MEP(Fire Fighting) Design Schedule progress report:

Description Location Global ICON Location SIGNATURE Location SOLITAIRE Location

Fire Protection System Layout Plans: These plans provide an


overview of the entire fire protection system within the building.
1 They show the locations of fire alarm panels, sprinkler systems, fire üü Need to Revision Need to Revision Need to Revision
hydrants, fire pumps, and other components.

Fire Protection System Detailed Single line ,Riser


2 drawing:Schematic,drawings:Wiring details, & Fixing details
etc .
üü Need to Revision Need to Revision Need to Revision

Hydraulic Calculations: Detailed hydraulic calculations should be


provided to demonstrate that the fire protection system can deliver
3 the required water flow and pressure throughout the building, üü Need to Revision Need to Revision
especially in high-rise structures.

Specifications Plans and Details of FIRE FIGHTING System:


4 1. Automatic wet-type, Class III standpipe systems. PENDING PENDING PENDING PENDING
2. Wet-pipe sprinkler systems.

Above/Under Ground Water Tanks:Sectional detailed drawings: 707 Cubic Meter 890 Cubic meter 556 Cubic meter 298 Cubic meter
5 (Pump pit ,Sump pit):POTABLE water Supply: B---3 186,665.804 USG 890,000 liters. B---3 556,000 liters. B---3 298,000 liters B--2
707,000 liters 235,184.08 USG 146,980.832 USG 78,806.456 USG

Capacity:Above/Under Ground Water Tanks:Sectional detailed 320 Cubic meter) 235 Cubic meter) 270 Cubic meter 250 Cubic meter
6 drawings:(Pump pit ,Sump pit): B---3 320,000 liters 235,000 liters 270,000 liters. 250,000 liters.
Fire Fighting water System: 84,537.44 USG 62,107.42 USG 71,291.08 USG 66,043.0 USG

Sprinkler System Drawings:Fixture and Equipment Schedules: Lists of Have only


7 fire fighting fixtures and equipment.Schematic detailed IFC drawings: Schematic dwg PENDING PENDING PENDING

Fire Suppression System Drawings: If the hotel uses specialized fire


8 suppression systems like clean agent or foam suppression systems, PENDING PENDING PENDING PENDING
detailed drawings of their layout and components should be provided.

• Electrical
CO2 Fire Suppression System Drawings:detailed drawings of rooms
9 their layout and components should be provided. • Transformer PENDING PENDING PENDING PENDING
rooms

Inert Gas Fire Suppression System detailed drawings of their • Server


10 layout and components should be provided. Room PENDING PENDING PENDING PENDING
FM 200,CO2,Foam,Deluge suppression system: • IT rooms

ANSUL R-102 “Piranha” Dual Agent Suppression System for


11 Kitchen Hoods detailed drawings of their layout and components PENDING PENDING PENDING PENDING
should be provided.

12 Guest Room complete MEP Services System Design: PENDING PENDING PENDING PENDING

13 Central LP Gas system for the commercial kitchens. PENDING PENDING PENDING PENDING
Fire Escape Plans: Emergency evacuation plans showing the locations of
14 exits, stairwells, and assembly points, which are essential for guiding PENDING PENDING PENDING PENDING
occupants to safety during a fire.
Fire Extinguisher and Hose Reel Locations: These drawings specify the
15 locations of fire extinguishers, hose reels, and fire cabinets throughout
the building for quick access in case of emergencies.
üü PENDING PENDING PENDING PENDING