THQ - Current Site Status - Review 30 NOV 2020
THQ - Current Site Status - Review 30 NOV 2020
No. AP Code
I Substation
GIS
€ 310.10
II Potline
Potline A+B
€ 320.00
Side Entrance & Pedestrian access
320.1
Access to ground floor & Safety shower
320.2 (1)
Access to ground floor & Safety shower
320.3 (2)
Access to ground floor & Safety shower
320.4 (3)
Electrical room
322.1~6
Potline Equipment Storage
320.6
III GTC
324.;325.;328. GTC1
;332.
324.;325.;328. GTC2
;332.
324.;325.;328. GTC3
;332.
Power loop Substation
710-02.
Power loop Substation
710-03.
Power loop Substation
710-04.
Power loop Substation
710-02.1
Power loop Substation
710-02.2
Foundation support for Conveyer
Alumina and Gas colector pipe
IV Cast house
Cast house
350.
Cast house area offices
350.15
Cast house cooling water
350.41
Alloying products storage (1)
351.32
Alloying products storage (2)
351.32
Dross treatment
359.
Cast house area maintenance workshop
625.
Cast house area warehousing
635.
Power loop Substation
710-06.
VI Auxiliary works
Ladle & tapping tube cleaning
344.
Maintenance central workshop
620.
Main warehouse
630.
Fabrication workshop
Potshell
322.31
Superstructure
322.34
Busbar
322.33
Main Silo
Silo 60kt
831.
Silo 60kt Tower
0.
Casthouse
Workshop
Auxiliary buildings
Metal storage
350.90
Brick storage
0.
Metal storage
0.
Storage area
0.
Plant main gate
0.
Remark:
TBD: To be decided
Y: Detail design required
N: Detail design not required
C: Construction Completed
CIVIL ENGIN
PROJECT: DAK NONG
Civil guideline
Dimensions Area EPC
information
Solios Received
- 41,004
38x168m + 65x97m+87x130m+30x63m 20,849
70x60m 4,200
40x100m 4,000
63x100m 6,300
- -
CIVIL ENGINEERING INFORMATION
OJECT: DAK NONG ALUMINIUM SMELTER PLANT
Structure
Architect Steel Structure Piling
Foundation Body
Y (Vapico) Y (Vapico) N
Y (Vapico) Y (Vapico) N
N Y(Vapico) N Y (Solios)
N Y(Vapico) N Y (Solios)
N Y(Vapico) Y(Vapico) N
N Y(Vapico) Y(Vapico) N
N Y(Vapico) Y(Vapico) N
N Y(Vapico) Y(Vapico) N
N Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
Y(Vapico) Y(Vapico) N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) N N
N Y(Vapico) Y(Vapico) N
Y Y N
Civil Construction
Completed Completed
Completed Completed
Remark
Fabrication done
Fabrication done
Fabrication done
Steel structure by Cladding
only
Floor (Slab) only
CODING
WORK, ES ES HV
FOUND FIELD FUME/ UNDER RAIL PROCE
AREA
DRAIN (PIPING CONCR SIDING MASON (INCL. BUILDI MECHA PROCE &MV PANNE THQ
FENCIN EARLY FINAL LANDS ATION STRUC ROOF FIRE ERECT REFRA GAS GROUN CONDU SS PLC & PROGR MECHA
AGE, , ETE AND RY BLOCK NG NICAL SS POTLIN ELECT L & ELECT
Engineering - Future G & ROAD ROAD CAPIN PILING AND TURAL MONIT PROTE HVAC ED CORY COLLE PIPING D CTOR CABLI HARD AMMIN NICAL
TRENC CONDU TANKS/ ROOFI BUILDI WORK, UTILITI EQUIP EQUIP ING RICAL FIELD RICAL
GATES WAYS WAYS G CONCR STEEL ORS CTION BINS / WORK CTION EARTHI (CRAN NG (LV WARE G scope
HING, ITS, SILOS NG NG DOORS ES MENT MENT EQUIP DEVICE scope
ETE TANKS SYSTE NG E) & HV)
& DUCTB , MENT
M
CLEARI ANK, WINDO
NG …) WS,
PAINT'
G)
filters to
310 SUBSTATION finsihed
? ?
350 CASTHOUSE
641 LABORATORY
646 CAFETERIA
MECHANICAL EQUIPMENT
FACILTIES' LEGEND
CONCRETE TANKS/SILOS
COLLECTION SYSTEM
SIDING AND ROOFING
HV &MV ELECTRICAL
STRUCTURAL STEEL
MASONRY BUILDING
(INCL. BLOCKWORK,
MASS EARTHWORK,
REFRACORY WORK
EARLY ROADWAYS
DOORS, WINDOWS,
FENCING & GATES
FOUNDATION AND
FIRE PROTECTION
ROOF MONITORS
DUST/FUME/GAS
PROGRAMMING
LANDSCAPING
MECHANICAL
ELECTRICAL
EQUIPMENT
CONCRETE
Added details
POTLINING
CLEARING
PAINT'G)
TANKS
PIPING
PILING
HVAC
HV)
CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL THQ NETWORKs
CODING
CODING
AREA
SITE PREPARATION 001
SUBSTATION 310
POTLINE EQUIPMENT
346
MAINTENANCE
CASTHOUSE 350
MAINTENANCE CENTRAL
620
WORKSHOP
CASTHOUSE AREA MAINTENANCE
625
WORKSHOP
CARBON AREA MAINTENANCE
626
WORKSHOP
632
LABORATORY 641
CAFETERIA 646
L
A
S
O
P
S
I
D
S
G
N
I
L
I
A
T
NOTES
LEGEND CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL NETWORK
CODING
FINISH
AREA
MASS U/G ES
EARTH SERVIC (INCL.
Construction - Future WORK, ES BLOCK
DRAIN (PIPING WORK, DUST/
AGE, , DOORS FUME/ HV
TRENC CONDU FOUND , FIELD GAS UNDER RAIL PROCE &MV
HING, ITS, ATION CONCR SIDING MASON WINDO BUILDI MECHA PROCE ERECT COLLE GROUN CONDU SS ELECT PANNE
& FENCIN EARLY FINAL DUCTB LANDS AND ETE STRUC AND RY ROOF WS, NG FIRE NICAL SS ED REFRA CTION D CTOR CABLI RICAL L & PLC & PROGR
CLEARI G & ROAD ROAD ANK, CAPIN CONCR TANKS/ TURAL ROOFI BUILDI MONIT PAINT' UTILITI PROTE EQUIP EQUIP BINS / CORY POTLIN SYSTE EARTHI (CRAN NG (LV EQUIP FIELD HARD AMMIN MECHA ELECT
NG GATES WAYS WAYS …) G PILING ETE SILOS STEEL NG NG ORS G) ES CTION HVAC MENT MENT TANKS WORK ING M PIPING NG E) & HV) MENT DEVICE WARE G NICAL RICAL
310 SUBSTATION 80 60 90 40 40 25 95 10
350 CASTHOUSE 15 15 10 20
641 LABORATORY 75 75 70 60 20
646 CAFETERIA
MECHANICAL EQUIPMENT
FACILTIES' LEGEND
CONCRETE TANKS/SILOS
COLLECTION SYSTEM
SIDING AND ROOFING
HV &MV ELECTRICAL
STRUCTURAL STEEL
MASONRY BUILDING
(INCL. BLOCKWORK,
MASS EARTHWORK,
REFRACORY WORK
EARLY ROADWAYS
DOORS, WINDOWS,
FENCING & GATES
FOUNDATION AND
FIRE PROTECTION
ROOF MONITORS
DUST/FUME/GAS
PROGRAMMING
LANDSCAPING
MECHANICAL
ELECTRICAL
EQUIPMENT
CONCRETE
Added details
POTLINING
CLEARING
PAINT'G)
TANKS
PIPING
PILING
HVAC
HV)
CIVIL AND STRUCTURAL ARCHITECTURAL / BLDG SERVICES MECHANICAL & PIPING ELECT & CONTROL NETWORK
CODING
CODING
AREA
SITE PREPARATION 001
SUBSTATION 310
POTLINE EQUIPMENT
346
MAINTENANCE
CASTHOUSE 350
MAINTENANCE CENTRAL
620
WORKSHOP
CASTHOUSE AREA MAINTENANCE
625
WORKSHOP
CARBON AREA MAINTENANCE
626
WORKSHOP
LABORATORY 641
CAFETERIA 646
L
A
S
O
P
S
I
D
S
G
N
I
L
I
A
T
NOTES
MAIN SUBSTATION AREA- CURRENT STATUS AT
NO. TASKS / ACTIVITIES
1.2 M&E
Building
Floor
Check correct Cable Cut Outs in GIS floor- Close Holes with Wooden
2.1.12
boards
2.2 M&E
Rails
Other jobs
3.1.6 Completing and inspecting the slope of floors, cable trenches, oil pipes
3.1.8 Complete and Inspection of 220 kV Cable ducts and HDPE conduits
3.2 M&E
Complete and inspect the distance and the Geometric dimension of the
4.1.1
wall
Other jobs
4.2 M&E
5.1.4 Completing and checking the flatness of basement floors and 1st floor
5.1.6 Completing and checking of the False Floors in LV and Battery Room
5.2 M&E
6.2 M&E
7.2 M&E
Already completed
Cable trench not yet constructed, Oil pits already constructed and
can be checked
Already completed
Already completed
Already completed
Already completed
Potroom Buildings
2.2.8 Installation of all Conduits for all AUX power to Pot Mirco Controllers
3.2 M&E
3.2.4 Installation of Aux power Conduits for central passage work/ toolstore area
4.1.1 Complete and inspect the Geometric dimension of the Electrical Room
4.2 M&E
5.1.1 Complete and inspect the Geometric dimension of the Electrical Room
5.2 M&E
6.1 Building
6.1.4 Completing and checking the flatness of basement floors and 1st floor
6.1.6 Completing and checking of the False Floors in LV and Battery Room
6.2 M&E
7.1.5 Finalize and inspect the size of LV cable trenchs, Pull Pits & Conduits
7.2 M&E
Already completed
B - PHASE 1
B- PHASE 2
SE 1 & PHASE 2
al Rooms 1 & 4
al Rooms 2 & 5
ILDING
GAS TREATMENT CENTERS 1 , 2 & 3- CURRENT ST
NO. TASKS / ACTIVITIES
GTC Building
1.1.4 Completing and checking the flatness of basement floors and other floors
1.1.5 Construction and Inspection of water drainage for Main GTC Area
1.2.7 Installation of all Conduits for all AUX power for GTC 1 area
2.1.1 Complete and inspect the Geometric dimension of the Electrical Room
3.1.4 Completing and checking the flatness of basement floors and other floors
3.1.5 Construction and Inspection of water drainage for Main GTC 2 Area
3.2.7 Installation of all Conduits for all AUX power for GTC 2 area
4.1.1 Complete and inspect the Geometric dimension of the Electrical Room
5.1.4 Completing and checking the flatness of basement floors and other floors
5.1.5 Construction and Inspection of water drainage for Main GTC 3 Area
5.2.7 Installation of all Conduits for all AUX power for GTC 3 area
6.1.1 Complete and inspect the Geometric dimension of the Electrical Room
1.1.4 Completing and checking the flatness of basement floors and other floors
1.1.5 Construction and Inspection of water drainage for Main INGOT Area
1.2.7 Installation of all Conduits for all AUX power for Main INGOT area
2.1.1 Complete and inspect the Geometric dimension of the Substation & Electrical Room
Finalize and inspect the location of the transformer foundation ( Oil drainage Pit & Cable
2.1.3
access)
2.2 INGOT Offices & Substation / Electrical Room Building Phase 1 & 2
3.1.4 Completing and checking the flatness of basement floors and other floors
3.1.5 Construction and Inspection of water drainage for Main BILLET Area
3.2.7 Installation of all Conduits for all AUX power for Main BILLET area
4.1.1 Complete and inspect the Geometric dimension of the Substation & Electrical Room
Finalize and inspect the location of the transformer foundation ( Oil drainage Pit & Cable
4.1.3
access)
MAIN Building
5.1.4 Completing and checking the flatness of basement floors and other floors
5.2.7 Installation of all Conduits for all AUX power for Main areas
5.2.8 Fire alarm system, emergency alarms, emergency lights
6.1.1 Complete and inspect the Geometric dimension of the part of Foudations
6.1.3 Finalize and inspect the location of the storage of Ingot & Billet
6.1.4 Finishing and inspection of access into and out of Storage Area.
6.2 M&E -Laydown/ Storage INDOOR areas in Building- Ingot & Billet
6.3 Civil Construction OUTDOORS- Laydown/ Storage area- Ingot & Billet
6.3.2 Finalize and inspect the location of the storage of Ingot & Billet
6.3.3 Complete and inspect the Geometric dimension of the part of Foudations
6.3.4 Finishing and inspection of elevation of outdoor concrete floor for laydowns
6.3.5 Finishing and inspection of access into and out of laydown Area.
6.3.6 Finishing and inspection of Conduits into and out of laydown Area.
6.3.7 Construction and Inspection of water drainage for Main Laydown Area
6.3.9 Construction and inspection LV Cable Ducts & Trenches in Laydown areas
6.3.10 Check the location of earthing pits and earthing cables in Laydown Area
6.4 M&E -Laydown/ Storage OUTDOOR areas in Building- Ingot & Billet
6.4.2 Construction and inspection of Cable Conduits for AUX Power and Lighting
6.4.7 Safety Hand Rails, Fences, Barricades Contstructed and Installed in Laydown Areas
SE INGOT & BILLET- CURRENT STATUS AT THQ SITE
DETAILS, SPECIFICATION,
STAGE- NOT STARTED, ONGOING or COMPLETED
REFERENCE, DRAWING NUMBER
1 364 & 381- MAIN ANODE ROD SHOP HANDLING & STOR
1.1 Anode Handling & Storage- Phase 1 & 2 & 3
1.1.1 Construction and inspection of Geometric dimension of Rod Shop AREA- Foundations
1.1.2 Complete and inspect the Geometric dimension Rod Shop Building
1.1.4 Completing and checking the flatness of basement floors and other floors
1.1.5 Construction and Inspection of water drainage for Main Rod Shop Area
1.2.4 Construction of outdoor lighting system for Main Rod Shop Area
1.2.5 Installation and Measuring earthing in all Main Rod Shop Area
1.2.6 Installation of all Street Lighting & conduits- Main Rod Shop Area
1.2.7 Installation of all Conduits for all AUX power for Main area
Main Section of Cathode Sealing & Lining- Phase 1 & 2 & 3 Building
2.1.2 Construction and inspection of Geometric dimension of Rod Shop AREA- Foundations
2.1.3 Complete and inspect the Geometric dimension Rod Shop Building
2.1.5 Completing and checking the flatness of basement floors and other floors
2.1.6 Construction and Inspection of water drainage for Main Rod Shop Area
2.2.7 Installation of all Conduits for all AUX power for Main area
ROD SHOP Offices & Substation / Electrical Room Building Phase 1 & 2
3.1.1 Complete and inspect the Geometric dimension of the Substation & Electrical Room
Finalize and inspect the location of the transformer foundation ( Oil drainage Pit & Cable
3.1.3
access)
4.1.4 Completing and checking the flatness of basement floors and other floors
4.2.7 Installation of all Conduits for all AUX power for Main area
MAIN Building
5.1.4 Completing and checking the flatness of basement floors and other floors
5.2.7 Installation of all Conduits for all AUX power for Main areas
ANODE ROD SHOP HANDLING & STORAGE AREA- Phase 1 & 2 & 3
1&2&3
3