Dana Jumlah Biaya Per TM

Pengajuan Aktual
6/14/2021 Senin 7 Rp 50,000.00 Rp 100,000.00
6/15/2021 Selasa 5 Rp 50,000.00 Rp 100,000.00
6/14/2021 Operator hari ke-1 1 Rp 200,000 Rp 150,000
6/15/2021 Operator hari ke-2 1 Rp 200,000 Rp 150,000
6/15/2021 Security hari 1&2 (3 Orang) 1 Rp 600,000 Rp 300,000
6/15/2021 Operator CP jari ke 1&2 2 Rp 250,000 Rp 250,000
6/15/2021 Biaya waspang 2 Rp 200,000 Rp 200,000
Total Biaya Teknis Pengecoran
Enetertaint Pengecoran Bersama Dilapangan
Grand Total Jalan Section 1
Total Biaya Cor Total Biaya Cor
Selisih
Pengajuan aktual
Rp 350,000.00 Rp 700,000.00 Rp 350,000.00
Rp 250,000.00 Rp 500,000.00 Rp 250,000.00
Rp 200,000.00 Rp 150,000.00 Rp 50,000.00
Rp 200,000.00 Rp 150,000.00 Rp 50,000.00
Rp 600,000.00 Rp 300,000.00 Rp 300,000.00
Rp 500,000.00 Rp 500,000.00 Rp -
Rp 400,000.00 Rp 400,000.00 Rp -
Rp 2,500,000.00 Rp 2,700,000.00 Rp 1,000,000.00
Rp 200,000 Rp 300,000 Rp 100,000.00
Rp 2,700,000.00 Rp 3,000,000.00 Rp 1,100,000.00