Monthly Progress Report No 05
Monthly Progress Report No 05
05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 1 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Contents
1. INTRODUCTION ............................................................................................................................................................. 3
2. PROJECT SUMMARY ................................................................................................................................................... 3
2.1 OVERALL ...................................................................................................................................................................... 3
3. PROJECT STAGE SUMMARY STATUS .................................................................................................................... 3
3.1 ENGINEERING AND DESIGN................................................................................................................................ 3
3.2 MOBILIZATION ....................................................................................................................................................... 4
3.3 PROCUREMENT .................................................................................................................................................... 4
4. MONTHLY EXECUTIVE SUMMARY .............................................................................................................................. 5
4.1 MAIN ACTIVITIES DONE THIS MONTH ................................................................................................................ 5
4.2 MAIN ACTIVITIES NEXT MONTH .......................................................................................................................... 5
5. HEALTH AND SAFETY ................................................................................................................................................. 5
5.1 PERFORMANCE INDICATOR ................................................................................................................................ 5
6. ENVIRONMENTAL ......................................................................................................................................................... 6
7. DETAIL ACTIVITIES ENGINEERING ............................................................................................................................. 6
7.1 DISCIPLINE STATUS ............................................................................................................................................. 6
7.2 DOCUMENT ISSUE STATUS BY DISCIPLINE .................................................................................................... 6
7.3 DOCUMENT LIST AND STATUS ........................................................................................................................... 7
8. DETAIL ACTIVITIES QC TESTING ................................................................................................................................ 8
9. DETAIL ACTIVITIES PROCUREMENT .......................................................................................................................... 8
9.1 PROCUREMENT STATUS BY DISCIPLINE .......................................................................................................... 8
9.2 MATERIAL SHIPPING STATUS SUMMARY ......................................................................................................... 9
9.3 MATERIAL DELIVERY STATUS BY MODE OF SHIPMENT ................................................................................. 9
10. DETAIL ACTIVITY CONSTRUCTION ........................................................................................................................ 9
10.1 DETAIL CONSTRUCTION PROGRESS ................................................................................................................ 9
11. PROGRESS PHOTOS .............................................................................................................................................. 10
12. OVERALL PROJECT PROGRESS TIMELINE ......................................................................................................... 21
Page 2 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
1. INTRODUCTION
PROJECT NAME COM-FSM TEACHING CLINIC PROJECT CODE JR0690
DATE OF STATUS
PROJECT MANAGER Manolo Mendoza ENTRY
28-October-23
PROJECTED DATE OF
PERIOD COVERED September 28, 2023 to October 27, 2023 COMPLETION
13-Mar-25
2. PROJECT SUMMARY
2.1 OVERALL
WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. STAGE
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE
1 ENGINEERING AND DESIGN 13.00% 7.00% 5.00% 2.00% 4.00% 2.00% 2.00% 11.00% 7.00% 4.00%
2 CONSTRUCTION 32.00 % 3.00% 3.00% 0.00% 5.00% 1.00% 4.00% 7.00% 4.00% 3.00%
3 PROCUREMENT 48.00 % 5.00% 5.00% 0.00% 5.00% 1.00% 4.00% 10.00% 6.00% 4.00%
MOBILIZATION
4 8.00 % 8.00% 4.00% 4.00% 0.00% 0.00% 0.00% 8.00% 4.00% 4.00%
(EQUIP+MANPOWER)
OVERALL PROGRESS 100.00 % 28.00% 20.0% 8.00% 14.00% 4.00% 10.00% 36.00% 21.00% 15.00%
WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. ITEM DESCRIPTION
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE
1 DESIGN SCOPING 5.00 % 5.00% 5.00% 0.00% 0.00% 0.00 0.00% 5.00% 5.00% 0.00%
2 DESIGN AND DETAILING 60.00 % 40.00% 30.00% 10.00% 14.00% 7.00% 7.00% 54.00% 37.00% 17.00%
3 COMPLETION 30.00 % 0.00% 0.00% 0.00% 12.00% 4.00% 8.00% 12.00% 4.00% 8.00%
4 DRAWING SUBMITTALS 5.00 % 5.00% 1.00% 4.00% 4.00% 4.00% 0.00% 9.00% 5.00% 4.00%
OVERALL PROGRESS 100.00 % 50.00% 36.00% 14.00% 30.00% 15.00% 15.00% 80.00% 51.00% 29.00%
Page 3 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
3.2 MOBILIZATION
WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONTH
NO. ITEM DESCRIPTION
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE
1 TEMPORARY SITE FACILITY 30.00 % 30.00% 30.00% 0.00% 0.00% 0.00% 0.00% 30.00% 30.00% 0.00%
2 EQUIPMENT 50.00 % 50.00% 35.00% 15.00% 15.00% 0.00% 15.00% 50.00% 35.00% 15.00%
3 MANPOWER 20.00 % 20.00% 6.00% 14.00% 14.00% 3.00% 11.00% 20.00% 9.00% 11.00%
OVERALL PROGRESS 100.00 % 100.00 % 71.00 % 29.00 % 29.00 % 3.00 % 26.00 % 100.00 % 74.00 % 26.00 %
3.3 PROCUREMENT
WEIGHT CUMULATIVE LAST MONTH PROGRESS THIS MONTH CUMULATIVE THIS MONT
NO. ITEM DESCRIPTION
(WF %) PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE PLANNED ACTUAL VARIANCE
1 PRELIMINARY WORKS 5.00 % 5.00 % 5.00 % 0.00 % 0.00 % 0.00 % 0.00 % 5.00 % 5.00 % 0.00 %
2 EARTHWORKS MATERIALS 13.00 % 13.00 % 9.00 % 4.00 % 4.00 % 1.00 % 3.00 % 13.00 % 10.00 % 3.00 %
3 CONCRETE MATERIALS 20.00 % 10.00% 10.00 % 0.00 % 5.00 % 0.00 % 5.00 % 15.00 % 10.00 % 5.00 %
10 DOORS 3.00 %
11 WINDOWS 3.00 %
13 MECHANICAL 2.00 %
14 ELECTRICAL 5.00 %
17 DRAINAGE 2.00 %
18 FURNISHING 7.00 %
OVERALL PROGRESS 100.00 % 28.00 % 24.00 % 4.00 % 9.00 % 1.00 % 8.00 % 33.00 % 25.00 % 8.00 %
Page 4 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
2 PROCUREMENT A. REQUEST QUOTATIONS ON DOORS, WINDOWS AND OTHER FINISHING MATERIALS ONCE APPROVED
2 PROCUREMENT F. REQUEST QUOTATIONS ON DOORS, WINDOWS AND OTHER FINISHING MATERIALS ONCE APPROVED
Page 5 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
6. ENVIRONMENTAL
ISSUES CORRECTIVE ACTIONS PHOTO
Page 6 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 7 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
3 TRIAL MIX/COMPRESSION TEST/14 DAYS DT&I LABORATORY 3 DT&I LAB TECHNICIAN October 28, 2023
1 PRELIMINARY WORKS 90,597.00 54,358.00 54,358.00 0.00 36,239.00 36,239.00 0.00 90,597.00 90,597.00 0.00
2 EARTHWORKS MATERIALS 336,384.00 336,384.00 252,387.00 113,997.00 113,997.00 23,000.00 90,997.00 336,384.00 275,387.00 60,997.00
3 CONCRETE MATERIALS 418,303.00 209,152.00 209,152.00 0.00 0.00 0.00 0.00 209,152.00 209,152.00 0.00
10 DOORS 63,273.00
11 WINDOWS 56,212.00
13 MECHANICAL 51,059.00
14 ELECTRICAL 123,674.00
Page 8 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
17 DRAINAGE 34,811.00
18 FURNISHING 181,996.00
TOTAL
1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
1 PRELIMINARY WORKS 132,858.33 101,000.00 101,000.00 0.00 22,858.33 0.00 0.00 132,858.33 101,000.00 22,858.33
2 EARTHWORKS 537,280.00 230,480.00 230,480.00 0.00 123,188.00 61,594.00 61,594.00 353,668.00 292,074.00 61,594.00
3 CONCRETE WORKS 697,171.10 144,594.10. 144,594.10 0.00 160,427.06 52,720.60 107,706.46 305,021.16 197,394.56 107,706.6
Page 9 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
10 DOORS 105,455.00
11 WINDOWS 93,686.48
13 MECHANICAL 85,369.10
14 ELECTRICAL 206,123.70
17 DRAINAGE 58,018.08
18 FURNISHING 303,326.00
TOTAL
Page 10 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 11 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 12 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 13 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 14 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 15 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 16 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 17 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 18 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 19 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 20 of 21
MONTHLY PROGRESS REPORT NO. 05
DOC.
TCVCS-MPR-05 REVISION 00
NO.
Page 21 of 21