CODE NAME TITLE SICTION

246 ALI AMIN Planning Manager PLANNING


Production and raw materials
394 SAMEH MOHAMED PLANNING
coordinator and Man Power
Planning and Follow-up
342 AHMED ADEL PLANNING
Coordinator & Man Power
Planning and Follow-up
225 ABDELRAHMAN MOSTAFA PLANNING
Coordinator
Planning and Follow-up
323 AHMED ELSAYED PLANNING
Coordinator
DELIVERY
Delivery and Receiving
129 TAREK ABDELGHANY AND
Coordinator
RECEIVING
260 ASHRAF SAMY SAYED Dispatcher DISPATCH
PLANNING FACTORY
Name: Sameh Mohamed Ahmed Title: Production and raw materials coordinator and Man Power
Dep. : Planning Factory Department Code : 394

S/N TASKS REF. RESULT

Follow-up of the manufacturing order with the remainder of it per day and the number of hours used in its
1 manufacture Backlog Factory
‫متابعة امر التصنيع بالمتبقي منه يوميًا وعدد الساعات المستخدمة في تصنيعه‬
Follow up the production process in the factory with the production plan and material costs
2 ‫متابعة عملية االنتاج في المصنع مع خطة االنتاج وتكاليف المواد‬
Follow-up of the production process in the factory with the production
Graphical analysis of the production plan and workers plan
3 ‫تحليل بياني للخطة اإلنتاجية وخطة العمال‬ plan and material costs, in addition to a graphic analysis of the plan, and
Production follow-up work accurately for the results of my work to follow up on the
Meticulously follow up work for special results employees and their performance process
4 ‫متابعة العمل بدقة لنتائج خاصة‬ ‫متابعة عملية االنتاج في المصنع مع خطة االنتاج وتكاليف المواد اضافة الى تحليل بياني‬
‫ ومتابعة العمل بدقة لنتائج خاصة لدي لمتابعة الموظفين وعملية االداء لديهم‬, ‫بالخطة‬
Follow-up of employees and their performance process
5 ‫متابعة الموظفين وعملية االداء لديهم‬

6 Follow-up of raw materials and deficiencies in manufacturing orders and make a daily report on raw materials
‫متابعة الخامات والنواقص في اوامر التصنيع وعمل تقرير يومي خاص بالخامات‬

Follow up the actual hours and expected hours for each manufacturing order for each department
7 ‫متابعة الساعات الفعلية والساعات المتوقعة لكل أمر تصنيع لكل قسم‬ Man Power

Follow up the schedule of workers with actual, expected and overtime hours during the month
8 ‫متابعة جدول العمال بالساعات الفعلية والمتوقعة واإلضافي خالل الشهر‬ Man (H)

A graph showing the number of actual and expected hours and additional hours during the month
9 ‫رسم بياني يوضح عدد الساعات الفعلية والمتوقعة والساعات اإلضافية خالل الشهر‬ Utilization Hours

SIGNATURE MANAGER
PLANNING FACTORY
Name: ASHRAF SAMY SAYED Title: DISPATCHER
Dep. : Planning Factory Department Code : 260

S/N TASKS REF. RESULT

Write the delivery correctly and in accordance with the work order
1 ‫كتابة الدليفري بصورة صحيحة بشكل جيد ومطابق ألمر التصنيع‬ Delivery Note

Follow-up production lines and dispatch continuously to know each position


2 of work orders Following
‫متابعة خطوط االنتاج والتحميالت باستمرار لمعرفة كل موقف من اوامر التصنيع‬
Follow-up of the origins of the deliveries returning from the site so as not to
3 forget them and send them to planning Following
‫متابعة اصول الدليفريات العائدة من الموقع لعدم نسيانها وارسالها للتخطيط‬

‫ عمل‬Archive ‫ الوامر التصنيع بعد انتهاءها وعمل‬Filling ‫للدليفري بعد االسكان وكتابة سيريال‬
4 ‫الدليفري علي كفر امر التصنيع‬ Archive

SIGNATURE MANAGER
PLANNING FACTORY
Name: Tariq Mahmoud Abdul Ghani Title: Delivery and receiving officer
Dep. : Planning Factory Department Code : 129

S/N TASKS REF. RESULT

Dispensing the raw materials of manufacturing orders and delivering them to the
1 production line or site
‫صرف خامات اوامر التصنيع وتسليمها لخط االنتاج او الموقع‬

Follow up on the shortcomings of manufacturing orders and disburse them as soon


2 as they arrive according to priority
‫متابعة نواقص اوامر التصنيع وصرفها فور وصولها علي حسب االولوية‬

3 Distribution of manufacturing orders sent from the technical office


‫توزيع اوامر التصنيع المرسلة من المكتب الفني‬

SIGNATURE MANAGER
PLANNING FACTORY
Name: Ahmed Adel Ibrahim Title: Planning and Follow-up Coordinator & Man Power
Dep. : Planning Factory Department Code : 342

S/N TASKS REF. RESULT

Follow-up of the product during its entry and exit from the factory Production Follow
1 ‫متابعة المنتج اثناء دخوله وخروجه من المصنع‬ up
Follow up the actual hours and expected hours for each manufacturing order for each department
2 ‫متابعة الساعات الفعلية والساعات المتوقعة لكل أمر تصنيع لكل قسم‬ Man Power

Follow up the company's official tendency for manufacturing orders and their modifications
3 ‫متابعة الميل الرسمي للشركة ألوامر التصنيع وتعديالتها‬ Rev

Follow-up work orders for each project in meters


4 ‫متابعة اوامر الشغل الخاصة بكل مشروع باالمتار‬ Job No.

Continuous follow-up of project codes


5 ‫متابعة اكواد المشاريع باستمرار‬ Project No.

A graph showing the number of actual and expected hours and additional hours during the month
6 ‫رسم بياني يوضح عدد الساعات الفعلية والمتوقعة والساعات اإلضافية خالل الشهر‬ Utilization Hours

Follow up the schedule of workers with actual, expected and overtime hours during the month
7 ‫متابعة جدول العمال بالساعات الفعلية والمتوقعة واإلضافي خالل الشهر‬ Man (H)

SIGNATURE MANAGER
PLANNING FACTORY
Name: Ahmed El-Sayed Title: Planning and Follow-up Coordinator
Dep. : Planning Factory Department Code : 323

S/N TASKS REF. RESULT

Registration of manufacturing orders codes and numbers


1 ‫تسجيل اوامر التصنيع اكواد واعداد‬ Following up

Follow up the delivery details with each serial in the notebook


2 ‫متابعة تفاصيل الدليفري بكل سيريال في الدفتر‬ Delivery Details

Follow up on returns issued from the site


3 ‫متابعة المرتجعات الصادرة من الموقع‬ Rejections

Follow up supplier order


4 ‫تسجيل و متابعة اوامر التوريد‬ S.o No

Follow up the delivery and work for residents


5 ‫متابعة الدليفري وعمل له سكان‬ Scan

SIGNATURE MANAGER
PLANNING FACTORY
Name: Abdelrahman Mostafa Halafawy Title: Planning and Follow-up Coordinator
Dep. : Planning Factory Department Code : 225

S/N TASKS REF. RESULT

Reviewing Records Work order - Rejection - Delivery) No errors


1 )‫ الدليفريات‬- ‫ المرتجعات‬- ‫المراجعة علي التسجيالت (امر التصنيع‬ Rev ‫عدم وجود أخطاء‬
Follow up the work order and record the supplied delivery Follow up on codes and Quantity
2 ‫متابعة امر التصنيع وتسجيل الدليفري المورد به‬ Following up ‫متابعة االكواد واالعداد‬
Recording work orders, the total number of the category, and the total area of order and supplying
3 ‫تسجيل اوامر التصنيع إجمالي عدد الفئة وإجمالي المساحة تصنيع وتوريد‬ Register

Recording all manufacturing orders sent from the technical office throughout the month
4 ‫تسجيل كل اوامر التصنيع المرسلة من المكتب الفني علي مدار الشهر‬ Released

Record all that has been manufactured from the production line
5 ‫تسجيل كل ماتم تصنيعه من خط االنتاج‬ Productivity

Making an inventory of all projects and knowing their final position regarding raw materials and work orders
6 ‫عمل حصر بجميع المشاريع ومعرفة موقفهم النهائي بالنسبة للخامات والتصنيع‬ Final Situation

Make a weekly report of everything that was manufactured in the factory and everything that was supplied to the site in a
7 detailed and accurate manner, with a total area Weekly
‫عمل تقرير أسبوعي بكل ماتم تصنيعه في المصنع وبكل ماتم توريده للموقع بشكل مفصل ودقيق بإجمالي المساحة‬
Receiving quality reports and matching them with the manufacturing order
8 ‫استالم تقارير الجودة ومطابقتها بأمر التصنيع‬ Receiving

Follow up with sites to coordinate supplies


9 ‫المتابعة مع المواقع لتنسيق التوريدات‬ Calling