with frontal piping and first charge of filter media, 1 Set
capacity. . (Pentair Make, Technical Details are provided in the following
section)
12 Interconnecting pipeline in CPVC, valves & fittings with support as 1 lot
required
(Main aeration line of CPVC (Approx. 8 Mts, 2 CPVC Valves, 4 Nos.
CPVC Elbows (900), 8 Nos (CPVC T Joints), 8 Nos CPVC reducers bushes,
Approx.8 Mts CPVC ¾ inch pipe, 2 Nos. CPVC Couplings)
13 Electric control panel with cables and cable tray (finolex/ Equivalent make 1 job
cable tray 4 Inch with cable ties, fasteners and wall clamps, Cable and
sleeves, with suitable insulation. Control panel consists of PLC with ABB
or equivalent 3 Pole MCBs, Contactors, Digital Voltage, Current indicators
with overload/surge protection, Actuator switches for control of pumps and
motors, level switches for flow control.
14 Instruments: water level controllers, timer & pressure gauges etc. with PLC 1 set
for automation.
15 Other item: packing material, bolts and nuts, painting material, testing kit 1 lot
etc.
16 Electromagnetic Flow Meter 1 Lot
Technical Specifications
ELECTRO-MECHANICAL ITEMS
1.1 Bar screens
Duty To retain and remove non-biodegradable solids in the wastewater.
No. of units One
Opening size clear opening 10 mm
Material of SS 304 Flats 20mm x 5mm
construction
Overall size In house fabrication- size: 1050mmx1000mm.
Angle 45o
1.2 Sewage Transfer pump
To enable pumping of raw sewage from sump to subsequent
Duty
treatment tanks.
No. of units 1W+1S
Pump Type Vertical submersible cutter pump
Flow 5 M3 /hr
Discharge line 1”
Head 12 m
Phase/HP 3 Ph/ 1.5 HP
Pump housing CI/SS
Impeller /shaft Stainless Steel 304
Make Kirloskar (750CW)/Equivalent.
1.3 Sludge Transfer pumps
To enable pumping of sludge to external source for disposal from
Duty
aeration tank.
No. of units 1
Pump Type Vertical submersible cutter pump
Flow 2 M3 /hr
Discharge line 1”
Head 12 m
Phase/HP 3 Ph/ 2.0 HP
Pump housing CI/SS
Impeller /shaft Stainless Steel 304
Make Kirloskar (750SW)/Equivalent.
Make PENTAIR
Media Activated Coconut Shell Carbon (IV > 900)
1.10 Electrical Control Panel
No. of Units One
MODEL with complete automation
Components MCB, Voltage and current metering with selector switch and CTs,
considered in incomer lamp/Voltmeter, protection fuses, phase indicating lamps.
Components Power and control fuses, contractor, over load relays, ON/OFF/Trip
considered in outgoing indicating lamps and terminals.
Internal wiring PVC insulated multistrand copper conductor for control, CTs
&earthling, Multistrand copper conductor for power..
Make All electrical items used shall be of Siemens/equivalent make Only.
Electrical power cable Finolex
make
Exclusions/ Owner’s scope:
Approach to site and storage of equipment.
All civil work including tanks construction, foundation of equipment, plant room or
shedding for equipment.
Sewage incoming pipeline up to the STP.
Treated water disposal pipeline beyond STP area. AIT shall provide the flanges end
connection at the outlet of STP.
Sludge disposal pipeline beyond STP area.
Electricity during the erection work.
Electric incoming power supply with earthling to STP panel on continuous basis.
Fresh water connection in STP.
Drain arrangement in STP area.
Lighting in STP area.
All necessary approvals, NOC from Govt. Agencies
Plant room/ covering of STP equipment.
Any other work, which is not specifically mentioned
Section E
DESCRIPTION OF WORK & Scope
S.No. Description AIT Scope Client Scope
1. Perforated screen in SS construction Complete Supply and Civil work
erection
2. Equalization Tank Internal Sewage Civil work
Distribution grid,
Anaerobic microbes,
biogas collection system
with valves and flare
3. MBR TANK with membrane modules, Complete Supply, Civil work
Submerged Diffused Aeration Blowers - erection and
2 nos commissioning of
mechanical parts
4. Sand and Carbon Bed Filtration Systems AIT Scope
2 Vessels with Multiport valves, internal
pipelines, sand, carbon and multigrade
media, installation and supply
5. Sewage treatment plant design, drawings AIT Scope
6. Civil work execution Your Scope
7. Commissioning of STP AIT Scope
8. Pipeline work and connections till inlet of Your Scope
STP and from Outlet of STP
9. PUMPS AND MOTORS: AIT Scope
10.Training to operators AIT Scope
11.Free Maintenance for 6 months AIT Scope Your scope after
1 year.
Section F
COST ESTIMATION:
S.No Description Cost (Rs.)
.
Payment Terms
70% - Advance along work order
20%- Against Performa Invoice against readiness of Equipment’s at Ex-Works
10% - After completion of Erection& Commissioning
Delivery:
AIT will be in a position to deliver the equipment within 3-6 weeks’ time from the date of
approval of drawings.
Execution: 6-10 weeks after complete civil works have been handed over to us.
EXCLUSIONS:
i. All apparatus, chemicals, materials and other necessary equipment required for
Laboratory for analysis. All related civil works, platform, ladders, railings, support
and design of civil structures.
ii. Water, electricity and other utilities at one center point for Construction, Erection,
Fabrication, Testing and commissioning.
iii. Manpower, Tools & tackles, Operators, Chemicals, required at the time of erection &
commissioning.
iv. Site leveling & Cleaning and all related civil works including hand rails, platforms,
Foundations/supports and civil design.
v. Solid material handling system/ Disposal system.
vi. All equipment, work and services not specifically mentioned as part of our offer.
vii. Lubricant oil & grease as required for initial operation.
viii. All piping works beyond our termination point or battery limit.
ix. Lodging & boarding provide to our persons during the erection & commissioning.
x. Design codes standards, features, specifications and supply of all item, quantity, make
etc. shall be as per our standard indicated in the proposal or as per the scope &
specifications finalized at time of order.
xi. Any changes in design codes, standards, features, specifications, quantity makes,
addition of items other than specified in the order shall be at extra cost which shall be
finalized before the same are supplied. The client shall not alter/ delay the works
progress and the schedule of payments related to the original order.
COMMERCIAL OFFER
COMPLETION:
Erection, Commissioning and handing over of the plant shall be considered to have been
completed as described below:
ERECTION
The plant shall be considered erected once the equipment’s, media, interconnecting piping,
instruments and accessories essential to the plant operation are in place.
Minor job completion, not affecting commissioning, shall not be reason to consider it not
completed.
HANDING OVER
Once PG is conducted then the Plant is considered to be handed over to the client OR If PG is
not possible due to practical site conditions then the date from which plant is taken in
commercial production and operation and maintenance of system is given to client’s
operating staff, then plant is considered as handed over and final payments shall be released.
Hover, PG may be performed at any later date as per mutual convenience but that would not
be the reason to hold up retention payments.
Should there be any change in the same the final prices shall be agreed upon by discussions /
negotiations.
Validity of Offer The offer shall remain valid for a period of 30 days from the date of offer.
Acceptance of Order:AIT will accept the order on the basis of agreed terms of payment and
conditions of contract.
Warranty:
Plant will be subject to warranty of 6 months from the date of last major dispatch.
This warranty will be conditional upon proper maintenance and service work being
undertaken and recorded in accordance with AIT operation and maintenance procedure.
Taxes and Duties: GST Excluded.
All prices quoted above excludesGST and is exclusive of duties and license fees or any other
personal fees and corporate taxes that may be applicable to the execution of the project.
Consequential Damages:AIT shall not be liable, or responsible for any consequential loss,
indirect loss, and loss of profit, loss of use or loss of opportunity suffered by the client.
Insurance Claim – Client scope
Statutory Variation: Any change in Govt., duties levies, taxes or policies having direct
effect on our above quoted prices will be at customers account for which documentary
evidence will be submitted on request.
Force Majeure Clause: Our offer is subject to the acceptance of Force Majeure Clause such
as Strike, Lockout, Non- Availability of raw materials, Terrorism Acts or Acts of God such as
Fire, Flood, Earthquake, etc. which are beyond our control.
MODE OF PAYMENT: Cash/RTGS payable to Akshaya Engineering Innovations,
Visakhapatnam.
Assuring you of our best services at all times.