Date : 10 - 31 OKT'15
1 27-Nov-15 TC TATA 3 1 Ǿ600 7 17 24.00 26.00 1.00 16.00 196.80 TI-18 TC TATA
2 27-Nov-15 TC TATA 3 2 Ǿ600 8 17 25.00 26.00 1.00 19.00 233.70 TI-18 TC TATA
3 27-Nov-15 TC TATA 3 3 Ǿ600 8 17 25.00 26.00 1.00 11.00 270.60 TI-18 TC TATA
4 27-Nov-15 TC TATA 3 4 Ǿ600 8 17 25.00 26.00 1.00 19.50 239.80 TI-18 TC TATA
5 3-Dec-15 TC TATA 4 1 Ǿ600 11 17 28.00 15.00 1.00 24.00 426.50 TI-21A potong tiang
6 4-Dec-15 TC TATA 4 2 Ǿ600 9 17 26.00 27.50 1.00 20.00 355.40 TI-21A
7 4-Dec-15 TC TATA 4 3 Ǿ600 8 17 25.00 16.00 1.00 24.00 426.50 TI-21A potong tiang
8 4-Dec-15 TC TATA 4 4 Ǿ600 9 17 26.00 27.50 1.00 15.00 266.60 TI-21A
9 17-Feb-16 TC TATA 2 1 Ǿ600 12 15 27.00 28.00 1.0 14.00 243.60 TI-03
10 17-Feb-16 TC TATA 2 2 Ǿ600 12 15 27.00 28.00 1.0 16.00 278.40 TI-03
11 17-Feb-16 TC TATA 2 3 Ǿ600 15 15 30.00 31.00 1.0 20.00 348.00 TI-03
12 17-Feb-16 TC TATA 2 4 Ǿ600 15 15 30.00 31.00 1.0 19.00 330.60 TI-03
13 11-Apr-16 TC TATA 1 1 Ǿ600 11 15 26.00 27.00 1.00 13.00 319.80 TI-18
14 13-Apr-16 TC TATA 1 2 Ǿ600 11 15 26.00 27.00 1.00 13.00 319.80 TI-18
15 13-Apr-16 TC TATA 1 3 Ǿ600 11 15 26.00 27.00 1.00 20.00 246.00 TI-18
16 13-Apr-16 TC TATA 1 4 Ǿ600 11 15 26.00 27.00 1.00 20.00 246.00 TI-18
TOTAL PEMANCANGAN MAIN PILE 422.00 416.00 0.00 0.00 0.00 16.00 0.00
55 20-Oct-15 Main Pile 2088 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
56 20-Oct-15 Main Pile 2092 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
57 20-Oct-15 Main Pile 2093 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
58 20-Oct-15 Main Pile 2097 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
59 20-Oct-15 Main Pile 2098 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
60 21-Oct-15 Main Pile 2239 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
61 21-Oct-15 Main Pile 2240 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
62 21-Oct-15 Main Pile 2241 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
63 21-Oct-15 Main Pile 2242 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
64 21-Oct-15 Main Pile 2283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03
65 21-Oct-15 Main Pile 2282 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
66 21-Oct-15 Main Pile 2089 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
67 21-Oct-15 Main Pile 2090 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
68 21-Oct-15 Main Pile 2091 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
69 21-Oct-15 Main Pile 2110 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
70 21-Oct-15 Main Pile 2111 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
71 21-Oct-15 Main Pile 2112 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
72 21-Oct-15 Main Pile 2113 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
73 22-Oct-15 Main Pile 2107 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
74 22-Oct-15 Main Pile 2108 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
75 22-Oct-15 Main Pile 2109 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
76 22-Oct-15 Main Pile 2099 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
77 22-Oct-15 Main Pile 2100 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
78 22-Oct-15 Main Pile 2101 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
79 23-Oct-15 Main Pile 2026 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
80 23-Oct-15 Main Pile 2095 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
81 23-Oct-15 Main Pile 2096 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 23.70 421.10 12.00 TI-21A
82 23-Oct-15 Main Pile 2094 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
83 23-Oct-15 Main Pile 2162 Ǿ600 15 7 17 39.00 28.00 -11.00 2.00 1 23.70 421.10 12.00 TI-21A
84 23-Oct-15 Main Pile 2160 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
85 23-Oct-15 Main Pile 2164 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 23.70 421.10 12.00 TI-21A
86 23-Oct-15 Main Pile 2293 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
87 23-Oct-15 Main Pile 2296 Ǿ600 15 17 32.00 33.50 1.50 1.00 24.20 421.10 12.00 TI-03
88 23-Oct-15 Main Pile 2350 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
89 23-Oct-15 Main Pile 2352 Ǿ600 15 17 32.00 27.30 -4.70 1.00 24.20 421.10 12.00 TI-03
90 23-Oct-15 Main Pile 2353 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
91 24-Oct-15 Main Pile 2163 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
92 24-Oct-15 Main Pile 2161 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
93 24-Oct-15 Main Pile 2102 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
94 24-Oct-15 Main Pile 2105 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
95 24-Oct-15 Main Pile 2104 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A
96 24-Oct-15 Main Pile 2289 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03
97 24-Oct-15 Main Pile 2294 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
98 24-Oct-15 Main Pile 2295 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
99 24-Oct-15 Main Pile 2351 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
100 24-Oct-15 Main Pile 2292 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03
101 25-Oct-15 Main Pile 2103 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
102 25-Oct-15 Main Pile 2106 Ǿ600 15 17 32.00 19.00 -13.00 1.00 1 23.70 421.10 12.00 TI-21A
103 25-Oct-15 Main Pile 2006 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
104 25-Oct-15 Main Pile 2009 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
105 25-Oct-15 Main Pile 2010 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
106 26-Oct-15 Main Pile 2003 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.10 421.10 12.00 TI-21A
107 26-Oct-15 Main Pile 2004 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
108 26-Oct-15 Main Pile 2005 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
109 26-Oct-15 Main Pile 2007 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 23.70 421.10 12.00 TI-21A
110 26-Oct-15 Main Pile 2011 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
111 27-Oct-15 Main Pile 2290 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.20 12.00 TI-03
112 27-Oct-15 Main Pile 2291 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03
113 27-Oct-15 Main Pile 2231 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
114 27-Oct-15 Main Pile 2232 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03
115 27-Oct-15 Main Pile 2233 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
116 27-Oct-15 Main Pile 2234 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
117 27-Oct-15 Main Pile 2008 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
118 27-Oct-15 Main Pile 2012 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
119 28-Oct-15 main pile 2021 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
120 28-Oct-15 main pile 2023 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
121 28-Oct-15 main pile 2022 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
122 28-Oct-15 main pile 2024 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
123 28-Oct-15 main pile 2340 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 421.10 12.00 TI-03
124 28-Oct-15 main pile 2355 Ǿ600 15 17 32.00 35.50 3.50 1.00 24.00 421.10 12.00 TI-03
125 28-Oct-15 main pile 2356 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.00 421.10 12.00 TI-03
126 28-Oct-15 main pile 2357 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.00 421.10 12.00 TI-03
127 29-Oct-15 main pile 2020 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.70 438.90 12.00 TI-21A
128 29-Oct-15 main pile 2025 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
129 29-Oct-15 main pile 2155 Ǿ600 15 17 32.00 16.50 -15.50 1.00 1 24.70 438.90 12.00 TI-21A
130 29-Oct-15 main pile 2152 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
131 29-Oct-15 main pile 2177 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
132 29-Oct-15 main pile 2180 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
133 29-Oct-15 main pile 2338 Ǿ600 15 17 32.00 37.00 5.00 1.00 24.10 421.10 12.00 TI-03
134 29-Oct-15 main pile 2339 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
135 29-Oct-15 main pile 2341 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
136 29-Oct-15 main pile 2379 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
137 29-Oct-15 main pile 2384 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
138 29-Oct-15 main pile 2385 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
139 29-Oct-15 main pile 2387 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
140 29-Oct-15 soldier pile 2380 Ǿ600 15 17 32.00 32.00 0.00 1.00 24..2 421.10 12.00 TI-03
141 30-Oct-15 main pile 2354 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
142 30-Oct-15 main pile 2305 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 42.10 12.00 TI-03
143 30-Oct-15 main pile 2308 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
144 30-Oct-15 main pile 2219 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
145 30-Oct-15 main pile 2220 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
146 30-Oct-15 main pile 2221 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
147 30-Oct-15 main pile 2222 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
148 30-Oct-15 main pile 2153 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
149 30-Oct-15 main pile 2154 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
150 30-Oct-15 main pile 2178 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
151 30-Oct-15 main pile 2179 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
152 30-Oct-15 main pile 1971 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.80 421.90 12.00 TI-26
153 1-Nov-15 main pile 1969 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
154 1-Nov-15 main pile 1970 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
155 1-Nov-15 main pile 1972 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 439.50 12.00 TI-26
156 1-Nov-15 main pile 1973 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
157 1-Nov-15 main pile 1974 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
158 1-Nov-15 main pile 1975 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
159 2-Nov-15 main pile 2156 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
160 2-Nov-15 main pile 2159 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
161 2-Nov-15 main pile 2173 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
162 2-Nov-15 main pile 2176 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
163 2-Nov-15 main pile 2223 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
164 2-Nov-15 main pile 2226 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
165 3-Nov-15 main pile 2127 Ǿ600 15 17 32.00 17.00 -15.00 1.00 1 17.00 439.50 12.00 TI-26
166 3-Nov-15 main pile 2128 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
167 3-Nov-15 main pile 2130 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
168 3-Nov-15 main pile 2132 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.50 439.50 12.00 TI-26
169 3-Nov-15 main pile 2133 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
170 3-Nov-15 main pile 2158 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
171 3-Nov-15 main pile 2174 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
172 3-Nov-15 main pile 2175 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
173 3-Nov-15 main pile 2224 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
174 3-Nov-15 main pile 2225 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
175 4-Nov-15 main pile 2194 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
176 4-Nov-15 main pile 1967 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
177 4-Nov-15 main pile 1968 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
178 4-Nov-15 main pile 2134 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
179 4-Nov-15 main pile 2131 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
180 4-Nov-15 main pile 2135 Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 17.50 439.50 12.00 TI-26
181 4-Nov-15 main pile 2195 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
182 4-Nov-15 main pile 2197 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
183 4-Nov-15 main pile 2157 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
184 4-Nov-15 main pile 2015 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
185 4-Nov-15 main pile 2016 Ǿ600 15 17 32.00 32.30 0.30 1.00 24.00 426.50 12.00 TI-21A
186 4-Nov-15 main pile 2017 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
187 5-Nov-15 main pile 2129 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
188 5-Nov-15 main pile 2126 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
189 6-Nov-15 main pile 2261 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
190 6-Nov-15 main pile 2262 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
191 6-Nov-15 main pile 2266 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
192 6-Nov-15 main pile 2267 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03
193 6-Nov-15 main pile 2271 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
194 6-Nov-15 Hotel pile 1468 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
195 6-Nov-15 Hotel pile 1469 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
196 6-Nov-15 Hotel pile 1470 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
197 6-Nov-15 Hotel pile 1471 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
198 6-Nov-15 Hotel pile 1472 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 418.20 12.00 TI-18
199 6-Nov-15 Hotel pile 1473 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
200 6-Nov-15 Hotel pile 1474 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.30 425.60 12.00 TI-18
201 6-Nov-15 main pile 1976 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 17.50 439.50 12.00 TI-26
202 6-Nov-15 main pile 1977 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
203 6-Nov-15 main pile 1978 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 439.50 12.00 TI-26
204 6-Nov-15 main pile 2067 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
205 6-Nov-15 main pile 2069 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 439.50 12.00 TI-26
206 6-Nov-15 main pile 2070 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
207 7-Nov-15 main pile 2214 Ǿ600 15 17 32.00 17.50 -14.50 1.00 24.00 426.50 12.00 TI-21A
208 7-Nov-15 main pile 2215 Ǿ600 17 17.00 15.00 -2.00 1.00 24.00 426.50 12.00 TI-21A
209 7-Nov-15 main pile 2217 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
210 7-Nov-15 main pile 2216 Ǿ600 15 17 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A
211 7-Nov-15 main pile 2218 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
212 7-Nov-15 Hotel pile 1475 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
213 7-Nov-15 Hotel pile 1476 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
214 7-Nov-15 Hotel pile 1467 Ǿ600 15 17 32.00 32.00 0.00 1.00 19.40 477.20 12.00 TI-18
215 7-Nov-15 Hotel pile 1466 Ǿ600 15 17 32.00 37.00 5.00 1.00 18.70 460.00 12.00 TI-18
216 7-Nov-15 Hotel pile 1465 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
217 7-Nov-15 Hotel pile 1464 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
218 7-Nov-15 main pile 2068 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
219 7-Nov-15 main pile 2071 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
220 7-Nov-15 main pile 2123 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
221 7-Nov-15 main pile 2124 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
222 7-Nov-15 main pile 2125 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
223 7-Nov-15 main pile 2122 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
224 8-Nov-15 main pile 2147 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
225 8-Nov-15 main pile 2149 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A
226 8-Nov-15 main pile 2150 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A
227 8-Nov-15 main pile 2181 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A
228 8-Nov-15 main pile 2182 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A
229 8-Nov-15 main pile 2183 Ǿ600 15 15.00 14.50 -0.50 1.00 1 24.00 426.50 12.00 TI-21A
230 8-Nov-15 main pile 2184 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
231 8-Nov-15 Hotel pile 1457 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.30 474.80 12.00 TI-18
232 8-Nov-15 Hotel pile 1458 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
233 8-Nov-15 Hotel pile 1459 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
234 8-Nov-15 Hotel pile 1460 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.40 479.70 12.00 TI-18
235 8-Nov-15 Hotel pile 1461 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
236 8-Nov-15 Hotel pile 1462 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
237 8-Nov-15 Hotel pile 1463 Ǿ600 15 17 32.00 33.00 1.00 1.00 19.10 469.90 12.00 TI-18
238 9-Nov-15 main pile 2148 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
239 9-Nov-15 main pile 2151 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
240 9-Nov-15 main pile 2257 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
241 9-Nov-15 main pile 2256 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
242 9-Nov-15 main pile 2252 Ǿ600 17 15 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
243 9-Nov-15 main pile 2253 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
244 9-Nov-15 main pile 2050 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.10 439.50 12.00 TI-26
245 9-Nov-15 main pile 2051 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 439.50 12.00 TI-26
246 9-Nov-15 main pile 2052 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
247 9-Nov-15 main pile 2048 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
248 9-Nov-15 main pile 2049 Ǿ600 15 17 32.00 33.50 1.50 1.00 17.50 439.50 12.00 TI-26
249 9-Nov-15 main pile 2053 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
250 9-Nov-15 main pile 2054 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
251 9-Nov-15 Hotel pile 1454 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.60 482.20 12.00 TI-18
252 9-Nov-15 Hotel pile 1455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
253 9-Nov-15 Hotel pile 1456 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
254 9-Nov-15 Hotel pile 1453 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.90 415.70 12.00 TI-18
255 9-Nov-15 Hotel pile 1452 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 418.20 12.00 TI-18
256 10-Nov-15 main pile 2116 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
257 10-Nov-15 main pile 2117 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
258 10-Nov-15 main pile 2115 Ǿ600 17 15 32.00 32.10 0.10 1.00 23.70 421.10 12.00 TI-21A
259 10-Nov-15 main pile 2114 Ǿ600 17 15 32.00 32.13 0.13 1.00 23.70 421.10 12.00 TI-21A
260 10-Nov-15 main pile 2084 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
261 10-Nov-15 main pile 2085 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
262 10-Nov-15 main pile 2086 Ǿ600 17 15 32.00 24.50 -7.50 1.00 1 24.00 426.50 12.00 TI-21A
263 10-Nov-15 main pile 1979 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
264 10-Nov-15 main pile 1981 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
265 10-Nov-15 main pile 1980 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
266 10-Nov-15 main pile 2066 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
267 10-Nov-15 main pile 2063 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.00 12.00 TI-26
268 10-Nov-15 main pile 2064 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
269 10-Nov-15 Hotel pile 1451 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 430.50 12.00 TI-18
270 10-Nov-15 Hotel pile 1450 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.50 479.70 12.00 TI-18
271 10-Nov-15 Hotel pile 1449 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.70 435.40 12.00 TI-18
272 10-Nov-15 Hotel pile 1441 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.80 437.90 12.00 TI-18
273 10-Nov-15 Hotel pile 1442 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.90 440.30 12.00 TI-18
274 11-Nov-15 main pile 2082 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
275 11-Nov-15 main pile 2083 Ǿ600 15 15.00 15.00 0.00 1.00 24.00 426.50 12.00 TI-21A
276 11-Nov-15 main pile 2019 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.20 421.10 12.00 TI-21A
277 11-Nov-15 main pile 2018 Ǿ600 17 15 32.00 28.00 -4.00 1.00 23.70 421.10 12.00 TI-21A
278 11-Nov-15 main pile 2014 Ǿ600 17 15 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A
279 11-Nov-15 main pile 2062 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
280 11-Nov-15 main pile 2139 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
281 11-Nov-15 main pile 2138 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
282 11-Nov-15 main pile 2137 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
283 11-Nov-15 main pile 2140 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
284 11-Nov-15 Hotel pile 1443 Ǿ600 15 17 32.00 33.00 1.00 1.00 20.30 499.40 12.00 TI-18
285 11-Nov-15 Hotel pile 1444 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
286 11-Nov-15 Hotel pile 1445 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.90 489.50 12.00 TI-18
287 11-Nov-15 Hotel pile 1446 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 12.00 TI-18
288 11-Nov-15 Hotel pile 1447 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
289 12-Nov-15 main pile 2013 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 24.00 426.50 12.00 TI-21A
290 12-Nov-15 main pile 1994 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 23.70 421.10 12.00 TI-21A
291 12-Nov-15 main pile 1996 Ǿ600 15 17 32.00 29.30 -2.70 1.00 1 23.70 421.10 12.00 TI-21A
292 12-Nov-15 main pile 1995 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
293 12-Nov-15 main pile 1999 Ǿ600 15 17 32.00 22.50 -9.50 1.00 1 24.00 426.50 12.00 TI-21A
294 12-Nov-15 main pile 2141 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
295 12-Nov-15 main pile 2193 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.00 12.00 TI-26
296 12-Nov-15 main pile 2190 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
297 12-Nov-15 main pile 2192 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
298 12-Nov-15 main pile 2191 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
299 12-Nov-15 main pile 2119 Ǿ600 17 15 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
300 12-Nov-15 main pile 2118 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
301 13-Nov-15 main pile 1998 Ǿ600 17 15 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A
302 13-Nov-15 main pile 1997 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
303 13-Nov-15 main pile 2000 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
304 13-Nov-15 main pile 2001 Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A
305 13-Nov-15 main pile 2002 Ǿ600 15 17 32.00 23.50 -8.50 1.00 24.00 426.50 12.00 TI-21A
306 13-Nov-15 main pile 1992 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A
307 13-Nov-15 main pile 1991 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A
308 13-Nov-15 Hotel pile 1408 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
309 13-Nov-15 Hotel pile 1409 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
310 13-Nov-15 Hotel pile 1407 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
311 13-Nov-15 Hotel pile 1406 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.70 489.50 12.00 TI-18
312 13-Nov-15 Hotel pile 1405 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 12.00 TI-18
313 13-Nov-15 Hotel pile 1404 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 489.50 12.00 TI-18
314 13-Nov-15 Hotel pile 1428 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
315 13-Nov-15 Hotel pile 1426 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.70 12.00 TI-18
316 13-Nov-15 Hotel pile 1425 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
317 13-Nov-15 Hotel pile 1429 Ǿ600 15 17 32.00 27.00 -5.00 1.00 20.60 506.40 12.00 TI-18
318 13-Nov-15 main pile 2146 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
319 13-Nov-15 main pile 2143 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
320 13-Nov-15 main pile 2144 Ǿ600 15 17 32.00 15.00 -17.00 1.00 17.50 439.50 12.00 TI-26
321 13-Nov-15 main pile 2145 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
322 13-Nov-15 main pile 2142 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
323 13-Nov-15 main pile 2120 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
324 13-Nov-15 main pile 2121 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
325 13-Nov-15 Hotel pile 1279 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16
326 13-Nov-15 Hotel pile 1278 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.50 506.90 12.00 TI-16
327 13-Nov-15 Hotel pile 1277 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
328 13-Nov-15 Hotel pile 1276 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
329 13-Nov-15 Hotel pile 1275 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
330 13-Nov-15 Hotel pile 1274 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16
331 14-Nov-15 main pile 1993 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A
332 14-Nov-15 main pile 1989 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.00 426.50 12.00 TI-21A
333 14-Nov-15 main pile 1990 Ǿ600 17 17.00 15.00 -2.00 1.00 1 24.00 426.00 12.00 TI-21A
334 14-Nov-15 main pile 1988 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
335 14-Nov-15 main pile 1985 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
336 14-Nov-15 main pile 1986 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A
337 14-Nov-15 main pile 1987 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
338 14-Nov-15 Hotel pile 1431 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.90 489.50 12.00 TI-18
339 14-Nov-15 Hotel pile 1430 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
340 14-Nov-15 Hotel pile 1432 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.30 499.40 12.00 TI-18
341 14-Nov-15 Hotel pile 1433 Ǿ600 15 17 32.00 31.00 -1.00 1.00 20.80 511.70 12.00 TI-18
342 14-Nov-15 main pile 2185 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
343 14-Nov-15 main pile 2186 Ǿ600 15 17 32.00 29.00 -3.00 1.00 17.50 439.50 12.00 TI-26
344 14-Nov-15 main pile 2189 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
345 14-Nov-15 main pile 2187 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
346 14-Nov-15 main pile 2188 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
347 14-Nov-15 Hotel pile 1273 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
348 14-Nov-15 Hotel pile 1272 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
349 14-Nov-15 Hotel pile 1271 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
350 14-Nov-15 Hotel pile 1288 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
351 14-Nov-15 Hotel pile 1287 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
352 14-Nov-15 main pile 2250 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
353 14-Nov-15 main pile 2249 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.30 12.00 TI-03
354 14-Nov-15 main pile 2248 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
355 14-Nov-15 main pile 2247 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
356 14-Nov-15 main pile 2251 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
357 14-Nov-15 main pile 2254 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
358 16-Nov-15 Hotel pile 1285 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
359 16-Nov-15 Hotel pile 1284 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.50 506.90 12.00 TI-16
360 16-Nov-15 Hotel pile 1283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16
361 16-Nov-15 Hotel pile 1282 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 12.50 362.10 12.00 TI-16
362 16-Nov-15 main pile 2255 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03
363 16-Nov-15 main pile 2260 Ǿ600 15 17 32.00 33.00 1.00 1.00 1 24.20 421.10 12.00 TI-03
364 16-Nov-15 main pile 2259 Ǿ600 15 17 32.00 20.00 -12.00 1.00 24.50 426.30 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
365 17-Nov-15 Hotel pile 1281 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
366 17-Nov-15 Hotel pile 1280 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
367 17-Nov-15 main pile 2258 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 25.50 426.30 12.00 TI-03
368 17-Nov-15 main pile 2209 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
369 17-Nov-15 main pile 2211 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
370 17-Nov-15 main pile 2212 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
371 17-Nov-15 main pile 2213 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
372 17-Nov-15 main pile 1984 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
373 17-Nov-15 main pile 1982 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
374 17-Nov-15 main pile 1983 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
375 17-Nov-15 main pile 2035 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
376 17-Nov-15 main pile 2036 Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 24.00 426.50 12.00 TI-21A
377 17-Nov-15 main pile 2034 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.00 426.50 12.00 TI-21A
378 17-Nov-15 main pile 2037 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A
379 18-Nov-15 main pile 2265 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
380 18-Nov-15 main pile 2264 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
381 18-Nov-15 main pile 2263 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
382 18-Nov-15 main pile 2269 Ǿ600 15 17 32.00 19.50 -12.50 1.00 24.20 421.00 12.00 TI-03
383 18-Nov-15 main pile 2530 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
384 19-Nov-15 main pile 2536 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
385 19-Nov-15 main pile 2535 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
386 19-Nov-15 main pile 2531 Ǿ600 15 17 32.00 38.00 6.00 1.00 18.00 319.80 12.00 TI-07
387 19-Nov-15 main pile 2038 Ǿ600 17 17.00 15.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A
388 19-Nov-15 main pile 2040 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 24.00 426.50 12.00 TI-21A
389 19-Nov-15 main pile 2039 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
390 20-Nov-15 main pile 2032 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
391 20-Nov-15 main pile 2027 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
392 20-Nov-15 main pile 2030 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
393 20-Nov-15 main pile 2033 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
394 20-Nov-15 main pile 2529 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
395 20-Nov-15 main pile 2528 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
396 20-Nov-15 main pile 2522 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
397 20-Nov-15 main pile 2523 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
398 20-Nov-15 main pile 2524 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
399 20-Nov-15 main pile 2526 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
400 21-Nov-15 main pile 2525 Ǿ600 15 15 30.00 38.00 8.00 1.00 14.00 248.70 12.00 TI-07
401 21-Nov-15 main pile 2533 Ǿ600 15 15 30.00 35.80 5.80 1.00 23.70 420.00 12.00 TI-07
402 21-Nov-15 main pile 2532 Ǿ600 15 17 32.00 23.00 -9.00 1.00 23.70 420.00 12.00 TI-07
403 21-Nov-15 main pile 2527 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
404 21-Nov-15 main pile 2045 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
405 21-Nov-15 main pile 2041 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A
406 21-Nov-15 main pile 2046 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
407 21-Nov-15 main pile 2044 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
408 21-Nov-15 main pile 2031 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
409 22-Nov-15 main pile 2042 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A
410 22-Nov-15 main pile 2047 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.00 426.50 12.00 TI-21A
411 22-Nov-15 main pile 2043 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
412 22-Nov-15 main pile 2028 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
413 22-Nov-15 main pile 2029 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
414 23-Nov-15 main pile 2272 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03
415 23-Nov-15 main pile 2275 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
416 23-Nov-15 main pile 2274 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03
417 23-Nov-15 main pile 2273 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
418 23-Nov-15 main pile 2268 Ǿ600 15 17 32.00 23.00 -9.00 1.00 1 24.20 421.10 12.00 TI-03
419 23-Nov-15 main pile 2270 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
420 23-Nov-15 Hotel pile 1297 Ǿ600 15 17 32.00 32.50 0.50 1.00 16.50 477.90 12.00 TI-16
421 23-Nov-15 Hotel pile 1296 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
422 23-Nov-15 Hotel pile 1295 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
423 23-Nov-15 Hotel pile 1294 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
424 23-Nov-15 Hotel pile 1293 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
425 23-Nov-15 Hotel pile 1292 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
426 23-Nov-15 Hotel pile 1291 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
427 23-Nov-15 Hotel pile 1290 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
428 23-Nov-15 Hotel pile 1448 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 474.90 12.00 TI-18
429 23-Nov-15 Hotel pile 1435 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
430 23-Nov-15 Hotel pile 1434 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
431 23-Nov-15 Hotel pile 1436 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
432 23-Nov-15 Hotel pile 1437 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
433 23-Nov-15 Hotel pile 1438 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
434 23-Nov-15 Hotel pile 1440 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
435 24-Nov-15 Hotel pile 1289 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
436 24-Nov-15 Hotel pile 1306 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
437 24-Nov-15 Hotel pile 1305 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
438 24-Nov-15 Hotel pile 1304 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
439 24-Nov-15 Hotel pile 1303 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
440 24-Nov-15 Hotel pile 1302 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
441 24-Nov-15 Hotel pile 1301 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
442 24-Nov-15 Hotel pile 1398 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 20.70 509.20 12.00 TI-18
443 24-Nov-15 Hotel pile 1399 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.80 487.10 12.00 TI-18
444 24-Nov-15 Hotel pile 1400 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 12.00 TI-18
445 24-Nov-15 Hotel pile 1401 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
446 24-Nov-15 Hotel pile 1402 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
447 24-Nov-15 main pile 2518 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
448 24-Nov-15 main pile 2517 Ǿ600 17 15 32.00 36.70 4.70 1.00 23.70 426.00 12.00 TI-07
449 24-Nov-15 main pile 2515 Ǿ600 17 15 32.00 37.80 5.80 1.00 23.70 420.00 12.00 TI-07
450 24-Nov-15 main pile 2516 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
451 24-Nov-15 main pile 2519 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
452 24-Nov-15 main pile 2076 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
453 24-Nov-15 main pile 2074 Ǿ600 17 15 32.00 17.00 -15.00 1.00 1 24.00 426.50 12.00 TI-21A
454 24-Nov-15 main pile 2072 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
455 24-Nov-15 main pile 2073 Ǿ600 17 15 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
456 24-Nov-15 main pile 2075 Ǿ600 17 15 32.00 16.20 -15.80 1.00 1 24.00 426.50 12.00 TI-21A
457 25-Nov-15 Hotel pile 1300 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.50 477.90 12.00 TI-16
458 25-Nov-15 Hotel pile 1298 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 506.90 12.00 TI-16
459 25-Nov-15 Hotel pile 1315 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
460 25-Nov-15 Hotel pile 1314 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
461 25-Nov-15 Hotel pile 1313 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
462 25-Nov-15 Hotel pile 1312 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
463 25-Nov-15 Hotel pile 1311 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
464 25-Nov-15 Hotel pile 1403 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 430.50 12.00 TI-18
465 25-Nov-15 Hotel pile 1439 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.70 435.40 12.00 TI-18
466 25-Nov-15 Hotel pile 1420 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.10 469.90 12.00 TI-18
467 25-Nov-15 Hotel pile 1421 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
468 25-Nov-15 Hotel pile 1422 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
469 25-Nov-15 main pile 2520 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.00 284.00 12.00 TI-07
470 25-Nov-15 main pile 2521 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 23.70 420.00 12.00 TI-07
471 25-Nov-15 main pile 2505 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
472 25-Nov-15 main pile 2506 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
473 25-Nov-15 main pile 2504 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
474 25-Nov-15 main pile 2503 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
475 25-Nov-15 main pile 2058 Ǿ600 15 10 25.00 18.00 -7.00 1.00 1 23.70 421.10 12.00 TI-21A
476 25-Nov-15 main pile 2055 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
477 25-Nov-15 main pile 2057 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
478 25-Nov-15 main pile 2061 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
479 25-Nov-15 main pile 2059 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
480 25-Nov-15 main pile 2060 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A
481 25-Nov-15 main pile 2278 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
482 25-Nov-15 main pile 2279 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.20 421.10 12.00 TI-03
483 25-Nov-15 main pile 2307 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
484 25-Nov-15 main pile 2309 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
485 25-Nov-15 main pile 2306 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
486 25-Nov-15 main pile 2277 Ǿ600 15 17 32.00 27.00 -5.00 1.00 24.20 421.10 12.00 TI-03
487 25-Nov-15 main pile 2245 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
488 25-Nov-15 main pile 2244 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
489 25-Nov-15 main pile 2243 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
490 25-Nov-15 main pile 2246 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
491 25-Nov-15 main pile 2276 Ǿ600 15 17 32.00 28.00 -4.00 1.00 24.20 421.10 12.00 TI-03
492 25-Nov-15 main pile 2280 Ǿ600 15 17 32.00 19.00 -13.00 1.00 24.20 421.10 12.00 TI-03
493 26-Nov-15 Hotel pile 1310 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
494 26-Nov-15 Hotel pile 1309 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
495 26-Nov-15 Hotel pile 1308 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
496 26-Nov-15 Hotel pile 1307 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
497 26-Nov-15 Hotel pile 1324 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
498 26-Nov-15 Hotel pile 1323 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
499 26-Nov-15 Hotel pile 1322 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
500 26-Nov-15 Hotel pile 1419 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.30 499.40 12.00 TI-18
501 26-Nov-15 Hotel pile 1397 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
502 26-Nov-15 Hotel pile 1396 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.20 49.6.9 12.00 TI-18
503 26-Nov-15 Hotel pile 1395 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 12.00 TI-18
504 26-Nov-15 Hotel pile 1394 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.00 492.00 12.00 TI-18
505 26-Nov-15 Hotel pile 1393 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506,8 12.00 TI-18
506 26-Nov-15 Hotel pile 1392 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
507 26-Nov-15 Hotel pile 1424 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
508 26-Nov-15 Hotel pile 1423 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
509 26-Nov-15 main pile 2509 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
510 26-Nov-15 main pile 2510 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
511 26-Nov-15 main pile 2513 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
512 26-Nov-15 main pile 2514 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
513 26-Nov-15 main pile 2508 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
514 26-Nov-15 main pile 2056 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.00 426.50 12.00 TI-21A
515 26-Nov-15 main pile 2077 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
516 26-Nov-15 main pile 2078 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
517 26-Nov-15 main pile 2079 Ǿ600 15 17 32.00 32.35 0.35 1.00 23.70 421.10 12.00 TI-21A
518 26-Nov-15 main pile 2080 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
519 26-Nov-15 main pile 2081 Ǿ600 15 17 32.00 32.40 0.40 1.00 23.70 421.10 12.00 TI-21A
520 26-Nov-15 main pile 2065 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
521 27-Nov-15 Hotel pile 1417 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
522 27-Nov-15 Hotel pile 1418 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
523 27-Nov-15 Hotel pile 1416 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
524 27-Nov-15 Hotel pile 1415 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
525 27-Nov-15 main pile 2196 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
526 27-Nov-15 main pile 2198 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
527 27-Nov-15 main pile 2210 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
528 27-Nov-15 main pile 2205 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
529 27-Nov-15 main pile 2204 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
530 27-Nov-15 main pile 2200 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
531 27-Nov-15 main pile 2199 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
532 27-Nov-15 main pile 2207 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
533 27-Nov-15 main pile 2310 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421,1 12.00 TI-03
534 27-Nov-15 main pile 2333 Ǿ600 17 15 32.00 33.00 1.00 1.00 24,2 421.10 12.00 TI-03
535 27-Nov-15 main pile 2336 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
536 27-Nov-15 main pile 2335 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
537 27-Nov-15 main pile 2337 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
538 27-Nov-15 main pile 2334 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
539 27-Nov-15 main pile 2314 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03
540 27-Nov-15 main pile 2311 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
541 27-Nov-15 main pile 2952 Ǿ600 17 17 34.00 31.50 -2.50 1.00 1 17.50 506.90 12.00 TI-16
542 27-Nov-15 main pile 3055 Ǿ600 17 17 34.00 34.00 0.00 1.00 13.50 391.00 12.00 TI-16
543 27-Nov-15 main pile 2507 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
544 27-Nov-15 main pile 2512 Ǿ600 15 17 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
545 27-Nov-15 main pile 2511 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
546 27-Nov-15 main pile 2492 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
547 27-Nov-15 main pile 2493 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
548 28-Nov-15 Hotel pile 1316 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
549 28-Nov-15 Hotel pile 1317 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
550 28-Nov-15 Hotel pile 1318 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
551 28-Nov-15 Hotel pile 1319 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
552 28-Nov-15 Hotel pile 1385 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
553 28-Nov-15 Hotel pile 1384 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
554 28-Nov-15 Hotel pile 1383 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
555 28-Nov-15 Hotel pile 1382 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
556 28-Nov-15 Hotel pile 1381 Ǿ600 5 17 22.00 35.00 13.00 1.00 17.00 418.20 12.00 TI-18
557 28-Nov-15 main pile 2494 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
558 28-Nov-15 main pile 2489 Ǿ600 15 17 32.00 37.40 5.40 1.00 23.70 420.00 12.00 TI-07
559 28-Nov-15 main pile 2498 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
560 28-Nov-15 main pile 2497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
561 28-Nov-15 main pile 2502 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
562 28-Nov-15 main pile 2501 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
563 28-Nov-15 main pile 2312 Ǿ600 15 15 30.00 34.00 4.00 1.00 24.20 421.10 12.00 TI-03
564 28-Nov-15 main pile 2313 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
565 28-Nov-15 main pile 2330 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
566 28-Nov-15 main pile 2331 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
567 28-Nov-15 main pile 2362 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
568 28-Nov-15 main pile 2359 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
569 29-Nov-15 Hotel pile 1320 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
570 29-Nov-15 Hotel pile 1321 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
571 29-Nov-15 Hotel pile 1333 Ǿ600 15 17 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
572 29-Nov-15 Hotel pile 1332 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
573 29-Nov-15 Hotel pile 1331 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.00 463.40 12.00 TI-16
574 29-Nov-15 main pile 2491 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
575 29-Nov-15 main pile 2495 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
576 29-Nov-15 main pile 2496 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
577 29-Nov-15 main pile 2499 Ǿ600 17 15 32.00 37.00 5.00 1.00 21.00 373.10 12.00 TI-07
578 29-Nov-15 main pile 2500 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
579 30-Nov-15 Hotel pile 1330 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
580 30-Nov-15 Hotel pile 1329 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
581 30-Nov-15 Hotel pile 1328 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
582 30-Nov-15 Hotel pile 1327 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
583 30-Nov-15 Hotel pile 1326 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
584 30-Nov-15 Hotel pile 1325 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
585 30-Nov-15 main pile 2490 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
586 30-Nov-15 main pile 2483 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
587 30-Nov-15 main pile 2482 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
588 30-Nov-15 main pile 2488 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
589 30-Nov-15 main pile 2487 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
590 30-Nov-15 main pile 2203 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
591 30-Nov-15 main pile 2208 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
592 30-Nov-15 main pile 2206 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
593 30-Nov-15 main pile 2201 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
594 30-Nov-15 main pile 2202 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
595 30-Nov-15 Hotel pile 1412 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.60 482.20 12.00 TI-18
596 30-Nov-15 Hotel pile 1411 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
597 30-Nov-15 Hotel pile 1410 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
598 30-Nov-15 Hotel pile 1380 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
599 30-Nov-15 Hotel pile 1414 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
600 30-Nov-15 main pile 2317 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
601 30-Nov-15 main pile 2360 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
602 30-Nov-15 main pile 2361 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
603 30-Nov-15 main pile 2358 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
604 30-Nov-15 main pile 2332 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
605 30-Nov-15 main pile 2318 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
606 30-Nov-15 main pile 2315 Ǿ600 15 17 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
607 30-Nov-15 main pile 2329 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
608 30-Nov-15 main pile 2316 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
609 1-Dec-15 Hotel pile 1262 Ǿ600 17 15 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
610 1-Dec-15 Hotel pile 1263 Ǿ600 17 15 32.00 31.00 -1.00 1.00 15.50 448.90 12.00 TI-16
611 1-Dec-15 Hotel pile 1264 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
612 1-Dec-15 Hotel pile 1265 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
613 1-Dec-15 Hotel pile 1266 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
614 1-Dec-15 Hotel pile 1267 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
615 1-Dec-15 main pile 2486 Ǿ600 17 17 34.00 37.50 3.50 1.00 23.70 420.00 12.00 TI-07
616 1-Dec-15 main pile 2481 Ǿ600 17 17 34.00 29.00 -5.00 1.00 23.70 420.00 12.00 TI-07
617 1-Dec-15 main pile 2480 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
618 1-Dec-15 main pile 2479 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
619 1-Dec-15 main pile 2485 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
620 1-Dec-15 main pile 2484 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
621 1-Dec-15 main pile 2172 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
622 1-Dec-15 main pile 2171 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
623 1-Dec-15 main pile 2170 Ǿ600 15 17 32.00 30.00 -2.00 1.00 24.00 426.50 12.00 TI-21A
624 1-Dec-15 main pile 2169 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
625 1-Dec-15 main pile 2227 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
626 1-Dec-15 main pile 2230 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
627 1-Dec-15 main pile 2229 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
628 1-Dec-15 Hotel pile 1413 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.50 479.70 12.00 TI-18
629 1-Dec-15 Hotel pile 1391 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
630 1-Dec-15 Hotel pile 1390 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
631 1-Dec-15 Hotel pile 1389 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
632 1-Dec-15 Hotel pile 1388 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
633 1-Dec-15 Hotel pile 1387 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
634 1-Dec-15 Hotel pile 1386 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
635 1-Dec-15 main pile 2325 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
636 1-Dec-15 main pile 2328 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
637 1-Dec-15 main pile 2364 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
638 1-Dec-15 main pile 2367 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
639 2-Dec-15 Hotel pile 1379 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
640 2-Dec-15 Hotel pile 1378 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.40 477.20 12.00 TI-18
641 2-Dec-15 Hotel pile 1377 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
642 2-Dec-15 Hotel pile 1376 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
643 2-Dec-15 Hotel pile 1375 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.70 484.60 12.00 TI-18
644 2-Dec-15 Hotel pile 1374 Ǿ600 17 15 32.00 36.00 4.00 1.00 19.50 479.70 12.00 TI-18
645 2-Dec-15 Hotel pile 1367 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
646 2-Dec-15 Hotel pile 1366 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
647 2-Dec-15 Hotel pile 1268 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
648 2-Dec-15 Hotel pile 1269 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16
649 2-Dec-15 Hotel pile 1270 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
650 2-Dec-15 main pile 2319 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
651 2-Dec-15 main pile 2321 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
652 2-Dec-15 main pile 2320 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
653 2-Dec-15 main pile 2323 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
654 3-Dec-15 main pile 2166 Ǿ600 17 17.00 14.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
655 3-Dec-15 main pile 2167 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A
656 3-Dec-15 main pile 2165 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
657 3-Dec-15 main pile 2168 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
658 3-Dec-15 main pile 2478 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
659 3-Dec-15 main pile 2477 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
660 3-Dec-15 main pile 2476 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
661 3-Dec-15 main pile 2474 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
662 3-Dec-15 main pile 2475 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
663 3-Dec-15 main pile 2473 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
664 3-Dec-15 main pile 2880 Ǿ600 17 17 34.00 34.00 0.00 1.00 14.00 405.50 12.00 TI-16
665 3-Dec-15 main pile 2365 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
666 3-Dec-15 main pile 2366 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
667 3-Dec-15 main pile 2363 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
668 3-Dec-15 main pile 2326 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
669 3-Dec-15 main pile 2327 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
670 3-Dec-15 main pile 2324 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
671 3-Dec-15 main pile 2322 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
672 4-Dec-15 main pile 2979 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
673 4-Dec-15 main pile 2978 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
674 4-Dec-15 main pile 2228 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
675 4-Dec-15 Hotel pile 1365 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
676 4-Dec-15 main pile 2472 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
677 4-Dec-15 main pile 2471 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
678 4-Dec-15 main pile 2470 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
679 4-Dec-15 main pile 2469 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
680 4-Dec-15 main pile 2468 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
681 4-Dec-15 main pile 2467 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
682 4-Dec-15 main pile 2701 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
683 4-Dec-15 main pile 2700 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
684 4-Dec-15 main pile 2698 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
685 4-Dec-15 main pile 2699 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16
686 4-Dec-15 main pile 2702 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 15.50 448.90 12.00 TI-16
687 4-Dec-15 main pile 2703 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
688 4-Dec-15 main pile 2370 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
689 4-Dec-15 main pile 2368 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
690 4-Dec-15 main pile 2369 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
691 4-Dec-15 main pile 2371 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
692 4-Dec-15 main pile 2372 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
693 5-Dec-15 main pile 2704 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
694 5-Dec-15 main pile 2705 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
695 5-Dec-15 main pile 2694 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
696 5-Dec-15 main pile 2693 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
697 5-Dec-15 main pile 2691 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
698 5-Dec-15 main pile 2692 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
699 5-Dec-15 main pile 2464 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
700 5-Dec-15 main pile 2463 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
701 5-Dec-15 main pile 2465 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
702 5-Dec-15 main pile 2466 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
703 5-Dec-15 main pile 2459 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
704 6-Dec-15 Hotel pile 1364 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 413.70 12.00 TI-18
705 6-Dec-15 Hotel pile 1363 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.60 482.20 12.00 TI-18
706 6-Dec-15 Hotel pile 1372 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.10 494.50 12.00 TI-18
707 7-Dec-15 main pile 2458 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
708 7-Dec-15 main pile 2460 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
709 7-Dec-15 main pile 2462 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
710 7-Dec-15 main pile 2461 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
711 7-Dec-15 main pile 2448 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
712 7-Dec-15 Hotel pile 1352 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.00 467.40 12.00 TI-18
713 7-Dec-15 Hotel pile 1353 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
714 7-Dec-15 Hotel pile 1354 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
715 7-Dec-15 Hotel pile 1371 Ǿ600 17 15 32.00 29.00 -3.00 1.00 19.10 469.90 12.00 TI-18
716 7-Dec-15 Hotel pile 1373 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.70 489.50 12.00 TI-18
717 8-Dec-15 main pile 2447 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
718 8-Dec-15 main pile 2450 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
719 8-Dec-15 main pile 2451 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
720 8-Dec-15 main pile 2449 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
721 8-Dec-15 main pile 2689 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
722 8-Dec-15 main pile 2690 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
723 8-Dec-15 main pile 2687 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
724 8-Dec-15 main pile 2688 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
725 8-Dec-15 main pile 2682 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
726 8-Dec-15 main pile 2683 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16
727 8-Dec-15 main pile 2684 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
728 8-Dec-15 main pile 2685 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
729 8-Dec-15 main pile 2686 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
730 8-Dec-15 Hotel pile 1355 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.20 472.30 12.00 TI-18
731 8-Dec-15 Hotel pile 1356 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.30 499.40 12.00 TI-18
732 8-Dec-15 Hotel pile 1357 Ǿ600 17 15 32.00 21.00 -11.00 1.00 1 20.00 246.00 12.00 TI-18
733 8-Dec-15 main pile 2378 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
734 8-Dec-15 main pile 2377 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
735 8-Dec-15 main pile 2376 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
736 8-Dec-15 main pile 2374 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
737 8-Dec-15 main pile 2373 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
738 10-Dec-15 main pile 2375 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
739 10-Dec-15 main pile 2392 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
740 10-Dec-15 main pile 2391 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
741 10-Dec-15 main pile 2397 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
742 10-Dec-15 main pile 2396 Ǿ600 17 15 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
743 10-Dec-15 main pile 2393 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
744 10-Dec-15 main pile 2394 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
745 10-Dec-15 main pile 2395 Ǿ600 17 15 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03
746 10-Dec-15 main pile 2577 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
747 10-Dec-15 main pile 2578 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
748 10-Dec-15 main pile 2582 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
749 10-Dec-15 main pile 2579 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
750 10-Dec-15 main pile 2576 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
751 10-Dec-15 main pile 2580 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
752 10-Dec-15 main pile 2581 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
753 10-Dec-15 main pile 2583 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
754 10-Dec-15 main pile 2651 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
755 10-Dec-15 main pile 2650 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
756 10-Dec-15 main pile 2649 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
757 10-Dec-15 main pile 2648 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
758 10-Dec-15 main pile 2647 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
759 10-Dec-15 main pile 2644 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
760 10-Dec-15 main pile 2643 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
761 10-Dec-15 main pile 2645 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
762 10-Dec-15 main pile 2646 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
763 11-Dec-15 main pile 2584 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
764 11-Dec-15 main pile 2585 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
765 11-Dec-15 main pile 2586 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
766 11-Dec-15 main pile 2587 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
767 11-Dec-15 main pile 2588 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
768 11-Dec-15 main pile 2636 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
769 11-Dec-15 main pile 2635 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
770 11-Dec-15 main pile 2638 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
771 11-Dec-15 main pile 2642 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
772 11-Dec-15 main pile 2641 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
773 11-Dec-15 main pile 2640 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
774 11-Dec-15 main pile 2639 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
775 11-Dec-15 main pile 2652 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
776 11-Dec-15 main pile 2653 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
777 11-Dec-15 main pile 2654 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
778 11-Dec-15 main pile 2655 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
779 11-Dec-15 main pile 2656 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
780 11-Dec-15 Hotel pile 1358 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
781 11-Dec-15 Hotel pile 1359 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.20 472.30 12.00 TI-18
782 11-Dec-15 Hotel pile 1368 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
783 11-Dec-15 Hotel pile 1370 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
784 11-Dec-15 Hotel pile 1369 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
785 11-Dec-15 main pile 2400 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
786 11-Dec-15 main pile 2401 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
787 11-Dec-15 main pile 2398 Ǿ600 17 15 32.00 19.00 -13.00 1.00 1 24.20 421.10 12.00 TI-03
788 11-Dec-15 main pile 2399 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
789 11-Dec-15 main pile 2402 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
790 11-Dec-15 main pile 2403 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
791 11-Dec-15 main pile 2404 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
792 11-Dec-15 main pile 2389 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
793 11-Dec-15 main pile 2388 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
794 11-Dec-15 main pile 2390 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
795 11-Dec-15 main pile 1659 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
796 11-Dec-15 main pile 1658 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
797 11-Dec-15 main pile 1664 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
798 11-Dec-15 main pile 1666 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
799 11-Dec-15 main pile 1667 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
800 11-Dec-15 main pile 1665 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
801 11-Dec-15 main pile 1787 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
802 11-Dec-15 main pile 1786 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
803 12-Dec-15 main pile 2637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
804 12-Dec-15 main pile 2632 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
805 12-Dec-15 main pile 2631 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
806 12-Dec-15 main pile 2634 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
807 12-Dec-15 main pile 2633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
808 12-Dec-15 main pile 2657 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
809 12-Dec-15 main pile 2676 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
810 12-Dec-15 main pile 2677 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
811 12-Dec-15 main pile 2678 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
812 12-Dec-15 main pile 2679 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
813 12-Dec-15 main pile 2680 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
814 12-Dec-15 main pile 2681 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
815 12-Dec-15 main pile 2712 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
816 12-Dec-15 main pile 2713 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
817 12-Dec-15 Hotel pile 1480 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.50 455.10 12.00 TI-18
818 12-Dec-15 Hotel pile 1479 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.70 460.00 12.00 TI-18
819 12-Dec-15 Hotel pile 1478 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.80 437.90 12.00 TI-18
820 12-Dec-15 Hotel pile 1477 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
821 12-Dec-15 main pile 2386 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
822 12-Dec-15 main pile 2383 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
823 12-Dec-15 main pile 2410 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
824 12-Dec-15 main pile 2409 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
825 12-Dec-15 main pile 2408 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
826 12-Dec-15 main pile 2411 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
827 12-Dec-15 main pile 2412 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
828 12-Dec-15 main pile 2413 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
829 12-Dec-15 main pile 2405 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
830 12-Dec-15 main pile 2406 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
831 12-Dec-15 main pile 1784 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
832 12-Dec-15 main pile 1785 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
833 12-Dec-15 main pile 1791 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
834 12-Dec-15 main pile 1790 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
835 12-Dec-15 main pile 1788 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
836 12-Dec-15 main pile 1789 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
837 12-Dec-15 main pile 1908 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
838 12-Dec-15 main pile 1909 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
839 12-Dec-15 main pile 1913 Ǿ600 15 17 32.00 33.10 1.10 1.00 23.70 421.10 12.00 TI-21A
840 13-Dec-15 main pile 2714 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
841 13-Dec-15 main pile 2715 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.30 501.10 12.00 TI-16
842 13-Dec-15 main pile 2716 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
843 13-Dec-15 main pile 2717 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
844 13-Dec-15 main pile 2737 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
845 13-Dec-15 main pile 2738 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
846 13-Dec-15 main pile 2739 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
847 13-Dec-15 main pile 2740 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
848 13-Dec-15 main pile 2417 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
849 13-Dec-15 main pile 2416 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.10 421.10 12.00 TI-03
850 13-Dec-15 main pile 2415 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
851 13-Dec-15 main pile 2418 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
852 13-Dec-15 main pile 2419 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
853 13-Dec-15 main pile 2414 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
854 13-Dec-15 main pile 1912 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
855 13-Dec-15 main pile 1914 Ǿ600 17 15 32.00 31.20 -0.80 1.00 1 23.70 421.10 12.00 TI-21A
856 13-Dec-15 main pile 1915 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A
857 13-Dec-15 main pile 1911 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
858 13-Dec-15 main pile 1910 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
859 13-Dec-15 main pile 1662 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
860 13-Dec-15 main pile 1661 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
861 13-Dec-15 main pile 1660 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
862 14-Dec-15 main pile 2741 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
863 14-Dec-15 main pile 2742 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.50 477.90 12.00 TI-16
864 14-Dec-15 main pile 2743 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
865 14-Dec-15 Hotel pile 1481 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
866 14-Dec-15 Hotel pile 1482 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.20 472.30 12.00 TI-18
867 14-Dec-15 Hotel pile 1483 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
868 14-Dec-15 Hotel pile 1484 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
869 14-Dec-15 main pile 2429 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
870 14-Dec-15 main pile 2428 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
871 14-Dec-15 main pile 2425 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
872 14-Dec-15 main pile 2423 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.11 12.00 TI-03
873 14-Dec-15 main pile 2424 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
874 14-Dec-15 main pile 2420 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
875 14-Dec-15 main pile 2421 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
876 14-Dec-15 main pile 2422 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
877 14-Dec-15 main pile 1663B Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
878 14-Dec-15 main pile 1663A Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
879 14-Dec-15 main pile 1541 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
880 14-Dec-15 main pile 1540 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
881 14-Dec-15 main pile 1543 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
882 14-Dec-15 main pile 1542 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
883 14-Dec-15 main pile 1543A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
884 14-Dec-15 main pile 1543B Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
885 15-Dec-15 main pile 2426 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
886 15-Dec-15 main pile 2442 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
887 15-Dec-15 main pile 2441 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
888 15-Dec-15 main pile 2443 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
889 15-Dec-15 main pile 2444 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
890 15-Dec-15 main pile 2445 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
891 15-Dec-15 main pile 2446 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
892 15-Dec-15 main pile 2438 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
893 15-Dec-15 main pile 2439 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
894 15-Dec-15 main pile 2427 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.20 421.10 12.00 TI-03
895 15-Dec-15 main pile 1539 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
896 15-Dec-15 main pile 1538 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
897 15-Dec-15 main pile 1536 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
898 15-Dec-15 main pile 1537 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
899 15-Dec-15 main pile 1535 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
900 15-Dec-15 main pile 1530 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
901 15-Dec-15 main pile 1528 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
902 15-Dec-15 main pile 1525 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.90 424.70 12.00 TI-21A
903 15-Dec-15 main pile 1523 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
904 15-Dec-15 main pile 2706 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
905 15-Dec-15 main pile 2707 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
906 15-Dec-15 main pile 2708 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
907 15-Dec-15 main pile 2709 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
908 15-Dec-15 main pile 2710 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
909 15-Dec-15 main pile 2711 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
910 15-Dec-15 main pile 2747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
911 15-Dec-15 main pile 2748 Ǿ600 15 17 32.00 32.60 0.60 1.00 23.70 420.00 12.00 TI-07
912 15-Dec-15 main pile 2749 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
913 16-Dec-15 main pile 2047A Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
914 16-Dec-15 main pile 2040A Ǿ600 17 15 32.00 16.00 -16.00 1.00 1 16.00 463.40 12.00 TI-16
915 16-Dec-15 main pile 2061B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
916 16-Dec-15 main pile 2744 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
917 16-Dec-15 main pile 2745 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
918 16-Dec-15 main pile 2746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
919 16-Dec-15 main pile 2721 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
920 16-Dec-15 main pile 2719 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
921 16-Dec-15 main pile 2720 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
922 16-Dec-15 main pile 2433 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
923 16-Dec-15 main pile 2434 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
924 16-Dec-15 main pile 2432 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
925 16-Dec-15 main pile 2430 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
926 16-Dec-15 main pile 2431 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
927 16-Dec-15 main pile 2437 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
928 16-Dec-15 main pile 2436 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
929 16-Dec-15 main pile 2435 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.70 12.00 TI-03
930 16-Dec-15 main pile 2440 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
931 16-Dec-15 main pile 1534 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
932 16-Dec-15 main pile 1520 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
933 16-Dec-15 main pile 1522 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
934 16-Dec-15 main pile 1521 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
935 16-Dec-15 main pile 1524 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
936 16-Dec-15 main pile 1526 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
937 16-Dec-15 main pile 1529 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
938 16-Dec-15 main pile 1532 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
939 16-Dec-15 main pile 1533 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
940 17-Dec-15 main pile 1975C Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
941 17-Dec-15 main pile 1975D Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 15.00 405.50 12.00 TI-16
942 17-Dec-15 main pile 1975B Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
943 17-Dec-15 main pile 2982 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
944 17-Dec-15 main pile 2983 Ǿ600 17 15 32.00 17.50 -14.50 1.00 1 16.00 463.40 12.00 TI-16
945 17-Dec-15 main pile 1975A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
946 17-Dec-15 main pile 2718 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
947 17-Dec-15 main pile 2674 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
948 17-Dec-15 main pile 2673 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
949 17-Dec-15 main pile 2672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
950 17-Dec-15 main pile 2539 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
951 17-Dec-15 main pile 2538 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
952 17-Dec-15 main pile 2540 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
953 17-Dec-15 main pile 2537 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
954 17-Dec-15 main pile 1527 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
955 17-Dec-15 main pile 1531 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
956 18-Dec-15 main pile 1549 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
957 18-Dec-15 main pile 1548 Ǿ600 17 15 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
958 18-Dec-15 main pile 1547 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
959 18-Dec-15 main pile 1657 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
960 18-Dec-15 main pile 1673 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
961 18-Dec-15 main pile 1672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
962 18-Dec-15 main pile 1671 Ǿ600 17 15 32.00 33.20 1.20 1.00 23.70 421.10 12.00 TI-21A
963 18-Dec-15 main pile 1783 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
964 18-Dec-15 main pile 2130A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
965 18-Dec-15 main pile 1978A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
966 18-Dec-15 main pile 1978B Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 15.50 448.90 12.00 TI-16
967 18-Dec-15 main pile 1990B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
968 19-Dec-15 main pile 1990A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
969 19-Dec-15 main pile 2040B Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
970 19-Dec-15 main pile 2076B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
971 19-Dec-15 main pile 2076A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
972 19-Dec-15 main pile 1781 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
973 19-Dec-15 main pile 1782 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
974 19-Dec-15 main pile 1797 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
975 19-Dec-15 main pile 1796 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
976 19-Dec-15 main pile 1795 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
977 19-Dec-15 main pile 1906 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
978 19-Dec-15 main pile 2732 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
979 19-Dec-15 main pile 2735 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
980 19-Dec-15 main pile 2734 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
981 19-Dec-15 main pile 2733 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
982 19-Dec-15 main pile 2736 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
983 19-Dec-15 main pile 2776 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
984 19-Dec-15 main pile 2779 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
985 19-Dec-15 main pile 2777 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
986 19-Dec-15 main pile 2542 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
987 19-Dec-15 main pile 2545 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.10 12.00 TI-03
988 19-Dec-15 main pile 2553 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
989 19-Dec-15 main pile 2554 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
990 19-Dec-15 main pile 2555 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
991 19-Dec-15 main pile 2552 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
992 19-Dec-15 main pile 2544 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
993 19-Dec-15 main pile 2541 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
994 19-Dec-15 main pile 2543 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
995 19-Dec-15 main pile 1730 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 251.20 12.00 TI-26
996 19-Dec-15 main pile 1731 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 427.00 12.00 TI-26
997 19-Dec-15 main pile 1732 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
998 19-Dec-15 main pile 1840 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
999 19-Dec-15 main pile 1841 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1000 19-Dec-15 main pile 1842 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1001 19-Dec-15 Hotel pile 1360 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
1002 20-Dec-15 main pile 2775 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1003 20-Dec-15 main pile 2778 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1004 20-Dec-15 main pile 2790 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1005 20-Dec-15 main pile 2793 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1006 20-Dec-15 main pile 2792 Ǿ600 17 15 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
1007 20-Dec-15 main pile 2791 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1008 20-Dec-15 main pile 2794 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1009 20-Dec-15 main pile 1854 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1010 20-Dec-15 main pile 1855 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1011 20-Dec-15 main pile 1856 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1012 20-Dec-15 main pile 1959 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1013 20-Dec-15 main pile 1958 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1014 20-Dec-15 main pile 1960 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1015 20-Dec-15 main pile 1962 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1016 20-Dec-15 main pile 1961 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1017 21-Dec-15 main pile 2800 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
1018 21-Dec-15 main pile 2799 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
1019 21-Dec-15 main pile 2798 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1020 21-Dec-15 main pile 2797 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1021 21-Dec-15 main pile 2796 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1022 21-Dec-15 main pile 2795 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1023 21-Dec-15 main pile 2805 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1024 21-Dec-15 main pile 1905 Ǿ600 17 15 32.00 31.25 -0.75 1.00 1 24.00 426.50 12.00 TI-21A
1025 21-Dec-15 main pile 1921 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.90 424.70 12.00 TI-21A
1026 21-Dec-15 main pile 1920 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1027 21-Dec-15 main pile 1919 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1028 21-Dec-15 main pile 1917 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1029 21-Dec-15 main pile 1857 Ǿ600 15 17 32.00 32.00 0.00 1.00 18.00 452.10 12.00 TI-26
1030 21-Dec-15 main pile 1858 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
1031 21-Dec-15 main pile 1859 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1032 21-Dec-15 main pile 1843 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1033 21-Dec-15 main pile 1844 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1034 21-Dec-15 main pile 1845 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1035 21-Dec-15 main pile 1733 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1036 21-Dec-15 main pile 1734 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1037 21-Dec-15 main pile 1735 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1038 22-Dec-15 main pile 2806 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1039 22-Dec-15 main pile 2807 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1040 22-Dec-15 main pile 2808 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1041 22-Dec-15 main pile 2809 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1042 22-Dec-15 main pile 2810 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1043 22-Dec-15 main pile 2814 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1044 22-Dec-15 main pile 2813 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1045 22-Dec-15 main pile 1926 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1046 22-Dec-15 main pile 1918 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1047 22-Dec-15 main pile 1916 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.90 424.70 12.00 TI-21A
1048 22-Dec-15 main pile 1904 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1049 22-Dec-15 main pile 1903 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1050 22-Dec-15 main pile 1902 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
1051 22-Dec-15 main pile 1907 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
1052 22-Dec-15 main pile 2086A Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 16.00 463.40 12.00 TI-16
1053 22-Dec-15 main pile 2019A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
1054 22-Dec-15 main pile 2979C Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.00 434.50 12.00 TI-16
1055 22-Dec-15 main pile 2979B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1056 22-Dec-15 main pile 2979D Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 16.00 463.40 12.00 TI-16
1057 22-Dec-15 main pile 2979A Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.50 448.90 12.00 TI-16
1058 22-Dec-15 main pile 1965 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1059 22-Dec-15 main pile 1966 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 17.00 427.00 12.00 TI-26
1060 22-Dec-15 main pile 1964 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1061 22-Dec-15 main pile 1963 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 17.50 439.50 12.00 TI-26
1062 22-Dec-15 main pile 1851 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 17.00 427.00 12.00 TI-26
1063 23-Dec-15 main pile 2812 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1064 23-Dec-15 main pile 2811 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1065 23-Dec-15 main pile 2815 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
1066 23-Dec-15 main pile 2816 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
1067 23-Dec-15 main pile 2818 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1068 23-Dec-15 main pile 2817 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1069 23-Dec-15 main pile 2822 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1070 23-Dec-15 main pile 2601 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1071 23-Dec-15 main pile 2604 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1072 23-Dec-15 main pile 2603 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
1073 23-Dec-15 main pile 2605 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1074 23-Dec-15 main pile 2602 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1075 23-Dec-15 main pile 2556 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1076 23-Dec-15 main pile 2559 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1077 23-Dec-15 main pile 2558 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1078 23-Dec-15 main pile 2557 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1079 23-Dec-15 main pile 2549 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1080 23-Dec-15 main pile 2548 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1081 23-Dec-15 main pile 2550 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1082 23-Dec-15 main pile 2551 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1083 23-Dec-15 main pile 2547 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1084 23-Dec-15 main pile 2546 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1085 23-Dec-15 main pile 1928 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1086 23-Dec-15 main pile 1929 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1087 23-Dec-15 main pile 1931 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1088 23-Dec-15 main pile 1923 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
1089 23-Dec-15 main pile 1922 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A
1090 23-Dec-15 main pile 1927 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1091 23-Dec-15 main pile 2979E Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1092 23-Dec-15 main pile 2979F Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1093 23-Dec-15 main pile 2026A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
1094 23-Dec-15 main pile 2002A Ǿ600 17 15 32.00 26.00 -6.00 1.00 1 16.00 463.40 12.00 TI-16
1095 23-Dec-15 main pile 2002B Ǿ600 17 15 32.00 25.00 -7.00 1.00 1 16.00 463.40 12.00 TI-16
1096 23-Dec-15 main pile 1850 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1097 23-Dec-15 main pile 1853 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1098 23-Dec-15 main pile 1852 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1099 23-Dec-15 main pile 1847 Ǿ600 15 17 32.00 37.50 5.50 1.00 17.00 427.00 12.00 TI-26
1100 23-Dec-15 main pile 1846 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
1101 23-Dec-15 main pile 1849 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26
1102 23-Dec-15 main pile 1848 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26
1103 23-Dec-15 main pile 1723 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26
1104 23-Dec-15 main pile 1722 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26
1105 23-Dec-15 Hotel pile 1351 Ǿ800 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
1106 23-Dec-15 Hotel pile 1350 Ǿ800 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
1107 23-Dec-15 Hotel pile 1349 Ǿ800 17 15 32.00 38.00 6.00 1.00 20.40 504.30 12.00 TI-18
1108 23-Dec-15 Hotel pile 1348 Ǿ800 17 15 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1109 23-Dec-15 Hotel pile 1347 Ǿ800 17 15 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
1110 23-Dec-15 Hotel pile 1346 Ǿ800 17 15 32.00 32.00 0.00 1.00 20.70 509.20 12.00 TI-18
1111 23-Dec-15 Hotel pile 1345 Ǿ800 17 15 32.00 29.00 -3.00 1.00 1 20.90 514.10 12.00 TI-18
1112 24-Dec-15 main pile 2819 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
1113 24-Dec-15 main pile 2821 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1114 24-Dec-15 main pile 2820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
1115 24-Dec-15 main pile 2765 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1116 24-Dec-15 main pile 2763 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1117 24-Dec-15 main pile 2766 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1118 24-Dec-15 main pile 2613 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
1119 24-Dec-15 main pile 2615 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1120 24-Dec-15 main pile 2618 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1121 24-Dec-15 main pile 2659 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1122 24-Dec-15 main pile 2660 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1123 24-Dec-15 main pile 2661 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.20 421.10 12.00 TI-03
1124 24-Dec-15 main pile 2658 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
1125 24-Dec-15 main pile 2617 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1126 24-Dec-15 main pile 2616 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1127 24-Dec-15 main pile 1888 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
1128 24-Dec-15 main pile 1941 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1129 24-Dec-15 main pile 1886 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1130 24-Dec-15 main pile 1938 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1131 24-Dec-15 main pile 1939 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
1132 24-Dec-15 main pile 1940 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1133 24-Dec-15 main pile 1933 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
1134 24-Dec-15 main pile 1935 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1135 24-Dec-15 main pile 2146A Ǿ600 17 15 32.00 20.50 -11.50 1.00 1 15.00 434.50 12.00 TI-16
1136 24-Dec-15 main pile 2135A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1137 24-Dec-15 main pile 2155A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
1138 24-Dec-15 main pile 2164A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1139 24-Dec-15 main pile 2184B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1140 24-Dec-15 main pile 1724 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1141 24-Dec-15 main pile 1725 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26
1142 24-Dec-15 main pile 1603 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1143 24-Dec-15 main pile 1602 Ǿ600 15 17 32.00 35.50 3.50 1.00 17.00 427.00 12.00 TI-26
1144 24-Dec-15 main pile 1604 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1145 24-Dec-15 main pile 1605 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1146 24-Dec-15 Hotel pile 1337 Ǿ800 15 17 32.00 36.00 4.00 1.00 20.80 511.70 12.00 TI-18
1147 24-Dec-15 Hotel pile 1338 Ǿ800 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
1148 24-Dec-15 Hotel pile 1334 Ǿ800 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
1149 24-Dec-15 Hotel pile 1343 Ǿ800 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
1150 24-Dec-15 Hotel pile 1344 Ǿ800 15 17 32.00 34.00 2.00 1.00 20.50 504.30 12.00 TI-18
1151 24-Dec-15 Hotel pile 1335 Ǿ800 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
1152 25-Dec-15 main pile 2695 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
1153 25-Dec-15 main pile 2696 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1154 25-Dec-15 main pile 2760 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1155 25-Dec-15 main pile 2761 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1156 25-Dec-15 main pile 2759 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1157 25-Dec-15 main pile 2762 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1158 25-Dec-15 main pile 2764 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1159 25-Dec-15 main pile 2670 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1160 25-Dec-15 main pile 2669 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1161 25-Dec-15 main pile 2671 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1162 25-Dec-15 main pile 2668 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1163 25-Dec-15 main pile 2663 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1164 25-Dec-15 main pile 2666 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1165 25-Dec-15 main pile 2665 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1166 25-Dec-15 main pile 2664 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1167 25-Dec-15 main pile 2662 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1168 25-Dec-15 main pile 1887 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1169 25-Dec-15 main pile 1889 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
1170 25-Dec-15 main pile 1763 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.90 424.70 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1171 25-Dec-15 main pile 1764 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
1172 25-Dec-15 main pile 1765 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.00 426.50 12.00 TI-21A
1173 25-Dec-15 main pile 1815 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1174 25-Dec-15 main pile 1814 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
1175 25-Dec-15 main pile 1727 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1176 25-Dec-15 main pile 1726 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
1177 25-Dec-15 main pile 1728 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1178 25-Dec-15 main pile 1729 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1179 25-Dec-15 main pile 1599 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1180 25-Dec-15 main pile 1598 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1181 25-Dec-15 main pile 1601 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1182 25-Dec-15 main pile 1600 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1183 25-Dec-15 Hotel pile 1341 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
1184 25-Dec-15 Hotel pile 1340 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.60 506.80 12.00 TI-18
1185 25-Dec-15 Hotel pile 1339 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
1186 25-Dec-15 Hotel pile 1342 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
1187 25-Dec-15 main pile 2184A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.00 434.00 12.00 TI-16
1188 25-Dec-15 main pile 2218B Ǿ600 15 17 32.00 30.50 -1.50 1.00 15.50 228.90 12.00 TI-16
1189 25-Dec-15 main pile 2218A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.50 228.90 12.00 TI-16
1190 25-Dec-15 main pile 2280A Ǿ600 15 17 32.00 27.00 -5.00 1.00 16.00 463.40 12.00 TI-16
1191 26-Dec-15 main pile 2697 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1192 26-Dec-15 main pile 2755 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
1193 26-Dec-15 main pile 2758 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1194 26-Dec-15 main pile 2756 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1195 26-Dec-15 main pile 2754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
1196 26-Dec-15 main pile 2757 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1197 26-Dec-15 main pile 2723 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1198 26-Dec-15 main pile 2724 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1199 26-Dec-15 main pile 2725 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1200 26-Dec-15 main pile 2722 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1201 26-Dec-15 main pile 2667 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1202 26-Dec-15 main pile 2731 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1203 26-Dec-15 main pile 2728 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1204 26-Dec-15 main pile 1810 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1205 26-Dec-15 main pile 1812 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1206 26-Dec-15 main pile 1811 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1207 26-Dec-15 main pile 1813 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.90 424.70 12.00 TI-21A
1208 26-Dec-15 main pile 1883 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1209 26-Dec-15 main pile 1884 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.00 426.70 12.00 TI-21A
1210 26-Dec-15 main pile 1487 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1211 26-Dec-15 main pile 1488 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1212 26-Dec-15 main pile 1485 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1213 26-Dec-15 main pile 1486 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1214 27-Dec-15 main pile 2768 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1215 27-Dec-15 main pile 2770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1216 27-Dec-15 main pile 2751 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1217 27-Dec-15 main pile 2752 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1218 27-Dec-15 main pile 2750 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1219 27-Dec-15 main pile 2726 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1220 27-Dec-15 main pile 2783 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1221 27-Dec-15 main pile 2780 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1222 27-Dec-15 main pile 2730 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 42.70 12.00 TI-03
1223 27-Dec-15 main pile 2727 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1224 27-Dec-15 main pile 2729 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1225 27-Dec-15 main pile 1762 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1226 27-Dec-15 main pile 1761 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1227 27-Dec-15 main pile 1760 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1228 27-Dec-15 main pile 1688 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1229 27-Dec-15 main pile 1687 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1230 27-Dec-15 main pile 2275A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
1231 27-Dec-15 main pile 2367A Ǿ600 15 17 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
1232 27-Dec-15 main pile 2367B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1233 27-Dec-15 main pile 2328A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
1234 27-Dec-15 main pile 2328B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 12.00 TI-16
1235 27-Dec-15 main pile 2260A Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 14.50 420.00 12.00 TI-16
1236 27-Dec-15 main pile 2270A Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 12.00 TI-16
1237 28-Dec-15 main pile 2767 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1238 28-Dec-15 main pile 2769 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1239 28-Dec-15 main pile 2753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1240 28-Dec-15 main pile 2772 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1241 28-Dec-15 main pile 2774 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1242 28-Dec-15 main pile 2771 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
1243 28-Dec-15 main pile 2773 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1244 28-Dec-15 main pile 2824 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
1245 28-Dec-15 main pile 2825 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1246 28-Dec-15 main pile 1686 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1247 28-Dec-15 main pile 1691 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1248 28-Dec-15 main pile 1690 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1249 28-Dec-15 main pile 1689 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1250 28-Dec-15 main pile 1639 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1251 28-Dec-15 main pile 1640 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1252 28-Dec-15 main pile 1641 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1253 28-Dec-15 main pile 1636 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1254 28-Dec-15 main pile 1637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1255 28-Dec-15 main pile 2270B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 12.00 TI-16
1256 28-Dec-15 main pile 2784A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
1257 28-Dec-15 main pile 1606 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1258 28-Dec-15 main pile 1607 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1259 28-Dec-15 main pile 1608 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1260 28-Dec-15 main pile 1609 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1261 28-Dec-15 main pile 1610 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1262 28-Dec-15 main pile 1611 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1263 28-Dec-15 Hotel pile 1362 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
1264 28-Dec-15 Hotel pile 1361 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
1265 29-Dec-15 main pile 2828 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1266 29-Dec-15 main pile 2823 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1267 29-Dec-15 main pile 2826 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1268 29-Dec-15 main pile 2827 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1269 29-Dec-15 main pile 2829 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1270 29-Dec-15 main pile 2830 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1271 29-Dec-15 main pile 1716 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1272 29-Dec-15 main pile 1717 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1273 29-Dec-15 main pile 1718 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1274 29-Dec-15 main pile 1721 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1275 29-Dec-15 main pile 1720 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 427.00 12.00 TI-26
1276 29-Dec-15 main pile 1719 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1277 30-Dec-15 main pile 2787 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.20 421.10 12.00 TI-03
1278 30-Dec-15 main pile 2785 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1279 30-Dec-15 main pile 2788 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1280 30-Dec-15 main pile 2789A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1281 30-Dec-15 main pile 2784B Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1282 30-Dec-15 main pile 2456 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
1283 30-Dec-15 main pile 2454 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 206.80 12.00 TI-18
1284 30-Dec-15 main pile 2455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
1285 30-Dec-15 main pile 2453 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
1286 30-Dec-15 main pile 2457 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
1287 30-Dec-15 main pile 2452 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
1288 2-Jan-16 main pile 2802 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1289 2-Jan-16 main pile 2801 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
1290 2-Jan-16 main pile 2804 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1291 2-Jan-16 main pile 2803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1292 2-Jan-16 main pile 1638 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
1293 2-Jan-16 main pile 1617 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1294 2-Jan-16 main pile 1612 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1295 2-Jan-16 main pile 1613 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1296 2-Jan-16 main pile 1614 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1297 2-Jan-16 main pile 3016 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1298 2-Jan-16 main pile 3017 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1299 2-Jan-16 main pile 2996 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1300 2-Jan-16 main pile 2997 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1301 3-Jan-16 main pile 1616 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1302 3-Jan-16 main pile 1615 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1303 3-Jan-16 main pile 1589 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1304 3-Jan-16 main pile 1590 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1305 3-Jan-16 main pile 1591 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1306 3-Jan-16 main pile 1586 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1307 3-Jan-16 main pile 1587 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
1308 3-Jan-16 main pile 1588 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
1309 3-Jan-16 main pile 2984 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1310 3-Jan-16 main pile 2985 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1311 3-Jan-16 main pile 2980 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26
1312 3-Jan-16 main pile 2981 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26
1313 4-Jan-16 main pile 3018 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1314 4-Jan-16 main pile 3019 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1315 4-Jan-16 main pile 2999 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1316 4-Jan-16 main pile 2998 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1317 4-Jan-16 main pile 2986 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1318 4-Jan-16 main pile 2987 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1319 4-Jan-16 main pile 1595 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1320 4-Jan-16 main pile 1596 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1321 4-Jan-16 main pile 1597 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1322 4-Jan-16 main pile 1592 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1323 4-Jan-16 main pile 1593 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1324 4-Jan-16 main pile 1594 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1325 4-Jan-16 main pile 1490 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1326 5-Jan-16 main pile 1489 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1327 5-Jan-16 main pile 1491 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1328 5-Jan-16 main pile 1493 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1329 5-Jan-16 main pile 1492 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1330 5-Jan-16 main pile 1495 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1331 5-Jan-16 main pile 1494 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1332 5-Jan-16 main pile 1496 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1333 5-Jan-16 main pile 1498 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1334 5-Jan-16 main pile 1497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1335 5-Jan-16 main pile 2784 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1336 5-Jan-16 main pile 2781 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1337 5-Jan-16 main pile 2789B Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1338 5-Jan-16 main pile 2786 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1339 5-Jan-16 main pile 2789 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1340 5-Jan-16 main pile 2782 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1341 5-Jan-16 Kondo Tower A 700 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 695.50 12.00 TI-24
1342 5-Jan-16 Kondo Tower A 699 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 12.00 TI-24
1343 5-Jan-16 Kondo Tower A 688 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 12.00 TI-24
1344 5-Jan-16 Kondo Tower A 675 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1345 5-Jan-16 main pile 3021 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1346 5-Jan-16 main pile 3020 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1347 5-Jan-16 main pile 3001 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1348 5-Jan-16 main pile 2989 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1349 5-Jan-16 main pile 2988 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1350 5-Jan-16 main pile 2990 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1351 5-Jan-16 main pile 2991 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1352 5-Jan-16 main pile 2992 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1353 5-Jan-16 main pile 2922 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1354 5-Jan-16 main pile 2923 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1355 5-Jan-16 main pile 2924 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1356 5-Jan-16 main pile 2925 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1357 5-Jan-16 main pile 2928 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1358 5-Jan-16 main pile 2929 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1359 5-Jan-16 main pile 2934 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1360 5-Jan-16 main pile 2935 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1361 6-Jan-16 main pile 2608 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1362 6-Jan-16 main pile 2606 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1363 6-Jan-16 main pile 2609 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1364 6-Jan-16 main pile 2614 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1365 6-Jan-16 main pile 2612 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1366 6-Jan-16 main pile 2611 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1367 6-Jan-16 main pile 2610 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1368 6-Jan-16 main pile 2607 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1369 6-Jan-16 main pile 2993 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1370 6-Jan-16 main pile 2994 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1371 6-Jan-16 main pile 2995 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1372 6-Jan-16 main pile 3013 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26
1373 6-Jan-16 main pile 3012 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1374 6-Jan-16 main pile 3011 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1375 6-Jan-16 main pile 3010 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1376 6-Jan-16 main pile 2939 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1377 6-Jan-16 main pile 2938 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1378 6-Jan-16 main pile 2933 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18
1379 6-Jan-16 main pile 2932 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18
1380 6-Jan-16 main pile 2927 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1381 6-Jan-16 main pile 2926 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1382 7-Jan-16 main pile 2624 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1383 7-Jan-16 main pile 2600 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1384 7-Jan-16 main pile 2599 Ǿ600 17 15 32.00 22.00 -10.00 1.00 1 24.20 421.10 12.00 TI-03
1385 7-Jan-16 main pile 2598 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1386 7-Jan-16 main pile 2619 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1387 7-Jan-16 main pile 2620 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1388 7-Jan-16 main pile 2621 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1389 7-Jan-16 main pile 2622 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1390 7-Jan-16 main pile 2623 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1391 7-Jan-16 main pile 1710 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1392 7-Jan-16 main pile 1711 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1393 7-Jan-16 main pile 1712 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1394 7-Jan-16 main pile 1736 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1395 7-Jan-16 main pile 1737 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1396 7-Jan-16 main pile 1738 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1397 7-Jan-16 main pile 1739 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1398 7-Jan-16 main pile 1740 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1399 7-Jan-16 main pile 1741 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
1400 7-Jan-16 main pile 2920 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1401 7-Jan-16 main pile 2921 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1402 7-Jan-16 main pile 2919 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1403 7-Jan-16 main pile 2918 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 509.20 12.00 TI-18
1404 7-Jan-16 main pile 2916 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1405 7-Jan-16 main pile 2917 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1406 7-Jan-16 main pile 2912 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1407 7-Jan-16 main pile 2913 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1408 7-Jan-16 Condo tower A 627 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 12.00 TI-24
1409 7-Jan-16 Condo tower A 640 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1410 7-Jan-16 Condo tower A 651 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 12.00 TI-24
1411 7-Jan-16 Condo tower A 664 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.80 800.90 12.00 TI-24
1412 8-Jan-16 main pile 2627 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
1413 8-Jan-16 main pile 2628 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1414 8-Jan-16 main pile 2629 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1415 8-Jan-16 main pile 2626 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1416 8-Jan-16 main pile 2625 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1417 8-Jan-16 main pile 2630 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1418 8-Jan-16 main pile 2597 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1419 8-Jan-16 main pile 2596 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1420 8-Jan-16 main pile 2595 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1421 8-Jan-16 main pile 1713 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1422 8-Jan-16 main pile 1714 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1423 8-Jan-16 main pile 1715 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1424 8-Jan-16 main pile 1744 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1425 8-Jan-16 main pile 1743 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1426 8-Jan-16 main pile 1742 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1427 8-Jan-16 main pile 1706 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1428 8-Jan-16 main pile 1705 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1429 8-Jan-16 main pile 1704 Ǿ600 15 17 32.00 24.00 -8.00 1.00 23.70 421.10 12.00 TI-21A
1430 8-Jan-16 main pile 2906 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1431 8-Jan-16 main pile 2907 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1432 8-Jan-16 main pile 2900 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1433 8-Jan-16 main pile 2901 Ǿ600 11 17 28.00 43.00 15.00 1.00 20.60 506.80 12.00 TI-18
1434 8-Jan-16 main pile 2902 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1435 8-Jan-16 main pile 2903 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1436 8-Jan-16 main pile 2977 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.50 477.90 12.00 TI-16
1437 8-Jan-16 main pile 2976 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 434.50 12.00 TI-16
1438 8-Jan-16 main pile 2974 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16
1439 8-Jan-16 main pile 2975 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16
1440 8-Jan-16 main pile 2973 Ǿ600 13 15 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16
1441 8-Jan-16 main pile 3008 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1442 8-Jan-16 main pile 3009 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1443 8-Jan-16 main pile 3007 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1444 8-Jan-16 main pile 3006 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26
1445 8-Jan-16 main pile 3005 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1446 8-Jan-16 main pile 3004 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1447 9-Jan-16 main pile 2575 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
1448 9-Jan-16 main pile 2572 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1449 9-Jan-16 main pile 2573 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.1 12.00 TI-03
1450 9-Jan-16 main pile 2571 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1451 9-Jan-16 main pile 2574 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1452 9-Jan-16 main pile 2592 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1453 9-Jan-16 main pile 2591 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1454 9-Jan-16 main pile 2593 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.1 12.00 TI-03
1455 9-Jan-16 main pile 2590 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1456 9-Jan-16 main pile 2594 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1457 9-Jan-16 main pile 2589 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1458 9-Jan-16 main pile 1583 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1459 9-Jan-16 main pile 1620 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1460 9-Jan-16 main pile 1619 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1461 9-Jan-16 main pile 1618 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1462 9-Jan-16 main pile 1582 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 241.10 12.00 TI-21A
1463 9-Jan-16 main pile 1581 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1464 9-Jan-16 main pile 1580 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 241.10 12.00 TI-21A
1465 9-Jan-16 main pile 1585 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1466 9-Jan-16 main pile 1584 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 12.00 TI-21A
1467 9-Jan-16 main pile 2908 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1468 9-Jan-16 main pile 2899 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1469 9-Jan-16 main pile 2898 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 505.30 12.00 TI-18
1470 9-Jan-16 main pile 2909 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1471 9-Jan-16 main pile 2914 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 511.70 12.00 TI-18
1472 9-Jan-16 main pile 2915 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 12.00 TI-18
1473 9-Jan-16 main pile 3026 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1474 9-Jan-16 main pile 3027 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1475 9-Jan-16 main pile 3028 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1476 9-Jan-16 main pile 3029 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1477 9-Jan-16 main pile 3031 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1478 10-Jan-16 main pile 1623 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1479 10-Jan-16 main pile 1622 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1480 10-Jan-16 main pile 1621 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1481 10-Jan-16 main pile 1709 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1482 10-Jan-16 main pile 1708 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1483 10-Jan-16 main pile 1707 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1484 10-Jan-16 main pile 1747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
1485 10-Jan-16 main pile 1746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1486 10-Jan-16 main pile 1745 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1487 10-Jan-16 main pile 2910 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.70 509.20 12.00 TI-18
1488 10-Jan-16 main pile 2911 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 12.00 TI-18
1489 10-Jan-16 main pile 2904 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1490 10-Jan-16 main pile 2905 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1491 10-Jan-16 main pile 2897 Ǿ600 11 17 28.00 28.00 0.00 1.00 20.90 514.10 12.00 TI-18
1492 11-Jan-16 main pile 1952 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1493 11-Jan-16 main pile 1833 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
1494 11-Jan-16 main pile 1832 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
1495 11-Jan-16 main pile 1831 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1496 11-Jan-16 main pile 1871 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1497 11-Jan-16 main pile 1870 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1498 11-Jan-16 main pile 1869 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
1499 11-Jan-16 main pile 1951 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1500 11-Jan-16 main pile 1950 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
1501 11-Jan-16 main pile 2563 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1502 11-Jan-16 main pile 2564 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1503 11-Jan-16 main pile 2562 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1504 11-Jan-16 main pile 2560 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1505 11-Jan-16 main pile 2561 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1506 11-Jan-16 main pile 2570 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1507 11-Jan-16 main pile 2569 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1508 11-Jan-16 main pile 2568 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1509 11-Jan-16 main pile 2567 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1510 11-Jan-16 main pile 2565 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1511 11-Jan-16 main pile 2566 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1512 11-Jan-16 main pile 3030 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1513 11-Jan-16 main pile 3032 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1514 11-Jan-16 main pile 3033 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1515 11-Jan-16 main pile 3034 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1516 11-Jan-16 Condo tower A 579 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 609.20 12.00 TI-24
1517 11-Jan-16 Condo tower A 592 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1518 11-Jan-16 Condo tower A 616 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1519 11-Jan-16 Condo tower A 603 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1520 12-Jan-16 main pile 1949 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1521 12-Jan-16 main pile 1948 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1522 12-Jan-16 main pile 1868 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1523 12-Jan-16 main pile 1867 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
1524 12-Jan-16 main pile 1866 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1525 12-Jan-16 main pile 1830 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1526 12-Jan-16 main pile 1829 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1527 12-Jan-16 main pile 1828 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1528 12-Jan-16 main pile 3035 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1529 12-Jan-16 main pile 3036 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1530 12-Jan-16 main pile 3037 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 301.40 12.00 TI-26
1531 12-Jan-16 main pile 3038 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26
1532 12-Jan-16 main pile 3039 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 12.00 TI-26
1533 12-Jan-16 main pile 3040 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1534 12-Jan-16 main pile 2890 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1535 12-Jan-16 main pile 2896 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1536 12-Jan-16 main pile 2893 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1537 12-Jan-16 main pile 2891 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1538 12-Jan-16 main pile 2892 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1539 12-Jan-16 Condo tower A 568 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1540 12-Jan-16 Condo tower A 555 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1541 12-Jan-16 Condo tower A 544 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 12.00 TI-24
1542 12-Jan-16 Condo tower A 531 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1543 13-Jan-16 main pile 1836 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1544 13-Jan-16 main pile 1860 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1545 13-Jan-16 main pile 1862 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1546 13-Jan-16 main pile 1953 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1547 13-Jan-16 main pile 1954 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1548 13-Jan-16 main pile 1955 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1549 13-Jan-16 main pile 1957 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1550 13-Jan-16 main pile 1956 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1551 13-Jan-16 Condo tower A 520 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1552 13-Jan-16 Condo tower A 507 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1553 13-Jan-16 Condo tower A 496 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 590.10 12.00 TI-24
1554 13-Jan-16 Condo tower A 483 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1555 13-Jan-16 Condo tower A 472 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1556 14-Jan-16 main pile 1863 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1557 14-Jan-16 main pile 1864 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1558 14-Jan-16 main pile 1865 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1559 14-Jan-16 main pile 1837 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
1560 14-Jan-16 main pile 1838 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
1561 14-Jan-16 main pile 1839 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1562 14-Jan-16 main pile 1834 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1563 14-Jan-16 main pile 1835 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1564 14-Jan-16 main pile 1861 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1565 14-Jan-16 main pile 2971 Ǿ600 11 17 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16
1566 14-Jan-16 main pile 2972 Ǿ600 11 17 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16
1567 14-Jan-16 main pile 2970 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16
1568 14-Jan-16 main pile 2968 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 12.00 TI-16
1569 14-Jan-16 main pile 2969 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 12.00 TI-16
1570 14-Jan-16 main pile 2965 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16
1571 14-Jan-16 Condo tower A 452 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 618.20 12.00 TI-24
1572 14-Jan-16 Condo tower A 448 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1573 14-Jan-16 Condo tower A 459 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1574 15-Jan-16 main pile 1944 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1575 15-Jan-16 main pile 1943 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1576 15-Jan-16 main pile 1874 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1577 15-Jan-16 main pile 1873 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1578 15-Jan-16 main pile 1872 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1579 15-Jan-16 main pile 1824 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1580 15-Jan-16 main pile 1823 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1581 15-Jan-16 main pile 1822 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1582 15-Jan-16 main pile 3041 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1583 15-Jan-16 main pile 3042 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1584 15-Jan-16 main pile 3043 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1585 15-Jan-16 main pile 3044 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1586 15-Jan-16 main pile 3045 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1587 15-Jan-16 main pile 3047 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1588 15-Jan-16 main pile 3046 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1589 15-Jan-16 Condo tower A 503 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1590 15-Jan-16 Condo tower A 479 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1591 15-Jan-16 Condo tower A 476 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1592 15-Jan-16 Condo tower A 455 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
1593 15-Jan-16 Condo tower A 500 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1594 16-Jan-16 main pile 1750 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1595 16-Jan-16 main pile 1749 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1596 16-Jan-16 main pile 1748 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1597 16-Jan-16 main pile 1700 Ǿ600 15 17 32.00 34.40 2.40 1.00 23.70 421.10 TI-21A
1598 16-Jan-16 main pile 1699 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
1599 16-Jan-16 Condo tower A 524 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1600 16-Jan-16 Condo tower A 527 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1601 16-Jan-16 Condo tower A 548 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1602 16-Jan-16 Condo tower A 551 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1603 16-Jan-16 Condo tower A 572 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.70 797.40 TI-24
1604 17-Jan-16 Condo tower A 575 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1605 17-Jan-16 Condo tower A 596 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
1606 17-Jan-16 Condo tower A 599 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1607 17-Jan-16 Condo tower A 620 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1608 18-Jan-16 main pile 1698 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1609 18-Jan-16 main pile 1626 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1610 18-Jan-16 main pile 1625 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1611 18-Jan-16 main pile 1624 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1612 18-Jan-16 main pile 1576 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1613 18-Jan-16 main pile 1575 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1614 18-Jan-16 main pile 1574 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1615 18-Jan-16 main pile 1579 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1616 18-Jan-16 main pile 2967 Ǿ600 11 17 28.00 33.00 5.00 1.00 17.50 506.90 TI-16
1617 18-Jan-16 main pile 2966 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1618 18-Jan-16 main pile 2964 Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16
1619 18-Jan-16 main pile 2962 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16
1620 18-Jan-16 main pile 2963 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16
1621 18-Jan-16 main pile 2886 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 TI-18
1622 18-Jan-16 main pile 2883 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18
1623 18-Jan-16 main pile 2884 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18
1624 18-Jan-16 main pile 2888 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 TI-18
1625 18-Jan-16 main pile 2887 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 504.30 TI-18
1626 18-Jan-16 main pile 2885 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.50 504.30 TI-18
1627 18-Jan-16 main pile 2889 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1628 19-Jan-16 main pile 1578 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1629 19-Jan-16 main pile 1577 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1630 19-Jan-16 main pile 1629 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
1631 19-Jan-16 main pile 1628 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1632 19-Jan-16 main pile 1627 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1633 19-Jan-16 main pile 1703 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1634 19-Jan-16 main pile 1702 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1635 19-Jan-16 main pile 1701 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1636 19-Jan-16 main pile 2961 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1637 19-Jan-16 main pile 2960 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1638 19-Jan-16 main pile 2959 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1639 19-Jan-16 main pile 2958 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1640 19-Jan-16 main pile 3022 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1641 19-Jan-16 main pile 3023 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1642 19-Jan-16 main pile 3000 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1643 19-Jan-16 main pile 3002 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1644 19-Jan-16 main pile 3003 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1645 19-Jan-16 main pile 3024 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1646 19-Jan-16 main pile 3025 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1647 19-Jan-16 Condo tower A 623 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1648 19-Jan-16 Condo tower A 644 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
1649 19-Jan-16 Condo tower A 647 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.70 586.60 TI-24
1650 19-Jan-16 Condo tower A 668 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
1651 19-Jan-16 Condo tower A 671 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1652 19-Jan-16 Condo tower A 692 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1653 20-Jan-16 main pile 3050 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1654 20-Jan-16 main pile 3048 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
1655 20-Jan-16 main pile 3049 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1656 20-Jan-16 main pile 3051 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1657 20-Jan-16 main pile 3056 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1658 20-Jan-16 main pile 3057 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
1659 20-Jan-16 Condo tower A 695 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1660 20-Jan-16 Condo tower A 716 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1661 20-Jan-16 Condo tower A 719 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 637.30 TI-24
1662 20-Jan-16 Condo tower A 740 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1663 20-Jan-16 Condo tower A 743 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1664 20-Jan-16 Condo tower A 764 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1665 21-Jan-16 main pile 2061A Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1666 21-Jan-16 main pile 2168B Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 420.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1667 21-Jan-16 main pile 2168A Ǿ600 15 17 32.00 29.50 -2.50 1.00 23.70 420.00 TI-07
1668 21-Jan-16 main pile 1753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1669 21-Jan-16 main pile 1752 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1670 21-Jan-16 main pile 1751 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1671 21-Jan-16 main pile 1827 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1672 21-Jan-16 main pile 1826 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1673 21-Jan-16 main pile 1825 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1674 21-Jan-16 main pile office 1016 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1675 21-Jan-16 main pile office 1017 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
1676 21-Jan-16 main pile office 1018 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1677 21-Jan-16 main pile office 1019 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1678 21-Jan-16 main pile office 1020 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1679 21-Jan-16 main pile 3064 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1680 21-Jan-16 main pile 3065 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1681 21-Jan-16 main pile 3067 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1682 21-Jan-16 main pile 3066 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1683 21-Jan-16 main pile 3059A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1684 21-Jan-16 main pile 3058 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1685 21-Jan-16 main pile 3015 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1686 21-Jan-16 main pile 3014 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1687 21-Jan-16 Condo tower A 767 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1688 21-Jan-16 Condo tower A 788 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1689 21-Jan-16 Condo tower A 791 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
1690 21-Jan-16 Condo tower A 812 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1691 21-Jan-16 Condo tower A 815 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
1692 21-Jan-16 Condo tower A 836 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1693 22-Jan-16 main pile 1937 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1694 22-Jan-16 main pile 1946 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1695 22-Jan-16 main pile 1947 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1696 22-Jan-16 main pile 1945 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1697 22-Jan-16 main pile 1877 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1698 22-Jan-16 main pile 1876 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
1699 22-Jan-16 main pile 1875 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1700 22-Jan-16 main pile office 1024 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
1701 22-Jan-16 main pile office 1023 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1702 22-Jan-16 main pile office 1021 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1703 22-Jan-16 main pile office 1022 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
1704 22-Jan-16 main pile office 1027 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1705 22-Jan-16 main pile office 1026 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1706 22-Jan-16 main pile office 1025 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1707 22-Jan-16 main pile 2949 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1708 22-Jan-16 main pile 2948 Ǿ600 11 17 28.00 35.00 7.00 1.00 13.50 339.10 TI-26
1709 22-Jan-16 main pile 2946 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1710 22-Jan-16 main pile 2947 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1711 22-Jan-16 main pile 2945 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1712 22-Jan-16 Condo tower A 839 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1713 22-Jan-16 Condo tower A 860 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1714 22-Jan-16 Condo tower A 863 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1715 22-Jan-16 Condo tower A 884 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1716 23-Jan-16 main pile 1882 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
1717 23-Jan-16 main pile 1881 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1718 23-Jan-16 main pile 1885 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1719 23-Jan-16 main pile 1819 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1720 23-Jan-16 main pile 1820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1721 23-Jan-16 main pile 1821 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1722 23-Jan-16 main pile 1757 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1723 23-Jan-16 main pile office 1033 Ǿ600 15 17 32.00 35.0 3.00 1.00 20.70 509.20 TI-18
1724 23-Jan-16 main pile office 1032 Ǿ600 15 17 32.00 35.0 3.00 1.00 20.60 506.80 TI-18
1725 23-Jan-16 main pile office 1031 Ǿ600 15 17 32.00 34.0 2.00 1.00 20.50 504.30 TI-18
1726 23-Jan-16 main pile office 1030 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
1727 23-Jan-16 main pile office 1029 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
1728 23-Jan-16 main pile office 1028 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1729 23-Jan-16 Condo tower A 763 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1730 23-Jan-16 Condo tower A 768 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1731 23-Jan-16 Condo tower A 787 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1732 23-Jan-16 Condo tower A 792 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
1733 23-Jan-16 Condo tower A 811 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
1734 23-Jan-16 Condo tower A 816 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1735 24-Jan-16 main pile office 1041 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1736 24-Jan-16 main pile office 1040 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1737 24-Jan-16 main pile office 1039 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
1738 24-Jan-16 main pile office 1038 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1739 24-Jan-16 main pile office 1037 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1740 24-Jan-16 main pile office 1036 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1741 24-Jan-16 main pile office 1035 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1742 24-Jan-16 main pile office 1034 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
1743 25-Jan-16 main pile office 1043 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
1744 25-Jan-16 main pile office 1044 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1745 25-Jan-16 main pile office 1045 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1746 25-Jan-16 main pile office 1046 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1747 25-Jan-16 main pile office 1047 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.90 514.10 TI-18
1748 25-Jan-16 main pile office 1048 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
1749 25-Jan-16 main pile 1932 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1750 25-Jan-16 main pile 1934 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1751 25-Jan-16 main pile 1930 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
1752 25-Jan-16 main pile 1936 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1753 25-Jan-16 Condo tower A 744 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
1754 25-Jan-16 Condo tower A 739 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1755 25-Jan-16 Condo tower A 720 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.60 793.90 TI-24
1756 26-Jan-16 main pile office 1058 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1757 26-Jan-16 main pile office 1057 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.90 514.10 TI-18
1758 26-Jan-16 main pile office 1056 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1759 26-Jan-16 main pile office 1055 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1760 26-Jan-16 main pile office 1054 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1761 26-Jan-16 main pile office 1053 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1762 26-Jan-16 main pile office 1052 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1763 26-Jan-16 main pile office 1051 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1764 26-Jan-16 main pile office 1050 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
1765 26-Jan-16 main pile office 1049 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 505.30 TI-18
1766 26-Jan-16 main pile 1893 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1767 26-Jan-16 main pile 1894 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1768 26-Jan-16 main pile 1895 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1769 26-Jan-16 main pile 1892 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1770 26-Jan-16 main pile 1891 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1771 26-Jan-16 main pile 1890 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1772 26-Jan-16 main pile 1758 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
1773 26-Jan-16 main pile 1695 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1774 26-Jan-16 main pile 1759 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
1775 26-Jan-16 main pile 1696 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1776 26-Jan-16 main pile 1571 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1777 26-Jan-16 main pile 1572 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1778 26-Jan-16 main pile 1573 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1779 26-Jan-16 main pile 1512 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A
1780 26-Jan-16 main pile 1513 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1781 26-Jan-16 main pile 1514 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A
1782 26-Jan-16 main pile 2944 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1783 26-Jan-16 main pile 2950 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
1784 26-Jan-16 main pile 2954 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.50 414.40 TI-26
1785 26-Jan-16 main pile 2955 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.40 TI-26
1786 26-Jan-16 main pile 2953 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1787 26-Jan-16 main pile 2951 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1788 26-Jan-16 main pile 3063 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1789 26-Jan-16 main pile 3062 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1790 26-Jan-16 main pile 3054 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1791 26-Jan-16 Condo tower A 715 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1792 26-Jan-16 Condo tower A 696 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1793 26-Jan-16 Condo tower A 691 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1794 26-Jan-16 Condo tower A 672 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1795 26-Jan-16 Condo tower A 667 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1796 26-Jan-16 Condo tower A 648 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1797 26-Jan-16 Condo tower A 643 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1798 27-Jan-16 main pile office 1064 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1799 27-Jan-16 main pile office 1063 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1800 27-Jan-16 main pile office 1062 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 TI-18
1801 27-Jan-16 main pile office 1061 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1802 27-Jan-16 main pile office 1060 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
1803 27-Jan-16 main pile office 1059 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
1804 27-Jan-16 main pile 3052 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1805 27-Jan-16 main pile 3053 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1806 27-Jan-16 main pile 3060 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1807 27-Jan-16 main pile 3061 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1808 27-Jan-16 main pile 3068 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1809 27-Jan-16 main pile 3069 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1810 27-Jan-16 main pile 3076 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1811 27-Jan-16 main pile 3077 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1812 27-Jan-16 Condo tower A 624 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1813 27-Jan-16 Condo tower A 619 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1814 27-Jan-16 Condo tower A 600 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1815 27-Jan-16 Condo tower A 595 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1816 27-Jan-16 Condo tower A 576 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1817 27-Jan-16 Condo tower A 571 Ǿ800 17 17 34.00 37.00 3.00 1.00 22.80 800.90 TI-24
1818 28-Jan-16 main pile office 1071 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1819 28-Jan-16 main pile office 1070 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1820 28-Jan-16 main pile office 1069 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1821 28-Jan-16 main pile office 1068 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
1822 28-Jan-16 main pile office 1067 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
1823 28-Jan-16 main pile office 1066 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1824 28-Jan-16 main pile office 1065 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
1825 28-Jan-16 main pile 3084 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1826 28-Jan-16 main pile 3085 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1827 28-Jan-16 main pile 3092 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1828 28-Jan-16 main pile 3093 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1829 28-Jan-16 main pile 3100 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1830 28-Jan-16 main pile 3101 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1831 28-Jan-16 main pile 3108 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1832 28-Jan-16 main pile 3109 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1833 28-Jan-16 main pile 3116 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1834 28-Jan-16 main pile 3117 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1835 28-Jan-16 Condo tower A 552 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1836 28-Jan-16 Condo tower A 547 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1837 28-Jan-16 Condo tower A 528 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
1838 28-Jan-16 Condo tower A 523 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1839 28-Jan-16 Condo tower A 504 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
1840 28-Jan-16 Condo tower A 499 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1841 28-Jan-16 Condo tower A 480 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.70 621.70 TI-24
1842 29-Jan-16 main pile office 1073 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
1843 29-Jan-16 main pile office 1074 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1844 29-Jan-16 main pile office 1075 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1845 29-Jan-16 main pile office 1076 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1846 29-Jan-16 main pile office 1077 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1847 29-Jan-16 main pile office 1078 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1848 29-Jan-16 main pile office 1079 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1849 29-Jan-16 main pile 1509 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
1850 29-Jan-16 main pile 1510 Ǿ600 15 17 32.00 22.00 -10.00 1.00 24.00 426.50 TI-21A
1851 29-Jan-16 main pile 1635 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1852 29-Jan-16 main pile 1568 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1853 29-Jan-16 main pile 1569 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1854 29-Jan-16 main pile 1570 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1855 29-Jan-16 main pile 1511 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1856 29-Jan-16 main pile 3124 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1857 29-Jan-16 main pile 3125 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1858 29-Jan-16 main pile 3132 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1859 29-Jan-16 main pile 3133 Ǿ600 11 17 28.00 33.00 5.00 1.00 12.50 313.90 TI-26
1860 29-Jan-16 main pile 3140 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1861 29-Jan-16 main pile 3141 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1862 29-Jan-16 main pile 3148 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1863 29-Jan-16 main pile 3149 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1864 29-Jan-16 Condo tower A 453 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
1865 29-Jan-16 Condo tower A 451 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1866 29-Jan-16 Condo tower A 456 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1867 29-Jan-16 Condo tower A 475 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1868 30-Jan-16 main pile office 1080 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
1869 30-Jan-16 main pile office 1081 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1870 30-Jan-16 main pile office 1082 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
1871 30-Jan-16 main pile office 1083 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1872 30-Jan-16 main pile office 1084 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
1873 30-Jan-16 main pile 1896 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
1874 30-Jan-16 main pile 1897 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
1875 30-Jan-16 main pile 1898 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
1876 30-Jan-16 main pile 1924 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1877 30-Jan-16 main pile 1925 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1878 30-Jan-16 main pile 1899 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1879 30-Jan-16 main pile 3156 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1880 30-Jan-16 main pile 3157 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1881 30-Jan-16 Condo tower A 454 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.80 800.90 TI-24
1882 30-Jan-16 Condo tower A 477 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1883 30-Jan-16 Condo tower A 478 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1884 30-Jan-16 Condo tower A 501 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1885 30-Jan-16 Condo tower A 502 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 624.70 TI-24
1886 30-Jan-16 Condo tower A 526 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1887 31-Jan-16 main pile 1900 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1888 31-Jan-16 main pile 1901 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1889 31-Jan-16 main pile 1801 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1890 31-Jan-16 main pile 1802 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1891 31-Jan-16 main pile 1803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1892 31-Jan-16 Condo tower A 549 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1893 31-Jan-16 Condo tower A 550 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1894 31-Jan-16 Condo tower A 573 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 632.30 TI-24
1895 31-Jan-16 Condo tower A 574 Ǿ800 17 17 34.00 40.03 6.03 1.00 22.80 800.90 TI-24
1896 1-Feb-16 Condo tower A 597 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1897 1-Feb-16 Condo tower A 598 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1898 1-Feb-16 Condo tower A 621 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1899 1-Feb-16 Condo tower A 622 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1900 1-Feb-16 Condo tower A 645 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1901 1-Feb-16 Condo tower A 646 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1902 1-Feb-16 Condo tower A 669 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1903 2-Feb-16 Condo tower A 670 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1904 2-Feb-16 Condo tower A 693 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1905 2-Feb-16 Condo tower A 694 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1906 2-Feb-16 Condo tower A 717 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
1907 2-Feb-16 Condo tower A 718 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1908 2-Feb-16 Condo tower A 741 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
1909 2-Feb-16 Condo tower B 440 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 828.10 TI-26
1910 2-Feb-16 Condo tower B 423 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
1911 2-Feb-16 Condo tower B 420 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
1912 2-Feb-16 main pile 1775 Ǿ600 15 17 32.00 33.20 1.20 1.00 23.70 420.00 TI-07
1913 2-Feb-16 main pile 1776 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
1914 2-Feb-16 main pile 1777 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1915 2-Feb-16 main pile 1677 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
1916 2-Feb-16 main pile 1678 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1917 2-Feb-16 main pile 1679 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1918 2-Feb-16 main pile 1651 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1919 2-Feb-16 main pile 1634 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
1920 2-Feb-16 main pile 1633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1921 2-Feb-16 main pile 1697 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1922 2-Feb-16 main pile 1630 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
1923 2-Feb-16 main pile 1631 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1924 2-Feb-16 main pile 1632 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
1925 2-Feb-16 main pile 1692 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
1926 2-Feb-16 main pile 1693 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-21A
1927 2-Feb-16 main pile 1694 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
1928 2-Feb-16 main pile 1754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1929 2-Feb-16 main pile 1755 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A
1930 2-Feb-16 main pile 3159 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1931 2-Feb-16 main pile 3158 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1932 2-Feb-16 main pile 3151 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1933 3-Feb-16 Condo tower A 742 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
1934 3-Feb-16 Condo tower A 765 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1935 3-Feb-16 Condo tower A 766 Ǿ800 17 17 34.00 34.00 0.00 1.00 20.50 720.10 TI-24
1936 3-Feb-16 Condo tower A 789 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
1937 3-Feb-16 Condo tower A 790 Ǿ800 17 17 34.00 36.00 2.00 1.00 20.30 713.10 TI-24
1938 3-Feb-16 Condo tower A 814 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1939 3-Feb-16 Condo tower A 837 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.60 TI-24
1940 3-Feb-16 main pile 1652 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1941 3-Feb-16 main pile 1653 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
1942 3-Feb-16 main pile 1553 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
1943 3-Feb-16 main pile 1554 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
1944 3-Feb-16 main pile 1555 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 TI-07
1945 3-Feb-16 main pile 1756 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
1946 3-Feb-16 main pile 1816 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1947 3-Feb-16 main pile 1817 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1948 3-Feb-16 main pile 1818 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1949 3-Feb-16 main pile 1880 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1950 3-Feb-16 main pile 3150 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1951 3-Feb-16 main pile 3143 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1952 3-Feb-16 main pile 3142 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1953 3-Feb-16 main pile 3135 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1954 3-Feb-16 soldier pile 4495s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1955 3-Feb-16 soldier pile 4509s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16
1956 3-Feb-16 soldier pile 4513s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16
1957 3-Feb-16 soldier pile 4516s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1958 3-Feb-16 soldier pile 4517s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1959 4-Feb-16 Condo tower A 838 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
1960 4-Feb-16 Condo tower A 861 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.20 818.00 TI-24
1961 4-Feb-16 Condo tower A 862 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1962 4-Feb-16 Condo tower A 885 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
1963 4-Feb-16 Condo tower B 399 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
1964 4-Feb-16 Condo tower B 396 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
1965 4-Feb-16 Condo tower B 375 Ǿ800 17 17 34.00 40.00 6.00 1.00 18.50 697.00 TI-26
1966 4-Feb-16 Condo tower B 329 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
1967 4-Feb-16 main pile 3134 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1968 4-Feb-16 main pile 3127 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1969 4-Feb-16 main pile 3126 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.60 506.80 TI-18
1970 4-Feb-16 main pile 3119 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18
1971 4-Feb-16 main pile 3118 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1972 4-Feb-16 main pile 3111 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 514.10 TI-18
1973 4-Feb-16 soldier pile 4518s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16
1974 4-Feb-16 soldier pile 4519s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16
1975 4-Feb-16 soldier pile 4520 Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16
1976 4-Feb-16 soldier pile 4521s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
1977 4-Feb-16 soldier pile 4522s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1978 4-Feb-16 soldier pile 4523s Ǿ600 17 17.00 24.00 7.00 1.00 13.50 391.00 TI-16
1979 5-Feb-16 Condo tower A 883 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1980 5-Feb-16 Condo tower A 864 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
1981 5-Feb-16 Condo tower A 859 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.20 779.80 TI-24
1982 5-Feb-16 Condo tower A 840 Ǿ800 17 17 34.00 32.00 -2.00 1.00 19.00 667.40 TI-24
1983 5-Feb-16 Condo tower A 817 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1984 5-Feb-16 main pile 3110 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1985 5-Feb-16 main pile 3103 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1986 5-Feb-16 main pile 3102 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1987 5-Feb-16 main pile 3095 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18
1988 5-Feb-16 main pile 3094 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1989 5-Feb-16 main pile 3087 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 TI-18
1990 5-Feb-16 main pile 3086 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.80 511.70 TI-18
1991 5-Feb-16 main pile 3079 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.90 515.10 TI-18
1992 6-Feb-16 Condo tower A 810 Ǿ800 17 17 34.00 33.00 -1.00 1.00 18.50 649.80 TI-24
1993 6-Feb-16 Condo tower A 793 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
1994 6-Feb-16 Condo tower A 786 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1995 6-Feb-16 Condo tower A 769 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 755.70 TI-24
1996 6-Feb-16 Condo tower A 762 Ǿ800 17 17 34.00 36.50 2.50 1.00 22.90 804.40 TI-24
1997 6-Feb-16 soldier pile 4630s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16
1998 6-Feb-16 soldier pile 4654s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16
1999 6-Feb-16 soldier pile 4661s Ǿ600 17 17.00 24.50 7.50 1.00 10.00 289.60 TI-16
2000 6-Feb-16 soldier pile 4667s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16
2001 6-Feb-16 soldier pile 4675s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16
2002 6-Feb-16 soldier pile 4683s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16
2003 8-Feb-16 Condo tower A 745 Ǿ800 17 17 34.00 35.00 1.00 1.00 23.00 807.90 TI-24
2004 8-Feb-16 Condo tower A 738 Ǿ800 17 17 34.00 38.20 4.20 1.00 23.10 811.40 TI-24
2005 8-Feb-16 Condo tower A 721 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2006 9-Feb-16 Condo tower A 714 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 674.40 TI-24
2007 9-Feb-16 Condo tower A 697 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
2008 9-Feb-16 Condo tower A 690 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2009 9-Feb-16 Condo tower A 673 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 692.00 TI-24
2010 9-Feb-16 Condo tower A 666 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 496.50 TI-24
2011 9-Feb-16 Condo tower A 649 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2012 9-Feb-16 Condo tower A 642 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
2013 9-Feb-16 main pile 2862 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2014 9-Feb-16 main pile 2863 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2015 9-Feb-16 main pile 2867 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2016 9-Feb-16 main pile 2866 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2017 9-Feb-16 main pile 2870 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2018 9-Feb-16 main pile 2871 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2019 9-Feb-16 main pile 2872 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2020 9-Feb-16 main pile 2873 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2021 9-Feb-16 main pile 2874 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2022 9-Feb-16 main pile 2875 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2023 9-Feb-16 main pile 1550 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
2024 9-Feb-16 main pile 1551 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2025 9-Feb-16 main pile 1552 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2026 9-Feb-16 main pile 1648 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2027 9-Feb-16 main pile 1809 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2028 9-Feb-16 main pile 1808 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2029 9-Feb-16 main pile 1807 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2030 9-Feb-16 main pile 1804 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2031 9-Feb-16 main pile 1879 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2032 9-Feb-16 main pile 1878 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2033 9-Feb-16 main pile 1942 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2034 9-Feb-16 main pile 1500 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2035 9-Feb-16 main pile 1499 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
2036 9-Feb-16 main pile 1501 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 TI-21A
2037 9-Feb-16 main pile office 1086 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2038 9-Feb-16 main pile office 1087 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2039 9-Feb-16 main pile office 1088 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2040 9-Feb-16 main pile office 1089 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2041 9-Feb-16 main pile office 1090 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2042 9-Feb-16 main pile office 1091 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
2043 10-Feb-16 Condo tower A 625 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
2044 10-Feb-16 Condo tower A 618 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
2045 10-Feb-16 Condo tower A 601 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
2046 10-Feb-16 Condo tower A 594 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
2047 10-Feb-16 Condo tower A 577 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
2048 10-Feb-16 main pile 2876 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2049 10-Feb-16 main pile 2877 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2050 10-Feb-16 main pile 2878 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2051 10-Feb-16 main pile 2879 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2052 10-Feb-16 main pile 3070 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2053 10-Feb-16 main pile 3071 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2054 10-Feb-16 main pile 3078 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2055 10-Feb-16 main pile 3072 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2056 10-Feb-16 main pile 3073 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2057 10-Feb-16 main pile 3080 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2058 10-Feb-16 main pile 3081 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2059 10-Feb-16 main pile 1805 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 420.00 TI-07
2060 10-Feb-16 main pile 1806 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
2061 10-Feb-16 main pile 1768 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2062 10-Feb-16 main pile 1767 Ǿ600 15 17 32.00 32.80 0.80 1.00 23.70 420.00 TI-07
2063 10-Feb-16 main pile 1766 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2064 10-Feb-16 main pile 1502 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
2065 10-Feb-16 main pile 1503 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A
2066 10-Feb-16 main pile 1504 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2067 10-Feb-16 main pile 1505 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2068 10-Feb-16 main pile 1506 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2069 10-Feb-16 main pile office 1092 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2070 10-Feb-16 main pile office 1093 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2071 10-Feb-16 main pile office 1094 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2072 10-Feb-16 main pile office 1095 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2073 10-Feb-16 main pile office 1102 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2074 10-Feb-16 main pile office 1103 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2075 11-Feb-16 Condo tower A 570 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.40 646.30 TI-24
2076 11-Feb-16 Condo tower A 553 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 660.40 TI-24
2077 11-Feb-16 Condo tower A 546 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
2078 11-Feb-16 Condo tower A 529 Ǿ800 17 17 34.00 31.00 -3.00 1.00 22.50 507.80 TI-24
2079 11-Feb-16 main pile 3088 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2080 11-Feb-16 main pile 3089 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2081 11-Feb-16 main pile 3096 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2082 11-Feb-16 main pile 3097 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16
2083 11-Feb-16 main pile 3104 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2084 11-Feb-16 main pile 3105 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2085 11-Feb-16 main pile 1508 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2086 11-Feb-16 main pile 1507 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2087 11-Feb-16 main pile 1515 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
2088 11-Feb-16 main pile 1516 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2089 12-Feb-16 Condo tower A 522 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
2090 12-Feb-16 Condo tower A 505 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2091 12-Feb-16 Condo tower A 498 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 660.40 TI-24
2092 12-Feb-16 Condo tower A 481 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2093 12-Feb-16 Condo tower A 474 Ǿ800 17 17 34.00 26.00 -8.00 1.00 20.50 462.70 TI-24
2094 12-Feb-16 main pile 3112 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2095 12-Feb-16 main pile 3113 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2096 12-Feb-16 main pile 3120 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 463.40 TI-16
2097 12-Feb-16 main pile 3121 Ǿ600 11 17 28.00 30.00 2.00 1.00 12.50 362.10 TI-16
2098 12-Feb-16 main pile 3128 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2099 12-Feb-16 main pile 3129 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2100 12-Feb-16 main pile office 1104 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2101 12-Feb-16 main pile office 1105 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2102 12-Feb-16 main pile office 1106 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2103 12-Feb-16 main pile office 1107 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2104 12-Feb-16 main pile office 1108 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2105 12-Feb-16 main pile office 1109 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2106 12-Feb-16 main pile office 1110 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2107 12-Feb-16 main pile office 1111 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2108 13-Feb-16 main pile 3136 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2109 13-Feb-16 main pile 3137 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2110 13-Feb-16 main pile 3144 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2111 13-Feb-16 main pile 3145 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2112 13-Feb-16 main pile 2943 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2113 13-Feb-16 main pile 2942 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2114 13-Feb-16 main pile 2937 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2115 13-Feb-16 main pile 2936 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2116 13-Feb-16 main pile 2931 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2117 13-Feb-16 main pile office 1125 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
2118 13-Feb-16 main pile office 1124 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2119 13-Feb-16 main pile office 1114 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2120 13-Feb-16 main pile office 1113 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
2121 13-Feb-16 main pile office 1112 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2122 13-Feb-16 main pile 1517 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2123 13-Feb-16 main pile 1519 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2124 13-Feb-16 main pile 1518 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2125 13-Feb-16 main pile 1567 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2126 13-Feb-16 main pile 1566 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2127 13-Feb-16 main pile 1565 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2128 13-Feb-16 main pile 1771 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 421.00 TI-07
2129 13-Feb-16 main pile 1770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
2130 13-Feb-16 main pile 1769 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
2131 13-Feb-16 main pile 1773 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
2132 13-Feb-16 main pile 1774 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
2133 13-Feb-16 main pile 1798 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
2134 13-Feb-16 main pile 1799 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
2135 13-Feb-16 main pile 1800 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 421.00 TI-07
2136 14-Feb-16 main pile 3153 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2137 14-Feb-16 main pile 3152 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2138 14-Feb-16 main pile 3160 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2139 14-Feb-16 main pile office 1126 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2140 14-Feb-16 main pile office 1127 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2141 14-Feb-16 main pile office 1128 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2142 14-Feb-16 main pile office 1129 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2143 15-Feb-16 main pile 3163 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16
2144 15-Feb-16 main pile 3162 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 448.90 TI-16
2145 15-Feb-16 main pile 3155 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2146 15-Feb-16 main pile 3154 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2147 15-Feb-16 main pile 3147 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2148 15-Feb-16 main pile office 1123 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2149 15-Feb-16 main pile office 1122 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2150 15-Feb-16 main pile office 1121 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2151 15-Feb-16 main pile office 1120 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2152 15-Feb-16 main pile office 1119 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2153 15-Feb-16 main pile office 1140 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2154 16-Feb-16 main pile 3146 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2155 16-Feb-16 main pile 3139 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16
2156 16-Feb-16 main pile 3138 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2157 16-Feb-16 main pile 3131 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2158 16-Feb-16 main pile 3130 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2159 16-Feb-16 main pile 3123 Ǿ600 11 17 28.00 19.00 -9.00 1.00 8.00 100.50 TI-16
2160 16-Feb-16 main pile 3122 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2161 16-Feb-16 main pile 2930 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
2162 16-Feb-16 main pile 3165 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2163 16-Feb-16 main pile 3164 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2164 16-Feb-16 main pile 2894 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2165 16-Feb-16 main pile 2895 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2166 16-Feb-16 main pile 2881 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2167 16-Feb-16 main pile office 1139 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2168 16-Feb-16 main pile office 1138 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2169 16-Feb-16 main pile office 1137 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2170 16-Feb-16 main pile office 1136 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2171 16-Feb-16 main pile office 1135 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2172 16-Feb-16 main pile office 1134 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2173 16-Feb-16 main pile office 1133 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2174 16-Feb-16 main pile office 1132 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2175 17-Feb-16 main pile 2848 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2176 17-Feb-16 main pile 2849 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2177 17-Feb-16 main pile 2847 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2178 17-Feb-16 main pile 2846 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2179 17-Feb-16 main pile 2853 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2180 17-Feb-16 main pile office 1131 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2181 17-Feb-16 main pile office 1130 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2182 17-Feb-16 main pile office 1151 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2183 17-Feb-16 main pile office 1150 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2184 17-Feb-16 main pile office 1149 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2185 17-Feb-16 main pile office 1148 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2186 17-Feb-16 main pile office 1147 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2187 17-Feb-16 main pile office 1146 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2188 18-Feb-16 main pile 2852 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2189 18-Feb-16 main pile 2845 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2190 18-Feb-16 main pile 2844 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
2191 18-Feb-16 main pile 2843 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2192 18-Feb-16 main pile 2842 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2193 18-Feb-16 main pile 2840 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2194 18-Feb-16 main pile 2841 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2195 18-Feb-16 main pile 2839 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2196 18-Feb-16 main pile 2838 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2197 18-Feb-16 main pile office 1145 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2198 18-Feb-16 main pile office 1144 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2199 18-Feb-16 main pile office 1142 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2200 18-Feb-16 main pile office 1141 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2201 18-Feb-16 main pile office 1162 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2202 18-Feb-16 main pile office 1161 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2203 18-Feb-16 main pile office 1160 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.90 514.10 TI-18
2204 18-Feb-16 main pile office 1159 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2205 18-Feb-16 main pile office 1158 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2206 19-Feb-16 main pile 3123A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2207 19-Feb-16 main pile 3115 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2208 19-Feb-16 main pile 3114 Ǿ600 11 17 28.00 16.00 -12.00 1.00 9.00 113.00 TI-16
2209 19-Feb-16 main pile 1564 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2210 19-Feb-16 main pile 1563 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2211 19-Feb-16 main pile 1562 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2212 19-Feb-16 main pile 1966B Ǿ600 15 17 32.00 28.50 -3.50 1.00 24.00 426.50 TI-21A
2213 19-Feb-16 main pile 1966A Ǿ600 15 17 32.00 17.00 -15.00 1.00 24.00 426.50 TI-21A
2214 19-Feb-16 main pile 1725A Ǿ600 15 17 32.00 18.00 -14.00 1.00 24.00 426.50 TI-21A
2215 19-Feb-16 main pile office 1156 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2216 19-Feb-16 main pile office 1155 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2217 19-Feb-16 main pile office 1154 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2218 19-Feb-16 main pile office 1153 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2219 20-Feb-16 main pile office 1152 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2220 20-Feb-16 main pile office 1173 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2221 20-Feb-16 main pile office 1172 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2222 20-Feb-16 main pile office 1171 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2223 20-Feb-16 main pile office 1170 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2224 21-Feb-16 main pile office 1169 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2225 21-Feb-16 main pile office 1168 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2226 21-Feb-16 main pile office 1167 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2227 21-Feb-16 main pile office 1166 Ǿ600 15 17 32.00 32.00 0.00 1.00 20.60 506.80 TI-18
2228 21-Feb-16 main pile office 1165 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2229 22-Feb-16 main pile office 1163 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2230 22-Feb-16 main pile office 1164 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 TI-18
2231 22-Feb-16 main pile office 1182 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2232 23-Feb-16 main pile office 1181 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2233 23-Feb-16 main pile office 1180 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2234 23-Feb-16 main pile office 1179 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
2235 23-Feb-16 main pile office 1178 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.80 511.70 TI-18
2236 23-Feb-16 soldier pile 4306s Ǿ600 17 17.00 20.00 3.00 1.00 24.20 421.10 TI-03
2237 23-Feb-16 soldier pile 4357s Ǿ600 17 17.00 20.50 3.50 1.00 24.20 421.10 TI-03
2238 23-Feb-16 soldier pile 4336s Ǿ600 17 17.00 24.50 7.50 1.00 20.00 196.00 TI-03
2239 23-Feb-16 main pile 2521A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03
2240 23-Feb-16 main pile 2429A Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 TI-03
2241 23-Feb-16 main pile 2401A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
2242 23-Feb-16 main pile 2397A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03
2243 23-Feb-16 main pile 2600A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
2244 24-Feb-16 main pile office 1177 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2245 24-Feb-16 main pile office 1176 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
2246 24-Feb-16 main pile office 1175 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2247 24-Feb-16 main pile office 1174 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2248 24-Feb-16 main pile office 1195 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2249 24-Feb-16 main pile office 1194 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2250 24-Feb-16 main pile 1772 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2251 24-Feb-16 main pile 1649 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2252 24-Feb-16 main pile 1650 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2253 24-Feb-16 main pile 1674 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2254 24-Feb-16 main pile 1675 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2255 24-Feb-16 main pile 2957A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2256 24-Feb-16 main pile 2956A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2257 25-Feb-16 main pile office 1193 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2258 25-Feb-16 main pile office 1192 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2259 25-Feb-16 main pile office 1191 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2260 25-Feb-16 main pile office 1190 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2261 25-Feb-16 main pile office 1189 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2262 26-Feb-16 main pile office 1188 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2263 26-Feb-16 main pile office 1187 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2264 26-Feb-16 main pile office 1186 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
2265 26-Feb-16 main pile 2940 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2266 26-Feb-16 main pile 2941 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2267 27-Feb-16 main pile office 1203 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2268 27-Feb-16 main pile office 1202 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2269 27-Feb-16 main pile office 1201 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2270 27-Feb-16 main pile office 1200 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2271 27-Feb-16 main pile office 1199 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2272 27-Feb-16 main pile office 1198 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2273 27-Feb-16 soldier pile 4709s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24
2274 27-Feb-16 soldier pile 4712s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24
2275 27-Feb-16 condo tower A 457 Ǿ800 17 17 34.00 34.50 0.50 1.00 19.90 699.00 TI-24
2276 28-Feb-16 main pile office 1197 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2277 28-Feb-16 main pile office 1196 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2278 28-Feb-16 main pile office 1204 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2279 28-Feb-16 main pile office 1205 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2280 28-Feb-16 main pile office 1206 Ǿ600 15 17 32.00 31.50 -0.50 1.00 20.90 514.10 TI-18
2281 29-Feb-16 main pile office 1185 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2282 29-Feb-16 main pile office 1184 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
2283 29-Feb-16 main pile office 1183 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2284 29-Feb-16 main pile office 1207 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2285 29-Feb-16 main pile office 1208 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2286 29-Feb-16 main pile office 1209 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2287 29-Feb-16 main pile office 1210 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2288 29-Feb-16 main pile tambahan 10929 Ǿ600 15 17 32.00 37.00 5.00 1.00 16.00 401.90 TI-26
2289 29-Feb-16 main pile tambahan 10930 Ǿ600 15 17 32.00 37.00 5.00 1.00 16.00 401.90 TI-26
2290 29-Feb-16 main pile tambahan 10931 Ǿ600 15 17 32.00 37.00 5.00 1.00 14.00 351.60 TI-26
2291 29-Feb-16 main pile tambahan 10932 Ǿ600 15 17 32.00 37.00 5.00 1.00 15.00 376.70 TI-26
2292 29-Feb-16 Condo tower A 450 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2293 29-Feb-16 Condo tower A 449 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2294 1-Mar-16 main pile office 1211 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2295 1-Mar-16 main pile office 1212 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2296 1-Mar-16 main pile office 1213 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2297 1-Mar-16 main pile office 1214 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2298 1-Mar-16 main pile office 1215 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2299 1-Mar-16 main pile office 1216 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2300 1-Mar-16 main pile office 1217 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2301 1-Mar-16 main pile office 1218 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2302 1-Mar-16 main pile 1779 Ǿ600 15 17 32.00 32.50 0.50 1.00 14.50 420.00 TI-16
2303 1-Mar-16 main pile 1778 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
2304 1-Mar-16 Condo tower A 447 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2305 1-Mar-16 Condo tower A 446 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2306 1-Mar-16 Condo tower A 445 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2307 1-Mar-16 Condo tower A 444 Ǿ800 17 17 34.00 31.00 -3.00 1.00 18.00 632.30 TI-24
2308 2-Mar-16 main pile 1676 Ǿ600 15 17 32.00 28.00 -4.00 1.00 23.70 420.00 TI-07
2309 2-Mar-16 main pile 1680 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2310 2-Mar-16 main pile 1681 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2311 2-Mar-16 main pile 1682 Ǿ600 15 17 32.00 35.20 3.20 1.00 23.70 420.00 TI-07
2312 2-Mar-16 main pile 1780 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
2313 2-Mar-16 Condo tower A 443 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2314 2-Mar-16 Condo tower A 442 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 695.50 TI-24
2315 3-Mar-16 main pile 1683 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2316 3-Mar-16 main pile 1684 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
2317 3-Mar-16 main pile 1685 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 420.00 TI-07
2318 3-Mar-16 main pile office 1219 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2319 3-Mar-16 main pile office 1220 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2320 3-Mar-16 main pile office 1221 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2321 3-Mar-16 main pile office 1222 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2322 3-Mar-16 Condo tower A 464 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2323 3-Mar-16 Condo tower A 463 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2324 3-Mar-16 Condo tower A 462 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2325 3-Mar-16 Condo tower A 461 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2326 3-Mar-16 Condo tower A 460 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2327 4-Mar-16 main pile office 1223 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
2328 4-Mar-16 main pile office 1224 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2329 4-Mar-16 main pile office 1225 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2330 4-Mar-16 main pile office 1226 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2331 4-Mar-16 main pile office 1227 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2332 4-Mar-16 main pile office 1228 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2333 4-Mar-16 main pile office 1229 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2334 4-Mar-16 Condo tower A 458 Ǿ800 17 17 34.00 27.00 -7.00 1.00 23.00 519.10 TI-24
2335 5-Mar-16 main pile 10938 Ǿ600 11 17 28.00 34.00 6.00 1.00 19.00 477.20 TI-26
2336 5-Mar-16 main pile 2882 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2337 5-Mar-16 main pile 10936 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2338 5-Mar-16 main pile 2860 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2339 5-Mar-16 main pile 2861 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2340 5-Mar-16 main pile 2856 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2341 5-Mar-16 main pile 2857 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2342 5-Mar-16 Condo tower A 465 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2343 5-Mar-16 Condo tower A 466 Ǿ800 17 17 34.00 35.00 1.00 1.00 20.00 702.50 TI-24
2344 6-Mar-16 main pile office 1230 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2345 6-Mar-16 main pile office 1231 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2346 6-Mar-16 main pile office 1232 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2347 6-Mar-16 main pile office 1233 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
2348 6-Mar-16 main pile office 1234 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2349 6-Mar-16 main pile office 1235 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
2350 7-Mar-16 Condo tower A 467 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.00 737.70 TI-24
2351 7-Mar-16 Condo tower A 468 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.00 TI-24
2352 8-Mar-16 Condo tower A 469 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
2353 8-Mar-16 Condo tower A 470 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2354 8-Mar-16 main pile office 1236 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2355 8-Mar-16 main pile office 1237 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2356 8-Mar-16 main pile office 1238 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2357 8-Mar-16 main pile office 1239 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2358 8-Mar-16 main pile office 1240 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2359 8-Mar-16 main pile office 1241 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2360 8-Mar-16 main pile office 1242 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2361 9-Mar-16 Condo tower A 471 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.10 TI-24
2362 9-Mar-16 Condo tower A 473 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2363 9-Mar-16 Condo tower B 414 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2364 9-Mar-16 Condo tower B 405 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2365 9-Mar-16 main pile 1644 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2366 9-Mar-16 main pile 1643 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
2367 9-Mar-16 main pile 1642 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2368 9-Mar-16 main pile 1558 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2369 9-Mar-16 main pile office 1243 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2370 9-Mar-16 soldier pile 4777s Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A
2371 9-Mar-16 soldier pile 4753s Ǿ600 17 17.00 24.50 7.50 10.00 177.70 TI-21A
2372 10-Mar-16 Condo tower A 489 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 519.10 TI-24
2373 10-Mar-16 Condo tower A 488 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
2374 10-Mar-16 Condo tower B 366 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2375 10-Mar-16 Condo tower B 381 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2376 10-Mar-16 Condo tower B 342 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2377 10-Mar-16 Condo tower B 357 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
2378 10-Mar-16 Condo tower B 406 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2379 10-Mar-16 main pile office 1244 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2380 10-Mar-16 main pile office 1245 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2381 10-Mar-16 main pile office 1246 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2382 10-Mar-16 main pile office 1247 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2383 11-Mar-16 Condo tower B 413 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.40 806.20 TI-25
2384 11-Mar-16 Condo tower B 382 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2385 11-Mar-16 Condo tower B 389 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.30 802.40 TI-25
2386 11-Mar-16 Condo tower B 365 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
2387 11-Mar-16 main pile office 1248 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2388 11-Mar-16 main pile office 1249 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2389 11-Mar-16 main pile office 1250 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2390 11-Mar-16 main pile office 1251 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2391 11-Mar-16 soldier pile 4733 Ǿ600 17 17.00 24.40 7.40 20.00 355.40 TI-21A
2392 11-Mar-16 soldier pile 4726 Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A
2393 11-Mar-16 soldier pile 4722 Ǿ600 17 17.00 16.00 -1.00 24.00 426.50 TI-21A
2394 11-Mar-16 soldier pile 4719 Ǿ600 17 17.00 24.50 7.50 13.00 231.00 TI-21A
2395 12-Mar-16 main pile 3074 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2396 12-Mar-16 main pile 3075 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2397 12-Mar-16 main pile 3082 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2398 13-Mar-16 Condo tower B 380 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2399 13-Mar-16 Condo tower B 367 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
2400 13-Mar-16 Condo tower B 404 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2401 14-Mar-16 Condo tower B 391 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2402 14-Mar-16 Condo tower B 416 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2403 14-Mar-16 Condo tower B 427 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.30 614.10 TI-25
2404 14-Mar-16 Condo tower B 428 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2405 14-Mar-16 main pile 3083 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2406 14-Mar-16 main pile 3090 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16
2407 15-Mar-16 Condo tower A 487 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2408 15-Mar-16 Condo tower A 486 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2409 15-Mar-16 Condo tower A 485 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2410 15-Mar-16 Condo tower A 484 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2411 15-Mar-16 Condo tower B 415 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2412 15-Mar-16 Condo tower B 356 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2413 15-Mar-16 main pile 3091 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2414 15-Mar-16 main pile 3098 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2415 15-Mar-16 main pile 3099 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2416 15-Mar-16 main pile 3106 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16
2417 15-Mar-16 main pile office 1253 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2418 15-Mar-16 main pile office 1254 Ǿ600 15 17 32.00 31.50 -0.50 1.00 21.00 516.60 TI-18
2419 15-Mar-16 main pile office 1255 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2420 15-Mar-16 main pile office 1256 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2421 16-Mar-16 Condo tower A 482 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2422 16-Mar-16 Condo tower A 497 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2423 16-Mar-16 Condo tower A 495 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2424 16-Mar-16 Condo tower B 332 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 658.70 TI-25
2425 16-Mar-16 Condo tower B 343 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.60 813.70 TI-25
2426 16-Mar-16 main pile office 1257 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2427 16-Mar-16 main pile office 1258 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2428 16-Mar-16 main pile office 1259 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2429 16-Mar-16 main pile office 1260 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2430 16-Mar-16 sisipan soldier pile 4722s1 Ǿ600 17 17.00 24.50 7.50 11.00 195.50 TI-21A
2431 17-Mar-16 Condo tower A 494 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2432 17-Mar-16 Condo tower A 493 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2433 17-Mar-16 Condo tower A 492 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2434 17-Mar-16 Condo tower A 491 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2435 17-Mar-16 Condo tower A 490 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2436 17-Mar-16 Condo tower A 506 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2437 17-Mar-16 Condo tower A 508 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2438 17-Mar-16 Condo tower B 308 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
2439 17-Mar-16 Condo tower B 319 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2440 17-Mar-16 Condo tower B 379 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
2441 18-Mar-16 Condo tower A 509 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2442 18-Mar-16 Condo tower A 510 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2443 18-Mar-16 Condo tower A 511 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2444 18-Mar-16 Condo tower A 512 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2445 18-Mar-16 Condo tower A 513 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2446 18-Mar-16 Condo tower B 392 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
2447 18-Mar-16 Condo tower B 403 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2448 18-Mar-16 Condo tower B 344 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.40 506.20 TI-25
2449 18-Mar-16 main pile office 1261 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2450 18-Mar-16 main pile office 1252 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2451 18-Mar-16 main pile office 1118 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2452 18-Mar-16 main pile office 1097 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2453 18-Mar-16 main pile office 1096 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2454 18-Mar-16 main pile office 1098 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2455 18-Mar-16 Main pile 1645 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2456 18-Mar-16 Main pile 1646 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.00 420.00 TI-07
2457 18-Mar-16 Main pile 1647 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2458 18-Mar-16 Main pile 1559 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2459 18-Mar-16 Main pile 1560 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2460 18-Mar-16 Main pile 1561 Ǿ600 15 17 32.00 34.70 2.70 1.00 23.70 420.00 TI-07
2461 18-Mar-16 Main pile 1556 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2462 18-Mar-16 Main pile 1557 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2463 19-Mar-16 main pile office 1115 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2464 19-Mar-16 main pile office 1116 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2465 19-Mar-16 main pile office 1117 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2466 19-Mar-16 main pile office 1100 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 TI-18
2467 19-Mar-16 main pile office 1099 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2468 19-Mar-16 Main pile 1512A Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2469 19-Mar-16 Main pile 1510A Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
2470 19-Mar-16 Main pile 1503A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2471 20-Mar-16 Condo tower A 521 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2472 20-Mar-16 Condo tower A 519 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2473 20-Mar-16 Condo tower A 518 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2474 20-Mar-16 Condo tower A 517 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 678.10 TI-26
2475 20-Mar-16 Condo tower B 355 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.40 806.20 TI-25
2476 20-Mar-16 Condo tower B 368 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.90 674.40 TI-25
2477 21-Mar-16 Condo tower A 514 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2478 21-Mar-16 Condo tower A 515 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2479 21-Mar-16 Condo tower A 516 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2480 21-Mar-16 Condo tower B 400 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
2481 21-Mar-16 Main pile 3107 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2482 21-Mar-16 Main pile 1544 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2483 21-Mar-16 Main pile 1545 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2484 22-Mar-16 Condo tower B 419 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 742.20 TI-25
2485 22-Mar-16 Condo tower B 424 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2486 22-Mar-16 Condo tower B 371 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
2487 22-Mar-16 Condo tower B 376 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
2488 22-Mar-16 Main pile 3114A Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2489 22-Mar-16 Main pile 3121A Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16
2490 22-Mar-16 Main pile 1546 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2491 22-Mar-16 Main pile 1654 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
2492 22-Mar-16 Main pile 1655 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2493 22-Mar-16 Main pile 1656 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
2494 22-Mar-16 Main pile 1668 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
2495 22-Mar-16 Main pile 1670 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
2496 22-Mar-16 main pile office 1101 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2497 23-Mar-16 Condo tower A 533 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2498 23-Mar-16 Condo tower A 532 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2499 23-Mar-16 Condo tower A 530 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2500 23-Mar-16 Main pile 1669 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2501 23-Mar-16 Main pile 1792 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2502 23-Mar-16 Main pile 1793 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2503 23-Mar-16 Main pile 1794 Ǿ600 15 17 32.00 30.00 -2.00 1.00 23.70 420.00 TI-07
2504 23-Mar-16 main pile office 1001 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2505 23-Mar-16 main pile office 1002 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2506 23-Mar-16 main pile office 1003 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2507 23-Mar-16 main pile office 1004 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2508 23-Mar-16 main pile office 1005 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2509 24-Mar-16 Condo tower A 537 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2510 24-Mar-16 Condo tower A 536 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2511 24-Mar-16 Condo tower A 535 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2512 24-Mar-16 Condo tower A 534 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2513 24-Mar-16 Condo tower B 299 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 632.90 TI-25
2514 24-Mar-16 main pile office 1085 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 506.90 TI-16
2515 24-Mar-16 Main Pile 2864 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2516 24-Mar-16 Main Pile 2865 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2517 24-Mar-16 Main Pile 2868 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16
2518 24-Mar-16 Main Pile 2869 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2519 25-Mar-16 Main Pile 2859 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2520 25-Mar-16 Main Pile 2858 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16
2521 25-Mar-16 Main Pile ofifice 1006 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2522 25-Mar-16 Main Pile ofifice 1007 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2523 25-Mar-16 Main Pile ofifice 1008 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2524 25-Mar-16 Main Pile ofifice 1009 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2525 26-Mar-16 Main Pile 2855 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2526 26-Mar-16 Main Pile 2854 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2527 26-Mar-16 Main Pile 2850 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2528 26-Mar-16 Main Pile 2851 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2529 26-Mar-16 Main Pile 2837 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2530 26-Mar-16 Main Pile 2836 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2531 26-Mar-16 Main Pile ofifice 1011 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2532 26-Mar-16 Main Pile ofifice 1012 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2533 26-Mar-16 Main Pile ofifice 1013 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2534 26-Mar-16 Main Pile ofifice 1015 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2535 27-Mar-16 Main Pile 2835 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16
2536 27-Mar-16 Main Pile 2834 Ǿ600 11 17 28.00 27.00 -1.00 1.00 14.50 420.00 TI-16
2537 27-Mar-16 Main Pile 10927 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2538 28-Mar-16 Condo tower A 545 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 565.10 TI-26
2539 28-Mar-16 Condo tower A 543 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2540 28-Mar-16 Condo tower A 542 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2541 29-Mar-16 Condo tower A 538 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 688.10 TI-26
2542 29-Mar-16 Condo tower A 539 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2543 29-Mar-16 Condo tower A 540 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2544 29-Mar-16 Condo tower A 541 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2545 30-Mar-16 Condo tower A 554 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2546 30-Mar-16 Condo tower A 556 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 527.40 TI-26
2547 30-Mar-16 Main Pile 2834A Ǿ600 15 17 32.00 38.00 6.00 1.00 13.00 376.50 TI-16
2548 31-Mar-16 Condo tower A 557 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.80 TI-26
2549 1-Apr-16 Condo tower B 304 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
2550 1-Apr-16 Condo tower B 323 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-25
2551 1-Apr-16 Condo tower B 328 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2552 1-Apr-16 Condo tower B 347 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.50 810.00 TI-25
2553 1-Apr-16 Condo tower B 395 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2554 1-Apr-16 Condo tower B 352 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
2555 1-Apr-16 main pile 4137s Ǿ600 17 17.00 24.50 7.50 1.00 20.00 492.00 TI-218
2556 2-Apr-16 Condo tower A 561 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2557 2-Apr-16 Condo tower A 560 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2558 2-Apr-16 Condo tower A 559 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2559 2-Apr-16 Condo tower A 558 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2560 3-Apr-16 Condo tower A 569 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2561 3-Apr-16 Condo tower A 567 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2562 3-Apr-16 Condo tower A 566 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.00 TI-26
2563 3-Apr-16 Condo tower A 565 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2564 3-Apr-16 Condo tower A 564 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2565 3-Apr-16 Condo tower A 563 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2566 3-Apr-16 main pile 3161A Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-218
2567 3-Apr-16 main pile 4127s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218
2568 3-Apr-16 main pile 4130s Ǿ600 17 17.00 24.50 7.50 18.70 460.00 TI-218
2569 3-Apr-16 main pile 4131s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218
2570 3-Apr-16 main pile 4134s Ǿ600 17 17.00 24.50 7.50 19.00 467.40 TI-218
2571 4-Apr-16 Condo tower B 300 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 745.90 TI-25
2572 4-Apr-16 Condo tower B 303 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2573 4-Apr-16 Condo tower B 324 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2574 5-Apr-16 Condo tower B 327 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2575 5-Apr-16 Condo tower B 348 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2576 5-Apr-16 Condo tower B 351 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2577 5-Apr-16 Condo tower B 372 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-25
2578 5-Apr-16 Condo tower B 30069 Ǿ800 17 17 34.00 28.00 -6.00 1.00 21.50 810.00 TI-25
2579 6-Apr-16 Condo tower A 578 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2580 6-Apr-16 Condo tower A 580 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2581 6-Apr-16 Condo tower A 581 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2582 6-Apr-16 Condo tower A 582 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2583 6-Apr-16 Condo tower A 583 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2584 6-Apr-16 Condo tower A 584 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
2585 8-Apr-16 Condo tower A 30051 Ǿ800 17 17 34.00 31.00 -3.00 1.00 21.50 810.00 TI-26
2586 8-Apr-16 Condo tower A 30052 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2587 8-Apr-16 Condo tower B 36 Ǿ800 17 17 34.00 32.00 -2.00 1.00 17.00 597.20 TI-24
2588 8-Apr-16 Condo tower B 298 Ǿ800 17 17 34.00 39.00 5.00 1.00 18.50 697.00 TI-25
2589 8-Apr-16 Condo tower B 305 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 817.50 TI-25
2590 8-Apr-16 Condo tower B 322 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
2591 8-Apr-16 Condo tower B 346 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2592 8-Apr-16 Condo tower B 353 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
2593 8-Apr-16 Condo tower B 370 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.20 798.70 TI-25
2594 9-Apr-16 Condo tower B 34 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
2595 9-Apr-16 Condo tower B 377 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
2596 9-Apr-16 Condo tower B 394 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2597 9-Apr-16 Condo tower B 401 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2598 9-Apr-16 Condo tower B 418 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2599 9-Apr-16 Condo tower A 586 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2600 9-Apr-16 Condo tower A 587 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2601 9-Apr-16 Condo tower A 588 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2602 11-Apr-16 Condo tower A 589 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2603 11-Apr-16 Condo tower A 590 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
2604 11-Apr-16 Condo tower A 591 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2605 11-Apr-16 Condo tower A 593 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2606 12-Apr-16 Condo tower B 33 Ǿ800 17 17 34.00 34.00 0.00 1.00 22.90 804.90 TI-24
2607 12-Apr-16 Condo tower B 32 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2608 13-Apr-16 Condo tower B 31 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2609 13-Apr-16 Condo tower B 30 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2610 13-Apr-16 Condo tower B 29 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2611 13-Apr-16 Condo tower B 306 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
2612 13-Apr-16 Condo tower B 321 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
2613 13-Apr-16 Condo tower B 330 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.60 813.70 TI-25
2614 13-Apr-16 Condo tower B 345 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2615 13-Apr-16 Condo tower B 354 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.1.1 TI-25
2616 13-Apr-16 Condo tower A 602 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.90 TI-26
2617 13-Apr-16 Condo tower A 604 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2618 13-Apr-16 Condo tower A 605 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2619 13-Apr-16 Condo tower A 606 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2620 13-Apr-16 Condo tower A 607 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2621 13-Apr-16 Condo tower A 608 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2622 13-Apr-16 Condo tower A 609 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 878.10 TI-26
2623 14-Apr-16 Condo tower B 369 Ǿ800 17 17 34.00 17.50 -16.50 1.00 22.10 836.60 TI-25
2624 14-Apr-16 Condo tower A 617 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
2625 14-Apr-16 Condo tower A 615 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
2626 14-Apr-16 Condo tower A 614 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2627 14-Apr-16 Sisipan Office 1254A Ǿ600 17 15 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2628 15-Apr-16 Condo tower B 378 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
2629 15-Apr-16 Condo tower B 393 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2630 15-Apr-16 Condo tower B 402 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
2631 15-Apr-16 Condo tower B 417 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.70 817.50 TI-25
2632 15-Apr-16 Condo tower B 25 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2633 15-Apr-16 Condo tower A 613 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2634 15-Apr-16 Condo tower A 612 Ǿ800 17 17 34.00 42.40 8.40 1.00 18.00 678.10 TI-26
2635 15-Apr-16 Condo tower A 611 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2636 15-Apr-16 Condo tower A 610 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2637 16-Apr-16 Condo tower B 26 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2638 16-Apr-16 Condo tower B 27 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.80 800.90 TI-24
2639 16-Apr-16 Condo tower B 28 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.90 804.40 TI-24
2640 17-Apr-16 Condo tower A 626 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
2641 17-Apr-16 Condo tower A 628 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2642 17-Apr-16 Condo tower A 629 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2643 19-Apr-16 Condo tower B 49 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.00 TI-24
2644 19-Apr-16 Condo tower B 48 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2645 19-Apr-16 Condo tower B 47 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2646 19-Apr-16 Condo tower B 46 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2647 19-Apr-16 Condo tower B 45 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2648 19-Apr-16 Condo tower B 292 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.80 783.60 TI-25
2649 19-Apr-16 Condo tower B 311 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.80 821.30 TI-25
2650 19-Apr-16 Condo tower B 316 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
2651 19-Apr-16 Condo tower B 335 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
2652 19-Apr-16 Condo tower A 633 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
2653 19-Apr-16 Condo tower A 632 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2654 19-Apr-16 Condo tower A 631 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2655 19-Apr-16 Condo tower A 630 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2656 20-Apr-16 Condo tower B 44 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2657 20-Apr-16 Condo tower B 43 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 744.20 TI-24
2658 20-Apr-16 Condo tower B 42 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2659 20-Apr-16 Condo tower B 41 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2660 20-Apr-16 Condo tower B 40 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737,7 TI-24
2661 21-Apr-16 Condo tower A 641 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2662 21-Apr-16 Condo tower A 639 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2663 21-Apr-16 Condo tower A 638 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2664 21-Apr-16 Condo tower A 637 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2665 21-Apr-16 Condo tower A 636 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2666 21-Apr-16 Condo tower A 635 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2667 21-Apr-16 Condo tower B 39 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2668 21-Apr-16 Condo tower B 50 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2669 21-Apr-16 Condo tower B 51 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2670 21-Apr-16 Condo tower B 52 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2671 21-Apr-16 Condo tower B 340 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
2672 21-Apr-16 Condo tower B 359 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
2673 21-Apr-16 Condo tower B 364 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2674 22-Apr-16 Condo tower B 53 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2675 22-Apr-16 Condo tower B 54 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2676 22-Apr-16 Condo tower B 55 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.30 713.10 TI-24
2677 22-Apr-16 Condo tower B 56 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.00 807.90 TI-24
2678 22-Apr-16 Condo tower B 57 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2679 22-Apr-16 Condo tower B 58 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
2680 22-Apr-16 Condo tower B 383 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.80 821.30 TI-25
2681 22-Apr-16 Condo tower B 388 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2682 22-Apr-16 Condo tower B 407 Ǿ800 17 17 34.00 37.50 3.50 1.00 22.00 828.80 TI-25
2683 22-Apr-16 Condo tower B 412 Ǿ800 17 17 34.00 32.00 -2.00 1.00 22.00 828.80 TI-25
2684 22-Apr-16 Condo tower B 634 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2685 23-Apr-16 Condo tower B 59 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2686 23-Apr-16 Condo tower B 60 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.90 804.40 TI-24
2687 23-Apr-16 Condo tower B 72 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2688 23-Apr-16 Condo tower B 358 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
2689 23-Apr-16 Condo tower B 293 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2690 23-Apr-16 Condo tower B 341 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2691 23-Apr-16 Condo tower B 310 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2692 24-Apr-16 Condo tower B 71 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
2693 24-Apr-16 Condo tower B 70 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2694 24-Apr-16 Condo tower B 68 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
2695 24-Apr-16 Condo tower B 73 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2696 24-Apr-16 Condo tower B 317 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
2697 24-Apr-16 Condo tower B 334 Ǿ800 17 17 34.00 42.00 8.00 1.00 14.50 546.30 TI-25
2698 25-Apr-16 Condo tower B 67 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2699 25-Apr-16 Condo tower B 66 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2700 25-Apr-16 Condo tower B 65 Ǿ800 17 17 34.00 40.00 6.00 1.00 22.90 804.40 TI-24
2701 25-Apr-16 Condo tower B 64 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2702 25-Apr-16 Condo tower A 650 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2703 25-Apr-16 Condo tower A 652 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2704 25-Apr-16 Condo tower A 653 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2705 25-Apr-16 Condo tower A 654 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2706 26-Apr-16 Condo tower B 63 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2707 26-Apr-16 Condo tower B 74 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2708 26-Apr-16 Condo tower B 75 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 800.90 TI-24
2709 26-Apr-16 Condo tower B 285 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.20 610.30 TI-25
2710 26-Apr-16 Condo tower B 309 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 828.80 TI-25
2711 26-Apr-16 Condo tower B 294 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
2712 26-Apr-16 Condo tower B 318 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
2713 26-Apr-16 Condo tower B 333 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2714 26-Apr-16 Condo tower A 655 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2715 26-Apr-16 Condo tower A 656 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2716 26-Apr-16 Condo tower A 657 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
2717 27-Apr-16 Condo tower B 76 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2718 27-Apr-16 Condo tower B 77 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2719 27-Apr-16 Condo tower B 78 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2720 27-Apr-16 Condo tower B 79 Ǿ800 17 17 34.00 24.00 -10.00 1.00 23.00 807.90 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2721 27-Apr-16 Condo tower B 80 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2722 27-Apr-16 Condo tower B 81 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2723 27-Apr-16 Condo tower B 82 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2724 27-Apr-16 Condo tower B 235 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.70 817.50 TI-25
2725 27-Apr-16 Condo tower B 248 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2726 27-Apr-16 Condo tower B 259 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2727 27-Apr-16 Condo tower B 272 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 817.50 TI-25
2728 27-Apr-16 Condo tower B 283 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 727.10 TI-25
2729 27-Apr-16 Condo tower A 665 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2730 27-Apr-16 Condo tower A 663 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2731 27-Apr-16 Condo tower A 662 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
2732 27-Apr-16 Condo tower A 661 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
2733 27-Apr-16 Condo tower A 660 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2734 27-Apr-16 Condo tower A 659 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2735 28-Apr-16 Condo tower B 83 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.00 TI-24
2736 28-Apr-16 Condo tower B 84 Ǿ800 17 17 34.00 31.50 -2.50 1.00 23.00 807.90 TI-24
2737 28-Apr-16 Condo tower B 97 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 807.90 TI-24
2738 28-Apr-16 Condo tower B 96 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2739 28-Apr-16 Condo tower B 296 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.70 817.50 TI-25
2740 28-Apr-16 Condo tower B 307 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.80 821.30 TI-25
2741 28-Apr-16 Condo tower B 320 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.80 821.30 TI-25
2742 28-Apr-16 Condo tower B 331 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2743 28-Apr-16 Condo tower A 674 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2744 29-Apr-16 Condo tower B 95 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2745 29-Apr-16 Condo tower B 94 Ǿ800 17 17 34.00 41.00 7.00 1.00 22.90 804.40 TI-24
2746 29-Apr-16 Condo tower B 93 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2747 29-Apr-16 Condo tower B 92 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2748 29-Apr-16 Condo tower B 225 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2749 29-Apr-16 Condo tower B 234 Ǿ800 17 17 34.00 40.00 6.00 1.00 12.00 452.10 TI-25
2750 29-Apr-16 Condo tower B 249 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
2751 29-Apr-16 Condo tower B 258 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.90 825.10 TI-25
2752 29-Apr-16 Condo tower A 676 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2753 29-Apr-16 Condo tower A 677 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2754 29-Apr-16 Condo tower A 678 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
2755 29-Apr-16 Condo tower A 679 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 679.00 TI-26
2756 29-Apr-16 Condo tower A 680 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
2757 30-Apr-16 Condo tower B 91 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2758 30-Apr-16 Condo tower B 90 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2759 30-Apr-16 Condo tower B 89 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2760 30-Apr-16 Condo tower B 273 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.00 828.80 TI-25
2761 30-Apr-16 Condo tower B 282 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
2762 30-Apr-16 Condo tower B 297 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.90 825.10 TI-25
2763 30-Apr-16 Condo tower A 681 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
2764 30-Apr-16 Condo tower A 689 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2765 30-Apr-16 Condo tower A 687 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2766 1-May-16 Condo tower B 226 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 669.30 TI-25
2767 1-May-16 Condo tower B 233 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2768 1-May-16 Condo tower A 686 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2769 1-May-16 Condo tower A 685 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
2770 1-May-16 Condo tower A 684 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
2771 2-May-16 Condo tower B 250 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2772 2-May-16 Condo tower B 257 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2773 2-May-16 Condo tower B 274 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2774 2-May-16 Condo tower B 281 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
2775 2-May-16 Condo tower B 88 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2776 2-May-16 Condo tower B 87 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2777 2-May-16 Condo tower A 683 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
2778 2-May-16 Condo tower A 682 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
2779 3-May-16 Condo tower B 227 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
2780 3-May-16 Condo tower B 232 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.00 TI-25
2781 3-May-16 Condo tower B 251 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
2782 3-May-16 Condo tower B 256 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2783 3-May-16 Condo tower B 275 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2784 3-May-16 Condo tower B 98 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2785 3-May-16 Condo tower B 99 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
2786 3-May-16 Condo tower B 100 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2787 3-May-16 Condo tower B 101 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2788 3-May-16 Condo tower B 102 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2789 3-May-16 Condo tower A 698 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2790 4-May-16 Condo tower B 280 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2791 4-May-16 Condo tower B 103 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2792 4-May-16 Condo tower B 104 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2793 4-May-16 Condo tower B 105 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.60 685.00 TI-24
2794 4-May-16 Condo tower B 106 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2795 4-May-16 Condo tower B 107 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2796 4-May-16 Condo tower B 108 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2797 4-May-16 Condo tower A 701 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 659.30 TI-26
2798 4-May-16 Condo tower A 702 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2799 4-May-16 Condo tower A 703 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
2800 4-May-16 Condo tower A 704 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2801 4-May-16 Condo tower A 705 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
2802 5-May-16 Condo tower B 228 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2803 5-May-16 Condo tower B 231 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2804 5-May-16 Condo tower B 252 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 648.00 TI-25
2805 5-May-16 Condo tower B 255 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2806 5-May-16 Condo tower B 276 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 678.10 TI-25
2807 5-May-16 Condo tower B 279 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2808 5-May-16 Condo tower B 121 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
2809 5-May-16 Condo tower B 120 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2810 5-May-16 Condo tower B 119 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2811 5-May-16 Condo tower B 118 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2812 5-May-16 Condo tower B 117 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2813 5-May-16 Condo tower B 116 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2814 5-May-16 Condo tower B 115 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2815 5-May-16 Condo tower A 713 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2816 5-May-16 Condo tower A 711 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2817 5-May-16 Condo tower A 710 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.50 810.00 TI-26
2818 5-May-16 Condo tower A 709 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2819 5-May-16 Condo tower A 708 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2820 5-May-16 Condo tower A 707 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2821 6-May-16 Condo tower B 253 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 663.10 TI-25
2822 6-May-16 Condo tower B 254 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
2823 6-May-16 Condo tower B 277 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 695.70 TI-25
2824 6-May-16 Condo tower B 278 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2825 6-May-16 Condo tower B 114 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2826 6-May-16 Condo tower B 113 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2827 6-May-16 Condo tower B 112 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2828 6-May-16 Condo tower B 111 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2829 6-May-16 Condo tower A 706 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
2830 6-May-16 Condo tower A 712 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2831 6-May-16 Condo tower A 30072 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.70 659.30 TI-26
2832 6-May-16 Condo tower A 723 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2833 7-May-16 Condo tower B 301 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
2834 7-May-16 Condo tower B 302 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2835 7-May-16 Condo tower B 325 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2836 7-May-16 Condo tower B 326 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2837 7-May-16 Condo tower B 349 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
2838 7-May-16 Condo tower B 122 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2839 7-May-16 Condo tower B 123 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2840 7-May-16 Condo tower B 124 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2841 7-May-16 Condo tower B 125 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2842 7-May-16 Condo tower B 126 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2843 7-May-16 Condo tower B 127 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2844 7-May-16 Condo tower B 128 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2845 7-May-16 Condo tower A 722 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
2846 7-May-16 Condo tower A 724 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2847 7-May-16 Condo tower A 725 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2848 7-May-16 Condo tower A 726 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2849 7-May-16 Condo tower A 727 Ǿ800 17 17 34.00 40.40 6.40 1.00 21.50 810.00 TI-26
2850 8-May-16 Condo tower B 129 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2851 8-May-16 Condo tower B 130 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2852 8-May-16 Condo tower B 131 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2853 8-May-16 Condo tower B 132 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2854 9-May-16 Condo tower B 145 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2855 9-May-16 Condo tower B 144 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.50 790.40 TI-24
2856 9-May-16 Condo tower B 143 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 773.80 TI-24
2857 9-May-16 Condo tower B 350 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2858 9-May-16 Condo tower B 373 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2859 9-May-16 Condo tower B 374 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-25
2860 9-May-16 Condo tower B 398 Ǿ800 17 17 34.00 39.50 5.50 1.00 22.00 828.80 TI-25
2861 9-May-16 Condo tower B 421 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
2862 9-May-16 Condo tower B 422 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2863 9-May-16 Condo tower B 441 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 632.90 TI-25
2864 9-May-16 Condo tower A 728 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
2865 9-May-16 Condo tower A 729 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
2866 9-May-16 Condo tower A 737 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
2867 9-May-16 Condo tower A 736 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2868 10-May-16 Condo tower B 142 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2869 10-May-16 Condo tower B 141 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2870 10-May-16 Condo tower B 140 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2871 10-May-16 Condo tower B 139 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2872 10-May-16 Condo tower B 138 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2873 10-May-16 Condo tower B 137 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2874 10-May-16 Condo tower B 136 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
2875 10-May-16 Condo tower B 434 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2876 10-May-16 Condo tower B 435 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
2877 10-May-16 Condo tower B 436 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.00 TI-25
2878 10-May-16 Condo tower A 735 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
2879 10-May-16 Condo tower A 734 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2880 10-May-16 Condo tower A 733 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
2881 10-May-16 Condo tower A 732 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
2882 10-May-16 Condo tower A 731 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2883 10-May-16 Condo tower A 730 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2884 11-May-16 Condo tower A 746 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2885 11-May-16 Condo tower A 747 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2886 11-May-16 Condo tower A 748 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
2887 11-May-16 Condo tower A 30070 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
2888 11-May-16 Condo tower A 30071 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2889 11-May-16 Condo tower B 135 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2890 11-May-16 Condo tower B 146 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2891 11-May-16 Condo tower B 147 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2892 11-May-16 Condo tower B 148 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
2893 11-May-16 Condo tower B 149 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2894 11-May-16 Condo tower B 437 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
2895 11-May-16 Condo tower B 438 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2896 11-May-16 Condo tower B 439 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
2897 11-May-16 Condo tower B 433 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2898 11-May-16 Condo tower B 432 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2899 11-May-16 Condo tower B 431 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25
2900 12-May-16 Condo tower A 749 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
2901 12-May-16 Condo tower A 750 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
2902 12-May-16 Condo tower A 751 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
2903 12-May-16 Condo tower A 752 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2904 12-May-16 Condo tower A 753 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2905 12-May-16 Condo tower B 150 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2906 12-May-16 Condo tower B 151 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2907 12-May-16 Condo tower B 152 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
2908 12-May-16 Condo tower B 153 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
2909 12-May-16 Condo tower B 154 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.40 TI-24
2910 12-May-16 Condo tower B 430 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2911 12-May-16 Condo tower B 429 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
2912 12-May-16 Condo tower B 426 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2913 12-May-16 Condo tower B 425 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
2914 12-May-16 Condo tower B 30075 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
2915 12-May-16 Condo tower B 410 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2916 13-May-16 Condo tower B 155 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2917 13-May-16 Condo tower B 156 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
2918 13-May-16 Condo tower B 169 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2919 13-May-16 Condo tower B 168 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2920 13-May-16 Condo tower B 167 Ǿ800 17 17 34.00 39.50 5.5 1.00 23.00 807.90 TI-24
2921 13-May-16 Condo tower B 166 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.50 TI-24
2922 13-May-16 Condo tower B 411 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
2923 13-May-16 Condo tower B 408 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2924 13-May-16 Condo tower B 409 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
2925 13-May-16 Condo tower B 386 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
2926 13-May-16 Condo tower B 387 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2927 13-May-16 Condo tower B 384 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
2928 13-May-16 Condo tower A 30057 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2929 13-May-16 Condo tower A 761 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2930 13-May-16 Condo tower A 760 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2931 14-May-16 Condo tower B 165 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2932 14-May-16 Condo tower B 164 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2933 14-May-16 Condo tower B 163 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2934 14-May-16 Condo tower B 162 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2935 14-May-16 Condo tower B 161 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.90 804.40 TI-24
2936 14-May-16 Condo tower B 385 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2937 14-May-16 Condo tower B 363 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
2938 14-May-16 Condo tower B 362 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
2939 14-May-16 Condo tower B 360 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2940 14-May-16 Condo tower B 361 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
2941 14-May-16 Condo tower B 339 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2942 14-May-16 Condo tower A 759 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2943 14-May-16 Condo tower A 758 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2944 14-May-16 Condo tower A 757 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2945 14-May-16 Condo tower A 756 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2946 14-May-16 Condo tower A 755 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2947 14-May-16 Condo tower A 754 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2948 15-May-16 Condo tower A 30056 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26
2949 15-May-16 Condo tower A 770 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2950 15-May-16 Condo tower A 771 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
2951 16-May-16 Condo tower B 160 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2952 16-May-16 Condo tower B 159 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2953 16-May-16 Condo tower B 170 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2954 17-May-16 Condo tower B 171 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24
2955 17-May-16 Condo tower B 172 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2956 17-May-16 Condo tower B 173 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2957 17-May-16 Condo tower B 174 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2958 17-May-16 Condo tower B 175 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2959 17-May-16 Condo tower B 176 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2960 17-May-16 Condo tower B 177 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2961 17-May-16 Condo tower B 178 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2962 17-May-16 Condo tower B 338 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2963 17-May-16 Condo tower B 313 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
2964 17-May-16 Condo tower B 312 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
2965 17-May-16 Condo tower B 291 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
2966 17-May-16 Condo tower B 290 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25
2967 17-May-16 Condo tower B 288 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
2968 17-May-16 Condo tower B 289 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
2969 17-May-16 Condo tower B 284 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2970 17-May-16 Condo tower A 772 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
2971 17-May-16 Condo tower A 773 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2972 17-May-16 Condo tower A 774 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2973 17-May-16 Condo tower A 775 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
2974 17-May-16 Condo tower A 776 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
2975 17-May-16 Condo tower A 777 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2976 18-May-16 Condo tower B 179 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2977 18-May-16 Condo tower B 180 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2978 18-May-16 Condo tower B 193 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2979 18-May-16 Condo tower B 192 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2980 18-May-16 Condo tower B 191 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2981 18-May-16 Condo tower B 295 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
2982 18-May-16 Condo tower B 287 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
2983 18-May-16 Condo tower B 286 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2984 18-May-16 Condo tower B 266 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
2985 18-May-16 Condo tower B 267 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
2986 18-May-16 Condo tower A 785 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
2987 18-May-16 Condo tower A 784 Ǿ800 17 17 34.00 36.50 2.5 1.00 21.50 810.00 TI-26
2988 18-May-16 Condo tower A 783 Ǿ800 17 17 34.00 37.50 3.5 1.00 21.50 810.00 TI-26
2989 19-May-16 Condo tower B 190 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2990 19-May-16 Condo tower B 189 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2991 19-May-16 Condo tower B 188 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2992 19-May-16 Condo tower B 187 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2993 19-May-16 Condo tower B 186 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2994 19-May-16 Condo tower B 185 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2995 19-May-16 Condo tower B 268 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.80 670.80 TI-25
2996 19-May-16 Condo tower B 269 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
2997 19-May-16 Condo tower B 270 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2998 19-May-16 Condo tower B 271 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
2999 19-May-16 Condo tower B 265 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.10 606.50 TI-25
3000 19-May-16 Condo tower B 264 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3001 19-May-16 Condo tower A 782 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
3002 19-May-16 Condo tower A 781 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3003 19-May-16 Condo tower A 780 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
3004 19-May-16 Condo tower A 779 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
3005 19-May-16 Condo tower A 778 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
3006 20-May-16 Condo tower B 184 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3007 20-May-16 Condo tower B 183 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3008 20-May-16 Condo tower B 182 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
3009 20-May-16 Condo tower B 181 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3010 20-May-16 Condo tower A 794 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3011 20-May-16 Condo tower A 795 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3012 20-May-16 Condo tower A 796 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
3013 20-May-16 Condo tower A 797 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.00 TI-26
3014 20-May-16 Condo tower A 798 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3015 21-May-16 Condo tower B 158 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3016 21-May-16 Condo tower B 157 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3017 21-May-16 Condo tower B 134 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3018 21-May-16 Condo tower B 133 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3019 21-May-16 Condo tower B 263 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
3020 21-May-16 Condo tower B 262 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3021 21-May-16 Condo tower B 261 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3022 21-May-16 Condo tower B 260 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.70 742.20 TI-25
3023 21-May-16 Condo tower A 799 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
3024 21-May-16 Condo tower A 800 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
3025 21-May-16 Condo tower A 801 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
3026 23-May-16 Condo tower B 24 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3027 23-May-16 Condo tower B 23 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.30 TI-24
3028 23-May-16 Condo tower B 22 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3029 23-May-16 Condo tower B 21 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
3030 23-May-16 Condo tower B 242 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
3031 23-May-16 Condo tower B 243 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
3032 23-May-16 Condo tower B 244 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
3033 23-May-16 Condo tower A 30054 Ǿ800 17 17 34.00 35.50 1.5 1.00 21.50 810.00 TI-26
3034 23-May-16 Condo tower A 30055 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-26
3035 23-May-16 Condo tower A 809 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 791.10 TI-26
3036 23-May-16 Condo tower A 808 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3037 23-May-16 Condo tower A 807 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3038 24-May-16 Condo tower B 20 Ǿ800 17 17 34.00 42.00 8.0 1.00 29.00 702.50 TI-24
3039 24-May-16 Condo tower B 19 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3040 24-May-16 Condo tower B 18 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3041 24-May-16 Condo tower B 17 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
3042 24-May-16 Condo tower B 245 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
3043 24-May-16 Condo tower B 246 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
3044 24-May-16 Condo tower B 247 Ǿ800 17 17 34.00 42.00 8.0 1.00 18,1 681,9 TI-25
3045 24-May-16 Condo tower A 806 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3046 24-May-16 Condo tower A 805 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3047 25-May-16 Condo tower B 16 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3048 25-May-16 Condo tower B 15 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3049 25-May-16 Condo tower A 804 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
3050 25-May-16 Condo tower A 803 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
3051 25-May-16 Condo tower A 802 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
3052 25-May-16 Condo tower A 818 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
3053 26-May-16 Condo tower B 14 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3054 26-May-16 Condo tower B 13 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3055 26-May-16 Condo tower B 241 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3056 26-May-16 Condo tower B 240 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.60 813.70 TI-25
3057 26-May-16 Condo tower A 819 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.50 810.00 TI-26
3058 26-May-16 Condo tower A 820 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 20.50 772.30 TI-26
3059 26-May-16 Condo tower A 821 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3060 27-May-16 Condo tower B 1 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3061 27-May-16 Condo tower B 2 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3062 27-May-16 Condo tower B 3 Ǿ800 17 17 34.00 38.50 4.5 1.00 23.00 807.90 TI-24
3063 27-May-16 Condo tower B 4 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3064 27-May-16 Condo tower B 239 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3065 27-May-16 Condo tower B 238 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
3066 27-May-16 Condo tower B 237 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.90 674.40 TI-25
3067 27-May-16 Condo tower B 236 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3068 27-May-16 Condo tower A 822 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3069 27-May-16 Condo tower A 823 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26
3070 27-May-16 Condo tower A 824 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 847.70 TI-26
3071 27-May-16 Condo tower A 825 Ǿ800 17 17 34.00 28.00 -6.0 1.00 22.00 828.80 TI-26
3072 28-May-16 Condo tower B 5 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.60 TI-24
3073 28-May-16 Condo tower B 6 Ǿ800 17 17 34.00 19.50 -14.5 1.00 23.00 807.90 TI-24
3074 28-May-16 Condo tower B 218 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3075 28-May-16 Condo tower B 219 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 838.80 TI-25
3076 28-May-16 Condo tower B 220 Ǿ800 17 17 34.00 36.00 2.0 1.00 12.00 452.10 TI-25
3077 28-May-16 Condo tower B 221 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.60 738.40 TI-25
3078 28-May-16 Condo tower A 835 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
3079 28-May-16 Condo tower A 834 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.00 602.80 TI-26
3080 28-May-16 Condo tower A 833 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 810.00 TI-26
3081 28-May-16 Condo tower A 832 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-26
3082 29-May-16 Condo tower A 831 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-26
3083 29-May-16 Condo tower A 830 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3084 30-May-16 Condo tower B 7 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3085 30-May-16 Condo tower B 8 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3086 30-May-16 Condo tower B 222 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
3087 30-May-16 Condo tower B 223 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3088 30-May-16 Condo tower B 224 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.10 757.20 TI-25
3089 30-May-16 Condo tower B 217 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-25
3090 30-May-16 Condo tower A 829 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3091 30-May-16 Condo tower A 828 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3092 30-May-16 Condo tower A 827 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
3093 30-May-16 Condo tower A 826 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3094 31-May-16 Condo tower B 9 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3095 31-May-16 Condo tower B 10 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3096 31-May-16 Condo tower B 11 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3097 31-May-16 Condo tower B 12 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
3098 31-May-16 Condo tower B 216 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
3099 31-May-16 Condo tower B 215 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3100 31-May-16 Condo tower B 212 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3101 1-Jun-16 Condo tower B 86 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3102 1-Jun-16 Condo tower B 38 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3103 1-Jun-16 Condo tower B 61 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3104 1-Jun-16 Condo tower B 85 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24
3105 1-Jun-16 Condo tower B 211 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 22.20 836.40 TI-25
3106 1-Jun-16 Condo tower B 210 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.70 817.50 TI-25
3107 1-Jun-16 Condo tower B 209 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
3108 1-Jun-16 Condo tower B 208 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3109 1-Jun-16 Condo tower B 207 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
3110 2-Jun-16 Condo tower B 109 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
3111 2-Jun-16 Condo tower B 110 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3112 2-Jun-16 Condo tower B 214 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3113 2-Jun-16 Condo tower B 213 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3114 2-Jun-16 Condo tower B 194 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
3115 2-Jun-16 Condo tower B 195 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
3116 2-Jun-16 Condo tower A 30053 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
3117 2-Jun-16 Condo tower A 841 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3118 2-Jun-16 Condo tower A 842 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3119 2-Jun-16 Condo tower A 843 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 810.00 TI-26
3120 2-Jun-16 Condo tower A 844 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3121 2-Jun-16 Condo tower A 845 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3122 3-Jun-16 Condo tower B 30091 Ǿ800 17 17 34.00 32.50 -1.5 1.00 23.00 807.90 TI-24
3123 3-Jun-16 Condo tower B 30092 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3124 3-Jun-16 Condo tower B 30093 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3125 3-Jun-16 Condo tower B 30094 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3126 3-Jun-16 Condo tower B 196 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3127 3-Jun-16 Condo tower B 197 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3128 3-Jun-16 Condo tower B 198 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
3129 3-Jun-16 Condo tower B 199 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
3130 3-Jun-16 Condo tower B 200 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
3131 3-Jun-16 Condo tower A 846 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
3132 3-Jun-16 Condo tower A 847 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 700.70 TI-26
3133 3-Jun-16 Condo tower A 848 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
3134 3-Jun-16 Condo tower A 849 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
3135 4-Jun-16 Condo tower B 30095 Ǿ800 17 17 34.00 30.00 -4.0 1.00 23.00 808.90 TI-24
3136 4-Jun-16 Condo tower B 30096 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 632.30 TI-24
3137 4-Jun-16 Condo tower B 201 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3138 4-Jun-16 Condo tower B 202 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3139 4-Jun-16 Condo tower B 203 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3140 5-Jun-16 Condo tower B 204 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 640.50 TI-25
3141 5-Jun-16 Condo tower B 205 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
3142 5-Jun-16 Condo tower B 206 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
3143 7-Jun-16 Condo tower B 30097 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3144 7-Jun-16 Condo tower B 30081 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24
3145 7-Jun-16 Condo tower B 37 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3146 7-Jun-16 Condo tower B 30080 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3147 7-Jun-16 Condo tower B 30089 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3148 7-Jun-16 Condo tower B 30088 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.60 813.70 TI-25
3149 7-Jun-16 Condo tower B 30087 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 716.00 TI-25
3150 8-Jun-16 Condo tower B 30098 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3151 8-Jun-16 Condo tower B 30090 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3152 8-Jun-16 Condo tower B 230 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25
3153 8-Jun-16 Condo tower B 30079 Ǿ800 17 17 34.00 33.00 -1.0 1.00 22.10 832.60 TI-25
3154 8-Jun-16 Condo tower B 30078 Ǿ800 17 17 34.00 34.50 0.5 1.00 22.00 828.80 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
3155 9-Jun-16 Condo tower B 30110 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24
3156 9-Jun-16 Condo tower B 30076 Ǿ800 17 17 34.00 32.50 -1.5 1.00 21.00 527.40 TI-25
3157 9-Jun-16 Condo tower B 30077 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
3158 9-Jun-16 Condo tower B 314 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
3159 9-Jun-16 Condo tower B 315 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3160 10-Jun-16 Condo tower B 336 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
3161 10-Jun-16 Condo tower B 337 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
3162 10-Jun-16 Condo tower B 30085 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
3163 10-Jun-16 Condo tower B 30084 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 791.10 TI-25
3164 10-Jun-16 Condo tower B 30083 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
3165 10-Jun-16 Condo tower A 858 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3166 10-Jun-16 Condo tower A 857 Ǿ800 17 17 34.00 42.40 8.4 1.00 19.50 734.60 TI-26
3167 10-Jun-16 Condo tower A 856 Ǿ800 17 17 34.00 42.30 8.3 1.00 21.00 791.10 TI-26
3168 10-Jun-16 Condo tower A 855 Ǿ800 17 17 34.00 42.20 8.2 1.00 18.00 678.10 TI-26
3169 11-Jun-16 Condo tower B 30082 Ǿ800 17 17 34.00 32.00 -2.0 1.00 16.10 404.40 TI-25
3170 11-Jun-16 Condo tower A 854 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3171 11-Jun-16 Condo tower A 853 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
3172 11-Jun-16 Condo tower A 852 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 719.80 TI-26
3173 11-Jun-16 Condo tower A 851 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
3174 12-Jun-16 Condo tower A 865 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.50 659.30 TI-26
3175 12-Jun-16 Condo tower A 866 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
3176 12-Jun-16 Condo tower A 867 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3177 12-Jun-16 Condo tower A 868 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.00 TI-26
3178 13-Jun-16 Condo tower A 869 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3179 13-Jun-16 Condo tower A 870 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3180 13-Jun-16 Condo tower A 871 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3181 13-Jun-16 Condo tower A 872 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3182 13-Jun-16 Condo tower A 873 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3183 13-Jun-16 Condo tower B 30086 Ǿ800 17 17 34.00 35.00 1.0 1.00 20.10 757.20 TI-25
3184 14-Jun-16 Condo tower A 882 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
3185 14-Jun-16 Condo tower A 881 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
3186 14-Jun-16 Condo tower A 880 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3187 14-Jun-16 Condo tower A 879 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
3188 14-Jun-16 Condo tower B 30171 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25
3189 14-Jun-16 Condo tower B 30172 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3190 15-Jun-16 Condo tower A 878 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
3191 15-Jun-16 Condo tower A 877 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3192 15-Jun-16 Condo tower A 876 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3193 15-Jun-16 Condo tower A 875 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3194 15-Jun-16 Condo tower A 850 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3195 15-Jun-16 Condo tower B 30175 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.40 693.20 TI-25
3196 18-Jun-16 Condo tower A 30063 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25
3197 18-Jun-16 Condo tower A 30064 Ǿ800 17 17 34.00 34.25 0.3 1.00 21.70 817.50 TI-25
3198 18-Jun-16 Condo tower A 30062 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3199 18-Jun-16 Condo tower A 30103 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
3200 18-Jun-16 Condo tower A 30104 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
3201 18-Jun-16 Condo tower A 30105 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3202 18-Jun-16 Condo tower A 30106 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3203 19-Jun-16 Condo tower A 30066 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25
3204 19-Jun-16 Condo tower A 30068 Ǿ800 17 17 34.00 35.00 1.0 1.00 21.70 817.50 TI-25
3205 19-Jun-16 Condo tower A 30065 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.80 821.30 TI-25
3206 20-Jun-16 Condo tower A 30074 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
3207 20-Jun-16 Condo tower A 30067 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3208 20-Jun-16 Condo tower A 30100 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26
3209 20-Jun-16 Condo tower A 30101 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
3210 20-Jun-16 Condo tower A 30102 Ǿ800 17 17 34.00 34.50 0.5 1.00 21.50 810.00 TI-26
3211 21-Jun-16 Condo tower B 30173 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
3212 21-Jun-16 Condo tower B 30174 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
3213 21-Jun-16 Condo tower A 30109 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
TOTAL PEMANCANGAN MAIN PILE 102944.00 114528.51 11584.51 1.00 0.00 3227.00 196.00
: 10 Okt 2015 -
No. of Page
……1….. Of ……1…..
REMARK
VWSG
VWSG
VWSG
790
pengganti IP-18{466)
VWSG
INDIKATOR
INDIKATOR
INDIKATOR
INDIKATOR
INDIKATOR
potong tiang
potong tiang
tiang pecah
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
tiang pecah
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
Potong tiang
Potong tiang
Potong tiang
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
REMARK
potong tiang
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
REMARK
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
REMARK
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
TENTION
TENTION
REMARK
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
TENTION
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
sisipan
sisipan
potong tiang
sisipan
potong tiang(sisipan)
potong tiang(sisipan)
REMARK
sisipan
potong tiang(sisipan)
sisipan
potong tiang
potong tiang
potong tiang(sisipan)
potong tiang(sisipan)
sisipan
potong tiang(sisipan)
sisipan
potong tiang(sisipan)
potong tiang(sisipan)
potong tiang(sisipan)
potong tiang(sisipan)
REMARK
potong tiang
REMARK
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
REMARK
potong tiang
sisipan
sisipan
sisipan
sisipan
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
potong tiang
potong tiang
potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
Kondo Twr A
Kondo Twr A
Kondo Twr A
Kondo Twr A
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
sisipan
sisipan
REMARK
sisipan
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
potong tiang
potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tiang pecah
tiang pecah
tension
tension
tension
tension
SP sisipan
SP sisipan
SP sisipan
SP sisipan
SP sisipan
tiang pecah
tiang pecah
tension
tension
tension
tension
tension
tension
SP sisipan
SP sisipan
SP sisipan
SP sisipan
REMARK
SP sisipan
SP sisipan
tension
tension
tension
tension
tension
tension
tension
tension
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
Condo tower A
Condo tower A
Condo tower A
potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
potong tiang
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
potong tiang
tension
tension
tension
tension
tension
tension
potong tiang
tension
tension
tension
tension
tension
tension(potong)
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tention
tention
tention
sisipan
sisipan
sisipan
REMARK
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
tention
tention
Tension
Tension
sisipan SP
sisipan SP
Pecah
potong tiang
REMARK
pecah
pecah
Tension Tambahan
Tension
Tension Tambahan
Tension
Tension
Tension
Tension
pecah
REMARK
tiang pecah
sisipam sp
sisipam sp
potong tiang
sisipan
sisipan
sisipan(potong tiang)
sisipan
tension
tension
tension
tension
tension
REMARK
tension
tension
tension
tension
potong tiang
sisipan
sisipan
sisipan
REMARK
Tension
Tension
Tension
Potong tiang
salah mancang
Tension
Tension
Tension
Tension
Tension
Tension
Tension
Tension
Tension
Tension
Tension
Tension
REMARK
Tension
Tension
Tension Tambahan
sisipan Tension
sisipan SP
Tension
sisipan SP
sisipan SP
sisipan SP
sisipan SP
potong (sisipan)
sisipan(potong tiang)
sisipan(potong tiang)
tiang pecah
tiang pecah
REMARK
potong tiang
sisipan office
REMARK
Potong tiang
potong tiang
potong tiang
REMARK
potong tiang
potong tiang
REMARK
sisipan
REMARK
sisipan
sisipan
REMARK
sisipan
sisipan
sisipan
REMARK
REMARK
sisipan
sisipan
potong tiang
potong tiang
presur los
REMARK
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
REMARK
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan(pecah)
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
REMARK
1 13-Oct-15 Main Pile 2345 Ǿ600 17 15 32.00 30.00 1.00 1 21.00 373.20 12.00 TI-21A tiang pecah
2 21-Oct-15 Main Pile 2283 Ǿ600 15 17 32.00 31.00 - 1.00 1 24.20 421.10 12.00 TI-03 tiang pecah
TOTAL PEMANCANGAN MAIN PILE 64.00 61.00 0.00 0.00 0.00 2.00 2.00
1 29-Feb-16 main pile tambahan 10929 Ǿ600 15 17 32.00 37.00 5.0 1.00 16.00 401.90 TI-26
2 29-Feb-16 main pile tambahan 10930 Ǿ600 15 17 32.00 37.00 5.0 1.00 16.00 401.90 TI-26
3 29-Feb-16 main pile tambahan 10931 Ǿ600 15 17 32.00 37.00 5.0 1.00 14.00 351.60 TI-26
4 29-Feb-16 main pile tambahan 10932 Ǿ600 15 17 32.00 37.00 5.0 1.00 15.00 376.70 TI-26
TOTAL PEMANCANGAN MAIN PILE 128.00 148.00 20.00 0.00 0.00 4.00 0.00
195 8-Nov-15 main pile 2183 Ǿ600 15 15.00 14.50 -0.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
457 3-Dec-15 main pile 2166 Ǿ600 17 17.00 14.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
180 7-Nov-15 main pile 2215 Ǿ600 17 17.00 15.00 -2.00 1.00 24.00 426.50 12.00 TI-21A Potong tiang
224 11-Nov-15 main pile 2083 Ǿ600 15 15.00 15.00 0.00 1.00 24.00 426.50 12.00 TI-21A
254 13-Nov-15 main pile 2144 Ǿ600 15 17 32.00 15.00 -17.00 1.00 17.50 439.50 12.00 TI-26 potong pile
261 14-Nov-15 main pile 1990 Ǿ600 17 17.00 15.00 -2.00 1.00 1 24.00 426.00 12.00 TI-21A potong pile
233 12-Nov-15 main pile 2013 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
300 19-Nov-15 main pile 2038 Ǿ600 17 17.00 15.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A
106 29-Oct-15 main pile 2020 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.70 438.90 12.00 TI-21A potong tiang
173 6-Nov-15 main pile 1976 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
194 8-Nov-15 main pile 2182 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
372 26-Nov-15 main pile 2056 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
458 3-Dec-15 main pile 2167 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
342 24-Nov-15 main pile 2075 Ǿ600 17 15 32.00 16.20 -15.80 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
108 29-Oct-15 main pile 2155 Ǿ600 15 17 32.00 16.50 -15.50 1.00 1 24.70 438.90 12.00 TI-21A potong tiang
144 3-Nov-15 main pile 2127 Ǿ600 15 17 32.00 17.00 -15.00 1.00 1 17.00 439.50 12.00 TI-26 potong tiang
339 24-Nov-15 main pile 2074 Ǿ600 17 15 32.00 17.00 -15.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
179 7-Nov-15 main pile 2214 Ǿ600 15 17 32.00 17.50 -14.50 1.00 24.00 426.50 12.00 TI-21A Potong tiang
664 17-Dec-15 main pile 2983 Ǿ600 17 15 32.00 17.50 -14.50 1.00 1 16.00 463.40 12.00 TI-16 potong tiang
349 25-Nov-15 main pile 2058 Ǿ600 15 10 25.00 18.00 -7.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
81 25-Oct-15 Main Pile 2106 Ǿ600 15 17 32.00 19.00 -13.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
366 25-Nov-15 main pile 2280 Ǿ600 15 17 32.00 19.00 -13.00 1.00 24.20 421.10 12.00 TI-03
572 11-Dec-15 main pile 2398 Ǿ600 17 15 32.00 19.00 -13.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
295 18-Nov-15 main pile 2269 Ǿ600 15 17 32.00 19.50 -12.50 1.00 24.20 421.00 12.00 TI-03
279 16-Nov-15 main pile 2259 Ǿ600 15 17 32.00 20.00 -12.00 1.00 24.50 426.30 12.00 TI-03
323 22-Nov-15 main pile 2047 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
329 23-Nov-15 main pile 2274 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
535 10-Dec-15 main pile 2395 Ǿ600 17 15 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
64 23-Oct-15 Main Pile 2164 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
301 19-Nov-15 main pile 2040 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 24.00 426.50 12.00 TI-21A
159 4-Nov-15 main pile 2135 Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
175 6-Nov-15 main pile 1978 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
831 7-Jan-16 main pile 2599 Ǿ600 17 15 32.00 22.00 -10.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
237 12-Nov-15 main pile 1999 Ǿ600 15 17 32.00 22.50 -9.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
315 21-Nov-15 main pile 2532 Ǿ600 15 17 32.00 23.00 -9.00 1.00 23.70 420.00 12.00 TI-07
331 23-Nov-15 main pile 2268 Ǿ600 15 17 32.00 23.00 -9.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
249 13-Nov-15 main pile 2002 Ǿ600 15 17 32.00 23.50 -8.50 1.00 24.00 426.50 12.00 TI-21A potong pile
79 24-Oct-15 Main Pile 2292 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
171 6-Nov-15 main pile 2267 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
264 14-Nov-15 main pile 1986 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
322 22-Nov-15 main pile 2042 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
216 10-Nov-15 main pile 2086 Ǿ600 17 15 32.00 24.50 -7.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
90 27-Oct-15 Main Pile 2290 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.20 12.00 TI-03 potong tiang
193 8-Nov-15 main pile 2181 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
272 14-Nov-15 main pile 2249 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.30 12.00 TI-03
354 25-Nov-15 main pile 2060 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A
344 25-Nov-15 main pile 2521 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 23.70 420.00 12.00 TI-07
638 15-Dec-15 main pile 2427 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
360 25-Nov-15 main pile 2277 Ǿ600 15 17 32.00 27.00 -5.00 1.00 24.20 421.10 12.00 TI-03
68 23-Oct-15 Main Pile 2352 Ǿ600 15 17 32.00 27.30 -4.70 1.00 24.20 421.10 12.00 TI-03
182 7-Nov-15 main pile 2216 Ǿ600 15 17 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A Potong tiang
227 11-Nov-15 main pile 2014 Ǿ600 17 15 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A
289 17-Nov-15 main pile 2036 Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
60 23-Oct-15 Main Pile 2096 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
62 23-Oct-15 Main Pile 2162 Ǿ600 15 7 17 39.00 28.00 -11.00 2.00 1 23.70 421.10 12.00 TI-21A potong tiang
226 11-Nov-15 main pile 2018 Ǿ600 17 15 32.00 28.00 -4.00 1.00 23.70 421.10 12.00 TI-21A
290 17-Nov-15 main pile 2034 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
365 25-Nov-15 main pile 2276 Ǿ600 15 17 32.00 28.00 -4.00 1.00 24.20 421.10 12.00 TI-03
682 19-Dec-15 main pile 2545 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.10 12.00 TI-03
849 9-Jan-16 main pile 2573 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.1 12.00 TI-03 potong tiang
88 26-Oct-15 Main Pile 2007 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
259 14-Nov-15 main pile 1993 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
318 21-Nov-15 main pile 2041 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
234 12-Nov-15 main pile 1994 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 23.70 421.10 12.00 TI-21A potong pile
260 14-Nov-15 main pile 1989 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.00 426.50 12.00 TI-21A potong pile
613 13-Dec-15 main pile 2416 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.10 421.10 12.00 TI-03 potong tiang
47 21-Oct-15 Main Pile 2091 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
49 21-Oct-15 Main Pile 2111 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
70 24-Oct-15 Main Pile 2163 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
84 25-Oct-15 Main Pile 2010 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
85 26-Oct-15 Main Pile 2003 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.10 421.10 12.00 TI-21A potong tiang
87 26-Oct-15 Main Pile 2005 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
121 30-Oct-15 main pile 2305 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 42.10 12.00 TI-03
123 30-Oct-15 main pile 2219 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
140 2-Nov-15 main pile 2173 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
149 3-Nov-15 main pile 2158 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
163 4-Nov-15 main pile 2015 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
190 8-Nov-15 main pile 2147 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
191 8-Nov-15 main pile 2149 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A potong pile
192 8-Nov-15 main pile 2150 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A potong pile
210 10-Nov-15 main pile 2116 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
245 13-Nov-15 main pile 1998 Ǿ600 17 15 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A potong pile
248 13-Nov-15 main pile 2001 Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A potong pile
250 13-Nov-15 main pile 1992 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A potong pile
251 13-Nov-15 main pile 1991 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A potong pile
267 14-Nov-15 main pile 2186 Ǿ600 15 17 32.00 29.00 -3.00 1.00 17.50 439.50 12.00 TI-26 potong pile
274 14-Nov-15 main pile 2247 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
280 17-Nov-15 main pile 2258 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 25.50 426.30 12.00 TI-03 potong pile
285 17-Nov-15 main pile 1984 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
320 21-Nov-15 main pile 2044 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
325 22-Nov-15 main pile 2028 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
437 1-Dec-15 main pile 2481 Ǿ600 17 17 34.00 29.00 -5.00 1.00 23.70 420.00 12.00 TI-07 potong tiang
460 3-Dec-15 main pile 2168 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
523 8-Dec-15 main pile 2378 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
605 13-Dec-15 main pile 2715 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.30 501.10 12.00 TI-16 potong tiang
663 17-Dec-15 main pile 2982 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16 potong tiang
720 23-Dec-15 main pile 2603 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
745 24-Dec-15 main pile 2658 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
235 12-Nov-15 main pile 1996 Ǿ600 15 17 32.00 29.30 -2.70 1.00 1 23.70 421.10 12.00 TI-21A potong pile
56 22-Oct-15 Main Pile 2100 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
57 22-Oct-15 Main Pile 2101 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
72 24-Oct-15 Main Pile 2102 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
128 30-Oct-15 main pile 2154 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
142 2-Nov-15 main pile 2223 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
143 2-Nov-15 main pile 2226 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
151 3-Nov-15 main pile 2175 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
197 9-Nov-15 main pile 2148 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
262 14-Nov-15 main pile 1988 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
263 14-Nov-15 main pile 1985 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
286 17-Nov-15 main pile 1982 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
287 17-Nov-15 main pile 1983 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong pile
304 20-Nov-15 main pile 2027 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
317 21-Nov-15 main pile 2045 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
319 21-Nov-15 main pile 2046 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
324 22-Nov-15 main pile 2043 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
459 3-Dec-15 main pile 2165 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
744 24-Dec-15 main pile 2661 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
7 10-Oct-15 Main Pile 2382 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 23.00 408.70 12.00 TI-12A potong tiang
9 13-Oct-15 Main Pile 2345 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 21.00 373.20 12.00 TI-21A tiang pecah
10 13-Oct-15 Main Pile 2343 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 23.30 421.10 12.00 TI-21A potong tiang
15 14-Oct-15 Main Pile 2304 Ǿ600 17 15 32.00 30.00 -2.00 1.00 23.50 421.10 TI-21A potong tiang
71 24-Oct-15 Main Pile 2161 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
75 24-Oct-15 Main Pile 2289 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
82 25-Oct-15 Main Pile 2006 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
91 27-Oct-15 Main Pile 2291 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
109 29-Oct-15 main pile 2152 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
110 29-Oct-15 main pile 2177 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
111 29-Oct-15 main pile 2180 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
138 2-Nov-15 main pile 2156 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
141 2-Nov-15 main pile 2176 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
147 3-Nov-15 main pile 2132 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
152 3-Nov-15 main pile 2224 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
153 3-Nov-15 main pile 2225 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
236 12-Nov-15 main pile 1995 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
303 20-Nov-15 main pile 2032 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
321 21-Nov-15 main pile 2031 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
327 23-Nov-15 main pile 2272 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
350 25-Nov-15 main pile 2055 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
444 1-Dec-15 main pile 2170 Ǿ600 15 17 32.00 30.00 -2.00 1.00 24.00 426.50 12.00 TI-21A
476 4-Dec-15 main pile 2228 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
26 19-Oct-15 Main Pile 2287 Ǿ600 15 17 32.00 30.20 -1.80 1.00 24.20 421.10 12.00 TI-03 potong tiang
6 10-Oct-15 Main Pile 2381 Ǿ600 17 15 32.00 30.50 -1.50 1.00 1 23.00 408.70 12.00 TI-12A potong tiang
12 14-Oct-15 Main Pile 2301 Ǿ600 17 15 32.00 30.50 -1.50 1.00 23.70 421.10 TI-21A potong tiang
13 14-Oct-15 Main Pile 2302 Ǿ600 17 15 32.00 30.50 -1.50 1.00 23.70 421.10 TI-21A potong tiang
22 18-Oct-15 Main Pile 2297 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.50 426.30 TI-03 potong tiang
23 18-Oct-15 Main Pile 2298 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.50 426.30 TI-03 potong tiang
93 27-Oct-15 Main Pile 2232 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
277 16-Nov-15 main pile 2255 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03
291 17-Nov-15 main pile 2037 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
356 25-Nov-15 main pile 2279 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.20 421.10 12.00 TI-03
43 21-Oct-15 Main Pile 2283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03 tiang pecah
74 24-Oct-15 Main Pile 2104 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
393 27-Nov-15 main pile 2314 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
486 4-Dec-15 main pile 2699 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16
487 4-Dec-15 main pile 2702 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 15.50 448.90 12.00 TI-16
519 8-Dec-15 main pile 2683 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16 potong tiang
619 14-Dec-15 main pile 2742 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.50 477.90 12.00 TI-16
803 30-Dec-15 main pile 2787 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.20 421.10 12.00 TI-03
854 9-Jan-16 main pile 2593 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.1 12.00 TI-03 potong tiang
29 20-Oct-15 Main Pile 2288 Ǿ600 15 17 32.00 31.10 -0.90 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
433 30-Nov-15 main pile 2315 Ǿ600 15 17 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
532 10-Dec-15 main pile 2396 Ǿ600 17 15 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
31 20-Oct-15 Main Pile 2236 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
34 20-Oct-15 Main Pile 2088 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
35 20-Oct-15 Main Pile 2092 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
40 21-Oct-15 Main Pile 2240 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
41 21-Oct-15 Main Pile 2241 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
44 21-Oct-15 Main Pile 2282 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
55 22-Oct-15 Main Pile 2099 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
61 23-Oct-15 Main Pile 2094 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
76 24-Oct-15 Main Pile 2294 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
83 25-Oct-15 Main Pile 2009 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
89 26-Oct-15 Main Pile 2011 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
95 27-Oct-15 Main Pile 2234 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
102 28-Oct-15 main pile 2340 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 421.10 12.00 TI-03
119 29-Oct-15 soldier pile 2380 Ǿ600 15 17 32.00 32.00 0.00 1.00 24..2 421.10 12.00 TI-03
120 30-Oct-15 main pile 2354 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
129 30-Oct-15 main pile 2178 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
198 9-Nov-15 main pile 2151 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
211 10-Nov-15 main pile 2117 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
215 10-Nov-15 main pile 2085 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
217 10-Nov-15 main pile 1979 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
219 10-Nov-15 main pile 1980 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
223 11-Nov-15 main pile 2082 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
265 14-Nov-15 main pile 1987 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
271 14-Nov-15 main pile 2250 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
273 14-Nov-15 main pile 2248 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
276 14-Nov-15 main pile 2254 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
288 17-Nov-15 main pile 2035 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
302 19-Nov-15 main pile 2039 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
305 20-Nov-15 main pile 2030 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
306 20-Nov-15 main pile 2033 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
326 22-Nov-15 main pile 2029 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
328 23-Nov-15 main pile 2275 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
332 23-Nov-15 main pile 2270 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
351 25-Nov-15 main pile 2057 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
352 25-Nov-15 main pile 2061 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
353 25-Nov-15 main pile 2059 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
355 25-Nov-15 main pile 2278 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
357 25-Nov-15 main pile 2307 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
358 25-Nov-15 main pile 2309 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
359 25-Nov-15 main pile 2306 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
363 25-Nov-15 main pile 2243 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
364 25-Nov-15 main pile 2246 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
387 27-Nov-15 main pile 2310 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421,1 12.00 TI-03
389 27-Nov-15 main pile 2336 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
391 27-Nov-15 main pile 2337 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
394 27-Nov-15 main pile 2311 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
407 28-Nov-15 main pile 2313 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
409 28-Nov-15 main pile 2331 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
411 28-Nov-15 main pile 2359 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
427 30-Nov-15 main pile 2317 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
432 30-Nov-15 main pile 2318 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
434 30-Nov-15 main pile 2329 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
435 30-Nov-15 main pile 2316 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
449 1-Dec-15 main pile 2325 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
451 1-Dec-15 main pile 2364 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
452 1-Dec-15 main pile 2367 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
454 2-Dec-15 main pile 2321 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
455 2-Dec-15 main pile 2320 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
456 2-Dec-15 main pile 2323 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
465 3-Dec-15 main pile 2475 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
468 3-Dec-15 main pile 2366 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
469 3-Dec-15 main pile 2363 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
471 3-Dec-15 main pile 2327 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
472 3-Dec-15 main pile 2324 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
473 3-Dec-15 main pile 2322 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
483 4-Dec-15 main pile 2701 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
484 4-Dec-15 main pile 2700 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
485 4-Dec-15 main pile 2698 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
488 4-Dec-15 main pile 2703 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
489 4-Dec-15 main pile 2370 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
490 4-Dec-15 main pile 2368 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
491 4-Dec-15 main pile 2369 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
492 4-Dec-15 main pile 2371 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
493 4-Dec-15 main pile 2372 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
494 5-Dec-15 main pile 2704 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
495 5-Dec-15 main pile 2705 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
496 5-Dec-15 main pile 2694 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
497 5-Dec-15 main pile 2693 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
498 5-Dec-15 main pile 2691 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
499 5-Dec-15 main pile 2692 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
501 5-Dec-15 main pile 2463 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
505 7-Dec-15 main pile 2458 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
506 7-Dec-15 main pile 2460 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
508 7-Dec-15 main pile 2461 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
514 8-Dec-15 main pile 2689 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
515 8-Dec-15 main pile 2690 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
516 8-Dec-15 main pile 2687 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
517 8-Dec-15 main pile 2688 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
518 8-Dec-15 main pile 2682 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
520 8-Dec-15 main pile 2684 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
521 8-Dec-15 main pile 2685 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
522 8-Dec-15 main pile 2686 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
524 8-Dec-15 main pile 2377 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
525 8-Dec-15 main pile 2376 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
526 8-Dec-15 main pile 2374 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
529 10-Dec-15 main pile 2392 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
530 10-Dec-15 main pile 2391 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
531 10-Dec-15 main pile 2397 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
533 10-Dec-15 main pile 2393 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
534 10-Dec-15 main pile 2394 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
544 10-Dec-15 main pile 2651 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
545 10-Dec-15 main pile 2650 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
546 10-Dec-15 main pile 2649 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
547 10-Dec-15 main pile 2648 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
548 10-Dec-15 main pile 2647 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
549 10-Dec-15 main pile 2644 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
550 10-Dec-15 main pile 2643 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
551 10-Dec-15 main pile 2645 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
552 10-Dec-15 main pile 2646 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
553 11-Dec-15 main pile 2584 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
566 11-Dec-15 main pile 2653 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
568 11-Dec-15 main pile 2655 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
569 11-Dec-15 main pile 2656 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
570 11-Dec-15 main pile 2400 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
573 11-Dec-15 main pile 2399 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
574 11-Dec-15 main pile 2402 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
575 11-Dec-15 main pile 2403 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
576 11-Dec-15 main pile 2404 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
578 11-Dec-15 main pile 2388 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
591 12-Dec-15 main pile 2681 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
595 12-Dec-15 main pile 2383 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
596 12-Dec-15 main pile 2410 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
598 12-Dec-15 main pile 2408 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
600 12-Dec-15 main pile 2412 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
602 12-Dec-15 main pile 2405 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
604 13-Dec-15 main pile 2714 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
607 13-Dec-15 main pile 2717 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
609 13-Dec-15 main pile 2738 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
615 13-Dec-15 main pile 2418 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
617 13-Dec-15 main pile 2414 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
622 14-Dec-15 main pile 2428 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
625 14-Dec-15 main pile 2424 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
626 14-Dec-15 main pile 2420 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
628 14-Dec-15 main pile 2422 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
629 15-Dec-15 main pile 2426 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
631 15-Dec-15 main pile 2441 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
633 15-Dec-15 main pile 2444 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
636 15-Dec-15 main pile 2438 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
637 15-Dec-15 main pile 2439 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
661 16-Dec-15 main pile 2435 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.70 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
665 17-Dec-15 main pile 2718 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
785 27-Dec-15 main pile 2730 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 42.70 12.00 TI-03
838 8-Jan-16 main pile 2627 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
844 8-Jan-16 main pile 2597 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
847 9-Jan-16 main pile 2575 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
859 11-Jan-16 main pile 2564 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
861 11-Jan-16 main pile 2560 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
865 11-Jan-16 main pile 2568 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
866 11-Jan-16 main pile 2567 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
867 11-Jan-16 main pile 2565 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
868 11-Jan-16 main pile 2566 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
212 10-Nov-15 main pile 2115 Ǿ600 17 15 32.00 32.10 0.10 1.00 23.70 421.10 12.00 TI-21A
213 10-Nov-15 main pile 2114 Ǿ600 17 15 32.00 32.13 0.13 1.00 23.70 421.10 12.00 TI-21A
54 22-Oct-15 Main Pile 2109 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
86 26-Oct-15 Main Pile 2004 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
127 30-Oct-15 main pile 2153 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
150 3-Nov-15 main pile 2174 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
162 4-Nov-15 main pile 2157 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
165 4-Nov-15 main pile 2017 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
183 7-Nov-15 main pile 2218 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
196 8-Nov-15 main pile 2184 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
338 24-Nov-15 main pile 2076 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
443 1-Dec-15 main pile 2171 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
448 1-Dec-15 main pile 2229 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
475 4-Dec-15 main pile 2978 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
45 21-Oct-15 Main Pile 2089 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
48 21-Oct-15 Main Pile 2110 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
51 21-Oct-15 Main Pile 2113 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
125 30-Oct-15 main pile 2221 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
130 30-Oct-15 main pile 2179 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
181 7-Nov-15 main pile 2217 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
374 26-Nov-15 main pile 2078 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
379 27-Nov-15 main pile 2196 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
382 27-Nov-15 main pile 2205 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
442 1-Dec-15 main pile 2172 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
474 4-Dec-15 main pile 2979 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
58 23-Oct-15 Main Pile 2026 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
383 27-Nov-15 main pile 2204 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
426 30-Nov-15 main pile 2202 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
164 4-Nov-15 main pile 2016 Ǿ600 15 17 32.00 32.30 0.30 1.00 24.00 426.50 12.00 TI-21A
246 13-Nov-15 main pile 1997 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
247 13-Nov-15 main pile 2000 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
341 24-Nov-15 main pile 2073 Ǿ600 17 15 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
446 1-Dec-15 main pile 2227 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
507 7-Dec-15 main pile 2462 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
555 11-Dec-15 main pile 2586 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
666 17-Dec-15 main pile 2674 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
375 26-Nov-15 main pile 2079 Ǿ600 15 17 32.00 32.35 0.35 1.00 23.70 421.10 12.00 TI-21A
308 20-Nov-15 main pile 2528 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
377 26-Nov-15 main pile 2081 Ǿ600 15 17 32.00 32.40 0.40 1.00 23.70 421.10 12.00 TI-21A
461 3-Dec-15 main pile 2478 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
504 5-Dec-15 main pile 2459 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
537 10-Dec-15 main pile 2578 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
556 11-Dec-15 main pile 2587 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
697 21-Dec-15 main pile 2800 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
37 20-Oct-15 Main Pile 2097 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
42 21-Oct-15 Main Pile 2242 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
52 22-Oct-15 Main Pile 2107 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
139 2-Nov-15 main pile 2159 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
214 10-Nov-15 main pile 2084 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
225 11-Nov-15 main pile 2019 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.20 421.10 12.00 TI-21A
296 18-Nov-15 main pile 2530 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
340 24-Nov-15 main pile 2072 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
373 26-Nov-15 main pile 2077 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
376 26-Nov-15 main pile 2080 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
378 26-Nov-15 main pile 2065 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
385 27-Nov-15 main pile 2199 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
408 28-Nov-15 main pile 2330 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
423 30-Nov-15 main pile 2208 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
445 1-Dec-15 main pile 2169 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
447 1-Dec-15 main pile 2230 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
450 1-Dec-15 main pile 2328 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
463 3-Dec-15 main pile 2476 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
464 3-Dec-15 main pile 2474 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
500 5-Dec-15 main pile 2464 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
502 5-Dec-15 main pile 2465 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
503 5-Dec-15 main pile 2466 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
536 10-Dec-15 main pile 2577 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
540 10-Dec-15 main pile 2576 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
541 10-Dec-15 main pile 2580 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
543 10-Dec-15 main pile 2583 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
557 11-Dec-15 main pile 2588 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
561 11-Dec-15 main pile 2642 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
562 11-Dec-15 main pile 2641 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
563 11-Dec-15 main pile 2640 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
564 11-Dec-15 main pile 2639 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
565 11-Dec-15 main pile 2652 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
567 11-Dec-15 main pile 2654 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
580 12-Dec-15 main pile 2637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
581 12-Dec-15 main pile 2632 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
582 12-Dec-15 main pile 2631 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
583 12-Dec-15 main pile 2634 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
585 12-Dec-15 main pile 2657 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
586 12-Dec-15 main pile 2676 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
587 12-Dec-15 main pile 2677 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
588 12-Dec-15 main pile 2678 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
589 12-Dec-15 main pile 2679 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
590 12-Dec-15 main pile 2680 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
592 12-Dec-15 main pile 2712 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
593 12-Dec-15 main pile 2713 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
606 13-Dec-15 main pile 2716 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
608 13-Dec-15 main pile 2737 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
610 13-Dec-15 main pile 2739 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
611 13-Dec-15 main pile 2740 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
648 16-Dec-15 main pile 2744 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
652 16-Dec-15 main pile 2719 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
674 19-Dec-15 main pile 2735 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
698 21-Dec-15 main pile 2799 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
739 24-Dec-15 main pile 2613 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
813 2-Jan-16 main pile 2801 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
646 15-Dec-15 main pile 2748 Ǿ600 15 17 32.00 32.60 0.60 1.00 23.70 420.00 12.00 TI-07
24 18-Oct-15 Main Pile 2299 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 TI-03
33 20-Oct-15 Main Pile 2087 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
36 20-Oct-15 Main Pile 2093 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
38 20-Oct-15 Main Pile 2098 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
39 21-Oct-15 Main Pile 2239 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
46 21-Oct-15 Main Pile 2090 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
50 21-Oct-15 Main Pile 2112 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
59 23-Oct-15 Main Pile 2095 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
63 23-Oct-15 Main Pile 2160 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
96 27-Oct-15 Main Pile 2008 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
97 27-Oct-15 Main Pile 2012 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
98 28-Oct-15 main pile 2021 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
99 28-Oct-15 main pile 2023 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
100 28-Oct-15 main pile 2022 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
101 28-Oct-15 main pile 2024 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
104 28-Oct-15 main pile 2356 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.00 421.10 12.00 TI-03
116 29-Oct-15 main pile 2384 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
124 30-Oct-15 main pile 2220 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
126 30-Oct-15 main pile 2222 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
169 6-Nov-15 main pile 2262 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
174 6-Nov-15 main pile 1977 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
176 6-Nov-15 main pile 2067 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
186 7-Nov-15 main pile 2123 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
199 9-Nov-15 main pile 2257 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
203 9-Nov-15 main pile 2050 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.10 439.50 12.00 TI-26
205 9-Nov-15 main pile 2052 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
218 10-Nov-15 main pile 1981 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
221 10-Nov-15 main pile 2063 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.00 12.00 TI-26
228 11-Nov-15 main pile 2062 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
229 11-Nov-15 main pile 2139 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
231 11-Nov-15 main pile 2137 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
232 11-Nov-15 main pile 2140 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
238 12-Nov-15 main pile 2141 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
240 12-Nov-15 main pile 2190 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
269 14-Nov-15 main pile 2187 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
275 14-Nov-15 main pile 2251 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
278 16-Nov-15 main pile 2260 Ǿ600 15 17 32.00 33.00 1.00 1.00 1 24.20 421.10 12.00 TI-03
294 18-Nov-15 main pile 2263 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
330 23-Nov-15 main pile 2273 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
361 25-Nov-15 main pile 2245 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
362 25-Nov-15 main pile 2244 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
380 27-Nov-15 main pile 2198 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
384 27-Nov-15 main pile 2200 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
386 27-Nov-15 main pile 2207 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
388 27-Nov-15 main pile 2333 Ǿ600 17 15 32.00 33.00 1.00 1.00 24,2 421.10 12.00 TI-03
392 27-Nov-15 main pile 2334 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
416 29-Nov-15 main pile 2500 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
419 30-Nov-15 main pile 2482 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
422 30-Nov-15 main pile 2203 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
424 30-Nov-15 main pile 2206 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
425 30-Nov-15 main pile 2201 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
429 30-Nov-15 main pile 2361 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
430 30-Nov-15 main pile 2358 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
431 30-Nov-15 main pile 2332 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
438 1-Dec-15 main pile 2480 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
439 1-Dec-15 main pile 2479 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
453 2-Dec-15 main pile 2319 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
462 3-Dec-15 main pile 2477 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
467 3-Dec-15 main pile 2365 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
470 3-Dec-15 main pile 2326 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
527 8-Dec-15 main pile 2373 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
528 10-Dec-15 main pile 2375 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
539 10-Dec-15 main pile 2579 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
542 10-Dec-15 main pile 2581 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
554 11-Dec-15 main pile 2585 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
577 11-Dec-15 main pile 2389 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
579 11-Dec-15 main pile 2390 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
584 12-Dec-15 main pile 2633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
594 12-Dec-15 main pile 2386 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
601 12-Dec-15 main pile 2413 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
603 12-Dec-15 main pile 2406 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
612 13-Dec-15 main pile 2417 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
616 13-Dec-15 main pile 2419 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
618 14-Dec-15 main pile 2741 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
620 14-Dec-15 main pile 2743 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
621 14-Dec-15 main pile 2429 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
623 14-Dec-15 main pile 2425 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
627 14-Dec-15 main pile 2421 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
630 15-Dec-15 main pile 2442 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
654 16-Dec-15 main pile 2433 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
655 16-Dec-15 main pile 2434 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
656 16-Dec-15 main pile 2432 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
657 16-Dec-15 main pile 2430 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
658 16-Dec-15 main pile 2431 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
662 16-Dec-15 main pile 2440 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
672 17-Dec-15 main pile 2537 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
681 19-Dec-15 main pile 2542 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
723 23-Dec-15 main pile 2556 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
729 23-Dec-15 main pile 2550 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
732 23-Dec-15 main pile 2546 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
735 24-Dec-15 main pile 2820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
746 24-Dec-15 main pile 2617 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
760 25-Dec-15 main pile 2666 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
768 26-Dec-15 main pile 2754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
804 30-Dec-15 main pile 2785 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
818 5-Jan-16 main pile 2786 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
839 8-Jan-16 main pile 2628 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
840 8-Jan-16 main pile 2629 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
841 8-Jan-16 main pile 2626 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
842 8-Jan-16 main pile 2625 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
851 9-Jan-16 main pile 2574 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
852 9-Jan-16 main pile 2592 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
855 9-Jan-16 main pile 2590 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
856 9-Jan-16 main pile 2594 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
857 9-Jan-16 main pile 2589 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
863 11-Jan-16 main pile 2570 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
864 11-Jan-16 main pile 2569 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
53 22-Oct-15 Main Pile 2108 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
66 23-Oct-15 Main Pile 2296 Ǿ600 15 17 32.00 33.50 1.50 1.00 24.20 421.10 12.00 TI-03
80 25-Oct-15 Main Pile 2103 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
207 9-Nov-15 main pile 2049 Ǿ600 15 17 32.00 33.50 1.50 1.00 17.50 439.50 12.00 TI-26
381 27-Nov-15 main pile 2210 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
560 11-Dec-15 main pile 2638 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
643 15-Dec-15 main pile 2710 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
793 28-Dec-15 main pile 2771 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
21 17-Oct-15 Main Pile 2347 Ǿ600 15 17 32.00 33.80 1.80 1.00 24.20 421.10 TI-03
17 15-Oct-15 Main Pile 2281 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
19 17-Oct-15 Main Pile 2346 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
27 20-Oct-15 Main Pile 2285 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
28 20-Oct-15 Main Pile 2286 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
30 20-Oct-15 Main Pile 2235 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
32 20-Oct-15 Main Pile 2237 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
65 23-Oct-15 Main Pile 2293 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
67 23-Oct-15 Main Pile 2350 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
77 24-Oct-15 Main Pile 2295 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
92 27-Oct-15 Main Pile 2231 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
115 29-Oct-15 main pile 2379 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
134 1-Nov-15 main pile 1972 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 439.50 12.00 TI-26
145 3-Nov-15 main pile 2128 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
146 3-Nov-15 main pile 2130 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
157 4-Nov-15 main pile 2134 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
160 4-Nov-15 main pile 2195 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
161 4-Nov-15 main pile 2197 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
168 6-Nov-15 main pile 2261 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
170 6-Nov-15 main pile 2266 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
172 6-Nov-15 main pile 2271 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
202 9-Nov-15 main pile 2253 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
206 9-Nov-15 main pile 2048 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
239 12-Nov-15 main pile 2193 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.00 12.00 TI-26
241 12-Nov-15 main pile 2192 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
242 12-Nov-15 main pile 2191 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
244 12-Nov-15 main pile 2118 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
253 13-Nov-15 main pile 2143 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
268 14-Nov-15 main pile 2189 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
270 14-Nov-15 main pile 2188 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
283 17-Nov-15 main pile 2212 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
293 18-Nov-15 main pile 2264 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
390 27-Nov-15 main pile 2335 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
403 28-Nov-15 main pile 2497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
406 28-Nov-15 main pile 2312 Ǿ600 15 15 30.00 34.00 4.00 1.00 24.20 421.10 12.00 TI-03
410 28-Nov-15 main pile 2362 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
428 30-Nov-15 main pile 2360 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
559 11-Dec-15 main pile 2635 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
571 11-Dec-15 main pile 2401 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
597 12-Dec-15 main pile 2409 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
599 12-Dec-15 main pile 2411 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
614 13-Dec-15 main pile 2415 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
624 14-Dec-15 main pile 2423 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.11 12.00 TI-03
632 15-Dec-15 main pile 2443 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
634 15-Dec-15 main pile 2445 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
635 15-Dec-15 main pile 2446 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
649 16-Dec-15 main pile 2745 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
650 16-Dec-15 main pile 2746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
651 16-Dec-15 main pile 2721 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
653 16-Dec-15 main pile 2720 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
659 16-Dec-15 main pile 2437 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
660 16-Dec-15 main pile 2436 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
667 17-Dec-15 main pile 2673 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
668 17-Dec-15 main pile 2672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
669 17-Dec-15 main pile 2539 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
670 17-Dec-15 main pile 2538 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
671 17-Dec-15 main pile 2540 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
678 19-Dec-15 main pile 2776 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
680 19-Dec-15 main pile 2777 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
683 19-Dec-15 main pile 2553 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
684 19-Dec-15 main pile 2554 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
685 19-Dec-15 main pile 2555 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
686 19-Dec-15 main pile 2552 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
687 19-Dec-15 main pile 2544 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
688 19-Dec-15 main pile 2541 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
689 19-Dec-15 main pile 2543 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
690 20-Dec-15 main pile 2775 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
691 20-Dec-15 main pile 2778 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
692 20-Dec-15 main pile 2790 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
693 20-Dec-15 main pile 2793 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
696 20-Dec-15 main pile 2794 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
702 21-Dec-15 main pile 2795 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
703 21-Dec-15 main pile 2805 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
711 23-Dec-15 main pile 2812 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
718 23-Dec-15 main pile 2601 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
719 23-Dec-15 main pile 2604 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
721 23-Dec-15 main pile 2605 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
722 23-Dec-15 main pile 2602 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
724 23-Dec-15 main pile 2559 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
725 23-Dec-15 main pile 2558 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
726 23-Dec-15 main pile 2557 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
727 23-Dec-15 main pile 2549 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
728 23-Dec-15 main pile 2548 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
730 23-Dec-15 main pile 2551 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
731 23-Dec-15 main pile 2547 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
740 24-Dec-15 main pile 2615 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
741 24-Dec-15 main pile 2618 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
742 24-Dec-15 main pile 2659 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
743 24-Dec-15 main pile 2660 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
747 24-Dec-15 main pile 2616 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
755 25-Dec-15 main pile 2670 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
756 25-Dec-15 main pile 2669 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
757 25-Dec-15 main pile 2671 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
758 25-Dec-15 main pile 2668 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
759 25-Dec-15 main pile 2663 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
761 25-Dec-15 main pile 2665 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
762 25-Dec-15 main pile 2664 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
763 25-Dec-15 main pile 2662 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
770 26-Dec-15 main pile 2723 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
771 26-Dec-15 main pile 2724 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
772 26-Dec-15 main pile 2725 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
773 26-Dec-15 main pile 2722 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
774 26-Dec-15 main pile 2667 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
775 26-Dec-15 main pile 2731 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
776 26-Dec-15 main pile 2728 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
782 27-Dec-15 main pile 2726 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
783 27-Dec-15 main pile 2783 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
784 27-Dec-15 main pile 2780 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
786 27-Dec-15 main pile 2727 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
787 27-Dec-15 main pile 2729 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
790 28-Dec-15 main pile 2753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
791 28-Dec-15 main pile 2772 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
792 28-Dec-15 main pile 2774 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
794 28-Dec-15 main pile 2773 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
805 30-Dec-15 main pile 2788 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
812 2-Jan-16 main pile 2802 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
814 2-Jan-16 main pile 2804 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
815 2-Jan-16 main pile 2803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
816 5-Jan-16 main pile 2784 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
817 5-Jan-16 main pile 2781 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
819 5-Jan-16 main pile 2789 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
820 5-Jan-16 main pile 2782 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
821 6-Jan-16 main pile 2608 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
822 6-Jan-16 main pile 2606 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
823 6-Jan-16 main pile 2609 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
824 6-Jan-16 main pile 2614 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
825 6-Jan-16 main pile 2612 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
826 6-Jan-16 main pile 2611 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
827 6-Jan-16 main pile 2610 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
828 6-Jan-16 main pile 2607 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
829 7-Jan-16 main pile 2624 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
830 7-Jan-16 main pile 2600 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
832 7-Jan-16 main pile 2598 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
833 7-Jan-16 main pile 2619 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
834 7-Jan-16 main pile 2620 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
835 7-Jan-16 main pile 2621 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
836 7-Jan-16 main pile 2622 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
837 7-Jan-16 main pile 2623 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
843 8-Jan-16 main pile 2630 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
845 8-Jan-16 main pile 2596 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
846 8-Jan-16 main pile 2595 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
848 9-Jan-16 main pile 2572 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
850 9-Jan-16 main pile 2571 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
853 9-Jan-16 main pile 2591 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
858 11-Jan-16 main pile 2563 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
860 11-Jan-16 main pile 2562 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
862 11-Jan-16 main pile 2561 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
20 17-Oct-15 Main Pile 2348 Ǿ600 15 17 32.00 34.20 2.20 1.00 24.20 421.10 TI-03
18 17-Oct-15 Main Pile 2349 Ǿ600 15 17 32.00 34.30 2.30 1.00 24.20 421.10 TI-03
69 23-Oct-15 Main Pile 2353 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
78 24-Oct-15 Main Pile 2351 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
336 24-Nov-15 main pile 2516 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
673 19-Dec-15 main pile 2732 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
795 28-Dec-15 main pile 2824 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
155 4-Nov-15 main pile 1967 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
156 4-Nov-15 main pile 1968 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
132 1-Nov-15 main pile 1969 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
133 1-Nov-15 main pile 1970 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
131 30-Oct-15 main pile 1971 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.80 421.90 12.00 TI-26
135 1-Nov-15 main pile 1973 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
136 1-Nov-15 main pile 1974 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
137 1-Nov-15 main pile 1975 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
107 29-Oct-15 main pile 2025 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
204 9-Nov-15 main pile 2051 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 439.50 12.00 TI-26
208 9-Nov-15 main pile 2053 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
209 9-Nov-15 main pile 2054 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
222 10-Nov-15 main pile 2064 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
220 10-Nov-15 main pile 2066 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
184 7-Nov-15 main pile 2068 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
177 6-Nov-15 main pile 2069 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 439.50 12.00 TI-26
178 6-Nov-15 main pile 2070 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
185 7-Nov-15 main pile 2071 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
73 24-Oct-15 Main Pile 2105 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
243 12-Nov-15 main pile 2119 Ǿ600 17 15 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
257 13-Nov-15 main pile 2120 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
258 13-Nov-15 main pile 2121 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
189 7-Nov-15 main pile 2122 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
187 7-Nov-15 main pile 2124 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
188 7-Nov-15 main pile 2125 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
167 5-Nov-15 main pile 2126 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
166 5-Nov-15 main pile 2129 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
158 4-Nov-15 main pile 2131 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
148 3-Nov-15 main pile 2133 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
230 11-Nov-15 main pile 2138 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
256 13-Nov-15 main pile 2142 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
255 13-Nov-15 main pile 2145 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
252 13-Nov-15 main pile 2146 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
266 14-Nov-15 main pile 2185 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
154 4-Nov-15 main pile 2194 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
281 17-Nov-15 main pile 2209 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
282 17-Nov-15 main pile 2211 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
284 17-Nov-15 main pile 2213 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
94 27-Oct-15 Main Pile 2233 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
201 9-Nov-15 main pile 2252 Ǿ600 17 15 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
200 9-Nov-15 main pile 2256 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
292 18-Nov-15 main pile 2265 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
16 14-Oct-15 Main Pile 2284 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
25 18-Oct-15 Main Pile 2300 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.20 421.10 TI-03
14 14-Oct-15 Main Pile 2303 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
122 30-Oct-15 main pile 2308 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
112 29-Oct-15 main pile 2338 Ǿ600 15 17 32.00 37.00 5.00 1.00 24.10 421.10 12.00 TI-03
113 29-Oct-15 main pile 2339 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
114 29-Oct-15 main pile 2341 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
8 12-Oct-15 Main Pile 2342 Ǿ600 17 15 32.00 37.00 5.00 1.00 20.00 355.40 12.00 TI-12A
11 13-Oct-15 Main Pile 2344 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.50 421.10 12.00 TI-21A
103 28-Oct-15 main pile 2355 Ǿ600 15 17 32.00 35.50 3.50 1.00 24.00 421.10 12.00 TI-03
105 28-Oct-15 main pile 2357 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.00 421.10 12.00 TI-03
117 29-Oct-15 main pile 2385 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
118 29-Oct-15 main pile 2387 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
510 8-Dec-15 main pile 2447 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
509 7-Dec-15 main pile 2448 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
513 8-Dec-15 main pile 2449 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
511 8-Dec-15 main pile 2450 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
512 8-Dec-15 main pile 2451 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
811 30-Dec-15 main pile 2452 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
809 30-Dec-15 main pile 2453 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
807 30-Dec-15 main pile 2454 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 206.80 12.00 TI-18
808 30-Dec-15 main pile 2455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
806 30-Dec-15 main pile 2456 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
810 30-Dec-15 main pile 2457 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
482 4-Dec-15 main pile 2467 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
481 4-Dec-15 main pile 2468 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
480 4-Dec-15 main pile 2469 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
479 4-Dec-15 main pile 2470 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
478 4-Dec-15 main pile 2471 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
477 4-Dec-15 main pile 2472 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
466 3-Dec-15 main pile 2473 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
418 30-Nov-15 main pile 2483 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
441 1-Dec-15 main pile 2484 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
440 1-Dec-15 main pile 2485 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
436 1-Dec-15 main pile 2486 Ǿ600 17 17 34.00 37.50 3.50 1.00 23.70 420.00 12.00 TI-07
421 30-Nov-15 main pile 2487 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
420 30-Nov-15 main pile 2488 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
401 28-Nov-15 main pile 2489 Ǿ600 15 17 32.00 37.40 5.40 1.00 23.70 420.00 12.00 TI-07
417 30-Nov-15 main pile 2490 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
412 29-Nov-15 main pile 2491 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
398 27-Nov-15 main pile 2492 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
399 27-Nov-15 main pile 2493 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
400 28-Nov-15 main pile 2494 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
413 29-Nov-15 main pile 2495 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
414 29-Nov-15 main pile 2496 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
402 28-Nov-15 main pile 2498 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
415 29-Nov-15 main pile 2499 Ǿ600 17 15 32.00 37.00 5.00 1.00 21.00 373.10 12.00 TI-07
405 28-Nov-15 main pile 2501 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
404 28-Nov-15 main pile 2502 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
348 25-Nov-15 main pile 2503 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
347 25-Nov-15 main pile 2504 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
345 25-Nov-15 main pile 2505 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
346 25-Nov-15 main pile 2506 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
395 27-Nov-15 main pile 2507 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
371 26-Nov-15 main pile 2508 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
367 26-Nov-15 main pile 2509 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
368 26-Nov-15 main pile 2510 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
397 27-Nov-15 main pile 2511 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
396 27-Nov-15 main pile 2512 Ǿ600 15 17 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
369 26-Nov-15 main pile 2513 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
370 26-Nov-15 main pile 2514 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
335 24-Nov-15 main pile 2515 Ǿ600 17 15 32.00 37.80 5.80 1.00 23.70 420.00 12.00 TI-07
334 24-Nov-15 main pile 2517 Ǿ600 17 15 32.00 36.70 4.70 1.00 23.70 426.00 12.00 TI-07
333 24-Nov-15 main pile 2518 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
337 24-Nov-15 main pile 2519 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
343 25-Nov-15 main pile 2520 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.00 284.00 12.00 TI-07
309 20-Nov-15 main pile 2522 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
310 20-Nov-15 main pile 2523 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
311 20-Nov-15 main pile 2524 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
313 21-Nov-15 main pile 2525 Ǿ600 15 15 30.00 38.00 8.00 1.00 14.00 248.70 12.00 TI-07
312 20-Nov-15 main pile 2526 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
316 21-Nov-15 main pile 2527 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
307 20-Nov-15 main pile 2529 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
299 19-Nov-15 main pile 2531 Ǿ600 15 17 32.00 38.00 6.00 1.00 18.00 319.80 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
314 21-Nov-15 main pile 2533 Ǿ600 15 15 30.00 35.80 5.80 1.00 23.70 420.00 12.00 TI-07
298 19-Nov-15 main pile 2535 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
297 19-Nov-15 main pile 2536 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
538 10-Dec-15 main pile 2582 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
558 11-Dec-15 main pile 2636 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
748 25-Dec-15 main pile 2695 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
749 25-Dec-15 main pile 2696 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
764 26-Dec-15 main pile 2697 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
639 15-Dec-15 main pile 2706 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
640 15-Dec-15 main pile 2707 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
641 15-Dec-15 main pile 2708 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
642 15-Dec-15 main pile 2709 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
644 15-Dec-15 main pile 2711 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
676 19-Dec-15 main pile 2733 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
675 19-Dec-15 main pile 2734 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
677 19-Dec-15 main pile 2736 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
645 15-Dec-15 main pile 2747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
647 15-Dec-15 main pile 2749 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
781 27-Dec-15 main pile 2750 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
779 27-Dec-15 main pile 2751 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
780 27-Dec-15 main pile 2752 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
765 26-Dec-15 main pile 2755 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
767 26-Dec-15 main pile 2756 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
769 26-Dec-15 main pile 2757 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
766 26-Dec-15 main pile 2758 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
752 25-Dec-15 main pile 2759 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
750 25-Dec-15 main pile 2760 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
751 25-Dec-15 main pile 2761 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
753 25-Dec-15 main pile 2762 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
737 24-Dec-15 main pile 2763 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
754 25-Dec-15 main pile 2764 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
736 24-Dec-15 main pile 2765 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
738 24-Dec-15 main pile 2766 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
788 28-Dec-15 main pile 2767 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
777 27-Dec-15 main pile 2768 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
789 28-Dec-15 main pile 2769 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
778 27-Dec-15 main pile 2770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
679 19-Dec-15 main pile 2779 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
695 20-Dec-15 main pile 2791 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
694 20-Dec-15 main pile 2792 Ǿ600 17 15 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
701 21-Dec-15 main pile 2796 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
700 21-Dec-15 main pile 2797 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
699 21-Dec-15 main pile 2798 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
704 22-Dec-15 main pile 2806 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
705 22-Dec-15 main pile 2807 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
706 22-Dec-15 main pile 2808 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
707 22-Dec-15 main pile 2809 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
708 22-Dec-15 main pile 2810 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
712 23-Dec-15 main pile 2811 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
710 22-Dec-15 main pile 2813 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
709 22-Dec-15 main pile 2814 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
713 23-Dec-15 main pile 2815 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
714 23-Dec-15 main pile 2816 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
716 23-Dec-15 main pile 2817 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
715 23-Dec-15 main pile 2818 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
733 24-Dec-15 main pile 2819 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
734 24-Dec-15 main pile 2821 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
717 23-Dec-15 main pile 2822 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
798 29-Dec-15 main pile 2823 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
796 28-Dec-15 main pile 2825 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
799 29-Dec-15 main pile 2826 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
800 29-Dec-15 main pile 2827 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
797 29-Dec-15 main pile 2828 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
801 29-Dec-15 main pile 2829 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
802 29-Dec-15 main pile 2830 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
3 10-Aug-15 P - 1/2238 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 18.20 410.80 12.00 TI - 24
5 16-Aug-15 P - 17/2136 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.00 440.80 12.00 TI - 24
4 15-Aug-15 P - 20/2534 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.80 519.90 12.00 TI - 24
2 6-Aug-15 P - 5/2407 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 13.00 456.60 12.00 TI - 24
1 5-Aug-15 P - 9/2675 Ǿ600 13 13 12 38.00 36.50 -1.50 2.00 1.00 14.50 509.30 12.00 TI - 24
TOTAL PEMANCANGAN MAIN PILE 27680.00 28215.13 535.13 0.00 0.00 874.00 133.00
1 30-Jul-15 P - 10/1663 Ǿ600 13 13 12 38.00 35.00 4.00 - - 2.00 1.00 15.50 544.50 12.00 TI - 24
2 22-Dec-15 main pile 1963 Ǿ600 15 17 32.00 15.50 -16.5 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
3 29-Jan-16 main pile 1510 Ǿ600 15 17 32.00 22.00 -10.0 1.00 24.00 426.50 TI-21A
4 26-Jan-16 main pile 1512 Ǿ600 15 17 32.00 23.00 -9.0 1.00 24.00 426.50 TI-21A potong tiang
5 10-Feb-16 main pile 1503 Ǿ600 15 17 32.00 23.00 -9.0 1.00 24.00 426.50 TI-21A potong tiang
6 22-Dec-15 main pile 1966 Ǿ600 15 17 32.00 24.00 -8.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
7 8-Jan-16 main pile 1704 Ǿ600 15 17 32.00 24.00 -8.0 1.00 23.70 421.10 12.00 TI-21A
8 26-Dec-15 main pile 1884 Ǿ600 15 17 32.00 26.00 -6.0 1.00 1 24.00 426.70 12.00 TI-21A potong tiang
9 22-Dec-15 main pile 1851 Ǿ600 15 17 32.00 28.50 -3.5 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
10 23-Dec-15 main pile 1849 Ǿ600 15 17 32.00 29.00 -3.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
11 23-Dec-15 main pile 1848 Ǿ600 17 15 32.00 29.00 -3.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
12 24-Dec-15 main pile 1725 Ǿ600 15 17 32.00 29.00 -3.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
13 11-Jan-16 main pile 1950 Ǿ600 15 17 32.00 29.00 -3.0 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
14 26-Jan-16 main pile 1514 Ǿ600 15 17 32.00 29.00 -3.0 1.00 24.00 426.50 TI-21A potong tiang
15 2-Feb-16 main pile 1755 Ǿ600 15 17 32.00 29.00 -3.0 1.00 24.00 426.50 TI-21A
16 23-Dec-15 main pile 1723 Ǿ600 15 17 32.00 29.50 -2.5 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
17 23-Dec-15 main pile 1722 Ǿ600 15 17 32.00 29.50 -2.5 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
18 26-Dec-15 main pile 1813 Ǿ600 15 17 32.00 29.50 -2.5 1.00 1 23.90 424.70 12.00 TI-21A potong tiang
19 19-Dec-15 main pile 1731 Ǿ600 15 17 32.00 30.00 -2.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
20 25-Dec-15 main pile 1765 Ǿ600 15 17 32.00 30.50 -1.5 1.00 24.00 426.50 12.00 TI-21A
21 13-Dec-15 main pile 1915 Ǿ600 17 15 32.00 31.00 -1.0 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
22 21-Dec-15 main pile 1921 Ǿ600 17 15 32.00 31.00 -1.0 1.00 1 23.90 424.70 12.00 TI-21A
23 23-Dec-15 main pile 1922 Ǿ600 15 17 32.00 31.00 -1.0 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
24 9-Jan-16 main pile 1584 Ǿ600 15 17 32.00 31.00 -1.0 1.00 24.00 426.50 12.00 TI-21A
25 30-Jan-16 main pile 1897 Ǿ600 15 17 32.00 31.00 -1.0 1.00 1 23.70 420.00 TI-07
26 30-Jan-16 main pile 1898 Ǿ600 15 17 32.00 31.00 -1.0 1.00 1 23.70 420.00 TI-07
27 9-Feb-16 main pile 1501 Ǿ600 15 17 32.00 31.00 -1.0 1.00 24.00 426.50 TI-21A potong tiang
28 10-Feb-16 main pile 1805 Ǿ600 15 17 32.00 31.00 -1.0 1.00 23.70 420.00 TI-07
29 13-Feb-16 main pile 1800 Ǿ600 15 17 32.00 31.00 -1.0 1.00 23.70 421.00 TI-07 potong tiang
30 13-Dec-15 main pile 1914 Ǿ600 17 15 32.00 31.20 -0.8 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
31 21-Dec-15 main pile 1905 Ǿ600 17 15 32.00 31.25 -0.8 1.00 1 24.00 426.50 12.00 TI-21A
32 14-Dec-15 main pile 1543 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
33 15-Dec-15 main pile 1538 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
34 15-Dec-15 main pile 1537 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
35 19-Dec-15 main pile 1906 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
36 21-Dec-15 main pile 1857 Ǿ600 15 17 32.00 32.00 0.0 1.00 18.00 452.10 12.00 TI-26
37 23-Dec-15 main pile 1923 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
38 25-Dec-15 main pile 1764 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
39 25-Dec-15 main pile 1814 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
40 23-Jan-16 main pile 1882 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 TI-21A
41 9-Feb-16 main pile 1499 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
TOTAL PEMANCANGAN MAIN PILE 1318.00 1205.45 -105.55 0.00 0.00 42.00 20.00
1 19-Mar-16 Main pile 1512A Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A sisipan
2 19-Mar-16 Main pile 1510A Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A sisipan
3 19-Mar-16 Main pile 1503A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A sisipan
TOTAL PEMANCANGAN MAIN PILE 96.00 100.00 4.00 0.00 0.00 3.00 0.00
1 30-Jul-15 P - 10/1663 Ǿ600 13 13 12 38.00 35.00 -3.00 2.00 1.00 15.50 544.50 12.00 TI - 24
2 11-Dec-15 main pile 1659 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
3 11-Dec-15 main pile 1658 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
4 11-Dec-15 main pile 1664 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
5 11-Dec-15 main pile 1666 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
6 11-Dec-15 main pile 1667 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
7 11-Dec-15 main pile 1665 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
8 11-Dec-15 main pile 1787 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
9 11-Dec-15 main pile 1786 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
10 12-Dec-15 main pile 1784 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
11 12-Dec-15 main pile 1785 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
12 12-Dec-15 main pile 1791 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
13 12-Dec-15 main pile 1790 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
14 12-Dec-15 main pile 1788 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
15 12-Dec-15 main pile 1789 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
16 12-Dec-15 main pile 1908 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
17 12-Dec-15 main pile 1909 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
18 12-Dec-15 main pile 1913 Ǿ600 15 17 32.00 33.10 1.10 1.00 23.70 421.10 12.00 TI-21A
19 13-Dec-15 main pile 1912 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
20 13-Dec-15 main pile 1914 Ǿ600 17 15 32.00 31.20 -0.80 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
21 13-Dec-15 main pile 1915 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
22 13-Dec-15 main pile 1911 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
23 13-Dec-15 main pile 1910 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
24 13-Dec-15 main pile 1662 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
25 13-Dec-15 main pile 1661 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
26 13-Dec-15 main pile 1660 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
27 14-Dec-15 main pile 1541 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
28 14-Dec-15 main pile 1540 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
29 14-Dec-15 main pile 1543 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
30 14-Dec-15 main pile 1542 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
31 15-Dec-15 main pile 1539 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
32 15-Dec-15 main pile 1538 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
33 15-Dec-15 main pile 1536 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
34 15-Dec-15 main pile 1537 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
35 15-Dec-15 main pile 1535 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
36 15-Dec-15 main pile 1530 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
37 15-Dec-15 main pile 1528 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
38 15-Dec-15 main pile 1525 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.90 424.70 12.00 TI-21A
39 15-Dec-15 main pile 1523 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
40 16-Dec-15 main pile 1534 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
41 16-Dec-15 main pile 1520 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
42 16-Dec-15 main pile 1522 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
43 16-Dec-15 main pile 1521 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
44 16-Dec-15 main pile 1524 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
45 16-Dec-15 main pile 1526 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
46 16-Dec-15 main pile 1529 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
47 16-Dec-15 main pile 1532 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
48 16-Dec-15 main pile 1533 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
49 17-Dec-15 main pile 1527 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
50 17-Dec-15 main pile 1531 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
51 18-Dec-15 main pile 1549 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
52 18-Dec-15 main pile 1548 Ǿ600 17 15 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
53 18-Dec-15 main pile 1547 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
54 18-Dec-15 main pile 1657 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
55 18-Dec-15 main pile 1673 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
56 18-Dec-15 main pile 1672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
57 18-Dec-15 main pile 1671 Ǿ600 17 15 32.00 33.20 1.20 1.00 23.70 421.10 12.00 TI-21A
58 18-Dec-15 main pile 1783 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
59 19-Dec-15 main pile 1781 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
60 19-Dec-15 main pile 1782 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
61 19-Dec-15 main pile 1797 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
62 19-Dec-15 main pile 1796 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
63 19-Dec-15 main pile 1795 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
64 19-Dec-15 main pile 1906 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
65 19-Dec-15 main pile 1730 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 251.20 12.00 TI-26
66 19-Dec-15 main pile 1731 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
67 19-Dec-15 main pile 1732 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
68 19-Dec-15 main pile 1840 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
69 19-Dec-15 main pile 1841 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
70 19-Dec-15 main pile 1842 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
71 20-Dec-15 main pile 1854 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
72 20-Dec-15 main pile 1855 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
73 20-Dec-15 main pile 1856 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
74 20-Dec-15 main pile 1959 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
75 20-Dec-15 main pile 1958 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
76 20-Dec-15 main pile 1960 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
77 20-Dec-15 main pile 1962 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
78 20-Dec-15 main pile 1961 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
79 21-Dec-15 main pile 1905 Ǿ600 17 15 32.00 31.25 -0.75 1.00 1 24.00 426.50 12.00 TI-21A
80 21-Dec-15 main pile 1921 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.90 424.70 12.00 TI-21A
81 21-Dec-15 main pile 1920 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
82 21-Dec-15 main pile 1919 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
83 21-Dec-15 main pile 1917 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
84 21-Dec-15 main pile 1857 Ǿ600 15 17 32.00 32.00 0.00 1.00 18.00 452.10 12.00 TI-26
85 21-Dec-15 main pile 1858 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
86 21-Dec-15 main pile 1859 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
87 21-Dec-15 main pile 1843 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
88 21-Dec-15 main pile 1844 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
89 21-Dec-15 main pile 1845 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
90 21-Dec-15 main pile 1733 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
91 21-Dec-15 main pile 1734 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
92 21-Dec-15 main pile 1735 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
93 22-Dec-15 main pile 1926 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
94 22-Dec-15 main pile 1918 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
95 22-Dec-15 main pile 1916 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.90 424.70 12.00 TI-21A
96 22-Dec-15 main pile 1904 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
97 22-Dec-15 main pile 1903 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
98 22-Dec-15 main pile 1902 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
99 22-Dec-15 main pile 1907 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
100 22-Dec-15 main pile 1965 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
101 22-Dec-15 main pile 1966 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
102 22-Dec-15 main pile 1964 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
103 22-Dec-15 main pile 1963 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
104 22-Dec-15 main pile 1851 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
105 23-Dec-15 main pile 1928 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
106 23-Dec-15 main pile 1929 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
107 23-Dec-15 main pile 1931 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
108 23-Dec-15 main pile 1923 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
109 23-Dec-15 main pile 1922 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
110 23-Dec-15 main pile 1927 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
111 23-Dec-15 main pile 1850 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
112 23-Dec-15 main pile 1853 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
113 23-Dec-15 main pile 1852 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
114 23-Dec-15 main pile 1847 Ǿ600 15 17 32.00 37.50 5.50 1.00 17.00 427.00 12.00 TI-26
115 23-Dec-15 main pile 1846 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
116 23-Dec-15 main pile 1849 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
117 23-Dec-15 main pile 1848 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
118 23-Dec-15 main pile 1723 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
119 23-Dec-15 main pile 1722 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
120 24-Dec-15 main pile 1888 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
121 24-Dec-15 main pile 1941 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
122 24-Dec-15 main pile 1886 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
123 24-Dec-15 main pile 1938 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
124 24-Dec-15 main pile 1939 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
125 24-Dec-15 main pile 1940 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
126 24-Dec-15 main pile 1933 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
127 24-Dec-15 main pile 1935 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
128 24-Dec-15 main pile 1724 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
129 24-Dec-15 main pile 1725 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
130 24-Dec-15 main pile 1603 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
131 24-Dec-15 main pile 1602 Ǿ600 15 17 32.00 35.50 3.50 1.00 17.00 427.00 12.00 TI-26
132 24-Dec-15 main pile 1604 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
133 24-Dec-15 main pile 1605 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
134 25-Dec-15 main pile 1887 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
135 25-Dec-15 main pile 1889 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
136 25-Dec-15 main pile 1763 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.90 424.70 12.00 TI-21A
137 25-Dec-15 main pile 1764 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
138 25-Dec-15 main pile 1765 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.00 426.50 12.00 TI-21A
139 25-Dec-15 main pile 1815 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
140 25-Dec-15 main pile 1814 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
141 25-Dec-15 main pile 1727 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
142 25-Dec-15 main pile 1726 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
143 25-Dec-15 main pile 1728 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
144 25-Dec-15 main pile 1729 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
145 25-Dec-15 main pile 1599 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
146 25-Dec-15 main pile 1598 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
147 25-Dec-15 main pile 1601 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
148 25-Dec-15 main pile 1600 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
149 26-Dec-15 main pile 1812 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
150 26-Dec-15 main pile 1811 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
151 26-Dec-15 main pile 1813 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.90 424.70 12.00 TI-21A potong tiang
152 26-Dec-15 main pile 1883 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
153 26-Dec-15 main pile 1884 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.00 426.70 12.00 TI-21A potong tiang
154 26-Dec-15 main pile 1810 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
155 26-Dec-15 main pile 1487 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
156 26-Dec-15 main pile 1488 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
157 26-Dec-15 main pile 1485 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
158 26-Dec-15 main pile 1486 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
159 27-Dec-15 main pile 1762 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
160 27-Dec-15 main pile 1761 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
161 27-Dec-15 main pile 1760 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
162 27-Dec-15 main pile 1688 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
163 27-Dec-15 main pile 1687 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
164 28-Dec-15 main pile 1686 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
165 28-Dec-15 main pile 1691 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
166 28-Dec-15 main pile 1690 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
167 28-Dec-15 main pile 1689 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
168 28-Dec-15 main pile 1639 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
169 28-Dec-15 main pile 1640 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
170 28-Dec-15 main pile 1641 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
171 28-Dec-15 main pile 1636 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
172 28-Dec-15 main pile 1637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
173 28-Dec-15 main pile 1606 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
174 28-Dec-15 main pile 1607 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
175 28-Dec-15 main pile 1608 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
176 28-Dec-15 main pile 1609 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
177 28-Dec-15 main pile 1610 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
178 28-Dec-15 main pile 1611 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
179 29-Dec-15 main pile 1716 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
180 29-Dec-15 main pile 1717 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
181 29-Dec-15 main pile 1718 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
182 29-Dec-15 main pile 1721 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
183 29-Dec-15 main pile 1720 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 427.00 12.00 TI-26
184 29-Dec-15 main pile 1719 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
185 2-Jan-16 main pile 1638 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
186 2-Jan-16 main pile 1617 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
187 2-Jan-16 main pile 1612 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
188 2-Jan-16 main pile 1613 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
189 2-Jan-16 main pile 1614 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
190 3-Jan-16 main pile 1616 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
191 3-Jan-16 main pile 1615 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
192 3-Jan-16 main pile 1589 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
193 3-Jan-16 main pile 1590 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
194 3-Jan-16 main pile 1591 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
195 3-Jan-16 main pile 1586 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
196 3-Jan-16 main pile 1587 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
197 3-Jan-16 main pile 1588 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
198 4-Jan-16 main pile 1595 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
199 4-Jan-16 main pile 1596 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
200 4-Jan-16 main pile 1597 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
201 4-Jan-16 main pile 1592 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
202 4-Jan-16 main pile 1593 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
203 4-Jan-16 main pile 1594 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
204 4-Jan-16 main pile 1490 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
205 5-Jan-16 main pile 1489 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
206 5-Jan-16 main pile 1491 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
207 5-Jan-16 main pile 1493 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
208 5-Jan-16 main pile 1492 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
209 5-Jan-16 main pile 1495 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
210 5-Jan-16 main pile 1494 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
211 5-Jan-16 main pile 1496 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
212 5-Jan-16 main pile 1498 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
213 5-Jan-16 main pile 1497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
214 7-Jan-16 main pile 1710 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
215 7-Jan-16 main pile 1711 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
216 7-Jan-16 main pile 1712 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
217 7-Jan-16 main pile 1736 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
218 7-Jan-16 main pile 1737 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
219 7-Jan-16 main pile 1738 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
220 7-Jan-16 main pile 1739 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
221 7-Jan-16 main pile 1740 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
222 7-Jan-16 main pile 1741 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
223 8-Jan-16 main pile 1713 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
224 8-Jan-16 main pile 1714 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
225 8-Jan-16 main pile 1715 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
226 8-Jan-16 main pile 1744 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
227 8-Jan-16 main pile 1743 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
228 8-Jan-16 main pile 1742 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
229 8-Jan-16 main pile 1706 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
230 8-Jan-16 main pile 1705 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
231 8-Jan-16 main pile 1704 Ǿ600 15 17 32.00 24.00 -8.00 1.00 23.70 421.10 12.00 TI-21A
232 9-Jan-16 main pile 1583 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
233 9-Jan-16 main pile 1620 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
234 9-Jan-16 main pile 1619 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
235 9-Jan-16 main pile 1618 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
236 9-Jan-16 main pile 1582 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 241.10 12.00 TI-21A
237 9-Jan-16 main pile 1581 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
238 9-Jan-16 main pile 1580 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 241.10 12.00 TI-21A
239 9-Jan-16 main pile 1585 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
240 9-Jan-16 main pile 1584 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
241 10-Jan-16 main pile 1623 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
242 10-Jan-16 main pile 1622 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
243 10-Jan-16 main pile 1621 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
244 10-Jan-16 main pile 1709 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
245 10-Jan-16 main pile 1708 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
246 10-Jan-16 main pile 1707 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
247 10-Jan-16 main pile 1747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
248 10-Jan-16 main pile 1746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
249 10-Jan-16 main pile 1745 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
250 11-Jan-16 main pile 1952 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
251 11-Jan-16 main pile 1833 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
252 11-Jan-16 main pile 1832 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
253 11-Jan-16 main pile 1831 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
254 11-Jan-16 main pile 1871 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
255 11-Jan-16 main pile 1870 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
256 11-Jan-16 main pile 1869 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
257 11-Jan-16 main pile 1951 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
258 11-Jan-16 main pile 1950 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
259 12-Jan-16 main pile 1949 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
260 12-Jan-16 main pile 1948 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
261 12-Jan-16 main pile 1868 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
262 12-Jan-16 main pile 1867 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
263 12-Jan-16 main pile 1866 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
264 12-Jan-16 main pile 1830 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
265 12-Jan-16 main pile 1829 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
266 12-Jan-16 main pile 1828 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
267 13-Jan-16 main pile 1836 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
268 13-Jan-16 main pile 1860 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
269 13-Jan-16 main pile 1862 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
270 13-Jan-16 main pile 1953 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
271 13-Jan-16 main pile 1954 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
272 13-Jan-16 main pile 1955 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
273 13-Jan-16 main pile 1957 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
274 13-Jan-16 main pile 1956 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
275 14-Jan-16 main pile 1863 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
276 14-Jan-16 main pile 1864 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
277 14-Jan-16 main pile 1865 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
278 14-Jan-16 main pile 1837 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
279 14-Jan-16 main pile 1838 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
280 14-Jan-16 main pile 1839 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
281 14-Jan-16 main pile 1834 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
282 14-Jan-16 main pile 1835 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
283 14-Jan-16 main pile 1861 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
284 15-Jan-16 main pile 1944 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
285 15-Jan-16 main pile 1943 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
286 15-Jan-16 main pile 1874 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
287 15-Jan-16 main pile 1873 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
288 15-Jan-16 main pile 1872 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
289 15-Jan-16 main pile 1824 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
290 15-Jan-16 main pile 1823 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
291 15-Jan-16 main pile 1822 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
292 16-Jan-16 main pile 1750 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
293 16-Jan-16 main pile 1749 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
294 16-Jan-16 main pile 1748 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
295 16-Jan-16 main pile 1700 Ǿ600 15 17 32.00 34.40 2.40 1.00 23.70 421.10 TI-21A
296 16-Jan-16 main pile 1699 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
297 18-Jan-16 main pile 1698 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
298 18-Jan-16 main pile 1626 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
299 18-Jan-16 main pile 1625 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
300 18-Jan-16 main pile 1624 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
301 18-Jan-16 main pile 1576 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
302 18-Jan-16 main pile 1575 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
303 18-Jan-16 main pile 1574 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
304 18-Jan-16 main pile 1579 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
305 19-Jan-16 main pile 1578 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
306 19-Jan-16 main pile 1577 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
307 19-Jan-16 main pile 1629 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
308 19-Jan-16 main pile 1628 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
309 19-Jan-16 main pile 1627 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
310 19-Jan-16 main pile 1703 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
311 19-Jan-16 main pile 1702 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
312 19-Jan-16 main pile 1701 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
313 21-Jan-16 main pile 1753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
314 21-Jan-16 main pile 1752 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
315 21-Jan-16 main pile 1751 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
316 21-Jan-16 main pile 1827 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
317 21-Jan-16 main pile 1826 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
318 21-Jan-16 main pile 1825 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
319 22-Jan-16 main pile 1937 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
320 22-Jan-16 main pile 1946 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
321 22-Jan-16 main pile 1947 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
322 22-Jan-16 main pile 1945 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
323 22-Jan-16 main pile 1877 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
324 22-Jan-16 main pile 1876 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
325 22-Jan-16 main pile 1875 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
326 23-Jan-16 main pile 1882 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
327 23-Jan-16 main pile 1881 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
328 23-Jan-16 main pile 1885 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
329 23-Jan-16 main pile 1819 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
330 23-Jan-16 main pile 1820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
331 23-Jan-16 main pile 1821 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
332 23-Jan-16 main pile 1757 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
333 25-Jan-16 main pile 1932 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
334 25-Jan-16 main pile 1934 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
335 25-Jan-16 main pile 1930 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
336 25-Jan-16 main pile 1936 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
337 26-Jan-16 main pile 1893 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
338 26-Jan-16 main pile 1894 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
339 26-Jan-16 main pile 1895 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
340 26-Jan-16 main pile 1892 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
341 26-Jan-16 main pile 1891 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
342 26-Jan-16 main pile 1890 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
343 26-Jan-16 main pile 1758 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
344 26-Jan-16 main pile 1695 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
345 26-Jan-16 main pile 1759 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
346 26-Jan-16 main pile 1696 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
347 26-Jan-16 main pile 1571 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
348 26-Jan-16 main pile 1572 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
349 26-Jan-16 main pile 1573 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
350 26-Jan-16 main pile 1512 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A potong tiang
351 26-Jan-16 main pile 1513 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
352 26-Jan-16 main pile 1514 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A potong tiang
353 29-Jan-16 main pile 1509 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
354 29-Jan-16 main pile 1510 Ǿ600 15 17 32.00 22.00 -10.00 1.00 24.00 426.50 TI-21A
355 29-Jan-16 main pile 1635 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
356 29-Jan-16 main pile 1568 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
357 29-Jan-16 main pile 1569 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
358 29-Jan-16 main pile 1570 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
359 29-Jan-16 main pile 1511 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
360 30-Jan-16 main pile 1896 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
361 30-Jan-16 main pile 1897 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
362 30-Jan-16 main pile 1898 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
363 30-Jan-16 main pile 1924 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
364 30-Jan-16 main pile 1925 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
365 30-Jan-16 main pile 1899 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
366 31-Jan-16 main pile 1900 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
367 31-Jan-16 main pile 1901 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
368 31-Jan-16 main pile 1801 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
369 31-Jan-16 main pile 1802 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
370 31-Jan-16 main pile 1803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
371 2-Feb-16 main pile 1775 Ǿ600 15 17 32.00 33.20 1.20 1.00 23.70 420.00 TI-07
372 2-Feb-16 main pile 1776 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
373 2-Feb-16 main pile 1777 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
374 2-Feb-16 main pile 1677 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
375 2-Feb-16 main pile 1678 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
376 2-Feb-16 main pile 1679 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
377 2-Feb-16 main pile 1651 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
378 2-Feb-16 main pile 1634 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
379 2-Feb-16 main pile 1633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
380 2-Feb-16 main pile 1697 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
381 2-Feb-16 main pile 1630 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
382 2-Feb-16 main pile 1631 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
383 2-Feb-16 main pile 1632 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
384 2-Feb-16 main pile 1692 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
385 2-Feb-16 main pile 1693 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-21A
386 2-Feb-16 main pile 1694 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
387 2-Feb-16 main pile 1754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
388 2-Feb-16 main pile 1755 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A
389 3-Feb-16 main pile 1652 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
390 3-Feb-16 main pile 1653 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
391 3-Feb-16 main pile 1553 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
392 3-Feb-16 main pile 1554 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
393 3-Feb-16 main pile 1555 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 TI-07
394 3-Feb-16 main pile 1756 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
395 3-Feb-16 main pile 1816 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
396 3-Feb-16 main pile 1817 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
397 3-Feb-16 main pile 1818 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
398 3-Feb-16 main pile 1880 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
399 9-Feb-16 main pile 1550 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
400 9-Feb-16 main pile 1551 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
401 9-Feb-16 main pile 1552 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
402 9-Feb-16 main pile 1648 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
403 9-Feb-16 main pile 1809 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
404 9-Feb-16 main pile 1808 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
405 9-Feb-16 main pile 1807 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
406 9-Feb-16 main pile 1804 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
407 9-Feb-16 main pile 1879 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
408 9-Feb-16 main pile 1878 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
409 9-Feb-16 main pile 1942 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
410 9-Feb-16 main pile 1500 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
411 9-Feb-16 main pile 1499 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
412 9-Feb-16 main pile 1501 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 TI-21A potong tiang
413 10-Feb-16 main pile 1805 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 420.00 TI-07
414 10-Feb-16 main pile 1806 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
415 10-Feb-16 main pile 1768 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
416 10-Feb-16 main pile 1767 Ǿ600 15 17 32.00 32.80 0.80 1.00 23.70 420.00 TI-07
417 10-Feb-16 main pile 1766 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
418 10-Feb-16 main pile 1502 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
419 10-Feb-16 main pile 1503 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A potong tiang
420 10-Feb-16 main pile 1504 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
421 10-Feb-16 main pile 1505 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
422 10-Feb-16 main pile 1506 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
423 11-Feb-16 main pile 1508 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
424 11-Feb-16 main pile 1507 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
425 11-Feb-16 main pile 1515 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
426 11-Feb-16 main pile 1516 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
427 13-Feb-16 main pile 1517 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
428 13-Feb-16 main pile 1519 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
429 13-Feb-16 main pile 1518 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
430 13-Feb-16 main pile 1567 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
431 13-Feb-16 main pile 1566 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
432 13-Feb-16 main pile 1565 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
433 13-Feb-16 main pile 1771 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 421.00 TI-07
434 13-Feb-16 main pile 1770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
435 13-Feb-16 main pile 1769 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
436 13-Feb-16 main pile 1773 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
437 13-Feb-16 main pile 1774 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
438 13-Feb-16 main pile 1798 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
439 13-Feb-16 main pile 1799 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
440 13-Feb-16 main pile 1800 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 421.00 TI-07 potong tiang
441 19-Feb-16 main pile 1564 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
442 19-Feb-16 main pile 1563 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
443 19-Feb-16 main pile 1562 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
444 24-Feb-16 main pile 1772 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
445 24-Feb-16 main pile 1649 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
446 24-Feb-16 main pile 1650 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
447 24-Feb-16 main pile 1674 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
448 24-Feb-16 main pile 1675 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
449 1-Mar-16 main pile 1779 Ǿ600 15 17 32.00 32.50 0.50 1.00 14.50 420.00 TI-16
450 1-Mar-16 main pile 1778 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
451 2-Mar-16 main pile 1676 Ǿ600 15 17 32.00 28.00 -4.00 1.00 23.70 420.00 TI-07
452 2-Mar-16 main pile 1680 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
453 2-Mar-16 main pile 1681 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
454 2-Mar-16 main pile 1682 Ǿ600 15 17 32.00 35.20 3.20 1.00 23.70 420.00 TI-07
455 2-Mar-16 main pile 1780 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
456 3-Mar-16 main pile 1683 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
457 3-Mar-16 main pile 1684 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
458 3-Mar-16 main pile 1685 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 420.00 TI-07
459 9-Mar-16 main pile 1644 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
460 9-Mar-16 main pile 1643 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
461 9-Mar-16 main pile 1642 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
462 9-Mar-16 main pile 1558 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
463 18-Mar-16 Main pile 1645 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
464 18-Mar-16 Main pile 1646 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.00 420.00 TI-07
465 18-Mar-16 Main pile 1647 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
466 18-Mar-16 Main pile 1559 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
467 18-Mar-16 Main pile 1560 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
468 18-Mar-16 Main pile 1561 Ǿ600 15 17 32.00 34.70 2.70 1.00 23.70 420.00 TI-07
469 18-Mar-16 Main pile 1556 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
470 18-Mar-16 Main pile 1557 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
471 21-Mar-16 Main pile 1544 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
472 21-Mar-16 Main pile 1545 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
473 22-Mar-16 Main pile 1546 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
474 22-Mar-16 Main pile 1654 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
475 22-Mar-16 Main pile 1655 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
476 22-Mar-16 Main pile 1656 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
477 22-Mar-16 Main pile 1668 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
478 22-Mar-16 Main pile 1670 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
479 23-Mar-16 Main pile 1669 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
480 23-Mar-16 Main pile 1792 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
481 23-Mar-16 Main pile 1793 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
482 23-Mar-16 Main pile 1794 Ǿ600 15 17 32.00 30.00 -2.00 1.00 23.70 420.00 TI-07 Potong tiang
TOTAL PEMANCANGAN MAIN PILE 15430.00 16215.80 785.80 0.00 0.00 483.00 20.00
1 25-Aug-15 V-4 / 658 Ǿ800 16 16 15 47.00 48.00 1.00 2.00 19.00 715.80 12.00 TI - 26 VWSG
2 27-Aug-15 IP-8 / 874 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15.00 565.10 12.00 TI - 26
3 29-Aug-15 IP-7 / 813 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15.00 565.10 12.00 TI - 26 790
4 1-Sep-15 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI - 26
5 3-Sep-15 IP-18/562 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI -pengganti
26 IP-18{466)
6 5-Jan-16 Condo tower A 700 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 695.50 TI-24
7 5-Jan-16 Condo tower A 699 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
8 5-Jan-16 Condo tower A 688 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
9 5-Jan-16 Condo tower A 675 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
10 7-Jan-16 Condo tower A 627 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
11 7-Jan-16 Condo tower A 640 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
12 7-Jan-16 Condo tower A 651 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
13 7-Jan-16 Condo tower A 664 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.80 800.90 TI-24
14 11-Jan-16 Condo tower A 579 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 609.20 TI-24
15 11-Jan-16 Condo tower A 592 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
16 11-Jan-16 Condo tower A 616 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
17 11-Jan-16 Condo tower A 603 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
18 12-Jan-16 Condo tower A 568 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
19 12-Jan-16 Condo tower A 555 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
20 12-Jan-16 Condo tower A 544 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
21 12-Jan-16 Condo tower A 531 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
22 13-Jan-16 Condo tower A 520 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
23 13-Jan-16 Condo tower A 507 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
24 13-Jan-16 Condo tower A 496 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 590.10 TI-24
25 13-Jan-16 Condo tower A 483 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
26 13-Jan-16 Condo tower A 472 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
27 14-Jan-16 Condo tower A 452 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 618.20 TI-24
28 14-Jan-16 Condo tower A 448 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
29 14-Jan-16 Condo tower A 459 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
30 15-Jan-16 Condo tower A 503 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
31 15-Jan-16 Condo tower A 479 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
32 15-Jan-16 Condo tower A 476 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
33 15-Jan-16 Condo tower A 455 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
34 15-Jan-16 Condo tower A 500 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
35 16-Jan-16 Condo tower A 524 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
36 16-Jan-16 Condo tower A 527 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
37 16-Jan-16 Condo tower A 548 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
38 16-Jan-16 Condo tower A 551 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
39 16-Jan-16 Condo tower A 572 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.70 797.40 TI-24
40 17-Jan-16 Condo tower A 575 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
41 17-Jan-16 Condo tower A 596 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
42 17-Jan-16 Condo tower A 599 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
43 17-Jan-16 Condo tower A 620 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
44 19-Jan-16 Condo tower A 623 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
45 19-Jan-16 Condo tower A 644 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
46 19-Jan-16 Condo tower A 647 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.70 586.60 TI-24
47 19-Jan-16 Condo tower A 668 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
48 19-Jan-16 Condo tower A 671 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
49 19-Jan-16 Condo tower A 692 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
50 20-Jan-16 Condo tower A 695 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
51 20-Jan-16 Condo tower A 716 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
52 20-Jan-16 Condo tower A 719 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 637.30 TI-24
53 20-Jan-16 Condo tower A 740 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
54 20-Jan-16 Condo tower A 743 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
55 20-Jan-16 Condo tower A 764 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
56 21-Jan-16 Condo tower A 767 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
57 21-Jan-16 Condo tower A 788 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
58 21-Jan-16 Condo tower A 791 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
59 21-Jan-16 Condo tower A 812 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
60 21-Jan-16 Condo tower A 815 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
61 21-Jan-16 Condo tower A 836 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
62 22-Jan-16 Condo tower A 839 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
63 22-Jan-16 Condo tower A 860 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
64 22-Jan-16 Condo tower A 863 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
65 22-Jan-16 Condo tower A 884 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
66 23-Jan-16 Condo tower A 763 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
67 23-Jan-16 Condo tower A 768 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
68 23-Jan-16 Condo tower A 787 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
69 23-Jan-16 Condo tower A 792 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
70 23-Jan-16 Condo tower A 811 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
71 23-Jan-16 Condo tower A 816 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
72 25-Jan-16 Condo tower A 744 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
73 25-Jan-16 Condo tower A 739 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
74 25-Jan-16 Condo tower A 720 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.60 793.90 TI-24
75 26-Jan-16 Condo tower A 715 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
76 26-Jan-16 Condo tower A 696 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
77 26-Jan-16 Condo tower A 691 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
78 26-Jan-16 Condo tower A 672 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
79 26-Jan-16 Condo tower A 667 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
80 26-Jan-16 Condo tower A 648 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
81 26-Jan-16 Condo tower A 643 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
82 27-Jan-16 Condo tower A 624 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
83 27-Jan-16 Condo tower A 619 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
84 27-Jan-16 Condo tower A 600 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
85 27-Jan-16 Condo tower A 595 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
86 27-Jan-16 Condo tower A 576 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
87 27-Jan-16 Condo tower A 571 Ǿ800 17 17 34.00 37.00 3.00 1.00 22.80 800.90 TI-24
88 28-Jan-16 Condo tower A 552 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
89 28-Jan-16 Condo tower A 547 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
90 28-Jan-16 Condo tower A 528 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
91 28-Jan-16 Condo tower A 523 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
92 28-Jan-16 Condo tower A 504 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
93 28-Jan-16 Condo tower A 499 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
94 28-Jan-16 Condo tower A 480 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.70 621.70 TI-24
95 29-Jan-16 Condo tower A 453 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
96 29-Jan-16 Condo tower A 451 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
97 29-Jan-16 Condo tower A 456 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
98 29-Jan-16 Condo tower A 475 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
99 30-Jan-16 Condo tower A 454 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.80 800.90 TI-24
100 30-Jan-16 Condo tower A 477 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
101 30-Jan-16 Condo tower A 478 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
102 30-Jan-16 Condo tower A 501 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
103 30-Jan-16 Condo tower A 502 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 624.70 TI-24
104 30-Jan-16 Condo tower A 526 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
105 31-Jan-16 Condo tower A 549 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
106 31-Jan-16 Condo tower A 550 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
107 31-Jan-16 Condo tower A 573 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 632.30 TI-24
108 31-Jan-16 Condo tower A 574 Ǿ800 17 17 34.00 40.03 6.03 1.00 22.80 800.90 TI-24 tiang pecah
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
109 1-Feb-16 Condo tower A 597 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
110 1-Feb-16 Condo tower A 598 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
111 1-Feb-16 Condo tower A 621 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
112 1-Feb-16 Condo tower A 622 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
113 1-Feb-16 Condo tower A 645 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
114 1-Feb-16 Condo tower A 646 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
115 1-Feb-16 Condo tower A 669 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
116 2-Feb-16 Condo tower A 670 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
117 2-Feb-16 Condo tower A 693 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
118 2-Feb-16 Condo tower A 694 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
119 2-Feb-16 Condo tower A 717 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
120 2-Feb-16 Condo tower A 718 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
121 2-Feb-16 Condo tower A 741 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
122 3-Feb-16 Condo tower A 742 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
123 3-Feb-16 Condo tower A 765 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
124 3-Feb-16 Condo tower A 766 Ǿ800 17 17 34.00 34.00 0.00 1.00 20.50 720.10 TI-24 tiang pecah
125 3-Feb-16 Condo tower A 789 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
126 3-Feb-16 Condo tower A 790 Ǿ800 17 17 34.00 36.00 2.00 1.00 20.30 713.10 TI-24 tiang pecah
127 3-Feb-16 Condo tower A 814 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
128 3-Feb-16 Condo tower A 837 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.60 TI-24
129 4-Feb-16 Condo tower A 838 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
130 4-Feb-16 Condo tower A 861 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.20 818.00 TI-24
131 4-Feb-16 Condo tower A 862 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
132 4-Feb-16 Condo tower A 885 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
133 5-Feb-16 Condo tower A 883 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
134 5-Feb-16 Condo tower A 864 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
135 5-Feb-16 Condo tower A 859 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.20 779.80 TI-24
136 5-Feb-16 Condo tower A 840 Ǿ800 17 17 34.00 32.00 -2.00 1.00 19.00 667.40 TI-24 potong
137 5-Feb-16 Condo tower A 817 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
138 6-Feb-16 Condo tower A 810 Ǿ800 17 17 34.00 33.00 -1.00 1.00 18.50 649.80 TI-24 potong
139 6-Feb-16 Condo tower A 793 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
140 6-Feb-16 Condo tower A 786 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
141 6-Feb-16 Condo tower A 769 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 755.70 TI-24 pecah
142 6-Feb-16 Condo tower A 762 Ǿ800 17 17 34.00 36.50 2.50 1.00 22.90 804.40 TI-24
143 8-Feb-16 Condo tower A 745 Ǿ800 17 17 34.00 35.00 1.00 1.00 23.00 807.90 TI-24
144 8-Feb-16 Condo tower A 738 Ǿ800 17 17 34.00 38.20 4.20 1.00 23.10 811.40 TI-24
145 8-Feb-16 Condo tower A 721 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
146 9-Feb-16 Condo tower A 714 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 674.40 TI-24
147 9-Feb-16 Condo tower A 697 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
148 9-Feb-16 Condo tower A 690 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
149 9-Feb-16 Condo tower A 673 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 692.00 TI-24
150 9-Feb-16 Condo tower A 666 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 496.50 TI-24 potong
151 9-Feb-16 Condo tower A 649 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
152 9-Feb-16 Condo tower A 642 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
153 10-Feb-16 Condo tower A 625 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
154 10-Feb-16 Condo tower A 618 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
155 10-Feb-16 Condo tower A 601 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
156 10-Feb-16 Condo tower A 594 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
157 10-Feb-16 Condo tower A 577 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
158 11-Feb-16 Condo tower A 570 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.40 646.30 TI-24
159 11-Feb-16 Condo tower A 553 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 660.40 TI-24
160 11-Feb-16 Condo tower A 546 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
161 11-Feb-16 Condo tower A 529 Ǿ800 17 17 34.00 31.00 -3.00 1.00 22.50 507.80 TI-24 potong
162 12-Feb-16 Condo tower A 522 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
163 12-Feb-16 Condo tower A 505 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
164 12-Feb-16 Condo tower A 498 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 660.40 TI-24
165 12-Feb-16 Condo tower A 481 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
166 12-Feb-16 Condo tower A 474 Ǿ800 17 17 34.00 26.00 -8.00 1.00 20.50 462.70 TI-24 potong tiang
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
167 27-Feb-16 Condo tower A 457 Ǿ800 17 17 34.00 34.50 0.50 1.00 19.90 699.00 TI-24 pecah
168 29-Feb-16 Condo tower A 450 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
169 29-Feb-16 Condo tower A 449 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
170 1-Mar-16 Condo tower A 447 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
171 1-Mar-16 Condo tower A 446 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
172 1-Mar-16 Condo tower A 445 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
173 1-Mar-16 Condo tower A 444 Ǿ800 17 17 34.00 31.00 -3.00 1.00 18.00 632.30 TI-24 pecah
174 2-Mar-16 Condo tower A 443 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
175 2-Mar-16 Condo tower A 442 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 695.50 TI-24
176 3-Mar-16 Condo tower A 464 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
177 3-Mar-16 Condo tower A 463 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
178 3-Mar-16 Condo tower A 462 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
179 3-Mar-16 Condo tower A 461 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
180 3-Mar-16 Condo tower A 460 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
181 4-Mar-16 Condo tower A 458 Ǿ800 17 17 34.00 27.00 -7.00 1.00 23.00 519.10 TI-24 pecah
182 5-Mar-16 Condo tower A 465 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
183 5-Mar-16 Condo tower A 466 Ǿ800 17 17 34.00 35.00 1.00 1.00 20.00 702.50 TI-24 pecah
184 7-Mar-16 Condo tower A 467 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.00 737.70 TI-24 tiang pecah
185 7-Mar-16 Condo tower A 468 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.00 TI-24
186 8-Mar-16 Condo tower A 469 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
187 8-Mar-16 Condo tower A 470 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
188 9-Mar-16 Condo tower A 471 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.10 TI-24
189 9-Mar-16 Condo tower A 473 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
190 10-Mar-16 Condo tower A 489 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 519.10 TI-24 potong tiang
191 10-Mar-16 Condo tower A 488 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
192 15-Mar-16 Condo tower A 487 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
193 15-Mar-16 Condo tower A 486 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
194 15-Mar-16 Condo tower A 485 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
195 15-Mar-16 Condo tower A 484 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
196 16-Mar-16 Condo tower A 482 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
197 16-Mar-16 Condo tower A 497 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
198 16-Mar-16 Condo tower A 495 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
199 17-Mar-16 Condo tower A 494 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
200 17-Mar-16 Condo tower A 493 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
201 17-Mar-16 Condo tower A 492 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
202 17-Mar-16 Condo tower A 491 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
203 17-Mar-16 Condo tower A 490 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
204 17-Mar-16 Condo tower A 506 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
205 17-Mar-16 Condo tower A 508 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
206 18-Mar-16 Condo tower A 509 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
207 18-Mar-16 Condo tower A 510 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
208 18-Mar-16 Condo tower A 511 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
209 18-Mar-16 Condo tower A 512 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
210 18-Mar-16 Condo tower A 513 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
211 20-Mar-16 Condo tower A 521 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
212 20-Mar-16 Condo tower A 519 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.00 TI-26
213 20-Mar-16 Condo tower A 518 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
214 20-Mar-16 Condo tower A 517 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 678.10 TI-26
215 21-Mar-16 Condo tower A 514 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
216 21-Mar-16 Condo tower A 515 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
217 21-Mar-16 Condo tower A 516 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
218 23-Mar-16 Condo tower A 533 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
219 23-Mar-16 Condo tower A 532 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
220 23-Mar-16 Condo tower A 530 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
221 24-Mar-16 Condo tower A 537 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
222 24-Mar-16 Condo tower A 536 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
223 24-Mar-16 Condo tower A 535 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
224 24-Mar-16 Condo tower A 534 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
225 28-Mar-16 Condo tower A 545 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 565.10 TI-26
226 28-Mar-16 Condo tower A 543 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
227 28-Mar-16 Condo tower A 542 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
228 29-Mar-16 Condo tower A 538 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 688.10 TI-26
229 29-Mar-16 Condo tower A 539 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
230 29-Mar-16 Condo tower A 540 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
231 29-Mar-16 Condo tower A 541 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
232 30-Mar-16 Condo tower A 554 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
233 30-Mar-16 Condo tower A 556 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 527.40 TI-26
234 31-Mar-16 Condo tower A 557 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.80 TI-26
235 2-Apr-16 Condo tower A 561 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
236 2-Apr-16 Condo tower A 560 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
237 2-Apr-16 Condo tower A 559 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
238 2-Apr-16 Condo tower A 558 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
239 3-Apr-16 Condo tower A 569 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
240 3-Apr-16 Condo tower A 567 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
241 3-Apr-16 Condo tower A 566 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.00 TI-26
242 3-Apr-16 Condo tower A 565 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
243 3-Apr-16 Condo tower A 564 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
244 3-Apr-16 Condo tower A 563 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
245 6-Apr-16 Condo tower A 578 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
246 6-Apr-16 Condo tower A 580 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
247 6-Apr-16 Condo tower A 581 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
248 6-Apr-16 Condo tower A 582 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
249 6-Apr-16 Condo tower A 583 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
250 6-Apr-16 Condo tower A 584 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
251 9-Apr-16 Condo tower A 586 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
252 9-Apr-16 Condo tower A 587 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
253 9-Apr-16 Condo tower A 588 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
254 11-Apr-16 Condo tower A 589 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
255 11-Apr-16 Condo tower A 590 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
256 11-Apr-16 Condo tower A 591 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
257 11-Apr-16 Condo tower A 593 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
258 13-Apr-16 Condo tower A 602 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.90 TI-26
259 13-Apr-16 Condo tower A 604 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
260 13-Apr-16 Condo tower A 605 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
261 13-Apr-16 Condo tower A 606 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
262 13-Apr-16 Condo tower A 607 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
263 13-Apr-16 Condo tower A 608 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
264 13-Apr-16 Condo tower A 609 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 878.10 TI-26
265 14-Apr-16 Condo tower A 617 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
266 14-Apr-16 Condo tower A 615 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
267 14-Apr-16 Condo tower A 614 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
268 15-Apr-16 Condo tower A 613 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
269 15-Apr-16 Condo tower A 612 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
270 15-Apr-16 Condo tower A 611 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
271 15-Apr-16 Condo tower A 610 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
272 17-Apr-16 Condo tower A 626 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
273 17-Apr-16 Condo tower A 628 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
274 17-Apr-16 Condo tower A 629 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
275 19-Apr-16 Condo tower A 633 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
276 19-Apr-16 Condo tower A 632 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
277 19-Apr-16 Condo tower A 631 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
278 19-Apr-16 Condo tower A 630 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
279 21-Apr-16 Condo tower A 641 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
280 21-Apr-16 Condo tower A 639 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
281 21-Apr-16 Condo tower A 638 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
282 21-Apr-16 Condo tower A 637 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
283 21-Apr-16 Condo tower A 636 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
284 21-Apr-16 Condo tower A 635 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
285 22-Apr-16 Condo tower A 634 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
286 25-Apr-16 Condo tower A 650 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
287 25-Apr-16 Condo tower A 652 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
288 25-Apr-16 Condo tower A 653 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
289 25-Apr-16 Condo tower A 654 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
290 26-Apr-16 Condo tower A 655 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
291 26-Apr-16 Condo tower A 656 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
292 26-Apr-16 Condo tower A 657 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
293 27-Apr-16 Condo tower A 665 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
294 27-Apr-16 Condo tower A 663 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
295 27-Apr-16 Condo tower A 662 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
296 27-Apr-16 Condo tower A 661 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
297 27-Apr-16 Condo tower A 660 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
298 27-Apr-16 Condo tower A 659 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
299 28-Apr-16 Condo tower A 674 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
300 29-Apr-16 Condo tower A 676 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
301 29-Apr-16 Condo tower A 677 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
302 29-Apr-16 Condo tower A 678 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
303 29-Apr-16 Condo tower A 679 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 679.00 TI-26
304 29-Apr-16 Condo tower A 680 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
305 30-Apr-16 Condo tower A 681 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
306 30-Apr-16 Condo tower A 689 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
307 30-Apr-16 Condo tower A 687 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
308 1-May-16 Condo tower A 686 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
309 1-May-16 Condo tower A 685 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
310 1-May-16 Condo tower A 684 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
311 2-May-16 Condo tower A 683 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
312 2-May-16 Condo tower A 682 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
313 3-May-16 Condo tower A 698 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
314 4-May-16 Condo tower A 701 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 659.30 TI-26
315 4-May-16 Condo tower A 702 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
316 4-May-16 Condo tower A 703 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
317 4-May-16 Condo tower A 704 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
318 4-May-16 Condo tower A 705 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
319 5-May-16 Condo tower A 713 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
320 5-May-16 Condo tower A 711 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
321 5-May-16 Condo tower A 710 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.50 810.00 TI-26
322 5-May-16 Condo tower A 709 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
323 5-May-16 Condo tower A 708 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
324 5-May-16 Condo tower A 707 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
325 6-May-16 Condo tower A 706 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
326 6-May-16 Condo tower A 712 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
327 6-May-16 Condo tower A 723 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
328 7-May-16 Condo tower A 722 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
329 7-May-16 Condo tower A 724 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
330 7-May-16 Condo tower A 725 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
331 7-May-16 Condo tower A 726 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
332 7-May-16 Condo tower A 727 Ǿ800 17 17 34.00 40.40 6.40 1.00 21.50 810.00 TI-26
333 9-May-16 Condo tower A 728 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
334 9-May-16 Condo tower A 729 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810 TI-26
335 9-May-16 Condo tower A 737 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
336 9-May-16 Condo tower A 736 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
337 10-May-16 Condo tower A 735 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
338 10-May-16 Condo tower A 734 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
339 10-May-16 Condo tower A 733 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
340 10-May-16 Condo tower A 732 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
341 10-May-16 Condo tower A 731 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
342 10-May-16 Condo tower A 730 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
343 11-May-16 Condo tower A 746 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
344 11-May-16 Condo tower A 747 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
345 11-May-16 Condo tower A 748 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
346 12-May-16 Condo tower A 749 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
347 12-May-16 Condo tower A 750 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
348 12-May-16 Condo tower A 751 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
349 12-May-16 Condo tower A 752 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
350 12-May-16 Condo tower A 753 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
351 13-May-16 Condo tower A 761 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
352 13-May-16 Condo tower A 760 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
353 14-May-16 Condo tower A 759 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
354 14-May-16 Condo tower A 758 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
355 14-May-16 Condo tower A 757 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
356 14-May-16 Condo tower A 756 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
357 14-May-16 Condo tower A 755 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
358 14-May-16 Condo tower A 754 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
359 15-May-16 Condo tower A 770 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
360 15-May-16 Condo tower A 771 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
361 17-May-16 Condo tower A 772 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
362 17-May-16 Condo tower A 773 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
363 17-May-16 Condo tower A 774 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
364 17-May-16 Condo tower A 775 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
365 17-May-16 Condo tower A 776 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
366 17-May-16 Condo tower A 777 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
367 18-May-16 Condo tower A 785 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
368 18-May-16 Condo tower A 784 Ǿ800 17 17 34.00 36.50 2.5 1.00 21.50 810.00 TI-26
369 18-May-16 Condo tower A 783 Ǿ800 17 17 34.00 37.50 3.5 1.00 21.50 810.00 TI-26
370 19-May-16 Condo tower A 782 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
371 19-May-16 Condo tower A 781 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
372 19-May-16 Condo tower A 780 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
373 19-May-16 Condo tower A 779 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
374 19-May-16 Condo tower A 778 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
375 20-May-16 Condo tower A 794 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
376 20-May-16 Condo tower A 795 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
377 20-May-16 Condo tower A 796 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
378 20-May-16 Condo tower A 797 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.00 TI-26
379 20-May-16 Condo tower A 798 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
380 21-May-16 Condo tower A 799 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
381 21-May-16 Condo tower A 800 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
382 21-May-16 Condo tower A 801 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
383 23-May-16 Condo tower A 809 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
384 23-May-16 Condo tower A 808 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
385 23-May-16 Condo tower A 807 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
386 24-May-16 Condo tower A 806 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
387 24-May-16 Condo tower A 805 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
388 25-May-16 Condo tower A 804 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
389 25-May-16 Condo tower A 803 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
390 25-May-16 Condo tower A 802 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
391 25-May-16 Condo tower A 818 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
392 26-May-16 Condo tower A 819 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.50 810.00 TI-26
393 26-May-16 Condo tower A 820 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 20.50 772.30 TI-26
394 26-May-16 Condo tower A 821 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
395 27-May-16 Condo tower A 822 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
396 27-May-16 Condo tower A 823 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26
397 27-May-16 Condo tower A 824 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 847.70 TI-26
398 27-May-16 Condo tower A 825 Ǿ800 17 17 34.00 28.00 -6.0 1.00 22.00 828.80 TI-26 potong tiang
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
399 28-May-16 Condo tower A 835 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
400 28-May-16 Condo tower A 834 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26
401 28-May-16 Condo tower A 833 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.50 810.00 TI-26
402 28-May-16 Condo tower A 832 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.50 772.30 TI-26
403 29-May-16 Condo tower A 831 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.50 772.30 TI-26
404 29-May-16 Condo tower A 830 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
405 30-May-16 Condo tower A 829 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
406 30-May-16 Condo tower A 828 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
407 30-May-16 Condo tower A 827 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
408 30-May-16 Condo tower A 826 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
409 2-Jun-16 Condo tower A 841 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
410 2-Jun-16 Condo tower A 842 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
411 2-Jun-16 Condo tower A 843 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 810.00 TI-26
412 2-Jun-16 Condo tower A 844 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
413 2-Jun-16 Condo tower A 845 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
414 3-Jun-16 Condo tower A 846 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
415 3-Jun-16 Condo tower A 847 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 700.70 TI-26
416 3-Jun-16 Condo tower A 848 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
417 3-Jun-16 Condo tower A 849 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
418 10-Jun-16 Condo tower A 858 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
419 10-Jun-16 Condo tower A 857 Ǿ800 17 17 34.00 42.40 8.4 1.00 19.50 734.60 TI-26
420 10-Jun-16 Condo tower A 856 Ǿ800 17 17 34.00 42.30 8.3 1.00 21.00 791.10 TI-26
421 10-Jun-16 Condo tower A 855 Ǿ800 17 17 34.00 42.20 8.2 1.00 18.00 678.10 TI-26
422 11-Jun-16 Condo tower A 854 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
423 11-Jun-16 Condo tower A 853 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
424 11-Jun-16 Condo tower A 852 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 719.80 TI-26
425 11-Jun-16 Condo tower A 851 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
426 12-Jun-16 Condo tower A 865 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.50 659.30 TI-26
427 12-Jun-16 Condo tower A 866 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
428 12-Jun-16 Condo tower A 867 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
429 12-Jun-16 Condo tower A 868 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.00 TI-26
430 13-Jun-16 Condo tower A 869 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
431 13-Jun-16 Condo tower A 870 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
432 13-Jun-16 Condo tower A 871 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
433 13-Jun-16 Condo tower A 872 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
434 13-Jun-16 Condo tower A 873 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
435 14-Jun-16 Condo tower A 882 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
436 14-Jun-16 Condo tower A 881 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
437 14-Jun-16 Condo tower A 880 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
438 14-Jun-16 Condo tower A 879 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
439 15-Jun-16 Condo tower A 878 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
440 15-Jun-16 Condo tower A 877 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
441 15-Jun-16 Condo tower A 876 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
442 15-Jun-16 Condo tower A 875 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
443 15-Jun-16 Condo tower A 850 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
444
1 8-Apr-16 Condo tower A 30051 Ǿ800 17 17 34.00 31.00 -3.0 1.00 21.50 810.00 TI-26 sisipan (SM)
2 8-Apr-16 Condo tower A 30052 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26 sisipan (SM)
3 6-May-16 Condo tower A 30072 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.70 659.30 TI-26 sisipan (SM)
4 11-May-16 Condo tower A 30070 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26 sisipan
5 11-May-16 Condo tower A 30071 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26 sisipan
6 13-May-16 Condo tower A 30057 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26 sisipan (SM)
7 15-May-16 Condo tower A 30056 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26 sisipan (SM)
8 23-May-16 Condo tower A 30054 Ǿ800 17 17 34.00 35.50 1.5 1.00 21.50 810.00 TI-26 sisipan (SM)
9 23-May-16 Condo tower A 30055 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.50 772.30 TI-26 sisipan (SM)
10 2-Jun-16 Condo tower A 30053 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan (SM)
11 18-Jun-16 Condo tower A 30063 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25 sisipan
12 18-Jun-16 Condo tower A 30064 Ǿ800 17 17 34.00 34.25 0.3 1.00 21.70 817.50 TI-25 sisipan
13 18-Jun-16 Condo tower A 30062 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25 sisipan
14 18-Jun-16 Condo tower A 30103 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan
15 18-Jun-16 Condo tower A 30104 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan
16 18-Jun-16 Condo tower A 30105 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26 sisipan
17 18-Jun-16 Condo tower A 30106 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26 sisipan
18 19-Jun-16 Condo tower A 30066 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25 sisipan
19 19-Jun-16 Condo tower A 30068 Ǿ800 17 17 34.00 35.00 1.0 1.00 21.70 817.50 TI-25 sisipan
20 19-Jun-16 Condo tower A 30065 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.80 821.30 TI-25 sisipan
21 20-Jun-16 Condo tower A 30074 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25 sisipan
22 20-Jun-16 Condo tower A 30067 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25 sisipan
23 20-Jun-16 Condo tower A 30100 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26 sisipan
24 20-Jun-16 Condo tower A 30101 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan
25 20-Jun-16 Condo tower A 30102 Ǿ800 17 17 34.00 34.50 0.5 1.00 21.50 810.00 TI-26 sisipan
26 21-Jun-16 Condo tower A 30109 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26 sisipan
27
28
29
30
31
32
33
34
1 8-Sep-15 V-3/229 Ǿ800 16 16 15 47.00 44.00 -3.00 2.00 1 21.50 12.00 TI-26 VWSG
2 11-Sep-15 IP-15/390 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 20.00 753.50 12.00 TI-26 INDIKATOR
3 13-Sep-15 IP-14/397 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 16 602.80 12.00 TI-24 INDIKATOR
4 15-Sep-15 IP-16/69 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 18 678.10 12.00 TI-26 INDIKATOR
5 15-Sep-15 IP-19/62 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI-26 INDIKATOR
6 2-Feb-16 Condo tower B 440 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 828.10 TI-26
7 2-Feb-16 Condo tower B 423 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
8 2-Feb-16 Condo tower B 420 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
9 4-Feb-16 Condo tower B 399 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
10 4-Feb-16 Condo tower B 396 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
11 4-Feb-16 Condo tower B 375 Ǿ800 17 17 34.00 40.00 6.00 1.00 18.50 697.00 TI-26 tiang pecah
12 4-Feb-16 Condo tower B 329 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
13 9-Mar-16 Condo tower B 414 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
14 9-Mar-16 Condo tower B 405 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
15 10-Mar-16 Condo tower B 366 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
16 10-Mar-16 Condo tower B 381 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
17 10-Mar-16 Condo tower B 342 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
18 10-Mar-16 Condo tower B 357 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
19 10-Mar-16 Condo tower B 406 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
20 11-Mar-16 Condo tower B 413 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.40 806.20 TI-25
21 11-Mar-16 Condo tower B 382 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
22 11-Mar-16 Condo tower B 389 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.30 802.40 TI-25
23 11-Mar-16 Condo tower B 365 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
24 13-Mar-16 Condo tower B 380 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
25 13-Mar-16 Condo tower B 367 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
26 13-Mar-16 Condo tower B 404 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
27 14-Mar-16 Condo tower B 391 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
28 14-Mar-16 Condo tower B 416 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
29 14-Mar-16 Condo tower B 427 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.30 614.10 TI-25
30 14-Mar-16 Condo tower B 428 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
31 15-Mar-16 Condo tower B 415 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
32 15-Mar-16 Condo tower B 356 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
33 16-Mar-16 Condo tower B 332 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 658.70 TI-25
34 16-Mar-16 Condo tower B 343 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.60 813.70 TI-25
35 17-Mar-16 Condo tower B 308 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
36 17-Mar-16 Condo tower B 319 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
37 17-Mar-16 Condo tower B 379 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
38 18-Mar-16 Condo tower B 392 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
39 18-Mar-16 Condo tower B 403 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
40 18-Mar-16 Condo tower B 344 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.40 506.20 TI-25
41 20-Mar-16 Condo tower B 355 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.40 806.20 TI-25
42 20-Mar-16 Condo tower B 368 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.90 674.40 TI-25
43 21-Mar-16 Condo tower B 400 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
44 22-Mar-16 Condo tower B 419 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 742.20 TI-25
45 22-Mar-16 Condo tower B 424 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
46 22-Mar-16 Condo tower B 371 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
47 22-Mar-16 Condo tower B 376 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
48 24-Mar-16 Condo tower B 299 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 632.90 TI-25
49 1-Apr-16 Condo tower B 304 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
50 1-Apr-16 Condo tower B 323 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
51 1-Apr-16 Condo tower B 328 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
52 1-Apr-16 Condo tower B 347 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.50 810.00 TI-25
53 1-Apr-16 Condo tower B 395 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
54 1-Apr-16 Condo tower B 352 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
55 4-Apr-16 Condo tower B 300 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 745.90 TI-25
56 4-Apr-16 Condo tower B 303 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
57 4-Apr-16 Condo tower B 324 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
58 5-Apr-16 Condo tower B 327 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
59 5-Apr-16 Condo tower B 348 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
60 5-Apr-16 Condo tower B 351 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
61 5-Apr-16 Condo tower B 372 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-25
62 8-Apr-16 Condo tower B 36 Ǿ800 17 17 34.00 32.00 -2.00 1.00 17.00 597.20 TI-24 tiang pecah
63 8-Apr-16 Condo tower B 298 Ǿ800 17 17 34.00 39.00 5.00 1.00 18.50 697.00 TI-25 tiang pecah
64 8-Apr-16 Condo tower B 305 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 817.50 TI-25
65 8-Apr-16 Condo tower B 322 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
66 8-Apr-16 Condo tower B 346 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
67 8-Apr-16 Condo tower B 353 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
68 8-Apr-16 Condo tower B 370 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.20 798.70 TI-25
69 9-Apr-16 Condo tower B 34 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
70 9-Apr-16 Condo tower B 377 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
71 9-Apr-16 Condo tower B 394 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
72 9-Apr-16 Condo tower B 401 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
73 9-Apr-16 Condo tower B 418 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
74 12-Apr-16 Condo tower B 33 Ǿ800 17 17 34.00 34.00 0.00 1.00 22.90 804.90 TI-24
75 12-Apr-16 Condo tower B 32 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
76 13-Apr-16 Condo tower B 31 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
77 13-Apr-16 Condo tower B 30 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
78 13-Apr-16 Condo tower B 29 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
79 13-Apr-16 Condo tower B 306 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
80 13-Apr-16 Condo tower B 321 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
81 13-Apr-16 Condo tower B 330 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.60 813.70 TI-25
82 13-Apr-16 Condo tower B 345 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
83 13-Apr-16 Condo tower B 354 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.1.1 TI-25
84 14-Apr-16 Condo tower B 369 Ǿ800 17 17 34.00 17.50 -16.50 1.00 22.10 836.60 TI-25 potong tiang
85 15-Apr-16 Condo tower B 378 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
86 15-Apr-16 Condo tower B 393 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
87 15-Apr-16 Condo tower B 402 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
88 15-Apr-16 Condo tower B 417 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.70 817.50 TI-25
89 15-Apr-16 Condo tower B 25 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
90 16-Apr-16 Condo tower B 26 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
91 16-Apr-16 Condo tower B 27 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.80 800.90 TI-24
92 16-Apr-16 Condo tower B 28 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.90 804.40 TI-24
93 19-Apr-16 Condo tower B 49 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.00 TI-24
94 19-Apr-16 Condo tower B 48 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
95 19-Apr-16 Condo tower B 47 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
96 19-Apr-16 Condo tower B 46 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
97 19-Apr-16 Condo tower B 45 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
98 19-Apr-16 Condo tower B 292 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.80 783.60 TI-25
99 19-Apr-16 Condo tower B 311 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.80 821.30 TI-25
100 19-Apr-16 Condo tower B 316 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
101 19-Apr-16 Condo tower B 335 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
102 20-Apr-16 Condo tower B 44 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
103 20-Apr-16 Condo tower B 43 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 744.20 TI-24
104 20-Apr-16 Condo tower B 42 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
105 20-Apr-16 Condo tower B 41 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
106 20-Apr-16 Condo tower B 40 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737,7 TI-24
107 21-Apr-16 Condo tower B 39 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
108 21-Apr-16 Condo tower B 50 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
109 21-Apr-16 Condo tower B 51 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
110 21-Apr-16 Condo tower B 52 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
111 21-Apr-16 Condo tower B 340 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
112 21-Apr-16 Condo tower B 359 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
113 21-Apr-16 Condo tower B 364 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
114 22-Apr-16 Condo tower B 53 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
115 22-Apr-16 Condo tower B 54 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
116 22-Apr-16 Condo tower B 55 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.30 713.10 TI-24
117 22-Apr-16 Condo tower B 56 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.00 807.90 TI-24
118 22-Apr-16 Condo tower B 57 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
119 22-Apr-16 Condo tower B 58 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
120 22-Apr-16 Condo tower B 383 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.80 821.30 TI-25
121 22-Apr-16 Condo tower B 388 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
122 22-Apr-16 Condo tower B 407 Ǿ800 17 17 34.00 37.50 3.50 1.00 22.00 828.80 TI-25
123 22-Apr-16 Condo tower B 412 Ǿ800 17 17 34.00 32.00 -2.00 1.00 22.00 828.80 TI-25 potong tiang
124 23-Apr-16 Condo tower B 59 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
125 23-Apr-16 Condo tower B 60 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.90 804.40 TI-24
126 23-Apr-16 Condo tower B 72 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
127 23-Apr-16 Condo tower B 358 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
128 23-Apr-16 Condo tower B 293 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
129 23-Apr-16 Condo tower B 341 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
130 23-Apr-16 Condo tower B 310 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
131 24-Apr-16 Condo tower B 71 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
132 24-Apr-16 Condo tower B 70 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
133 24-Apr-16 Condo tower B 68 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
134 24-Apr-16 Condo tower B 73 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
135 24-Apr-16 Condo tower B 317 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
136 24-Apr-16 Condo tower B 334 Ǿ800 17 17 34.00 42.00 8.00 1.00 14.50 546.30 TI-25
137 25-Apr-16 Condo tower B 67 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
138 25-Apr-16 Condo tower B 66 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
139 25-Apr-16 Condo tower B 65 Ǿ800 17 17 34.00 40.00 6.00 1.00 22.90 804.40 TI-24
140 25-Apr-16 Condo tower B 64 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
141 26-Apr-16 Condo tower B 63 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
142 26-Apr-16 Condo tower B 74 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
143 26-Apr-16 Condo tower B 75 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 800.90 TI-24
144 26-Apr-16 Condo tower B 285 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.20 610.30 TI-25
145 26-Apr-16 Condo tower B 309 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 828.80 TI-25 potong tiang
146 26-Apr-16 Condo tower B 294 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
147 26-Apr-16 Condo tower B 318 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
148 26-Apr-16 Condo tower B 333 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
149 27-Apr-16 Condo tower B 76 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
150 27-Apr-16 Condo tower B 77 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
151 27-Apr-16 Condo tower B 78 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
152 27-Apr-16 Condo tower B 79 Ǿ800 17 17 34.00 24.00 -10.00 1.00 23.00 807.90 TI-24 potong tiang
153 27-Apr-16 Condo tower B 80 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
154 27-Apr-16 Condo tower B 81 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
155 27-Apr-16 Condo tower B 82 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
156 27-Apr-16 Condo tower B 235 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.70 817.50 TI-25
157 27-Apr-16 Condo tower B 248 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
158 27-Apr-16 Condo tower B 259 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
159 27-Apr-16 Condo tower B 272 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
160 27-Apr-16 Condo tower B 283 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 727.10 TI-25
161 28-Apr-16 Condo tower B 83 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.00 TI-24
162 28-Apr-16 Condo tower B 84 Ǿ800 17 17 34.00 31.50 -2.50 1.00 23.00 807.90 TI-24
163 28-Apr-16 Condo tower B 97 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 807.90 TI-24
164 28-Apr-16 Condo tower B 96 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
165 28-Apr-16 Condo tower B 296 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.70 817.50 TI-25
166 28-Apr-16 Condo tower B 307 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.80 821.30 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
167 28-Apr-16 Condo tower B 320 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.80 821.30 TI-25
168 28-Apr-16 Condo tower B 331 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
169 29-Apr-16 Condo tower B 95 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
170 29-Apr-16 Condo tower B 94 Ǿ800 17 17 34.00 41.00 7.00 1.00 22.90 804.40 TI-24
171 29-Apr-16 Condo tower B 93 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
172 29-Apr-16 Condo tower B 92 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
173 29-Apr-16 Condo tower B 225 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
174 29-Apr-16 Condo tower B 234 Ǿ800 17 17 34.00 40.00 6.00 1.00 12.00 452.10 TI-25
175 29-Apr-16 Condo tower B 249 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
176 29-Apr-16 Condo tower B 258 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.90 825.10 TI-25
177 30-Apr-16 Condo tower B 91 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
178 30-Apr-16 Condo tower B 90 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
179 30-Apr-16 Condo tower B 89 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
180 30-Apr-16 Condo tower B 273 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.00 828.80 TI-25
181 30-Apr-16 Condo tower B 282 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
182 30-Apr-16 Condo tower B 297 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.90 825.10 TI-25
183 1-May-16 Condo tower B 226 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 669.30 TI-25
184 1-May-16 Condo tower B 233 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
185 2-May-16 Condo tower B 250 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
186 2-May-16 Condo tower B 257 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
187 2-May-16 Condo tower B 274 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
188 2-May-16 Condo tower B 281 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
189 2-May-16 Condo tower B 88 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
190 2-May-16 Condo tower B 87 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
191 3-May-16 Condo tower B 227 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
192 3-May-16 Condo tower B 232 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.00 TI-25
193 3-May-16 Condo tower B 251 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
194 3-May-16 Condo tower B 256 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
195 3-May-16 Condo tower B 275 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
196 3-May-16 Condo tower B 98 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
197 3-May-16 Condo tower B 99 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
198 3-May-16 Condo tower B 100 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
199 3-May-16 Condo tower B 101 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
200 3-May-16 Condo tower B 102 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
201 4-May-16 Condo tower B 280 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
202 4-May-16 Condo tower B 103 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
203 4-May-16 Condo tower B 104 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
204 4-May-16 Condo tower B 105 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.60 685.00 TI-24
205 4-May-16 Condo tower B 106 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
206 4-May-16 Condo tower B 107 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
207 4-May-16 Condo tower B 108 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
208 5-May-16 Condo tower B 228 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
209 5-May-16 Condo tower B 231 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
210 5-May-16 Condo tower B 252 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 648.00 TI-25
211 5-May-16 Condo tower B 255 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
212 5-May-16 Condo tower B 276 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 678.10 TI-25
213 5-May-16 Condo tower B 279 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
214 5-May-16 Condo tower B 121 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
215 5-May-16 Condo tower B 120 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
216 5-May-16 Condo tower B 119 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
217 5-May-16 Condo tower B 118 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
218 5-May-16 Condo tower B 117 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
219 5-May-16 Condo tower B 116 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
220 5-May-16 Condo tower B 115 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
221 6-May-16 Condo tower B 253 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 663.10 TI-25
222 6-May-16 Condo tower B 254 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
223 6-May-16 Condo tower B 277 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 695.70 TI-25
224 6-May-16 Condo tower B 278 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
225 6-May-16 Condo tower B 114 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
226 6-May-16 Condo tower B 113 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
227 6-May-16 Condo tower B 112 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
228 6-May-16 Condo tower B 111 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
229 7-May-16 Condo tower B 301 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
230 7-May-16 Condo tower B 302 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
231 7-May-16 Condo tower B 325 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
232 7-May-16 Condo tower B 326 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
233 7-May-16 Condo tower B 349 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
234 7-May-16 Condo tower B 122 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
235 7-May-16 Condo tower B 123 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
236 7-May-16 Condo tower B 124 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
237 7-May-16 Condo tower B 125 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
238 7-May-16 Condo tower B 126 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
239 7-May-16 Condo tower B 127 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
240 7-May-16 Condo tower B 128 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
241 8-May-16 Condo tower B 129 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
242 8-May-16 Condo tower B 130 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
243 8-May-16 Condo tower B 131 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
244 8-May-16 Condo tower B 132 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
245 9-May-16 Condo tower B 145 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
246 9-May-16 Condo tower B 144 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
247 9-May-16 Condo tower B 143 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 773.80 TI-24
248 9-May-16 Condo tower B 350 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
249 9-May-16 Condo tower B 373 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
250 9-May-16 Condo tower B 374 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
251 9-May-16 Condo tower B 398 Ǿ800 17 17 34.00 39.50 5.5 1.00 22.00 828.80 TI-25
252 9-May-16 Condo tower B 421 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
253 9-May-16 Condo tower B 422 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
254 9-May-16 Condo tower B 441 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
255 10-May-16 Condo tower B 142 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
256 10-May-16 Condo tower B 141 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
257 10-May-16 Condo tower B 140 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
258 10-May-16 Condo tower B 139 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
259 10-May-16 Condo tower B 138 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
260 10-May-16 Condo tower B 137 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
261 10-May-16 Condo tower B 136 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
262 10-May-16 Condo tower B 434 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
263 10-May-16 Condo tower B 435 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
264 10-May-16 Condo tower B 436 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.00 TI-25
265 11-May-16 Condo tower B 135 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
266 11-May-16 Condo tower B 146 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
267 11-May-16 Condo tower B 147 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
268 11-May-16 Condo tower B 148 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
269 11-May-16 Condo tower B 149 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
270 11-May-16 Condo tower B 437 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
271 11-May-16 Condo tower B 438 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
272 11-May-16 Condo tower B 439 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
273 11-May-16 Condo tower B 433 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
274 11-May-16 Condo tower B 432 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
275 11-May-16 Condo tower B 431 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25
276 12-May-16 Condo tower B 150 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
277 12-May-16 Condo tower B 151 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
278 12-May-16 Condo tower B 152 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
279 12-May-16 Condo tower B 153 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
280 12-May-16 Condo tower B 154 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.40 TI-24
281 12-May-16 Condo tower B 430 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
282 12-May-16 Condo tower B 429 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
283 12-May-16 Condo tower B 426 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
284 12-May-16 Condo tower B 425 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
285 12-May-16 Condo tower B 410 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
286 13-May-16 Condo tower B 155 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
287 13-May-16 Condo tower B 156 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
288 13-May-16 Condo tower B 169 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
289 13-May-16 Condo tower B 168 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
290 13-May-16 Condo tower B 167 Ǿ800 17 17 34.00 39.50 5.5 1.00 23.00 807.90 TI-24
291 13-May-16 Condo tower B 166 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.50 TI-24
292 13-May-16 Condo tower B 411 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
293 13-May-16 Condo tower B 408 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
294 13-May-16 Condo tower B 409 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
295 13-May-16 Condo tower B 386 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
296 13-May-16 Condo tower B 387 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
297 13-May-16 Condo tower B 384 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
298 14-May-16 Condo tower B 165 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
299 14-May-16 Condo tower B 164 Ǿ800 17 17 34.00 43.00 9.0 1.00 23.00 807.90 TI-24
300 14-May-16 Condo tower B 163 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
301 14-May-16 Condo tower B 162 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
302 14-May-16 Condo tower B 161 Ǿ800 17 17 34.00 42.50 8.5 1.00 22.90 804.40 TI-24
303 14-May-16 Condo tower B 385 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
304 14-May-16 Condo tower B 363 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
305 14-May-16 Condo tower B 362 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
306 14-May-16 Condo tower B 360 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
307 14-May-16 Condo tower B 361 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
308 14-May-16 Condo tower B 339 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
309 16-May-16 Condo tower B 160 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
310 16-May-16 Condo tower B 159 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
311 16-May-16 Condo tower B 170 Ǿ800 17 17 34.00 43.00 9.0 1.00 22.00 772.80 TI-24
312 17-May-16 Condo tower B 171 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24
313 17-May-16 Condo tower B 172 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
314 17-May-16 Condo tower B 173 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
315 17-May-16 Condo tower B 174 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
316 17-May-16 Condo tower B 175 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
317 17-May-16 Condo tower B 176 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
318 17-May-16 Condo tower B 177 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
319 17-May-16 Condo tower B 178 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
320 17-May-16 Condo tower B 338 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
321 17-May-16 Condo tower B 313 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
322 17-May-16 Condo tower B 312 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
323 17-May-16 Condo tower B 291 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
324 17-May-16 Condo tower B 290 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25
325 17-May-16 Condo tower B 288 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
326 17-May-16 Condo tower B 289 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
327 17-May-16 Condo tower B 284 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
328 18-May-16 Condo tower B 179 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
329 18-May-16 Condo tower B 180 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
330 18-May-16 Condo tower B 193 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
331 18-May-16 Condo tower B 192 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
332 18-May-16 Condo tower B 191 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
333 18-May-16 Condo tower B 295 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
334 18-May-16 Condo tower B 287 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
335 18-May-16 Condo tower B 286 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
336 18-May-16 Condo tower B 266 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
337 18-May-16 Condo tower B 267 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
338 19-May-16 Condo tower B 190 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
339 19-May-16 Condo tower B 189 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
340 19-May-16 Condo tower B 188 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
341 19-May-16 Condo tower B 187 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
342 19-May-16 Condo tower B 186 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
343 19-May-16 Condo tower B 185 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
344 19-May-16 Condo tower B 268 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.80 670.80 TI-25
345 19-May-16 Condo tower B 269 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
346 19-May-16 Condo tower B 270 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
347 19-May-16 Condo tower B 271 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
348 19-May-16 Condo tower B 265 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.10 606.50 TI-25
349 19-May-16 Condo tower B 264 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
350 20-May-16 Condo tower B 184 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
351 20-May-16 Condo tower B 183 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
352 20-May-16 Condo tower B 182 Ǿ800 17 17 34.00 43.00 9.0 1.00 19.50 685.00 TI-24
353 20-May-16 Condo tower B 181 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
354 21-May-16 Condo tower B 158 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
355 21-May-16 Condo tower B 157 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
356 21-May-16 Condo tower B 134 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
357 21-May-16 Condo tower B 133 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
358 21-May-16 Condo tower B 263 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
359 21-May-16 Condo tower B 262 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
360 21-May-16 Condo tower B 261 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
361 21-May-16 Condo tower B 260 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.70 742.20 TI-25
362 23-May-16 Condo tower B 24 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
363 23-May-16 Condo tower B 23 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.30 TI-24
364 23-May-16 Condo tower B 22 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
365 23-May-16 Condo tower B 21 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
366 23-May-16 Condo tower B 242 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
367 23-May-16 Condo tower B 243 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
368 23-May-16 Condo tower B 244 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
369 24-May-16 Condo tower B 20 Ǿ800 17 17 34.00 42.00 8.0 1.00 29.00 702.50 TI-24
370 24-May-16 Condo tower B 19 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
371 24-May-16 Condo tower B 18 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
372 24-May-16 Condo tower B 17 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
373 24-May-16 Condo tower B 245 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
374 24-May-16 Condo tower B 246 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
375 24-May-16 Condo tower B 247 Ǿ800 17 17 34.00 42.00 8.0 1.00 18,1 681,9 TI-25
376 25-May-16 Condo tower B 16 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
377 25-May-16 Condo tower B 15 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
378 26-May-16 Condo tower B 14 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
379 26-May-16 Condo tower B 13 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
380 26-May-16 Condo tower B 241 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
381 26-May-16 Condo tower B 240 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.60 813.70 TI-25
382 27-May-16 Condo tower B 1 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
383 27-May-16 Condo tower B 2 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
384 27-May-16 Condo tower B 3 Ǿ800 17 17 34.00 38.50 4.5 1.00 23.00 807.90 TI-24
385 27-May-16 Condo tower B 4 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
386 27-May-16 Condo tower B 239 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
387 27-May-16 Condo tower B 238 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
388 27-May-16 Condo tower B 237 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.90 674.40 TI-25
389 27-May-16 Condo tower B 236 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
390 28-May-16 Condo tower B 5 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.60 TI-24
391 28-May-16 Condo tower B 6 Ǿ800 17 17 34.00 19.50 -14.5 1.00 23.00 807.90 TI-24
392 28-May-16 Condo tower B 218 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
393 28-May-16 Condo tower B 219 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 838.80 TI-25
394 28-May-16 Condo tower B 220 Ǿ800 17 17 34.00 36.00 2.0 1.00 12.00 452.10 TI-25 presur los
395 28-May-16 Condo tower B 221 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.60 738.40 TI-25
396 30-May-16 Condo tower B 7 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
397 30-May-16 Condo tower B 8 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
398 30-May-16 Condo tower B 222 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
399 30-May-16 Condo tower B 223 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
400 30-May-16 Condo tower B 224 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.10 757.20 TI-25
401 30-May-16 Condo tower B 217 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-25
402 31-May-16 Condo tower B 9 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
403 31-May-16 Condo tower B 10 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
404 31-May-16 Condo tower B 11 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
405 31-May-16 Condo tower B 12 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
406 31-May-16 Condo tower B 216 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
407 31-May-16 Condo tower B 215 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
408 31-May-16 Condo tower B 212 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
409 1-Jun-16 Condo tower B 86 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
410 1-Jun-16 Condo tower B 38 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
411 1-Jun-16 Condo tower B 61 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
412 1-Jun-16 Condo tower B 85 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24
413 1-Jun-16 Condo tower B 211 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 22.20 836.40 TI-25
414 1-Jun-16 Condo tower B 210 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.70 817.50 TI-25
415 1-Jun-16 Condo tower B 209 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
416 1-Jun-16 Condo tower B 208 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
417 1-Jun-16 Condo tower B 207 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
418 2-Jun-16 Condo tower B 109 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
419 2-Jun-16 Condo tower B 110 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
420 2-Jun-16 Condo tower B 214 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
421 2-Jun-16 Condo tower B 213 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
422 2-Jun-16 Condo tower B 194 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
423 2-Jun-16 Condo tower B 195 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
424 3-Jun-16 Condo tower B 196 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
425 3-Jun-16 Condo tower B 197 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
426 3-Jun-16 Condo tower B 198 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
427 3-Jun-16 Condo tower B 199 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
428 3-Jun-16 Condo tower B 200 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
429 4-Jun-16 Condo tower B 201 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
430 4-Jun-16 Condo tower B 202 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
431 4-Jun-16 Condo tower B 203 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
432 5-Jun-16 Condo tower B 204 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 640.50 TI-25
433 5-Jun-16 Condo tower B 205 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
434 5-Jun-16 Condo tower B 206 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
435 7-Jun-16 Condo tower B 37 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
436 8-Jun-16 Condo tower B 230 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25
437 9-Jun-16 Condo tower B 314 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
438 9-Jun-16 Condo tower B 315 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
439 10-Jun-16 Condo tower B 336 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
440 10-Jun-16 Condo tower B 337 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
1 5-Apr-16 Condo tower B 30069 Ǿ800 17 17 34.00 28.00 -6.0 1.00 21.50 810.00 TI-25 potong (sisipan)
2 12-May-16 Condo tower B 30075 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25 sisipan
3 3-Jun-16 Condo tower B 30091 Ǿ800 17 17 34.00 32.50 -1.5 1.00 23.00 807.90 TI-24 sisipan
4 3-Jun-16 Condo tower B 30092 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24 sisipan
5 3-Jun-16 Condo tower B 30093 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
6 3-Jun-16 Condo tower B 30094 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
7 4-Jun-16 Condo tower B 30095 Ǿ800 17 17 34.00 30.00 -4.0 1.00 23.00 808.90 TI-24 sisipan
8 4-Jun-16 Condo tower B 30096 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 632.30 TI-24 sisipan
9 7-Jun-16 Condo tower B 30097 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
10 7-Jun-16 Condo tower B 30081 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24 sisipan (SM)
11 7-Jun-16 Condo tower B 30080 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25 sisipan
12 7-Jun-16 Condo tower B 30089 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25 sisipan (SM)
13 7-Jun-16 Condo tower B 30088 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.60 813.70 TI-25 sisipan
14 7-Jun-16 Condo tower B 30087 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 716.00 TI-25 sisipan
15 8-Jun-16 Condo tower B 30098 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
16 8-Jun-16 Condo tower B 30090 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24 sisipan
17 8-Jun-16 Condo tower B 30079 Ǿ800 17 17 34.00 33.00 -1.0 1.00 22.10 832.60 TI-25 sisipan (SM)
18 8-Jun-16 Condo tower B 30078 Ǿ800 17 17 34.00 34.50 0.5 1.00 22.00 828.80 TI-25 sisipan (SM)
19 9-Jun-16 Condo tower B 30110 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24 sisipan
20 9-Jun-16 Condo tower B 30076 Ǿ800 17 17 34.00 32.50 -1.5 1.00 21.00 527.40 TI-25 sisipan (SM)
21 9-Jun-16 Condo tower B 30077 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25 sisipan (SM)
22 10-Jun-16 Condo tower B 30085 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25 sisipan
23 10-Jun-16 Condo tower B 30084 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 791.10 TI-25 sisipan
24 10-Jun-16 Condo tower B 30083 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25 sisipan
25 11-Jun-16 Condo tower B 30082 Ǿ800 17 17 34.00 32.00 -2.0 1.00 16.10 404.40 TI-25 sisipan
26 13-Jun-16 Condo tower B 30086 Ǿ800 17 17 34.00 35.00 1.0 1.00 20.10 757.20 TI-25 sisipan(pecah)
27 14-Jun-16 Condo tower B 30171 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25 sisipan (SM)
28 14-Jun-16 Condo tower B 30172 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25 sisipan (SM)
29 15-Jun-16 Condo tower B 30175 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.40 693.20 TI-25 sisipan (SM)
30 21-Jun-16 Condo tower B 30173 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24 sisipan (SM)
31 21-Jun-16 Condo tower B 30174 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24 sisipan (SM)
1 7-Aug-15 P - 3/1299 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 18.50 417.50 12.00 TI - 24
2 7-Aug-15 P - 2/1286 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.70 444.60 12.00 TI - 24
3 11-Aug-15 P - 4/1427 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.50 440.10 12.00 TI - 24
4 18-Aug-15 V-1 / 1336 Ǿ600 15 15 13 43.00 36.00 -7.00 2.00 1.00 15.30 537.40 12.00 TI - 24 VWSG
5 6-Nov-15 Hotel pile 1468 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
6 6-Nov-15 Hotel pile 1469 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
7 6-Nov-15 Hotel pile 1470 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
8 6-Nov-15 Hotel pile 1471 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
9 6-Nov-15 Hotel pile 1472 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 418.20 12.00 TI-18 potong tiang
10 6-Nov-15 Hotel pile 1473 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
11 6-Nov-15 Hotel pile 1474 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.30 425.60 12.00 TI-18 potong tiang
12 7-Nov-15 Hotel pile 1464 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
13 7-Nov-15 Hotel pile 1465 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
14 7-Nov-15 Hotel pile 1466 Ǿ600 15 17 32.00 37.00 5.00 1.00 18.70 460.00 12.00 TI-18
15 7-Nov-15 Hotel pile 1467 Ǿ600 15 17 32.00 32.00 0.00 1.00 19.40 477.20 12.00 TI-18
16 7-Nov-15 Hotel pile 1475 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
17 7-Nov-15 Hotel pile 1476 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
18 8-Nov-15 Hotel pile 1457 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.30 474.80 12.00 TI-18
19 8-Nov-15 Hotel pile 1458 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
20 8-Nov-15 Hotel pile 1459 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
21 8-Nov-15 Hotel pile 1460 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.40 479.70 12.00 TI-18
22 8-Nov-15 Hotel pile 1461 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
23 8-Nov-15 Hotel pile 1462 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
24 8-Nov-15 Hotel pile 1463 Ǿ600 15 17 32.00 33.00 1.00 1.00 19.10 469.90 12.00 TI-18
25 9-Nov-15 Hotel pile 1452 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 418.20 12.00 TI-18
26 9-Nov-15 Hotel pile 1453 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.90 415.70 12.00 TI-18
27 9-Nov-15 Hotel pile 1454 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.60 482.20 12.00 TI-18
28 9-Nov-15 Hotel pile 1455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
29 9-Nov-15 Hotel pile 1456 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
30 10-Nov-15 Hotel pile 1441 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.80 437.90 12.00 TI-18
31 10-Nov-15 Hotel pile 1442 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.90 440.30 12.00 TI-18
32 10-Nov-15 Hotel pile 1449 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.70 435.40 12.00 TI-18
33 10-Nov-15 Hotel pile 1450 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.50 479.70 12.00 TI-18
34 10-Nov-15 Hotel pile 1451 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 430.50 12.00 TI-18
35 11-Nov-15 Hotel pile 1443 Ǿ600 15 17 32.00 33.00 1.00 1.00 20.30 499.40 12.00 TI-18
36 11-Nov-15 Hotel pile 1444 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
37 11-Nov-15 Hotel pile 1445 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.90 489.50 12.00 TI-18
38 11-Nov-15 Hotel pile 1446 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 12.00 TI-18
39 11-Nov-15 Hotel pile 1447 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
40 13-Nov-15 Hotel pile 1274 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16 potong pile
41 13-Nov-15 Hotel pile 1275 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
42 13-Nov-15 Hotel pile 1276 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
43 13-Nov-15 Hotel pile 1277 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
44 13-Nov-15 Hotel pile 1278 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.50 506.90 12.00 TI-16
45 13-Nov-15 Hotel pile 1279 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16 potong pile
46 13-Nov-15 Hotel pile 1404 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 489.50 12.00 TI-18
47 13-Nov-15 Hotel pile 1405 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 12.00 TI-18
48 13-Nov-15 Hotel pile 1406 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.70 489.50 12.00 TI-18
49 13-Nov-15 Hotel pile 1407 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
50 13-Nov-15 Hotel pile 1408 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
51 13-Nov-15 Hotel pile 1409 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
52 13-Nov-15 Hotel pile 1425 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
53 13-Nov-15 Hotel pile 1426 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.70 12.00 TI-18
54 13-Nov-15 Hotel pile 1428 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
55 13-Nov-15 Hotel pile 1429 Ǿ600 15 17 32.00 27.00 -5.00 1.00 20.60 506.40 12.00 TI-18 potong pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
56 14-Nov-15 Hotel pile 1271 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
57 14-Nov-15 Hotel pile 1272 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
58 14-Nov-15 Hotel pile 1273 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
59 14-Nov-15 Hotel pile 1287 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
60 14-Nov-15 Hotel pile 1288 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
61 14-Nov-15 Hotel pile 1430 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
62 14-Nov-15 Hotel pile 1431 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.90 489.50 12.00 TI-18
63 14-Nov-15 Hotel pile 1432 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.30 499.40 12.00 TI-18
64 14-Nov-15 Hotel pile 1433 Ǿ600 15 17 32.00 31.00 -1.00 1.00 20.80 511.70 12.00 TI-18 potong pile
65 16-Nov-15 Hotel pile 1282 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 12.50 362.10 12.00 TI-16
66 16-Nov-15 Hotel pile 1283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16
67 16-Nov-15 Hotel pile 1284 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.50 506.90 12.00 TI-16
68 16-Nov-15 Hotel pile 1285 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
69 17-Nov-15 Hotel pile 1280 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
70 17-Nov-15 Hotel pile 1281 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
71 23-Nov-15 Hotel pile 1290 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
72 23-Nov-15 Hotel pile 1291 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
73 23-Nov-15 Hotel pile 1292 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
74 23-Nov-15 Hotel pile 1293 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
75 23-Nov-15 Hotel pile 1294 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
76 23-Nov-15 Hotel pile 1295 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
77 23-Nov-15 Hotel pile 1296 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
78 23-Nov-15 Hotel pile 1297 Ǿ600 15 17 32.00 32.50 0.50 1.00 16.50 477.90 12.00 TI-16
79 23-Nov-15 Hotel pile 1434 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
80 23-Nov-15 Hotel pile 1435 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
81 23-Nov-15 Hotel pile 1436 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
82 23-Nov-15 Hotel pile 1437 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
83 23-Nov-15 Hotel pile 1438 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
84 23-Nov-15 Hotel pile 1440 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
85 23-Nov-15 Hotel pile 1448 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 474.90 12.00 TI-18
86 24-Nov-15 Hotel pile 1289 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
87 24-Nov-15 Hotel pile 1301 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
88 24-Nov-15 Hotel pile 1302 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
89 24-Nov-15 Hotel pile 1303 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
90 24-Nov-15 Hotel pile 1304 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
91 24-Nov-15 Hotel pile 1305 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
92 24-Nov-15 Hotel pile 1306 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
93 24-Nov-15 Hotel pile 1398 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 20.70 509.20 12.00 TI-18 potong tiang
94 24-Nov-15 Hotel pile 1399 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.80 487.10 12.00 TI-18
95 24-Nov-15 Hotel pile 1400 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 12.00 TI-18
96 24-Nov-15 Hotel pile 1401 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
97 24-Nov-15 Hotel pile 1402 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
98 25-Nov-15 Hotel pile 1298 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 506.90 12.00 TI-16
99 25-Nov-15 Hotel pile 1300 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.50 477.90 12.00 TI-16
100 25-Nov-15 Hotel pile 1311 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
101 25-Nov-15 Hotel pile 1312 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
102 25-Nov-15 Hotel pile 1313 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
103 25-Nov-15 Hotel pile 1314 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
104 25-Nov-15 Hotel pile 1315 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
105 25-Nov-15 Hotel pile 1403 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 430.50 12.00 TI-18 potong tiang
106 25-Nov-15 Hotel pile 1420 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.10 469.90 12.00 TI-18
107 25-Nov-15 Hotel pile 1421 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
108 25-Nov-15 Hotel pile 1422 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
109 25-Nov-15 Hotel pile 1439 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.70 435.40 12.00 TI-18
110 26-Nov-15 Hotel pile 1307 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16 potong tiang
111 26-Nov-15 Hotel pile 1308 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
112 26-Nov-15 Hotel pile 1309 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
113 26-Nov-15 Hotel pile 1310 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
114 26-Nov-15 Hotel pile 1322 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
115 26-Nov-15 Hotel pile 1323 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
116 26-Nov-15 Hotel pile 1324 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
117 26-Nov-15 Hotel pile 1392 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
118 26-Nov-15 Hotel pile 1393 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506,8 12.00 TI-18
119 26-Nov-15 Hotel pile 1394 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.00 492.00 12.00 TI-18
120 26-Nov-15 Hotel pile 1395 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 12.00 TI-18
121 26-Nov-15 Hotel pile 1396 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.20 49.6.9 12.00 TI-18
122 26-Nov-15 Hotel pile 1397 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
123 26-Nov-15 Hotel pile 1419 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.30 499.40 12.00 TI-18
124 26-Nov-15 Hotel pile 1423 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
125 26-Nov-15 Hotel pile 1424 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
126 27-Nov-15 Hotel pile 1415 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
127 27-Nov-15 Hotel pile 1416 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
128 27-Nov-15 Hotel pile 1417 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
129 27-Nov-15 Hotel pile 1418 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
130 28-Nov-15 Hotel pile 1316 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
131 28-Nov-15 Hotel pile 1317 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
132 28-Nov-15 Hotel pile 1318 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
133 28-Nov-15 Hotel pile 1319 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
134 28-Nov-15 Hotel pile 1381 Ǿ600 5 17 22.00 35.00 13.00 1.00 17.00 418.20 12.00 TI-18
135 28-Nov-15 Hotel pile 1382 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
136 28-Nov-15 Hotel pile 1383 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
137 28-Nov-15 Hotel pile 1384 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
138 28-Nov-15 Hotel pile 1385 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
139 29-Nov-15 Hotel pile 1320 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
140 29-Nov-15 Hotel pile 1321 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
141 29-Nov-15 Hotel pile 1331 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.00 463.40 12.00 TI-16
142 29-Nov-15 Hotel pile 1332 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
143 29-Nov-15 Hotel pile 1333 Ǿ600 15 17 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
144 30-Nov-15 Hotel pile 1325 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
145 30-Nov-15 Hotel pile 1326 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
146 30-Nov-15 Hotel pile 1327 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
147 30-Nov-15 Hotel pile 1328 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
148 30-Nov-15 Hotel pile 1329 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
149 30-Nov-15 Hotel pile 1330 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
150 30-Nov-15 Hotel pile 1380 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
151 30-Nov-15 Hotel pile 1410 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
152 30-Nov-15 Hotel pile 1411 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
153 30-Nov-15 Hotel pile 1412 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.60 482.20 12.00 TI-18
154 30-Nov-15 Hotel pile 1414 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
155 1-Dec-15 Hotel pile 1262 Ǿ600 17 15 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
156 1-Dec-15 Hotel pile 1263 Ǿ600 17 15 32.00 31.00 -1.00 1.00 15.50 448.90 12.00 TI-16 potong tiang
157 1-Dec-15 Hotel pile 1264 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
158 1-Dec-15 Hotel pile 1265 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
159 1-Dec-15 Hotel pile 1266 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
160 1-Dec-15 Hotel pile 1267 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
161 1-Dec-15 Hotel pile 1386 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
162 1-Dec-15 Hotel pile 1387 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
163 1-Dec-15 Hotel pile 1388 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
164 1-Dec-15 Hotel pile 1389 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
165 1-Dec-15 Hotel pile 1390 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
166 1-Dec-15 Hotel pile 1391 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
167 1-Dec-15 Hotel pile 1413 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.50 479.70 12.00 TI-18
168 2-Dec-15 Hotel pile 1268 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
169 2-Dec-15 Hotel pile 1269 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16 potong tiang
170 2-Dec-15 Hotel pile 1270 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
171 2-Dec-15 Hotel pile 1366 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
172 2-Dec-15 Hotel pile 1367 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
173 2-Dec-15 Hotel pile 1374 Ǿ600 17 15 32.00 36.00 4.00 1.00 19.50 479.70 12.00 TI-18
174 2-Dec-15 Hotel pile 1375 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.70 484.60 12.00 TI-18
175 2-Dec-15 Hotel pile 1376 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
176 2-Dec-15 Hotel pile 1377 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
177 2-Dec-15 Hotel pile 1378 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.40 477.20 12.00 TI-18
178 2-Dec-15 Hotel pile 1379 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
179 4-Dec-15 Hotel pile 1365 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
180 6-Dec-15 Hotel pile 1363 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.60 482.20 12.00 TI-18
181 6-Dec-15 Hotel pile 1364 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 413.70 12.00 TI-18
182 6-Dec-15 Hotel pile 1372 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.10 494.50 12.00 TI-18
183 7-Dec-15 Hotel pile 1352 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.00 467.40 12.00 TI-18
184 7-Dec-15 Hotel pile 1353 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
185 7-Dec-15 Hotel pile 1354 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
186 7-Dec-15 Hotel pile 1371 Ǿ600 17 15 32.00 29.00 -3.00 1.00 19.10 469.90 12.00 TI-18
187 7-Dec-15 Hotel pile 1373 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.70 489.50 12.00 TI-18
188 8-Dec-15 Hotel pile 1355 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.20 472.30 12.00 TI-18
189 8-Dec-15 Hotel pile 1356 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.30 499.40 12.00 TI-18
190 8-Dec-15 Hotel pile 1357 Ǿ600 17 15 32.00 21.00 -11.00 1.00 1 20.00 246.00 12.00 TI-18 potong tiang
191 11-Dec-15 Hotel pile 1358 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
192 11-Dec-15 Hotel pile 1359 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.20 472.30 12.00 TI-18
193 11-Dec-15 Hotel pile 1368 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
194 11-Dec-15 Hotel pile 1369 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
195 11-Dec-15 Hotel pile 1370 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
196 12-Dec-15 Hotel pile 1477 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
197 12-Dec-15 Hotel pile 1478 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.80 437.90 12.00 TI-18
198 12-Dec-15 Hotel pile 1479 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.70 460.00 12.00 TI-18
199 12-Dec-15 Hotel pile 1480 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.50 455.10 12.00 TI-18
200 14-Dec-15 Hotel pile 1481 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
201 14-Dec-15 Hotel pile 1482 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.20 472.30 12.00 TI-18
202 14-Dec-15 Hotel pile 1483 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
203 14-Dec-15 Hotel pile 1484 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
204 19-Dec-15 Hotel pile 1360 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
205 23-Dec-15 Hotel pile 1345 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 20.90 514.10 12.00 TI-18 potong tiang
206 23-Dec-15 Hotel pile 1346 Ǿ600 17 15 32.00 32.00 0.00 1.00 20.70 509.20 12.00 TI-18
207 23-Dec-15 Hotel pile 1347 Ǿ600 17 15 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
208 23-Dec-15 Hotel pile 1348 Ǿ600 17 15 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
209 23-Dec-15 Hotel pile 1349 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.40 504.30 12.00 TI-18
210 23-Dec-15 Hotel pile 1350 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
211 23-Dec-15 Hotel pile 1351 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
212 24-Dec-15 Hotel pile 1334 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
213 24-Dec-15 Hotel pile 1335 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
214 24-Dec-15 Hotel pile 1337 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 12.00 TI-18
215 24-Dec-15 Hotel pile 1338 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
216 24-Dec-15 Hotel pile 1343 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
217 24-Dec-15 Hotel pile 1344 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.50 504.30 12.00 TI-18
218 25-Dec-15 Hotel pile 1339 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
219 25-Dec-15 Hotel pile 1340 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.60 506.80 12.00 TI-18
220 25-Dec-15 Hotel pile 1341 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
221 25-Dec-15 Hotel pile 1342 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
222 28-Dec-15 Hotel pile 1361 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
223 28-Dec-15 Hotel pile 1362 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
TOTAL PEMANCANGAN MAIN PILE 7155.00 7672.00 517.00 0.00 0.00 227.00 13.00
55 28-Jan-16 main pile office 1069 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
56 28-Jan-16 main pile office 1068 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
57 28-Jan-16 main pile office 1067 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
58 28-Jan-16 main pile office 1066 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
59 28-Jan-16 main pile office 1065 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
60 29-Jan-16 main pile office 1073 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
61 29-Jan-16 main pile office 1074 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
62 29-Jan-16 main pile office 1075 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
63 29-Jan-16 main pile office 1076 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
64 29-Jan-16 main pile office 1077 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
65 29-Jan-16 main pile office 1078 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
66 29-Jan-16 main pile office 1079 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
67 30-Jan-16 main pile office 1080 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
68 30-Jan-16 main pile office 1081 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
69 30-Jan-16 main pile office 1082 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
70 30-Jan-16 main pile office 1083 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
71 30-Jan-16 main pile office 1084 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
72 9-Feb-16 main pile office 1086 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
73 9-Feb-16 main pile office 1087 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
74 9-Feb-16 main pile office 1088 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
75 9-Feb-16 main pile office 1089 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
76 9-Feb-16 main pile office 1090 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
77 9-Feb-16 main pile office 1091 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
78 10-Feb-16 main pile office 1092 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
79 10-Feb-16 main pile office 1093 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
80 10-Feb-16 main pile office 1094 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
81 10-Feb-16 main pile office 1095 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
82 10-Feb-16 main pile office 1102 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
83 10-Feb-16 main pile office 1103 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
84 12-Feb-16 main pile office 1104 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
85 12-Feb-16 main pile office 1105 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
86 12-Feb-16 main pile office 1106 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
87 12-Feb-16 main pile office 1107 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
88 12-Feb-16 main pile office 1108 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
89 12-Feb-16 main pile office 1109 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
90 12-Feb-16 main pile office 1110 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
91 12-Feb-16 main pile office 1111 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
92 13-Feb-16 main pile office 1125 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
93 13-Feb-16 main pile office 1124 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
94 13-Feb-16 main pile office 1114 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
95 13-Feb-16 main pile office 1113 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
96 13-Feb-16 main pile office 1112 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
97 14-Feb-16 main pile office 1126 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
98 14-Feb-16 main pile office 1127 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
99 14-Feb-16 main pile office 1128 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
100 14-Feb-16 main pile office 1129 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
101 15-Feb-16 main pile office 1123 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
102 15-Feb-16 main pile office 1122 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
103 15-Feb-16 main pile office 1121 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
104 15-Feb-16 main pile office 1120 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
105 15-Feb-16 main pile office 1119 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
106 15-Feb-16 main pile office 1140 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
107 16-Feb-16 main pile office 1139 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
108 16-Feb-16 main pile office 1138 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
109 16-Feb-16 main pile office 1137 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
110 16-Feb-16 main pile office 1136 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
111 16-Feb-16 main pile office 1135 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
112 16-Feb-16 main pile office 1134 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
113 16-Feb-16 main pile office 1133 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
114 16-Feb-16 main pile office 1132 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
115 17-Feb-16 main pile office 1131 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
116 17-Feb-16 main pile office 1130 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
117 17-Feb-16 main pile office 1151 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
118 17-Feb-16 main pile office 1150 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
119 17-Feb-16 main pile office 1149 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
120 17-Feb-16 main pile office 1148 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
121 17-Feb-16 main pile office 1147 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
122 17-Feb-16 main pile office 1146 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
123 18-Feb-16 main pile office 1145 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
124 18-Feb-16 main pile office 1144 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
125 18-Feb-16 main pile office 1142 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
126 18-Feb-16 main pile office 1141 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
127 18-Feb-16 main pile office 1162 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
128 18-Feb-16 main pile office 1161 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
129 18-Feb-16 main pile office 1160 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.90 514.10 TI-18
130 18-Feb-16 main pile office 1159 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
131 18-Feb-16 main pile office 1158 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
132 19-Feb-16 main pile office 1156 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
133 19-Feb-16 main pile office 1155 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
134 19-Feb-16 main pile office 1154 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
135 19-Feb-16 main pile office 1153 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
136 20-Feb-16 main pile office 1152 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
137 20-Feb-16 main pile office 1173 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
138 20-Feb-16 main pile office 1172 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
139 20-Feb-16 main pile office 1171 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
140 20-Feb-16 main pile office 1170 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
141 21-Feb-16 main pile office 1169 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
142 21-Feb-16 main pile office 1168 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
143 21-Feb-16 main pile office 1167 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
144 21-Feb-16 main pile office 1166 Ǿ600 15 17 32.00 32.00 0.00 1.00 20.60 506.80 TI-18
145 21-Feb-16 main pile office 1165 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
146 22-Feb-16 main pile office 1163 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
147 22-Feb-16 main pile office 1164 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 TI-18
148 22-Feb-16 main pile office 1182 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
149 23-Feb-16 main pile office 1181 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
150 23-Feb-16 main pile office 1180 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
151 23-Feb-16 main pile office 1179 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
152 23-Feb-16 main pile office 1178 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.80 511.70 TI-18
153 24-Feb-16 main pile office 1177 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
154 24-Feb-16 main pile office 1176 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
155 24-Feb-16 main pile office 1175 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
156 24-Feb-16 main pile office 1174 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
157 24-Feb-16 main pile office 1195 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
158 24-Feb-16 main pile office 1194 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
159 25-Feb-16 main pile office 1193 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
160 25-Feb-16 main pile office 1192 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
161 25-Feb-16 main pile office 1191 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
162 25-Feb-16 main pile office 1190 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
163 25-Feb-16 main pile office 1189 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
164 26-Feb-16 main pile office 1188 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
165 26-Feb-16 main pile office 1187 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
166 26-Feb-16 main pile office 1186 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
167 27-Feb-16 main pile office 1203 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
168 27-Feb-16 main pile office 1202 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
169 27-Feb-16 main pile office 1201 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
170 27-Feb-16 main pile office 1200 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
171 27-Feb-16 main pile office 1199 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
172 27-Feb-16 main pile office 1198 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
173 28-Feb-16 main pile office 1197 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
174 28-Feb-16 main pile office 1196 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
175 28-Feb-16 main pile office 1204 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
176 28-Feb-16 main pile office 1205 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
177 28-Feb-16 main pile office 1206 Ǿ600 15 17 32.00 31.50 -0.50 1.00 20.90 514.10 TI-18 potong tiang
178 29-Feb-16 main pile office 1185 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
179 29-Feb-16 main pile office 1184 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
180 29-Feb-16 main pile office 1183 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
181 29-Feb-16 main pile office 1207 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
182 29-Feb-16 main pile office 1208 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
183 29-Feb-16 main pile office 1209 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
184 29-Feb-16 main pile office 1210 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
185 1-Mar-16 main pile office 1211 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
186 1-Mar-16 main pile office 1212 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
187 1-Mar-16 main pile office 1213 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
188 1-Mar-16 main pile office 1214 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
189 1-Mar-16 main pile office 1215 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
190 1-Mar-16 main pile office 1216 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
191 1-Mar-16 main pile office 1217 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
192 1-Mar-16 main pile office 1218 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
193 3-Mar-16 main pile office 1219 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
194 3-Mar-16 main pile office 1220 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
195 3-Mar-16 main pile office 1221 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
196 3-Mar-16 main pile office 1222 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
197 4-Mar-16 main pile office 1223 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
198 4-Mar-16 main pile office 1224 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
199 4-Mar-16 main pile office 1225 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
200 4-Mar-16 main pile office 1226 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
201 4-Mar-16 main pile office 1227 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
202 4-Mar-16 main pile office 1228 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
203 4-Mar-16 main pile office 1229 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
204 6-Mar-16 main pile office 1230 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
205 6-Mar-16 main pile office 1231 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
206 6-Mar-16 main pile office 1232 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
207 6-Mar-16 main pile office 1233 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
208 6-Mar-16 main pile office 234 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
209 6-Mar-16 main pile office 1235 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
210 8-Mar-16 main pile office 1236 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
211 8-Mar-16 main pile office 1237 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
212 8-Mar-16 main pile office 1238 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
213 8-Mar-16 main pile office 1239 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
214 8-Mar-16 main pile office 1240 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
215 8-Mar-16 main pile office 1241 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
216 8-Mar-16 main pile office 1242 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
217 9-Mar-16 main pile office 1243 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
218 10-Mar-16 main pile office 1244 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
219 10-Mar-16 main pile office 1245 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
220 10-Mar-16 main pile office 1246 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
221 10-Mar-16 main pile office 1247 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
222 11-Mar-16 main pile office 1248 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
223 11-Mar-16 main pile office 1249 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
224 11-Mar-16 main pile office 1250 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
225 11-Mar-16 main pile office 1251 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
226 15-Mar-16 main pile office 1253 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
227 15-Mar-16 main pile office 1254 Ǿ600 15 17 32.00 31.50 -0.50 1.00 21.00 516.60 TI-18 potong tiang
228 15-Mar-16 main pile office 1255 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
229 15-Mar-16 main pile office 1256 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
230 16-Mar-16 main pile office 1257 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
231 16-Mar-16 main pile office 1258 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
232 16-Mar-16 main pile office 1259 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
233 16-Mar-16 main pile office 1260 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
234 18-Mar-16 main pile office 1261 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
235 18-Mar-16 main pile office 1252 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
236 18-Mar-16 main pile office 1118 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
237 18-Mar-16 main pile office 1097 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
238 18-Mar-16 main pile office 1096 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
239 18-Mar-16 main pile office 1098 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
240 19-Mar-16 main pile office 1115 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
241 19-Mar-16 main pile office 1116 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
242 19-Mar-16 main pile office 1117 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
243 19-Mar-16 main pile office 1100 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 TI-18
244 19-Mar-16 main pile office 1099 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
245 22-Mar-16 main pile office 1101 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
246 23-Mar-16 main pile office 1001 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
247 23-Mar-16 main pile office 1002 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
248 23-Mar-16 main pile office 1003 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
249 23-Mar-16 main pile office 1004 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
250 24-Mar-16 main pile office 1085 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 506.90 TI-16
251 25-Mar-16 Main Pile ofifice 1006 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
252 25-Mar-16 Main Pile ofifice 1007 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
253 25-Mar-16 Main Pile ofifice 1008 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
254 25-Mar-16 Main Pile ofifice 1009 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
255 26-Mar-16 Main Pile ofifice 1011 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
256 26-Mar-16 Main Pile ofifice 1012 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
257 26-Mar-16 Main Pile ofifice 1013 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
258 26-Mar-16 Main Pile ofifice 1015 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
259 14-Apr-16 Sisipan Office 1254A Ǿ600 17 15 32.00 37.00 5.00 1.00 20.50 504.30 TI-18 sisipan
TOTAL PEMANCANGAN MAIN PILE 8317.00 9438.00 1121.00 0.00 0.00 263.00 1.00
1 19-Aug-15 T-1 / 3059 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.00 440.80 12.00 TI - 24
2 23-Sep-15 T-2/3161 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 20.50 504.30 12.00 TI-18 INDIKATOR
3 27-Nov-15 main pile(tention) 2952 Ǿ600 17 17 34.00 31.50 -2.50 1.00 1 17.50 506.90 12.00 TI-16 Tension
4 27-Nov-15 main pile(tention) 3055 Ǿ600 17 17 34.00 34.00 0.00 1.00 13.50 391.00 12.00 TI-16 Tension
5 3-Dec-15 main pile(tention) 2880 Ǿ600 17 17 34.00 34.00 0.00 1.00 14.00 405.50 12.00 TI-16 Tension
6 2-Jan-16 main pile(tention) 3016 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
7 2-Jan-16 main pile(tention) 3017 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
8 2-Jan-16 main pile(tention) 2996 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
9 2-Jan-16 main pile(tention) 2997 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
10 3-Jan-16 main pile(tention) 2984 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
11 3-Jan-16 main pile(tention) 2985 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
12 3-Jan-16 main pile(tention) 2980 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26 Tension
13 3-Jan-16 main pile(tention) 2981 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26 Tension
14 4-Jan-16 main pile(tention) 3018 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
15 4-Jan-16 main pile(tention) 3019 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
16 4-Jan-16 main pile(tention) 2999 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
17 4-Jan-16 main pile(tention) 2998 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
18 4-Jan-16 main pile(tention) 2986 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
19 4-Jan-16 main pile(tention) 2987 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
20 5-Jan-16 main pile(tention) 3021 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
21 5-Jan-16 main pile(tention) 3020 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
22 5-Jan-16 main pile(tention) 3001 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
23 5-Jan-16 main pile(tention) 2989 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
24 5-Jan-16 main pile(tention) 2988 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
25 5-Jan-16 main pile(tention) 2990 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
26 5-Jan-16 main pile(tention) 2991 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
27 5-Jan-16 main pile(tention) 2992 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
28 5-Jan-16 main pile(tention) 2922 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
29 5-Jan-16 main pile(tention) 2923 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
30 5-Jan-16 main pile(tention) 2924 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
31 5-Jan-16 main pile(tention) 2925 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
32 5-Jan-16 main pile(tention) 2928 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
33 5-Jan-16 main pile(tention) 2929 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
34 5-Jan-16 main pile(tention) 2934 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
35 5-Jan-16 main pile(tention) 2935 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
36 6-Jan-16 main pile(tention) 2993 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
37 6-Jan-16 main pile(tention) 2994 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
38 6-Jan-16 main pile(tention) 2995 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
39 6-Jan-16 main pile(tention) 3013 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26 Tension
40 6-Jan-16 main pile(tention) 3012 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
41 6-Jan-16 main pile(tention) 3011 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
42 6-Jan-16 main pile(tention) 3010 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
43 6-Jan-16 main pile(tention) 2939 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
44 6-Jan-16 main pile(tention) 2938 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
45 6-Jan-16 main pile(tention) 2933 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18 Tension
46 6-Jan-16 main pile(tention) 2932 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18 Tension
47 6-Jan-16 main pile(tention) 2927 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
48 6-Jan-16 main pile(tention) 2926 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
49 7-Jan-16 main pile(tention) 2920 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
50 7-Jan-16 main pile(tention) 2921 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
51 7-Jan-16 main pile(tention) 2919 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
52 7-Jan-16 main pile(tention) 2918 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 509.20 12.00 TI-18 Tension
53 7-Jan-16 main pile(tention) 2916 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
54 7-Jan-16 main pile(tention) 2917 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
55 7-Jan-16 main pile(tention) 2912 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
56 7-Jan-16 main pile(tention) 2913 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
57 8-Jan-16 main pile(tention) 2906 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
58 8-Jan-16 main pile(tention) 2907 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
59 8-Jan-16 main pile(tention) 2900 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
60 8-Jan-16 main pile(tention) 2901 Ǿ600 11 17 28.00 43.00 15.00 1.00 20.60 506.80 12.00 TI-18 Tension
61 8-Jan-16 main pile(tention) 2902 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
62 8-Jan-16 main pile(tention) 2903 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
63 8-Jan-16 main pile(tention) 2977 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.50 477.90 12.00 TI-16 Tension
64 8-Jan-16 main pile(tention) 2976 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 434.50 12.00 TI-16 Tension
65 8-Jan-16 main pile(tention) 2974 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16 Tension
66 8-Jan-16 main pile(tention) 2975 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16 Tension
67 8-Jan-16 main pile(tention) 2973 Ǿ600 13 15 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16 Tension
68 8-Jan-16 main pile(tention) 3008 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
69 8-Jan-16 main pile(tention) 3009 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
70 8-Jan-16 main pile(tention) 3007 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
71 8-Jan-16 main pile(tention) 3006 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26 Tension
72 8-Jan-16 main pile(tention) 3005 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
73 8-Jan-16 main pile(tention) 3004 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
74 9-Jan-16 main pile 2908 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
75 9-Jan-16 main pile 2899 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
76 9-Jan-16 main pile 2898 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 505.30 12.00 TI-18 Tension
77 9-Jan-16 main pile 2909 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
78 9-Jan-16 main pile 2914 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 511.70 12.00 TI-18 Tension
79 9-Jan-16 main pile 2915 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 12.00 TI-18 Tension
80 9-Jan-16 main pile 3026 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
81 9-Jan-16 main pile 3027 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
82 9-Jan-16 main pile 3028 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
83 9-Jan-16 main pile 3029 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
84 9-Jan-16 main pile 3031 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
85 10-Jan-16 main pile 2910 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.70 509.20 12.00 TI-18 Tension
86 10-Jan-16 main pile 2911 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 12.00 TI-18 Tension
87 10-Jan-16 main pile 2904 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
88 10-Jan-16 main pile 2905 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
89 10-Jan-16 main pile 2897 Ǿ600 11 17 28.00 28.00 0.00 1.00 20.90 514.10 12.00 TI-18 Tension
90 11-Jan-16 main pile 3030 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
91 11-Jan-16 main pile 3032 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
92 11-Jan-16 main pile 3033 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
93 11-Jan-16 main pile 3034 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
94 12-Jan-16 main pile 3035 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
95 12-Jan-16 main pile 3036 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
96 12-Jan-16 main pile 3037 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 301.40 12.00 TI-26 Tension
97 12-Jan-16 main pile 3038 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26 Tension
98 12-Jan-16 main pile 3039 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 12.00 TI-26 Tension
99 12-Jan-16 main pile 3040 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
100 12-Jan-16 main pile 2890 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
101 12-Jan-16 main pile 2896 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
102 12-Jan-16 main pile 2893 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
103 12-Jan-16 main pile 2891 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
104 12-Jan-16 main pile 2892 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
105 14-Jan-16 main pile 2971 Ǿ600 11 17 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16 Tension
106 14-Jan-16 main pile 2972 Ǿ600 11 17 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16 Tension
107 14-Jan-16 main pile 2970 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16 Tension
108 14-Jan-16 main pile 2968 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 12.00 TI-16 Tension
109 14-Jan-16 main pile 2969 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 12.00 TI-16 Tension
110 14-Jan-16 main pile 2965 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16 Tension
111 15-Jan-16 main pile 3041 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
112 15-Jan-16 main pile 3042 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
113 15-Jan-16 main pile 3043 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
114 15-Jan-16 main pile 3044 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
115 15-Jan-16 main pile 3045 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
116 15-Jan-16 main pile 3047 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
117 15-Jan-16 main pile 3046 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
118 18-Jan-16 main pile 2967 Ǿ600 11 17 28.00 33.00 5.00 1.00 17.50 506.90 TI-16 Tension
119 18-Jan-16 main pile 2966 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
120 18-Jan-16 main pile 2964 Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16 Tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
121 18-Jan-16 main pile 2962 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16 Tension
122 18-Jan-16 main pile 2963 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16 Tension
123 18-Jan-16 main pile 2886 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 TI-18 Tension
124 18-Jan-16 main pile 2883 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18 Tension
125 18-Jan-16 main pile 2884 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18 Tension
126 18-Jan-16 main pile 2888 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 TI-18 Tension
127 18-Jan-16 main pile 2887 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 504.30 TI-18 Tension
128 18-Jan-16 main pile 2885 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.50 504.30 TI-18 Tension
129 18-Jan-16 main pile 2889 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
130 19-Jan-16 main pile 2961 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
131 19-Jan-16 main pile 2960 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
132 19-Jan-16 main pile 2959 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
133 19-Jan-16 main pile 2958 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
134 19-Jan-16 main pile 3022 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
135 19-Jan-16 main pile 3023 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
136 19-Jan-16 main pile 3000 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
137 19-Jan-16 main pile 3002 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
138 19-Jan-16 main pile 3003 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
139 19-Jan-16 main pile 3024 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
140 19-Jan-16 main pile 3025 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
141 20-Jan-16 main pile 3050 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
142 20-Jan-16 main pile 3048 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
143 20-Jan-16 main pile 3049 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
144 20-Jan-16 main pile 3051 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
145 20-Jan-16 main pile 3056 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
146 20-Jan-16 main pile 3057 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
147 21-Jan-16 main pile 3064 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
148 21-Jan-16 main pile 3065 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
149 21-Jan-16 main pile 3067 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
150 21-Jan-16 main pile 3066 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
151 21-Jan-16 main pile 3059A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
152 21-Jan-16 main pile 3058 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
153 21-Jan-16 main pile 3015 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
154 21-Jan-16 main pile 3014 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
155 22-Jan-16 main pile 2949 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
156 22-Jan-16 main pile 2948 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
157 22-Jan-16 main pile 2946 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
158 22-Jan-16 main pile 2947 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
159 22-Jan-16 main pile 2945 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
160 26-Jan-16 main pile 2944 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
161 26-Jan-16 main pile 2950 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
162 26-Jan-16 main pile 2954 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.50 414.40 TI-26 Tension
163 26-Jan-16 main pile 2955 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.40 TI-26 Tension
164 26-Jan-16 main pile 2953 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
165 26-Jan-16 main pile 2951 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
166 26-Jan-16 main pile 3063 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
167 26-Jan-16 main pile 3062 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
168 26-Jan-16 main pile 3054 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
169 27-Jan-16 main pile 3052 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
170 27-Jan-16 main pile 3053 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
171 27-Jan-16 main pile 3060 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
172 27-Jan-16 main pile 3061 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
173 27-Jan-16 main pile 3068 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
174 27-Jan-16 main pile 3069 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
175 27-Jan-16 main pile 3076 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
176 27-Jan-16 main pile 3077 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
177 28-Jan-16 main pile 3084 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
178 28-Jan-16 main pile 3085 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
179 28-Jan-16 main pile 3092 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
180 28-Jan-16 main pile 3093 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
181 28-Jan-16 main pile 3100 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
182 28-Jan-16 main pile 3101 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
183 28-Jan-16 main pile 3108 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
184 28-Jan-16 main pile 3109 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
185 28-Jan-16 main pile 3116 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
186 28-Jan-16 main pile 3117 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
187 29-Jan-16 main pile 3124 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
188 29-Jan-16 main pile 3125 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
189 29-Jan-16 main pile 3132 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
190 29-Jan-16 main pile 3133 Ǿ600 11 17 28.00 33.00 5.00 1.00 12.50 313.90 TI-26 Tension
191 29-Jan-16 main pile 3140 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
192 29-Jan-16 main pile 3141 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
193 29-Jan-16 main pile 3148 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
194 29-Jan-16 main pile 3149 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
195 30-Jan-16 main pile 3156 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
196 30-Jan-16 main pile 3157 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
197 2-Feb-16 main pile 3159 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
198 2-Feb-16 main pile 3158 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
199 2-Feb-16 main pile 3151 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
200 3-Feb-16 main pile 3150 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
201 3-Feb-16 main pile 3143 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
202 3-Feb-16 main pile 3142 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
203 3-Feb-16 main pile 3135 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
204 4-Feb-16 main pile 3134 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
205 4-Feb-16 main pile 3127 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
206 4-Feb-16 main pile 3126 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.60 506.80 TI-18 Tension
207 4-Feb-16 main pile 3119 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18 Tension
208 4-Feb-16 main pile 3118 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
209 4-Feb-16 main pile 3111 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 514.10 TI-18 Tension
210 5-Feb-16 main pile 3110 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
211 5-Feb-16 main pile 3103 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
212 5-Feb-16 main pile 3102 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
213 5-Feb-16 main pile 3095 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18 Tension
214 5-Feb-16 main pile 3094 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
215 5-Feb-16 main pile 3087 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 TI-18 Tension
216 5-Feb-16 main pile 3086 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.80 511.70 TI-18 Tension
217 5-Feb-16 main pile 3079 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.90 515.10 TI-18 Tension
218 9-Feb-16 main pile 2862 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
219 9-Feb-16 main pile 2863 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
220 9-Feb-16 main pile 2867 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
221 9-Feb-16 main pile 2866 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
222 9-Feb-16 main pile 2870 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
223 9-Feb-16 main pile 2871 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
224 9-Feb-16 main pile 2872 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
225 9-Feb-16 main pile 2873 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
226 9-Feb-16 main pile 2874 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
227 9-Feb-16 main pile 2875 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
228 10-Feb-16 main pile 2876 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
229 10-Feb-16 main pile 2877 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
230 10-Feb-16 main pile 2878 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
231 10-Feb-16 main pile 2879 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
232 10-Feb-16 main pile 3070 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
233 10-Feb-16 main pile 3071 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
234 10-Feb-16 main pile 3078 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
235 10-Feb-16 main pile 3072 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
236 10-Feb-16 main pile 3073 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
237 10-Feb-16 main pile 3080 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
238 10-Feb-16 main pile 3081 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
239 11-Feb-16 main pile 3088 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
240 11-Feb-16 main pile 3089 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
241 11-Feb-16 main pile 3096 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
242 11-Feb-16 main pile 3097 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16 Tension
243 11-Feb-16 main pile 3104 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
244 11-Feb-16 main pile 3105 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
245 12-Feb-16 main pile 3112 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
246 12-Feb-16 main pile 3113 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
247 12-Feb-16 main pile 3120 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 463.40 TI-16 Tension
248 12-Feb-16 main pile 3121 Ǿ600 11 17 28.00 30.00 2.00 1.00 12.50 362.10 TI-16 tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
249 12-Feb-16 main pile 3128 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
250 12-Feb-16 main pile 3129 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
251 13-Feb-16 main pile 3136 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16 Tension
252 13-Feb-16 main pile 3137 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
253 13-Feb-16 main pile 3144 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
254 13-Feb-16 main pile 3145 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
255 13-Feb-16 main pile 2943 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
256 13-Feb-16 main pile 2942 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
257 13-Feb-16 main pile 2937 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
258 13-Feb-16 main pile 2936 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
259 13-Feb-16 main pile 2931 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
260 14-Feb-16 main pile 3153 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
261 14-Feb-16 main pile 3152 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
262 14-Feb-16 main pile 3160 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
263 15-Feb-16 main pile 3163 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16 Tension
264 15-Feb-16 main pile 3162 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 448.90 TI-16 Tension
265 15-Feb-16 main pile 3155 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
266 15-Feb-16 main pile 3154 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
267 15-Feb-16 main pile 3147 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
268 16-Feb-16 main pile 3146 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16 Tension
269 16-Feb-16 main pile 3139 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16 Tension
270 16-Feb-16 main pile 3138 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16 Tension
271 16-Feb-16 main pile 3131 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
272 16-Feb-16 main pile 3130 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
273 16-Feb-16 main pile 3123 Ǿ600 11 17 28.00 19.00 -9.00 1.00 8.00 100.50 TI-16 Tension
274 16-Feb-16 main pile 3122 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
275 16-Feb-16 main pile 2930 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
276 16-Feb-16 main pile 3165 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
277 16-Feb-16 main pile 3164 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
278 16-Feb-16 main pile 2894 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
279 16-Feb-16 main pile 2895 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
280 16-Feb-16 main pile 2881 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
281 17-Feb-16 main pile 2848 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
282 17-Feb-16 main pile 2849 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
283 17-Feb-16 main pile 2847 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
284 17-Feb-16 main pile 2846 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
285 17-Feb-16 main pile 2853 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
286 18-Feb-16 main pile 2852 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
287 18-Feb-16 main pile 2845 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
288 18-Feb-16 main pile 2844 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
289 18-Feb-16 main pile 2843 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
290 18-Feb-16 main pile 2842 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
291 18-Feb-16 main pile 2840 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
292 18-Feb-16 main pile 2841 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
293 18-Feb-16 main pile 2839 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
294 18-Feb-16 main pile 2838 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
295 19-Feb-16 main pile 3115 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
296 19-Feb-16 main pile 3114 Ǿ600 11 17 28.00 16.00 -12.00 1.00 9.00 113.00 TI-16 Tension
297 24-Feb-16 main pile 2957A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
298 24-Feb-16 main pile 2956A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
299 26-Feb-16 main pile 2940 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
300 26-Feb-16 main pile 2941 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
301 5-Mar-16 main pile 2882 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
302 5-Mar-16 main pile 2860 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
303 5-Mar-16 main pile 2861 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
304 5-Mar-16 main pile 2856 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
305 5-Mar-16 main pile 2857 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
306 12-Mar-16 main pile 3074 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
307 12-Mar-16 main pile 3075 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
308 12-Mar-16 main pile 3082 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
309 14-Mar-16 main pile 3083 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 tension
310 14-Mar-16 main pile 3090 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16 tension
311 15-Mar-16 main pile 3091 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 tension
312 15-Mar-16 main pile 3098 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
313 15-Mar-16 main pile 3099 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 tension
314 15-Mar-16 main pile 3106 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16 tension
315 21-Mar-16 Main pile 3107 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
316 24-Mar-16 Main Pile 2864 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
317 24-Mar-16 Main Pile 2865 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
318 24-Mar-16 Main Pile 2868 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16 Tension
319 24-Mar-16 Main Pile 2869 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
320 25-Mar-16 Main Pile 2859 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
321 25-Mar-16 Main Pile 2858 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16 Tension
322 26-Mar-16 Main Pile 2855 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
323 26-Mar-16 Main Pile 2854 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
324 26-Mar-16 Main Pile 2850 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
325 26-Mar-16 Main Pile 2851 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
326 26-Mar-16 Main Pile 2837 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
327 26-Mar-16 Main Pile 2836 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
328 27-Mar-16 Main Pile 2835 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16 Tension
329 27-Mar-16 Main Pile 2834 Ǿ600 11 17 28.00 27.00 -1.00 1.00 14.50 420.00 TI-16 Tension
TOTAL PEMANCANGAN MAIN PILE 9250.00 11056.00 1806.00 0.00 0.00 331.00 1.00
1 19-Feb-16 main pile 3123A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 sisipan Tension
2 22-Mar-16 Main pile 3114A Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 sisipan Tension
3 22-Mar-16 Main pile 3121A Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16 sisipan Tension
4 30-Mar-16 Main Pile 2834A Ǿ600 15 17 32.00 38.00 6.00 1.00 13.00 376.50 TI-16 sisipan Tension
5 3-Apr-16 main pile 3161A Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-218 sisipan Tension
TOTAL PEMANCANGAN MAIN PILE 144.00 168.50 24.50 0.00 0.00 5.00 0.00
1 5-Mar-16 main pile 10928 Ǿ600 11 17 28.00 34.00 6.00 1.00 19.00 477.20 TI-26 TAMBAHAN
2 5-Mar-16 main pile 10936 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 TAMBAHAN
3 27-Mar-16 Main Pile 10927 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
Tension tambahan
TOTAL PEMANCANGAN MAIN PILE 84.00 102.00 18.00 0.00 0.00 3.00 0.00
1 19-Feb-16 main pile 1966B Ǿ600 15 17 32.00 28.50 -3.50 1.00 24.00 426.50 TI-21A sisipan
2 19-Feb-16 main pile 1966A Ǿ600 15 17 32.00 17.00 -15.00 1.00 24.00 426.50 TI-21A sisipan
3 19-Feb-16 main pile 1725A Ǿ600 15 17 32.00 18.00 -14.00 1.00 24.00 426.50 TI-21A sisipan
4 23-Feb-16 main pile 2521A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03 sisipan
5 23-Feb-16 main pile 2429A Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 TI-03 sisipan
6 23-Feb-16 main pile 2401A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan
7 23-Feb-16 main pile 2398A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03 sisipan
8 23-Feb-16 main pile 2600A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan
TOTAL PEMANCANGAN MAIN PILE 256.00 237.50 -18.50 0.00 0.00 8.00 0.00
1 14-Dec-15 main pile 1663B Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A sisipan
2 14-Dec-15 main pile 1663A Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A sisipan
3 14-Dec-15 main pile 1543A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
4 14-Dec-15 main pile 1543B Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
5 16-Dec-15 main pile 2047A Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 TI-16 sisipan
6 16-Dec-15 main pile 2040A Ǿ600 17 15 32.00 16.00 -16.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)
7 16-Dec-15 main pile 2061B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)
8 17-Dec-15 main pile 1975C Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
9 17-Dec-15 main pile 1975D Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 15.00 405.50 TI-16 potong tiang(sisipan)
10 17-Dec-15 main pile 1975B Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 TI-16 sisipan
11 17-Dec-15 main pile 1975A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)
12 18-Dec-15 main pile 2130A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)
13 18-Dec-15 main pile 1978A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
14 18-Dec-15 main pile 1978B Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)
15 18-Dec-15 main pile 1990B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
16 19-Dec-15 main pile 1990A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)
17 19-Dec-15 main pile 2040B Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)
18 19-Dec-15 main pile 2076B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)
19 19-Dec-15 main pile 2076A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)
20 22-Dec-15 main pile 2086A Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan
21 22-Dec-15 main pile 2019A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan
22 22-Dec-15 main pile 2979C Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan
23 22-Dec-15 main pile 2979B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan
24 22-Dec-15 main pile 2979D Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan
25 22-Dec-15 main pile 2979A Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan
26 23-Dec-15 main pile 2979E Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan
27 23-Dec-15 main pile 2979F Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan
28 23-Dec-15 main pile 2026A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan
29 23-Dec-15 main pile 2002A Ǿ600 17 15 32.00 26.00 -6.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan
30 23-Dec-15 main pile 2002B Ǿ600 17 15 32.00 25.00 -7.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan
31 24-Dec-15 main pile 2146A Ǿ600 17 15 32.00 20.50 -11.50 1.00 1 15.00 434.50 TI-16 potong tiang
32 24-Dec-15 main pile 2135A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang
33 24-Dec-15 main pile 2155A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang
34 24-Dec-15 main pile 2164A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang
35 24-Dec-15 main pile 2184B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang
36 25-Dec-15 main pile 2184A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.00 434.00 TI-16 sisipan
37 25-Dec-15 main pile 2218B Ǿ600 15 17 32.00 30.50 -1.50 1.00 15.50 228.90 TI-16 sisipan
38 25-Dec-15 main pile 2218A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.50 228.90 TI-16 sisipan
39 25-Dec-15 main pile 2280A Ǿ600 15 17 32.00 27.00 -5.00 1.00 16.00 463.40 TI-16 sisipan
40 27-Dec-15 main pile 2275A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
41 27-Dec-15 main pile 2367A Ǿ600 15 17 32.00 32.50 0.50 1.00 15.00 434.50 TI-16 sisipan
42 27-Dec-15 main pile 2367B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.50 448.90 TI-16 sisipan
43 27-Dec-15 main pile 2328A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
44 27-Dec-15 main pile 2328B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 TI-16 sisipan
45 27-Dec-15 main pile 2260A Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 14.50 420.00 TI-16 potong tiang
46 27-Dec-15 main pile 2270A Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 TI-16 sisipan
47 28-Dec-15 main pile 2270B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 TI-16 sisipan
48 28-Dec-15 main pile 2784A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 TI-03 sisipan
49 30-Dec-15 main pile 2789A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan
50 30-Dec-15 main pile 2784B Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan
51 5-Jan-16 main pile 2789B Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 TI-03 sisipan
52 21-Jan-16 main pile 2061A Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07 sisipan
53 21-Jan-16 main pile 2168B Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 420.00 TI-07 sisipan
54 21-Jan-16 main pile 2168A Ǿ600 15 17 32.00 29.50 -2.50 1.00 23.70 420.00 TI-07 sisipan
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 54
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
TOTAL PEMANCANGAN MAIN PILE 1728.00 1607.50 -120.50 0.00 0.00 54.00 27.00
1 3-Feb-16 soldier pile 4495s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
2 3-Feb-16 soldier pile 4509s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16 SP sisipan
3 3-Feb-16 soldier pile 4513s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16 SP sisipan
4 3-Feb-16 soldier pile 4516s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
5 3-Feb-16 soldier pile 4517s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
6 4-Feb-16 soldier pile 4518s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16 SP sisipan
7 4-Feb-16 soldier pile 4519s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16 SP sisipan
8 4-Feb-16 soldier pile 4520s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16 SP sisipan
9 4-Feb-16 soldier pile 4521s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16 SP sisipan
10 4-Feb-16 soldier pile 4522s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
11 4-Feb-16 soldier pile 4523s Ǿ600 17 17.00 24.00 7.00 1.00 13.50 391.00 TI-16 SP sisipan
12 6-Feb-16 soldier pile 4630s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16 sisipan
13 6-Feb-16 soldier pile 4654s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16 sisipan
14 6-Feb-16 soldier pile 4661s Ǿ600 17 17.00 24.50 7.50 1.00 10.00 289.60 TI-16 sisipan
15 6-Feb-16 soldier pile 4667s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16 sisipan
16 6-Feb-16 soldier pile 4675s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16 sisipan
17 6-Feb-16 soldier pile 4683s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16 sisipan
18 23-Feb-16 soldier pile 4306s Ǿ600 17 17.00 20.00 3.00 1.00 24.20 421.10 TI-03 sisipan
19 23-Feb-16 soldier pile 4357s Ǿ600 17 17.00 20.50 3.50 1.00 24.20 421.10 TI-03 sisipan
20 23-Feb-16 soldier pile 4336s Ǿ600 17 17.00 24.50 7.50 1.00 20.00 196.00 TI-03 sisipan
21 27-Feb-16 soldier pile 4709s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24 sisipan
22 27-Feb-16 soldier pile 4712s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24 sisipan
23 9-Mar-16 soldier pile 4777s Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A sisipan
24 9-Mar-16 soldier pile 4753s Ǿ600 17 17.00 24.50 7.50 10.00 177.70 TI-21A sisipan
25 11-Mar-16 soldier pile 4733S Ǿ600 17 17.00 24.40 7.40 20.00 355.40 TI-21A sisipan
26 11-Mar-16 soldier pile 4726s Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A sisipan
27 11-Mar-16 soldier pile 4722s Ǿ600 17 17.00 16.00 -1.00 24.00 426.50 TI-21A sisipan(potong tiang)
28 11-Mar-16 soldier pile 4719s Ǿ600 17 17.00 24.50 7.50 13.00 231.00 TI-21A sisipan
29 16-Mar-16 soldier pile 4722s1 Ǿ600 17 17.00 24.50 7.50 11.00 195.50 TI-21A sisipan soldier pile
30 1-Apr-16 main pile 4137s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218 sisipan SP
31 3-Apr-16 main pile 4127s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218 sisipan SP
32 3-Apr-16 main pile 4130s Ǿ600 17 17.00 24.50 7.50 18.70 460.00 TI-218 sisipan SP
33 3-Apr-16 main pile 4131s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218 sisipan SP
34 3-Apr-16 main pile 4134s Ǿ600 17 17.00 24.50 7.50 19.00 467.40 TI-218 sisipan SP
TOTAL PEMANCANGAN MAIN PILE 578.00 814.40 236.40 0.00 0.00 20.00 0.00
1 8-Aug-15 Soldier pile 4128 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 14.50 356.70 TI-18 Soldier Pile
2 8-Aug-15 Soldier pile 4129 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 15.00 369.00 TI-18 Soldier Pile
3 12-Aug-15 Soldier pile 4130 Ǿ800 17 11 28.00 23.00 -5.00 - - 1.00 1.00 18.00 442.80 TI-18 Soldier Pile
4 13-Aug-15 Soldier pile 4147 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 15.00 369.00 12.00 TI-18 Soldier Pile
5 13-Aug-15 Soldier pile 4148 Ǿ800 17 11 28.00 23.00 -5.00 - - 1.00 1.00 18.00 442.80 12.00 TI-18 Soldier Pile
6 14-Aug-15 Soldier pile 4149 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 15.00 376.70 12.00 TI-26 Soldier Pile
7 14-Aug-15 Soldier pile 4150 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 14.50 364.20 12.00 TI-26 Soldier Pile
8 15-Aug-15 Soldier pile 4151 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile
9 16-Aug-15 Soldier pile 4146 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile
10 16-Aug-15 Soldier pile 4145 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 13.00 326.50 12.00 TI-26 Soldier Pile
11 16-Aug-15 Soldier pile 4144 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
12 18-Aug-15 Soldier pile 4143 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 13.00 326.50 12.00 TI-26 Soldier Pile
13 18-Aug-15 Soldier pile 4142 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.50 364.20 12.00 TI-26 Soldier Pile
14 18-Aug-15 Soldier pile 4141 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.50 364.20 12.00 TI-26 Soldier Pile
15 18-Aug-15 Soldier pile 4140 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 16.00 401.90 12.00 TI-26 Soldier Pile
16 19-Aug-15 Soldier pile 4137 Ǿ800 17 11 28.00 23.50 -4.50 - - 1.00 1.00 23.00 577.70 12.00 TI-26 Soldier Pile
17 19-Aug-15 Soldier pile 4139 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
18 19-Aug-15 Soldier pile 4138 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 16.50 414.40 12.00 TI-26 Soldier Pile
19 19-Aug-15 Soldier pile 4136 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile
20 20-Aug-15 Soldier pile 4131 Ǿ800 17 11 28.00 19.00 -9.00 - - 1.00 23.00 577.70 12.00 TI-26 Soldier Pile
21 20-Aug-15 Soldier pile 4134 Ǿ800 17 11 28.00 22.50 -5.50 - - 1.00 1.00 23.00 577.70 12.00 TI-26 Soldier Pile
22 20-Aug-15 Soldier pile 4135 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 13.50 339.10 12.00 TI-26 Soldier Pile
23 20-Aug-15 Soldier pile 4133 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile
24 20-Aug-15 Soldier pile 4132 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 20.00 502.30 12.00 TI-26 Soldier Pile
25 27-Aug-15 Soldier pile 4433 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.80 401.70 12.00 TI-24 Soldier Pile
26 27-Aug-15 Soldier pile 4434 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24 Soldier Pile
27 27-Aug-15 Soldier pile 4435 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile
28 27-Aug-15 Soldier pile 4436 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
29 28-Aug-15 Soldier pile 4437 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
30 28-Aug-15 Soldier pile 4438 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
31 28-Aug-15 Soldier pile 4439 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
32 28-Aug-15 Soldier pile 4440 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.70 376.90 12.00 TI-24 Soldier Pile
33 28-Aug-15 Soldier pile 4441 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile
34 28-Aug-15 Soldier pile 4442 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile
35 29-Aug-15 Soldier pile 4443 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.80 379.20 12.00 TI-24 Soldier Pile
36 29-Aug-15 Soldier pile 4444 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
37 29-Aug-15 Soldier pile 4445 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
38 29-Aug-15 Soldier pile 4446 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.90 381.40 12.00 TI-24 Soldier Pile
39 29-Aug-15 Soldier pile 4447 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24 Soldier Pile
40 29-Aug-15 Soldier pile 4448 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
41 31-Aug-15 Soldier pile 4453 Ǿ800 17 11 28.00 27.00 -1.00 1.00 1.00 16.80 379.20 12.00 TI-24 Soldier Pile
42 31-Aug-15 Soldier pile 4449 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
43 31-Aug-15 Soldier pile 4450 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile
44 31-Aug-15 Soldier pile 4451 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
45 31-Aug-15 Soldier pile 4452 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile
46 31-Aug-15 Soldier pile 4454 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
47 31-Aug-15 Soldier pile 4455 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24 Soldier Pile
48 1-Sep-15 Soldier pile 4456 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24 Soldier Pile
49 1-Sep-15 Soldier pile 4457 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile
50 1-Sep-15 Soldier pile 4458 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile
51 1-Sep-15 Soldier pile 4459 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
52 1-Sep-15 Soldier pile 4460 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
53 1-Sep-15 Soldier pile 4461 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
54 1-Sep-15 Soldier pile 4462 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.00 12.00 TI-24 Soldier Pile
55 1-Sep-15 Soldier pile 4463 Ǿ800 17 11 28.00 28.00 0.00 1.00 17 383.70 12.00 TI-24 Soldier Pile
56 2-Sep-15 Soldier pile 4464 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.80 401.70 12.00 TI-24 Soldier Pile
57 2-Sep-15 Soldier pile 4465 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.40 392.70 12.00 TI-24 Soldier Pile
58 2-Sep-15 Soldier pile 4466 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
59 2-Sep-15 Soldier pile 4467 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24 Soldier Pile
60 2-Sep-15 Soldier pile 4468 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
61 2-Sep-15 Soldier pile 4469 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
62 2-Sep-15 Soldier pile 4470 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
63 2-Sep-15 Soldier pile 4471 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.2 388.20 12.00 TI-24 Soldier Pile
64 3-Sep-15 Soldier pile 4472 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
65 3-Sep-15 Soldier pile 4473 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.70 12.00 TI-24 Soldier Pile
66 3-Sep-15 Soldier pile 4474 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile
67 3-Sep-15 Soldier pile 4475 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
68 3-Sep-15 Soldier pile 4476 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
69 3-Sep-15 Soldier pile 4477 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
70 3-Sep-15 Soldier pile 4478 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
71 3-Sep-15 Soldier pile 4479 Ǿ800 17 11 28.00 28.00 0.00 1.00 19 428.80 12.00 TI-24 Soldier Pile
72 4-Sep-15 Soldier pile 4480 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile
73 4-Sep-15 Soldier pile 4481 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24 Soldier Pile
74 4-Sep-15 Soldier pile 4482 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
75 4-Sep-15 Soldier pile 4483 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
76 4-Sep-15 Soldier pile 4484 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
77 4-Sep-15 Soldier pile 4485 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 410.80 12.00 TI-24 Soldier Pile
78 4-Sep-15 Soldier pile 4486 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
79 4-Sep-15 Soldier pile 4487 Ǿ800 17 11 28.00 28.00 0.00 1.00 20 451.40 12.00 TI-24 Soldier Pile
80 6-Sep-15 Soldier pile 4495 Ǿ800 17 11 28.00 19.50 -8.50 1.00 1 17.5 614.70 12.00 TI-24 Soldier Pile
81 6-Sep-15 Soldier pile 4488 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
82 6-Sep-15 Soldier pile 4489 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24 Soldier Pile
83 6-Sep-15 Soldier pile 4490 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
84 6-Sep-15 Soldier pile 4491 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
85 6-Sep-15 Soldier pile 4492 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
86 6-Sep-15 Soldier pile 4493 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
87 6-Sep-15 Soldier pile 4494 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
88 7-Sep-15 Soldier pile 4496 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
89 7-Sep-15 Soldier pile 4497 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
90 7-Sep-15 Soldier pile 4498 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.30 502.30 12.00 TI-24 Soldier Pile
91 7-Sep-15 Soldier pile 4499 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
92 7-Sep-15 Soldier pile 4500 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
93 7-Sep-15 Soldier pile 4501 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.70 516.40 12.00 TI-24 Soldier Pile
94 7-Sep-15 Soldier pile 4502 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile
95 7-Sep-15 Soldier pile 4503 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.5 440.10 12.00 TI-24 Soldier Pile
96 7-Sep-15 Soldier pile 4504 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.5 395.00 12.00 TI-24 Soldier Pile
97 8-Sep-15 Soldier pile 4505 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24 Soldier Pile
98 8-Sep-15 Soldier pile 4506 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 562.00 12.00 TI-24 Soldier Pile
99 8-Sep-15 Soldier pile 4507 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.20 569.10 12.00 TI-24 Soldier Pile
100 8-Sep-15 Soldier pile 4508 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.20 569.10 12.00 TI-24 Soldier Pile
101 9-Sep-15 Soldier pile 4509 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.50 579.60 12.00 TI-24 Soldier Pile
102 9-Sep-15 Soldier pile 4510 Ǿ800 17 11 28.00 24.00 -4.00 1.00 1 16.50 579.60 12.00 TI-24 Soldier Pile
103 9-Sep-15 Soldier pile 4511 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
104 10-Sep-15 Soldier pile 4513 Ǿ800 17 11 28.00 21.00 -7.00 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile
105 10-Sep-15 Soldier pile 4519 Ǿ800 17 11 28.00 22.50 -5.50 1.00 1 16.80 590.00 12.00 TI-24 Soldier Pile
106 10-Sep-15 Soldier pile 4516 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile
107 10-Sep-15 Soldier pile 4517 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile
108 10-Sep-15 Soldier pile 4518 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile
109 10-Sep-15 Soldier pile 4512 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile
110 10-Sep-15 Soldier pile 4514 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
111 10-Sep-15 Soldier pile 4515 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
112 11-Sep-15 Soldier pile 4520 Ǿ800 17 11 28.00 23.00 -5.00 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile
113 11-Sep-15 Soldier pile 4521 Ǿ800 17 11 28.00 23.00 -5.00 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile
114 11-Sep-15 Soldier pile 4522 Ǿ800 17 11 28.00 23.00 -5.00 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile
115 11-Sep-15 Soldier pile 4523 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile
116 11-Sep-15 Soldier pile 4524 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
117 11-Sep-15 Soldier pile 4525 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
118 11-Sep-15 Soldier pile 4526 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
119 14-Sep-15 Soldier pile 4527 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24 Soldier Pile
120 14-Sep-15 Soldier pile 4528 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
121 14-Sep-15 Soldier pile 4529 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
122 14-Sep-15 Soldier pile 4530 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile
123 14-Sep-15 Soldier pile 4531 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.90 12.00 TI-24 Soldier Pile
124 14-Sep-15 Soldier pile 4532 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
125 15-Sep-15 Soldier pile 4533 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
126 15-Sep-15 Soldier pile 4534 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24 Soldier Pile
127 15-Sep-15 Soldier pile 4535 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
128 15-Sep-15 Soldier pile 4536 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
129 15-Sep-15 Soldier pile 4537 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile
130 15-Sep-15 Soldier pile 4538 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.80 424.30 12.00 TI-24 Soldier Pile
131 15-Sep-15 Soldier pile 4539 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
132 15-Sep-15 Soldier pile 4540 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile
133 16-Sep-15 Soldier pile 4541 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
134 16-Sep-15 Soldier pile 4542 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24 Soldier Pile
135 16-Sep-15 Soldier pile 4543 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
136 16-Sep-15 Soldier pile 4544 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.70 422.00 12.00 TI-24 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
137 16-Sep-15 Soldier pile 4545 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile
138 17-Sep-15 Soldier pile 4546 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.30 467.20 12.00 TI-24 Soldier Pile
139 17-Sep-15 Soldier pile 4547 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
140 17-Sep-15 Soldier pile 4548 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
141 17-Sep-15 Soldier pile 4549 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24 Soldier Pile
142 17-Sep-15 Soldier pile 4550 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
143 17-Sep-15 Soldier pile 4551 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
144 17-Sep-15 Soldier pile 4552 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
145 17-Sep-15 Soldier pile 4553 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
146 18-Sep-15 Soldier pile 4558 Ǿ800 17 11 28.00 18.50 -9.50 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile
147 18-Sep-15 Soldier pile 4554 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
148 18-Sep-15 Soldier pile 4555 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
149 18-Sep-15 Soldier pile 4556 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
150 18-Sep-15 Soldier pile 4557 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
151 18-Sep-15 Soldier pile 4559 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
152 18-Sep-15 Soldier pile 4560 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
153 19-Sep-15 Soldier pile 4566 Ǿ800 17 11 28.00 22.00 -6.00 1.00 1 16.90 593.60 12.00 TI-24 Soldier Pile
154 19-Sep-15 Soldier pile 4561 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
155 19-Sep-15 Soldier pile 4562 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
156 19-Sep-15 Soldier pile 4563 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
157 19-Sep-15 Soldier pile 4564 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 414.50 12.00 TI-24 Soldier Pile
158 19-Sep-15 Soldier pile 4565 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile
159 22-Sep-15 Soldier pile 4567 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
160 22-Sep-15 Soldier pile 4568 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
161 22-Sep-15 Soldier pile 4569 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile
162 22-Sep-15 Soldier pile 4570 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
163 22-Sep-15 Soldier pile 4571 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
164 22-Sep-15 Soldier pile 4572 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile
165 22-Sep-15 Soldier pile 4573 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
166 22-Sep-15 Soldier pile 4574 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
167 22-Sep-15 Soldier pile 4575 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
168 23-Sep-15 Soldier pile 4576 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24 Soldier Pile
169 23-Sep-15 Soldier pile 4577 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile
170 23-Sep-15 Soldier pile 4578 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
171 23-Sep-15 Soldier pile 4579 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
172 23-Sep-15 Soldier pile 4580 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
173 23-Sep-15 Soldier pile 4581 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
174 23-Sep-15 Soldier pile 4582 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
175 23-Sep-15 Soldier pile 4583 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile
176 23-Sep-15 Soldier pile 4584 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile
177 25-Sep-15 Soldier pile 4588 Ǿ800 17 11 28.00 24.00 -4.00 1.00 1 16.50 579.60 12.00 TI-24 Soldier Pile
178 25-Sep-15 Soldier pile 4585 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile
179 25-Sep-15 Soldier pile 4586 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 544.40 12.00 TI-24 Soldier Pile
180 25-Sep-15 Soldier pile 4587 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
181 25-Sep-15 Soldier pile 4589 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
182 25-Sep-15 Soldier pile 4590 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
183 26-Sep-15 Soldier pile 4593 Ǿ800 17 11 28.00 24.00 -4.00 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile
184 26-Sep-15 Soldier pile 4591 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
185 26-Sep-15 Soldier pile 4592 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
186 26-Sep-15 Soldier pile 4594 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
187 26-Sep-15 Soldier pile 4595 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.40 12.00 TI-24 Soldier Pile
188 26-Sep-15 Soldier pile 4596 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24 Soldier Pile
189 26-Sep-15 Soldier pile 4597 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile
190 28-Sep-15 Soldier pile 4598 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 529.90 12.00 TI-24 Soldier Pile
191 28-Sep-15 Soldier pile 4599 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 555.00 12.00 TI-24 Soldier Pile
192 28-Sep-15 Soldier pile 4600 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 555.00 12.00 TI-24 Soldier Pile
193 28-Sep-15 Soldier pile 4601 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
194 28-Sep-15 Soldier pile 4286 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.70 496.90 12.00 TI-18 Soldier Pile
195 29-Sep-15 Soldier pile 4602 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 555.00 12.00 TI-24 Soldier Pile
196 29-Sep-15 Soldier pile 4603 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.60 12.00 TI-24 Soldier Pile
197 29-Sep-15 Soldier pile 4604 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile
198 29-Sep-15 Soldier pile 4605 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.70 551.50 12.00 TI-24 Soldier Pile
199 29-Sep-15 Soldier pile 4606 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
200 29-Sep-15 Soldier pile 4607 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
201 29-Sep-15 Soldier pile 4608 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.80 519.90 12.00 TI-24 Soldier Pile
202 29-Sep-15 Soldier pile 4609 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile
203 29-Sep-15 Soldier pile 4610 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
204 29-Sep-15 Soldier pile 4287 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
205 29-Sep-15 Soldier pile 4288 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 467.40 12.00 TI-18 Soldier Pile
206 29-Sep-15 Soldier pile 4289 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.20 494.50 12.00 TI-18 Soldier Pile
207 29-Sep-15 Soldier pile 4290 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
208 29-Sep-15 Soldier pile 4291 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
209 29-Sep-15 Soldier pile 4292 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 490.00 12.00 TI-18 Soldier Pile
210 29-Sep-15 Soldier pile 4293 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.20 496.90 12.00 TI-18 Soldier Pile
211 29-Sep-15 Soldier pile 4294 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile
212 29-Sep-15 Soldier pile 4295 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.90 489.50 12.00 TI-18 Soldier Pile
213 30-Sep-15 Soldier pile 4611 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
214 30-Sep-15 Soldier pile 4612 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
215 30-Sep-15 Soldier pile 4613 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
216 30-Sep-15 Soldier pile 4614 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
217 30-Sep-15 Soldier pile 4615 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile
218 30-Sep-15 Soldier pile 4616 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile
219 30-Sep-15 Soldier pile 4617 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
220 30-Sep-15 Soldier pile 4618 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile
221 30-Sep-15 Soldier pile 4619 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
222 30-Sep-15 Soldier pile 4296 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
223 30-Sep-15 Soldier pile 4297 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 487.10 12.00 TI-18 Soldier Pile
224 30-Sep-15 Soldier pile 4298 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile
225 30-Sep-15 Soldier pile 4299 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
226 30-Sep-15 Soldier pile 4300 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile
227 30-Sep-15 Soldier pile 4301 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 519.10 12.00 TI-18 Soldier Pile
228 1-Oct-15 Soldier pile 4620 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
229 1-Oct-15 Soldier pile 4621 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
230 1-Oct-15 Soldier pile 4622 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
231 1-Oct-15 Soldier pile 4623 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
232 1-Oct-15 Soldier pile 4624 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile
233 1-Oct-15 Soldier pile 4625 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile
234 1-Oct-15 Soldier pile 4626 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile
235 1-Oct-15 Soldier pile 4627 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile
236 1-Oct-15 Soldier pile 4302 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 494.00 12.00 TI-18 Soldier Pile
237 1-Oct-15 Soldier pile 4303 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 487.10 12.00 TI-18 Soldier Pile
238 1-Oct-15 Soldier pile 4304 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.20 496.90 12.00 TI-18 Soldier Pile
239 1-Oct-15 Soldier pile 4305 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile
240 1-Oct-15 Soldier pile 4306 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.10 469.90 12.00 TI-18 Soldier Pile
241 1-Oct-15 Soldier pile 4307 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 474.80 12.00 TI-18 Soldier Pile
242 1-Oct-15 Soldier pile 4308 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile
243 1-Oct-15 Soldier pile 4309 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
244 2-Oct-15 Soldier pile 4630 Ǿ800 17 11 28.00 22.00 -6.00 1 1.00 1 16.80 590 12.00 TI-24 Soldier Pile
245 2-Oct-15 Soldier pile 4628 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
246 2-Oct-15 Soldier pile 4629 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
247 2-Oct-15 Soldier pile 4631 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile
248 2-Oct-15 Soldier pile 4632 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile
249 2-Oct-15 Soldier pile 4633 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 562.00 12.00 TI-24 Soldier Pile
250 2-Oct-15 Soldier pile 4634 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.80 519.90 12.00 TI-24 Soldier Pile
251 2-Oct-15 Soldier pile 4635 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.70 516.40 12.00 TI-24 Soldier Pile
252 2-Oct-15 Soldier pile 4310 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
253 2-Oct-15 Soldier pile 4311 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile
254 2-Oct-15 Soldier pile 4312 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile
255 2-Oct-15 Soldier pile 4313 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.90 489.50 12.00 TI-18 Soldier Pile
256 2-Oct-15 Soldier pile 4314 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile
257 2-Oct-15 Soldier pile 4315 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.60 467.40 12.00 TI-18 Soldier Pile
258 2-Oct-15 Soldier pile 4316 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
259 3-Oct-15 Soldier pile 4121 Ǿ800 17 11 28.00 22.00 -6.00 1.00 1 15.00 565.10 12.00 TI-26 Soldier Pile
260 3-Oct-15 Soldier pile 4127 Ǿ800 17 11 28.00 25.00 -3.00 1.00 1 15.00 565.10 12.00 TI-26 Soldier Pile
261 3-Oct-15 Soldier pile 4317 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.60 482.20 12.00 TI-18 Soldier Pile
262 3-Oct-15 Soldier pile 4318 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.20 472.30 12.00 TI-18 Soldier Pile
263 3-Oct-15 Soldier pile 4319 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492 12.00 TI-18 Soldier Pile
264 3-Oct-15 Soldier pile 4320 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 496.45 12.00 TI-18 Soldier Pile
265 3-Oct-15 Soldier pile 4321 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile
266 3-Oct-15 Soldier pile 4126 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 Soldier Pile
267 3-Oct-15 Soldier pile 4125 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile
268 3-Oct-15 Soldier pile 4124 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile
269 3-Oct-15 Soldier pile 4123 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
270 3-Oct-15 Soldier pile 4122 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
271 3-Oct-15 Soldier pile 4120 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26 Soldier Pile
272 4-Oct-15 Soldier pile 4119 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile
273 4-Oct-15 Soldier pile 4118 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.70 519.90 12.00 TI-26 Soldier Pile
274 4-Oct-15 Soldier pile 4117 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile
275 4-Oct-15 Soldier pile 4116 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
276 4-Oct-15 Soldier pile 4115 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.30 12.00 TI-26 Soldier Pile
277 4-Oct-15 Soldier pile 4114 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
278 4-Oct-15 Soldier pile 4113 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
279 4-Oct-15 Soldier pile 4112 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile
280 5-Oct-15 Soldier pile 4322 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
281 5-Oct-15 Soldier pile 4323 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.40 477.20 12.00 TI-18 Soldier Pile
282 5-Oct-15 Soldier pile 4324 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
283 5-Oct-15 Soldier pile 4325 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
284 5-Oct-15 Soldier pile 4326 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile
285 5-Oct-15 Soldier pile 4327 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile
286 5-Oct-15 Soldier pile 4328 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 474.80 12.00 TI-18 Soldier Pile
287 5-Oct-15 Soldier pile 4329 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile
288 6-Oct-15 Soldier pile 4336 Ǿ800 17 17.00 17.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile
289 6-Oct-15 Soldier pile 4330 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile
290 6-Oct-15 Soldier pile 4331 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
291 6-Oct-15 Soldier pile 4332 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.50 504.30 12.00 TI-18 Soldier Pile
292 6-Oct-15 Soldier pile 4333 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile
293 6-Oct-15 Soldier pile 4334 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile
294 6-Oct-15 Soldier pile 4335 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile
295 7-Oct-15 Soldier pile 4339 Ǿ800 17 11 28.00 25.00 -3.00 1.00 1 20.10 494.50 12.00 TI-18 Soldier Pile
296 7-Oct-15 Soldier pile 4337 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
297 7-Oct-15 Soldier pile 4338 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile
298 7-Oct-15 Soldier pile 4340 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile
299 7-Oct-15 Soldier pile 4341 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile
300 12-Oct-15 Soldier pile 4636 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.50 12.00 TI-24 Soldier Pile
301 12-Oct-15 Soldier pile 4637 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile
302 12-Oct-15 Soldier pile 4638 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile
303 12-Oct-15 Soldier pile 4639 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.50 462.70 12.00 TI-24 Soldier Pile
304 12-Oct-15 Soldier pile 4640 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile
305 12-Oct-15 Soldier pile 4641 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 441.60 12.00 TI-24 Soldier Pile
306 13-Oct-15 Soldier pile 4645 Ǿ800 17 11 28.00 27.50 -0.50 1.00 16.60 586.60 12.00 TI-24 potong tiang
307 13-Oct-15 Soldier pile 4642 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
308 13-Oct-15 Soldier pile 4643 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
309 13-Oct-15 Soldier pile 4644 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
310 13-Oct-15 Soldier pile 4646 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24
311 13-Oct-15 Soldier pile 4647 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
312 13-Oct-15 Soldier pile 4734 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 464.60 12.00 TI-26
313 13-Oct-15 Soldier pile 4735 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 477.20 12.00 TI-26
314 13-Oct-15 Soldier pile 4736 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 464.60 12.00 TI-26
315 13-Oct-15 Soldier pile 4737 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 464.60 12.00 TI-26
316 13-Oct-15 Soldier pile 4738 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
317 13-Oct-15 Soldier pile 4739 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
318 13-Oct-15 Soldier pile 4740 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
319 13-Oct-15 Soldier pile 4741 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
320 14-Oct-15 Soldier pile 4654 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 16.90 593.60 12.00 TI-24 potong tiang
321 14-Oct-15 Soldier pile 4648 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
322 14-Oct-15 Soldier pile 4649 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
323 14-Oct-15 Soldier pile 4650 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
324 14-Oct-15 Soldier pile 4651 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
325 14-Oct-15 Soldier pile 4652 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 444.60 12.00 TI-24
326 14-Oct-15 Soldier pile 4653 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
327 14-Oct-15 Soldier pile 4655 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
328 14-Oct-15 Soldier pile 4742 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
329 14-Oct-15 Soldier pile 4743 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
330 14-Oct-15 Soldier pile 4744 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
331 14-Oct-15 Soldier pile 4745 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
332 14-Oct-15 Soldier pile 4746 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
333 14-Oct-15 Soldier pile 4747 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
334 14-Oct-15 Soldier pile 4748 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
335 14-Oct-15 Soldier pile 4749 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
336 15-Oct-15 Soldier pile 4656 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 444.60 12.00 TI-24
337 15-Oct-15 Soldier pile 4657 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
338 15-Oct-15 Soldier pile 4658 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
339 15-Oct-15 Soldier pile 4659 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
340 16-Oct-15 Soldier pile 4661 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 16.90 593.60 12.00 TI-24 potong tiang
341 16-Oct-15 Soldier pile 4660 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
342 16-Oct-15 Soldier pile 4662 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
343 16-Oct-15 Soldier pile 4663 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
344 16-Oct-15 Soldier pile 4664 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 444.60 12.00 TI-24
345 16-Oct-15 Soldier pile 4665 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
346 17-Oct-15 Soldier pile 4667 Ǿ800 17 11 28.00 21.50 -6.50 1.00 20.00 451.40 12.00 TI-24
347 17-Oct-15 Soldier pile 4666 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24
348 17-Oct-15 Soldier pile 4668 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
349 17-Oct-15 Soldier pile 4669 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
350 17-Oct-15 Soldier pile 4670 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
351 17-Oct-15 Soldier pile 4671 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
352 17-Oct-15 Soldier pile 4672 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
353 17-Oct-15 Soldier pile 4673 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
354 19-Oct-15 Soldier pile 4675 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 19.00 428.80 12.00 TI-24 potong tiang
355 19-Oct-15 Soldier pile 4674 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
356 19-Oct-15 Soldier pile 4676 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
357 19-Oct-15 Soldier pile 4677 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
358 19-Oct-15 Soldier pile 4678 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
359 19-Oct-15 Soldier pile 4679 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24
360 19-Oct-15 Soldier pile 4680 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
361 20-Oct-15 Soldier pile 4683 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 17.00 597.20 12.00 TI-24 potong tiang
362 20-Oct-15 Soldier pile 4681 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.70 12.00 TI-24
363 20-Oct-15 Soldier pile 4682 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
364 20-Oct-15 Soldier pile 4684 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
365 20-Oct-15 Soldier pile 4685 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
366 20-Oct-15 Soldier pile 4686 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
367 20-Oct-15 Soldier pile 4687 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24
368 20-Oct-15 Soldier pile 4688 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
369 20-Oct-15 Soldier pile 4689 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
370 21-Oct-15 Soldier pile 4690 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
371 21-Oct-15 Soldier pile 4691 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.80 424.30 12.00 TI-24
372 21-Oct-15 Soldier pile 4692 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.60 419.80 12.00 TI-24
373 21-Oct-15 Soldier pile 4693 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24
374 21-Oct-15 Soldier pile 4694 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
375 21-Oct-15 Soldier pile 4695 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
376 21-Oct-15 Soldier pile 4696 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
377 21-Oct-15 Soldier pile 4697 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24
378 21-Oct-15 Soldier pile 4698 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.40 415.30 12.00 TI-24
379 23-Oct-15 Soldier pile 4285 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.60 374.60 12.00 TI-24
380 23-Oct-15 Soldier pile 4284 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
381 23-Oct-15 Soldier pile 4283 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
382 23-Oct-15 Soldier pile 4282 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
383 23-Oct-15 Soldier pile 4281 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
384 23-Oct-15 Soldier pile 4280 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
385 23-Oct-15 Soldier pile 4279 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
386 23-Oct-15 Soldier pile 4278 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
387 24-Oct-15 Soldier pile 4274 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
388 24-Oct-15 Soldier pile 4275 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
389 24-Oct-15 Soldier pile 4276 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
390 24-Oct-15 Soldier pile 4277 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.40 415.30 12.00 TI-24
391 26-Oct-15 Soldier pile 4273 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
392 26-Oct-15 Soldier pile 4272 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
393 26-Oct-15 Soldier pile 4271 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
394 26-Oct-15 Soldier pile 4270 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
395 26-Oct-15 Soldier pile 4269 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
396 26-Oct-15 Soldier pile 4268 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
397 26-Oct-15 Soldier pile 4267 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
398 26-Oct-15 Soldier pile 4266 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
399 27-Oct-15 Soldier pile 4265 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
400 27-Oct-15 Soldier pile 4264 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
401 27-Oct-15 Soldier pile 4263 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
402 27-Oct-15 Soldier pile 4262 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
403 27-Oct-15 Soldier pile 4261 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
404 27-Oct-15 Soldier pile 4260 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
405 27-Oct-15 Soldier pile 4259 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
406 27-Oct-15 Soldier pile 4258 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
407 27-Oct-15 Soldier pile 4257 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24
408 27-Oct-15 Soldier pile 4256 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
409 28-Oct-15 Soldier pile 4255 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 345.00 12.00 TI-24
410 28-Oct-15 Soldier pile 4254 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
411 28-Oct-15 Soldier pile 4253 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
412 28-Oct-15 Soldier pile 4252 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
413 28-Oct-15 Soldier pile 4251 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.20 410.80 12.00 TI-24
414 28-Oct-15 Soldier pile 4250 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
415 28-Oct-15 Soldier pile 4249 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
416 29-Oct-15 Soldier pile 4248 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
417 29-Oct-15 Soldier pile 4247 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
418 29-Oct-15 Soldier pile 4246 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 338.50 12.00 TI-24
419 29-Oct-15 Soldier pile 4245 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
420 29-Oct-15 Soldier pile 4244 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
421 29-Oct-15 Soldier pile 4243 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
422 29-Oct-15 Soldier pile 4242 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
423 29-Oct-15 Soldier pile 4241 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
424 29-Oct-15 Soldier pile 4240 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
425 29-Oct-15 Soldier pile 4239 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
426 30-Oct-15 Soldier pile 4238 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
427 30-Oct-15 Soldier pile 4237 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
428 30-Oct-15 Soldier pile 4236 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
429 30-Oct-15 Soldier pile 4235 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24
430 30-Oct-15 Soldier pile 4234 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
431 30-Oct-15 Soldier pile 4233 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
432 30-Oct-15 Soldier pile 4232 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
433 30-Oct-15 Soldier pile 4231 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
434 30-Oct-15 Soldier pile 4230 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
435 31-Oct-15 Soldier pile 4229 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
436 31-Oct-15 Soldier pile 4228 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
437 31-Oct-15 Soldier pile 4227 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
438 31-Oct-15 Soldier pile 4226 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.70 354.30 12.00 TI-24
439 31-Oct-15 Soldier pile 4225 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
440 31-Oct-15 Soldier pile 4224 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
441 31-Oct-15 Soldier pile 4223 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
442 31-Oct-15 Soldier pile 4222 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
443 2-Nov-15 Soldier pile 4221 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
444 2-Nov-15 Soldier pile 4220 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
445 2-Nov-15 Soldier pile 4219 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
446 2-Nov-15 Soldier pile 4218 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
447 2-Nov-15 Soldier pile 4217 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
448 2-Nov-15 Soldier pile 4216 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
449 2-Nov-15 Soldier pile 4215 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
450 3-Nov-15 Soldier pile 4214 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
451 3-Nov-15 Soldier pile 4213 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.20 365.60 12.00 TI-24
452 3-Nov-15 Soldier pile 4212 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
453 3-Nov-15 Soldier pile 4211 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24
454 3-Nov-15 Soldier pile 4210 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
455 3-Nov-15 Soldier pile 4209 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
456 3-Nov-15 Soldier pile 4208 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
457 3-Nov-15 Soldier pile 4207 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
458 3-Nov-15 Soldier pile 4206 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
459 4-Nov-15 Soldier pile 4205 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
460 4-Nov-15 Soldier pile 4204 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
461 4-Nov-15 Soldier pile 4203 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24
462 4-Nov-15 Soldier pile 4202 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
463 4-Nov-15 Soldier pile 4201 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
464 5-Nov-15 Soldier pile 4347 Ǿ800 17 11 28.00 22.00 -6.00 1.00 1 16.50 579.60 12.00 TI-24 potong tiang
465 5-Nov-15 Soldier pile 4342 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 394.00 12.00 TI-24
466 5-Nov-15 Soldier pile 4343 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
467 5-Nov-15 Soldier pile 4344 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
468 5-Nov-15 Soldier pile 4345 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
469 5-Nov-15 Soldier pile 4346 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
470 5-Nov-15 Soldier pile 4348 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
471 5-Nov-15 Soldier pile 4349 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
472 6-Nov-15 Soldier pile 4357 Ǿ800 17 11 28.00 20.00 -8.00 1.00 1 16.70 586.60 12.00 TI-24 potong tiang
473 6-Nov-15 Soldier pile 4350 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
474 6-Nov-15 Soldier pile 4351 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
475 6-Nov-15 Soldier pile 4352 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
476 6-Nov-15 Soldier pile 4353 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
477 6-Nov-15 Soldier pile 4354 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
478 6-Nov-15 Soldier pile 4355 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
479 6-Nov-15 Soldier pile 4356 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
480 6-Nov-15 Soldier pile 4358 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
481 6-Nov-15 Soldier pile 4359 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
482 7-Nov-15 Soldier pile 4366 Ǿ800 17 11 28.00 21.00 -7.00 1.00 1 16.80 590.10 12.00 TI-24 potong tiang
483 7-Nov-15 Soldier pile 4360 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
484 7-Nov-15 Soldier pile 4361 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
485 7-Nov-15 Soldier pile 4362 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
486 7-Nov-15 Soldier pile 4363 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
487 7-Nov-15 Soldier pile 4364 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
488 7-Nov-15 Soldier pile 4365 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.00 421.50 12.00 TI-24
489 9-Nov-15 Soldier pile 4367 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
490 9-Nov-15 Soldier pile 4368 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
491 9-Nov-15 Soldier pile 4369 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
492 9-Nov-15 Soldier pile 4370 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
493 9-Nov-15 Soldier pile 4371 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
494 9-Nov-15 Soldier pile 4372 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
495 9-Nov-15 Soldier pile 4373 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 395.00 12.00 TI-24
496 9-Nov-15 Soldier pile 4374 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
497 10-Nov-15 Soldier pile 4375 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
498 10-Nov-15 Soldier pile 4376 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
499 10-Nov-15 Soldier pile 4377 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
500 10-Nov-15 Soldier pile 4378 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
501 10-Nov-15 Soldier pile 4379 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
502 10-Nov-15 Soldier pile 4380 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
503 10-Nov-15 Soldier pile 4381 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
504 10-Nov-15 Soldier pile 4382 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
505 11-Nov-15 Soldier pile 4383 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
506 11-Nov-15 Soldier pile 4384 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.60 397.00 12.00 TI-24
507 11-Nov-15 Soldier pile 4385 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
508 11-Nov-15 Soldier pile 4386 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
509 11-Nov-15 Soldier pile 4387 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
510 11-Nov-15 Soldier pile 4388 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.60 397.20 12.00 TI-24
511 11-Nov-15 Soldier pile 4389 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
512 11-Nov-15 Soldier pile 4390 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
513 12-Nov-15 Soldier pile 4391 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
514 12-Nov-15 Soldier pile 4392 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.70 399.50 12.00 TI-24
515 12-Nov-15 Soldier pile 4393 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
516 12-Nov-15 Soldier pile 4394 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
517 12-Nov-15 Soldier pile 4395 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.60 367.90 12.00 TI-24
518 12-Nov-15 Soldier pile 4396 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
519 12-Nov-15 Soldier pile 4397 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
520 12-Nov-15 Soldier pile 4398 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
521 12-Nov-15 Soldier pile 4399 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.70 12.00 TI-24
522 12-Nov-15 Soldier pile 4400 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
523 13-Nov-15 Soldier pile 4401 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
524 13-Nov-15 Soldier pile 4402 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 466.20 12.00 TI-24
525 13-Nov-15 Soldier pile 4403 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
526 13-Nov-15 Soldier pile 4404 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
527 13-Nov-15 Soldier pile 4405 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
528 13-Nov-15 Soldier pile 4406 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
529 13-Nov-15 Soldier pile 4407 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
530 13-Nov-15 Soldier pile 4408 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
531 13-Nov-15 Soldier pile 4409 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
532 13-Nov-15 Soldier pile 4410 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
533 18-Nov-15 Soldier pile 4411 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
534 18-Nov-15 Soldier pile 4412 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
535 18-Nov-15 Soldier pile 4413 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
536 18-Nov-15 Soldier pile 4414 Ǿ800 17 1 18.00 28.00 10.00 1.00 17.00 383.70 12.00 TI-24
537 18-Nov-15 Soldier pile 4415 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
538 18-Nov-15 Soldier pile 4416 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
539 20-Nov-15 Soldier pile 4152 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
540 20-Nov-15 Soldier pile 4153 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
541 20-Nov-15 Soldier pile 4154 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
542 20-Nov-15 Soldier pile 4155 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
543 20-Nov-15 Soldier pile 4156 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
544 20-Nov-15 Soldier pile 4157 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
545 20-Nov-15 Soldier pile 4158 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
546 20-Nov-15 Soldier pile 4159 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
547 20-Nov-15 Soldier pile 4160 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
548 21-Nov-15 Soldier pile 4161 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
549 21-Nov-15 Soldier pile 4162 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
550 21-Nov-15 Soldier pile 4163 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
551 21-Nov-15 Soldier pile 4164 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
552 21-Nov-15 Soldier pile 4165 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
553 21-Nov-15 Soldier pile 4166 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
554 21-Nov-15 Soldier pile 4167 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.60 12.00 TI-24
555 23-Nov-15 Soldier pile 4168 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
556 23-Nov-15 Soldier pile 4169 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
557 23-Nov-15 Soldier pile 4170 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
558 23-Nov-15 Soldier pile 4171 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
559 23-Nov-15 Soldier pile 4172 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
560 23-Nov-15 Soldier pile 4173 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
561 23-Nov-15 Soldier pile 4174 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
562 23-Nov-15 Soldier pile 4175 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
563 24-Nov-15 Soldier pile 4185 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
564 24-Nov-15 Soldier pile 4184 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
565 24-Nov-15 Soldier pile 4183 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.70 354.30 12.00 TI-24
566 24-Nov-15 Soldier pile 4182 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
567 24-Nov-15 Soldier pile 4181 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
568 24-Nov-15 Soldier pile 4180 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
569 24-Nov-15 Soldier pile 4179 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
570 24-Nov-15 Soldier pile 4178 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
571 24-Nov-15 Soldier pile 4177 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
572 24-Nov-15 Soldier pile 4176 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
573 24-Nov-15 Soldier pile 4699 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
574 24-Nov-15 Soldier pile 4700 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
575 24-Nov-15 Soldier pile 4701 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.60 12.00 TI-26
576 24-Nov-15 Soldier pile 4702 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.60 12.00 TI-26
577 24-Nov-15 Soldier pile 4703 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
578 24-Nov-15 Soldier pile 4704 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
579 24-Nov-15 Soldier pile 4705 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
580 25-Nov-15 Soldier pile 4709 Ǿ800 12 16 28.00 15.00 -13.00 1.00 21.00 527.40 12.00 TI-26
581 25-Nov-15 Soldier pile 4712 Ǿ800 12 16 28.00 15.00 -13.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
582 25-Nov-15 Soldier pile 4194 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
583 25-Nov-15 Soldier pile 4193 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
584 25-Nov-15 Soldier pile 4192 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
585 25-Nov-15 Soldier pile 4191 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.70 331.80 12.00 TI-24
586 25-Nov-15 Soldier pile 4190 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
587 25-Nov-15 Soldier pile 4189 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
588 25-Nov-15 Soldier pile 4188 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
589 25-Nov-15 Soldier pile 4187 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
590 25-Nov-15 Soldier pile 4186 Ǿ800 12 16 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
591 25-Nov-15 Soldier pile 4706 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
592 25-Nov-15 Soldier pile 4707 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
593 25-Nov-15 Soldier pile 4708 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
594 25-Nov-15 Soldier pile 4710 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
595 25-Nov-15 Soldier pile 4711 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
596 25-Nov-15 Soldier pile 4713 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
597 26-Nov-15 Soldier pile 4719 Ǿ800 12 16 28.00 20.00 -8.00 1.00 1 14.50 546.30 12.00 TI-26 potong tiang
598 26-Nov-15 Soldier pile 4195 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.30 345.30 12.00 TI-24
599 26-Nov-15 Soldier pile 4196 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
600 26-Nov-15 Soldier pile 4197 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 12.00 TI-24
601 26-Nov-15 Soldier pile 4714 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.50 439.50 12.00 TI-26
602 26-Nov-15 Soldier pile 4715 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
603 26-Nov-15 Soldier pile 4716 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
604 26-Nov-15 Soldier pile 4717 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
605 26-Nov-15 Soldier pile 4718 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
606 27-Nov-15 Soldier pile 4722 Ǿ800 12 16 28.00 22.00 -6.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
607 27-Nov-15 Soldier pile 4726 Ǿ800 12 16 28.00 22.50 -5.50 1.00 1 21.50 540.00 12.00 TI-26 potong tiang
608 27-Nov-15 Soldier pile 4198 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
609 27-Nov-15 Soldier pile 4199 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
610 27-Nov-15 Soldier pile 4200 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
611 27-Nov-15 Soldier pile 4720 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
612 27-Nov-15 Soldier pile 4721 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
613 27-Nov-15 Soldier pile 4723 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
614 27-Nov-15 Soldier pile 4724 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
615 27-Nov-15 Soldier pile 4725 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
616 27-Nov-15 Soldier pile 4727 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
617 27-Nov-15 soldier pile 4728 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 blm masuk progres
618 28-Nov-15 Soldier pile 4733 Ǿ800 12 16 28.00 22.00 -6.00 1.00 1 21.50 540.00 12.00 TI-26 potong tiang
619 28-Nov-15 Soldier pile 4111 Ǿ800 12 16 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
620 28-Nov-15 Soldier pile 4110 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
621 28-Nov-15 Soldier pile 4109 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
622 28-Nov-15 Soldier pile 4108 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
623 28-Nov-15 Soldier pile 4107 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
624 28-Nov-15 Soldier pile 4106 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
625 28-Nov-15 Soldier pile 4105 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
626 28-Nov-15 Soldier pile 4729 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
627 28-Nov-15 Soldier pile 4730 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
628 28-Nov-15 Soldier pile 4731 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
629 28-Nov-15 Soldier pile 4732 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
630 29-Nov-15 Soldier pile 4753 Ǿ800 17 11 28.00 19.50 -8.50 1.00 21.50 540.00 12.00 TI-26
631 29-Nov-15 Soldier pile 4750 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 439.50 12.00 TI-26
632 29-Nov-15 Soldier pile 4751 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
633 29-Nov-15 Soldier pile 4752 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
634 29-Nov-15 Soldier pile 4754 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
635 29-Nov-15 Soldier pile 4755 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
636 30-Nov-15 Soldier pile 4104 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
637 30-Nov-15 Soldier pile 4103 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
638 30-Nov-15 Soldier pile 4102 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
639 30-Nov-15 Soldier pile 4101 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
640 30-Nov-15 Soldier pile 4100 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
641 30-Nov-15 Soldier pile 4099 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
642 30-Nov-15 Soldier pile 4098 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
643 30-Nov-15 Soldier pile 4097 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
644 1-Dec-15 Soldier pile 4096 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
645 1-Dec-15 Soldier pile 4095 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
646 1-Dec-15 Soldier pile 4094 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
647 1-Dec-15 Soldier pile 4093 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
648 1-Dec-15 Soldier pile 4092 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
649 1-Dec-15 Soldier pile 4091 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
650 1-Dec-15 Soldier pile 4090 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 316.60 12.00 TI-24
651 1-Dec-15 Soldier pile 4089 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
652 1-Dec-15 Soldier pile 4088 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
653 1-Dec-15 Soldier pile 4087 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
654 1-Dec-15 Soldier pile 4756 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.17 12.00 TI-26
655 1-Dec-15 Soldier pile 4758 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
656 1-Dec-15 Soldier pile 4759 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
657 1-Dec-15 Soldier pile 4760 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 439.50 12.00 TI-26
658 1-Dec-15 Soldier pile 4761 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
659 1-Dec-15 Soldier pile 4762 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
660 1-Dec-15 Soldier pile 4763 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
661 1-Dec-15 Soldier pile 4764 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
662 1-Dec-15 Soldier pile 4765 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
663 1-Dec-15 Soldier pile 4766 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 389.30 12.00 TI-26
664 2-Dec-15 Soldier pile 4767 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.70 12.00 TI-26
665 2-Dec-15 Soldier pile 4768 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.40 12.00 TI-26
666 2-Dec-15 Soldier pile 4769 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.40 12.00 TI-26
667 2-Dec-15 Soldier pile 4770 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
668 2-Dec-15 Soldier pile 4771 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.70 12.00 TI-26
669 2-Dec-15 Soldier pile 4772 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
670 2-Dec-15 Soldier pile 4773 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
671 2-Dec-15 Soldier pile 4774 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.70 12.00 TI-26
672 2-Dec-15 Soldier pile 4775 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
673 2-Dec-15 Soldier pile 4086 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
674 2-Dec-15 Soldier pile 4085 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
675 2-Dec-15 Soldier pile 4084 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
676 2-Dec-15 Soldier pile 4083 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
677 2-Dec-15 Soldier pile 4082 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
678 2-Dec-15 Soldier pile 4081 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
679 2-Dec-15 Soldier pile 4080 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
680 2-Dec-15 Soldier pile 4079 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.70 331.40 12.00 TI-24
681 2-Dec-15 Soldier pile 4078 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
682 2-Dec-15 Soldier pile 4077 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
683 3-Dec-15 Soldier pile 4076 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
684 3-Dec-15 Soldier pile 4075 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
685 3-Dec-15 Soldier pile 4074 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
686 3-Dec-15 Soldier pile 4073 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
687 3-Dec-15 Soldier pile 4072 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
688 3-Dec-15 Soldier pile 4071 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
689 3-Dec-15 Soldier pile 4070 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
690 3-Dec-15 Soldier pile 4069 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
691 3-Dec-15 Soldier pile 4068 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
692 3-Dec-15 Soldier pile 4067 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
693 3-Dec-15 Soldier pile 4776 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
694 3-Dec-15 Soldier pile 4777 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 376.70 12.00 TI-26
695 3-Dec-15 Soldier pile 4778 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
696 3-Dec-15 Soldier pile 4779 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
697 3-Dec-15 Soldier pile 4780 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
698 3-Dec-15 Soldier pile 4781 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
699 3-Dec-15 Soldier pile 4782 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
700 4-Dec-15 Soldier pile 4066 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
701 4-Dec-15 Soldier pile 4065 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
702 4-Dec-15 Soldier pile 4064 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
703 4-Dec-15 Soldier pile 4063 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
704 4-Dec-15 Soldier pile 4062 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
705 4-Dec-15 Soldier pile 4061 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
706 4-Dec-15 Soldier pile 4060 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
707 4-Dec-15 Soldier pile 4059 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
708 4-Dec-15 Soldier pile 4058 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
709 4-Dec-15 Soldier pile 4057 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
710 5-Dec-15 Soldier pile 4836 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
711 5-Dec-15 Soldier pile 4835 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
712 5-Dec-15 Soldier pile 4834 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
713 5-Dec-15 Soldier pile 4833 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
714 5-Dec-15 Soldier pile 4832 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
715 5-Dec-15 Soldier pile 4056 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
716 5-Dec-15 Soldier pile 4055 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
717 5-Dec-15 Soldier pile 4054 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
718 5-Dec-15 Soldier pile 4053 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.70 331.80 12.00 TI-24
719 5-Dec-15 Soldier pile 4052 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
720 5-Dec-15 Soldier pile 4051 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
721 5-Dec-15 Soldier pile 4050 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
722 7-Dec-15 Soldier pile 4049 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
723 7-Dec-15 Soldier pile 4048 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
724 7-Dec-15 Soldier pile 4047 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
725 7-Dec-15 Soldier pile 4046 Ǿ600 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
726 7-Dec-15 Soldier pile 4045 Ǿ600 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
727 7-Dec-15 Soldier pile 4044 Ǿ600 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
728 7-Dec-15 Soldier pile 4043 Ǿ600 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
729 7-Dec-15 Soldier pile 4042 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
730 8-Dec-15 Soldier pile 4041 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
731 8-Dec-15 Soldier pile 4040 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
732 8-Dec-15 Soldier pile 4039 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
733 8-Dec-15 Soldier pile 4038 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
734 8-Dec-15 Soldier pile 4037 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
735 8-Dec-15 Soldier pile 4036 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
736 8-Dec-15 Soldier pile 4035 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
737 8-Dec-15 Soldier pile 4034 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
738 8-Dec-15 Soldier pile 4033 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
739 8-Dec-15 Soldier pile 4032 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
740 8-Dec-15 Soldier pile 4831 Ǿ800 12 16 28.00 28.00 0.00 1.00 13.00 326.50 12.00 TI-26 0
741 8-Dec-15 Soldier pile 4830 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 54
742 8-Dec-15 Soldier pile 4829 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 8
743 8-Dec-15 Soldier pile 4828 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 308
744 8-Dec-15 Soldier pile 4827 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 221
745 8-Dec-15 Soldier pile 4826 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 223
746 8-Dec-15 Soldier pile 4825 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 462
747 11-Dec-15 Soldier pile 4824 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 868
748 11-Dec-15 Soldier pile 4823 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 4
749 11-Dec-15 Soldier pile 4822 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
750 11-Dec-15 Soldier pile 4821 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
751 11-Dec-15 Soldier pile 4820 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
752 11-Dec-15 Soldier pile 4819 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
753 11-Dec-15 Soldier pile 4818 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
754 11-Dec-15 Soldier pile 4817 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
755 11-Dec-15 Soldier pile 4816 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
756 12-Dec-15 Soldier pile 4811 Ǿ800 12 16 28.00 26.00 -2.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
757 12-Dec-15 Soldier pile 4815 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
758 12-Dec-15 Soldier pile 4814 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
759 12-Dec-15 Soldier pile 4813 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
760 12-Dec-15 Soldier pile 4812 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
761 12-Dec-15 Soldier pile 4810 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
762 12-Dec-15 Soldier pile 4809 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
763 12-Dec-15 Soldier pile 4808 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
764 12-Dec-15 Soldier pile 4031 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
765 12-Dec-15 Soldier pile 4030 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
766 12-Dec-15 Soldier pile 4029 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
767 12-Dec-15 Soldier pile 4028 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
768 12-Dec-15 Soldier pile 4027 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
769 12-Dec-15 Soldier pile 4026 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 383.70 12.00 TI-24
770 13-Dec-15 Soldier pile 4025 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
771 13-Dec-15 Soldier pile 4024 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
772 13-Dec-15 Soldier pile 4023 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.70 12.00 TI-24
773 13-Dec-15 Soldier pile 4022 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
774 13-Dec-15 Soldier pile 4021 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
775 14-Dec-15 Soldier pile 4020 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
776 14-Dec-15 Soldier pile 4019 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.30 345.30 12.00 TI-24
777 14-Dec-15 Soldier pile 4018 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
778 14-Dec-15 Soldier pile 4017 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 383.55 12.00 TI-24
779 14-Dec-15 Soldier pile 4016 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
780 14-Dec-15 Soldier pile 4015 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
781 14-Dec-15 Soldier pile 4014 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
782 14-Dec-15 Soldier pile 4807 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
783 14-Dec-15 Soldier pile 4806 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
784 14-Dec-15 Soldier pile 4805 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)
785 14-Dec-15 Soldier pile 4804 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
786 15-Dec-15 Soldier pile 4797 Ǿ800 17 11 28.00 20.00 -8.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
787 15-Dec-15 Soldier pile 4803 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
788 15-Dec-15 Soldier pile 4802 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
789 15-Dec-15 Soldier pile 4801 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
790 15-Dec-15 Soldier pile 4800 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
791 15-Dec-15 Soldier pile 4799 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
792 15-Dec-15 Soldier pile 4798 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
793 16-Dec-15 Soldier pile 4796 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 489.80 12.00 TI-26
794 16-Dec-15 Soldier pile 4795 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
795 16-Dec-15 Soldier pile 4794 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
796 16-Dec-15 Soldier pile 4793 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
797 16-Dec-15 Soldier pile 4792 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
798 16-Dec-15 Soldier pile 4791 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
799 16-Dec-15 Soldier pile 4790 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
800 16-Dec-15 Soldier pile 4789 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
801 16-Dec-15 Soldier pile 4788 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
802 17-Dec-15 Soldier pile 4787 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
803 17-Dec-15 Soldier pile 4786 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
804 17-Dec-15 Soldier pile 4785 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
805 17-Dec-15 Soldier pile 4784 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
806 17-Dec-15 Soldier pile 4783 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
807 17-Dec-15 Soldier pile 4013 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
808 17-Dec-15 Soldier pile 4012 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
809 17-Dec-15 Soldier pile 4011 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
810 17-Dec-15 Soldier pile 4010 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
811 17-Dec-15 Soldier pile 4009 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.40 327.20 12.00 TI-24
812 17-Dec-15 Soldier pile 4008 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
813 17-Dec-15 Soldier pile 4007 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
814 17-Dec-15 Soldier pile 4006 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
815 17-Dec-15 Soldier pile 4005 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.40 12.00 TI-24
816 19-Dec-15 Soldier pile 4432 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 430.50 12.00 TI-18
817 19-Dec-15 Soldier pile 4431 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 388.70 12.00 TI-18
818 19-Dec-15 Soldier pile 4430 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 467.40 12.00 TI-18
819 19-Dec-15 Soldier pile 4429 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.80 437.90 12.00 TI-18
820 20-Dec-15 Soldier pile 4423 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.90 415.70 12.00 TI-18
821 20-Dec-15 Soldier pile 4424 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
822 20-Dec-15 Soldier pile 4425 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
823 20-Dec-15 Soldier pile 4426 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.60 433.00 12.00 TI-18
824 20-Dec-15 Soldier pile 4427 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
825 20-Dec-15 Soldier pile 4428 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
826 22-Dec-15 Soldier pile 4422 Ǿ800 17 11 28.00 25.00 -3.00 1.00 1 20.30 499.40 12.00 TI-18 potong tiang
827 22-Dec-15 Soldier pile 4418 Ǿ800 17 11 28.00 26.00 -2.00 1.00 1 17.90 440.30 12.00 TI-18 potong tiang
828 22-Dec-15 Soldier pile 4421 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 423.10 12.00 TI-18
829 22-Dec-15 Soldier pile 4420 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 430.50 12.00 TI-18
830 22-Dec-15 Soldier pile 4419 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 423.10 12.00 TI-18
831 22-Dec-15 Soldier pile 4417 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 418.20 12.00 TI-18
832 25-Dec-15 Soldier pile 4004 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
833 25-Dec-15 Soldier pile 4003 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.00 12.00 TI-24
834 25-Dec-15 Soldier pile 4002 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.00 12.00 TI-24
835 25-Dec-15 Soldier pile 4001 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
Total Pemancangan Soldier Pile 23359.00 23106.00 -253.00 0.00 1.00 835.00 41.00
3008 4-May-16 Condo tower B 430 Ǿ500 12.00 TC-15 Condo tower B
3009 4-May-16 Condo tower B 431 Ǿ500 12.00 TC-15 Condo tower B
3010 4-May-16 Condo tower B 432 Ǿ500 12.00 TC-15 Condo tower B
3011 4-May-16 Condo tower B 433 Ǿ500 12.00 TC-15 Condo tower B
3012 4-May-16 Condo tower B 410 Ǿ500 12.00 TC-15 Condo tower B
3013 4-May-16 Condo tower B 409 Ǿ500 12.00 TC-15 Condo tower B
3014 4-May-16 Condo tower B 386 Ǿ500 12.00 TC-15 Condo tower B
3015 4-May-16 Condo tower B 385 Ǿ500 12.00 TC-15 Condo tower B
3016 4-May-16 Condo tower B 362 Ǿ500 12.00 TC-15 Condo tower B
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)
3017 4-May-16 Condo tower B 361 Ǿ500 12.00 TC-15 Condo tower B
3018 4-May-16 Condo tower B 338 Ǿ500 12.00 TC-15 Condo tower B
3019 4-May-16 Condo tower B 337 Ǿ500 12.00 TC-15 Condo tower B
3020 4-May-16 Condo tower B 314 Ǿ500 12.00 TC-15 Condo tower B
3021 4-May-16 Condo tower B 313 Ǿ500 12.00 TC-15 Condo tower B
3022 4-May-16 Condo tower B 290 Ǿ500 12.00 TC-15 Condo tower B
3023 4-May-16 Condo tower B 289 Ǿ500 12.00 TC-15 Condo tower B
3024 4-May-16 Condo tower B 266 Ǿ500 12.00 TC-15 Condo tower B
3025 4-May-16 Condo tower B 265 Ǿ500 12.00 TC-15 Condo tower B
3026 4-May-16 Condo tower B 242 Ǿ500 12.00 TC-15 Condo tower B
3027 4-May-16 Condo tower B 241 Ǿ500 12.00 TC-15 Condo tower B
3028 4-May-16 Condo tower B 218 Ǿ500 12.00 TC-15 Condo tower B
3029 4-May-16 Condo tower B 217 Ǿ500 12.00 TC-15 Condo tower B
3030 4-May-16 Condo tower B 194 Ǿ500 12.00 TC-15 Condo tower B
Page 342
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)
Page 343
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)
Page 344
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)
Page 345
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)
Page 346
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : BENTONITE
361 6-Mar-16 main pile 1510 Ǿ600 23.70 421.10 TI-21 Redrive
360 6-Mar-16 main pile 1512 Ǿ600 23.70 421.10 TI-21 Redrive
362 6-Mar-16 main pile 1514 Ǿ600 23.70 421.10 TI-21 Redrive
373 28-Mar-16 Main Pile 1537 Ǿ600 23.70 420.00 TI-07 Redive
374 28-Mar-16 Main Pile 1538 Ǿ600 23.70 420.00 TI-07 Redive
372 28-Mar-16 Main Pile 1543 Ǿ600 23.70 420.00 TI-07 Redive
369 25-Mar-16 Main Pile 1584 Ǿ600 23.70 421.10 TI-21A Redive
388 28-Mar-16 Main Pile 1676 Ǿ600 420.00 TI-07 Redive
370 25-Mar-16 Main Pile 1704 Ǿ600 23.70 421.10 TI-21A Redive
353 3-Mar-16 main pile 1722 Ǿ600 - 23.70 421.10 TI-21 Redrive
354 3-Mar-16 main pile 1723 Ǿ600 - 23.70 421.10 TI-21 Redrive
352 3-Mar-16 main pile 1725 Ǿ600 - 23.70 421.10 TI-21 Redrive
356 3-Mar-16 main pile 1731 Ǿ600 - 23.70 421.10 TI-21 Redrive
387 28-Mar-16 Main Pile 1755 Ǿ600 23.70 420.00 TI-07 Redive
382 28-Mar-16 Main Pile 1764 Ǿ600 23.70 420.00 TI-07 Redive
381 28-Mar-16 Main Pile 1765 Ǿ600 23.70 420.00 TI-07 Redive
363 25-Mar-16 Main Pile 1794 Ǿ600 23.70 420.00 TI-07 Redive
375 28-Mar-16 Main Pile 1800 Ǿ600 23.70 420.00 TI-07 Redive
380 28-Mar-16 Main Pile 1805 Ǿ600 23.70 420.00 TI-07 Redive
384 28-Mar-16 Main Pile 1813 Ǿ600 23.70 420.00 TI-07 Redive
383 28-Mar-16 Main Pile 1814 Ǿ600 23.70 420.00 TI-07 Redive
350 3-Mar-16 main pile 1848 Ǿ600 - 23.70 421.10 TI-21 Redrive
351 3-Mar-16 main pile 1849 Ǿ600 - 23.70 421.10 TI-21 Redrive
349 3-Mar-16 main pile 1851 Ǿ600 - 23.70 421.10 TI-21 Redrive
355 3-Mar-16 main pile 1857 Ǿ600 - 23.70 421.10 TI-21 Redrive
386 28-Mar-16 Main Pile 1882 Ǿ600 23.70 420.00 TI-07 Redive
385 28-Mar-16 Main Pile 1884 Ǿ600 23.70 420.00 TI-07 Redive
376 28-Mar-16 Main Pile 1897 Ǿ600 23.70 420.00 TI-07 Redive
377 28-Mar-16 Main Pile 1898 Ǿ600 23.70 420.00 TI-07 Redive
365 25-Mar-16 Main Pile 1905 Ǿ600 23.70 420.00 TI-07 Redive
364 25-Mar-16 Main Pile 1906 Ǿ600 23.70 420.00 TI-07 Redive
367 25-Mar-16 Main Pile 1914 Ǿ600 23.70 420.00 TI-07 Redive
368 25-Mar-16 Main Pile 1915 Ǿ600 23.70 420.00 TI-07 Redive
366 25-Mar-16 Main Pile 1921 Ǿ600 23.70 420.00 TI-07 Redive
378 28-Mar-16 Main Pile 1922 Ǿ600 23.70 420.00 TI-07 Redive
379 28-Mar-16 Main Pile 1923 Ǿ600 23.70 420.00 TI-07 Redive
371 25-Mar-16 Main Pile 1950 Ǿ600 23.70 421.10 TI-21A Redive
347 3-Mar-16 main pile 1963 Ǿ600 - 23.70 421.10 TI-21 Redrive
348 3-Mar-16 main pile 1966 Ǿ600 - 23.70 421.10 TI-21 Redrive
213 21-Jan-16 main pile 1975 Ǿ600 420.00 TI-07 REDRIVE
124 16-Jan-16 main pile 1976 Ǿ600 420.00 TI-07 REDRIVE
123 16-Jan-16 main pile 1978 Ǿ600 420.00 TI-07 REDRIVE
125 16-Jan-16 main pile 1979 Ǿ600 420.00 TI-07 REDRIVE
126 16-Jan-16 main pile 1980 Ǿ600 420.00 TI-07 REDRIVE
128 16-Jan-16 main pile 1982 Ǿ600 420.00 TI-07 REDRIVE
129 16-Jan-16 main pile 1983 Ǿ600 420.00 TI-07 REDRIVE
127 16-Jan-16 main pile 1984 Ǿ600 420.00 TI-07 REDRIVE
152 18-Jan-16 main pile 1985 Ǿ600 420.00 TI-07 REDRIVE
151 18-Jan-16 main pile 1986 Ǿ600 420.00 TI-07 REDRIVE
150 18-Jan-16 main pile 1987 Ǿ600 420.00 TI-07 REDRIVE
155 18-Jan-16 main pile 1988 Ǿ600 420.00 TI-07 REDRIVE
154 18-Jan-16 main pile 1989 Ǿ600 420.00 TI-07 REDRIVE
153 18-Jan-16 main pile 1990 Ǿ600 420.00 TI-07 REDRIVE
157 18-Jan-16 main pile 1991 Ǿ600 420.00 TI-07 REDRIVE
158 18-Jan-16 main pile 1992 Ǿ600 420.00 TI-07 REDRIVE
156 18-Jan-16 main pile 1993 Ǿ600 420.00 TI-07 REDRIVE
161 18-Jan-16 main pile 1994 Ǿ600 420.00 TI-07 REDRIVE
160 18-Jan-16 main pile 1995 Ǿ600 420.00 TI-07 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)
1 25-Nov-15 Soldier pile 4712 Ǿ800 12 16 28.00 15.00 1 1 21.00 527.40 TI-26 potong tiang
2 26-Nov-15 Soldier pile 4719 Ǿ800 12 16 28.00 20.00 1 1 14.50 546.30 TI-26 potong tiang
3 27-Nov-15 soldier pile 4722 Ǿ800 12 16 28.00 22.00 1 1 21.00 527.40 TI-26 potong tiang
4 27-Nov-15 soldier pile 4726 Ǿ800 12 16 28.00 22.50 1 1 21.50 540.00 TI-26 potong tiang
5 28-Nov-15 soldier pile 4733 Ǿ800 12 16 28.00 22.00 1 1 21.50 540.00 TI-26 potong tiang