Professional Documents
Culture Documents
FSVP Sop
FSVP Sop
● Scope - This SOP delineates the actions and responsibilities for the Foreign Supplier Verification
Program for (insert facility name)
● Purpose - This SOP is in conformance with FD&CA 801 (q) and the Foreign Supplier Verification
Program rule under FSMA and any GFSI scheme requirements
● Requirements – None
● Responsibilities - It is the responsibility of the owner or designee to understand and comply with this
SOP. This SOP, and the suppliers interviewed must be updated every 3 years.
● Storage - The documentation generated for this SOP will be stored on site for 6 months, and then
available from either onsite or offsite storage with 48 hours of request for a minimum of 3 years.
Procedure
In compliance with the FSVP SOP:
Importer Identification Number. This facility will have an importer identification number
(DUNS) for each line entry of food that is imported.
Foreign Supplier Assessment. This facility will conduct, an assessment based on FD&C 801 q
requirements and industry standards on each one of its foreign suppliers. Results will be recorded
on the foreign supplier assessment form. This assessment will be part of the foreign supplier
approval or denial process.
Compliance Status Review. This facility will conduct a compliance status review on each of its
foreign suppliers, every 3 years. This will done by way of querying local government, FDA and
foreign governments for warning letters and alerts pertaining to the foreign supplier. This will be
recorded on the compliance status review form. This compliance status review will be part of the
foreign supplier approval or denial process.
Hazard Analysis. This facility will evaluate each foreign food it imports for potential physical,
chemical or microbial hazards that are reasonably likely to occur (RLTO). This hazard analysis will
be recorded on the Hazard Analysis form. This hazard analysis will be part of the foreign supplier
approval or denial process.
Foreign Supplier Registry. This facility will add each of its approved foreign supplier to the
foreign supplier registry.
FSVP Customer complaint. This facility will track its corrective actions based on customer
complaints. Customer complaints will be recorded on the FSVP customer complaint form.
Signatory Authority:
Print Name:
Sign Name:
Job:
Date:
Implementation/Revision History:
Date Action
Implementation
1. Purpose: The purpose of this Standard Operating Procedure (SOP) is to establish the protocol for the Foreign
Supplier Verification Program (FSVP) to ensure that imported food products meet the requirements of the Food
Safety Modernization Act (FSMA) and other relevant regulations.
2. Scope: This SOP applies to all employees involved in the procurement, import, and verification of foreign
suppliers for food products intended for distribution and sale in [Company Name] or to [Specify Market or Region].
3. Responsibilities:
4. Procedure:
Assess the foreign supplier's compliance with applicable food safety regulations.
Collect and review supplier documentation, including Certificates of Analysis (COAs), third-party audit
reports, and other relevant records.
Review the foreign supplier's food safety plan to ensure it addresses identified hazards and complies with
FSMA requirements.
Perform on-site audits of high-risk foreign suppliers to assess compliance with food safety standards.
Establish procedures for addressing non-compliance or safety issues identified during supplier verification.
Communicate corrective actions to the supplier and track their implementation.
Regularly re-evaluate foreign suppliers to ensure ongoing compliance with FSMA and food safety standards.
6. Training:
Ensure that employees involved in FSVP activities are adequately trained in food safety regulations, hazard
analysis, and verification procedures.
Regularly review and update this SOP to reflect changes in regulations, processes, or supplier relationships.
8. References:
List any relevant regulations, guidelines, or standards that this SOP is based on.
9. Approval:
This SOP must be approved by [Name and Title] and reviewed at regular intervals to ensure its continued
effectiveness and compliance.
Scope: This SOP outlines the actions and responsibilities for the Foreign Supplier Verification Program
for [Insert Facility Name].
Purpose: This SOP is in compliance with FD&CA 801(q) and the Foreign Supplier Verification Program
rule under FSMA, as well as any applicable GFSI scheme requirements.
Requirements: None
Responsibilities:
The owner or designee is responsible for understanding and complying with this SOP.
This SOP and supplier information must be updated every 3 years.
Storage:
All documentation generated by this SOP will be stored on-site for 6 months.
After 6 months, the documents will be available from either on-site or off-site storage within 48
hours of request for a minimum of 3 years.
Procedure:
Verification/Validation:
The owner or designee will review the records generated by this SOP.
The owner or designee will assess procedures and implement Corrective Actions (CAR) as
needed for non-compliance.
Documents:
FSVP Registry
FSVP Assessment
FSVP Compliance Status Review
FSVP Hazard Analysis
FOREIGN SUPPLIER VERIFICATION PROGRAM SOP
Please ensure that this simplified FSVP aligns with your specific requirements and the relevant
regulations in your region. You may need to adapt and expand upon this SOP as needed to meet the
unique needs of your facility and your foreign supplier verification program.