Professional Documents
Culture Documents
DOS-Q104 - V - 1 - 2 (TRANS) Document Transmittal
DOS-Q104 - V - 1 - 2 (TRANS) Document Transmittal
Type of Discipline:
Civil / Structural Architectural Mechanical Electrical Infra Others
Type of Submittal
O & M Manual Test Results / Certificates Organisational Chart
We are sending herewith the drawings | documents | samples listed below for your review.
Item Drawing | Spec |
Description Copies Action Code
No. BOQ | Reference
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings, specifications and authority requirements. This check is only for review
of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor is responsible for confirming and correlating all quantities and
dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of other trades and performing his work in a safe and satisfactory manner.
Signature: Signature:
Date
OPTIONAL Additional Comments and/or Observations: (refer to the attached OCS, if any) YES NO
Part 3 – Approval
A. Approved B. Approved w/ Comments C. Revise and Resubmit D. Rejected E. For Information