MONTHLY PROGRESS REPORT NO.

05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 1 of 21

MONTHLY PROGRESS REPORT No. 05


CUT OFF DATE: September 28, 2023 to October 27, 2023
REVISION DESCRIPTION DATE PREPARED BY CHECKED BY APPROVED BY
00 For Information 10-28-2023 Francisco Vanguardia Manolo Mendoza

Page 1 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 2 of 21

Contents
1. INTRODUCTION ............................................................................................................................................................. 3
2. PROJECT SUMMARY ................................................................................................................................................... 3
2.1 OVERALL ...................................................................................................................................................................... 3
3. PROJECT STAGE SUMMARY STATUS .................................................................................................................... 3
3.1 ENGINEERING AND DESIGN................................................................................................................................ 3
3.2 MOBILIZATION ....................................................................................................................................................... 4
3.3 PROCUREMENT .................................................................................................................................................... 4
4. MONTHLY EXECUTIVE SUMMARY .............................................................................................................................. 5
4.1 MAIN ACTIVITIES DONE THIS MONTH ................................................................................................................ 5
4.2 MAIN ACTIVITIES NEXT MONTH .......................................................................................................................... 5
5. HEALTH AND SAFETY ................................................................................................................................................. 5
5.1 PERFORMANCE INDICATOR ................................................................................................................................ 5
6. ENVIRONMENTAL ......................................................................................................................................................... 6
7. DETAIL ACTIVITIES ENGINEERING ............................................................................................................................. 6
7.1 DISCIPLINE STATUS ............................................................................................................................................. 6
7.2 DOCUMENT ISSUE STATUS BY DISCIPLINE .................................................................................................... 6
7.3 DOCUMENT LIST AND STATUS ........................................................................................................................... 7
8. DETAIL ACTIVITIES QC TESTING ................................................................................................................................ 8
9. DETAIL ACTIVITIES PROCUREMENT .......................................................................................................................... 8
9.1 PROCUREMENT STATUS BY DISCIPLINE .......................................................................................................... 8
9.2 MATERIAL SHIPPING STATUS SUMMARY ......................................................................................................... 9
9.3 MATERIAL DELIVERY STATUS BY MODE OF SHIPMENT ................................................................................. 9
10. DETAIL ACTIVITY CONSTRUCTION ........................................................................................................................ 9
10.1 DETAIL CONSTRUCTION PROGRESS ................................................................................................................ 9
11. PROGRESS PHOTOS .............................................................................................................................................. 10
12. OVERALL PROJECT PROGRESS TIMELINE ......................................................................................................... 21

Page 2 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 3 of 21

1. INTRODUCTION
PROJECT NAME COM-FSM TEACHING CLINIC PROJECT CODE JR0690

DATE OF STATUS
PROJECT MANAGER Manolo Mendoza ENTRY
28-October-23

PROJECTED DATE OF
PERIOD COVERED September 28, 2023 to October 27, 2023 COMPLETION
13-Mar-25

2. PROJECT SUMMARY
2.1 OVERALL

WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. STAGE
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE

1 ENGINEERING AND DESIGN 13.00% 7.00% 5.00% 2.00% 4.00% 2.00% 2.00% 11.00% 7.00% 4.00%

2 CONSTRUCTION 32.00 % 3.00% 3.00% 0.00% 5.00% 1.00% 4.00% 7.00% 4.00% 3.00%

3 PROCUREMENT 48.00 % 5.00% 5.00% 0.00% 5.00% 1.00% 4.00% 10.00% 6.00% 4.00%
MOBILIZATION
4 8.00 % 8.00% 4.00% 4.00% 0.00% 0.00% 0.00% 8.00% 4.00% 4.00%
(EQUIP+MANPOWER)
OVERALL PROGRESS 100.00 % 28.00% 20.0% 8.00% 14.00% 4.00% 10.00% 36.00% 21.00% 15.00%

3. PROJECT STAGE SUMMARY STATUS


3.1 ENGINEERING AND DESIGN

WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. ITEM DESCRIPTION
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE

1 DESIGN SCOPING 5.00 % 5.00% 5.00% 0.00% 0.00% 0.00 0.00% 5.00% 5.00% 0.00%

2 DESIGN AND DETAILING 60.00 % 40.00% 30.00% 10.00% 14.00% 7.00% 7.00% 54.00% 37.00% 17.00%

3 COMPLETION 30.00 % 0.00% 0.00% 0.00% 12.00% 4.00% 8.00% 12.00% 4.00% 8.00%

4 DRAWING SUBMITTALS 5.00 % 5.00% 1.00% 4.00% 4.00% 4.00% 0.00% 9.00% 5.00% 4.00%

OVERALL PROGRESS 100.00 % 50.00% 36.00% 14.00% 30.00% 15.00% 15.00% 80.00% 51.00% 29.00%

Page 3 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 4 of 21

3.2 MOBILIZATION
WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. ITEM DESCRIPTION
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE

1 TEMPORARY SITE FACILITY 30.00 % 30.00% 30.00% 0.00% 0.00% 0.00% 0.00% 30.00% 30.00% 0.00%

2 EQUIPMENT 50.00 % 50.00% 35.00% 15.00% 15.00% 0.00% 15.00% 50.00% 35.00% 15.00%

3 MANPOWER 20.00 % 20.00% 6.00% 14.00% 14.00% 3.00% 11.00% 20.00% 9.00% 11.00%

OVERALL PROGRESS 100.00 % 100.00 % 71.00 % 29.00 % 29.00 % 3.00 % 26.00 % 100.00 % 74.00 % 26.00 %

3.3 PROCUREMENT
WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONT
NO. ITEM DESCRIPTION
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE

1 PRELIMINARY WORKS 5.00 % 5.00 % 5.00 % 0.00 % 0.00 % 0.00 % 0.00 % 5.00 % 5.00 % 0.00 %

2 EARTHWORKS MATERIALS 13.00 % 13.00 % 9.00 % 4.00 % 4.00 % 1.00 % 3.00 % 13.00 % 10.00 % 3.00 %

3 CONCRETE MATERIALS 20.00 % 10.00% 10.00 % 0.00 % 5.00 % 0.00 % 5.00 % 15.00 % 10.00 % 5.00 %

4 MASONRY MATERIALS 8.00 %

5 ROOFING AND ROOF FRAMING 8.00 %

6 INTERIOR WORKS MATERIALS 4.00 %

7 FINISHING WORKS MATERIALS 6.00 %

8 PAINTING WORKS MATERIALS 5.00 %

9 METAL WORKS MATERIALS 1.00 %

10 DOORS 3.00 %

11 WINDOWS 3.00 %

12 PLUMBING MATERIALS 3.00 %

13 MECHANICAL 2.00 %

14 ELECTRICAL 5.00 %

15 FIRE PROTECTION 2.00 %

16 EXTERIOR WORKS ITEM 2.00 %

17 DRAINAGE 2.00 %

18 FURNISHING 7.00 %

19 COMMUNICATION SYSTEM 1.00 %

OVERALL PROGRESS 100.00 % 28.00 % 24.00 % 4.00 % 9.00 % 1.00 % 8.00 % 33.00 % 25.00 % 8.00 %

Page 4 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 5 of 21

4. MONTHLY EXECUTIVE SUMMARY


4.1 MAIN ACTIVITIES DONE THIS MONTH
NO. STAGE DESCRIPTION (S)

A. SUBMISSION OF REMAINING STRUCTURE DESIGN DRAWINGS


1 ENGINEERING B. RE-SUBMIT OF PLANNING SCHEDULE

2 PROCUREMENT A. REQUEST QUOTATIONS ON DOORS, WINDOWS AND OTHER FINISHING MATERIALS ONCE APPROVED

3 MOBILIZATION A. WORKS RESUME

B. RE-ADJUSTED PROPOSED BUILDING CONSTRUCTION DUE TO THE EXISTING PIPELINE


C. RE-SETTING BORDER REFERENCE LEVEL WITH THE ADJUSTED BORDER
4 CONSTRUCTION
D. LAYING OF ADDITIONAL GEOTEXTILE AND BACKFILLING WITH APPROVED MATERIALS
E. ASSEMBLY OF COLUMN REINFORCEMENTS

4.2 MAIN ACTIVITIES NEXT MONTH


NO. STAGE DESCRIPTION (S)

A. RE-SUBMIT OF STRUCTURAL DESIGN DRAWINGS


1 ENGINEERING
B. SUBMIT MEP DRAWINGS

2 PROCUREMENT F. REQUEST QUOTATIONS ON DOORS, WINDOWS AND OTHER FINISHING MATERIALS ONCE APPROVED

3 MOBILIZATION G. WORKS RESUME

A. CONTINUE BACKFILLING AND COMPACTION


B. INSTALLATION OF REBARS FOR FOUNDATION
4 CONSTRUCTION
C. CONCRETING OF FOUNDATION
D. CONTINUE ASSEMBLY OF REMAINING REINFORCEMENTS

5. HEALTH AND SAFETY


5.1 PERFORMANCE INDICATOR
CUMULATIVE
NO. INDICATOR CUMULATIVE LAST MONTH THIS MONTH
TOTAL

Page 5 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 6 of 21

6. ENVIRONMENTAL
ISSUES CORRECTIVE ACTIONS PHOTO

7. DETAIL ACTIVITIES ENGINEERING


7.1 DISCIPLINE STATUS
TOTAL CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. DISCIPLINE
QTY PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIAMCE
A CIVIL 5.00 5.00 4.00 1.00 1.00 1.00 0.00 5.00 5.00 0.00
B ARCHITECTURAL
C STRUCTURAL 19.00 19.00 6.00 13.00 13.00 13.00 0.00 19.00 19.00 0.00
D MECHANICAL
E PLUMBING
F ELECTRICAL
G FIRE PROTECTION

7.2 DOCUMENT ISSUE STATUS BY DISCIPLINE


TOTAL ISSUED FOR REVIEW (IFR) ISSUED FOR APPROVAL (IFA) ISSUED FOR CONSTRUCTION (IFC)
NO. DISCIPLINE
QTY PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIAMCE
A CIVIL WORK 5.00 5.00 5.00 0.00 5.00 5.00 0.00 5.00 5.00 0.00
B ARCHITECTURAL
C STRUCTURAL 19.00 19.00 19.00 0.00
D MECHANICAL
E PLUMBING
F ELECTRICAL
G FIRE PROTECTION

Page 6 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 7 of 21

7.3 DOCUMENT LIST AND STATUS


DISCIPLINE/ SUBMITTAL DATE SUBMITTAL STATUS / DATE
NO. DRAWING TITLE APPROVED
DRAWING NO. 1ST 2ND 3RD RE-SUBMIT APPROVED
AS NOTED
A CIVIL WORK
CIV-EW-0001 Bulk Earthworks Layout and Details 6-03-2023 6-23-2023 9-8-2023 7-19-2023
CIV-EW-0002 Earthworks Long Sections 6-03-2023 9-8-2023 7-19-2023
CIV-EW-0003 Column Grid Setting Out 6-23-2023 9-8-2023 7-19-2023
CIV-EW-0004 Column Grid Setting Out Coordinates 9-23-2023 9-8-2023 7-19-2023
B ARCHITECTURAL
AR-0001 Ground Floor Plan
AR-0002 Second Floor Plan
AR-0003 Elevations and Sections
C STRUCTURAL
ST-ST-0000.1 General, Concrete & Masonry Notes Sheet 1 of 2 9-8-2023
ST-ST-0000.2 General, Concrete & Masonry Notes Sheet 2 of 2 9-8-2023
ST-ST-0001 Foundation Layout & Details 9-8-2023
ST-ST-0002 Ground and Second Floor Layouts 10-19-2023
ST-ST-0003 Roof Layout 10-19-2023
ST-ST-0004 Sections and Details 10-19-2023
ST-BS-0001 Foundation Reinforcement 9-8-2023
ST-BS-0002 Foundation Walls and Column Reinforcement 9-8-2023
ST-BS-0003.0 Second Floor - Slab Reinforcement 10-19-2023
ST-BS-0003.1 Second Floor - Slab Reinforcement Schedule 10-19-2023
Second Floor - Beams Reinforcement and Reinforcing
ST-BS-0004 10-19-2023
Schedule
ST-BS-0005.0 Roof Slab Reinforcement 10-19-2023
ST-BS-0005.1 Roof Slab Reinforcement Schedule 10-19-2023
ST-BS-0006.0 Roof Beam Reinforcement 10-19-2023
ST-BS-0006.1 Roof Beam Reinforcement Schedule 10-19-2023
ST-BS-0007.0 Staircase Reinforcement 10-19-2023
ST-BS-0007.1 Staircase Reinforcement Schedule 10-19-2023
ST-BS-0008.0 RC Shear Wall Reinforcement 10-19-2023
ST-BS-0008.1 RC Shear Wall Reinforcement Schedule 10-19-2023
D MECHANICAL
E PLUMBING
F ELECTRICAL
FIRE
G
PROTECTION

Page 7 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 8 of 21

8. DETAIL ACTIVITIES QC TESTING


DATE
DATE
ITEM DESCRIPTION / METHOD LOCATION FREQUENCY PERFORMED BY FORWARDED
COMPLETED
TO CM
1 TRIAL MIX/ CHB DESIGN VCS OFFICE 3 PROJECT FOREMAN October 7, 2023
2 TRIAL MIX./COMPRESSION TEST/7 DAYS DT&I LABORATORY 3 DT&I LAB TECHNICIAN October 14, 2023

3 TRIAL MIX/COMPRESSION TEST/14 DAYS DT&I LABORATORY 3 DT&I LAB TECHNICIAN October 28, 2023

9. DETAIL ACTIVITIES PROCUREMENT


9.1 PROCUREMENT STATUS BY DISCIPLINE
CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. ITEM DESCRIPTION TOTAL
PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE

1 PRELIMINARY WORKS 90,597.00 54,358.00 54,358.00 0.00 36,239.00 36,239.00 0.00 90,597.00 90,597.00 0.00

2 EARTHWORKS MATERIALS 336,384.00 336,384.00 252,387.00 113,997.00 113,997.00 23,000.00 90,997.00 336,384.00 275,387.00 60,997.00

3 CONCRETE MATERIALS 418,303.00 209,152.00 209,152.00 0.00 0.00 0.00 0.00 209,152.00 209,152.00 0.00

4 MASONRY MATERIALS 181.420.00

5 ROOFING AND ROOF FRAMING 127,114.00

6 INTERIOR WORKS MATERIALS 58,878.00

7 FINISHING WORKS MATERIALS 105,975.00

8 PAINTING WORKS MATERIALS 121,340.00

9 METAL WORKS MATERIALS 8,142.00

10 DOORS 63,273.00

11 WINDOWS 56,212.00

12 PLUMBING MATERIALS 53,745.00

13 MECHANICAL 51,059.00

14 ELECTRICAL 123,674.00

15 FIRE PROTECTION 43,264.00

16 EXTERIOR WORKS ITEM 48,162.00

Page 8 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 9 of 21

17 DRAINAGE 34,811.00

18 FURNISHING 181,996.00

19 COMMUNICATION SYSTEM 20,700.00

TOTAL

9.2 MATERIAL SHIPPING STATUS SUMMARY


SHIPMENT STATUS CUSTOM CLEARANCE STATUS CERTIFICATION STATUS DELIVERY TO SITE STATUS
PLAN ACTUAL VARIANCE PLAN ACTUAL VARIANCE PLAN ACTUAL VARIANCE PLAN ACTUAL VARIANCE

1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00

9.3 MATERIAL DELIVERY STATUS BY MODE OF SHIPMENT


MODE OF TOTAL QTY. ARRIVED IN TOTAL QTY. CERTIFIED / TOTAL QTY. DELIVERED TO
TOTAL QTY. SHIPPED
SHIPMENT BONDED WAREHOUSE CUSTOM CLEARED SITE
SEA FREIGHT 1.27 TONS (REBAR) 1.27 TONS (REBAR) 1.27 TONS (REBAR) 1.27 TONS (REBAR)

10. DETAIL ACTIVITY CONSTRUCTION


10.1 DETAIL CONSTRUCTION PROGRESS
CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. ITEM DESCRIPTION TOTAL
PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE

1 PRELIMINARY WORKS 132,858.33 101,000.00 101,000.00 0.00 22,858.33 0.00 0.00 132,858.33 101,000.00 22,858.33

2 EARTHWORKS 537,280.00 230,480.00 230,480.00 0.00 123,188.00 61,594.00 61,594.00 353,668.00 292,074.00 61,594.00

3 CONCRETE WORKS 697,171.10 144,594.10. 144,594.10 0.00 160,427.06 52,720.60 107,706.46 305,021.16 197,394.56 107,706.6

4 MASONRY WORKS 302,366.68

5 ROOFING AND ROOF FRAMING 211,856.57

6 INTERIOR WORKS 98,129.50

7 FINISHING WORKS 176,625.75

8 PAINTING WORKS 202,233.84

Page 9 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 10 of 21

9 METAL WORKS 13,570.00

10 DOORS 105,455.00

11 WINDOWS 93,686.48

12 PLUMBING MATERIALS 89,574.42

13 MECHANICAL 85,369.10

14 ELECTRICAL 206,123.70

15 FIRE PROTECTION 76,707.25

16 EXTERIOR WORKS ITEM 80,210.20

17 DRAINAGE 58,018.08

18 FURNISHING 303,326.00

19 COMMUNICATION SYSTEM 34,500.00

TOTAL

11. PROGRESS PHOTOS


TASK NO. TASK NAME / DESCRIPTION (S) PHOTO

3.2.01.02 FOUNDATION FORMS FABRICATION WORKS (OCTOBER 02, 2023)

Page 10 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 11 of 21

REBAR FABRICATION WORKS FOR FOUNDATION (OCTOBER 03,


3.2.01.02
2023)

3.2.01.02 FOUNDATION FORMS FABRICATION WORKS (OCTOBER 03, 2023)

REBAR FABRICATION WORKS FOR FOUNDATION (OCTOBER 05,


3.2.01.02
2023)

Page 11 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 12 of 21

TRENCHING TO RELOCATE THE UTILITY PIPE LINES (OCTOBER 05,


2023)

3.2.01.02 FOUNDATION FORMS FABRICATION WORKS (OCTOBER 06, 2023)

3.2.01.02 FOUNDATION FORMS FABRICATION WORKS (OCTOBER 07, 2023)

3.2.01 CMU TRIAL MIX DESIGN (OCTOBER 07, 2023)

Page 12 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 13 of 21

CONDUCTED THE FIRST SAFETY WEEKLY MEETING (OCTOBER 09,


2023)

RELOCATION OF STEEL BARS STORAGE (OCTOBER 09, 2023)

APPLICATION OF REBARS RUST INHIBITORS (OCTOBER 09, 2023)

Page 13 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 14 of 21

RELOCATION OF STEEL BARS STORAGE (OCTOBER 10, 2023)

RELOCATION OF STEEL BARS STORAGE (OCTOBER 10, 2023)

RELOCATION OF STEEL BARS STORAGE (OCTOBER 11, 2023)

Page 14 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 15 of 21

PREPARATION OF EMERGENCY ACCESS ROAD AROUND BUILDING


AREA (OCTOBER 11, 2023)

3.2.01 CHB TRIAL MIX COMPRESSION TEST (7 DAYS OLD SAMPLE)

3.2.01 CHB TRIAL MIX COMPRESSION TEST (7 DAYS OLD SAMPLE)

RELOCATION OF STEEL BARS STORAGE (OCTOBER 14, 2023)

Page 15 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 16 of 21

RELOCATION OF FILL-IN MATERIALS STORAGE SITE (OCTOBER 16,


2023)

DTCI CONSULTANT AND THE DIRECTOR OF MAINTENANCE SITE


MEETING (OCTOBER 16, 2023)

RELOCATION OF FILL-IN MATERIALS STORAGE SITE (OCTOBER 17,


2023)

Page 16 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 17 of 21

RE-SETTING REFERENCE BOUNDARY LEVELS WITH THE


ADJUSTED FOOTING LINE BOUNDARIES (OCTOBER 17, 2023)

RE-SETTING REFERENCE BOUNDARY LEVELS WITH THE


ADJUSTED FOOTING LINE BOUNDARIES (OCTOBER 17, 2023)

3.2.01.02 FORM FABRICATION FOR COLUMN (OCTOBER 18, 2023)

Page 17 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 18 of 21

RELOCATION OF FILL-IN MATERIALS STORAGE SITE (OCTOBER 18,


2023)

3.2.01.02 FORM FABRICATION FOR COLUMN (OCTOBER 19, 2023)

LAYING OF GEOTEXTILE FABRIC AND BACKFILLING AT EXCAVATED


AREA (OCTOBER 19, 2023)

EXCAVATED PIPE LINES ARE SCHEDULED TO BE BACKFILLED


(OCTOBER 20, 2023)

BACKFILLING OF THE ADJUSTED LOCATION (OCTOBER 20, 2023)

Page 18 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 19 of 21

3.2.01.02 COLUMN FORM FABRICATION (OCTOBER 20, 2023)

LAYING OF GEOTEXTILE NEAR THE EXCAVATED PIPELINES


BEFORE BACKFILLING (OCTOBER 21, 2023)

3.2.01.02 COLUMN FORM FABRICATION (OCTOBER 21, 2023)

BACKFILLING WORKS WITH THE APPROVED FILL MATERIALS


(OCTOBER 23, 2023)

BACKFILLING WORKS WITH THE APPROVED FILL MATERIALS


(OCTOBER 23, 2023)

Page 19 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 20 of 21

CONDUCTED OUR WEEKLY TOOLBOX MEETING (OCTOBER 23,


2023)

DISMANTLING/ADJUSTING OF PERIMETER PROJECT FENCE


(OCTOBER 23, 2023)

PAINTING WORKS AT THE ADJUSTED PERIMETER PROJECT FENCE


(OCTOBER 24, 2023)

ASSEMBLY OF COLUMN REINFORCEMENTS (OCTOBER 24, 2023)

Page 20 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.

DATE October 28, 2023 PAGE 21 of 21

12. OVERALL PROJECT PROGRESS TIMELINE

Page 21 of 21