Item

No. AP Code

I Substation
GIS
€ 310.10

€ 310.11 Reduction rectifier group


€ 310.12 Process rectifier group
Filter and Capaity bank
€ 310.13
Transfomer
€ 310.14
Control building + 3MVA Transformer
€ 310.15
Oil pit
310.16

II Potline
Potline A+B
€ 320.00
Side Entrance & Pedestrian access
320.1
Access to ground floor & Safety shower
320.2 (1)
Access to ground floor & Safety shower
320.3 (2)
Access to ground floor & Safety shower
320.4 (3)
Electrical room
322.1~6
Potline Equipment Storage
320.6

III GTC
324.;325.;328. GTC1
;332.
324.;325.;328. GTC2
;332.
324.;325.;328. GTC3
;332.
Power loop Substation
710-02.
Power loop Substation
710-03.
Power loop Substation
710-04.
Power loop Substation
710-02.1
Power loop Substation
710-02.2
Foundation support for Conveyer
Alumina and Gas colector pipe

IV Cast house
Cast house
350.
Cast house area offices
350.15
Cast house cooling water
350.41
Alloying products storage (1)
351.32
Alloying products storage (2)
351.32
Dross treatment
359.
Cast house area maintenance workshop
625.
Cast house area warehousing
635.
Power loop Substation
710-06.

Power loop Substation


710-09.

V Rodding shop and cathode sealing


Cathode sealing & Lining material
341; 632 storage
Carbon area offices & Carbon area
360.15;626 maintenance workshop
Anode handling & Storage
364.
Anode assembly storage
381.
Anode assembly rodding shop & Cast
382.;386 iron recycling shop
Bath recycling shop
384.
Foundation support for Conveyer

Carbon recycling shop


385.
Power loop Substation
710-07.
Power loop Substation
710-07.2
Power loop Substation
710-07.3
Power loop Substation
710-07.4
Power loop Substation
710-07.5

VI Auxiliary works
Ladle & tapping tube cleaning
344.
Maintenance central workshop
620.
Main warehouse
630.

Fabrication workshop
Potshell
322.31
Superstructure
322.34
Busbar
322.33

Compressed air station


Compressed air station
747.
Power loop Substation
710-05.
Warehouse & Service station
Service station
650.
Fire pump house & Water tank
741.
Fire fighting water, Drinking water,
741, 742, 743 Industrial water
Power loop Substation
710-05.1
Flourinated product facilities
836.
Power loop Substation
710-08
Power loop Substation
710-08,1
Reduction area offices
320.15
Laboratory
641.
Potline equipment maintenance
346.
LPG Tank
0.
Argon Tank
0.

Main Silo
Silo 60kt
831.
Silo 60kt Tower
0.

VII Infrastructure, others


Internal roads for Buildings
0.
Potline

Casthouse + 344 +346+ 320,15&641

Anode rodding shop + 836 + 384 +


710.08 + 630
747&710.05

Water drain system for Buildings


0.
Potline

Casthouse

Anode rodding shop

Workshop

Auxiliary buildings

Metal storage
350.90
Brick storage
0.
Metal storage
0.
Storage area
0.
Plant main gate
0.

VIII 5.1ha Zone

Remark:
TBD: To be decided
Y: Detail design required
N: Detail design not required
C: Construction Completed
CIVIL ENGIN
PROJECT: DAK NONG

Civil guideline
Dimensions Area EPC
information

14,4x43,6mx Basment and Ground floor 1,256 Alstom- GE Received

20,75x32,6m x 7 bays (1 future bay) 4,735 Alstom- GE Received


9,4x9,46m x 6 bays (1 future bay) 534 Alstom- GE Received
14,65x12,6m 185 Alstom- GE Received

27,55 x 8,3m 229 Alstom- GE Received

14,8 x 40,4mx 3 floors + 3,95x3,132mx2 1,819 Alstom- GE Received

24x9x3m 216 Alstom- GE Received

1107x30,2mx 2 buildings 66,863 Rio Tinto AP Received

11x8,35mx 20 items 1,837 Rio Tinto AP Received

(1,3x15,69+0,9x4,6+1,8x1,8m)x 4items 111 Rio Tinto AP Received

(1,3x12,07+4,6x0,9+1,8x1,8m)x 16 items 369 Rio Tinto AP Received

(1,25x14,84+4,6x0,9+1,8x1,8m)x 6 items 156 Rio Tinto AP Received

5,4x13,7m x 6 items 444 Rio Tinto AP Received

40x57,97m x 2 items 4,638 Rio Tinto AP Received


15,210 Solios Received

15,714 Solios Received

16,218 Solios Received

12x60m 720 CIMAS Received

12x60m 720 CIMAS Received

12x60m 720 CIMAS Received

12x18m 216 CIMAS Received

12x18m 216 CIMAS Received

Solios Received

80x110m + 100x160m 24,800 AIF Not yet

15x24,6m 369 AIF Not yet

11x43,5m 479 AIF Not yet

25x50m 1,250 AIF Not yet

40x50m 2,000 AIF Not yet

25x35m 875 AIF Not yet

15x30m 450 AIF Not yet

15x15m 225 AIF Not yet

- Kích thước : 16x75m 1,200 CIMAS Received

- Kích thước : 16x75m 1,200 CIMAS Received

50x61m 3,050 Metaltech Received


30,12x23,81m 717 Metaltech Received

39,4x140m + 30x50m 7,016 Metaltech Received

124,4x118m 14,679 Metaltech Received

50x70,87m+57,56x79,12-30,12x23,81m 7,380 Metaltech Received

438 Solios Received


10x25+9x20,9m
Solios Received

47x55,2+40x31,56+20x15m 4,157 Metaltech Received

18,45x55,12m 1,017 CIMAS Received

18,45x55,12m 1,017 Metaltech Not yet

18,45x55,12m 1,017 Metaltech Not yet

18,45x55,12m 1,017 Metaltech Not yet

18,45x55,12m 1,017 Metaltech Not yet

28,8x78m 2,246 Techmo Received

30x100m 3,000 Received

35x95m 3,325 Received

25x100m x 2 bays 5,000 Received

25x100m x 2 bays 5,000 Received

25x100m x 2 bays 5,000 Received

39x26m 1,014 Atlas Copco Received

18x30m 540 CIMAS Received


10x18m 180 Not yet

D24m 452 CIMAS Received

21x48m 1,008 CIMAS Not yet

12x60m 192 CIMAS Received

15x40m 600 AP Received

12x60m 192 CIMAS Received

12x60m 192 CIMAS Received

24x23,97m 575 Received

12x24m 288 Received

30x91m 2,730 Received

10x20m 200 CIMAS Received

10x20m 200 Not yet

D=46 1,661 Solios Not yet

18x18m 324 Solios Not yet

- 41,004
38x168m + 65x97m+87x130m+30x63m 20,849

70x60m 4,200

40x100m 4,000

63x100m 6,300

- -
CIVIL ENGINEERING INFORMATION
OJECT: DAK NONG ALUMINIUM SMELTER PLANT

Civil Detail Design Scope

Structure
Architect Steel Structure Piling
Foundation Body

Y (Vapico) Y (Vapico) Y (ATAD)

Y (Vapico) Y (Vapico) Y (TBD)


Y (Vapico) Y (Vapico) Y (TBD)
Y (Vapico) Y (Vapico) N
Y(Vapico)
Y (Vapico) Y (Vapico) N

Y (Vapico) Y (Vapico) N

Y (Vapico) Y (Vapico) N

Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y (ATAD)


N Y(Vapico) N Y (Solios)

N Y(Vapico) N Y (Solios)

N Y(Vapico) N Y (Solios)

N Y(Vapico) Y(Vapico) N

N Y(Vapico) Y(Vapico) N

N Y(Vapico) Y(Vapico) N

N Y(Vapico) Y(Vapico) N

N Y(Vapico) Y(Vapico) N

N Y(Vapico) Y(Vapico) Y (Solios)

Y(Vapico) Y(Vapico) Y (TBD)

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y (TBD)

Y(Vapico) Y(Vapico) Y (TBD)


Y(Vapico)
Y(Vapico) Y(Vapico) Y (TBD)

Y(Vapico) Y(Vapico) Y (TBD)

Y(Vapico) Y(Vapico) Y (TBD)

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y (DD)


Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (Solios)

Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (TBD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y(Vapico) Y (ATAD)

Y(Vapico) Y(Vapico) Y (DD)


Y(Vapico)
Y(Vapico) Y(Vapico) N
TBD TBD TBD TBD

Y(Vapico) Y(Vapico) Y(Vapico) TBD

Y(Vapico) Y(Vapico) Y(Vapico) TBD

Y(Vapico) Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) TBD

Y(Vapico) Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) Y (DD)

Y(Vapico) Y(Vapico) Y(Vapico) N

Y(Vapico) Y(Vapico) Y(Vapico) N

N TBD TBD TBD

N Y(Vapico) Y(Vapico) TBD

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N
N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) N N

N Y(Vapico) Y(Vapico) N

Y Y N
Civil Construction

Foundation Structures Work to be finished- After Site Inspection

Completed Completed

Completed Completed
Remark
Fabrication done

Fabrication done

Fabrication done
Steel structure by Cladding
only
Floor (Slab) only

Floor (Slab) only

Floor (Slab) only


THQ
LEGEND CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL
NETWORKs

Engineering 100 % Completed ARCHI


TECTU
MASS U/G RAL
EARTH SERVIC FINISH
Engineering in Progress DUST/

CODING
WORK, ES ES HV
FOUND FIELD FUME/ UNDER RAIL PROCE

AREA
DRAIN (PIPING CONCR SIDING MASON (INCL. BUILDI MECHA PROCE &MV PANNE THQ
FENCIN EARLY FINAL LANDS ATION STRUC ROOF FIRE ERECT REFRA GAS GROUN CONDU SS PLC & PROGR MECHA
AGE, , ETE AND RY BLOCK NG NICAL SS POTLIN ELECT L & ELECT
Engineering - Future G & ROAD ROAD CAPIN PILING AND TURAL MONIT PROTE HVAC ED CORY COLLE PIPING D CTOR CABLI HARD AMMIN NICAL
TRENC CONDU TANKS/ ROOFI BUILDI WORK, UTILITI EQUIP EQUIP ING RICAL FIELD RICAL
GATES WAYS WAYS G CONCR STEEL ORS CTION BINS / WORK CTION EARTHI (CRAN NG (LV WARE G scope
HING, ITS, SILOS NG NG DOORS ES MENT MENT EQUIP DEVICE scope
ETE TANKS SYSTE NG E) & HV)
& DUCTB , MENT
M
CLEARI ANK, WINDO
NG …) WS,
PAINT'
G)

001 SITE PREPARATION

filters to
310 SUBSTATION finsihed
? ?

SUBSTATION AREA OFFICES (INCL. MAIN


310.15
DISTRIBUTION RM.)

320 REDUCTION POTLINES

320.15 Reduction Potline office

324 FLUORINATED ALUMINA FACILITIES

325 CRUSHED BATH FACILITIES

328 FRESH ALUMINA FACILITIES IN POTLINES

332 POT GAS DRY TREATMENT (GTC)

341 CATHODE SEALING

344 LADLE AND TAPPING TUBE CLEANING

345 P.T.A. MAINTENANCE

346 POTLINE EQUIPMENT MAINTENANCE

350 CASTHOUSE

350.15 CASTHOUSE AREA OFFICES

350.41 CASTHOUSE COOLING WATER

350.9 METAL STORAGE

351.32 ALLOYING PRODUCTS STORAGE

359 DROSS TREATMENT

360.15 CARBONE AREA OFFICES

364 ANODE HANDLING AND STORAGE

381 ANODE ASSEMBLY STORAGE

382 ANODE ASSEMBLY RODDING SHOP

383 STEM BRACKET REPAIR SHOP

384 BATH RECYCLING SHOP

385 CARBONE RECYCLING SHOP

386 CAST IRON RECYCLING SHOP

620 MAINTENANCE CENTRAL WORKSHOP

CASTHOUSE AREA MAINTENANCE


625
WORKSHOP

626 CARBON AREA MAINTENANCE WORKSHOP

630 MAIN WAREHOUSE

632 Carbon Block STORAGE

635 CASTHOUSE AREA WAREHOUSING

641 LABORATORY

642 ENTRANCE BLOCK

643 MANAGEMENT OFFICES

644 MAIN PRODUCTION OFFICES

645 CLOAKROOMS - WASHROOMS

646 CAFETERIA

650 SERVICE STATION

710 POWER LOOP SUBSTATIONS

FIRE FIGHTING WATER/ FIRE DETECTION (Incl.


741
in site prep)

742 DRINKING WATER (Incl. in site prep)

743 INDUSTRIAL WATER (Incl. in site prep)

747 COMPRESSED AIR STATION

831 ALUMINA FACILITIES ON SITE

836 FLUORINATED PRODUCT FACILITIES

322 Fabrication Workshop

RAIL CONDUCTOR (CRANE)


UNDERGROUND EARTHING
ARCHITECTURAL FINISHES
CONDUITS, DUCTBANK, …)
DRAINAGE, TRENCHING, &

MECHANICAL EQUIPMENT

FACILTIES' LEGEND
CONCRETE TANKS/SILOS

PROCESS CABLING (LV &

PANNEL & FIELD DEVICE


U/G SERVICES (PIPING,

FIELD ERECTED BINS /

COLLECTION SYSTEM
SIDING AND ROOFING

HV &MV ELECTRICAL
STRUCTURAL STEEL

MASONRY BUILDING

(INCL. BLOCKWORK,
MASS EARTHWORK,

REFRACORY WORK
EARLY ROADWAYS

DOORS, WINDOWS,
FENCING & GATES

PLC & HARDWARE


FINAL ROADWAYS

FOUNDATION AND

FIRE PROTECTION
ROOF MONITORS

DUST/FUME/GAS

PROGRAMMING
LANDSCAPING

MECHANICAL

ELECTRICAL
EQUIPMENT
CONCRETE

Added details

POTLINING
CLEARING

PAINT'G)

TANKS

PIPING
PILING

HVAC

HV)
CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL THQ NETWORKs
CODING

CODING

AREA
SITE PREPARATION 001

SUBSTATION 310

SUBSTATION AREA OFFICES (INCL.


310.15
MAIN DISTRIBUTION RM.)

REDUCTION POTLINES 320

Reduction Potline office

FLUORINATED ALUMINA FACILITIES 324

CRUSHED BATH FACILITIES 325

FRESH ALUMINA FACILITIES IN


328
POTLINES

POT GAS DRY TREATMENT (GTC) 332

CATHODE SEALING 341

LADLE AND TAPPING TUBE


344
CLEANING

P.T.A. MAINTENANCE 345

POTLINE EQUIPMENT
346
MAINTENANCE

CASTHOUSE 350

CASTHOUSE AREA OFFICES 350.15

CASTHOUSE COOLING WATER 350.41

METAL STORAGE 350.9

ALLOYING PRODUCTS STORAGE 351.32

DROSS TREATMENT 359

CARBONE AREA OFFICES 360.15

ANODE HANDLING AND STORAGE 364

ANODE ASSEMBLY STORAGE 381

ANODE ASSEMBLY RODDING SHOP 382

STEM BRACKET REPAIR SHOP 383

BATH RECYCLING SHOP 384

CARBONE RECYCLING SHOP 385

CAST IRON RECYCLING SHOP 386

MAINTENANCE CENTRAL
620
WORKSHOP
CASTHOUSE AREA MAINTENANCE
625
WORKSHOP
CARBON AREA MAINTENANCE
626
WORKSHOP

MAIN WAREHOUSE 630

632

CASTHOUSE AREA WAREHOUSING 635

LABORATORY 641

ENTRANCE BLOCK 642

MANAGEMENT OFFICES 643

MAIN PRODUCTION OFFICES 644

CLOAKROOMS - WASHROOMS 645

CAFETERIA 646

SERVICE STATION 650

POWER LOOP SUBSTATIONS 710

FIRE FIGHTING WATER/ FIRE


741
DETECTION (Incl. in site prep)

DRINKING WATER (Incl. in site prep) 742

INDUSTRIAL WATER (Incl. in site


743
prep)

COMPRESSED AIR STATION 747

ALUMINA FACILITIES ON SITE 831

FLUORINATED PRODUCT FACILITIES 836

Fabrication Workshop 322


S
E
I
T
I
L
I
C
A
F

L
A
S
O
P
S
I
D

S
G
N
I
L
I
A
T

NOTES
LEGEND CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL NETWORK

Construction 100 % Completed


ARCHI
TECTU
RAL
Construction in Progress

CODING
FINISH

AREA
MASS U/G ES
EARTH SERVIC (INCL.
Construction - Future WORK, ES BLOCK
DRAIN (PIPING WORK, DUST/
AGE, , DOORS FUME/ HV
TRENC CONDU FOUND , FIELD GAS UNDER RAIL PROCE &MV
HING, ITS, ATION CONCR SIDING MASON WINDO BUILDI MECHA PROCE ERECT COLLE GROUN CONDU SS ELECT PANNE
& FENCIN EARLY FINAL DUCTB LANDS AND ETE STRUC AND RY ROOF WS, NG FIRE NICAL SS ED REFRA CTION D CTOR CABLI RICAL L & PLC & PROGR
CLEARI G & ROAD ROAD ANK, CAPIN CONCR TANKS/ TURAL ROOFI BUILDI MONIT PAINT' UTILITI PROTE EQUIP EQUIP BINS / CORY POTLIN SYSTE EARTHI (CRAN NG (LV EQUIP FIELD HARD AMMIN MECHA ELECT
NG GATES WAYS WAYS …) G PILING ETE SILOS STEEL NG NG ORS G) ES CTION HVAC MENT MENT TANKS WORK ING M PIPING NG E) & HV) MENT DEVICE WARE G NICAL RICAL

001 SITE PREPARATION 75 75 75 80

310 SUBSTATION 80 60 90 40 40 25 95 10

SUBSTATION AREA OFFICES (INCL. MAIN


310.15 80 50 30 10
DISTRIBUTION RM.)

320 REDUCTION POTLINES 65 10 65 75 30 35 35 10 20 10

320.15 REDUCTION POTLINE OFFICE 75 75 70 60 20

324 FLUORINATED ALUMINA FACILITIES 60 75 30 20 15 10 10

325 CRUSHED BATH FACILITIES 60 75 30 20 15 10 10

328 FRESH ALUMINA FACILITIES IN POTLINES 60 75 30 20 15 10 10

332 POT GAS DRY TREATMENT (GTC) 60 75 30 20 15 10 10

341 CATHODE SEALING 30 5 90

344 LADLE AND TAPPING TUBE CLEANING 5 10 20 80 80 60 20

345 P.T.A. MAINTENANCE 75 35 90 90 50 50 25

346 POTLINE EQUIPMENT MAINTENANCE 10 30

350 CASTHOUSE 15 15 10 20

350.15 CASTHOUSE AREA OFFICES 15 30 30

350.41 CASTHOUSE COOLING WATER

350.9 METAL STORAGE 75

351.32 ALLOYING PRODUCTS STORAGE 15 15 10 20

359 DROSS TREATMENT 15 15 10 20

360.15 CARBONE AREA OFFICES 50 25 90 50 75 10

364 ANODE HANDLING AND STORAGE 30 5 90

381 ANODE ASSEMBLY STORAGE 30 5 90

382 ANODE ASSEMBLY RODDING SHOP 30 5 90

383 STEM BRACKET REPAIR SHOP 30 5 90

384 BATH RECYCLING SHOP

385 CARBONE RECYCLING SHOP 30 5 90

386 CAST IRON RECYCLING SHOP 30 5 90

620 MAINTENANCE CENTRAL WORKSHOP 40 30 20 40

CASTHOUSE AREA MAINTENANCE


625 15 30 30
WORKSHOP

626 CARBON AREA MAINTENANCE WORKSHOP 50 25 90 50 75 10

630 MAIN WAREHOUSE

632 LINING MATERIAL STORAGE 30 5 90

635 CASTHOUSE AREA WAREHOUSING 15 30 30

641 LABORATORY 75 75 70 60 20

642 ENTRANCE BLOCK

643 MANAGEMENT OFFICES

644 MAIN PRODUCTION OFFICES

645 CLOAKROOMS - WASHROOMS

646 CAFETERIA

650 SERVICE STATION (BY GOV)

710 POWER LOOP SUBSTATIONS 10 20 20 60 50 50 10

FIRE FIGHTING WATER/ FIRE DETECTION (Incl.


741 5 30 10
in site prep)

742 DRINKING WATER (Incl. in site prep)

743 INDUSTRIAL WATER (Incl. in site prep)

747 COMPRESSED AIR STATION 75 10 10 25

831 ALUMINA FACILITIES ON SITE

836 FLUORINATED PRODUCT FACILITIES 75 10 10 25

RAIL CONDUCTOR (CRANE)


UNDERGROUND EARTHING
ARCHITECTURAL FINISHES
CONDUITS, DUCTBANK, …)
DRAINAGE, TRENCHING, &

MECHANICAL EQUIPMENT
FACILTIES' LEGEND
CONCRETE TANKS/SILOS

PROCESS CABLING (LV &

PANNEL & FIELD DEVICE


U/G SERVICES (PIPING,

FIELD ERECTED BINS /

COLLECTION SYSTEM
SIDING AND ROOFING

HV &MV ELECTRICAL
STRUCTURAL STEEL

MASONRY BUILDING

(INCL. BLOCKWORK,
MASS EARTHWORK,

REFRACORY WORK
EARLY ROADWAYS

DOORS, WINDOWS,
FENCING & GATES

PLC & HARDWARE


FINAL ROADWAYS

FOUNDATION AND

FIRE PROTECTION
ROOF MONITORS

DUST/FUME/GAS

PROGRAMMING
LANDSCAPING

MECHANICAL

ELECTRICAL
EQUIPMENT
CONCRETE

Added details

POTLINING
CLEARING

PAINT'G)

TANKS

PIPING
PILING

HVAC

HV)
CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL NETWORK
CODING

CODING

AREA
SITE PREPARATION 001

SUBSTATION 310

SUBSTATION AREA OFFICES (INCL.


310.15
MAIN DISTRIBUTION RM.)

REDUCTION POTLINES 320

REDUCTION POTLINE OFFICE

FLUORINATED ALUMINA FACILITIES 324

CRUSHED BATH FACILITIES 325

FRESH ALUMINA FACILITIES IN


328
POTLINES

POT GAS DRY TREATMENT (GTC) 332

CATHODE SEALING 341

LADLE AND TAPPING TUBE


344
CLEANING

P.T.A. MAINTENANCE 345

POTLINE EQUIPMENT
346
MAINTENANCE

CASTHOUSE 350

CASTHOUSE AREA OFFICES 350.15

CASTHOUSE COOLING WATER 350.41

METAL STORAGE 350.9

ALLOYING PRODUCTS STORAGE 351.32

DROSS TREATMENT 359

CARBONE AREA OFFICES 360.15

ANODE HANDLING AND STORAGE 364

ANODE ASSEMBLY STORAGE 381

ANODE ASSEMBLY RODDING SHOP 382

STEM BRACKET REPAIR SHOP 383

BATH RECYCLING SHOP 384

CARBONE RECYCLING SHOP 385

CAST IRON RECYCLING SHOP 386

MAINTENANCE CENTRAL
620
WORKSHOP
CASTHOUSE AREA MAINTENANCE
625
WORKSHOP
CARBON AREA MAINTENANCE
626
WORKSHOP

MAIN WAREHOUSE 630

LINING MATERIAL STORAGE 632

CASTHOUSE AREA WAREHOUSING 635

LABORATORY 641

ENTRANCE BLOCK 642

MANAGEMENT OFFICES 643

MAIN PRODUCTION OFFICES 644

CLOAKROOMS - WASHROOMS 645

CAFETERIA 646

SERVICE STATION (BY GOV) 650

POWER LOOP SUBSTATIONS 710

FIRE FIGHTING WATER/ FIRE


741
DETECTION (Incl. in site prep)

DRINKING WATER (Incl. in site prep) 742

INDUSTRIAL WATER (Incl. in site


743
prep)

COMPRESSED AIR STATION 747

ALUMINA FACILITIES ON SITE 831

FLUORINATED PRODUCT FACILITIES 836


S
E
I
T
I
L
I
C
A
F

L
A
S
O
P
S
I
D

S
G
N
I
L
I
A
T

NOTES
MAIN SUBSTATION AREA- CURRENT STATUS AT
NO. TASKS / ACTIVITIES

1 310 - General Area


1.1 Civil Construction

Construction and inspection of Geometric dimension of HV cable


1.1.1
trench
Construction and inspection of the Geometric dimension of MV cable
1.1.2
trench

1.1.3 Construction Cable trench from control Building to Harmonic Filter

Construction and inspection the Geometric dimension of Cable trench


1.1.4 from RT Transformer to Harmonic Filter and Main Substation Control
Building

1.2 M&E

1.2.1 Construction of water drainage for Main Substation Area

Construction of out door lighting system for Entire Main Substation


1.2.2
Area

1.2.3 Installation and Measuring earthing in all Main Substation Areas

2 310.10- GIS Area


2.1 Civil Construction

Building

2.1.1 Foundation of GIS building

2.1.2 Inspect the geometric dimensions of Structure & Architecture

2.1.3 Finishing and inspection of floors and roofs

2.1.4 Installation of crane rail and inspection of required spec

2.1.5 Installation of crane and inspection of required spec

2.1.6 Complete stairs and inspection required spec

2.1.7 Finishing and inspection of door frame spec

2.1.8 Safety Hand Rails contstructed and Installed

Floor

2.1.8 Epoxy paint 1st floor

2.1.9 Bolts mounted in floor for GIS Circuit Breakers


2.1.10 Check the flat floor Floor 1 (Tolerance +/- 2mm)

2.1.11 Construction of all cable entrances and exits to buiding

Check correct Cable Cut Outs in GIS floor- Close Holes with Wooden
2.1.12
boards

2.2 M&E

2.2.1 Construction and installation of earthing piles and earthing grids

2.2.2 Check the position of openings, HDPE pipes

2.2.3 Completing and inspection of HDPE cable pipes

2.2.4 Construction lighting system & indoor socket

2.2.5 Air conditioning & ventilation system

2.2.6 Fire alarm system, emergency lights, emergency lights

2.2.7 Public PA system

2.2.8 CCTV and camera system

2.2.9 Arranging fire extinguishers

3 310.11 - Regulating Transformer, Rectifying Transformer, Re


3.1 Civil Construction

Rails

3.1.1 Installation and inspection of rails (Size, flatness , tolerance)

3.1.2 Floor, platform of the Rectifier area

Construction and inspection of Floor, Platform for Regulating


3.1.3
Transformers
Construction and inspection of Floor, Platform for Rectifying
3.1.4
Transformers

Other jobs

3.1.4 Connect cable trench with of water drainge

3.1.5 Completing oil drainage holes, inspection of oil tank sizes

3.1.6 Completing and inspecting the slope of floors, cable trenches, oil pipes

3.1.7 Complete and inspection of basement size rectifier house

3.1.8 Complete and Inspection of 220 kV Cable ducts and HDPE conduits

3.1.9 Construction and inspection MV cable ducts

3.1.10 Construction and inspection LV cable ducts


3.1.11 Finishing and inspection of Floor / floor thickness

Construction and inspection of transformer house / electrical cabinet


3.1.12
dimensions of substation

3.1.13 Construction and inspection distance between fireproof walls

3.1.14 Check the number and sizes of conduits / cables

3.1.15 Safety Hand Rails, Fences, Barricades contstructed and Installed

3.2 M&E

3.2.1 Locating earthing piles and earthing grids

3.2.2 Construction Fire alarm system

3.2.3 Construction and inspection of oil pipeline system

4 310.14- Auxiliary Transformer


4.1 Civil Construction

Foundations and refractory walls

Complete and inspect the distance and the Geometric dimension of the
4.1.1
wall

4.1.2 Finishing and inspection of elevation and floor size, foundation

4.1.3 Finalize and inspect the location of the transformer foundation

4.1.4 Finishing and inspection altitude and flatness, inclination of foundation

4.1.5 Safety Hand Rails, Fences, Barricades contstructed and Installed

Other jobs

4.1.5 Locating earthing piles and earthing grids

4.1.6 Connect cable Trench with of water drainge

4.1.7 Check the size of cable Trench oil pits

4.1.8 Check the thickness of concrete Floor

4.2 M&E

4.2.1 Construction and inspection inclination of oil drainage

4.2.2 Fire alarm system

4.2.3 Arranging fire extinguishers

5 310.15 - Main Substation Control Buildi


5.1 Civil Construction
Building

5.1.1 Complete and inspect the Geometric dimension controls Building

5.1.2 Check and inspect control Building Foundations

5.1.3 Completing and inspecting elevation of floors, roofs, staircases

5.1.4 Completing and checking the flatness of basement floors and 1st floor

5.1.5 Completing and checking of the False Floors in Control Room

5.1.6 Completing and checking of the False Floors in LV and Battery Room

5.1.7 Connect cable trench with of water drainge

5.1.8 Construction and inspection MV cable ducts

5.1.9 Construction and inspection LV cable ducts

5.1.10 Check the location of earthing pits and cables

5.2 M&E

5.2.1 Locating earthing piles and earthing grids

5.2.2 Check the position of openings, HDPE pipes

5.2.3 Completing and inspection of HDPE cable pipes

5.2.4 Construction lighting system & indoor socket

5.2.5 Air conditioning & ventilation system

5.2.6 Fire alarm system, emergency lights, exit lights

5.2.7 Public alarm system

5.2.8 CCTV, camera system

5.2.9 Phone system, Internet

5.2.10 Fire System

5.2.11 Arranging fire extinguishers

5.2.12 Water supply and drainage system

5.2.13 Safety Hand Rails, Fences, Barricades contstructed and Installed

6 310.12- Process Substation & Process Busba


6.1 Civil Construction

6.1.1 Complete and inspection the Geometric dimension


6.1.2 Complete and inspection floor level, thickness and platform

6.1.3 Connect cable trench with of water drainge

6.1.4 Finalize and inspect the size of MV cable trench

6.1.5 Complete and check the thickness of the floors

6.1.6 Check the size of the controller, breaker

6.1.7 Completing and inspecting MV cable pit

6.1.8 Check the size of oil pit

6.1.9 Check the size of the transformer support bracket

6.1.10 Safety Hand Rails, Fences, Barricades contstructed and Installed

6.2 M&E

6.2.1 Locating earthing piles and earthing grids

6.2.2 Construction and inspection of oil drainage system

6.2.3 Construction Fire alarm system

6.2.4 Arranging fire extinguishers

7 310.13- HARMONIC FILTER BAYS


7.1.1 Civil Construction

7.1.2 Inspection of layout area and confirm dimensions

7.1.3 Review layout of Civil Foundations

7.1.4 Connect cable trench with of water drainge

7.1.5 Finalize and inspect the size of MV cable trench

7.1.6 Review thickness of foundations required

7.1.7 Review Location of Fencing & Gates

7.1.8 Road ways and access roads

7.1.9 Safety Hand Rails, Fences, Barricades contstructed and Installed

7.2 M&E

7.2.1 Locating earthing piles and earthing grids

7.2.2 Testing of earthing

7.2.3 Construction Fire alarm system


7.2.4 Arranging fire extinguishers
N SUBSTATION AREA- CURRENT STATUS AT THQ SITE
DETAILS, SPECIFICATION,
STAGE- NOT STARTED, ONGOING or COMPLETED
REFERENCE, DRAWING NUMBER

310 - General Area

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

310.10- GIS Area

Already finished basic construction

Already finished basic construction

Not yet completed

Not yet constructed

Not yet constructed

Not yet completed

Already finished basic construction

Not Stared Yet

Not yet constructed

Not yet constructed (Chemical bolts will be placed after official


information of the equipment is provided)
Not yet completed

Already finished basic construction

Already finished basic construction

Already finished construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Not Stared Yet

Not Stared Yet

Not Stared Yet

Not Stared Yet

Not Stared Yet

ulating Transformer, Rectifying Transformer, Rectifier & Busbar Corridor

Not Stared Yet

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished construction

Already finished construction

Not yet completed

Already finished construction

Already finished basic construction

Already finished basic construction

Already finished basic construction


Not Stared Yet

Already finished basic construction

Already finished basic construction

Already finished basic construction

Not Stared Yet

Already finished basic construction

Not Stared Yet

Already finished basic construction

310.14- Auxiliary Transformer

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Not Stared Yet

Already completed

Not Stared Yet

Cable trench not yet constructed, Oil pits already constructed and
can be checked

Already finished basic construction

Not Stared Yet

Not Stared Yet

Not Stared Yet

310.15 - Main Substation Control Building


Already finished basic construction

Already finished construction

Not yet completed

Not yet completed

Not Stared Yet

Not Stared Yet

Already finished construction

Already finished basic construction

Already finished basic construction

Already finished construction

Already completed

Already finished basic construction

Already finished basic construction

Not Stared Yet

Not Stared Yet

Not Stared Yet

Not Stared Yet

Not Stared Yet

Not Stared Yet

310.12- Process Substation & Process Busbar Corridor

Already finished basic construction


Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction

Not Stared Yet

Already completed

Already finished basic construction

Not Stared Yet

Not Stared Yet

310.13- HARMONIC FILTER BAYS

Already finished basic construction

Not Yet Started

Not Yet Started

Not Yet Started

Not Yet Started

Not Yet Started

Not Yet Started

Already completed

Already completed

Not Stared Yet


Not Stared Yet
E
NOTES & ACTIONS TO TAKE
usbar Corridor
MAIN POTLINE AREA- CURRENT
NO. TASKS / ACTIVITIES

1 320; 320.1 ; 320.2 ; 320.3 & 320.4-


1.1 Civil Construction Potroom A & B Phase 1

Potroom Buildings

Construction and inspection of Geometric dimension of Main Potroom A Phase 1


1.1.1
Foundations
Construction and inspection of Geometric dimension of Main Potroom B Phase 1
1.1.2
Foundations

1.1.3 Construction & Inspection of Main Busbar supports Phase 1- Potroom A

1.1.4 Construction & Inspection of Main Busbar supports Phase 1- Potroom B

1.1.5 Construction & Inspection of Process Busbar supports Phase 1- Potroom A

1.1.6 Construction & Inspection of Process Busbar supports Phase 1- Potroom B

1.1.7 Construction & Inspection of Tending Asile Phase 1- Potroom A

1.1.8 Construction & Inspection of Tending Asile Phase 1- Potroom B

1.1.9 Construction & Inspection of Service Asile Phase 1- Potroom A

1.1.10 Construction & Inspection of Service Asile Phase 1- Potroom B

Construction & Inspection of Access Stairways & Safety Handrails- Phase 1-


1.1.11
Potroom A
Construction & Inspection of Access Stairways & Safety Handrails Phase 1-
1.1.12
Potroom B

1.1.13 Construction & Inspection of Potroom Basement Floor- Phase 1- Potroom A

1.1.14 Construction & Inspection of Potroom Basement Floor- Phase 1- Potroom B

1.2 M&E- Potroom A & B Phase 1

1.2.1 Construction & Inspection of all Steel Structures

1.2.2 Construction & Inspection of all Clading, Roofing on Structures

1.2.3 Construction & Inspection of all Roofing ventalitors on Structures

1.2.4 Construction of water drainage for Main Potline Area

1.2.5 Construction of outdoor lighting system for Main Potline Area

1.2.6 Installation and Measuring earthing in all Main Potline Areas

1.2.7 Installation of all High Bay Lighting & conduits


1.2.8 Installation of all Conduits for all AUX power to Pot Mirco Controllers

1.2.9 Installation of Aux power Conduits for the ACM/PTA Cranes

1.2.10 Fire alarm system, emergency lights, emergency lights

1.2.11 Public PA system

1.2.12 CCTV and camera system

1.2.13 Arranging fire extinguishers

Installation and inspection of Crane rails (Size, flatness , tolerance)- Construction


1.2.14
Crane
Installation and inspection of Crane rails (Size, flatness , tolerance)-
1.2.15
ACM/PTMCrane
Installation and inspection of Crane rails power supply conduits, cable trays etc
1.2.16
for ACM/PTMCrane

1.2.17 Safety Hand Rails, Fences, Barricades contstructed and Installed

2 320, 320.1, 320.2, 320.3 & 320.4 -


Civil Construction Potroom A & B Phase 2

2.1 Potroom Buildings

Construction and inspection of Geometric dimension of Main Potroom A Phase 2


2.1.1
Foundations
Construction and inspection of Geometric dimension of Main Potroom B Phase 2
2.1.2
Foundations

2.1.3 Construction & Inspection of Main Busbar supports Phase 2- Potroom A

2.1.4 Construction & Inspection of Main Busbar supports Phase 2- Potroom B

2.1.5 Construction & Inspection of Process Busbar supports Phase 2- Potroom A

2.1.6 Construction & Inspection of Process Busbar supports Phase 2- Potroom B

2.1.7 Construction & Inspection of Tending Asile Phase 2- Potroom A

2.1.8 Construction & Inspection of Tending Asile Phase 2- Potroom B

2.1.9 Construction & Inspection of Service Asile Phase 2- Potroom A

2.1.10 Construction & Inspection of Service Asile Phase 2- Potroom B

Construction & Inspection of Access Stairways & Safety Handrails- Phase 2-


2.1.11
Potroom A
Construction & Inspection of Access Stairways & Safety Handrails Phase 2-
2.1.12
Potroom B

2.1.13 Construction & Inspection of Potroom Basement Floor- Phase 2- Potroom A

2.1.14 Construction & Inspection of Potroom Basement Floor- Phase 2- Potroom B


2.2 M&E Potroom A & B Phase 2

2.2.1 Construction & Inspection of all Steel Structures

2.2.2 Construction & Inspection of all Clading, Roofing on Structures

2.2.3 Construction & Inspection of all Roofing ventalitors on Structures

2.2.4 Construction of water drainage for Main Potline Area

2.2.5 Construction of outdoor lighting system for Main Potline Area

2.2.6 Installation and Measuring earthing in all Main Potline Areas

2.2.7 Installation of all High Bay Lighting & conduits

2.2.8 Installation of all Conduits for all AUX power to Pot Mirco Controllers

2.2.9 Installation of Aux power Conduits for the ACM/PTA Cranes

2.2.10 Emergency alarm system, emergency lights, emergency lights

2.2.11 Public PA system

2.2.12 CCTV and camera system

2.2.13 Arranging fire extinguishers

Installation and inspection of Crane rails (Size, flatness , tolerance)- Construction


2.2.14
Crane
Installation and inspection of Crane rails (Size, flatness , tolerance)-
2.2.15
ACM/PTMCrane
Installation and inspection of Crane rails power supply conduits, cable trays etc
2.2.16
for ACM/PTMCrane

2.2.17 Safety Hand Rails, Fences, Barricades contstructed and Installed

3 320 CENTRAL PASSAGE WAY-POTRO


Civil Construction Central Passage way A & B Phase 1 & 2

3.1 Central Passage way Building

Construction and inspection of Foundations- Geometric dimension of Central


3.1.1
passage way between Potroom A & B Phase 1
Construction and inspection of Foundations- Geometric dimension of Central
3.1.2
passage way between Potroom A & B Phase 2
Construction and Inpsection of Main Floor and Basement - Phase 1- Between
3.1.3
Potroom A & B
Construction and Inpsection of Main Floor and Basement - Phase 2- Between
3.1.4
Potroom A & B
Construction & Inspection of Main Busbar supports Phase 1 - Potroom A & B
3.1.5
( Temporary)
Construction & Inspection of Process Busbar supports Phase 1- Potroom A & B
3.1.6
( Temporary)
Construction & Inspection of Main Busbar supports Phase 2 - Potroom A & B
3.1.7
( Temporary)
Construction & Inspection of Process Busbar supports Phase 2- Potroom A & B
3.1.8
( Temporary)

3.1.9 Construction & Inspection of all Steel Structures

Construction & Inspection of all Clading, Roofing on Structures Phase 1 Central


3.1.10
Passage way
Construction & Inspection of all Clading, Roofing on Structures Phase 2 Central
3.1.11
Passage Way

3.1.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

3.2 M&E

3.2.1 Locating earthing piles and earthing grids

3.2.2 Construction & Inspection of workshop area

3.2.3 Construction & Inspection High Bay Lighting

3.2.4 Installation of Aux power Conduits for central passage work/ toolstore area

3.2.5 Emergency alarm system, emergency lights, emergency lights

3.2.6 Public PA system

3.2.7 Arranging fire extinguishers

4 322. 1 & 322.4 -POTROOM A & B- PH


Civil Construction

4.1 Electrical Room Building 1 & 4

4.1.1 Complete and inspect the Geometric dimension of the Electrical Room

4.1.2 Finishing and inspection of elevation and floor size, foundation

4.1.3 Finalize and inspect the location of the transformer foundation

4.1.4 Finishing and inspection of access stair ways

4.1.5 Finishing and inspection of floor cut outs for panels

4.2 M&E

4.2.1 Construction and inspection of Lighting

4.2.2 Construction and inspection of HVAC system


4.2.3 Construction and inspection of Cable Conduits

4.2.4 Construction and Inspection of Fire alarm system

4.2.5 Construction and Inspection of Fire alarm system

4.2.6 Arranging fire extinguishers

4.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed

5 322. 2 & 322.5 - POTROOM A & B- P


5.1 Civil Construction

5.1 Electrical Room Building 2 & 5

5.1.1 Complete and inspect the Geometric dimension of the Electrical Room

5.1.2 Finishing and inspection of elevation and floor size, foundation

5.1.3 Finalize and inspect the location of the transformer foundation

5.1.4 Finishing and inspection of access stair ways

5.1.5 Finishing and inspection of floor cut outs for panels

5.2 M&E

5.2.1 Construction and inspection of Lighting

5.2.2 Construction and inspection of HVAC system

5.2.3 Construction and inspection of Cable Conduits

5.2.4 Construction and Inspection of Fire alarm system

5.2.5 Construction and Inspection of Fire alarm system

5.2.6 Arranging fire extinguishers

5.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed

6 320. 15 - REDUCTION- POTLIN


Civil Construction

6.1 Building

6.1.1 Complete and inspect the Geometric dimension controls Building

6.1.2 Check and inspect control Building foundations


6.1.3 Completing and inspecting elevation of floors, roofs, staircases

6.1.4 Completing and checking the flatness of basement floors and 1st floor

6.1.5 Completing and checking of the False Floors in Control Room

6.1.6 Completing and checking of the False Floors in LV and Battery Room

6.1.7 Connect cable trench with of water drainge

6.1.8 Construction and inspection control cable ducts

6.1.9 Construction and inspection LV cable ducts

6.1.10 Check the location of earthing pits and cables

6.2 M&E

6.2.1 Locating earthing piles and earthing grids

6.2.2 Check the position of openings, HDPE pipes

6.2.3 Completing and inspection of HDPE cable pipes

6.2.4 Construction lighting system & indoor socket

6.2.5 Air conditioning & ventilation system

6.2.6 Fire alarm system, emergency lights, exit lights

6.2.7 Public alarm system

6.2.8 CCTV, camera system

6.2.9 Phone system, Internet

6.2.10 Fire System

6.2.11 Arranging fire extinguishers

6.2.12 Water supply and drainage system

6.2.13 Safety Hand Rails, Fences, Barricades contstructed and Installed

7 320. 6 - Potline Storag


7.1 Civil Construction

7.1.1 Complete and inspect the Geometric dimension foundations

7.1.2 Complete and inspect the Geometric dimension of building


7.1.3 Complete and inspection floor level, thickness and platform

7.1.4 Connect cable trench with of water drainge

7.1.5 Finalize and inspect the size of LV cable trenchs, Pull Pits & Conduits

7.1.6 Check the doors and road access

7.1.7 Check access ways into building

7.2 M&E

7.2.1 Locating earthing piles and earthing grids

7.2.2 Check the position of openings, HDPE pipes

7.2.3 Completing and inspection of HDPE cable pipes

7.2.4 Construction lighting system & indoor socket

7.2.5 Air conditioning & ventilation system

7.2.6 Fire alarm system, emergency lights, exit lights

7.2.7 Public alarm system

7.2.8 CCTV, camera system

7.2.9 Phone system, Internet

7.2.10 Fire System

7.2.11 Arranging fire extinguishers

7.2.12 Water supply and drainage system

7.2.13 Safety Hand Rails, Fences, Barricades contstructed and Installed


MAIN POTLINE AREA- CURRENT STATUS AT THQ SITE
STAGE- NOT STARTED, ONGOING or COMPLETED

320; 320.1 ; 320.2 ; 320.3 & 320.4- POTROOM A & B - PHASE 1

Already finished basic construction

Already finished basic construction


320, 320.1, 320.2, 320.3 & 320.4 - POTROOM A & B- PHASE 2
320 CENTRAL PASSAGE WAY-POTROOM A & B- PHASE 1 & PHASE 2
322. 1 & 322.4 -POTROOM A & B- PHASE 1 - Electrical Rooms 1 & 4

Already finished basic construction

Already finished basic construction

Already finished basic construction

Already finished basic construction


322. 2 & 322.5 - POTROOM A & B- PHASE 2 - Electrical Rooms 2 & 5

320. 15 - REDUCTION- POTLINE CONTROL BUILDING


320. 6 - Potline Storage and Equipment

Already finished basic construction

Already finished basic construction


Already finished basic construction

Already finished basic construction

Already completed

Already finished basic construction

Not Stared Yet

Not Stared Yet


HQ SITE
DETAILS, SPECIFICATION,
NOTES & ACTIONS TO TAKE
REFERENCE, DRAWING NUMBER

B - PHASE 1
B- PHASE 2
SE 1 & PHASE 2
al Rooms 1 & 4
al Rooms 2 & 5

ILDING
GAS TREATMENT CENTERS 1 , 2 & 3- CURRENT ST
NO. TASKS / ACTIVITIES

1 324 ; 325 ; 328 ; 332 - GTC 1 - PHA


1.1 GTC 1- Phase 1

GTC Building

Construction and inspection of Geometric dimension of GTC 1- Phase 1


1.1.1
Foundations

1.1.2 Complete and inspect the Geometric dimension GTC 1 Building

1.1.3 Completing and inspecting elevation of floors, roofs, staircases

1.1.4 Completing and checking the flatness of basement floors and other floors

1.1.5 Construction and Inspection of water drainage for Main GTC Area

1.1.6 Construction and inspection control cable ducts & Trenches

1.1.7 Construction and inspection MV cable ducts & Trenches

1.1.8 Construction and inspection LV cable ducts & Trenches

1.1.9 Check the location of earthing pits and earthing cables

1.2 M&E- GTC 1- Phase 1

1.2.1 Construction & Inspection of all Steel Structures

1.2.2 Construction & Inspection of all Clading, Roofing on Structures

1.2.3 Construction & Inspection of all Roofing Structures

1.2.4 Construction of outdoor lighting system for Main GTC 1 Area

1.2.5 Installation and Measuring earthing in all Main GTC 1 Area

1.2.6 Installation of all Street Lighting & conduits

1.2.7 Installation of all Conduits for all AUX power for GTC 1 area

1.2.8 Fire alarm system, emergency alarms, emergency lights

1.2.9 Public PA system

1.2.10 CCTV and camera system

1.2.11 Arranging fire extinguishers

1.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed


2 324 ; 325 ; 328 ; 332 -GTC 1 - PHASE 1 - Blower Roo
2.1 Civil Construction

GTC 1 - Blower Room & Electrical Room Building Phase 1

2.1.1 Complete and inspect the Geometric dimension of the Electrical Room

2.1.2 Finishing and inspection of elevation and floor size, foundation

2.1.3 Finalize and inspect the location of the transformer foundation

2.1.4 Finishing and inspection of access stair ways

2.1.5 Finishing and inspection of floor cut outs for panels

2.2 M&E- GTC 1 Blower Room & Electrical Room Phase 1

2.2.1 Construction and inspection of Lighting

2.2.2 Construction and inspection of HVAC system

2.2.3 Construction and inspection of Cable Conduits

2.2.4 Construction and Inspection of Fire alarm system

2.2.5 Construction and Inspection of Fire alarm system

2.2.6 Arranging fire extinguishers

2.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed

3 324 ; 325 ; 328 ; 332 -GTC 2 - PHA


GTC 2- Phase 2

3.1 GTC Building

Construction and inspection of Geometric dimension of GTC 2- Phase 2


3.1.1
Foundations

3.1.2 Complete and inspect the Geometric dimension GTC 2 Building

3.1.3 Completing and inspecting elevation of floors, roofs, staircases

3.1.4 Completing and checking the flatness of basement floors and other floors

3.1.5 Construction and Inspection of water drainage for Main GTC 2 Area

3.1.6 Construction and inspection control cable ducts & Trenches

3.1.7 Construction and inspection MV cable ducts & Trenches


3.1.8 Construction and inspection LV cable ducts & Trenches

3.1.9 Check the location of earthing pits and earthing cables

3.2 M&E- GTC 2- Phase 2

3.2.1 Construction & Inspection of all Steel Structures

3.2.2 Construction & Inspection of all Clading, Roofing on Structures

3.2.3 Construction & Inspection of all Roofing Structures

3.2.4 Construction of outdoor lighting system for Main GTC 2 Area

3.2.5 Installation and Measuring earthing in all Main GTC 2 Area

3.2.6 Installation of all Street Lighting & conduits

3.2.7 Installation of all Conduits for all AUX power for GTC 2 area

3.2.8 Fire alarm system, emergency alarms, emergency lights

3.2.9 Public PA system

3.2.10 CCTV and camera system

3.2.11 Arranging fire extinguishers

3.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

4 324 ; 325 ; 328 ; 332- GTC 2 - PHASE 2 - Blower Roo


4.1 Civil Construction

GTC 2 - Blower Room & Electrical Room Building Phase 2

4.1.1 Complete and inspect the Geometric dimension of the Electrical Room

4.1.2 Finishing and inspection of elevation and floor size, foundation

4.1.3 Finalize and inspect the location of the transformer foundation

4.1.4 Finishing and inspection of access stair ways

4.1.5 Finishing and inspection of floor cut outs for panels

4.2 M&E- GTC 2 Blower Room & Electrical Room Phase 2

4.2.1 Construction and inspection of Lighting

4.2.2 Construction and inspection of HVAC system

4.2.3 Construction and inspection of Cable Conduits


4.2.4 Construction and Inspection of Fire alarm system

4.2.5 Construction and Inspection of Fire alarm system

4.2.6 Arranging fire extinguishers

4.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed

5 324 ; 325 ; 328 ; 332- GTC 3 - PHA


GTC 3- Phase 3

5.1 GTC Building

Construction and inspection of Geometric dimension of GTC 3- Phase 3


5.1.1
Foundations

5.1.2 Complete and inspect the Geometric dimension GTC 3 Building

5.1.3 Completing and inspecting elevation of floors, roofs, staircases

5.1.4 Completing and checking the flatness of basement floors and other floors

5.1.5 Construction and Inspection of water drainage for Main GTC 3 Area

5.1.6 Construction and inspection control cable ducts & Trenches

5.1.7 Construction and inspection MV cable ducts & Trenches

5.1.8 Construction and inspection LV cable ducts & Trenches

5.1.9 Check the location of earthing pits and earthing cables

5.2 M&E- GTC 3- Phase 3

5.2.1 Construction & Inspection of all Steel Structures

5.2.2 Construction & Inspection of all Clading, Roofing on Structures

5.2.3 Construction & Inspection of all Roofing Structures

5.2.4 Construction of outdoor lighting system for Main GTC 3 Area

5.2.5 Installation and Measuring earthing in all Main GTC 3 Area

5.2.6 Installation of all Street Lighting & conduits

5.2.7 Installation of all Conduits for all AUX power for GTC 3 area

5.2.8 Fire alarm system, emergency alarms, emergency lights

5.2.9 Public PA system


5.2.10 CCTV and camera system

5.2.11 Arranging fire extinguishers

5.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

6 324 ; 325 ; 328 ; 332-GTC 3 - PHASE 3 - Blower Roo


6.1 Civil Construction

GTC 3 - Blower Room & Electrical Room Building Phase 3

6.1.1 Complete and inspect the Geometric dimension of the Electrical Room

6.1.2 Finishing and inspection of elevation and floor size, foundation

6.1.3 Finalize and inspect the location of the transformer foundation

6.1.4 Finishing and inspection of access stair ways

6.1.5 Finishing and inspection of floor cut outs for panels

6.2 M&E- GTC 3 Blower Room & Electrical Room Phase 3

6.2.1 Construction and inspection of Lighting

6.2.2 Construction and inspection of HVAC system

6.2.3 Construction and inspection of Cable Conduits

6.2.4 Construction and Inspection of Fire alarm system

6.2.5 Construction and Inspection of Fire alarm system

6.2.6 Arranging fire extinguishers

6.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed


MENT CENTERS 1 , 2 & 3- CURRENT STATUS AT THQ SITE
DETAILS, SPECIFICATION,
STAGE- NOT STARTED, ONGOING or COMPLETED
REFERENCE, DRAWING NUMBER

324 ; 325 ; 328 ; 332 - GTC 1 - PHASE 1

Already finished basic construction

Already finished basic construction


328 ; 332 -GTC 1 - PHASE 1 - Blower Room & LV Electrical Rooms

324 ; 325 ; 328 ; 332 -GTC 2 - PHASE 2


328 ; 332- GTC 2 - PHASE 2 - Blower Room & LV Electrical Rooms
324 ; 325 ; 328 ; 332- GTC 3 - PHASE 3
328 ; 332-GTC 3 - PHASE 3 - Blower Room & LV Electrical Rooms
TE
NOTES & ACTIONS TO TAKE
Rooms
Rooms
Rooms
CASTHOUSE INGOT & BILLET- CURRENT STAT
NO. TASKS / ACTIVITIES

1 350- MAIN CASTHOUSE -INGOT AREA-


1.1 INGOT- Phase 1 & 2

INGOT Section of Building

1.1.1 Construction and inspection of Geometric dimension of INGOT AREA- Foundations

1.1.2 Complete and inspect the Geometric dimension INGOT Building

1.1.3 Completing and inspecting elevation of floors, roofs, staircases

1.1.4 Completing and checking the flatness of basement floors and other floors

1.1.5 Construction and Inspection of water drainage for Main INGOT Area

1.1.6 Construction and inspection control cable ducts & Trenches

1.1.7 Construction and inspection MV cable ducts & Trenches

1.1.8 Construction and inspection LV cable ducts & Trenches

1.1.9 Check the location of earthing pits and earthing cables

1.2 M&E- INGOT Area- Phase 1 & 2

1.2.1 Construction & Inspection of all Steel Structures

1.2.2 Construction & Inspection of all Clading, Roofing on Structures

1.2.3 Construction & Inspection of all Roofing Structures

1.2.4 Construction of outdoor lighting system for Main INGOT Area

1.2.5 Installation and Measuring earthing in all Main INGOT Area

1.2.6 Installation of all Street Lighting & conduits- INGOT Area

1.2.7 Installation of all Conduits for all AUX power for Main INGOT area

1.2.8 Fire alarm system, emergency alarms, emergency lights

1.2.9 Public PA system

1.2.10 CCTV and camera system

1.2.11 Arranging fire extinguishers

1.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed


1.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits

2 350.15 -INGOT OFFICES AND SUBSTATION / ELECTR


2.1 Civil Construction

INGOT Offices & Substation / Electrical Room Building Phase 1 & 2

2.1.1 Complete and inspect the Geometric dimension of the Substation & Electrical Room

2.1.2 Finishing and inspection of elevation and floor size, foundation

Finalize and inspect the location of the transformer foundation ( Oil drainage Pit & Cable
2.1.3
access)

2.1.4 Finishing and inspection of access doors, fencing

2.1.5 Finishing and inspection of floor cut outs for panels

2.2 INGOT Offices & Substation / Electrical Room Building Phase 1 & 2

2.2.1 Construction and inspection of Lighting

2.2.2 Construction and inspection of HVAC system

2.2.3 Construction and inspection of Cable Conduits

2.2.4 Construction and Inspection of Fire alarm system

2.2.5 Construction and Inspection of Fire alarm system

2.2.6 Arranging fire extinguishers

2.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed

3 350.9- MAIN CASTHOUSE- BILLET


3.1 BILLET- Phase 3

BILLET Section of Building

3.1.1 Construction and inspection of Geometric dimension of BILLET AREA- Foundations

3.1.2 Complete and inspect the Geometric dimension BILLET Building

3.1.3 Completing and inspecting elevation of floors, roofs, staircases

3.1.4 Completing and checking the flatness of basement floors and other floors

3.1.5 Construction and Inspection of water drainage for Main BILLET Area

3.1.6 Construction and inspection control cable ducts & Trenches


3.1.7 Construction and inspection MV cable ducts & Trenches

3.1.8 Construction and inspection LV cable ducts & Trenches

3.1.9 Check the location of earthing pits and earthing cables

3.2 M&E- BILLET Area- Phase 3

3.2.1 Construction & Inspection of all Steel Structures

3.2.2 Construction & Inspection of all Clading, Roofing on Structures

3.2.3 Construction & Inspection of all Roofing Structures

3.2.4 Construction of outdoor lighting system for Main BILLET Area

3.2.5 Installation and Measuring earthing in all Main BILLET Area

3.2.6 Installation of all Street Lighting & conduits- BILLET Area

3.2.7 Installation of all Conduits for all AUX power for Main BILLET area

3.2.8 Fire alarm system, emergency alarms, emergency lights

3.2.9 Public PA system

3.2.10 CCTV and camera system

3.2.11 Arranging fire extinguishers

3.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

3.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits

4 350.15- BILLET OFFICES AND SUBSTATION / E


4.1 Civil Construction

BILLET Offices & Substation / Electrical Room Building Phase 3

4.1.1 Complete and inspect the Geometric dimension of the Substation & Electrical Room

4.1.2 Finishing and inspection of elevation and floor size, foundation

Finalize and inspect the location of the transformer foundation ( Oil drainage Pit & Cable
4.1.3
access)

4.1.4 Finishing and inspection of access doors, fencing

4.1.5 Finishing and inspection of floor cut outs for panels

4.2 BILLET Offices & Substation / Electrical Room Building Phase 3

4.2.1 Construction and inspection of Lighting


4.2.2 Construction and inspection of HVAC system

4.2.3 Construction and inspection of Cable Conduits

4.2.4 Construction and Inspection of Fire alarm system

4.2.5 Construction and Inspection of Fire alarm system

4.2.6 Arranging fire extinguishers

4.2.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed

5 359-CASTHOUSE - DROSS TREATMENT, MAINTENA


5.1 DROSS, MAINTENANCE & WAREHOUSE- Phase 1 & 2 & 3

MAIN Building

5.1.1 Construction and inspection of Geometric dimension of MAIN AREAS- Foundations

5.1.2 Complete and inspect the Geometric dimension MAIN Building

5.1.3 Completing and inspecting elevation of floors, roofs, staircases

5.1.4 Completing and checking the flatness of basement floors and other floors

5.1.5 Construction and Inspection of water drainage for Main Areas

5.1.6 Construction and inspection control cable ducts & Trenches

5.1.7 Construction and inspection MV cable ducts & Trenches

5.1.8 Construction and inspection LV cable ducts & Trenches

5.1.9 Check the location of earthing pits and earthing cables

5.2 M & E - DROSS, MAINTENANCE & WAREHOUSE- Phase 1 & 2 & 3

5.2.1 Construction & Inspection of all Steel Structures

5.2.2 Construction & Inspection of all Clading, Roofing on Structures

5.2.3 Construction & Inspection of all Roofing Structures

5.2.4 Construction of outdoor lighting system for Main Areas

5.2.5 Installation and Measuring earthing in all Main Areas

5.2.6 Installation of all Street Lighting & conduits- Main Areas

5.2.7 Installation of all Conduits for all AUX power for Main areas
5.2.8 Fire alarm system, emergency alarms, emergency lights

5.2.9 Public PA system

5.2.10 CCTV and camera system

5.2.11 Arranging fire extinguishers

5.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

5.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits

6 351.32- CASTHOUSE STORAGE AREA- IN


6.1 Civil Construction- Laydown/ Storage INDOOR area- Ingot & Billet

INDOOR Building Phase 1, 2 & 3

6.1.1 Complete and inspect the Geometric dimension of the part of Foudations

6.1.2 Finishing and inspection of elevation and floor size

6.1.3 Finalize and inspect the location of the storage of Ingot & Billet

6.1.4 Finishing and inspection of access into and out of Storage Area.

6.1.5 Finishing and inspection of floor area in building

6.2 M&E -Laydown/ Storage INDOOR areas in Building- Ingot & Billet

6.2.1 Construction and inspection of Lighting

6.2.2 Construction and inspection of Cranes

6.2.3 Construction and inspection of Cable Conduits

6.2.4 Construction and Inspection of Fire alarm system

6.2.5 Construction and Inspection of Emergency alarm system

6.2.6 Construction and Inspection of PA system

6.2.7 Arranging fire extinguishers

6.2.8 Safety Hand Rails, Fences, Barricades Contstructed and Installed

6.2.9 Inspection of Crane Rails, Crane Power AUX, Crane Conduits

6.3 Civil Construction OUTDOORS- Laydown/ Storage area- Ingot & Billet

6.3.1 Building Phase 1, 2 & 3

6.3.2 Finalize and inspect the location of the storage of Ingot & Billet
6.3.3 Complete and inspect the Geometric dimension of the part of Foudations

6.3.4 Finishing and inspection of elevation of outdoor concrete floor for laydowns

6.3.5 Finishing and inspection of access into and out of laydown Area.

6.3.6 Finishing and inspection of Conduits into and out of laydown Area.

6.3.7 Construction and Inspection of water drainage for Main Laydown Area

6.3.8 Construction and inspection control Cable Ducts & Trenches

6.3.9 Construction and inspection LV Cable Ducts & Trenches in Laydown areas

6.3.10 Check the location of earthing pits and earthing cables in Laydown Area

6.4 M&E -Laydown/ Storage OUTDOOR areas in Building- Ingot & Billet

6.4.1 Construction and inspection of Oudoor Stree and Yard Lighting

6.4.2 Construction and inspection of Cable Conduits for AUX Power and Lighting

6.4.3 Construction and Inspection of Fire alarm system

6.4.4 Construction and Inspection of Emergency alarm system

6.4.5 Construction and Inspection of PA system

6.4.6 Arranging fire extinguishers in Laydown Areas

6.4.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed in Laydown Areas
SE INGOT & BILLET- CURRENT STATUS AT THQ SITE
DETAILS, SPECIFICATION,
STAGE- NOT STARTED, ONGOING or COMPLETED
REFERENCE, DRAWING NUMBER

350- MAIN CASTHOUSE -INGOT AREA- Phase 1 & 2

Already finished basic construction

Already finished basic construction


OFFICES AND SUBSTATION / ELECTRICAL ROOMS- Phase 1 & 2

350.9- MAIN CASTHOUSE- BILLET AREA


BILLET OFFICES AND SUBSTATION / ELECTRICAL ROOMS
OUSE - DROSS TREATMENT, MAINTENANCE & WAREHOUSING
1.32- CASTHOUSE STORAGE AREA- INGOT & BILLET
NOTES & ACTIONS TO TAKE
e1&2
SING
364- MAIN ANODE RODDING SHOP & STORAGE AREA- CU
NO. TASKS / ACTIVITIES

1 364 & 381- MAIN ANODE ROD SHOP HANDLING & STOR
1.1 Anode Handling & Storage- Phase 1 & 2 & 3

Main Section of Anode Rod Shop Building

1.1.1 Construction and inspection of Geometric dimension of Rod Shop AREA- Foundations

1.1.2 Complete and inspect the Geometric dimension Rod Shop Building

1.1.3 Completing and inspecting elevation of floors, roofs, staircases

1.1.4 Completing and checking the flatness of basement floors and other floors

1.1.5 Construction and Inspection of water drainage for Main Rod Shop Area

1.1.6 Construction and inspection control cable ducts & Trenches

1.1.7 Construction and inspection MV cable ducts & Trenches

1.1.8 Construction and inspection LV cable ducts & Trenches

1.1.9 Check the location of earthing pits and earthing cables

1.2 M&E- Rod Shop Area- Phase 1 & 2 & 3

1.2.1 Construction & Inspection of all Steel Structures

1.2.2 Construction & Inspection of all Clading, Roofing on Structures

1.2.3 Construction & Inspection of all Roofing Structures

1.2.4 Construction of outdoor lighting system for Main Rod Shop Area

1.2.5 Installation and Measuring earthing in all Main Rod Shop Area

1.2.6 Installation of all Street Lighting & conduits- Main Rod Shop Area

1.2.7 Installation of all Conduits for all AUX power for Main area

1.2.8 Fire alarm system, emergency alarms, emergency lights

1.2.9 Public PA system

1.2.10 CCTV and camera system

1.2.11 Arranging fire extinguishers

1.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed


1.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits

2 341 & 632- CATHODE SEALING & LINING MATE


2.1 Cathode Sealing & Lining- Phase 1 & 2 & 3

Main Section of Cathode Sealing & Lining- Phase 1 & 2 & 3 Building

2.1.2 Construction and inspection of Geometric dimension of Rod Shop AREA- Foundations

2.1.3 Complete and inspect the Geometric dimension Rod Shop Building

2.1.4 Completing and inspecting elevation of floors, roofs, staircases

2.1.5 Completing and checking the flatness of basement floors and other floors

2.1.6 Construction and Inspection of water drainage for Main Rod Shop Area

2.1.7 Construction and inspection control cable ducts & Trenches

2.1.8 Construction and inspection MV cable ducts & Trenches

2.1.9 Construction and inspection LV cable ducts & Trenches

2.1.10 Check the location of earthing pits and earthing cables

2.2 M&E- Cathode Sealing & Lining- Phase 1 & 2 & 3

2.2.1 Construction & Inspection of all Steel Structures

2.2.2 Construction & Inspection of all Clading, Roofing on Structures

2.2.3 Construction & Inspection of all Roofing Structures

2.2.4 Construction of outdoor lighting system for Main Area

2.2.5 Installation and Measuring earthing in all Main Area

2.2.6 Installation of all Street Lighting & conduits- Main Area

2.2.7 Installation of all Conduits for all AUX power for Main area

2.2.8 Fire alarm system, emergency alarms, emergency lights

2.2.9 Public PA system

2.2.10 CCTV and camera system

2.2.11 Arranging fire extinguishers

2.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

2.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits


3 360.15 -ROD SHOP OFFICES AND ELECT
3.1 Civil Construction

ROD SHOP Offices & Substation / Electrical Room Building Phase 1 & 2

3.1.1 Complete and inspect the Geometric dimension of the Substation & Electrical Room

3.1.2 Finishing and inspection of elevation and floor size, foundation

Finalize and inspect the location of the transformer foundation ( Oil drainage Pit & Cable
3.1.3
access)

3.1.4 Finishing and inspection of access doors, fencing

3.1.5 Finishing and inspection of floor cut outs for panels

3.2 ROD SHOP Offices & Electrical Room Building

3.2.1 Construction and inspection of Lighting

3.2.2 Construction and inspection of HVAC system

3.2.3 Construction and inspection of Cable Conduits

3.2.4 Construction and Inspection of Fire alarm system

3.2.5 Arranging fire extinguishers

3.2.6 Safety Hand Rails, Fences, Barricades Contstructed and Installed

4 382 ; 386 - ANODE ASSEMBLY RODDING SHOP &


4.1 Anode Assembly & Cast Iron

Anode Assembly & Cast Iron Section of Building

4.1.1 Construction and inspection of Geometric dimension of Main AREA- Foundations

4.1.2 Complete and inspect the Geometric dimension of Building

4.1.3 Completing and inspecting elevation of floors, roofs, staircases

4.1.4 Completing and checking the flatness of basement floors and other floors

4.1.5 Construction and Inspection of water drainage for main Area

4.1.6 Construction and inspection control cable ducts & Trenches

4.1.7 Construction and inspection MV cable ducts & Trenches

4.1.8 Construction and inspection LV cable ducts & Trenches


4.1.9 Check the location of earthing pits and earthing cables

4.2 M&E- Anode Assembly & Cast Iron Area

4.2.1 Construction & Inspection of all Steel Structures

4.2.2 Construction & Inspection of all Clading, Roofing on Structures

4.2.3 Construction & Inspection of all Roofing Structures

4.2.4 Construction of outdoor lighting system for Main Area

4.2.5 Installation and Measuring earthing in all Main Area

4.2.6 Installation of all Street Lighting & conduits- Main Area

4.2.7 Installation of all Conduits for all AUX power for Main area

4.2.8 Fire alarm system, emergency alarms, emergency lights

4.2.9 Public PA system

4.2.10 CCTV and camera system

4.2.11 Arranging fire extinguishers

4.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

4.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits

5 626-ROD SHOP MAINTENANCE & WAR


5.1 ROD SHOP MAINTENANCE & WAREHOUSE- Phase 1 & 2 & 3

MAIN Building

5.1.1 Construction and inspection of Geometric dimension of MAIN AREAS- Foundations

5.1.2 Complete and inspect the Geometric dimension MAIN Building

5.1.3 Completing and inspecting elevation of floors, roofs, staircases

5.1.4 Completing and checking the flatness of basement floors and other floors

5.1.5 Construction and Inspection of water drainage for Main Areas

5.1.6 Construction and inspection control cable ducts & Trenches

5.1.7 Construction and inspection MV cable ducts & Trenches

5.1.8 Construction and inspection LV cable ducts & Trenches

5.1.9 Check the location of earthing pits and earthing cables


5.2 M & E - ROD SHOP MAINTENANCE & WAREHOUSE- Phase 1 & 2 & 3

5.2.1 Construction & Inspection of all Steel Structures

5.2.2 Construction & Inspection of all Clading, Roofing on Structures

5.2.3 Construction & Inspection of all Roofing Structures

5.2.4 Construction of outdoor lighting system for Main Areas

5.2.5 Installation and Measuring earthing in all Main Areas

5.2.6 Installation of all Street Lighting & conduits- Main Areas

5.2.7 Installation of all Conduits for all AUX power for Main areas

5.2.8 Fire alarm system, emergency alarms, emergency lights

5.2.9 Public PA system

5.2.10 CCTV and camera system

5.2.11 Arranging fire extinguishers

5.2.12 Safety Hand Rails, Fences, Barricades contstructed and Installed

5.2.13 Inspection of Crane Rails, Crane Power AUX, Crane Conduits


DDING SHOP & STORAGE AREA- CURRENT STATUS AT THQ SITE
DETAILS, SPECIFICATION,
STAGE- NOT STARTED, ONGOING or COMPLETED
REFERENCE, DRAWING NUMBER

ANODE ROD SHOP HANDLING & STORAGE AREA- Phase 1 & 2 & 3

Already finished basic construction

Already finished basic construction


2- CATHODE SEALING & LINING MATERIAL- PHASE 1, 2 & 3
0.15 -ROD SHOP OFFICES AND ELECTRICAL ROOMS

ANODE ASSEMBLY RODDING SHOP & CAST IRON RECYCLING


626-ROD SHOP MAINTENANCE & WAREHOUSING
T THQ SITE
NOTES & ACTIONS TO TAKE

1&2&3
3
ING