PROJECT
N-15558
220/33kV Grid Station at Al Towayya and All Related 220kV cable works
and Associated Works
DOCUMENT TITLE
Hazard identification & Risk Assessment for Temporary Access
Rev.No.0 Date: Reason for Issue : For Approval Prepared (Civil In charge) Checked (EHS Engineer) Approved : ( PM)
220/33kV Grid Station at Towayya and All related 220kv cable works Hazard Identification, Risk Assessment & Risk Control Doc Ref :
Table of content
1. Risk Assessment Matrix
2. Risk assessment
Activity Hazard/Aspect Effects Groups Exposed Risk Evaluation Additional Control Risk Evaluation
(With Existing Measures (With
Control Additional
220/33kV Grid Station at Towayya and All related 220kv cable works Hazard Identification, Risk Assessment & Risk Control Doc Ref :
Control
measures)
measure)
Existing Control measures
(If Required)
R (Risk Level)
R (Risk Level)
P (Probability)
P (Probability)
S (Severity)
S (Severity)
Temporary Vehicle Serious Client/Consultant 1. Visit the locations prior to start mobilization. 1 3 L
movement / injury, & Contractor Additional control
Access 2. Proper instruction and information should be
improper Personnel, Sub measures shall
access Damage to given to crew.
contractor, visitors apply upon
vehicle and 3. Deploy experienced drivers. evaluation of
plant /
4. Inspect all items prior to mobilize. present and /or
equipment.
Tripping 5. Only experienced and qualified workmen are actual site
hazard due allowed for skilled work. condition
to driving of
steel rods. 6. Proper access road to be used for
mobilization.
7. Ensure all materials are secured properly.
8.Provide mandatory personnel protective
equipment's to all employees
9. Survey markings to be protected with warning
tape and clearly visible to avoid tripping hazard.
UG services Serious Client/Consultant 1 NOC /Permit Shall be obtained from concerned 1 3 L Additional control
(Electric Cable, injury & Contractor authority prior to start work. measures shall
water, sewage Personnel, sub - apply upon
/property 2. The proper survey of area should be done &
line, Oil,& Gas contractors evaluation of
damage Trail pit must be done before excavation.
Pipelines) present and /or
/Electrical 3. Cable/metal detector shall be used.
shock, Fire actual site
& flooding 4. Competent workmen only allowed to for the condition
Trail pit/excavation.
5. Competent person should be available
monitoring work.
220/33kV Grid Station at Towayya and All related 220kv cable works Hazard Identification, Risk Assessment & Risk Control Doc Ref :
, Fire, Personnel point to avoid contact with the ground soil. evaluation of
3. Debris to be shifted to the waste storage are present and /or
Plastic & wood
stored and shall be cleared by Environmental actual site
waste , Metal
service Providers condition
Strap ,
4. Report any damages and leakage to prevent
Oil/chemical
possible contamination. Use drip tray for holding
Spill, dust
the spillage
5. Place Trip Tray under the oil work area to
avoid spill contact with the ground soil.
6. In case of any spill the emergency procedure
shall be followed
7. Adequate Fire extinguisher and trained Fire
fighters shall be available
Continuous supervision is required to ensure the
compliance.
8. Strict Instructions to be given to all involved
person to avoid soil contamination.
EMERGENCY INSTRUCTIONS
220/33kV Grid Station at Towayya and All related 220kv cable works Hazard Identification, Risk Assessment & Risk Control Doc Ref :
IN CASE OF EMERGENCY THE FOLLOWING INSTRUCTIONS SHALL BE COMPLIED WITH BY ALL PERSONNEL INCLUSIVE OF
VISITORS, SUBCONTRACTORS AND OTHER INTERESTED PARTIES.
1. REPORT THE SITUATION IMMEDIATELY AND RAISE THE ALARM
2. IF POSSIBLE TURN OFF ELECTRICAL APPLIANCES AND SWITCHES.
3. LEAVE THE BUILDING IN AN ORDERLY MANNER CLOSING ALL DOORS.
4. IF YOU ARE NOT ASSIGNED AN EMERGENCY RESPONSE TASK PROCEED TO THE EMERGENCY ASSEMBLY AREA.
5. STAY AT ASSEMBLY POINT UNTIL FURTHER INSTRUCTIONS
6. WHEN EMERGENCY IS OVER EMERGENCY CO ORDINATOR WILL INFORM NO HAZARD PRESENT AT SITE THEN YOU CAN GO TO WORK SITE.
7. IF SOME BODY IS INJURED, DO NOT TOUCH HIM IF YOU ARE NOT FIRST AIDER
8. IF YOU ARE FIRST AIDER ASSESS THE SITUATION FIRST AND THEN MOVE TO HELP.
9. WHILE GIVING FIRST AID ASK SOME BODY TO CALL FOR AMBULANCE.
Fire 997
Ambulance 998
Police 999
Electricity & Water 991
Al Ain Hospital 03 7635888