MAINTENANCE JOB DESCRIPTION 2022

*Common Project
1. M. Th. Hostel room (dormitory) demolishing and
reconstruction
2.

A. PASTOR EZRA WORK


First of all – since we will have only 2 working scholarship students, you should be ready to
work with scholarship students as work demands
Secondly, the followings are some of the specific works, which can be done by you and if
you need help at any works, you can ask Sir. Siemboi and Sir. Bishal
Do not give work only to scholarship students – you will have to do work and if you need
help scholarship students will help you, since scholarship students will have their work lot
already.
The followings work are to be done by you mostly:
a). To change full Gas pipe
b). All electrical works in all institution
- Checking what is damage in all institution
St. Paul High School – Kamanahahalli
St. Paul High School – Chellekere
St. Paul PU college – kamanahalli
AECS – Chellekere
BKC - Kacharakanahalli
- Get 3 or more quotations for all institutions
- Send to Sir. Siemboi 3 quotations and Sir. Siemboi will Get approval from the
President and acting President
- Then,
- Repairing will begin after all quotations work is done

c). STP checking – in all institution – to make sure its is all working every week

d). CCTV – to make sure all cctvs are working every week

e). Internet and Electrical bill matters, collecting bills, and paying bills

f). BBMP related work

Get 3 or more quotations for every work – Send the 3 quotations to Sir. Siemboi and Sir. Siemboi will
get approval from the President and acting President
B. MR. HEZEKIAH
First of all – since we will have only 2 working scholarship students, you should be ready to
work with scholarship students as work demands
Secondly, the followings are some of the specific works, which can be done by you and if
you need help at any works, you can ask Sir. Siemboi and Sir. Bishal
Do not give work only to scholarship students – you will have to do work and if you need
help scholarship students will help you, since scholarship students will have their work lot
already.
The followings works are to be done by you mostly:

a). Plumbing work and Window Glasses


- Checking what is damage in all institutions
St. Paul High School – Kamanahahalli
St. Paul High School – Chellekere
St. Paul PU college – kamanahalli
AECS – Chellekere
BKC - Kacharakanahalli
- Get 3 or more quotations for all institutions
- Send to Sir. Siemboi 3 quotations and Sir. Siemboi will Get approval from the
President and acting President
-
b). All vehicles to keep fit and clean
- start daily -or 3 times in a week
- wash all vehicle in a month 3-5 times
- wipe dust every week
c). Driving
e). Tiles Works – AECS and St. Paul Class rooms repairing
f). Security - AECS campus – to lock every night – to go ground the campus in a day 2-3
times
g). AECS – office building – computer room – door lock and window grill set up
h). St. Paul School, Chellekere
Broken Tiles
➢ 1 st Floor in old building--> V STD
➢ 1 st Floor in new building –> VI STD

Broken Desk and Bench No of bench & Desk broken-->13 Sets


C. SCHOLARSHIP STUDENTS WORK
1. AECS
Boy’s Hostel and Girls Hostel
a). Hostel – half
b). Stair – half (oil painting)
c). Bathroom – fully (half oil and half paint)
d).

Guest Apartment
a). Rooms – half paint
b). Toilet – oil paint
c). Stairs – half paint

Student Dinning hall and Staff Dining hall


a). Wall -half paint

Office Building
a). Class room – spot painting
b). Stair – putty, and half painting
c). Chapel room – roof, fully painting, wall – spot painting
d). Toilet – some part fully and some part half and spot painting
e). Blackboard painting -

Kitchen
a). kitchen and store room Wall fully painting

2. PUC – Kamanahalli
a). 3rd floor – windows grill painting – it is not paint yet – (white color)
b). building stairs ground to top – (half painting)
c). building toilets – half painting (oil painting)
d). sanctuary hall grill (white painting)
e). offices – half paint
f). Blackboard - painting

3. St. Paul – Kamanahalli


a). offices – half paint
b). building stairs ground to top – (half painting)
c). building toilets – half painting (oil painting)
d). Bench and Desk repairing – we might need to hire carpenter (Ps. Ezra, Hezekiah with
Scholarship can repair too)
e). Blackboard - painting
TUBE LIGHT TO FAN IS NOT W W GLASS
BENCHES DESKS CHAIRS
BE FIXED RUNNING HOOKS BROKEN

VH–7
NUR P - 1 VJ-5
LKG J - 1 VP–1
VH- 6
UKG P - 2 VI P – 1
VJ - 5
NUR J - 1 LKG P – 2 FAN VJ -3 VII P VP–1
VP- 1
7TH P - IP VP–1 VII J VI H – 4 VI P - 1
VII H – 2
2 UKG J - 2 VI H - 3 VII H VI J – 4 VII J – 1
SMALL
8TH J - LKG - VI P – 2 XJ–5 VI P – 2 VII H – 1
VII J – 2 LONG
3 REGULATOR XJ–3 XH–6 IX P – 1 XJ - 2
VII H – 1 LONG
9TH J - NOB TO BE X H – 12 XP–2 IX J – 1 XH–1
IX P – 1
2 CHANGED XP–1 IX H - 1 XP–1
IX J – 1
10TH P - 3 II H WINDOW
10TH J - LATCH
1 IX P – 2
IX J – 3
IX H - 5

The wooden benches and desks of all the classes should be sprayed with
insecticides due to insects [ bedbugs, insects, etc…. ]
4. St. Paul Chellekere
a). offices – half paint
b). building stairs ground to top – (half painting)
c). Black board - painting
d). class rooms – tiles – broken need to repair (with Kumar)
e). Broken desk and benches repair
f). LKG – UKG – 1st to 5th standard class room painting