Feeder

PROJECT COST SHEET

Project Name : Conventional FTTH Pemalang


Project Ref. : XL33PML00060 & XL33PML00
Date : 9/19/2023
Project ID :
FDT ID : FMOT10D01
OLT ID : MOT10
HP : 345

Labor Cost 1 1EA 1


No. Work Description Part Number Unit Quantity
9 Pole Mobilization (Pole by LN) PNRO-POLEMBS Unit 0
11 Pole Installation (Pole Provided by LN) PNRO-POLEINSTLN Piece 0

23 Fiber cable cross-section frame (+) PNRO-FOFRM Piece 0

24 Penempatan Kabel Fiber – Aerial, termasuk lashing (jika ada) PNRO-FOAIR Meter 251

33 Splicing Fiber Optic Kabel, Min.12 Core PNRO-SPLFO1 Tube 1


1 Pole Steel 7/250 (2 segment, 4" & 2.5") 8CLOT0029 Ea 0
4 Pole Steel 8/200 lb, 6M 5inch - 2M 4inch 8CLOT0026 Ea 0
11 12 core fiber optic cable , Single Mode, ADSS , G-652. 8CAFO0010 M 251
12 M 0
24 core fiber optic cable , Single Mode, ADSS, G-652. 8CAFO0017
53 Closure In Line, ILC 12 Core 8FOCL0020 Ea 0
54 Closure In Line, ILC 24 core 8FOCL0022 Ea 0
67 Bracket,'J' Type 8CLOT0003 Ea 9
71 Clamp Round 2" Pole 8CLRO0004 Ea 9
72 Clamp Round 4" Pole Bracket with Rubber Seal 8CLRO0006 Ea 0
78 Clamp Baut+Mur 10 cm 8CLBO0001 Ea 18
93 Strand Clamp 50-70 8CLOT0020 Ea 14
115 Sleeve Protector 8FOOT0018 EA 14

BOQ BOQ
Prepared by, Acknowledge by,

(Ade Irwanto) (Yunita WIike)

Page 1
Feeder

H Pemalang Area
XL33PML00239

Sudah rumus jangan diubah Total propose new pole


Sudah rumus jangan diubah Total propose new pole

Check manually Total Penggunaan New Slack-hanger

Sudah rumus jangan diubah Total panjang kabel


Sudah rumus jangan diubah Total splicing per-tube
Sudah rumus jangan diubah Propose new pole 7/250 New Pole 7/250 0
Sudah rumus jangan diubah Propose new pole 8/200 New Pole 8/200 0
Sudah rumus jangan diubah
Sudah rumus jangan diubah Jarak dari GE Toleransi 15%
Check manually Jika Ada Closure Di Pecah FDT 183 27.45
Check manually Jika Ada Closure Di Pecah FDT 0 0
Sudah rumus jangan diubah Total pengunaan tiang 1 rute feeder (add buffer 3)
Sudah rumus jangan diubah Total pengunaan tiang 7/250 1 rute feeder (add buffer 3)
Sudah rumus jangan diubah Total pengunaan tiang 8/200 1 rute feeder + total new slack-hanger (add buffer 1)
Sudah rumus jangan diubah Total clamp 2" x2
Sudah rumus jangan diubah Total penggunaan tiang dikali 1.5
Sudah rumus jangan diubah Total Splitter di FDT x2 Total Splitter FDT 7

Page 2
Feeder

Pole Lastmile 6 Curve pole 0

Total Coil (Default 2,


Total Cable
OLT & FDT)
2 251 ADSS 12c
0 0 ADSS 24c

uffer 1)