1 2 3 4 5 6

GENERAL KEY PLAN:


N

LA
QIB
UP
NOTES:
GENERAL CONCRETE SERVICES AND UTILITIES UP

ABBREVIATIONS AND ACRONYMS UP

UP
UP
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS STATED OTHERWISE.
1. CEMENT, AGGREGATES, STEEL REINFORCEMENT, WATER, ADMIXTURES (IF 1. THE CONTRACTOR TO VERIFY THE LOCATION OF ALL EXISTING SERVICES AND PARKING

FORK
BAY

LIFT
PARKING

FORK
BAY

LIFT
POINT
CHARGING
: CENTRELINE
PARKING

FORK
BAY

LIFT
CL

POINT
CHARGING
NECESSARY) SHALL BE IN COMPLIANCE WITH DRAWINGS AND PROJECT UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.
2. ALL LEVELS ARE IN METRES AND RELATIVE TO EGM 2008.
E SPECIFICATIONS.
DIA. : DIAMETER
3. PROJECT COORDINATE SYSTEM 2. BEFORE UNDERTAKING ANY WORKS, THE CONTRACTOR SHALL ESTABLISH THE
2. ALL CONCRETE EDGES (INTERNAL AND EXTERNAL CORNERS) TO HAVE 25x25mm DRG. (DWG) : DRAWING
BE
SS

HORIZONTAL DATUM - WGS 84, ZONE 36 N LOCATION OF ALL EXISTING SERVICES AFFECTED BY THE WORKS AND ADVISE THE TION

CHAMFER UNLESS OTHERWISE NOTED.


TA

THIS DRAWING
BS
SU

PROJECTION - UTM EMPLOYER IF THERE ARE ANY UNKNOWN SERVICES THAT CAN POTENTIALLY BE EJ : EXPANSION JOINT SU
BS
TA
TION

AFFECTED BY THE WORKS


3. CONCRETE BELOW GROUND SHOULD RECEIVE PROTECTIVE COATINGS AS PER
4. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING FROM DRAWINGS. IJ : ISOLATION JOINT
SPECIFICATIONS.
ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED. FPL : FINISHED PAVEMENT LEVEL
4. CONTRACTOR TO SUBMIT CONSTRUCTION METHOD STATEMENT AND DETAILED
5. ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT GL : GROUND LEVEL
CASTING AND ERECTING ANY STRUCTURAL ELEMENTS. PHASING AND
DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SEQUENCING PLANS WILL ALSO BE REQUIRED FOR CONCRETE PLACEMENT TEMPORARY WORKS RCC : REINFORCED CEMENT CONCRETE
REVIEW AND COORDINATION OF ALL DRAWINGS PRIOR TO THE START WITH CONSTRUCTION JOINTS.
1. ANY TEMPORARY WORKS' DESIGN MUST TAKE INTO CONSIDERATION THE SAFETY TOC : TOP OF CONCRETE
OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE
BOUGHT TO THE ATTENTION OF ENGINEER PRIOR TO START OF 5. CONCRETE IS DESIGNED FOR 28 DAYS COMPRESSIVE STRENGTHS. CONCRETE OF THE LABOUR FORCE WORKING IN THE VICINITY. TOW : TOP OF WALL
CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY STRENGTH IS BASED ON CUBE STRENGTH TESTS UNLESS NOTED OTHERWISE. TYP. : TYPICAL
WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS 6. CONSTRUCTION JOINTS SHALL BE FULLY ROUGHENED PRIOR TO CASTING 2. THE CONTRACTOR IS RESPONSIBLE OF USING ADEQUATE AND APPROPRIATE
OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE JOINING CONCRETE. SHELDING MEASURES TO PREVENT FALLING DEBRIS AND PROTECT PASSING
CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE VEHICLES AND LABOR FORCE. NOTES:
OWNER OR CONSULTANT. 7. CONCRETE WORKS SHALL BE IN ACCORDANCE WITH PROJECT SPECIFICATION.
3. ANY TEMPORARY WORKS DRAWINGS AND METHOD STATEMENT SHALL INCLUDE
6. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR ENGINEER'S 8. DIMENSIONS AND MODULES SHOWN ON THE DRAWINGS ARE THEORETICAL INFORMATION ON LIGHTING, DIRECTIONAL SIGNS, MAINTENANCE, AND PROTECTION
APPROVAL BEFORE PROCEEDING FOR CONSTRUCTION. ONLY. IN THE DESIGN, FABRICATION AND INSTALLATION THE CONTRACTOR OF WORKS AGAINST VEHICULAR COLLISION.
SHALL MAKE ALLOWANCE FOR TOLERANCE.
7. ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE ENTIRE 4. APPROVAL OF THE TEMPORARY WORKS BY THE EMPLOYER SHALL NOT RELIEVE
PROJECT DRAWINGS, SPECIFICATIONS AND WITH SUCH OTHER 9. CONCRETE GRADE SHALL BE AS FOLLOWS:
THE CONTRACTOR FROM HIS CONTRACTUAL OBLIGATIONS WITH RESPECT TO
WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF BEAM = C50
INTEGRITY OF THE PROPOSED TEMPORARY WORKS AND PERMANENT WORKS.
THE CONTRACT. ANY DISCREPANCY SHALL BE REFERRED TO THE PILES = C50
EMPLOYER BEFORE PROCEEDING WITH THE WORK. BLINDING CONCRETE = C20
(REFER TO CONCRETE SPECIFICATION FOR DETAILS) 5. THE CONTRACTOR SHALL PROVIDE TEMPORARY FORMWORK TO FORM A WATER
TIGHT WORKING AREA WITHIN WHICH ANY IN-SITU CONCRETE CAN BE CAST OR
8. DURING CONSTRUCTION THE STRUCTURE SHALL BE MAINTAINED IN A TAKE SUITABLE MEASURES AS APPROVED BY THE ENGINEER/CLIENT.
10. ALL CONCRETE WORKS IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED
STABLE CONDITION AND NO PART SHALL BE OVERSTRESSED.
IN SPECIFICATION FOR CONCRETE WORKS (DOC NO.
TEMPORARY BRACING AND BATTERS SHALL BE PROVIDED BY THE
D 03-000000-4800000507-CH2-STR-SPC-000001
CONTRACTOR TO KEEP THE WORKS AND EXCAVATION STABLE AT ALL
TIMES.
11. THE MINIMUM COVER TO THE OUTERMOST REINFORCEMENT SHALL BE MIN.
75mm.
9. THE CONTRACTOR SHALL PROVIDE CERTIFICATES FROM AN
APPROVED TESTING LABORATORY CERTIFYING THAT THE MATERIALS
HEALTH AND SAFETY
USED COMPLY WITH THE RELEVANT SPECIFICATIONS 1. WEATHER AND SEA-STATE FORECASTS SHOULD BE CLOSELY OBSERVED DURING
CONSTRUCTION.
10. THE CONTRACTOR SHALL SUBMIT A DETAILED METHOD STATEMENT REINFORCEMENT
FOR EACH CONSTRUCTION ACTIVITY TO THE EMPLOYER FOR 2. ALL TEMPORARY WORKS' PLATFORMS SHALL BE INCLUDED WITHIN THE CONTRACTOR'S
APPROVAL PRIOR TO THE COMMENCEMENT OF WORKS. 1. REINFORCEMENT SHALL BE IN ACCORDANCE WITH BS 4449, AND BENT IN METHOD STATEMENT.
ACCORDANCE WITH BS 8666. REINFORCEMENT TO BE HIGH YIELD 500 N/mm²
11. THE DESIGN AND CONSTRUCTION OF ANY TEMPORARY WORKS BY THE AND ARE IDENTIFIED BY A "B" PREFIX. T - TYPE 2 HIGH DEFORMED STEEL. 3. PERSONNEL AND PLANT SHOULD BE EVACUATED FROM THE TEMPORARY PLATFORMS
CONTRACTOR SHALL BE IN ACCORDANCE WITH THE RELEVANT DURING ROUGH SEA / ROUGH WEATHER.
LOCAL/INTERNATIONAL STANDARDS AND SUBMITTED FOR THE REVIEW 2. ALL REINFORCEMENT SHALL BE FIRMLY SUPPORTED ON APPROVED CHAIRS AT
OF THE EMPLOYER. NOT GREATER THAN 1m CENTRES BOTH WAYS.
4. THE CONSTRUCTION HEALTH AND SAFETY PLAN SHOULD INCLUDE DETAILS OF THE
3. MAINTAIN COVER TO REINFORCEMENT AT CHAMFERS, DRIP GROOVES, EVACUATION PROCEDURE FOR THE TEMPORARY WORKS' PLATFORMS.
12. ALL SAFETY LADDERS AND LIFE PROTECTION EQUIPMENT SHALL BE REGLETS ETC.
PROVIDED AS PER INTERNATIONAL STANDARDS AND AS REQUIRED BY 5. FOLLOWING A STORM EVENT, THE TEMPORARY WORKS' PLATFORMS SHOULD BE
RELEVANT AUTHORITIES. 4. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND NOT INSPECTED TO MAKE SURE THAT THEY ARE STILL SAFE TO WORK FROM.
NECESSARILY IN TRUE PROJECTION.
13. LOCATION AND NUMBER OF CONSTRUCTION JOINTS IF NOT SHOWN ON
THE DRAWINGS SHALL BE KEPT TO A MINIMUM CONSISTENT WITH 5. REINFORCEMENT LAPS WHEREVER ESSENTIAL SHALL BE PROVIDED AT
PRACTICAL CONSTRUCTION AND EFFECT ON THE APPEARANCE OF PREDETERMINED AN APPROVED LOCATIONS.
STRUCTURE AND SHALL BE AS APPROVED BY THE EMPLOYER.
6. REINFORCEMENT STEEL CALL OUT
14. THE CONTRACTOR SHALL FOLLOW ALL THE CODES AND STANDARDS 8 B 16 200 T
MENTIONED IN THE SPECIFICATIONS. IN CASE OF ANY CONFLICT
LAYOUT FACE LOCATION
BETWEEN THE STANDARDS, THE CONTRACTOR SHALL SEEK
APPROVAL FROM THE EMPLOYER. BARS CENTER SPACING (mm) REFERENCE NUMBER DESCRIPTION
03-100001-4800000507-CH2-STR-DRG-000005 T1 Area - RMG Beam Drawing List
BAR DIAMETER
C 15. THE CONTRACTOR SHALL OBTAIN ALL THE REQUIRED PERMITS FOR
COMPLETING THE WORKS. B- FOR TYPE 2 STEEL DEFORMED BARS TO BS 4449
NUMBERS
16. IT SHALL BE CONTRACTOR’S SOLE RESPONSIBILITY TO DESIGN AND
PROVIDE ADEQUATE SHORING, BRACING, AND FORMWORK, ETC. AS T TOP
REQUIRED FOR THE PROTECTION OF LIFE AND PROPERTY DURING B BOTTOM
THE CONSTRUCTION OF THE STRUCTURE. SHORING AND BRACING C/C CENTRE TO CENTRE
SHALL REMAIN IN PLACE UNTIL THE STRUCTURE IS COMPLETED.
7. THE CONTRACTOR IS RESPONSIBLE FOR PRODUCING FULLY DETAILED G.A.S,
REINFORCEMENT SCHEDULES, FABRICATION DRAWINGS FOR STEEL WORK,
17. SHORING DRAWINGS AND CALCULATIONS SHALL BE SEALED BY A AND SHEETING DETAILS.
COMPETENT ENGINEER AND SUBMITTED TO THE APPROVAL OF
ENGINEER AND AUTHORITIES. 8. THE FOLLOWING LAP/TENSION ANCHORAGE LENGTH SHALL APPLY TO ALL
REINFORCEMENT.
18. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO
PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES
REINFORCEMENT BAR SCHEDULE
SHALL INCLUDE, BUT NOT LIMITED TO BRACING, SHORING FOR LOADS
DUE TO CONSTRUCTION, EQUIPMENT , ETC. OBSERVATION VISITS TO
BAR TYPE LAP LENGTH COG LENGTH STAGE:
C:\Users\Sarabjit Singh\OneDrive - Jacobs\_Oxagon_Tender Design\_01. OXAGON PORT CS\WER 01\RMG BEAM\03-100001-4800000507-CH2-STR-DRG-000006.dwg

THE SITE BY STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION


OF THE ABOVE ITEMS. B12 500 210
B16 650 250
B20 800 300
A 3C DETAILED DESIGN ELN 21.02.23
B25 1000 370 REV DESCRIPTION APP DATE
B32 1300 470 PURPOSE OF ISSUE:
ISSUED FOR REVIEW
* COG LENGTH MEASURED FROM START OF BEND
CLIENT: PROGRAMME MANAGEMENT CONSULTANT:
9. LAPPING OF REINFORCEMENT SHALL NOT BE AT THE LOCATION OF MAXIMUM
BENDING MOMENT.

B 10. WELDING AND/OR SITE CUTTING OF REINFORCEMENT SHALL NOT BE


PERMITTED UNLESS REVIEWED AND ACCEPTED IN WRITING BY THE ENGINEER
OR SPECIFIED IN THE SPECIFICATION.

PORT DESIGN CONSULTANT: CONTRACTOR:

DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: SSH 21.02.23
CHECKED: VDD / GMU 21.02.23 CHECKED:
APPROVED: ELN 21.02.23 APPROVED:

SCALE: NTS SHEET SIZE: A0


DISCIPLINE NAME:
INFRA - CIVIL STRUCTURAL

T1 AREA - RMG CRANE BEAM


GENERAL NOTES
PROJECT NAME:

NEOM OXAGON
A
PORT DESIGN CONSULTANCY
NEOM OXAGON
NEOM
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE
20/02/2023 9:38:02 PM

03 100001 4800000507
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 STR DRG 000006 A


NEOM-NEN-PRC-010_TMP01_01.00