Professional Documents
Culture Documents
Assignment 3 Group 4
Assignment 3 Group 4
Lunchroom
Trailer Complex
Watchman
room
KAZ Sign Board
Container cool room -
Paint and grouting
Carpent
Kitchen
Porta-potties
Water tank
Porta-potties
Generator room
ool room -
grouting
Carpentary Workshop
Diesel Tank
om
Steel Yard
Rebar cuttin
Rebar cutting and bending area
Tower Cra
Tower Cra
ffffffff
Misc. Storage area
Misc. Storage area
Material Laydown
Tower Crane
Tower Crane
rea
rea
Hazardous material storage
Hazardous material storage
ID Resource Name Area m2 Category Nature
1
2
3
.
n
Resource Name: For resources listed in lecture, please use the same name as in Lecture
For resources that are not in the lecture, use a common name, and use red ink in the list
These includes resources that are represented as a symbol
Construction Site Categories Assigned Color*
1. Temporary amenities/facilities
2. Equipment
3. Material/Waste
4. Workspaces
5. Access, paths, roads
6. Temporary support
7. Site elements
red ink in the list copy-paste title with number *Use "exactly" this color in the layout
Make sure you include the border
Symbols
Fire extinguisher
Muster Point
Smoking Areas
Utilities
Add more as needed
Please use the relevant category color
n the layout
Existing Relationships Observed from the Site
ID Resource A Spatial Relationship Resource B
4
Watchman Gate
Reasoning Goal
Reasoning Goal
3. Farness
4. Minimum Distance
5. Maximum Distance
7. Visibility
8. Adjacency
6. Access
9. Reachibility
2. Mutual Exclusion
Please use exactly this line type color and thickness (line width)
Use straight lines only
Representing objects in with shapes that are not attached to the cells
Site Office
Material Laydown
For irregular shapes, draw them using Scribble freeform, cu
2x2 object
Fire extinguisher
Smoking Areas
Utilities
Fire extinguisher
Muster Point
Smoking Areas
Utilities
Stockpile
Site office
Gate
Stockpile
Stockpile
Site office
Gate
Gate
Road
Please draw the optimized layout twice, once without rela
Site Element
Crane
Crane
Site Element
ayout twice, once without relationships connected and one without
hem using Scribble freeform, curves, or arc from the MS Office Insert shape menu, and draw the closest circumventing rectilinear shape
x2 resource
circumventing rectilinear shape around it (see example)
ffffffff
ffffffff
Misc. Storage area
Material Laydown