Cost Estimate Billboard Signages

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KEDAH RUBBER CITY (KRC) PHASE 1 AT LOT PT 2192, MUKIM PADANG TERAP KIRI, DAERAH PADANGTERAP, KEDAH DARUL

AMAN

BILLBOARD AND ENTRANCE SIGNAGE CONCEPT PROPOSAL


ESTIMATION CONSTRUCTION COST

BILLBOARD ENTRANCE SIGNAGE


ITEM DESCRIPTION LOCATION A1 LOCATION A2 OPTION 1 OPTION 2 OPTION 3

1.0 Billboard 69,050.00 69,050.00

2.0 Entrance Signages 398,530.00 328,860.00 338,150.00

ESTIMATED CONSTRUCTION COST (RM) 69,050.00 69,050.00 398,530.00 328,860.00 338,150.00


KEDAH RUBBER CITY (KRC) PHASE 1 AT LOT PT 2192, MUKIM PADANG TERAP KIRI, DAERAH PADANGTERAP, KEDAH DARUL AMAN

BILLBOARD AND ENTRANCE SIGNAGE CONCEPT PROPOSAL


ESTIMATION CONSTRUCTION COST

BILLBOARD ENTRANCE SIGNAGE


ITEM DESCRIPTION LOCATION A1 LOCATION A2 OPTION 1 OPTION 2 OPTION 3

1.0 PRELIMINARIES AND GENERAL ITEMS 5,000.00 5,000.00 35,000.00 30,000.00 31,000.00

2.0 ARCHITECTURAL & STRUCTURAL WORKS 45,100.00 45,100.00 318,080.00 259,410.00 266,700.00

SUB-TOTAL (RM) 50,100.00 50,100.00 353,080.00 289,410.00 297,700.00

3.0 LANDSCAPING WORKS Including Including Including Including Including

SUB-TOTAL (RM) - - - - -

4.0 MECHANICAL AND ELECTRICAL WORKS 13,950.00 13,950.00 12,450.00 12,450.00 12,450.00

SUB-TOTAL (RM) 13,950.00 13,950.00 12,450.00 12,450.00 12,450.00

5.0 CONTIGENCIES SUM (10%) 5,000.00 5,000.00 33,000.00 27,000.00 28,000.00

SUB-TOTAL (RM) 5,000.00 5,000.00 33,000.00 27,000.00 28,000.00

OVERALL CONSTRUCTION COST (RM) 69,050.00 69,050.00 398,530.00 328,860.00 338,150.00