PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
YAKUT/BACAN PIT YAKUT DAN PIT BACAN Northing
RL
Clasification

(1) ECA 6002 Striping di blok 7


(2) ESY 9801 Striping di blok 8
(3) ESY 9802 striping di blok 8

3
2
1
7

PT AKG Observer By, Operation PT AKG Operation PT. KDC

(Pit Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. PRODUKSI )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
PIT YAKUT YAKUT IPD BLOK 1-3 Northing
RL
Clasification

BATAS PITA DAMPINGAN


BIKIN KAN BUNDWALL
BENCH RL 90 AGAR AIR TIDAK MELUAP

BENCH RL 85

DUMPINGAN BUAT MATERIAL


BAGUS SELEVEL RL 95

PT AKG Observer By, Operation PT AKG Operation PT.KDC

(Pit Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. PRODUKSI )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
OPD B PIT YAKUT Northing
RL
Clasification

AREA SPREADING
AREA SPREADING SOIL
SOIL

PARITAN WMP

FUEL STATION

PT AKG Observer By, Operation PT AKG Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. PRODUKSI )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
PIT YAKUT BLOK 7 Northing
RL
Clasification

ESY 9801 STRIPING KE SPEED UP PEMBUATAN KEYLOQ AGAR


ARAH BARAT SEKALIAN BISA CEPAT DI KUNCI AREA RETAKAN IPD
BUAT AKSES JALAN
SPEED UP SMOTHING
AREA RETAKAN IPD

PROGRES KAN
PEMBUATAN AKSES
JALAN

P1 EZL 4901 COAL


GETING DAN MINE OUT BENCH RL 80
SEAM 5

EHY 2101 CLEANING


SEAM 4 UNTUK 6002 STRIPING
PERSIAPAN SEBATAS PITA BENCH RENCANA SUMP
RL 70 TEMPORARY

BENCH RL 70
PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
PIT YAKUT BLOK 8 Northing
RL
Clasification

PEMBUATAN SLOPE 30
DERAJAT SELEVEL RL 83 PEMBUATAN SLOPE 20
DERAJAT SELEVEL RL 83

SMOOTHING AREA
ESY 9801 STRIPING SOIL RETAKAN IPD KARET
SEBATAS PITA SEQUEN

ESY 9802 STRIPING SELEVEL


RL 80 KE ARAH BARAT
SEKALIAN BENTUK AKSES
JALAN

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
YAKUT BLOK 10 Northing
RL
Clasification

PARITAN DARI LAHAN BELUM


BEBAS

PROGRES PEMBUATAN PARITAN AIR


UNTUK AIR DARI LOWSTPOIN BLOK 7

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
YAKUT BLOK 14 Northing
RL
Clasification

JALUR PIPA HDPE


BLOK 14

PARITAN ALIRAN
DARI LAHAN WARGA
BELUM BEBAS

RENCANA PARITAN
DARI BLOK 7 KE
ARAH CONTROL BOX

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
DIAMOND PIT DIAMOND Northing
RL
Clasification

(1) EZL 7503 Striping blok 40


(2) EZL 7504 Stripng blok 38
(3) ESY 7502 Striping blok 40

2
3

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
DIAMOND PIT DIAMOND BLOK 35 Northing
RL
Clasification

DAMPINGAN SELEVEL RL
120

BENCH RL 115

BENCH RL 110

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

KDC - AKG PROJECT


Field Observation and Monitoring
Name ALFIAN & ALAM
Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
DIAMOND SPREADING SOIL SAFIR Northing
RL
Clasification

SEGERA RAPIKAN UNTUK


PERSIAPAN PERALIHAN PARITAN JANGAN
SPREADING SOIL SAMPAI TERTUTUP

RAPIKAN SPREADING
SOIL SEBATAS PITA

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

Name ALFIAN & ALAM


Change Shift Easting
Date/Time
SIANG
3-Nov-23 PIT DIAMOND BLOK 42 Northing
Pit / Block DIAMOND RL
Clasification

PARITAN DARI GORONG JIKA ADA MATERIAL Ezl 4902 COAL GETING
GORONG JALAN HOULING 65 BAGUS, TIMBUN JALAN SEAM 5

BENCH RL 90

BUAT KAN LOST


POIN

DAMPINGAN KHUSUS
MATRIAL BAGUS UNTUK
SPEED UP PEGUNCIAN KE
SUMP JANGAN DI
ARAH SUTET
TIMBUN
SUMP SEMENTARA

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

Name ALFIAN & ALAM


Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
DIAMOND PIT DIAMOND BLOK 38 Northing
RL
Clasification

EZL 7504 STRIPING SOIL SEBATAS


PITA HIGWALL

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

Name ALFIAN & ALAM


Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
DIAMOND DIAMOND SEAM 6 BLOK 40 & SEAM 7 Northing
RL
Clasification

ESY 7502 LOADING EXPOSE


SEAM 7 SIDEWALL

EZL 3701 COAL GETING


PROGRES KAN
PEMBUATAN AKSES
JALAN

ESY 7503 STRIPING SEBATAS


BOUNDARY SELEVEL RL 100

BENCH RL 100

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

Name ALFIAN & ALAM


Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
DIAMOND IPD SAFIR Northing
RL
Clasification

DUMPINGAN DI BAWAH JALAN


HOULING KAPUK-KAPUK SELEVEL RL
113

PERALIHAN DUMPINGAN JANGAN


MELEWATI PITA KUNING DAN
BOUNDRY MERAH PUTIH

BENCH RL 107

BENCH RL 110

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

Name ALFIAN & ALAM


Change Shift SIANG Easting
Date/Time
Pit / Block
3-Nov-23
IPD SEAM 3 DIAMOND BLOK 36 Northing
RL
Clasification

DAMPINGAN KHUSUS
LUMPUR

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )


PIT BARAT

Name 2-Nov-23
Change Shift SIANG Easting
Date/Time
Pit / Block
ALFIAN & ALAM
SEAM 6 DIAMOND BLOK 40 Northing
RL
Clasification

P1 CLEARING SEAM 6
UTARA TIMUR

DAMPINGAN KHUSUS MATRIAL


BAGUS UNTUK PEMBUATAN
AKSES JALAN

PT AKG Observer By, Operation PT AKG, Operation PT. KDC

(Engineering AKG) ( Mine Spv. Operation ) ( Mine Spv. Operation )