Project: SUBESTACION PLAZA VEA ETAP Page: 1

Location: 20.0.0C Date: 03-18-2021

Contract: ARCO ELECTRICO SE PLAZA VEA SN:

Engineer: ING. FRANCIR ESCOBEDO PERALTA Revision: Base


Study Case: LF
Filename: ECP_PLAZAVEA Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Alimentador MT Cable 269.49 11.16 4.14

Alimentador Plaza Vea Cable 269.49 11.16 4.14

Cable-1E Cable 1073.24 1.03 0.10

Cable-1N Cable 1892.74 249.28 13.17

Cable-2E Cable 380.00 45.67 12.02

Cable-2N Cable 275.00 11.38 4.14

Cable-3E Cable 275.00 82.68 30.06

Cable-3N Cable 230.00 59.92 26.05

Cable-4E Cable 1073.24 103.43 9.64

Cable-4N Cable 330.00 22.34 6.77

Cable-5E Cable 230.00 7.18 3.12

Cable-5N Cable 125.00 1.10 0.88

Cable-6E Cable 125.00 6.87 5.49

Cable-6N Cable 125.00 1.24 0.99

Cable-7E Cable 330.00 1.03 0.31

Cable-7N Cable 125.00 1.24 0.99

Cable-8N Cable 525.00 30.97 5.90

T1 Transformer 1.250 0.443 35.4 0.435 34.8

* Indicates a branch with operating load exceeding the branch capability.