DAILY REPORT

Monday, 30 October 2023

Weather : Sunny Input : Day & Night Shift


Update : 6.00 WITA : 07.00 - 6.00 WITA
1. PIT PRODUCTION AND BARGING
ORE (MT)
OB TOP SOIL OUT PIT MATERIAL BARGING QUARRY SR SR
Description DIRECT TO BARGE ORE TO STOCKPILE ORE
TON TON ORE LIMONITE ORE SAPROLITE ORE LIMONITE ORE SAPROLITE DIRECT STOCKPILE MT TON Ton/Ton BCM/Ton

Daily
Pit Moskow Utara 3,444.0 0.0 0 0 0 0 0 126 2,919 126 0.0 1.13 0.71
Pit Moskow Tengah 13,362.0 0.0 0 0 0 0 0 2,899 3,822 2,889 0.0 1.99 1.24
WDK Hera 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
Quarry Segmen E 0.0 0.0 0 0 0 0 0 0 0 0 2,161.3 - -
ETO ARES 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
ETO SALWA 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
ETO MATARAM 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
PIT ROSTOV 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
EFO LT 5 0.0 0.0 0 0 0 0 0 0 0 1,184 0.0 - -
EFO LT 4 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
EFO LT 3 0.0 0.0 0 0 0 0 0 0 0 536 0.0 - -
EFO LT 2 0.0 0.0 0 0 0 0 0 0 0 1,604 0.0 - -
EFO LT 1 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
ETO HERA 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
SEGMEN F 0.0 0.0 0 0 0 0 0 0 0 0 0.0 - -
16,806 0 0 0 9,766
TOTAL 0 6,339 2,161 1.72 1.08
16,806 9,766

DAILY PLAN

Plan 19,600 0 10,400 7,500 1,600 1.88 1.18


Ach 86% 0% 94% 85% 135% 91% 91%
WTD (WEEK 42)
OB OUT PIT MATERIAL ORE BARGING QUARRY SR SR
Plan 128,900 0 68,100 49,200 10,500 1.89 1.18
Actual 59,648 0 35,028 30,425 9,557 1.70 1.06
Ach 46% 0% 51% 62% 91% 111% 111%

MTD OKTOBER 2023


OB OUTPIT MATERIAL ORE BARGING QUARRY SR SR

Plan 330,000 0 210,000 200,000 92,800 1.57 0.98


Actual 419,373 0 217,798 206,960 80,237 1.93 1.20
Ach 127% 100% 104% 103% 86% 123% 123%

YTD 2023

Plan 2023 3,224,600 0 1,619,800 1,500,000 313,000 1.99 1.24


Actual 1,401,217 16,756 748,945 884,741 530,720 1.89 1.18
Ach 43% 100% 46% 59% 170% 95% 95%

2. PRODUCTION QUALITY ESTIMATE BY BLOCK MODEL (Sumproduct)

Loading point TON Ni Co Fe SiO2 CaO MgO Al2O3 Sio2/MgO


Pit Moskow Utara 1,470 1.28 0.08 41.16 8.16 0.14 4.39 7.52 1.86
Pit Moskow Tengah 1,890 1.62 0.05 21.96 28.57 0.34 17.71 3.63 1.79
Pit Moskow Utara - Direct 126 1.32 0.04 16.30 32.08 0.82 16.49 4.04 1.95
Pit Moskow Tengah - Direct 76 2.00 0.05 20.33 32.34 0.26 19.30 2.68 1.68

TOTAL 3,562 NOTE : 1.932 WMT WA DARI MOSKOW TENGAH ; 1.449 WMT WA DARI MOSKOW UTARA; 2.813 WMT WA DARI MOSKOW TENGAH - DIRECT

3. BARGING ACTIVITY

Loading Barge
GATE BUYER PLAN TONNAGE Barge Dimension Loading duration Start Loading Achievement

1 OSS 9,500 TB. Avengers /BG. Captain Marvel 330 ft 9,553 3 hari 3 jam 45 menit 30-Sep-23 15:15 Wita 101%
2 OSS 8,600 TB. Maju Daya 47/BG. Marcopolo 330 300 ft 8,654 2 hari 10 jam 25 menit 02-Oct-23 15:05 Wita 101%
3 OSS 11,000 TB. Internusa 221/BG. Pratama Power 3203 330 ft 11,053 2 hari 11 jam 50 menit 03-Oct-23 14:35 Wita 100%
4 OSS 10,500 TB. Buana Express 50 / BG. Golden Way 3350 330 ft 10,552 2 hari 21 jam 50 menit 05-Oct-23 13:20 Wita 100%
5 OSS 10,500 TB. Buana Express 55/ BG. Golden Way 3355 330 ft 10,554 3 hari 7 jam 0 menit 05-Oct-23 16:40 Wita 101%
6 HNC 9,500 TB. Mitra Anugerah 51/BG. Anwari 330 ft 9,552 3 hari 3 jam 25 menit 06-Oct-23 07:55 Wita 101%
7 HNC 11,000 TB. Vier Navigator / BG. Ghani Naila 330-2 330 ft 11,043 4 hari 0 jam 20 menit 08-Oct-23 22:20 Wita 100%
8 OSS 9,500 TB. Mitra Anugerah 39 / BG. Professor 330 ft 9,553 3 hari 4 jam 55 menit 09-Oct-23 04:35 Wita 101%
9 OSS 12,000 TB. Avengers 02/BG. Batman 8 330 ft 12,055 4 hari 8 jam 20 menit 09-Oct-23 20:00 Wita 100%
10 OSS 8,600 TB. Maju Daya 47/BG. Marcopolo 330 300 ft 8,654 3 hari 4 jam 50 menit 13-Oct-23 03:40 Wita 101%
11 VDNI 9,500 TB. Vando V/BG. Anwari 330 ft 9,552 3 hari 18 jam 20 menit 14-Oct-23 09:30 Wita 101%
12 OSS 11,000 TB. Internusa 221/BG. Pratama Power 3203 300 ft 11,043 5 hari 9 jam 30 menit 15-Oct-23 07:30 Wita 100%
13 HNC 11,000 TB. Vier Navigator / BG. Ghani Naila 330-2 330 ft 11,044 4 hari 19 jam 20 menit 16-Oct-23 16:30 Wita 100%
14 VDNI 9,500 TB. Fortuna Samudera 02/ BG. Spiderman 330 ft 9,539 4 hari 7 jam 31 menit 18-Oct-23 08:54 Wita 100%
15 HNC 9,500 TB. Vando V/BG. Anwari 330 ft 9,532 2 hari 22 jam 30 menit 21-Oct-23 20:55 Wita 100%
16 VDMI 8,600 TB. Maju Daya 47 / BG. Marcopolo 330 330 ft 8,635 2 hari 10 jam 45 menit 23-Oct-23 09:15 Wita 100%
17 HNC 8,000 TB. Entebe Star 10 /BG. Shiva 330 ft 11,038 2 hari 5 jam 15 menit 25-Oct-23 14:55 Wita 138%
18 OSS 11,000 TB. Internusa 2201 /BG. Pratama Power 3203 330 ft 8,037 3 hari 3 jam 20 menit 25-Oct-23 16:30 Wita 73%
19 OSS 8,500 TB. Buana Express 5 /BG. Golden Way 3005 330 ft 8,537 2 hari 20 jam 0 menit 25-Oct-23 23:30 Wita 100%
20 VDNI/OSS 9,500 TB. Vando V / BG. Anwari 330 ft 7,532 1 hari 23 jam 49 menit 29-Oct-23 08:11 Wita 79%
21 VDNI/OSS 7,500 TB. Cathay 48 / BG. CSF 3009 330 ft 9,536 1 hari 7 jam 18 menit 29-Oct-23 08:02 Wita 127%
22 VDNI/OSS 7,500 TB. May 202 / BG. Finacia 62 330 ft 1,716 0 hari 10 jam 45 menit 30-Oct-23 22:15 Wita 23%

Monitoring quality loading barge


Cargo distribution to barge Estimation GA LAB BCPM
BARGE Remarks
PIT (%) ETO (%) EFO (%) Ni SiMa Ni SiMa
TB. Avengers /BG. Captain Marvel 95% 6% 1.46 SiMa : 1,67 1.45 SiMa : 1,66 KADAR SUBLOT 10 PENGISIAN SUBLOT : 12/48 RIT

TB. Maju Daya 47/BG. Marcopolo 330 65% 7% 28% 1.46 SiMa : 1,68 1.44 SiMa : 1,69 KADAR SUBLOT 8 PENGISIAN SUBLOT : 16/48 RIT

TB. Internusa 221/BG. Pratama Power 3203 80% 21% 1.36 SiMa : 1,67 1.34 SiMa : 1,64 KADAR SUBLOT 10 PENGISIAN SUBLOT : 33/48 RIT

TB. Buana Express 50 / BG. Golden Way 3350 88% 13% 1.45 SiMa : 1,65 1.45 SiMa : 1,65 KADAR SUBLOT 9 PENGISIAN SUBLOT : 21/48 RIT

TB. Buana Express 55/ BG. Golden Way 3355 64% 27% 10% 1.44 SiMa : 1,64 1.46 SiMa : 1,65 KADAR SUBLOT 10 PENGISIAN SUBLOT : 26/48 RIT

TB. Mitra Anugerah 51/BG. Anwari 62% 39% 1.22 SiMa : 1,72 1.23 SiMa : 1,68 KADAR SUBLOT 9 PENGISIAN SUBLOT : 23/48 RIT

TB. Vier Navigator / BG. Ghani Naila 330-2 82% 17% 2% 1.12 SiMa : 2,28 1.11 SiMa : 2,31 KADAR SUBLOT 10 PENGISIAN SUBLOT : 9/48 RIT

TB. Mitra Anugerah 39 / BG. Professor 72% 27% 1% 1.47 SiMa : 1,84 1.48 SiMa : 1,83 KADAR SUBLOT 9 PENGISIAN SUBLOT : 34/48 RIT

TB. Avengers 02/BG. Batman 8 100% 1.43 SiMa : 1,75 1.44 SiMa : 1,74 KADAR SUBLOT 12 PENGISIAN SUBLOT : 4/48 RIT

TB. Maju Daya 47/BG. Marcopolo 330 84% 16% 1.46 SiMa : 1,62 1.46 SiMa : 1,62 KADAR SUBLOT 8 PENGISIAN SUBLOT : 1/48 RIT

TB. Vando V/BG. Anwari 84% 10% 6% 1.46 SiMa : 1,76 1.47 SiMa : 1,76 KADAR SUBLOT 9 PENGISIAN SUBLOT : 48/48 RIT
TB. Internusa 221/BG. Pratama Power 3203 90% 10% 1.40 SiMa : 2,00 1.47 SiMa : 1.86 KADAR SUBLOT 11 PENGISIAN SUBLOT : 01/48 RIT
TB. Vier Navigator / BG. Ghani Naila 330-2 47% 23% 31% 1.19 SiMa : 2.33 1.17 SiMa : 2.24 KADAR SUBLOT 10 PENGISIAN SUBLOT : 40/48 RIT
TB. Fortuna Samudera 02/ BG. Spiderman 96% 5% 1.42 SiMa : 1.83 1.44 SiMa : 1.82 KADAR SUBLOT 10 PENGISIAN SUBLOT : 10/48 RIT
TB. Vando V/BG. Anwari 86% 14% 1.16 SiMa : 1.73 1,16 SiMa : 1.70 KADAR SUBLOT 9 PENGISIAN SUBLOT : 9/48 RIT
TB. Maju Daya 47 / BG. Marcopolo 330 90% 10% 1.52 SiMa : 1.98 1.52 SiMa : 1.98 KADAR SUBLOT 8 PENGISIAN SUBLOT : 20/48 RIT
TB. Entebe Star 10 /BG. Shiva 80% 21% 1.22 SiMa : 1.52 1.23 SiMa : 1.63 KADAR SUBLOT 7 PENGISIAN SUBLOT : 1/48 RIT
TB. Internusa 2201 /BG. Pratama Power 3203 74% 19% 8% 1.53 SiMa : 1.89 1.59 SiMa : 1.83 KADAR SUBLOT 11 PENGISIAN SUBLOT : 16/48 RIT
TB. Buana Express 5 /BG. Golden Way 3005 97% 3% 1.43 SiMa : 2.02 1.44 SiMa : 2.18 KADAR SUBLOT 9 PENGISIAN SUBLOT : 10/48 RIT
TB. Vando V / BG. Anwari 55% 24% 1.45 SiMa : 1.88 1.44 SiMa : 1.94 KADAR SUBLOT 8 PENGISIAN SUBLOT : 30/48 RIT
TB. Cathay 48 / BG. CSF 3009 77% 50% 1.43 SiMa : 1.85 1.43 SiMa : 1.85 KADAR SUBLOT 7 PENGISIAN SUBLOT : 32/48 RIT
TB. May 202 / BG. Finacia 62 23% 0% 1.45 SiMa : 1.76 WA WA KADAR SUBLOT 2 PENGISIAN SUBLOT :37/48 RIT
\

ACTUAL TONNAGE (Include cargo loading) BARGING DISTIBUTION OCTOBER 2023 STATUS Remarks
BUYER DIRECT ETO EFO
206,960 1%
SAILED OUT 19 barges Terdapat sebanyak wmt yang akan dimasukkan ke jumlah MTD bulan ini
3% 0%
OSS 9,552.576 TB. Avengers /BG. Captain Marvel COMPLETED 30-Sep-23 15:15 Wita
OSS 8,653.697 TB. Maju Daya 47/BG. Marcopolo 330 COMPLETED 02-Oct-23 15:05 Wita

OSS 11,052.781 TB. Internusa 221/BG. Pratama Power 3203 COMPLETED 03-Oct-23 14:35 Wita

OSS 10,551.562 TB. Buana Express 50 / BG. Golden Way 3350 COMPLETED 05-Oct-23 13:20 Wita

OSS 10,554.052 TB. Buana Express 55/ BG. Golden Way 3355 COMPLETED 05-Oct-23 16:40 Wita

HNC 9,552.338 TB. Mitra Anugerah 51/BG. Anwari COMPLETED 06-Oct-23 07:55 Wita

HNC 11,042.822 TB. Vier Navigator / BG. Ghani Naila 330-2 COMPLETED 08-Oct-23 22:20 Wita

OSS 9,552.650 TB. Mitra Anugerah 39 / BG. Professor COMPLETED 09-Oct-23 04:35 Wita

OSS 12,054.562 TB. Avengers 02/BG. Batman 8 COMPLETED 09-Oct-23 20:00 Wita

OSS 8,653.697 TB. Maju Daya 47/BG. Marcopolo 330 COMPLETED 13-Oct-23 03:40 Wita

VDNI 9,551.779 TB. Vando V/BG. Anwari COMPLETED 14-Oct-23 09:30 Wita

OSS 11,042.558 TB. Internusa 221/BG. Pratama Power 3203 COMPLETED 15-Oct-23 07:30 Wita

HNC 11,043.618 TB. Vier Navigator / BG. Ghani Naila 330-2 COMPLETED 16-Oct-23 16:30 Wita

VDNI 9,539.142 TB. Fortuna Samudera 02/ BG. Spiderman COMPLETED 18-Oct-23 08:54 Wita

HNC 9,531.856 TB. Vando V/BG. Anwari COMPLETED 21-Oct-23 20:55 Wita

VDMI 8,634.771 TB. Maju Daya 47 / BG. Marcopolo 330 COMPLETED 23-Oct-23 09:15 Wita

HNC 11,037.645 TB. Entebe Star 10 /BG. Shiva COMPLETED 25-Oct-23 14:55 Wita
OSS 8,036.570 TB. Internusa 2201 /BG. Pratama Power 3203 COMPLETED 25-Oct-23 16:30 Wita
OSS 8,536.656 TB. Buana Express 5 /BG. Golden Way 3005 COMPLETED 25-Oct-23 23:30 Wita
VDNI 7,532.313 TB. Vando V / BG. Anwari COMPLETED 29-Oct-23 08:11 Wita
OSS 9,536.190 TB. Cathay 48 / BG. CSF 3009 COMPLETED 29-Oct-23 08:02 Wita
OSS/VDNI 1,716.000 TB. May 202 / BG. Finacia 62 LOADING 30-Oct-23 22:15 Wita
TOTAL BARGING 206,959.835 SAILED OUT 19 Barges

5. PROJECT
PROJECT NAME ETA PROJECT PERCENTAGE REMARKS

6. STANDBY HOURS
RAIN AND SLIPPERY NOTES:
PLAN RAIN/DAY : 1 hours PLAN RAIN/MONTH : 41,2 hours PLAN SLIPPERY : 0.5 hours PLAN SLIPPERY/MONTH
: 42,2 hours DAY SHIFT
ACTUAL RAIN/DAY : 0 hours ACTUAL RAIN/MONTH : 13.4 hours TOTAL ACT. SLIPPERY (DT) : 0 hours ACTUAL SLIPPERY/MONTH
: 10.79 hours 1. Awal shift persiapan front loading point
TOTAL ACT. SLIPPERY (ADT) : 0 hours ACTUAL SLIPPERY/MONTH
: 10.83 hours 2. Traveling to Front dan P2H unit pkl 07:05 - 07:15 Wita
DAY SHIFT 3. Start loading Ore dari Moskow Utara pkl 07:55 Wita
PIT NIGHT SHIFT 4. Start loading OB dari Moskow Utara pkl 07:55 Wita
PIT 5. Start loading Ore dari Moskow Tengah (Direct BG. Anwari) pkl 07:40 Wita
6. Start loading Ore dari Moskow Tengah pkl 08:00 Wita
7. Start loading OB dari Moskow Tengah pkl 08:00 Wita
8. Start loading OB dari Moskow Tengah pkl 07:49 Wita
9. Start loading OB dari Moskow Tengah pkl 08:00 Wita
10. Start loading OB dari Moskow Tengah 08:25 Wita
11. Start loading Quarry Segmen E pkl 07:40 Wita
QUARRY SEGMEN E QUARRY SEGMEN E 12. Start loading BG. CSF 3009 dari EFO lt 5 pkl 08:00 Wita
13. Kendala day shift yaitu continue crowded area dumping point area Jetty
14. Complete BG. CSF 3009 pkl 19:50 Wita
15. Closed kegiatan pkl 18:00 Wita

NIGHT SHIFT
JETTY 1. Awal shift persiapan front loading point
JETTY 2. Traveling to Front dan P2H unit pkl 19:05 - 19:15 Wita
3. Start loading Ore dari Moskow Utara pkl 19:35 Wita
4. Start loading OB dari Moskow Utara pkl 20:00 Wita
5. Start loading Ore dari Moskow Tengah pkl 19:45 Wita
6. Start loading Ore dari Moskow Tengah pkl 19:35 Wita
7. Start loading OB dari Moskow Tengah pkl 19:46 Wita
8. Start loading OB dari Moskow Tengah pkl 19:33 Wita
9. Start loading OB dari Moskow Tengah pkl 19:40 Wita
10. Start loading OB dari Moskow Tengah 08:25 Wita
11. Start loading Quarry Segmen E pkl 19:40 Wita
12. Start loading BG. ANWARI dari EFO lt 2 & 3 pkl 08:00 Wita
13. Kendala Night shift yaitu continue crowded area dumping point WD Athena serta front - waste dump maintenance
14. Complete BG. Anwari tanggal 31 Oktober 2023 pukul 8:00 Wita
15. Closed kegiatan pkl 6:00 Wita
Rainfall (MTD) : 65 mm

7. DATA MAN POWER


WEEK SHIFT STATUS EXCAVATOR DT ADT DOZER GRADER VIBRO WT W LOADER MASTER Keterangan
Week 43 1 TOTAL MAN POWER 47 76 5 5 3 1 2 3 4 Cuti: Sakit : IZIN: OFF :
Week 43 1 ON SITE 35 59 3 3 3 1 1 2 4 - 23 Driver DT - 1 Opr ADT - 6 Driver DT - 1 Opr DT
Week 43 1 UNIT WORKING 35 54 3 3 2 2 2 2 - 2 Opr ADT - 1 Opr Exc - 11 Opr Exca - 2 Opr Exca
Week 43 1 UNIT RFU 43 60 4 3 2 2 2 2 - 15 Opr Exc - 1 Opr WT
ACH MAN POWER 100% 92% 100% 100% 150% 50% 50% 100% - 2 Opr Dz
Week 43 1
- 1 Opr WL
Week 43 2 TOTAL MAN POWER 44 74 5 4 3 2 2 2 3
Week 43 2 ON SITE 32 63 4 3 3 2 2 2 3 Keterangan Umum
Week 43 2 UNIT WORKING 33 53 4 2 2 2 2 2 1. Kegiatan Penambangan di bulan Oktober telah berjalan 2 shift
2 UNIT RFU 43 61 4 4 2 2 2 2 2. Telah dilakukan orientasi manpower baru dari pulau Obi, Maluku Utara sebanyak Driver Dump Truck :
Week 43
2 ACH MAN POWER 103% 84% 100% 150% 150% 100% 100% 100% 22 Orang, Opr. Excavator : 4 Orang, Opr. Bulldozer : 1 Orang, Master Unit : 2 Orang
Week 43
*) achievement man power based on total man power on site/unit working

8. SISA STOCK

Total Sisa Stock Ni Co Fe SiO2 CaO MgO Al2O3 SiMa Initial Tonnage Initial Tonnage
Total (Truck Count) (SURVEY)
1.50 0.07 31.25 18.69 0.26 11.18 5.61 1.67 20,432 14,447
Total WA 3,381 0
High 1.71 0.06 22.28 28.21 0.38 17.06 3.68 1.65 11,876 9,020
Medium 1.34 0.08 36.13 12.46 0.23 7.33 7.83 1.70 714 621
Low 1.19 0.09 44.39 4.84 0.08 2.63 8.34 1.84 7,842 4,806

Sisa Stok ORE ETO & EFO Ni Co Fe SiO2 CaO MgO Al2O3 SiMa Initial Tonnage Initial Tonnage
(Truck Count) (SURVEY)
Total 1.50 0.07 31.25 18.69 0.26 11.18 5.61 1.67 20,432 14,447
SISA STOCK ETO WAITING ASSAY 1,449
SISA STOCK EFO WAITING ASSAY 1,932
SISA STOCK AVERAGE ETO SALWA 1.65 0.07 26.46 23.56 0.34 12.96 4.93 1.82 2,100 2,023
SISA STOCK AVERAGE ETO MATARAM 1.24 0.08 43.24 6.24 0.10 3.49 7.79 1.79 2,478 -
SISA STOCK AVERAGE EFO 1.52 0.07 30.01 19.99 0.27 12.14 5.36 1.65 15,854 12,425