Feasibility of International Trade
Global Value Chain
to determine which of the two products, the Bugabyte or the Bugabyte Lite, is the best candidate
for outsourcing assembly.
In Need of Advice
Metrovox hires the services of Grunwald and Vogel, a manufacturing consultant, to help
determine how delivery times can be better managed and how to reduce its 30 percent late
delivery rates. On-time delivery lead times from procurement, assembly and circuit board testing
through to the assembly of the tested components in their casings takes approximately four
weeks. There are very specific measurements for circuit board quality testing compliance, defined
in terms of the solder used and the soldering process. The circuit boards for both the Bugabyte
and the Bugabyte Lite must have a minimum life span of ten years.
Annual demand for the Bugabyte in the first year of release is 300 percent over forecasted
demands. Production management and the sales team cannot reasonably predict future demand.
Since the Bugabyte Lite has experienced stability in sales over the past two years, forecasting
has been accurate and the margin of error is much lower than that of the Bugabyte. The entire
assembly process for Bugabyte and the Bugabyte Lite accounts for about 5 percent of each
product’s price, and is not viewed as an aspect that contributes to the product’s competitive
advantage.
With the recent design and production of the Bugabyte, Metrovox has had to include several new
stages in the assembly stage, to accommodate the video capability of the product. There is also
a significant amount of proprietary information that is used during circuit board testing. Bugabyte
Lite has a well established assembly process because of its existing presence in the market.
Product testing is based on technology that is widely used and that has been around for five years.
Outsourcing Criteria
Grunweld and Vogel’s task is to assess which product is the most suitable candidate for
outsourcing assembly. A key element that needs to be taken into account is that the new supplier
and assembler must commit to delivering the assembled circuit boards to meet Metrovox’s
delivery schedule. Metrovox has an agreement with North American distributors and European
retailers that it would deliver the Bugabyte and Bugabyte Lite in the same shipment. With quality
and defective rates a concern of management, the outsourced assembler must ensure Metrovox
will maintain its market position and competitive advantage.
© FITT 2
Feasibility of International Trade
Global Value Chain
Learning Outcomes
This case study relates to the following learning outcomes from the module Cost and Pricing
Analysis and Risk Analysis and Management in the course Feasibility of International Trade and
the module Document Management in the course Global Value Chain:
© FITT 3
Feasibility of International Trade
Global Value Chain
1. Based on the risk factors associated with the Bugabyte and the Bugabyte Lite, which product
do you think Grunwald and Vogel will recommend as the best candidate for assembly
outsourcing?
2. Based on Grunwald and Vogel’s decision, what will be the benefits and disadvantages of
outsourcing the assembly function?
3. If Metrovox can outsource the assembly of the circuit boards to an existing supplier, discuss
the key contract issues Metrovox will need to consider with its supplier.
4. Which inventory management strategy should Grunwald and Vogel recommend Metrovox
adopt to ensure efficiencies throughout its entire supply chain? Why?
© FITT 4
Feasibility of International Trade
Global Value Chain
Photo Attributions
Image #1 (Mobile)
Attribution: No attribution required Licence: Public Domain, free for commercial use
pixabay.com/en/mobile-phone-iphone-music-616012
Image #2 (Globe)
Attribution: No attribution required Licence: Public Domain, free for commercial use
pixabay.com/en/international-world-global-earth-1952464
Attribution: No attribution required Licence: Public Domain, free for commercial use
pixabay.com/en/hard-disk-storage-computer-159264
© FITT 5