Professional Documents
Culture Documents
Cost Estimate Billboard Signages
Cost Estimate Billboard Signages
Cost Estimate Billboard Signages
AMAN
1.0 PRELIMINARIES AND GENERAL ITEMS 5,000.00 5,000.00 35,000.00 30,000.00 31,000.00
2.0 ARCHITECTURAL & STRUCTURAL WORKS 45,100.00 45,100.00 318,080.00 259,410.00 266,700.00
SUB-TOTAL (RM) - - - - -
4.0 MECHANICAL AND ELECTRICAL WORKS 13,950.00 13,950.00 12,450.00 12,450.00 12,450.00