PT.

SINAR GALAXY DAILY REPORT


PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : PILING BARRIER

SUMMARY DAY OF PILE DRIVING RECORD Location : JL. IR SOEKARNO - SURABAYA


Date : 06 Jul'15 - 13 Sept' 15
TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

BARRIER PILE ……1….. Of ……1…..

PILE DATA Final PILING CARASTERISTIC


Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

1 6-Jul-15 01 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08


2 6-Jul-15 02 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
3 6-Jul-15 03 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
4 6-Jul-15 04 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
5 6-Jul-15 05 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
6 6-Jul-15 06 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
7 6-Jul-15 07 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
8 6-Jul-15 08 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
9 6-Jul-15 09 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
10 6-Jul-15 10 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
11 6-Jul-15 11 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
12 7-Jul-15 12 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
13 7-Jul-15 13 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
14 7-Jul-15 14 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
15 7-Jul-15 15 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
16 7-Jul-15 16 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
17 7-Jul-15 17 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
18 7-Jul-15 18 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
19 7-Jul-15 19 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
20 7-Jul-15 20 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
21 7-Jul-15 21 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
22 7-Jul-15 22 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
23 7-Jul-15 23 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
24 7-Jul-15 24 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
25 7-Jul-15 25 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

26 7-Jul-15 26 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08


27 7-Jul-15 27 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
28 7-Jul-15 28 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
29 7-Jul-15 29 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
30 7-Jul-15 30 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
31 8-Jul-15 31 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
32 8-Jul-15 32 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
33 8-Jul-15 33 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
34 8-Jul-15 34 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
35 8-Jul-15 35 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
36 8-Jul-15 36 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
37 8-Jul-15 37 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
38 8-Jul-15 38 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
39 8-Jul-15 39 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
40 8-Jul-15 40 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
41 8-Jul-15 41 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
42 8-Jul-15 42 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
43 8-Jul-15 43 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
44 8-Jul-15 44 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
45 8-Jul-15 45 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
46 8-Jul-15 46 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
47 8-Jul-15 47 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
48 8-Jul-15 48 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
49 8-Jul-15 49 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
50 8-Jul-15 50 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
51 9-Jul-15 51 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
52 9-Jul-15 52 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
53 9-Jul-15 53 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
54 9-Jul-15 54 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
55 9-Jul-15 55 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
56 9-Jul-15 56 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
57 9-Jul-15 57 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
58 9-Jul-15 58 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
59 9-Jul-15 59 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

60 10-Jul-15 60 250 - - - - 12 12 - - - 3 15.60 - - - - TI-08


61 10-Jul-15 61 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
62 10-Jul-15 62 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
63 10-Jul-15 63 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
64 10-Jul-15 64 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
65 10-Jul-15 65 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
66 10-Jul-15 66 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
67 10-Jul-15 67 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
68 10-Jul-15 68 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
69 10-Jul-15 69 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
70 10-Jul-15 70 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
71 10-Jul-15 71 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
72 10-Jul-15 72 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
73 10-Jul-15 73 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
74 10-Jul-15 74 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
75 10-Jul-15 75 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
76 10-Jul-15 76 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
77 10-Jul-15 77 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
78 10-Jul-15 78 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
79 10-Jul-15 79 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
80 10-Jul-15 80 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
81 10-Jul-15 81 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
82 10-Jul-15 82 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
83 10-Jul-15 83 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
84 10-Jul-15 84 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
85 11-Jul-15 85 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
86 11-Jul-15 86 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
87 11-Jul-15 87 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
88 11-Jul-15 88 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
89 11-Jul-15 89 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
90 11-Jul-15 90 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
91 11-Jul-15 91 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
92 11-Jul-15 92 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
93 11-Jul-15 93 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

94 11-Jul-15 94 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08


95 11-Jul-15 95 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
96 11-Jul-15 96 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
97 11-Jul-15 97 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
98 11-Jul-15 98 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
99 11-Jul-15 99 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
100 11-Jul-15 100 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
101 11-Jul-15 101 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
102 11-Jul-15 102 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
103 12-Jul-15 103 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
104 12-Jul-15 104 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
105 12-Jul-15 105 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
106 12-Jul-15 106 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
107 12-Jul-15 107 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
108 12-Jul-15 108 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
109 12-Jul-15 109 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
110 12-Jul-15 110 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
111 12-Jul-15 111 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
112 12-Jul-15 112 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
113 12-Jul-15 113 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
114 12-Jul-15 114 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
115 12-Jul-15 115 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
116 12-Jul-15 116 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
117 12-Jul-15 117 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
118 12-Jul-15 118 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
119 12-Jul-15 119 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
120 12-Jul-15 120 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
121 12-Jul-15 121 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
122 13-Jul-15 122 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
123 13-Jul-15 123 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
124 13-Jul-15 124 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
125 13-Jul-15 125 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
126 13-Jul-15 126 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
127 13-Jul-15 127 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

128 13-Jul-15 128 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08


129 13-Jul-15 129 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
130 13-Jul-15 130 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
131 13-Jul-15 131 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
132 13-Jul-15 132 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
133 13-Jul-15 133 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
134 13-Jul-15 134 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
135 13-Jul-15 135 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
136 13-Jul-15 136 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
137 13-Jul-15 137 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
138 13-Jul-15 138 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
139 13-Jul-15 139 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
140 13-Jul-15 140 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
141 13-Jul-15 141 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
142 25-Jul-15 142 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
143 25-Jul-15 143 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
144 25-Jul-15 144 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
145 25-Jul-15 145 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
146 25-Jul-15 146 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
147 25-Jul-15 147 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
148 25-Jul-15 148 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
149 25-Jul-15 149 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
150 25-Jul-15 150 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
151 25-Jul-15 151 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
152 25-Jul-15 152 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
153 25-Jul-15 153 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
154 25-Jul-15 154 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
155 25-Jul-15 155 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
156 25-Jul-15 156 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
157 25-Jul-15 157 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
158 25-Jul-15 158 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
159 25-Jul-15 159 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
160 25-Jul-15 160 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
161 25-Jul-15 161 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

162 26-Jul-15 1A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


163 26-Jul-15 2A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
164 26-Jul-15 3A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
165 26-Jul-15 4A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
166 26-Jul-15 5A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
167 26-Jul-15 6A 250 - - - - 12 12 - - - 9 46.70 - - - - TI-05
168 26-Jul-15 7A 250 - - - - 12 12 - - - 9 46.70 - - - - TI-05
169 26-Jul-15 8A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
170 26-Jul-15 9A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
171 26-Jul-15 10A 250 - - - - 12 12 - - - 9 46.70 - - - - TI-05
172 26-Jul-15 11A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
173 26-Jul-15 12A 250 - - - - 12 12 - - - 9 46.70 - - - - TI-05
174 26-Jul-15 13A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
175 26-Jul-15 14A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
176 26-Jul-15 15A 250 - - - - 12 12 - - - 9 46.70 - - - - TI-05
177 26-Jul-15 16A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
178 26-Jul-15 17A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
179 26-Jul-15 18A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
180 27-Jul-15 19A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
181 27-Jul-15 20A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
182 27-Jul-15 21A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
183 27-Jul-15 22A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
184 27-Jul-15 23A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
185 27-Jul-15 24A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
186 27-Jul-15 25A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
187 27-Jul-15 26A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
188 27-Jul-15 27A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
189 27-Jul-15 28A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
190 27-Jul-15 29A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
191 27-Jul-15 30A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
192 27-Jul-15 31A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
193 27-Jul-15 32A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
194 27-Jul-15 33A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
195 27-Jul-15 34A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

196 27-Jul-15 35A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


197 27-Jul-15 36A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
198 27-Jul-15 37A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
199 27-Jul-15 38A 250 - - - - 12 12 - - - 9 46.7 - - - - TI-05
200 27-Jul-15 39A 250 - - - - 12 12 - - - 9 46.7 - - - - TI-05
201 27-Jul-15 40A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
202 28-Jul-15 41A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
203 28-Jul-15 42A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
204 28-Jul-15 43A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
205 28-Jul-15 44A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
206 28-Jul-15 45A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
207 28-Jul-15 46A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
208 28-Jul-15 47A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
209 28-Jul-15 48A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
210 28-Jul-15 49A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
211 28-Jul-15 50A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
212 28-Jul-15 51A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
213 28-Jul-15 52A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
214 28-Jul-15 53A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
215 28-Jul-15 54A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
216 28-Jul-15 55A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
217 28-Jul-15 56A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
218 28-Jul-15 57A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
219 28-Jul-15 58A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
220 28-Jul-15 59A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
221 28-Jul-15 60A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
222 28-Jul-15 61A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
223 28-Jul-15 62A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
224 28-Jul-15 63A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
225 29-Jul-15 1 64A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
226 29-Jul-15 2 65A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
227 29-Jul-15 3 66A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
228 29-Jul-15 4 67A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
229 29-Jul-15 5 68A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

230 29-Jul-15 6 69A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


231 29-Jul-15 7 70A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
232 29-Jul-15 8 71A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
233 29-Jul-15 9 72A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
234 29-Jul-15 10 73A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
235 29-Jul-15 11 74A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
236 29-Jul-15 12 75A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
237 29-Jul-15 13 76A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
238 29-Jul-15 14 77A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
239 29-Jul-15 15 78A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
240 29-Jul-15 16 79A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
241 29-Jul-15 17 80A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
242 29-Jul-15 18 81A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
243 29-Jul-15 19 82A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
244 29-Jul-15 20 83A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
245 29-Jul-15 21 84A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
246 29-Jul-15 22 85A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
247 30-Jul-15 1 86A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
248 30-Jul-15 2 87A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
249 30-Jul-15 3 88A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
250 30-Jul-15 4 89A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
251 30-Jul-15 5 90A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
252 30-Jul-15 6 91A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
253 30-Jul-15 7 92A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
254 30-Jul-15 8 93A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
255 30-Jul-15 9 94A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
256 30-Jul-15 10 95A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
257 30-Jul-15 11 96A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
258 30-Jul-15 12 97A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
259 30-Jul-15 13 98A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
260 30-Jul-15 14 99A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
261 30-Jul-15 15 100A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
262 30-Jul-15 16 101A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
263 30-Jul-15 17 102A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

264 30-Jul-15 18 103A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


265 30-Jul-15 19 104A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
266 30-Jul-15 20 105A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
267 31-Jul-15 1 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
268 31-Jul-15 2 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
269 31-Jul-15 3 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
270 31-Jul-15 4 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
271 31-Jul-15 5 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
272 31-Jul-15 6 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
273 31-Jul-15 7 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
274 31-Jul-15 8 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
275 31-Jul-15 9 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
276 31-Jul-15 10 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
277 31-Jul-15 11 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
278 31-Jul-15 12 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
279 31-Jul-15 13 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
280 31-Jul-15 14 106A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
281 31-Jul-15 1 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
282 31-Jul-15 2 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
283 31-Jul-15 3 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
284 31-Jul-15 4 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
285 31-Jul-15 5 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
286 31-Jul-15 6 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
287 31-Jul-15 7 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
288 31-Jul-15 8 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
289 31-Jul-15 9 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
290 31-Jul-15 10 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
291 31-Jul-15 11 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
292 31-Jul-15 12 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
293 31-Jul-15 13 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
294 31-Jul-15 14 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
295 31-Jul-15 15 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
296 31-Jul-15 16 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
297 31-Jul-15 17 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

298 31-Jul-15 18 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08


299 31-Jul-15 19 106A 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
300 2-Aug-15 1 181 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
301 2-Aug-15 2 182 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
302 2-Aug-15 3 183 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
303 2-Aug-15 4 184 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
304 2-Aug-15 5 185 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
305 2-Aug-15 6 186 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
306 2-Aug-15 7 187 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
307 2-Aug-15 8 188 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
308 2-Aug-15 9 189 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
309 2-Aug-15 10 190 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
310 2-Aug-15 11 191 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
311 2-Aug-15 12 192 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
312 2-Aug-15 13 193 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
313 2-Aug-15 14 194 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
314 2-Aug-15 15 195 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
315 2-Aug-15 16 196 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
316 2-Aug-15 17 197 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
317 2-Aug-15 18 198 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
318 2-Aug-15 19 199 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
319 2-Aug-15 20 200 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
320 2-Aug-15 21 201 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
321 2-Aug-15 22 202 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
322 2-Aug-15 23 203 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
323 2-Aug-15 24 204 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
324 2-Aug-15 25 205 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
325 2-Aug-15 26 206 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
326 2-Aug-15 27 207 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
327 2-Aug-15 28 208 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
328 2-Aug-15 29 209 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
329 2-Aug-15 30 210 250 - - - - 12 12 - - - 7 36.30 - - - - TI-08
330 2-Aug-15 1 120A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
331 2-Aug-15 2 121A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

332 2-Aug-15 3 122A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


333 2-Aug-15 4 123A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
334 2-Aug-15 5 124A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
335 2-Aug-15 6 125A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
336 2-Aug-15 7 126A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
337 2-Aug-15 8 127A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
338 2-Aug-15 9 128A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
339 2-Aug-15 10 129A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
340 2-Aug-15 11 130A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
341 2-Aug-15 12 131A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
342 2-Aug-15 13 132A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
343 2-Aug-15 14 133A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
344 2-Aug-15 15 134A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
345 2-Aug-15 16 135A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
346 2-Aug-15 17 136A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
347 2-Aug-15 18 137A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
348 2-Aug-15 19 138A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
349 2-Aug-15 20 139A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
350 2-Aug-15 21 140A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
351 2-Aug-15 22 141A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
352 2-Aug-15 23 142A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
353 2-Aug-15 24 143A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
354 2-Aug-15 25 144A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
355 2-Aug-15 26 145A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
356 3-Aug-15 1 146A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
357 3-Aug-15 2 147A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
358 3-Aug-15 3 148A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
359 3-Aug-15 4 149A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
360 3-Aug-15 5 150A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
361 3-Aug-15 6 151A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
362 3-Aug-15 7 152A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
363 3-Aug-15 8 153A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
364 3-Aug-15 9 154A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
365 3-Aug-15 10 155A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

366 3-Aug-15 11 156A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


367 3-Aug-15 12 157A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
368 3-Aug-15 13 158A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
369 3-Aug-15 14 159A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
370 3-Aug-15 15 160A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
371 3-Aug-15 16 161A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
372 3-Aug-15 17 162A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
373 4-Aug-15 1 163A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
374 4-Aug-15 2 164A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
375 4-Aug-15 3 165A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
376 4-Aug-15 4 166A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
377 4-Aug-15 5 167A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
378 4-Aug-15 6 168A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
379 4-Aug-15 7 169A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
380 4-Aug-15 8 170A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
381 4-Aug-15 9 171A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
382 4-Aug-15 10 172A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
383 4-Aug-15 11 173A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
384 4-Aug-15 12 174A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
385 4-Aug-15 13 175A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
386 4-Aug-15 14 176A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
387 4-Aug-15 15 177A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
388 4-Aug-15 16 178A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
389 4-Aug-15 17 179A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
390 5-Aug-15 1 180A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
391 5-Aug-15 2 181A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
392 5-Aug-15 3 182A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
393 5-Aug-15 4 183A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
394 5-Aug-15 5 184A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
395 5-Aug-15 6 185A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
396 5-Aug-15 7 186A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
397 5-Aug-15 8 187A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
398 5-Aug-15 9 188A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
399 5-Aug-15 10 189A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

400 5-Aug-15 11 190A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


401 5-Aug-15 12 191A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
402 5-Aug-15 13 192A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
403 5-Aug-15 14 193A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
404 5-Aug-15 15 194A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
405 5-Aug-15 16 195A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
406 5-Aug-15 17 196A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
407 5-Aug-15 18 197A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
408 5-Aug-15 19 198A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
409 5-Aug-15 20 199A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
410 5-Aug-15 21 200A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
411 5-Aug-15 22 201A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
412 5-Aug-15 23 202A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
413 5-Aug-15 1 211 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
414 5-Aug-15 2 212 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
415 5-Aug-15 3 213 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
416 5-Aug-15 4 214 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
417 5-Aug-15 5 215 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
418 5-Aug-15 6 216 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
419 5-Aug-15 7 217 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
420 5-Aug-15 8 218 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
421 5-Aug-15 9 219 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
422 5-Aug-15 10 220 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
423 5-Aug-15 11 221 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
424 5-Aug-15 12 222 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
425 5-Aug-15 13 223 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
426 5-Aug-15 14 224 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
427 5-Aug-15 15 225 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
428 5-Aug-15 16 226 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
429 6-Aug-15 1 227 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
430 6-Aug-15 2 228 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
431 6-Aug-15 3 229 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
432 6-Aug-15 4 230 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
433 6-Aug-15 5 231 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

434 6-Aug-15 6 232 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21


435 6-Aug-15 7 233 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
436 6-Aug-15 8 234 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
437 6-Aug-15 9 235 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
438 6-Aug-15 10 236 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
439 6-Aug-15 11 237 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
440 6-Aug-15 12 238 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
441 6-Aug-15 13 239 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
442 6-Aug-15 14 240 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
443 6-Aug-15 15 241 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
444 6-Aug-15 16 242 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
445 6-Aug-15 17 243 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
446 6-Aug-15 18 244 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
447 6-Aug-15 19 245 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
448 6-Aug-15 20 246 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
449 6-Aug-15 21 247 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
450 7-Aug-15 1 248 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
451 7-Aug-15 2 249 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
452 7-Aug-15 3 250 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
453 7-Aug-15 4 251 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
454 7-Aug-15 5 252 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
455 7-Aug-15 6 253 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
456 7-Aug-15 7 254 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
457 7-Aug-15 8 255 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
458 7-Aug-15 9 256 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
459 7-Aug-15 10 257 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
460 7-Aug-15 11 258 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
461 7-Aug-15 12 259 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
462 7-Aug-15 13 260 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
463 7-Aug-15 1 203A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
464 7-Aug-15 2 204A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
465 7-Aug-15 3 205A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
466 7-Aug-15 4 206A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
467 7-Aug-15 5 207A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

468 7-Aug-15 6 208A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


469 7-Aug-15 7 209A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
470 7-Aug-15 8 210A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
471 7-Aug-15 9 211A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
472 7-Aug-15 10 212A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
473 7-Aug-15 11 213A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
474 7-Aug-15 12 214A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
475 7-Aug-15 13 215A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
476 7-Aug-15 14 216A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
477 7-Aug-15 15 217A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
478 7-Aug-15 16 218A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
479 7-Aug-15 17 219A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
480 8-Aug-15 1 220A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
481 8-Aug-15 2 221A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
482 8-Aug-15 3 222A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
483 8-Aug-15 4 223A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
484 8-Aug-15 5 224A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
485 8-Aug-15 6 225A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
486 8-Aug-15 7 226A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
487 8-Aug-15 8 227A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
488 8-Aug-15 9 228A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
489 8-Aug-15 10 229A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
490 8-Aug-15 11 230A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
491 8-Aug-15 12 231A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
492 8-Aug-15 13 232A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
493 8-Aug-15 14 233A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
494 8-Aug-15 15 234A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
495 8-Aug-15 16 235A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
496 8-Aug-15 1 261 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
497 8-Aug-15 2 262 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
498 8-Aug-15 3 263 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
499 8-Aug-15 4 264 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
500 8-Aug-15 5 265 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
501 8-Aug-15 6 266 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

502 8-Aug-15 7 267 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21


503 8-Aug-15 8 268 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
504 8-Aug-15 9 269 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
505 8-Aug-15 10 270 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
506 8-Aug-15 11 271 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
507 8-Aug-15 12 272 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
508 8-Aug-15 13 273 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
509 8-Aug-15 14 274 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
510 8-Aug-15 15 275 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
511 8-Aug-15 16 276 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
512 8-Aug-15 17 277 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
513 8-Aug-15 18 278 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
514 8-Aug-15 19 279 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
515 8-Aug-15 20 280 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
516 10-Aug-15 1 281 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
517 10-Aug-15 2 282 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
518 10-Aug-15 3 283 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
519 10-Aug-15 4 284 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
520 10-Aug-15 5 285 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
521 10-Aug-15 6 286 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
522 10-Aug-15 7 287 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
523 10-Aug-15 8 288 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
524 10-Aug-15 9 289 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
525 10-Aug-15 10 290 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
526 10-Aug-15 11 291 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
527 10-Aug-15 12 292 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
528 10-Aug-15 1 236A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
529 10-Aug-15 2 237A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
530 10-Aug-15 3 238A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
531 10-Aug-15 4 239A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
532 10-Aug-15 5 240A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
533 10-Aug-15 6 241A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
534 10-Aug-15 7 242A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
535 10-Aug-15 8 243A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

536 11-Aug-15 1 293 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21


537 11-Aug-15 2 294 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
538 11-Aug-15 3 295 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
539 11-Aug-15 4 296 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
540 11-Aug-15 5 297 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
541 11-Aug-15 6 298 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
542 11-Aug-15 7 299 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
543 11-Aug-15 8 300 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
544 11-Aug-15 9 301 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
545 11-Aug-15 10 302 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
546 11-Aug-15 11 303 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
547 11-Aug-15 12 304 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
548 11-Aug-15 13 305 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
549 11-Aug-15 14 306 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
550 11-Aug-15 15 307 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
551 11-Aug-15 16 308 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
552 12-Aug-15 1 244A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
553 12-Aug-15 2 245A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
554 12-Aug-15 3 246A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
555 12-Aug-15 4 247A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
556 12-Aug-15 5 248A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
557 12-Aug-15 6 249A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
558 12-Aug-15 7 250A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
559 12-Aug-15 8 251A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
560 12-Aug-15 9 252A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
561 12-Aug-15 10 253A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
562 12-Aug-15 11 254A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
563 12-Aug-15 12 255A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
564 12-Aug-15 13 256A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
565 12-Aug-15 14 257A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
566 12-Aug-15 15 258A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
567 12-Aug-15 16 259A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
568 12-Aug-15 17 260A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
569 12-Aug-15 18 261A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

570 12-Aug-15 19 262A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


571 13-Aug-15 1 263A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
572 13-Aug-15 2 264A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
573 13-Aug-15 3 265A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
574 13-Aug-15 4 266A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
575 13-Aug-15 5 267A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
576 13-Aug-15 6 268A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
577 13-Aug-15 7 269A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
578 13-Aug-15 8 270A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
579 13-Aug-15 9 271A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
580 13-Aug-15 10 272A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
581 13-Aug-15 11 273A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
582 13-Aug-15 12 274A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
583 13-Aug-15 13 275A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
584 13-Aug-15 14 276A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
585 13-Aug-15 15 277A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
586 13-Aug-15 16 278A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
587 13-Aug-15 17 279A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
588 13-Aug-15 18 280A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
589 13-Aug-15 19 281A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
590 13-Aug-15 20 282A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
591 13-Aug-15 21 283A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
592 13-Aug-15 22 284A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
593 13-Aug-15 23 285A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
594 13-Aug-15 24 286A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
595 13-Aug-15 25 287A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
596 13-Aug-15 26 288A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
597 13-Aug-15 27 289A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
598 13-Aug-15 28 290A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
599 13-Aug-15 29 291A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
600 13-Aug-15 30 292A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
601 13-Aug-15 31 293A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
602 13-Aug-15 32 294A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
603 14-Aug-15 1 309 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

604 14-Aug-15 2 310 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21


605 14-Aug-15 3 311 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
606 14-Aug-15 4 312 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
607 14-Aug-15 5 313 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
608 14-Aug-15 6 314 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
609 14-Aug-15 7 315 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
610 14-Aug-15 8 316 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
611 14-Aug-15 9 317 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
612 14-Aug-15 10 318 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
613 14-Aug-15 11 319 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
614 14-Aug-15 12 320 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
615 14-Aug-15 13 321 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
616 14-Aug-15 14 322 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
617 14-Aug-15 15 323 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
618 14-Aug-15 16 324 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
619 14-Aug-15 17 325 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
620 14-Aug-15 18 326 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
621 14-Aug-15 19 327 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
622 14-Aug-15 20 328 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
623 15-Aug-15 1 329 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
624 15-Aug-15 2 330 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
625 15-Aug-15 3 331 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
626 15-Aug-15 4 332 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
627 15-Aug-15 5 333 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
628 15-Aug-15 6 334 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
629 15-Aug-15 7 335 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
630 15-Aug-15 8 336 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
631 15-Aug-15 9 337 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
632 15-Aug-15 10 338 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
633 15-Aug-15 11 339 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
634 15-Aug-15 12 340 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
635 15-Aug-15 13 341 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
636 15-Aug-15 14 342 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
637 15-Aug-15 15 343 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

638 15-Aug-15 16 344 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21


639 15-Aug-15 17 345 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
640 15-Aug-15 18 346 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
641 15-Aug-15 19 347 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
642 15-Aug-15 20 348 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
643 15-Aug-15 21 349 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
644 15-Aug-15 22 350 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
645 15-Aug-15 23 351 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
646 15-Aug-15 24 352 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
647 15-Aug-15 25 353 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
648 15-Aug-15 26 354 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
649 15-Aug-15 27 355 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
650 15-Aug-15 28 356 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
651 16-Aug-15 1 295A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
652 16-Aug-15 2 296A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
653 16-Aug-15 3 297A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
654 16-Aug-15 4 298A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
655 16-Aug-15 5 299A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
656 16-Aug-15 6 300A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
657 16-Aug-15 7 301A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
658 16-Aug-15 8 302A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
659 16-Aug-15 9 303A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
660 16-Aug-15 10 304A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
661 16-Aug-15 11 305A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
662 16-Aug-15 12 306A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
663 16-Aug-15 13 307A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
664 16-Aug-15 14 308A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
665 16-Aug-15 15 309A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
666 16-Aug-15 16 310A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
667 16-Aug-15 17 311A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
668 16-Aug-15 18 312A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
669 16-Aug-15 19 313A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
670 16-Aug-15 20 314A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
671 16-Aug-15 21 315A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

672 16-Aug-15 22 316A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05


673 16-Aug-15 23 317A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
674 16-Aug-15 24 318A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
675 16-Aug-15 25 319A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
676 16-Aug-15 26 320A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
677 16-Aug-15 27 321A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
678 18-Aug-15 1 357 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
679 18-Aug-15 2 358 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
680 18-Aug-15 3 359 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
681 18-Aug-15 4 360 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
682 18-Aug-15 5 361 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
683 18-Aug-15 6 362 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
684 18-Aug-15 7 363 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
685 18-Aug-15 8 364 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
686 18-Aug-15 9 365 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
687 18-Aug-15 10 366 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
688 18-Aug-15 11 367 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
689 18-Aug-15 12 368 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
690 18-Aug-15 13 369 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
691 18-Aug-15 14 370 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
692 18-Aug-15 15 371 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
693 18-Aug-15 16 372 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
694 18-Aug-15 17 373 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
695 19-Aug-15 1 322A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
696 19-Aug-15 2 323A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
697 19-Aug-15 3 324A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
698 19-Aug-15 4 325A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
699 19-Aug-15 5 326A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
700 19-Aug-15 6 327A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
701 19-Aug-15 7 328A 250 - - - - 12 12 - - - 10 51.90 - - - - TI-05
702 20-Aug-15 1 374 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
703 20-Aug-15 2 375 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
704 20-Aug-15 3 376 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
705 20-Aug-15 4 377 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

706 20-Aug-15 5 378 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21


707 20-Aug-15 6 379 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
708 20-Aug-15 7 380 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
709 20-Aug-15 8 381 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
710 20-Aug-15 9 382 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
711 20-Aug-15 10 383 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
712 20-Aug-15 11 384 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
713 20-Aug-15 12 385 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
714 20-Aug-15 13 386 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
715 20-Aug-15 14 387 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
716 20-Aug-15 15 388 250 - - - - 12 12 - - - 6 31.10 - - - - TI-21
717 11-Sep-15 329A 250 - - - - 12 12 10 51.90 TI-05
718 11-Sep-15 330A 250 - - - - 12 12 10 51.90 TI-05
719 11-Sep-15 331A 250 - - - - 12 12 10 51.90 TI-05
720 11-Sep-15 332A 250 - - - - 12 12 10 51.90 TI-05
721 11-Sep-15 333A 250 - - - - 12 12 10 51.90 TI-05
722 11-Sep-15 334A 250 - - - - 12 12 10 51.90 TI-05
723 11-Sep-15 335A 250 - - - - 12 12 10 51.90 TI-05
724 11-Sep-15 336A 250 - - - - 12 12 10 51.90 TI-05
725 11-Sep-15 337A 250 - - - - 12 12 10 51.90 TI-05
726 11-Sep-15 338A 250 - - - - 12 12 10 51.90 TI-05
727 11-Sep-15 339A 250 - - - - 12 12 10 51.90 TI-05
728 11-Sep-15 340A 250 - - - - 12 12 10 51.90 TI-05
729 11-Sep-15 341A 250 - - - - 12 12 10 51.90 TI-05
730 11-Sep-15 342A 250 - - - - 12 12 10 51.90 TI-05
731 11-Sep-15 343A 250 - - - - 12 12 10 51.90 TI-05
732 11-Sep-15 344A 250 - - - - 12 12 10 51.90 TI-05
733 12-Sep-15 345A 250 - - - - 12 12 9 22.50 TI-05
734 12-Sep-15 346A 250 - - - - 12 12 10 51.90 TI-05
735 12-Sep-15 347A 250 - - - - 12 12 10 51.90 TI-05
736 12-Sep-15 348A 250 - - - - 12 12 10 51.90 TI-05
737 12-Sep-15 349A 250 - - - - 12 12 10 51.90 TI-05
738 12-Sep-15 350A 250 - - - - 12 12 8 20.00 TI-05
739 12-Sep-15 351A 250 - - - - 12 12 10 51.90 TI-05
PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

740 12-Sep-15 352A 250 - - - - 12 12 9 22.50 TI-05


741 12-Sep-15 353A 250 - - - - 12 12 10 51.90 TI-05
742 12-Sep-15 354A 250 - - - - 12 12 10 51.90 TI-05
743 12-Sep-15 355A 250 - - - - 12 12 10 51.90 TI-05
744 12-Sep-15 356A 250 - - - - 12 12 10 51.90 TI-05
745 12-Sep-15 357A 250 - - - - 12 12 9 22.50 TI-05
746 12-Sep-15 358A 250 - - - - 12 12 10 51.90 TI-05
747 12-Sep-15 359A 250 - - - - 12 12 10 51.90 TI-05
748 12-Sep-15 360A 250 - - - - 12 12 10 51.90 TI-05
749 12-Sep-15 361A 250 - - - - 12 12 10 51.90 TI-05
750 12-Sep-15 362A 250 - - - - 12 12 10 51.90 TI-05
751 12-Sep-15 363A 250 - - - - 12 12 10 51.90 TI-05
752 13-Sep-15 364A 250 - - - - 12 12 10 51.90 TI-05
753 13-Sep-15 365A 250 - - - - 12 12 10 51.9 TI-05
754 13-Sep-15 366A 250 - - - - 12 12 10 51.90 TI-05
755 13-Sep-15 367A 250 - - - - 12 12 9 22.50 TI-05
756 13-Sep-15 368A 250 - - - - 12 12 9 22.50 TI-05
757 13-Sep-15 369A 250 - - - - 12 12 10 51.90 TI-05
758 13-Sep-15 370A 250 - - - - 12 12 10 51.90 TI-05
759 13-Sep-15 371A 250 - - - - 12 12 10 51.90 TI-05
760 13-Sep-15 372A 250 - - - - 12 12 10 51.90 TI-05
761 13-Sep-15 373A 250 - - - - 12 12 10 51.90 TI-05
762 13-Sep-15 374A 250 - - - - 12 12 10 51.90 TI-05
763 13-Sep-15 375A 250 - - - - 12 12 10 51.90 TI-05
764 13-Sep-15 376A 250 - - - - 12 12 10 51.90 TI-05
765 13-Sep-15 377A 250 - - - - 12 12 10 51.90 TI-05
766 13-Sep-15 378A 250 - - - - 12 12 10 51.90 TI-05
767 13-Sep-15 379A 250 - - - - 12 12 10 51.90 TI-05
768 13-Sep-15 380A 250 - - - - 12 12 10 51.90 TI-05
769 13-Sep-15 381A 250 - - - - 12 12 10 51.90 TI-05
770 13-Sep-15 382A 250 - - - - 12 12 10 51.90 TI-05

TOTAL PANCANG BARIER PILE 9240.00 9240.00 0.00 0.00


PILE DATA Final PILING CARASTERISTIC
Axis ID Pile Section Pile Total Pene- Dolly / Potong Unit
oil
pressin
No. Date Pile Cap No. Type Length tration of Ruyung Joint Pile pressur Rig REMARK
1 2 3 4 g force
e
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

ALBERTUS ARDHO DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : PILING WORK

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA


Date : 28 JUL'15 - 23 SEPT'15
TYPE OF MACHINE DRIVING COMMENT/NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (nos) (Mpa) (ton) (code)

1 28-Jul-15 P - 13/1143 Ǿ600 13 13 12 38.00 38.00 - - - 2.00 18.00 406.20 TI - 24


2 28-Jul-15 P - 12/1072 Ǿ600 13 13 12 38.00 38.00 - - - 2.00 15.00 526.90 TI - 24
3 30-Jul-15 P - 10/1663 Ǿ600 13 13 12 38.00 35.00 4.00 - - 2.00 1.00 15.50 544.50 TI - 24
4 5-Aug-15 P - 9/2675 Ǿ600 13 13 12 38.00 36.50 2.00 1.00 14.50 509.30 12.00 TI - 24
5 6-Aug-15 P - 5/2407 Ǿ600 13 13 12 38.00 38.00 2.00 13.00 456.60 12.00 TI - 24
6 7-Aug-15 P - 3/1299 Ǿ600 13 13 12 38.00 38.00 2.00 18.50 417.50 12.00 TI - 24
7 7-Aug-15 P - 2/1286 Ǿ600 13 13 12 38.00 38.00 2.00 19.70 444.60 12.00 TI - 24
8 10-Aug-15 P - 1/2238 Ǿ600 13 13 12 38.00 38.00 2.00 18.20 410.80 12.00 TI - 24
9 11-Aug-15 P - 4/1427 Ǿ600 13 13 12 38.00 38.00 2.00 19.50 440.10 12.00 TI - 24
10 14-Aug-15 P - 11/1042 Ǿ600 13 13 12 38.00 38.00 2.00 19.50 440.10 12.00 TI - 24
11 15-Aug-15 P - 20/2534 Ǿ600 13 13 12 38.00 38.00 2.00 14.80 519.90 12.00 TI - 24
12 16-Aug-15 P - 17/2136 Ǿ600 13 13 12 38.00 38.00 2.00 14.00 440.80 12.00 TI - 24
13 18-Aug-15 V-1 / 1336 Ǿ600 15 15 13 43.00 36.00 2.00 1.00 15.30 537.40 12.00 TI - 24 VWSG
14 19-Aug-15 T-1 / 3059 Ǿ600 13 13 12 38.00 38.00 2.00 14.00 440.80 12.00 TI - 24
15 24-Aug-15 V-2 / 1157 Ǿ600 15 15 13 43.00 40.00 2.00 1.00 14.60 512.90 12.00 TI - 24 VWSG
16 25-Aug-15 V-4 / 658 Ǿ800 16 16 15 47.00 48.00 1.00 2.00 19.00 715.80 12.00 TI - 26 VWSG
17 27-Aug-15 IP-8 / 874 Ǿ800 14 14 14 42.00 42.00 2.00 15.00 565.10 12.00 TI - 26
18 29-Aug-15 IP-7 / 813 Ǿ800 14 14 14 42.00 42.00 2.00 15.00 565.10 12.00 TI - 26 790
19 1-Sep-15 IP-6/525 Ǿ800 14 14 14 42.00 42.00 2.00 15 565.10 12.00 TI - 26
20 3-Sep-15 IP-18/562 Ǿ800 14 14 14 42.00 42.00 2.00 15 565.10 12.00 TI - 26 pengganti IP-18{466)
21 8-Sep-15 V-3/229 Ǿ800 16 16 15 47.00 44.00 2.00 1 21.50 12.00 TI-26 VWSG
22 11-Sep-15 IP-15/390 Ǿ800 14 14 14 42.00 42.00 2.00 20.00 753.50 12.00 TI-26 INDIKATOR
23 13-Sep-15 IP-14/397 Ǿ800 14 14 14 42.00 42.00 2.00 16 602.80 12.00 TI-24 INDIKATOR
24 15-Sep-15 IP-16/69 Ǿ800 14 14 14 42.00 42.00 2.00 18 678.10 12.00 TI-26 INDIKATOR
25 15-Sep-15 IP-19/62 Ǿ800 14 14 14 42.00 42.00 2.00 15 565.10 12.00 TI-26 INDIKATOR
26 23-Sep-15 T-2/3161 Ǿ600 13 13 12 38.00 38.00 2.00 20.50 504.30 12.00 TI-18 INDIKATOR
27 10-Nov-15 2084 Ǿ600 17 15 32.00 32.50 1.00 23.70 421.10 12.00 TI-21A (indikator heaving)
28 25-Nov-15 2058 Ǿ600 15 10 25.00 18.00 1.00 1 23.70 421.10 12.00 TI-21A (indikator heaving)
29 27-Nov-15 2952 Ǿ600 17 17 34.00 31.50 1.00 1 17.50 506.90 12.00 TI-16 main pile(tention)
30 27-Nov-15 3055 Ǿ600 17 17 34.00 34.00 1.00 13.50 391.00 12.00 TI-16 main pile(tention)
31 3-Dec-15 2880 Ǿ600 17 17 34.00 34.00 1.00 14.00 405.50 12.00 TI-16 main pile(tention)

TOTAL PEMANCANGAN INDIKATOR 1207.00 1181.50 4.00 1.00 57.00 7.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

ALBERTUS ARDHO DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 10 - 31 OKT'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 27-Nov-15 TC TATA 3 1 Ǿ600 7 17 24.00 26.00 1.00 16.00 196.80 TI-18 TC TATA
2 27-Nov-15 TC TATA 3 2 Ǿ600 8 17 25.00 26.00 1.00 19.00 233.70 TI-18 TC TATA
3 27-Nov-15 TC TATA 3 3 Ǿ600 8 17 25.00 26.00 1.00 11.00 270.60 TI-18 TC TATA
4 27-Nov-15 TC TATA 3 4 Ǿ600 8 17 25.00 26.00 1.00 19.50 239.80 TI-18 TC TATA
5 3-Dec-15 TC TATA 4 1 Ǿ600 11 17 28.00 15.00 1.00 24.00 426.50 TI-21A potong tiang
6 4-Dec-15 TC TATA 4 2 Ǿ600 9 17 26.00 27.50 1.00 20.00 355.40 TI-21A
7 4-Dec-15 TC TATA 4 3 Ǿ600 8 17 25.00 16.00 1.00 24.00 426.50 TI-21A potong tiang
8 4-Dec-15 TC TATA 4 4 Ǿ600 9 17 26.00 27.50 1.00 15.00 266.60 TI-21A
9 17-Feb-16 TC TATA 2 1 Ǿ600 12 15 27.00 28.00 1.0 14.00 243.60 TI-03
10 17-Feb-16 TC TATA 2 2 Ǿ600 12 15 27.00 28.00 1.0 16.00 278.40 TI-03
11 17-Feb-16 TC TATA 2 3 Ǿ600 15 15 30.00 31.00 1.0 20.00 348.00 TI-03
12 17-Feb-16 TC TATA 2 4 Ǿ600 15 15 30.00 31.00 1.0 19.00 330.60 TI-03
13 11-Apr-16 TC TATA 1 1 Ǿ600 11 15 26.00 27.00 1.00 13.00 319.80 TI-18
14 13-Apr-16 TC TATA 1 2 Ǿ600 11 15 26.00 27.00 1.00 13.00 319.80 TI-18
15 13-Apr-16 TC TATA 1 3 Ǿ600 11 15 26.00 27.00 1.00 20.00 246.00 TI-18
16 13-Apr-16 TC TATA 1 4 Ǿ600 11 15 26.00 27.00 1.00 20.00 246.00 TI-18

TOTAL PEMANCANGAN MAIN PILE 422.00 416.00 0.00 0.00 0.00 16.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

ALBERTUS ARDHO DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 10 Okt 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 28-Jul-15 P - 13/1143 Ǿ600 13 13 12 38.00 38.00 0.00 - - 2.00 18.00 406.20 TI - 24


2 28-Jul-15 P - 12/1072 Ǿ600 13 13 12 38.00 38.00 0.00 - - 2.00 15.00 526.90 TI - 24
3 30-Jul-15 P - 10/1663 Ǿ600 13 13 12 38.00 35.00 -3.00 - - 2.00 1.00 15.50 544.50 TI - 24
4 5-Aug-15 P - 9/2675 Ǿ600 13 13 12 38.00 36.50 -1.50 2.00 1.00 14.50 509.30 12.00 TI - 24
5 6-Aug-15 P - 5/2407 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 13.00 456.60 12.00 TI - 24
6 7-Aug-15 P - 3/1299 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 18.50 417.50 12.00 TI - 24
7 7-Aug-15 P - 2/1286 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.70 444.60 12.00 TI - 24
8 10-Aug-15 P - 1/2238 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 18.20 410.80 12.00 TI - 24
9 11-Aug-15 P - 4/1427 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.50 440.10 12.00 TI - 24
10 14-Aug-15 P - 11/1042 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.50 440.10 12.00 TI - 24
11 15-Aug-15 P - 20/2534 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.80 519.90 12.00 TI - 24
12 16-Aug-15 P - 17/2136 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.00 440.80 12.00 TI - 24
13 18-Aug-15 V-1 / 1336 Ǿ600 15 15 13 43.00 36.00 -7.00 2.00 1.00 15.30 537.40 12.00 TI - 24
14 19-Aug-15 T-1 / 3059 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.00 440.80 12.00 TI - 24
15 24-Aug-15 V-2 / 1157 Ǿ600 15 15 13 43.00 40.00 -3.00 2.00 1.00 14.60 512.90 12.00 TI - 24
16 25-Aug-15 V-4 / 658 Ǿ800 16 16 15 47.00 48.00 1.00 1.00 2.00 19.00 715.80 12.00 TI - 26
17 27-Aug-15 IP-8 / 874 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15.00 565.10 12.00 TI - 26
18 29-Aug-15 IP-7 / 813 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15.00 565.10 12.00 TI - 26
19 1-Sep-15 IP-6/525 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI - 26
20 3-Sep-15 IP-18/562 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI - 26
21 8-Sep-15 V-3/229 Ǿ800 16 16 15 47.00 44.00 -3.00 2.00 1 21.50 12.00 TI-26
22 11-Sep-15 IP-15/390 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 20.00 753.50 12.00 TI-26
23 13-Sep-15 IP-14/397 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 16 602.80 12.00 TI-24
24 15-Sep-15 IP-16/69 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 18 678.10 12.00 TI-26
25 15-Sep-15 IP-19/62 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI-26
26 23-Sep-15 T-2/3161 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 20.50 504.30 12.00 TI-18
27 10-Oct-15 Main Pile 2381 Ǿ600 17 15 32.00 30.50 -1.50 1.00 1 23.00 408.70 12.00 TI-12A
28 10-Oct-15 Main Pile 2382 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 23.00 408.70 12.00 TI-12A
29 12-Oct-15 Main Pile 2342 Ǿ600 17 15 32.00 37.00 5.00 1.00 20.00 355.40 12.00 TI-12A
30 13-Oct-15 Main Pile 2345 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 21.00 373.20 12.00 TI-21A
31 13-Oct-15 Main Pile 2343 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 23.30 421.10 12.00 TI-21A
32 13-Oct-15 Main Pile 2344 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.50 421.10 12.00 TI-21A
33 14-Oct-15 Main Pile 2301 Ǿ600 17 15 32.00 30.50 -1.50 1.00 23.70 421.10 TI-21A
34 14-Oct-15 Main Pile 2302 Ǿ600 17 15 32.00 30.50 -1.50 1.00 23.70 421.10 TI-21A
35 14-Oct-15 Main Pile 2303 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
36 14-Oct-15 Main Pile 2304 Ǿ600 17 15 32.00 30.00 -2.00 1.00 23.50 421.10 TI-21A
37 14-Oct-15 Main Pile 2284 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
38 15-Oct-15 Main Pile 2281 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
39 17-Oct-15 Main Pile 2349 Ǿ600 15 17 32.00 34.30 2.30 1.00 24.20 421.10 TI-03
40 17-Oct-15 Main Pile 2346 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
41 17-Oct-15 Main Pile 2348 Ǿ600 15 17 32.00 34.20 2.20 1.00 24.20 421.10 TI-03
42 17-Oct-15 Main Pile 2347 Ǿ600 15 17 32.00 33.80 1.80 1.00 24.20 421.10 TI-03
43 18-Oct-15 Main Pile 2297 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.50 426.30 TI-03
44 18-Oct-15 Main Pile 2298 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.50 426.30 TI-03
45 18-Oct-15 Main Pile 2299 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 TI-03
46 18-Oct-15 Main Pile 2300 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.20 421.10 TI-03
47 19-Oct-15 Main Pile 2287 Ǿ600 15 17 32.00 30.20 -1.80 1.00 24.20 421.10 12.00 TI-03
48 20-Oct-15 Main Pile 2285 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
49 20-Oct-15 Main Pile 2286 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
50 20-Oct-15 Main Pile 2288 Ǿ600 15 17 32.00 31.10 -0.90 1.00 1 24.20 421.10 12.00 TI-03
51 20-Oct-15 Main Pile 2235 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
52 20-Oct-15 Main Pile 2236 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
53 20-Oct-15 Main Pile 2237 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
54 20-Oct-15 Main Pile 2087 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

55 20-Oct-15 Main Pile 2088 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
56 20-Oct-15 Main Pile 2092 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
57 20-Oct-15 Main Pile 2093 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
58 20-Oct-15 Main Pile 2097 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
59 20-Oct-15 Main Pile 2098 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
60 21-Oct-15 Main Pile 2239 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
61 21-Oct-15 Main Pile 2240 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
62 21-Oct-15 Main Pile 2241 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
63 21-Oct-15 Main Pile 2242 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
64 21-Oct-15 Main Pile 2283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03
65 21-Oct-15 Main Pile 2282 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
66 21-Oct-15 Main Pile 2089 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
67 21-Oct-15 Main Pile 2090 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
68 21-Oct-15 Main Pile 2091 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
69 21-Oct-15 Main Pile 2110 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
70 21-Oct-15 Main Pile 2111 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
71 21-Oct-15 Main Pile 2112 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
72 21-Oct-15 Main Pile 2113 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
73 22-Oct-15 Main Pile 2107 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
74 22-Oct-15 Main Pile 2108 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
75 22-Oct-15 Main Pile 2109 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
76 22-Oct-15 Main Pile 2099 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
77 22-Oct-15 Main Pile 2100 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
78 22-Oct-15 Main Pile 2101 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
79 23-Oct-15 Main Pile 2026 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
80 23-Oct-15 Main Pile 2095 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
81 23-Oct-15 Main Pile 2096 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 23.70 421.10 12.00 TI-21A
82 23-Oct-15 Main Pile 2094 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
83 23-Oct-15 Main Pile 2162 Ǿ600 15 7 17 39.00 28.00 -11.00 2.00 1 23.70 421.10 12.00 TI-21A
84 23-Oct-15 Main Pile 2160 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
85 23-Oct-15 Main Pile 2164 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 23.70 421.10 12.00 TI-21A
86 23-Oct-15 Main Pile 2293 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
87 23-Oct-15 Main Pile 2296 Ǿ600 15 17 32.00 33.50 1.50 1.00 24.20 421.10 12.00 TI-03
88 23-Oct-15 Main Pile 2350 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
89 23-Oct-15 Main Pile 2352 Ǿ600 15 17 32.00 27.30 -4.70 1.00 24.20 421.10 12.00 TI-03
90 23-Oct-15 Main Pile 2353 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
91 24-Oct-15 Main Pile 2163 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
92 24-Oct-15 Main Pile 2161 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
93 24-Oct-15 Main Pile 2102 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
94 24-Oct-15 Main Pile 2105 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
95 24-Oct-15 Main Pile 2104 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A
96 24-Oct-15 Main Pile 2289 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03
97 24-Oct-15 Main Pile 2294 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
98 24-Oct-15 Main Pile 2295 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
99 24-Oct-15 Main Pile 2351 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
100 24-Oct-15 Main Pile 2292 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03
101 25-Oct-15 Main Pile 2103 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
102 25-Oct-15 Main Pile 2106 Ǿ600 15 17 32.00 19.00 -13.00 1.00 1 23.70 421.10 12.00 TI-21A
103 25-Oct-15 Main Pile 2006 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
104 25-Oct-15 Main Pile 2009 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
105 25-Oct-15 Main Pile 2010 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
106 26-Oct-15 Main Pile 2003 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.10 421.10 12.00 TI-21A
107 26-Oct-15 Main Pile 2004 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
108 26-Oct-15 Main Pile 2005 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
109 26-Oct-15 Main Pile 2007 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 23.70 421.10 12.00 TI-21A
110 26-Oct-15 Main Pile 2011 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
111 27-Oct-15 Main Pile 2290 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.20 12.00 TI-03
112 27-Oct-15 Main Pile 2291 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03
113 27-Oct-15 Main Pile 2231 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
114 27-Oct-15 Main Pile 2232 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03
115 27-Oct-15 Main Pile 2233 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
116 27-Oct-15 Main Pile 2234 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

117 27-Oct-15 Main Pile 2008 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
118 27-Oct-15 Main Pile 2012 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
119 28-Oct-15 main pile 2021 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
120 28-Oct-15 main pile 2023 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
121 28-Oct-15 main pile 2022 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
122 28-Oct-15 main pile 2024 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
123 28-Oct-15 main pile 2340 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 421.10 12.00 TI-03
124 28-Oct-15 main pile 2355 Ǿ600 15 17 32.00 35.50 3.50 1.00 24.00 421.10 12.00 TI-03
125 28-Oct-15 main pile 2356 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.00 421.10 12.00 TI-03
126 28-Oct-15 main pile 2357 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.00 421.10 12.00 TI-03
127 29-Oct-15 main pile 2020 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.70 438.90 12.00 TI-21A
128 29-Oct-15 main pile 2025 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
129 29-Oct-15 main pile 2155 Ǿ600 15 17 32.00 16.50 -15.50 1.00 1 24.70 438.90 12.00 TI-21A
130 29-Oct-15 main pile 2152 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
131 29-Oct-15 main pile 2177 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
132 29-Oct-15 main pile 2180 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
133 29-Oct-15 main pile 2338 Ǿ600 15 17 32.00 37.00 5.00 1.00 24.10 421.10 12.00 TI-03
134 29-Oct-15 main pile 2339 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
135 29-Oct-15 main pile 2341 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
136 29-Oct-15 main pile 2379 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
137 29-Oct-15 main pile 2384 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
138 29-Oct-15 main pile 2385 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
139 29-Oct-15 main pile 2387 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
140 29-Oct-15 soldier pile 2380 Ǿ600 15 17 32.00 32.00 0.00 1.00 24..2 421.10 12.00 TI-03
141 30-Oct-15 main pile 2354 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
142 30-Oct-15 main pile 2305 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 42.10 12.00 TI-03
143 30-Oct-15 main pile 2308 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
144 30-Oct-15 main pile 2219 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
145 30-Oct-15 main pile 2220 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
146 30-Oct-15 main pile 2221 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
147 30-Oct-15 main pile 2222 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
148 30-Oct-15 main pile 2153 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
149 30-Oct-15 main pile 2154 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
150 30-Oct-15 main pile 2178 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
151 30-Oct-15 main pile 2179 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
152 30-Oct-15 main pile 1971 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.80 421.90 12.00 TI-26
153 1-Nov-15 main pile 1969 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
154 1-Nov-15 main pile 1970 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
155 1-Nov-15 main pile 1972 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 439.50 12.00 TI-26
156 1-Nov-15 main pile 1973 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
157 1-Nov-15 main pile 1974 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
158 1-Nov-15 main pile 1975 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
159 2-Nov-15 main pile 2156 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
160 2-Nov-15 main pile 2159 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
161 2-Nov-15 main pile 2173 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
162 2-Nov-15 main pile 2176 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
163 2-Nov-15 main pile 2223 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
164 2-Nov-15 main pile 2226 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
165 3-Nov-15 main pile 2127 Ǿ600 15 17 32.00 17.00 -15.00 1.00 1 17.00 439.50 12.00 TI-26
166 3-Nov-15 main pile 2128 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
167 3-Nov-15 main pile 2130 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
168 3-Nov-15 main pile 2132 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.50 439.50 12.00 TI-26
169 3-Nov-15 main pile 2133 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
170 3-Nov-15 main pile 2158 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
171 3-Nov-15 main pile 2174 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
172 3-Nov-15 main pile 2175 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
173 3-Nov-15 main pile 2224 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
174 3-Nov-15 main pile 2225 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A
175 4-Nov-15 main pile 2194 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
176 4-Nov-15 main pile 1967 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
177 4-Nov-15 main pile 1968 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
178 4-Nov-15 main pile 2134 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

179 4-Nov-15 main pile 2131 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
180 4-Nov-15 main pile 2135 Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 17.50 439.50 12.00 TI-26
181 4-Nov-15 main pile 2195 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
182 4-Nov-15 main pile 2197 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
183 4-Nov-15 main pile 2157 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
184 4-Nov-15 main pile 2015 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
185 4-Nov-15 main pile 2016 Ǿ600 15 17 32.00 32.30 0.30 1.00 24.00 426.50 12.00 TI-21A
186 4-Nov-15 main pile 2017 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
187 5-Nov-15 main pile 2129 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
188 5-Nov-15 main pile 2126 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
189 6-Nov-15 main pile 2261 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
190 6-Nov-15 main pile 2262 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
191 6-Nov-15 main pile 2266 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
192 6-Nov-15 main pile 2267 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03
193 6-Nov-15 main pile 2271 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
194 6-Nov-15 Hotel pile 1468 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
195 6-Nov-15 Hotel pile 1469 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
196 6-Nov-15 Hotel pile 1470 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
197 6-Nov-15 Hotel pile 1471 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
198 6-Nov-15 Hotel pile 1472 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 418.20 12.00 TI-18
199 6-Nov-15 Hotel pile 1473 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
200 6-Nov-15 Hotel pile 1474 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.30 425.60 12.00 TI-18
201 6-Nov-15 main pile 1976 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 17.50 439.50 12.00 TI-26
202 6-Nov-15 main pile 1977 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
203 6-Nov-15 main pile 1978 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 439.50 12.00 TI-26
204 6-Nov-15 main pile 2067 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
205 6-Nov-15 main pile 2069 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 439.50 12.00 TI-26
206 6-Nov-15 main pile 2070 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
207 7-Nov-15 main pile 2214 Ǿ600 15 17 32.00 17.50 -14.50 1.00 24.00 426.50 12.00 TI-21A
208 7-Nov-15 main pile 2215 Ǿ600 17 17.00 15.00 -2.00 1.00 24.00 426.50 12.00 TI-21A
209 7-Nov-15 main pile 2217 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
210 7-Nov-15 main pile 2216 Ǿ600 15 17 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A
211 7-Nov-15 main pile 2218 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
212 7-Nov-15 Hotel pile 1475 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
213 7-Nov-15 Hotel pile 1476 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
214 7-Nov-15 Hotel pile 1467 Ǿ600 15 17 32.00 32.00 0.00 1.00 19.40 477.20 12.00 TI-18
215 7-Nov-15 Hotel pile 1466 Ǿ600 15 17 32.00 37.00 5.00 1.00 18.70 460.00 12.00 TI-18
216 7-Nov-15 Hotel pile 1465 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
217 7-Nov-15 Hotel pile 1464 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
218 7-Nov-15 main pile 2068 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
219 7-Nov-15 main pile 2071 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
220 7-Nov-15 main pile 2123 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
221 7-Nov-15 main pile 2124 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
222 7-Nov-15 main pile 2125 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
223 7-Nov-15 main pile 2122 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
224 8-Nov-15 main pile 2147 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
225 8-Nov-15 main pile 2149 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A
226 8-Nov-15 main pile 2150 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A
227 8-Nov-15 main pile 2181 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A
228 8-Nov-15 main pile 2182 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A
229 8-Nov-15 main pile 2183 Ǿ600 15 15.00 14.50 -0.50 1.00 1 24.00 426.50 12.00 TI-21A
230 8-Nov-15 main pile 2184 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
231 8-Nov-15 Hotel pile 1457 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.30 474.80 12.00 TI-18
232 8-Nov-15 Hotel pile 1458 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
233 8-Nov-15 Hotel pile 1459 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
234 8-Nov-15 Hotel pile 1460 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.40 479.70 12.00 TI-18
235 8-Nov-15 Hotel pile 1461 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
236 8-Nov-15 Hotel pile 1462 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
237 8-Nov-15 Hotel pile 1463 Ǿ600 15 17 32.00 33.00 1.00 1.00 19.10 469.90 12.00 TI-18
238 9-Nov-15 main pile 2148 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
239 9-Nov-15 main pile 2151 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
240 9-Nov-15 main pile 2257 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

241 9-Nov-15 main pile 2256 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
242 9-Nov-15 main pile 2252 Ǿ600 17 15 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
243 9-Nov-15 main pile 2253 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
244 9-Nov-15 main pile 2050 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.10 439.50 12.00 TI-26
245 9-Nov-15 main pile 2051 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 439.50 12.00 TI-26
246 9-Nov-15 main pile 2052 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
247 9-Nov-15 main pile 2048 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
248 9-Nov-15 main pile 2049 Ǿ600 15 17 32.00 33.50 1.50 1.00 17.50 439.50 12.00 TI-26
249 9-Nov-15 main pile 2053 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
250 9-Nov-15 main pile 2054 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
251 9-Nov-15 Hotel pile 1454 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.60 482.20 12.00 TI-18
252 9-Nov-15 Hotel pile 1455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
253 9-Nov-15 Hotel pile 1456 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
254 9-Nov-15 Hotel pile 1453 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.90 415.70 12.00 TI-18
255 9-Nov-15 Hotel pile 1452 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 418.20 12.00 TI-18
256 10-Nov-15 main pile 2116 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
257 10-Nov-15 main pile 2117 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
258 10-Nov-15 main pile 2115 Ǿ600 17 15 32.00 32.10 0.10 1.00 23.70 421.10 12.00 TI-21A
259 10-Nov-15 main pile 2114 Ǿ600 17 15 32.00 32.13 0.13 1.00 23.70 421.10 12.00 TI-21A
260 10-Nov-15 main pile 2084 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
261 10-Nov-15 main pile 2085 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
262 10-Nov-15 main pile 2086 Ǿ600 17 15 32.00 24.50 -7.50 1.00 1 24.00 426.50 12.00 TI-21A
263 10-Nov-15 main pile 1979 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
264 10-Nov-15 main pile 1981 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
265 10-Nov-15 main pile 1980 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
266 10-Nov-15 main pile 2066 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
267 10-Nov-15 main pile 2063 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.00 12.00 TI-26
268 10-Nov-15 main pile 2064 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
269 10-Nov-15 Hotel pile 1451 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 430.50 12.00 TI-18
270 10-Nov-15 Hotel pile 1450 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.50 479.70 12.00 TI-18
271 10-Nov-15 Hotel pile 1449 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.70 435.40 12.00 TI-18
272 10-Nov-15 Hotel pile 1441 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.80 437.90 12.00 TI-18
273 10-Nov-15 Hotel pile 1442 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.90 440.30 12.00 TI-18
274 11-Nov-15 main pile 2082 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
275 11-Nov-15 main pile 2083 Ǿ600 15 15.00 15.00 0.00 1.00 24.00 426.50 12.00 TI-21A
276 11-Nov-15 main pile 2019 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.20 421.10 12.00 TI-21A
277 11-Nov-15 main pile 2018 Ǿ600 17 15 32.00 28.00 -4.00 1.00 23.70 421.10 12.00 TI-21A
278 11-Nov-15 main pile 2014 Ǿ600 17 15 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A
279 11-Nov-15 main pile 2062 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
280 11-Nov-15 main pile 2139 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
281 11-Nov-15 main pile 2138 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
282 11-Nov-15 main pile 2137 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
283 11-Nov-15 main pile 2140 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
284 11-Nov-15 Hotel pile 1443 Ǿ600 15 17 32.00 33.00 1.00 1.00 20.30 499.40 12.00 TI-18
285 11-Nov-15 Hotel pile 1444 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
286 11-Nov-15 Hotel pile 1445 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.90 489.50 12.00 TI-18
287 11-Nov-15 Hotel pile 1446 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 12.00 TI-18
288 11-Nov-15 Hotel pile 1447 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
289 12-Nov-15 main pile 2013 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 24.00 426.50 12.00 TI-21A
290 12-Nov-15 main pile 1994 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 23.70 421.10 12.00 TI-21A
291 12-Nov-15 main pile 1996 Ǿ600 15 17 32.00 29.30 -2.70 1.00 1 23.70 421.10 12.00 TI-21A
292 12-Nov-15 main pile 1995 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
293 12-Nov-15 main pile 1999 Ǿ600 15 17 32.00 22.50 -9.50 1.00 1 24.00 426.50 12.00 TI-21A
294 12-Nov-15 main pile 2141 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
295 12-Nov-15 main pile 2193 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.00 12.00 TI-26
296 12-Nov-15 main pile 2190 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
297 12-Nov-15 main pile 2192 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
298 12-Nov-15 main pile 2191 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
299 12-Nov-15 main pile 2119 Ǿ600 17 15 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
300 12-Nov-15 main pile 2118 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
301 13-Nov-15 main pile 1998 Ǿ600 17 15 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A
302 13-Nov-15 main pile 1997 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

303 13-Nov-15 main pile 2000 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
304 13-Nov-15 main pile 2001 Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A
305 13-Nov-15 main pile 2002 Ǿ600 15 17 32.00 23.50 -8.50 1.00 24.00 426.50 12.00 TI-21A
306 13-Nov-15 main pile 1992 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A
307 13-Nov-15 main pile 1991 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A
308 13-Nov-15 Hotel pile 1408 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
309 13-Nov-15 Hotel pile 1409 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
310 13-Nov-15 Hotel pile 1407 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
311 13-Nov-15 Hotel pile 1406 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.70 489.50 12.00 TI-18
312 13-Nov-15 Hotel pile 1405 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 12.00 TI-18
313 13-Nov-15 Hotel pile 1404 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 489.50 12.00 TI-18
314 13-Nov-15 Hotel pile 1428 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
315 13-Nov-15 Hotel pile 1426 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.70 12.00 TI-18
316 13-Nov-15 Hotel pile 1425 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
317 13-Nov-15 Hotel pile 1429 Ǿ600 15 17 32.00 27.00 -5.00 1.00 20.60 506.40 12.00 TI-18
318 13-Nov-15 main pile 2146 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
319 13-Nov-15 main pile 2143 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
320 13-Nov-15 main pile 2144 Ǿ600 15 17 32.00 15.00 -17.00 1.00 17.50 439.50 12.00 TI-26
321 13-Nov-15 main pile 2145 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
322 13-Nov-15 main pile 2142 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
323 13-Nov-15 main pile 2120 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
324 13-Nov-15 main pile 2121 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
325 13-Nov-15 Hotel pile 1279 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16
326 13-Nov-15 Hotel pile 1278 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.50 506.90 12.00 TI-16
327 13-Nov-15 Hotel pile 1277 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
328 13-Nov-15 Hotel pile 1276 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
329 13-Nov-15 Hotel pile 1275 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
330 13-Nov-15 Hotel pile 1274 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16
331 14-Nov-15 main pile 1993 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A
332 14-Nov-15 main pile 1989 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.00 426.50 12.00 TI-21A
333 14-Nov-15 main pile 1990 Ǿ600 17 17.00 15.00 -2.00 1.00 1 24.00 426.00 12.00 TI-21A
334 14-Nov-15 main pile 1988 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
335 14-Nov-15 main pile 1985 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
336 14-Nov-15 main pile 1986 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A
337 14-Nov-15 main pile 1987 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
338 14-Nov-15 Hotel pile 1431 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.90 489.50 12.00 TI-18
339 14-Nov-15 Hotel pile 1430 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
340 14-Nov-15 Hotel pile 1432 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.30 499.40 12.00 TI-18
341 14-Nov-15 Hotel pile 1433 Ǿ600 15 17 32.00 31.00 -1.00 1.00 20.80 511.70 12.00 TI-18
342 14-Nov-15 main pile 2185 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
343 14-Nov-15 main pile 2186 Ǿ600 15 17 32.00 29.00 -3.00 1.00 17.50 439.50 12.00 TI-26
344 14-Nov-15 main pile 2189 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
345 14-Nov-15 main pile 2187 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
346 14-Nov-15 main pile 2188 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
347 14-Nov-15 Hotel pile 1273 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
348 14-Nov-15 Hotel pile 1272 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
349 14-Nov-15 Hotel pile 1271 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
350 14-Nov-15 Hotel pile 1288 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
351 14-Nov-15 Hotel pile 1287 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
352 14-Nov-15 main pile 2250 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
353 14-Nov-15 main pile 2249 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.30 12.00 TI-03
354 14-Nov-15 main pile 2248 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
355 14-Nov-15 main pile 2247 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
356 14-Nov-15 main pile 2251 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
357 14-Nov-15 main pile 2254 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
358 16-Nov-15 Hotel pile 1285 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
359 16-Nov-15 Hotel pile 1284 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.50 506.90 12.00 TI-16
360 16-Nov-15 Hotel pile 1283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16
361 16-Nov-15 Hotel pile 1282 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 12.50 362.10 12.00 TI-16
362 16-Nov-15 main pile 2255 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03
363 16-Nov-15 main pile 2260 Ǿ600 15 17 32.00 33.00 1.00 1.00 1 24.20 421.10 12.00 TI-03
364 16-Nov-15 main pile 2259 Ǿ600 15 17 32.00 20.00 -12.00 1.00 24.50 426.30 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

365 17-Nov-15 Hotel pile 1281 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
366 17-Nov-15 Hotel pile 1280 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
367 17-Nov-15 main pile 2258 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 25.50 426.30 12.00 TI-03
368 17-Nov-15 main pile 2209 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
369 17-Nov-15 main pile 2211 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
370 17-Nov-15 main pile 2212 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
371 17-Nov-15 main pile 2213 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
372 17-Nov-15 main pile 1984 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
373 17-Nov-15 main pile 1982 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
374 17-Nov-15 main pile 1983 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
375 17-Nov-15 main pile 2035 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
376 17-Nov-15 main pile 2036 Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 24.00 426.50 12.00 TI-21A
377 17-Nov-15 main pile 2034 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.00 426.50 12.00 TI-21A
378 17-Nov-15 main pile 2037 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A
379 18-Nov-15 main pile 2265 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
380 18-Nov-15 main pile 2264 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
381 18-Nov-15 main pile 2263 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
382 18-Nov-15 main pile 2269 Ǿ600 15 17 32.00 19.50 -12.50 1.00 24.20 421.00 12.00 TI-03
383 18-Nov-15 main pile 2530 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
384 19-Nov-15 main pile 2536 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
385 19-Nov-15 main pile 2535 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
386 19-Nov-15 main pile 2531 Ǿ600 15 17 32.00 38.00 6.00 1.00 18.00 319.80 12.00 TI-07
387 19-Nov-15 main pile 2038 Ǿ600 17 17.00 15.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A
388 19-Nov-15 main pile 2040 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 24.00 426.50 12.00 TI-21A
389 19-Nov-15 main pile 2039 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
390 20-Nov-15 main pile 2032 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
391 20-Nov-15 main pile 2027 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
392 20-Nov-15 main pile 2030 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
393 20-Nov-15 main pile 2033 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
394 20-Nov-15 main pile 2529 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
395 20-Nov-15 main pile 2528 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
396 20-Nov-15 main pile 2522 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
397 20-Nov-15 main pile 2523 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
398 20-Nov-15 main pile 2524 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
399 20-Nov-15 main pile 2526 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
400 21-Nov-15 main pile 2525 Ǿ600 15 15 30.00 38.00 8.00 1.00 14.00 248.70 12.00 TI-07
401 21-Nov-15 main pile 2533 Ǿ600 15 15 30.00 35.80 5.80 1.00 23.70 420.00 12.00 TI-07
402 21-Nov-15 main pile 2532 Ǿ600 15 17 32.00 23.00 -9.00 1.00 23.70 420.00 12.00 TI-07
403 21-Nov-15 main pile 2527 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
404 21-Nov-15 main pile 2045 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
405 21-Nov-15 main pile 2041 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A
406 21-Nov-15 main pile 2046 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
407 21-Nov-15 main pile 2044 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
408 21-Nov-15 main pile 2031 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
409 22-Nov-15 main pile 2042 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A
410 22-Nov-15 main pile 2047 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.00 426.50 12.00 TI-21A
411 22-Nov-15 main pile 2043 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
412 22-Nov-15 main pile 2028 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
413 22-Nov-15 main pile 2029 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
414 23-Nov-15 main pile 2272 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03
415 23-Nov-15 main pile 2275 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
416 23-Nov-15 main pile 2274 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03
417 23-Nov-15 main pile 2273 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
418 23-Nov-15 main pile 2268 Ǿ600 15 17 32.00 23.00 -9.00 1.00 1 24.20 421.10 12.00 TI-03
419 23-Nov-15 main pile 2270 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
420 23-Nov-15 Hotel pile 1297 Ǿ600 15 17 32.00 32.50 0.50 1.00 16.50 477.90 12.00 TI-16
421 23-Nov-15 Hotel pile 1296 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
422 23-Nov-15 Hotel pile 1295 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
423 23-Nov-15 Hotel pile 1294 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
424 23-Nov-15 Hotel pile 1293 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
425 23-Nov-15 Hotel pile 1292 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
426 23-Nov-15 Hotel pile 1291 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

427 23-Nov-15 Hotel pile 1290 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
428 23-Nov-15 Hotel pile 1448 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 474.90 12.00 TI-18
429 23-Nov-15 Hotel pile 1435 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
430 23-Nov-15 Hotel pile 1434 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
431 23-Nov-15 Hotel pile 1436 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
432 23-Nov-15 Hotel pile 1437 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
433 23-Nov-15 Hotel pile 1438 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
434 23-Nov-15 Hotel pile 1440 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
435 24-Nov-15 Hotel pile 1289 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
436 24-Nov-15 Hotel pile 1306 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
437 24-Nov-15 Hotel pile 1305 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
438 24-Nov-15 Hotel pile 1304 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
439 24-Nov-15 Hotel pile 1303 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
440 24-Nov-15 Hotel pile 1302 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
441 24-Nov-15 Hotel pile 1301 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
442 24-Nov-15 Hotel pile 1398 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 20.70 509.20 12.00 TI-18
443 24-Nov-15 Hotel pile 1399 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.80 487.10 12.00 TI-18
444 24-Nov-15 Hotel pile 1400 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 12.00 TI-18
445 24-Nov-15 Hotel pile 1401 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
446 24-Nov-15 Hotel pile 1402 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
447 24-Nov-15 main pile 2518 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
448 24-Nov-15 main pile 2517 Ǿ600 17 15 32.00 36.70 4.70 1.00 23.70 426.00 12.00 TI-07
449 24-Nov-15 main pile 2515 Ǿ600 17 15 32.00 37.80 5.80 1.00 23.70 420.00 12.00 TI-07
450 24-Nov-15 main pile 2516 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
451 24-Nov-15 main pile 2519 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
452 24-Nov-15 main pile 2076 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
453 24-Nov-15 main pile 2074 Ǿ600 17 15 32.00 17.00 -15.00 1.00 1 24.00 426.50 12.00 TI-21A
454 24-Nov-15 main pile 2072 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
455 24-Nov-15 main pile 2073 Ǿ600 17 15 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
456 24-Nov-15 main pile 2075 Ǿ600 17 15 32.00 16.20 -15.80 1.00 1 24.00 426.50 12.00 TI-21A
457 25-Nov-15 Hotel pile 1300 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.50 477.90 12.00 TI-16
458 25-Nov-15 Hotel pile 1298 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 506.90 12.00 TI-16
459 25-Nov-15 Hotel pile 1315 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
460 25-Nov-15 Hotel pile 1314 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
461 25-Nov-15 Hotel pile 1313 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
462 25-Nov-15 Hotel pile 1312 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
463 25-Nov-15 Hotel pile 1311 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
464 25-Nov-15 Hotel pile 1403 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 430.50 12.00 TI-18
465 25-Nov-15 Hotel pile 1439 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.70 435.40 12.00 TI-18
466 25-Nov-15 Hotel pile 1420 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.10 469.90 12.00 TI-18
467 25-Nov-15 Hotel pile 1421 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
468 25-Nov-15 Hotel pile 1422 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
469 25-Nov-15 main pile 2520 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.00 284.00 12.00 TI-07
470 25-Nov-15 main pile 2521 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 23.70 420.00 12.00 TI-07
471 25-Nov-15 main pile 2505 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
472 25-Nov-15 main pile 2506 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
473 25-Nov-15 main pile 2504 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
474 25-Nov-15 main pile 2503 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
475 25-Nov-15 main pile 2058 Ǿ600 15 10 25.00 18.00 -7.00 1.00 1 23.70 421.10 12.00 TI-21A
476 25-Nov-15 main pile 2055 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
477 25-Nov-15 main pile 2057 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
478 25-Nov-15 main pile 2061 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
479 25-Nov-15 main pile 2059 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
480 25-Nov-15 main pile 2060 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A
481 25-Nov-15 main pile 2278 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
482 25-Nov-15 main pile 2279 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.20 421.10 12.00 TI-03
483 25-Nov-15 main pile 2307 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
484 25-Nov-15 main pile 2309 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
485 25-Nov-15 main pile 2306 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
486 25-Nov-15 main pile 2277 Ǿ600 15 17 32.00 27.00 -5.00 1.00 24.20 421.10 12.00 TI-03
487 25-Nov-15 main pile 2245 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
488 25-Nov-15 main pile 2244 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

489 25-Nov-15 main pile 2243 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
490 25-Nov-15 main pile 2246 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
491 25-Nov-15 main pile 2276 Ǿ600 15 17 32.00 28.00 -4.00 1.00 24.20 421.10 12.00 TI-03
492 25-Nov-15 main pile 2280 Ǿ600 15 17 32.00 19.00 -13.00 1.00 24.20 421.10 12.00 TI-03
493 26-Nov-15 Hotel pile 1310 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
494 26-Nov-15 Hotel pile 1309 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
495 26-Nov-15 Hotel pile 1308 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
496 26-Nov-15 Hotel pile 1307 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
497 26-Nov-15 Hotel pile 1324 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
498 26-Nov-15 Hotel pile 1323 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
499 26-Nov-15 Hotel pile 1322 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
500 26-Nov-15 Hotel pile 1419 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.30 499.40 12.00 TI-18
501 26-Nov-15 Hotel pile 1397 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
502 26-Nov-15 Hotel pile 1396 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.20 49.6.9 12.00 TI-18
503 26-Nov-15 Hotel pile 1395 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 12.00 TI-18
504 26-Nov-15 Hotel pile 1394 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.00 492.00 12.00 TI-18
505 26-Nov-15 Hotel pile 1393 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506,8 12.00 TI-18
506 26-Nov-15 Hotel pile 1392 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
507 26-Nov-15 Hotel pile 1424 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
508 26-Nov-15 Hotel pile 1423 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
509 26-Nov-15 main pile 2509 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
510 26-Nov-15 main pile 2510 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
511 26-Nov-15 main pile 2513 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
512 26-Nov-15 main pile 2514 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
513 26-Nov-15 main pile 2508 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
514 26-Nov-15 main pile 2056 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.00 426.50 12.00 TI-21A
515 26-Nov-15 main pile 2077 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
516 26-Nov-15 main pile 2078 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
517 26-Nov-15 main pile 2079 Ǿ600 15 17 32.00 32.35 0.35 1.00 23.70 421.10 12.00 TI-21A
518 26-Nov-15 main pile 2080 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
519 26-Nov-15 main pile 2081 Ǿ600 15 17 32.00 32.40 0.40 1.00 23.70 421.10 12.00 TI-21A
520 26-Nov-15 main pile 2065 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
521 27-Nov-15 Hotel pile 1417 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
522 27-Nov-15 Hotel pile 1418 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
523 27-Nov-15 Hotel pile 1416 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
524 27-Nov-15 Hotel pile 1415 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
525 27-Nov-15 main pile 2196 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
526 27-Nov-15 main pile 2198 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
527 27-Nov-15 main pile 2210 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
528 27-Nov-15 main pile 2205 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
529 27-Nov-15 main pile 2204 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
530 27-Nov-15 main pile 2200 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
531 27-Nov-15 main pile 2199 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
532 27-Nov-15 main pile 2207 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
533 27-Nov-15 main pile 2310 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421,1 12.00 TI-03
534 27-Nov-15 main pile 2333 Ǿ600 17 15 32.00 33.00 1.00 1.00 24,2 421.10 12.00 TI-03
535 27-Nov-15 main pile 2336 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
536 27-Nov-15 main pile 2335 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
537 27-Nov-15 main pile 2337 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
538 27-Nov-15 main pile 2334 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
539 27-Nov-15 main pile 2314 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03
540 27-Nov-15 main pile 2311 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
541 27-Nov-15 main pile 2952 Ǿ600 17 17 34.00 31.50 -2.50 1.00 1 17.50 506.90 12.00 TI-16
542 27-Nov-15 main pile 3055 Ǿ600 17 17 34.00 34.00 0.00 1.00 13.50 391.00 12.00 TI-16
543 27-Nov-15 main pile 2507 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
544 27-Nov-15 main pile 2512 Ǿ600 15 17 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
545 27-Nov-15 main pile 2511 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
546 27-Nov-15 main pile 2492 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
547 27-Nov-15 main pile 2493 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
548 28-Nov-15 Hotel pile 1316 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
549 28-Nov-15 Hotel pile 1317 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
550 28-Nov-15 Hotel pile 1318 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

551 28-Nov-15 Hotel pile 1319 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
552 28-Nov-15 Hotel pile 1385 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
553 28-Nov-15 Hotel pile 1384 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
554 28-Nov-15 Hotel pile 1383 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
555 28-Nov-15 Hotel pile 1382 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
556 28-Nov-15 Hotel pile 1381 Ǿ600 5 17 22.00 35.00 13.00 1.00 17.00 418.20 12.00 TI-18
557 28-Nov-15 main pile 2494 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
558 28-Nov-15 main pile 2489 Ǿ600 15 17 32.00 37.40 5.40 1.00 23.70 420.00 12.00 TI-07
559 28-Nov-15 main pile 2498 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
560 28-Nov-15 main pile 2497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
561 28-Nov-15 main pile 2502 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
562 28-Nov-15 main pile 2501 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
563 28-Nov-15 main pile 2312 Ǿ600 15 15 30.00 34.00 4.00 1.00 24.20 421.10 12.00 TI-03
564 28-Nov-15 main pile 2313 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
565 28-Nov-15 main pile 2330 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
566 28-Nov-15 main pile 2331 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
567 28-Nov-15 main pile 2362 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
568 28-Nov-15 main pile 2359 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
569 29-Nov-15 Hotel pile 1320 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
570 29-Nov-15 Hotel pile 1321 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
571 29-Nov-15 Hotel pile 1333 Ǿ600 15 17 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
572 29-Nov-15 Hotel pile 1332 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
573 29-Nov-15 Hotel pile 1331 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.00 463.40 12.00 TI-16
574 29-Nov-15 main pile 2491 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
575 29-Nov-15 main pile 2495 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
576 29-Nov-15 main pile 2496 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
577 29-Nov-15 main pile 2499 Ǿ600 17 15 32.00 37.00 5.00 1.00 21.00 373.10 12.00 TI-07
578 29-Nov-15 main pile 2500 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
579 30-Nov-15 Hotel pile 1330 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
580 30-Nov-15 Hotel pile 1329 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
581 30-Nov-15 Hotel pile 1328 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
582 30-Nov-15 Hotel pile 1327 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
583 30-Nov-15 Hotel pile 1326 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
584 30-Nov-15 Hotel pile 1325 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
585 30-Nov-15 main pile 2490 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
586 30-Nov-15 main pile 2483 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
587 30-Nov-15 main pile 2482 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
588 30-Nov-15 main pile 2488 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
589 30-Nov-15 main pile 2487 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
590 30-Nov-15 main pile 2203 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
591 30-Nov-15 main pile 2208 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
592 30-Nov-15 main pile 2206 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
593 30-Nov-15 main pile 2201 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
594 30-Nov-15 main pile 2202 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
595 30-Nov-15 Hotel pile 1412 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.60 482.20 12.00 TI-18
596 30-Nov-15 Hotel pile 1411 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
597 30-Nov-15 Hotel pile 1410 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
598 30-Nov-15 Hotel pile 1380 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
599 30-Nov-15 Hotel pile 1414 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
600 30-Nov-15 main pile 2317 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
601 30-Nov-15 main pile 2360 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
602 30-Nov-15 main pile 2361 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
603 30-Nov-15 main pile 2358 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
604 30-Nov-15 main pile 2332 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
605 30-Nov-15 main pile 2318 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
606 30-Nov-15 main pile 2315 Ǿ600 15 17 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
607 30-Nov-15 main pile 2329 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
608 30-Nov-15 main pile 2316 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
609 1-Dec-15 Hotel pile 1262 Ǿ600 17 15 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
610 1-Dec-15 Hotel pile 1263 Ǿ600 17 15 32.00 31.00 -1.00 1.00 15.50 448.90 12.00 TI-16
611 1-Dec-15 Hotel pile 1264 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
612 1-Dec-15 Hotel pile 1265 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

613 1-Dec-15 Hotel pile 1266 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
614 1-Dec-15 Hotel pile 1267 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
615 1-Dec-15 main pile 2486 Ǿ600 17 17 34.00 37.50 3.50 1.00 23.70 420.00 12.00 TI-07
616 1-Dec-15 main pile 2481 Ǿ600 17 17 34.00 29.00 -5.00 1.00 23.70 420.00 12.00 TI-07
617 1-Dec-15 main pile 2480 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
618 1-Dec-15 main pile 2479 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
619 1-Dec-15 main pile 2485 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
620 1-Dec-15 main pile 2484 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
621 1-Dec-15 main pile 2172 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
622 1-Dec-15 main pile 2171 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
623 1-Dec-15 main pile 2170 Ǿ600 15 17 32.00 30.00 -2.00 1.00 24.00 426.50 12.00 TI-21A
624 1-Dec-15 main pile 2169 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
625 1-Dec-15 main pile 2227 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
626 1-Dec-15 main pile 2230 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
627 1-Dec-15 main pile 2229 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
628 1-Dec-15 Hotel pile 1413 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.50 479.70 12.00 TI-18
629 1-Dec-15 Hotel pile 1391 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
630 1-Dec-15 Hotel pile 1390 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
631 1-Dec-15 Hotel pile 1389 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
632 1-Dec-15 Hotel pile 1388 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
633 1-Dec-15 Hotel pile 1387 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
634 1-Dec-15 Hotel pile 1386 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
635 1-Dec-15 main pile 2325 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
636 1-Dec-15 main pile 2328 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
637 1-Dec-15 main pile 2364 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
638 1-Dec-15 main pile 2367 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
639 2-Dec-15 Hotel pile 1379 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
640 2-Dec-15 Hotel pile 1378 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.40 477.20 12.00 TI-18
641 2-Dec-15 Hotel pile 1377 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
642 2-Dec-15 Hotel pile 1376 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
643 2-Dec-15 Hotel pile 1375 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.70 484.60 12.00 TI-18
644 2-Dec-15 Hotel pile 1374 Ǿ600 17 15 32.00 36.00 4.00 1.00 19.50 479.70 12.00 TI-18
645 2-Dec-15 Hotel pile 1367 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
646 2-Dec-15 Hotel pile 1366 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
647 2-Dec-15 Hotel pile 1268 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
648 2-Dec-15 Hotel pile 1269 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16
649 2-Dec-15 Hotel pile 1270 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
650 2-Dec-15 main pile 2319 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
651 2-Dec-15 main pile 2321 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
652 2-Dec-15 main pile 2320 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
653 2-Dec-15 main pile 2323 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
654 3-Dec-15 main pile 2166 Ǿ600 17 17.00 14.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
655 3-Dec-15 main pile 2167 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A
656 3-Dec-15 main pile 2165 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A
657 3-Dec-15 main pile 2168 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
658 3-Dec-15 main pile 2478 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
659 3-Dec-15 main pile 2477 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
660 3-Dec-15 main pile 2476 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
661 3-Dec-15 main pile 2474 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
662 3-Dec-15 main pile 2475 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
663 3-Dec-15 main pile 2473 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
664 3-Dec-15 main pile 2880 Ǿ600 17 17 34.00 34.00 0.00 1.00 14.00 405.50 12.00 TI-16
665 3-Dec-15 main pile 2365 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
666 3-Dec-15 main pile 2366 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
667 3-Dec-15 main pile 2363 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
668 3-Dec-15 main pile 2326 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
669 3-Dec-15 main pile 2327 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
670 3-Dec-15 main pile 2324 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
671 3-Dec-15 main pile 2322 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
672 4-Dec-15 main pile 2979 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
673 4-Dec-15 main pile 2978 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
674 4-Dec-15 main pile 2228 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

675 4-Dec-15 Hotel pile 1365 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
676 4-Dec-15 main pile 2472 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
677 4-Dec-15 main pile 2471 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
678 4-Dec-15 main pile 2470 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
679 4-Dec-15 main pile 2469 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
680 4-Dec-15 main pile 2468 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
681 4-Dec-15 main pile 2467 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
682 4-Dec-15 main pile 2701 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
683 4-Dec-15 main pile 2700 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
684 4-Dec-15 main pile 2698 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
685 4-Dec-15 main pile 2699 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16
686 4-Dec-15 main pile 2702 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 15.50 448.90 12.00 TI-16
687 4-Dec-15 main pile 2703 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
688 4-Dec-15 main pile 2370 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
689 4-Dec-15 main pile 2368 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
690 4-Dec-15 main pile 2369 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
691 4-Dec-15 main pile 2371 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
692 4-Dec-15 main pile 2372 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
693 5-Dec-15 main pile 2704 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
694 5-Dec-15 main pile 2705 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
695 5-Dec-15 main pile 2694 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
696 5-Dec-15 main pile 2693 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
697 5-Dec-15 main pile 2691 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
698 5-Dec-15 main pile 2692 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
699 5-Dec-15 main pile 2464 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
700 5-Dec-15 main pile 2463 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
701 5-Dec-15 main pile 2465 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
702 5-Dec-15 main pile 2466 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
703 5-Dec-15 main pile 2459 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
704 6-Dec-15 Hotel pile 1364 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 413.70 12.00 TI-18
705 6-Dec-15 Hotel pile 1363 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.60 482.20 12.00 TI-18
706 6-Dec-15 Hotel pile 1372 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.10 494.50 12.00 TI-18
707 7-Dec-15 main pile 2458 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
708 7-Dec-15 main pile 2460 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
709 7-Dec-15 main pile 2462 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
710 7-Dec-15 main pile 2461 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
711 7-Dec-15 main pile 2448 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
712 7-Dec-15 Hotel pile 1352 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.00 467.40 12.00 TI-18
713 7-Dec-15 Hotel pile 1353 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
714 7-Dec-15 Hotel pile 1354 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
715 7-Dec-15 Hotel pile 1371 Ǿ600 17 15 32.00 29.00 -3.00 1.00 19.10 469.90 12.00 TI-18
716 7-Dec-15 Hotel pile 1373 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.70 489.50 12.00 TI-18
717 8-Dec-15 main pile 2447 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
718 8-Dec-15 main pile 2450 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
719 8-Dec-15 main pile 2451 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
720 8-Dec-15 main pile 2449 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
721 8-Dec-15 main pile 2689 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
722 8-Dec-15 main pile 2690 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
723 8-Dec-15 main pile 2687 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
724 8-Dec-15 main pile 2688 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
725 8-Dec-15 main pile 2682 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
726 8-Dec-15 main pile 2683 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16
727 8-Dec-15 main pile 2684 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
728 8-Dec-15 main pile 2685 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
729 8-Dec-15 main pile 2686 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
730 8-Dec-15 Hotel pile 1355 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.20 472.30 12.00 TI-18
731 8-Dec-15 Hotel pile 1356 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.30 499.40 12.00 TI-18
732 8-Dec-15 Hotel pile 1357 Ǿ600 17 15 32.00 21.00 -11.00 1.00 1 20.00 246.00 12.00 TI-18
733 8-Dec-15 main pile 2378 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
734 8-Dec-15 main pile 2377 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
735 8-Dec-15 main pile 2376 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
736 8-Dec-15 main pile 2374 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

737 8-Dec-15 main pile 2373 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
738 10-Dec-15 main pile 2375 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
739 10-Dec-15 main pile 2392 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
740 10-Dec-15 main pile 2391 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
741 10-Dec-15 main pile 2397 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
742 10-Dec-15 main pile 2396 Ǿ600 17 15 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
743 10-Dec-15 main pile 2393 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
744 10-Dec-15 main pile 2394 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
745 10-Dec-15 main pile 2395 Ǿ600 17 15 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03
746 10-Dec-15 main pile 2577 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
747 10-Dec-15 main pile 2578 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
748 10-Dec-15 main pile 2582 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
749 10-Dec-15 main pile 2579 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
750 10-Dec-15 main pile 2576 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
751 10-Dec-15 main pile 2580 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
752 10-Dec-15 main pile 2581 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
753 10-Dec-15 main pile 2583 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
754 10-Dec-15 main pile 2651 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
755 10-Dec-15 main pile 2650 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
756 10-Dec-15 main pile 2649 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
757 10-Dec-15 main pile 2648 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
758 10-Dec-15 main pile 2647 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
759 10-Dec-15 main pile 2644 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
760 10-Dec-15 main pile 2643 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
761 10-Dec-15 main pile 2645 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
762 10-Dec-15 main pile 2646 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
763 11-Dec-15 main pile 2584 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
764 11-Dec-15 main pile 2585 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
765 11-Dec-15 main pile 2586 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
766 11-Dec-15 main pile 2587 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
767 11-Dec-15 main pile 2588 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
768 11-Dec-15 main pile 2636 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
769 11-Dec-15 main pile 2635 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
770 11-Dec-15 main pile 2638 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
771 11-Dec-15 main pile 2642 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
772 11-Dec-15 main pile 2641 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
773 11-Dec-15 main pile 2640 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
774 11-Dec-15 main pile 2639 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
775 11-Dec-15 main pile 2652 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
776 11-Dec-15 main pile 2653 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
777 11-Dec-15 main pile 2654 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
778 11-Dec-15 main pile 2655 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
779 11-Dec-15 main pile 2656 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
780 11-Dec-15 Hotel pile 1358 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
781 11-Dec-15 Hotel pile 1359 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.20 472.30 12.00 TI-18
782 11-Dec-15 Hotel pile 1368 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
783 11-Dec-15 Hotel pile 1370 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
784 11-Dec-15 Hotel pile 1369 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
785 11-Dec-15 main pile 2400 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
786 11-Dec-15 main pile 2401 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
787 11-Dec-15 main pile 2398 Ǿ600 17 15 32.00 19.00 -13.00 1.00 1 24.20 421.10 12.00 TI-03
788 11-Dec-15 main pile 2399 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
789 11-Dec-15 main pile 2402 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
790 11-Dec-15 main pile 2403 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
791 11-Dec-15 main pile 2404 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
792 11-Dec-15 main pile 2389 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
793 11-Dec-15 main pile 2388 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
794 11-Dec-15 main pile 2390 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
795 11-Dec-15 main pile 1659 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
796 11-Dec-15 main pile 1658 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
797 11-Dec-15 main pile 1664 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
798 11-Dec-15 main pile 1666 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

799 11-Dec-15 main pile 1667 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
800 11-Dec-15 main pile 1665 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
801 11-Dec-15 main pile 1787 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
802 11-Dec-15 main pile 1786 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
803 12-Dec-15 main pile 2637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
804 12-Dec-15 main pile 2632 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
805 12-Dec-15 main pile 2631 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
806 12-Dec-15 main pile 2634 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
807 12-Dec-15 main pile 2633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
808 12-Dec-15 main pile 2657 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
809 12-Dec-15 main pile 2676 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
810 12-Dec-15 main pile 2677 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
811 12-Dec-15 main pile 2678 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
812 12-Dec-15 main pile 2679 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
813 12-Dec-15 main pile 2680 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
814 12-Dec-15 main pile 2681 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
815 12-Dec-15 main pile 2712 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
816 12-Dec-15 main pile 2713 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
817 12-Dec-15 Hotel pile 1480 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.50 455.10 12.00 TI-18
818 12-Dec-15 Hotel pile 1479 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.70 460.00 12.00 TI-18
819 12-Dec-15 Hotel pile 1478 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.80 437.90 12.00 TI-18
820 12-Dec-15 Hotel pile 1477 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
821 12-Dec-15 main pile 2386 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
822 12-Dec-15 main pile 2383 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
823 12-Dec-15 main pile 2410 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
824 12-Dec-15 main pile 2409 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
825 12-Dec-15 main pile 2408 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
826 12-Dec-15 main pile 2411 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
827 12-Dec-15 main pile 2412 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
828 12-Dec-15 main pile 2413 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
829 12-Dec-15 main pile 2405 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
830 12-Dec-15 main pile 2406 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
831 12-Dec-15 main pile 1784 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
832 12-Dec-15 main pile 1785 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
833 12-Dec-15 main pile 1791 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
834 12-Dec-15 main pile 1790 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
835 12-Dec-15 main pile 1788 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
836 12-Dec-15 main pile 1789 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
837 12-Dec-15 main pile 1908 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
838 12-Dec-15 main pile 1909 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
839 12-Dec-15 main pile 1913 Ǿ600 15 17 32.00 33.10 1.10 1.00 23.70 421.10 12.00 TI-21A
840 13-Dec-15 main pile 2714 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
841 13-Dec-15 main pile 2715 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.30 501.10 12.00 TI-16
842 13-Dec-15 main pile 2716 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
843 13-Dec-15 main pile 2717 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
844 13-Dec-15 main pile 2737 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
845 13-Dec-15 main pile 2738 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
846 13-Dec-15 main pile 2739 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
847 13-Dec-15 main pile 2740 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
848 13-Dec-15 main pile 2417 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
849 13-Dec-15 main pile 2416 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.10 421.10 12.00 TI-03
850 13-Dec-15 main pile 2415 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
851 13-Dec-15 main pile 2418 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
852 13-Dec-15 main pile 2419 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
853 13-Dec-15 main pile 2414 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
854 13-Dec-15 main pile 1912 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
855 13-Dec-15 main pile 1914 Ǿ600 17 15 32.00 31.20 -0.80 1.00 1 23.70 421.10 12.00 TI-21A
856 13-Dec-15 main pile 1915 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A
857 13-Dec-15 main pile 1911 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
858 13-Dec-15 main pile 1910 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
859 13-Dec-15 main pile 1662 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
860 13-Dec-15 main pile 1661 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

861 13-Dec-15 main pile 1660 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
862 14-Dec-15 main pile 2741 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
863 14-Dec-15 main pile 2742 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.50 477.90 12.00 TI-16
864 14-Dec-15 main pile 2743 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
865 14-Dec-15 Hotel pile 1481 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
866 14-Dec-15 Hotel pile 1482 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.20 472.30 12.00 TI-18
867 14-Dec-15 Hotel pile 1483 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
868 14-Dec-15 Hotel pile 1484 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
869 14-Dec-15 main pile 2429 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
870 14-Dec-15 main pile 2428 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
871 14-Dec-15 main pile 2425 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
872 14-Dec-15 main pile 2423 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.11 12.00 TI-03
873 14-Dec-15 main pile 2424 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
874 14-Dec-15 main pile 2420 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
875 14-Dec-15 main pile 2421 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
876 14-Dec-15 main pile 2422 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
877 14-Dec-15 main pile 1663B Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
878 14-Dec-15 main pile 1663A Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
879 14-Dec-15 main pile 1541 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
880 14-Dec-15 main pile 1540 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
881 14-Dec-15 main pile 1543 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
882 14-Dec-15 main pile 1542 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
883 14-Dec-15 main pile 1543A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
884 14-Dec-15 main pile 1543B Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
885 15-Dec-15 main pile 2426 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
886 15-Dec-15 main pile 2442 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
887 15-Dec-15 main pile 2441 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
888 15-Dec-15 main pile 2443 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
889 15-Dec-15 main pile 2444 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
890 15-Dec-15 main pile 2445 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
891 15-Dec-15 main pile 2446 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
892 15-Dec-15 main pile 2438 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
893 15-Dec-15 main pile 2439 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
894 15-Dec-15 main pile 2427 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.20 421.10 12.00 TI-03
895 15-Dec-15 main pile 1539 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
896 15-Dec-15 main pile 1538 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
897 15-Dec-15 main pile 1536 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
898 15-Dec-15 main pile 1537 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
899 15-Dec-15 main pile 1535 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
900 15-Dec-15 main pile 1530 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
901 15-Dec-15 main pile 1528 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
902 15-Dec-15 main pile 1525 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.90 424.70 12.00 TI-21A
903 15-Dec-15 main pile 1523 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
904 15-Dec-15 main pile 2706 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
905 15-Dec-15 main pile 2707 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
906 15-Dec-15 main pile 2708 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
907 15-Dec-15 main pile 2709 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
908 15-Dec-15 main pile 2710 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
909 15-Dec-15 main pile 2711 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
910 15-Dec-15 main pile 2747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
911 15-Dec-15 main pile 2748 Ǿ600 15 17 32.00 32.60 0.60 1.00 23.70 420.00 12.00 TI-07
912 15-Dec-15 main pile 2749 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
913 16-Dec-15 main pile 2047A Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
914 16-Dec-15 main pile 2040A Ǿ600 17 15 32.00 16.00 -16.00 1.00 1 16.00 463.40 12.00 TI-16
915 16-Dec-15 main pile 2061B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
916 16-Dec-15 main pile 2744 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
917 16-Dec-15 main pile 2745 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
918 16-Dec-15 main pile 2746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
919 16-Dec-15 main pile 2721 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
920 16-Dec-15 main pile 2719 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
921 16-Dec-15 main pile 2720 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
922 16-Dec-15 main pile 2433 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

923 16-Dec-15 main pile 2434 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
924 16-Dec-15 main pile 2432 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
925 16-Dec-15 main pile 2430 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
926 16-Dec-15 main pile 2431 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
927 16-Dec-15 main pile 2437 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
928 16-Dec-15 main pile 2436 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
929 16-Dec-15 main pile 2435 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.70 12.00 TI-03
930 16-Dec-15 main pile 2440 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
931 16-Dec-15 main pile 1534 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
932 16-Dec-15 main pile 1520 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
933 16-Dec-15 main pile 1522 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
934 16-Dec-15 main pile 1521 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
935 16-Dec-15 main pile 1524 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
936 16-Dec-15 main pile 1526 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
937 16-Dec-15 main pile 1529 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
938 16-Dec-15 main pile 1532 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
939 16-Dec-15 main pile 1533 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
940 17-Dec-15 main pile 1975C Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
941 17-Dec-15 main pile 1975D Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 15.00 405.50 12.00 TI-16
942 17-Dec-15 main pile 1975B Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
943 17-Dec-15 main pile 2982 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
944 17-Dec-15 main pile 2983 Ǿ600 17 15 32.00 17.50 -14.50 1.00 1 16.00 463.40 12.00 TI-16
945 17-Dec-15 main pile 1975A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
946 17-Dec-15 main pile 2718 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
947 17-Dec-15 main pile 2674 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
948 17-Dec-15 main pile 2673 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
949 17-Dec-15 main pile 2672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
950 17-Dec-15 main pile 2539 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
951 17-Dec-15 main pile 2538 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
952 17-Dec-15 main pile 2540 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
953 17-Dec-15 main pile 2537 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
954 17-Dec-15 main pile 1527 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
955 17-Dec-15 main pile 1531 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
956 18-Dec-15 main pile 1549 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
957 18-Dec-15 main pile 1548 Ǿ600 17 15 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
958 18-Dec-15 main pile 1547 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
959 18-Dec-15 main pile 1657 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
960 18-Dec-15 main pile 1673 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
961 18-Dec-15 main pile 1672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
962 18-Dec-15 main pile 1671 Ǿ600 17 15 32.00 33.20 1.20 1.00 23.70 421.10 12.00 TI-21A
963 18-Dec-15 main pile 1783 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
964 18-Dec-15 main pile 2130A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
965 18-Dec-15 main pile 1978A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
966 18-Dec-15 main pile 1978B Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 15.50 448.90 12.00 TI-16
967 18-Dec-15 main pile 1990B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
968 19-Dec-15 main pile 1990A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
969 19-Dec-15 main pile 2040B Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
970 19-Dec-15 main pile 2076B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
971 19-Dec-15 main pile 2076A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
972 19-Dec-15 main pile 1781 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
973 19-Dec-15 main pile 1782 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
974 19-Dec-15 main pile 1797 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
975 19-Dec-15 main pile 1796 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
976 19-Dec-15 main pile 1795 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
977 19-Dec-15 main pile 1906 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
978 19-Dec-15 main pile 2732 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
979 19-Dec-15 main pile 2735 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
980 19-Dec-15 main pile 2734 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
981 19-Dec-15 main pile 2733 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
982 19-Dec-15 main pile 2736 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
983 19-Dec-15 main pile 2776 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
984 19-Dec-15 main pile 2779 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

985 19-Dec-15 main pile 2777 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
986 19-Dec-15 main pile 2542 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
987 19-Dec-15 main pile 2545 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.10 12.00 TI-03
988 19-Dec-15 main pile 2553 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
989 19-Dec-15 main pile 2554 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
990 19-Dec-15 main pile 2555 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
991 19-Dec-15 main pile 2552 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
992 19-Dec-15 main pile 2544 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
993 19-Dec-15 main pile 2541 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
994 19-Dec-15 main pile 2543 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
995 19-Dec-15 main pile 1730 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 251.20 12.00 TI-26
996 19-Dec-15 main pile 1731 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 427.00 12.00 TI-26
997 19-Dec-15 main pile 1732 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
998 19-Dec-15 main pile 1840 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
999 19-Dec-15 main pile 1841 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1000 19-Dec-15 main pile 1842 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1001 19-Dec-15 Hotel pile 1360 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
1002 20-Dec-15 main pile 2775 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1003 20-Dec-15 main pile 2778 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1004 20-Dec-15 main pile 2790 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1005 20-Dec-15 main pile 2793 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1006 20-Dec-15 main pile 2792 Ǿ600 17 15 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
1007 20-Dec-15 main pile 2791 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1008 20-Dec-15 main pile 2794 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1009 20-Dec-15 main pile 1854 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1010 20-Dec-15 main pile 1855 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1011 20-Dec-15 main pile 1856 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1012 20-Dec-15 main pile 1959 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1013 20-Dec-15 main pile 1958 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1014 20-Dec-15 main pile 1960 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1015 20-Dec-15 main pile 1962 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1016 20-Dec-15 main pile 1961 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1017 21-Dec-15 main pile 2800 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
1018 21-Dec-15 main pile 2799 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
1019 21-Dec-15 main pile 2798 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1020 21-Dec-15 main pile 2797 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1021 21-Dec-15 main pile 2796 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1022 21-Dec-15 main pile 2795 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1023 21-Dec-15 main pile 2805 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1024 21-Dec-15 main pile 1905 Ǿ600 17 15 32.00 31.25 -0.75 1.00 1 24.00 426.50 12.00 TI-21A
1025 21-Dec-15 main pile 1921 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.90 424.70 12.00 TI-21A
1026 21-Dec-15 main pile 1920 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1027 21-Dec-15 main pile 1919 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1028 21-Dec-15 main pile 1917 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1029 21-Dec-15 main pile 1857 Ǿ600 15 17 32.00 32.00 0.00 1.00 18.00 452.10 12.00 TI-26
1030 21-Dec-15 main pile 1858 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
1031 21-Dec-15 main pile 1859 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1032 21-Dec-15 main pile 1843 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1033 21-Dec-15 main pile 1844 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1034 21-Dec-15 main pile 1845 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1035 21-Dec-15 main pile 1733 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1036 21-Dec-15 main pile 1734 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1037 21-Dec-15 main pile 1735 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1038 22-Dec-15 main pile 2806 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1039 22-Dec-15 main pile 2807 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1040 22-Dec-15 main pile 2808 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1041 22-Dec-15 main pile 2809 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1042 22-Dec-15 main pile 2810 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1043 22-Dec-15 main pile 2814 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1044 22-Dec-15 main pile 2813 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1045 22-Dec-15 main pile 1926 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1046 22-Dec-15 main pile 1918 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1047 22-Dec-15 main pile 1916 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.90 424.70 12.00 TI-21A
1048 22-Dec-15 main pile 1904 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1049 22-Dec-15 main pile 1903 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1050 22-Dec-15 main pile 1902 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
1051 22-Dec-15 main pile 1907 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
1052 22-Dec-15 main pile 2086A Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 16.00 463.40 12.00 TI-16
1053 22-Dec-15 main pile 2019A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
1054 22-Dec-15 main pile 2979C Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.00 434.50 12.00 TI-16
1055 22-Dec-15 main pile 2979B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1056 22-Dec-15 main pile 2979D Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 16.00 463.40 12.00 TI-16
1057 22-Dec-15 main pile 2979A Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.50 448.90 12.00 TI-16
1058 22-Dec-15 main pile 1965 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1059 22-Dec-15 main pile 1966 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 17.00 427.00 12.00 TI-26
1060 22-Dec-15 main pile 1964 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1061 22-Dec-15 main pile 1963 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 17.50 439.50 12.00 TI-26
1062 22-Dec-15 main pile 1851 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 17.00 427.00 12.00 TI-26
1063 23-Dec-15 main pile 2812 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1064 23-Dec-15 main pile 2811 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1065 23-Dec-15 main pile 2815 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
1066 23-Dec-15 main pile 2816 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
1067 23-Dec-15 main pile 2818 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1068 23-Dec-15 main pile 2817 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1069 23-Dec-15 main pile 2822 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1070 23-Dec-15 main pile 2601 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1071 23-Dec-15 main pile 2604 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1072 23-Dec-15 main pile 2603 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
1073 23-Dec-15 main pile 2605 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1074 23-Dec-15 main pile 2602 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1075 23-Dec-15 main pile 2556 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1076 23-Dec-15 main pile 2559 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1077 23-Dec-15 main pile 2558 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1078 23-Dec-15 main pile 2557 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1079 23-Dec-15 main pile 2549 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1080 23-Dec-15 main pile 2548 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1081 23-Dec-15 main pile 2550 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1082 23-Dec-15 main pile 2551 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1083 23-Dec-15 main pile 2547 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1084 23-Dec-15 main pile 2546 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1085 23-Dec-15 main pile 1928 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1086 23-Dec-15 main pile 1929 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1087 23-Dec-15 main pile 1931 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1088 23-Dec-15 main pile 1923 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
1089 23-Dec-15 main pile 1922 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A
1090 23-Dec-15 main pile 1927 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1091 23-Dec-15 main pile 2979E Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1092 23-Dec-15 main pile 2979F Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1093 23-Dec-15 main pile 2026A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16
1094 23-Dec-15 main pile 2002A Ǿ600 17 15 32.00 26.00 -6.00 1.00 1 16.00 463.40 12.00 TI-16
1095 23-Dec-15 main pile 2002B Ǿ600 17 15 32.00 25.00 -7.00 1.00 1 16.00 463.40 12.00 TI-16
1096 23-Dec-15 main pile 1850 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1097 23-Dec-15 main pile 1853 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1098 23-Dec-15 main pile 1852 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1099 23-Dec-15 main pile 1847 Ǿ600 15 17 32.00 37.50 5.50 1.00 17.00 427.00 12.00 TI-26
1100 23-Dec-15 main pile 1846 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
1101 23-Dec-15 main pile 1849 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26
1102 23-Dec-15 main pile 1848 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26
1103 23-Dec-15 main pile 1723 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26
1104 23-Dec-15 main pile 1722 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26
1105 23-Dec-15 Hotel pile 1351 Ǿ800 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
1106 23-Dec-15 Hotel pile 1350 Ǿ800 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
1107 23-Dec-15 Hotel pile 1349 Ǿ800 17 15 32.00 38.00 6.00 1.00 20.40 504.30 12.00 TI-18
1108 23-Dec-15 Hotel pile 1348 Ǿ800 17 15 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1109 23-Dec-15 Hotel pile 1347 Ǿ800 17 15 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
1110 23-Dec-15 Hotel pile 1346 Ǿ800 17 15 32.00 32.00 0.00 1.00 20.70 509.20 12.00 TI-18
1111 23-Dec-15 Hotel pile 1345 Ǿ800 17 15 32.00 29.00 -3.00 1.00 1 20.90 514.10 12.00 TI-18
1112 24-Dec-15 main pile 2819 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
1113 24-Dec-15 main pile 2821 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1114 24-Dec-15 main pile 2820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
1115 24-Dec-15 main pile 2765 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1116 24-Dec-15 main pile 2763 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1117 24-Dec-15 main pile 2766 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1118 24-Dec-15 main pile 2613 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
1119 24-Dec-15 main pile 2615 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1120 24-Dec-15 main pile 2618 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1121 24-Dec-15 main pile 2659 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1122 24-Dec-15 main pile 2660 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1123 24-Dec-15 main pile 2661 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.20 421.10 12.00 TI-03
1124 24-Dec-15 main pile 2658 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
1125 24-Dec-15 main pile 2617 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1126 24-Dec-15 main pile 2616 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1127 24-Dec-15 main pile 1888 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
1128 24-Dec-15 main pile 1941 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1129 24-Dec-15 main pile 1886 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1130 24-Dec-15 main pile 1938 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1131 24-Dec-15 main pile 1939 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
1132 24-Dec-15 main pile 1940 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1133 24-Dec-15 main pile 1933 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
1134 24-Dec-15 main pile 1935 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1135 24-Dec-15 main pile 2146A Ǿ600 17 15 32.00 20.50 -11.50 1.00 1 15.00 434.50 12.00 TI-16
1136 24-Dec-15 main pile 2135A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1137 24-Dec-15 main pile 2155A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16
1138 24-Dec-15 main pile 2164A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1139 24-Dec-15 main pile 2184B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 12.00 TI-16
1140 24-Dec-15 main pile 1724 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1141 24-Dec-15 main pile 1725 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26
1142 24-Dec-15 main pile 1603 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1143 24-Dec-15 main pile 1602 Ǿ600 15 17 32.00 35.50 3.50 1.00 17.00 427.00 12.00 TI-26
1144 24-Dec-15 main pile 1604 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1145 24-Dec-15 main pile 1605 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1146 24-Dec-15 Hotel pile 1337 Ǿ800 15 17 32.00 36.00 4.00 1.00 20.80 511.70 12.00 TI-18
1147 24-Dec-15 Hotel pile 1338 Ǿ800 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
1148 24-Dec-15 Hotel pile 1334 Ǿ800 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
1149 24-Dec-15 Hotel pile 1343 Ǿ800 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
1150 24-Dec-15 Hotel pile 1344 Ǿ800 15 17 32.00 34.00 2.00 1.00 20.50 504.30 12.00 TI-18
1151 24-Dec-15 Hotel pile 1335 Ǿ800 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
1152 25-Dec-15 main pile 2695 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
1153 25-Dec-15 main pile 2696 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1154 25-Dec-15 main pile 2760 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1155 25-Dec-15 main pile 2761 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1156 25-Dec-15 main pile 2759 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1157 25-Dec-15 main pile 2762 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1158 25-Dec-15 main pile 2764 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
1159 25-Dec-15 main pile 2670 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1160 25-Dec-15 main pile 2669 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1161 25-Dec-15 main pile 2671 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1162 25-Dec-15 main pile 2668 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1163 25-Dec-15 main pile 2663 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1164 25-Dec-15 main pile 2666 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1165 25-Dec-15 main pile 2665 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1166 25-Dec-15 main pile 2664 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1167 25-Dec-15 main pile 2662 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1168 25-Dec-15 main pile 1887 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1169 25-Dec-15 main pile 1889 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
1170 25-Dec-15 main pile 1763 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.90 424.70 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1171 25-Dec-15 main pile 1764 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
1172 25-Dec-15 main pile 1765 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.00 426.50 12.00 TI-21A
1173 25-Dec-15 main pile 1815 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1174 25-Dec-15 main pile 1814 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
1175 25-Dec-15 main pile 1727 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1176 25-Dec-15 main pile 1726 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
1177 25-Dec-15 main pile 1728 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1178 25-Dec-15 main pile 1729 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1179 25-Dec-15 main pile 1599 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1180 25-Dec-15 main pile 1598 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1181 25-Dec-15 main pile 1601 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1182 25-Dec-15 main pile 1600 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1183 25-Dec-15 Hotel pile 1341 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
1184 25-Dec-15 Hotel pile 1340 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.60 506.80 12.00 TI-18
1185 25-Dec-15 Hotel pile 1339 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
1186 25-Dec-15 Hotel pile 1342 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
1187 25-Dec-15 main pile 2184A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.00 434.00 12.00 TI-16
1188 25-Dec-15 main pile 2218B Ǿ600 15 17 32.00 30.50 -1.50 1.00 15.50 228.90 12.00 TI-16
1189 25-Dec-15 main pile 2218A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.50 228.90 12.00 TI-16
1190 25-Dec-15 main pile 2280A Ǿ600 15 17 32.00 27.00 -5.00 1.00 16.00 463.40 12.00 TI-16
1191 26-Dec-15 main pile 2697 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1192 26-Dec-15 main pile 2755 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
1193 26-Dec-15 main pile 2758 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1194 26-Dec-15 main pile 2756 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1195 26-Dec-15 main pile 2754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
1196 26-Dec-15 main pile 2757 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1197 26-Dec-15 main pile 2723 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1198 26-Dec-15 main pile 2724 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1199 26-Dec-15 main pile 2725 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1200 26-Dec-15 main pile 2722 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1201 26-Dec-15 main pile 2667 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1202 26-Dec-15 main pile 2731 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1203 26-Dec-15 main pile 2728 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1204 26-Dec-15 main pile 1810 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1205 26-Dec-15 main pile 1812 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1206 26-Dec-15 main pile 1811 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1207 26-Dec-15 main pile 1813 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.90 424.70 12.00 TI-21A
1208 26-Dec-15 main pile 1883 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1209 26-Dec-15 main pile 1884 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.00 426.70 12.00 TI-21A
1210 26-Dec-15 main pile 1487 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1211 26-Dec-15 main pile 1488 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1212 26-Dec-15 main pile 1485 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
1213 26-Dec-15 main pile 1486 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1214 27-Dec-15 main pile 2768 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1215 27-Dec-15 main pile 2770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1216 27-Dec-15 main pile 2751 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1217 27-Dec-15 main pile 2752 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1218 27-Dec-15 main pile 2750 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1219 27-Dec-15 main pile 2726 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1220 27-Dec-15 main pile 2783 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1221 27-Dec-15 main pile 2780 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1222 27-Dec-15 main pile 2730 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 42.70 12.00 TI-03
1223 27-Dec-15 main pile 2727 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1224 27-Dec-15 main pile 2729 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
1225 27-Dec-15 main pile 1762 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1226 27-Dec-15 main pile 1761 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1227 27-Dec-15 main pile 1760 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1228 27-Dec-15 main pile 1688 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1229 27-Dec-15 main pile 1687 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1230 27-Dec-15 main pile 2275A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
1231 27-Dec-15 main pile 2367A Ǿ600 15 17 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
1232 27-Dec-15 main pile 2367B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1233 27-Dec-15 main pile 2328A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
1234 27-Dec-15 main pile 2328B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 12.00 TI-16
1235 27-Dec-15 main pile 2260A Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 14.50 420.00 12.00 TI-16
1236 27-Dec-15 main pile 2270A Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 12.00 TI-16
1237 28-Dec-15 main pile 2767 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1238 28-Dec-15 main pile 2769 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1239 28-Dec-15 main pile 2753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1240 28-Dec-15 main pile 2772 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1241 28-Dec-15 main pile 2774 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1242 28-Dec-15 main pile 2771 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
1243 28-Dec-15 main pile 2773 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1244 28-Dec-15 main pile 2824 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
1245 28-Dec-15 main pile 2825 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1246 28-Dec-15 main pile 1686 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1247 28-Dec-15 main pile 1691 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1248 28-Dec-15 main pile 1690 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
1249 28-Dec-15 main pile 1689 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1250 28-Dec-15 main pile 1639 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1251 28-Dec-15 main pile 1640 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1252 28-Dec-15 main pile 1641 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1253 28-Dec-15 main pile 1636 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1254 28-Dec-15 main pile 1637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1255 28-Dec-15 main pile 2270B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 12.00 TI-16
1256 28-Dec-15 main pile 2784A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
1257 28-Dec-15 main pile 1606 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1258 28-Dec-15 main pile 1607 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1259 28-Dec-15 main pile 1608 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1260 28-Dec-15 main pile 1609 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1261 28-Dec-15 main pile 1610 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1262 28-Dec-15 main pile 1611 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1263 28-Dec-15 Hotel pile 1362 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
1264 28-Dec-15 Hotel pile 1361 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
1265 29-Dec-15 main pile 2828 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1266 29-Dec-15 main pile 2823 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1267 29-Dec-15 main pile 2826 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1268 29-Dec-15 main pile 2827 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1269 29-Dec-15 main pile 2829 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1270 29-Dec-15 main pile 2830 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
1271 29-Dec-15 main pile 1716 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
1272 29-Dec-15 main pile 1717 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1273 29-Dec-15 main pile 1718 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
1274 29-Dec-15 main pile 1721 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
1275 29-Dec-15 main pile 1720 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 427.00 12.00 TI-26
1276 29-Dec-15 main pile 1719 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
1277 30-Dec-15 main pile 2787 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.20 421.10 12.00 TI-03
1278 30-Dec-15 main pile 2785 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1279 30-Dec-15 main pile 2788 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1280 30-Dec-15 main pile 2789A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1281 30-Dec-15 main pile 2784B Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1282 30-Dec-15 main pile 2456 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
1283 30-Dec-15 main pile 2454 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 206.80 12.00 TI-18
1284 30-Dec-15 main pile 2455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
1285 30-Dec-15 main pile 2453 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
1286 30-Dec-15 main pile 2457 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
1287 30-Dec-15 main pile 2452 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
1288 2-Jan-16 main pile 2802 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1289 2-Jan-16 main pile 2801 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
1290 2-Jan-16 main pile 2804 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1291 2-Jan-16 main pile 2803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
1292 2-Jan-16 main pile 1638 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
1293 2-Jan-16 main pile 1617 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1294 2-Jan-16 main pile 1612 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1295 2-Jan-16 main pile 1613 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1296 2-Jan-16 main pile 1614 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1297 2-Jan-16 main pile 3016 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1298 2-Jan-16 main pile 3017 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1299 2-Jan-16 main pile 2996 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1300 2-Jan-16 main pile 2997 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1301 3-Jan-16 main pile 1616 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1302 3-Jan-16 main pile 1615 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1303 3-Jan-16 main pile 1589 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1304 3-Jan-16 main pile 1590 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1305 3-Jan-16 main pile 1591 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1306 3-Jan-16 main pile 1586 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1307 3-Jan-16 main pile 1587 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
1308 3-Jan-16 main pile 1588 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
1309 3-Jan-16 main pile 2984 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1310 3-Jan-16 main pile 2985 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1311 3-Jan-16 main pile 2980 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26
1312 3-Jan-16 main pile 2981 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26
1313 4-Jan-16 main pile 3018 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1314 4-Jan-16 main pile 3019 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1315 4-Jan-16 main pile 2999 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1316 4-Jan-16 main pile 2998 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1317 4-Jan-16 main pile 2986 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1318 4-Jan-16 main pile 2987 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1319 4-Jan-16 main pile 1595 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1320 4-Jan-16 main pile 1596 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1321 4-Jan-16 main pile 1597 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1322 4-Jan-16 main pile 1592 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1323 4-Jan-16 main pile 1593 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1324 4-Jan-16 main pile 1594 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1325 4-Jan-16 main pile 1490 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1326 5-Jan-16 main pile 1489 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1327 5-Jan-16 main pile 1491 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1328 5-Jan-16 main pile 1493 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1329 5-Jan-16 main pile 1492 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1330 5-Jan-16 main pile 1495 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1331 5-Jan-16 main pile 1494 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
1332 5-Jan-16 main pile 1496 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1333 5-Jan-16 main pile 1498 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1334 5-Jan-16 main pile 1497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1335 5-Jan-16 main pile 2784 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1336 5-Jan-16 main pile 2781 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1337 5-Jan-16 main pile 2789B Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1338 5-Jan-16 main pile 2786 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1339 5-Jan-16 main pile 2789 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1340 5-Jan-16 main pile 2782 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1341 5-Jan-16 Kondo Tower A 700 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 695.50 12.00 TI-24
1342 5-Jan-16 Kondo Tower A 699 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 12.00 TI-24
1343 5-Jan-16 Kondo Tower A 688 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 12.00 TI-24
1344 5-Jan-16 Kondo Tower A 675 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1345 5-Jan-16 main pile 3021 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1346 5-Jan-16 main pile 3020 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1347 5-Jan-16 main pile 3001 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1348 5-Jan-16 main pile 2989 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1349 5-Jan-16 main pile 2988 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1350 5-Jan-16 main pile 2990 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1351 5-Jan-16 main pile 2991 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1352 5-Jan-16 main pile 2992 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1353 5-Jan-16 main pile 2922 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1354 5-Jan-16 main pile 2923 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1355 5-Jan-16 main pile 2924 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1356 5-Jan-16 main pile 2925 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1357 5-Jan-16 main pile 2928 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1358 5-Jan-16 main pile 2929 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1359 5-Jan-16 main pile 2934 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1360 5-Jan-16 main pile 2935 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1361 6-Jan-16 main pile 2608 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1362 6-Jan-16 main pile 2606 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1363 6-Jan-16 main pile 2609 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1364 6-Jan-16 main pile 2614 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1365 6-Jan-16 main pile 2612 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1366 6-Jan-16 main pile 2611 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1367 6-Jan-16 main pile 2610 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1368 6-Jan-16 main pile 2607 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1369 6-Jan-16 main pile 2993 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1370 6-Jan-16 main pile 2994 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1371 6-Jan-16 main pile 2995 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1372 6-Jan-16 main pile 3013 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26
1373 6-Jan-16 main pile 3012 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1374 6-Jan-16 main pile 3011 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26
1375 6-Jan-16 main pile 3010 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1376 6-Jan-16 main pile 2939 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1377 6-Jan-16 main pile 2938 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1378 6-Jan-16 main pile 2933 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18
1379 6-Jan-16 main pile 2932 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18
1380 6-Jan-16 main pile 2927 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1381 6-Jan-16 main pile 2926 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1382 7-Jan-16 main pile 2624 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1383 7-Jan-16 main pile 2600 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1384 7-Jan-16 main pile 2599 Ǿ600 17 15 32.00 22.00 -10.00 1.00 1 24.20 421.10 12.00 TI-03
1385 7-Jan-16 main pile 2598 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1386 7-Jan-16 main pile 2619 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1387 7-Jan-16 main pile 2620 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1388 7-Jan-16 main pile 2621 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1389 7-Jan-16 main pile 2622 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1390 7-Jan-16 main pile 2623 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1391 7-Jan-16 main pile 1710 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1392 7-Jan-16 main pile 1711 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1393 7-Jan-16 main pile 1712 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1394 7-Jan-16 main pile 1736 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1395 7-Jan-16 main pile 1737 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1396 7-Jan-16 main pile 1738 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1397 7-Jan-16 main pile 1739 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1398 7-Jan-16 main pile 1740 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1399 7-Jan-16 main pile 1741 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
1400 7-Jan-16 main pile 2920 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1401 7-Jan-16 main pile 2921 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1402 7-Jan-16 main pile 2919 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1403 7-Jan-16 main pile 2918 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 509.20 12.00 TI-18
1404 7-Jan-16 main pile 2916 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1405 7-Jan-16 main pile 2917 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1406 7-Jan-16 main pile 2912 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1407 7-Jan-16 main pile 2913 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1408 7-Jan-16 Condo tower A 627 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 12.00 TI-24
1409 7-Jan-16 Condo tower A 640 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1410 7-Jan-16 Condo tower A 651 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 12.00 TI-24
1411 7-Jan-16 Condo tower A 664 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.80 800.90 12.00 TI-24
1412 8-Jan-16 main pile 2627 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
1413 8-Jan-16 main pile 2628 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1414 8-Jan-16 main pile 2629 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1415 8-Jan-16 main pile 2626 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1416 8-Jan-16 main pile 2625 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1417 8-Jan-16 main pile 2630 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1418 8-Jan-16 main pile 2597 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1419 8-Jan-16 main pile 2596 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1420 8-Jan-16 main pile 2595 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1421 8-Jan-16 main pile 1713 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
1422 8-Jan-16 main pile 1714 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1423 8-Jan-16 main pile 1715 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1424 8-Jan-16 main pile 1744 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1425 8-Jan-16 main pile 1743 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1426 8-Jan-16 main pile 1742 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1427 8-Jan-16 main pile 1706 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1428 8-Jan-16 main pile 1705 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1429 8-Jan-16 main pile 1704 Ǿ600 15 17 32.00 24.00 -8.00 1.00 23.70 421.10 12.00 TI-21A
1430 8-Jan-16 main pile 2906 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1431 8-Jan-16 main pile 2907 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1432 8-Jan-16 main pile 2900 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1433 8-Jan-16 main pile 2901 Ǿ600 11 17 28.00 43.00 15.00 1.00 20.60 506.80 12.00 TI-18
1434 8-Jan-16 main pile 2902 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1435 8-Jan-16 main pile 2903 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1436 8-Jan-16 main pile 2977 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.50 477.90 12.00 TI-16
1437 8-Jan-16 main pile 2976 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 434.50 12.00 TI-16
1438 8-Jan-16 main pile 2974 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16
1439 8-Jan-16 main pile 2975 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16
1440 8-Jan-16 main pile 2973 Ǿ600 13 15 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16
1441 8-Jan-16 main pile 3008 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1442 8-Jan-16 main pile 3009 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26
1443 8-Jan-16 main pile 3007 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1444 8-Jan-16 main pile 3006 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26
1445 8-Jan-16 main pile 3005 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1446 8-Jan-16 main pile 3004 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1447 9-Jan-16 main pile 2575 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
1448 9-Jan-16 main pile 2572 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1449 9-Jan-16 main pile 2573 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.1 12.00 TI-03
1450 9-Jan-16 main pile 2571 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1451 9-Jan-16 main pile 2574 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1452 9-Jan-16 main pile 2592 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1453 9-Jan-16 main pile 2591 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
1454 9-Jan-16 main pile 2593 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.1 12.00 TI-03
1455 9-Jan-16 main pile 2590 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1456 9-Jan-16 main pile 2594 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1457 9-Jan-16 main pile 2589 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
1458 9-Jan-16 main pile 1583 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1459 9-Jan-16 main pile 1620 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1460 9-Jan-16 main pile 1619 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1461 9-Jan-16 main pile 1618 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1462 9-Jan-16 main pile 1582 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 241.10 12.00 TI-21A
1463 9-Jan-16 main pile 1581 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1464 9-Jan-16 main pile 1580 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 241.10 12.00 TI-21A
1465 9-Jan-16 main pile 1585 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1466 9-Jan-16 main pile 1584 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 12.00 TI-21A
1467 9-Jan-16 main pile 2908 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1468 9-Jan-16 main pile 2899 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1469 9-Jan-16 main pile 2898 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 505.30 12.00 TI-18
1470 9-Jan-16 main pile 2909 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18
1471 9-Jan-16 main pile 2914 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 511.70 12.00 TI-18
1472 9-Jan-16 main pile 2915 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 12.00 TI-18
1473 9-Jan-16 main pile 3026 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26
1474 9-Jan-16 main pile 3027 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1475 9-Jan-16 main pile 3028 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1476 9-Jan-16 main pile 3029 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1477 9-Jan-16 main pile 3031 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26
1478 10-Jan-16 main pile 1623 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1479 10-Jan-16 main pile 1622 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1480 10-Jan-16 main pile 1621 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1481 10-Jan-16 main pile 1709 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1482 10-Jan-16 main pile 1708 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1483 10-Jan-16 main pile 1707 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1484 10-Jan-16 main pile 1747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
1485 10-Jan-16 main pile 1746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1486 10-Jan-16 main pile 1745 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1487 10-Jan-16 main pile 2910 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.70 509.20 12.00 TI-18
1488 10-Jan-16 main pile 2911 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 12.00 TI-18
1489 10-Jan-16 main pile 2904 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1490 10-Jan-16 main pile 2905 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18
1491 10-Jan-16 main pile 2897 Ǿ600 11 17 28.00 28.00 0.00 1.00 20.90 514.10 12.00 TI-18
1492 11-Jan-16 main pile 1952 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1493 11-Jan-16 main pile 1833 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
1494 11-Jan-16 main pile 1832 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
1495 11-Jan-16 main pile 1831 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1496 11-Jan-16 main pile 1871 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1497 11-Jan-16 main pile 1870 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1498 11-Jan-16 main pile 1869 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
1499 11-Jan-16 main pile 1951 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1500 11-Jan-16 main pile 1950 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
1501 11-Jan-16 main pile 2563 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1502 11-Jan-16 main pile 2564 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1503 11-Jan-16 main pile 2562 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1504 11-Jan-16 main pile 2560 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1505 11-Jan-16 main pile 2561 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
1506 11-Jan-16 main pile 2570 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1507 11-Jan-16 main pile 2569 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
1508 11-Jan-16 main pile 2568 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1509 11-Jan-16 main pile 2567 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1510 11-Jan-16 main pile 2565 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1511 11-Jan-16 main pile 2566 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
1512 11-Jan-16 main pile 3030 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1513 11-Jan-16 main pile 3032 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1514 11-Jan-16 main pile 3033 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1515 11-Jan-16 main pile 3034 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26
1516 11-Jan-16 Condo tower A 579 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 609.20 12.00 TI-24
1517 11-Jan-16 Condo tower A 592 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1518 11-Jan-16 Condo tower A 616 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1519 11-Jan-16 Condo tower A 603 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1520 12-Jan-16 main pile 1949 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1521 12-Jan-16 main pile 1948 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1522 12-Jan-16 main pile 1868 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
1523 12-Jan-16 main pile 1867 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
1524 12-Jan-16 main pile 1866 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1525 12-Jan-16 main pile 1830 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1526 12-Jan-16 main pile 1829 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1527 12-Jan-16 main pile 1828 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1528 12-Jan-16 main pile 3035 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1529 12-Jan-16 main pile 3036 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1530 12-Jan-16 main pile 3037 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 301.40 12.00 TI-26
1531 12-Jan-16 main pile 3038 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26
1532 12-Jan-16 main pile 3039 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 12.00 TI-26
1533 12-Jan-16 main pile 3040 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26
1534 12-Jan-16 main pile 2890 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18
1535 12-Jan-16 main pile 2896 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18
1536 12-Jan-16 main pile 2893 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1537 12-Jan-16 main pile 2891 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18
1538 12-Jan-16 main pile 2892 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18
1539 12-Jan-16 Condo tower A 568 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1540 12-Jan-16 Condo tower A 555 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1541 12-Jan-16 Condo tower A 544 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 12.00 TI-24
1542 12-Jan-16 Condo tower A 531 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1543 13-Jan-16 main pile 1836 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1544 13-Jan-16 main pile 1860 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1545 13-Jan-16 main pile 1862 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1546 13-Jan-16 main pile 1953 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1547 13-Jan-16 main pile 1954 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1548 13-Jan-16 main pile 1955 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1549 13-Jan-16 main pile 1957 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
1550 13-Jan-16 main pile 1956 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
1551 13-Jan-16 Condo tower A 520 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1552 13-Jan-16 Condo tower A 507 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1553 13-Jan-16 Condo tower A 496 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 590.10 12.00 TI-24
1554 13-Jan-16 Condo tower A 483 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1555 13-Jan-16 Condo tower A 472 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 12.00 TI-24
1556 14-Jan-16 main pile 1863 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1557 14-Jan-16 main pile 1864 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1558 14-Jan-16 main pile 1865 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1559 14-Jan-16 main pile 1837 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
1560 14-Jan-16 main pile 1838 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
1561 14-Jan-16 main pile 1839 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1562 14-Jan-16 main pile 1834 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1563 14-Jan-16 main pile 1835 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1564 14-Jan-16 main pile 1861 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
1565 14-Jan-16 main pile 2971 Ǿ600 11 17 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16
1566 14-Jan-16 main pile 2972 Ǿ600 11 17 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16
1567 14-Jan-16 main pile 2970 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16
1568 14-Jan-16 main pile 2968 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 12.00 TI-16
1569 14-Jan-16 main pile 2969 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 12.00 TI-16
1570 14-Jan-16 main pile 2965 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16
1571 14-Jan-16 Condo tower A 452 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 618.20 12.00 TI-24
1572 14-Jan-16 Condo tower A 448 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 12.00 TI-24
1573 14-Jan-16 Condo tower A 459 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 12.00 TI-24
1574 15-Jan-16 main pile 1944 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1575 15-Jan-16 main pile 1943 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1576 15-Jan-16 main pile 1874 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1577 15-Jan-16 main pile 1873 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1578 15-Jan-16 main pile 1872 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1579 15-Jan-16 main pile 1824 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1580 15-Jan-16 main pile 1823 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1581 15-Jan-16 main pile 1822 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1582 15-Jan-16 main pile 3041 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1583 15-Jan-16 main pile 3042 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1584 15-Jan-16 main pile 3043 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1585 15-Jan-16 main pile 3044 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1586 15-Jan-16 main pile 3045 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1587 15-Jan-16 main pile 3047 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1588 15-Jan-16 main pile 3046 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1589 15-Jan-16 Condo tower A 503 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1590 15-Jan-16 Condo tower A 479 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1591 15-Jan-16 Condo tower A 476 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1592 15-Jan-16 Condo tower A 455 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
1593 15-Jan-16 Condo tower A 500 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1594 16-Jan-16 main pile 1750 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1595 16-Jan-16 main pile 1749 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1596 16-Jan-16 main pile 1748 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1597 16-Jan-16 main pile 1700 Ǿ600 15 17 32.00 34.40 2.40 1.00 23.70 421.10 TI-21A
1598 16-Jan-16 main pile 1699 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
1599 16-Jan-16 Condo tower A 524 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1600 16-Jan-16 Condo tower A 527 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1601 16-Jan-16 Condo tower A 548 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1602 16-Jan-16 Condo tower A 551 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1603 16-Jan-16 Condo tower A 572 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.70 797.40 TI-24
1604 17-Jan-16 Condo tower A 575 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1605 17-Jan-16 Condo tower A 596 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
1606 17-Jan-16 Condo tower A 599 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1607 17-Jan-16 Condo tower A 620 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1608 18-Jan-16 main pile 1698 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1609 18-Jan-16 main pile 1626 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1610 18-Jan-16 main pile 1625 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1611 18-Jan-16 main pile 1624 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1612 18-Jan-16 main pile 1576 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1613 18-Jan-16 main pile 1575 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1614 18-Jan-16 main pile 1574 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1615 18-Jan-16 main pile 1579 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1616 18-Jan-16 main pile 2967 Ǿ600 11 17 28.00 33.00 5.00 1.00 17.50 506.90 TI-16
1617 18-Jan-16 main pile 2966 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1618 18-Jan-16 main pile 2964 Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16
1619 18-Jan-16 main pile 2962 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16
1620 18-Jan-16 main pile 2963 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16
1621 18-Jan-16 main pile 2886 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 TI-18
1622 18-Jan-16 main pile 2883 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18
1623 18-Jan-16 main pile 2884 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18
1624 18-Jan-16 main pile 2888 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 TI-18
1625 18-Jan-16 main pile 2887 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 504.30 TI-18
1626 18-Jan-16 main pile 2885 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.50 504.30 TI-18
1627 18-Jan-16 main pile 2889 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1628 19-Jan-16 main pile 1578 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1629 19-Jan-16 main pile 1577 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1630 19-Jan-16 main pile 1629 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
1631 19-Jan-16 main pile 1628 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1632 19-Jan-16 main pile 1627 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1633 19-Jan-16 main pile 1703 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1634 19-Jan-16 main pile 1702 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1635 19-Jan-16 main pile 1701 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1636 19-Jan-16 main pile 2961 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1637 19-Jan-16 main pile 2960 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1638 19-Jan-16 main pile 2959 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1639 19-Jan-16 main pile 2958 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
1640 19-Jan-16 main pile 3022 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1641 19-Jan-16 main pile 3023 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1642 19-Jan-16 main pile 3000 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1643 19-Jan-16 main pile 3002 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1644 19-Jan-16 main pile 3003 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1645 19-Jan-16 main pile 3024 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1646 19-Jan-16 main pile 3025 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1647 19-Jan-16 Condo tower A 623 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1648 19-Jan-16 Condo tower A 644 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
1649 19-Jan-16 Condo tower A 647 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.70 586.60 TI-24
1650 19-Jan-16 Condo tower A 668 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
1651 19-Jan-16 Condo tower A 671 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1652 19-Jan-16 Condo tower A 692 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1653 20-Jan-16 main pile 3050 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1654 20-Jan-16 main pile 3048 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
1655 20-Jan-16 main pile 3049 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1656 20-Jan-16 main pile 3051 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1657 20-Jan-16 main pile 3056 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1658 20-Jan-16 main pile 3057 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
1659 20-Jan-16 Condo tower A 695 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1660 20-Jan-16 Condo tower A 716 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1661 20-Jan-16 Condo tower A 719 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 637.30 TI-24
1662 20-Jan-16 Condo tower A 740 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1663 20-Jan-16 Condo tower A 743 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1664 20-Jan-16 Condo tower A 764 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1665 21-Jan-16 main pile 2061A Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1666 21-Jan-16 main pile 2168B Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 420.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1667 21-Jan-16 main pile 2168A Ǿ600 15 17 32.00 29.50 -2.50 1.00 23.70 420.00 TI-07
1668 21-Jan-16 main pile 1753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1669 21-Jan-16 main pile 1752 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1670 21-Jan-16 main pile 1751 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1671 21-Jan-16 main pile 1827 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1672 21-Jan-16 main pile 1826 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1673 21-Jan-16 main pile 1825 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1674 21-Jan-16 main pile office 1016 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1675 21-Jan-16 main pile office 1017 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
1676 21-Jan-16 main pile office 1018 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1677 21-Jan-16 main pile office 1019 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1678 21-Jan-16 main pile office 1020 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1679 21-Jan-16 main pile 3064 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1680 21-Jan-16 main pile 3065 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1681 21-Jan-16 main pile 3067 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1682 21-Jan-16 main pile 3066 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1683 21-Jan-16 main pile 3059A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1684 21-Jan-16 main pile 3058 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1685 21-Jan-16 main pile 3015 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1686 21-Jan-16 main pile 3014 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1687 21-Jan-16 Condo tower A 767 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
1688 21-Jan-16 Condo tower A 788 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1689 21-Jan-16 Condo tower A 791 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
1690 21-Jan-16 Condo tower A 812 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1691 21-Jan-16 Condo tower A 815 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
1692 21-Jan-16 Condo tower A 836 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1693 22-Jan-16 main pile 1937 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1694 22-Jan-16 main pile 1946 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1695 22-Jan-16 main pile 1947 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1696 22-Jan-16 main pile 1945 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1697 22-Jan-16 main pile 1877 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1698 22-Jan-16 main pile 1876 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
1699 22-Jan-16 main pile 1875 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1700 22-Jan-16 main pile office 1024 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
1701 22-Jan-16 main pile office 1023 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1702 22-Jan-16 main pile office 1021 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1703 22-Jan-16 main pile office 1022 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
1704 22-Jan-16 main pile office 1027 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1705 22-Jan-16 main pile office 1026 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1706 22-Jan-16 main pile office 1025 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1707 22-Jan-16 main pile 2949 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1708 22-Jan-16 main pile 2948 Ǿ600 11 17 28.00 35.00 7.00 1.00 13.50 339.10 TI-26
1709 22-Jan-16 main pile 2946 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1710 22-Jan-16 main pile 2947 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1711 22-Jan-16 main pile 2945 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1712 22-Jan-16 Condo tower A 839 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1713 22-Jan-16 Condo tower A 860 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1714 22-Jan-16 Condo tower A 863 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1715 22-Jan-16 Condo tower A 884 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1716 23-Jan-16 main pile 1882 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
1717 23-Jan-16 main pile 1881 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1718 23-Jan-16 main pile 1885 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1719 23-Jan-16 main pile 1819 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1720 23-Jan-16 main pile 1820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1721 23-Jan-16 main pile 1821 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1722 23-Jan-16 main pile 1757 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1723 23-Jan-16 main pile office 1033 Ǿ600 15 17 32.00 35.0 3.00 1.00 20.70 509.20 TI-18
1724 23-Jan-16 main pile office 1032 Ǿ600 15 17 32.00 35.0 3.00 1.00 20.60 506.80 TI-18
1725 23-Jan-16 main pile office 1031 Ǿ600 15 17 32.00 34.0 2.00 1.00 20.50 504.30 TI-18
1726 23-Jan-16 main pile office 1030 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
1727 23-Jan-16 main pile office 1029 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
1728 23-Jan-16 main pile office 1028 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1729 23-Jan-16 Condo tower A 763 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1730 23-Jan-16 Condo tower A 768 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1731 23-Jan-16 Condo tower A 787 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1732 23-Jan-16 Condo tower A 792 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
1733 23-Jan-16 Condo tower A 811 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
1734 23-Jan-16 Condo tower A 816 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1735 24-Jan-16 main pile office 1041 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1736 24-Jan-16 main pile office 1040 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1737 24-Jan-16 main pile office 1039 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
1738 24-Jan-16 main pile office 1038 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1739 24-Jan-16 main pile office 1037 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1740 24-Jan-16 main pile office 1036 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1741 24-Jan-16 main pile office 1035 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1742 24-Jan-16 main pile office 1034 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
1743 25-Jan-16 main pile office 1043 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
1744 25-Jan-16 main pile office 1044 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1745 25-Jan-16 main pile office 1045 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1746 25-Jan-16 main pile office 1046 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1747 25-Jan-16 main pile office 1047 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.90 514.10 TI-18
1748 25-Jan-16 main pile office 1048 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
1749 25-Jan-16 main pile 1932 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1750 25-Jan-16 main pile 1934 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1751 25-Jan-16 main pile 1930 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
1752 25-Jan-16 main pile 1936 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1753 25-Jan-16 Condo tower A 744 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
1754 25-Jan-16 Condo tower A 739 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1755 25-Jan-16 Condo tower A 720 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.60 793.90 TI-24
1756 26-Jan-16 main pile office 1058 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1757 26-Jan-16 main pile office 1057 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.90 514.10 TI-18
1758 26-Jan-16 main pile office 1056 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1759 26-Jan-16 main pile office 1055 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1760 26-Jan-16 main pile office 1054 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1761 26-Jan-16 main pile office 1053 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1762 26-Jan-16 main pile office 1052 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1763 26-Jan-16 main pile office 1051 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
1764 26-Jan-16 main pile office 1050 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
1765 26-Jan-16 main pile office 1049 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 505.30 TI-18
1766 26-Jan-16 main pile 1893 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1767 26-Jan-16 main pile 1894 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1768 26-Jan-16 main pile 1895 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1769 26-Jan-16 main pile 1892 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1770 26-Jan-16 main pile 1891 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1771 26-Jan-16 main pile 1890 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1772 26-Jan-16 main pile 1758 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
1773 26-Jan-16 main pile 1695 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1774 26-Jan-16 main pile 1759 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
1775 26-Jan-16 main pile 1696 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1776 26-Jan-16 main pile 1571 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1777 26-Jan-16 main pile 1572 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1778 26-Jan-16 main pile 1573 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
1779 26-Jan-16 main pile 1512 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A
1780 26-Jan-16 main pile 1513 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1781 26-Jan-16 main pile 1514 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A
1782 26-Jan-16 main pile 2944 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1783 26-Jan-16 main pile 2950 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
1784 26-Jan-16 main pile 2954 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.50 414.40 TI-26
1785 26-Jan-16 main pile 2955 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.40 TI-26
1786 26-Jan-16 main pile 2953 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1787 26-Jan-16 main pile 2951 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1788 26-Jan-16 main pile 3063 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1789 26-Jan-16 main pile 3062 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1790 26-Jan-16 main pile 3054 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1791 26-Jan-16 Condo tower A 715 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1792 26-Jan-16 Condo tower A 696 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1793 26-Jan-16 Condo tower A 691 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1794 26-Jan-16 Condo tower A 672 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1795 26-Jan-16 Condo tower A 667 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1796 26-Jan-16 Condo tower A 648 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1797 26-Jan-16 Condo tower A 643 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1798 27-Jan-16 main pile office 1064 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1799 27-Jan-16 main pile office 1063 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1800 27-Jan-16 main pile office 1062 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 TI-18
1801 27-Jan-16 main pile office 1061 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1802 27-Jan-16 main pile office 1060 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
1803 27-Jan-16 main pile office 1059 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
1804 27-Jan-16 main pile 3052 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1805 27-Jan-16 main pile 3053 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1806 27-Jan-16 main pile 3060 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1807 27-Jan-16 main pile 3061 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1808 27-Jan-16 main pile 3068 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1809 27-Jan-16 main pile 3069 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1810 27-Jan-16 main pile 3076 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1811 27-Jan-16 main pile 3077 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1812 27-Jan-16 Condo tower A 624 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1813 27-Jan-16 Condo tower A 619 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1814 27-Jan-16 Condo tower A 600 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1815 27-Jan-16 Condo tower A 595 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1816 27-Jan-16 Condo tower A 576 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1817 27-Jan-16 Condo tower A 571 Ǿ800 17 17 34.00 37.00 3.00 1.00 22.80 800.90 TI-24
1818 28-Jan-16 main pile office 1071 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1819 28-Jan-16 main pile office 1070 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1820 28-Jan-16 main pile office 1069 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1821 28-Jan-16 main pile office 1068 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
1822 28-Jan-16 main pile office 1067 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
1823 28-Jan-16 main pile office 1066 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1824 28-Jan-16 main pile office 1065 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
1825 28-Jan-16 main pile 3084 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1826 28-Jan-16 main pile 3085 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
1827 28-Jan-16 main pile 3092 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1828 28-Jan-16 main pile 3093 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1829 28-Jan-16 main pile 3100 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1830 28-Jan-16 main pile 3101 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1831 28-Jan-16 main pile 3108 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1832 28-Jan-16 main pile 3109 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1833 28-Jan-16 main pile 3116 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1834 28-Jan-16 main pile 3117 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1835 28-Jan-16 Condo tower A 552 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1836 28-Jan-16 Condo tower A 547 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1837 28-Jan-16 Condo tower A 528 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
1838 28-Jan-16 Condo tower A 523 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1839 28-Jan-16 Condo tower A 504 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
1840 28-Jan-16 Condo tower A 499 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1841 28-Jan-16 Condo tower A 480 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.70 621.70 TI-24
1842 29-Jan-16 main pile office 1073 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
1843 29-Jan-16 main pile office 1074 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1844 29-Jan-16 main pile office 1075 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1845 29-Jan-16 main pile office 1076 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
1846 29-Jan-16 main pile office 1077 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1847 29-Jan-16 main pile office 1078 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
1848 29-Jan-16 main pile office 1079 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
1849 29-Jan-16 main pile 1509 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
1850 29-Jan-16 main pile 1510 Ǿ600 15 17 32.00 22.00 -10.00 1.00 24.00 426.50 TI-21A
1851 29-Jan-16 main pile 1635 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1852 29-Jan-16 main pile 1568 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1853 29-Jan-16 main pile 1569 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1854 29-Jan-16 main pile 1570 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
1855 29-Jan-16 main pile 1511 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1856 29-Jan-16 main pile 3124 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1857 29-Jan-16 main pile 3125 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1858 29-Jan-16 main pile 3132 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1859 29-Jan-16 main pile 3133 Ǿ600 11 17 28.00 33.00 5.00 1.00 12.50 313.90 TI-26
1860 29-Jan-16 main pile 3140 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1861 29-Jan-16 main pile 3141 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1862 29-Jan-16 main pile 3148 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
1863 29-Jan-16 main pile 3149 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
1864 29-Jan-16 Condo tower A 453 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
1865 29-Jan-16 Condo tower A 451 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1866 29-Jan-16 Condo tower A 456 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1867 29-Jan-16 Condo tower A 475 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1868 30-Jan-16 main pile office 1080 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
1869 30-Jan-16 main pile office 1081 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
1870 30-Jan-16 main pile office 1082 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
1871 30-Jan-16 main pile office 1083 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
1872 30-Jan-16 main pile office 1084 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
1873 30-Jan-16 main pile 1896 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
1874 30-Jan-16 main pile 1897 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
1875 30-Jan-16 main pile 1898 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
1876 30-Jan-16 main pile 1924 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1877 30-Jan-16 main pile 1925 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1878 30-Jan-16 main pile 1899 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1879 30-Jan-16 main pile 3156 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
1880 30-Jan-16 main pile 3157 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
1881 30-Jan-16 Condo tower A 454 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.80 800.90 TI-24
1882 30-Jan-16 Condo tower A 477 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1883 30-Jan-16 Condo tower A 478 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1884 30-Jan-16 Condo tower A 501 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1885 30-Jan-16 Condo tower A 502 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 624.70 TI-24
1886 30-Jan-16 Condo tower A 526 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
1887 31-Jan-16 main pile 1900 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1888 31-Jan-16 main pile 1901 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1889 31-Jan-16 main pile 1801 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
1890 31-Jan-16 main pile 1802 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1891 31-Jan-16 main pile 1803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1892 31-Jan-16 Condo tower A 549 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1893 31-Jan-16 Condo tower A 550 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1894 31-Jan-16 Condo tower A 573 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 632.30 TI-24
1895 31-Jan-16 Condo tower A 574 Ǿ800 17 17 34.00 40.03 6.03 1.00 22.80 800.90 TI-24
1896 1-Feb-16 Condo tower A 597 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1897 1-Feb-16 Condo tower A 598 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1898 1-Feb-16 Condo tower A 621 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1899 1-Feb-16 Condo tower A 622 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1900 1-Feb-16 Condo tower A 645 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1901 1-Feb-16 Condo tower A 646 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1902 1-Feb-16 Condo tower A 669 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1903 2-Feb-16 Condo tower A 670 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
1904 2-Feb-16 Condo tower A 693 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1905 2-Feb-16 Condo tower A 694 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
1906 2-Feb-16 Condo tower A 717 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
1907 2-Feb-16 Condo tower A 718 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1908 2-Feb-16 Condo tower A 741 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
1909 2-Feb-16 Condo tower B 440 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 828.10 TI-26
1910 2-Feb-16 Condo tower B 423 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
1911 2-Feb-16 Condo tower B 420 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
1912 2-Feb-16 main pile 1775 Ǿ600 15 17 32.00 33.20 1.20 1.00 23.70 420.00 TI-07
1913 2-Feb-16 main pile 1776 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
1914 2-Feb-16 main pile 1777 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1915 2-Feb-16 main pile 1677 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
1916 2-Feb-16 main pile 1678 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
1917 2-Feb-16 main pile 1679 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1918 2-Feb-16 main pile 1651 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
1919 2-Feb-16 main pile 1634 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
1920 2-Feb-16 main pile 1633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1921 2-Feb-16 main pile 1697 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1922 2-Feb-16 main pile 1630 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
1923 2-Feb-16 main pile 1631 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1924 2-Feb-16 main pile 1632 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
1925 2-Feb-16 main pile 1692 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
1926 2-Feb-16 main pile 1693 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-21A
1927 2-Feb-16 main pile 1694 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
1928 2-Feb-16 main pile 1754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
1929 2-Feb-16 main pile 1755 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A
1930 2-Feb-16 main pile 3159 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1931 2-Feb-16 main pile 3158 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1932 2-Feb-16 main pile 3151 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1933 3-Feb-16 Condo tower A 742 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
1934 3-Feb-16 Condo tower A 765 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1935 3-Feb-16 Condo tower A 766 Ǿ800 17 17 34.00 34.00 0.00 1.00 20.50 720.10 TI-24
1936 3-Feb-16 Condo tower A 789 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
1937 3-Feb-16 Condo tower A 790 Ǿ800 17 17 34.00 36.00 2.00 1.00 20.30 713.10 TI-24
1938 3-Feb-16 Condo tower A 814 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1939 3-Feb-16 Condo tower A 837 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.60 TI-24
1940 3-Feb-16 main pile 1652 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
1941 3-Feb-16 main pile 1653 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
1942 3-Feb-16 main pile 1553 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
1943 3-Feb-16 main pile 1554 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
1944 3-Feb-16 main pile 1555 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 TI-07
1945 3-Feb-16 main pile 1756 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
1946 3-Feb-16 main pile 1816 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1947 3-Feb-16 main pile 1817 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1948 3-Feb-16 main pile 1818 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1949 3-Feb-16 main pile 1880 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
1950 3-Feb-16 main pile 3150 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1951 3-Feb-16 main pile 3143 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1952 3-Feb-16 main pile 3142 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1953 3-Feb-16 main pile 3135 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1954 3-Feb-16 soldier pile 4495s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1955 3-Feb-16 soldier pile 4509s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16
1956 3-Feb-16 soldier pile 4513s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16
1957 3-Feb-16 soldier pile 4516s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1958 3-Feb-16 soldier pile 4517s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1959 4-Feb-16 Condo tower A 838 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
1960 4-Feb-16 Condo tower A 861 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.20 818.00 TI-24
1961 4-Feb-16 Condo tower A 862 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
1962 4-Feb-16 Condo tower A 885 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
1963 4-Feb-16 Condo tower B 399 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
1964 4-Feb-16 Condo tower B 396 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
1965 4-Feb-16 Condo tower B 375 Ǿ800 17 17 34.00 40.00 6.00 1.00 18.50 697.00 TI-26
1966 4-Feb-16 Condo tower B 329 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
1967 4-Feb-16 main pile 3134 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1968 4-Feb-16 main pile 3127 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1969 4-Feb-16 main pile 3126 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.60 506.80 TI-18
1970 4-Feb-16 main pile 3119 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18
1971 4-Feb-16 main pile 3118 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1972 4-Feb-16 main pile 3111 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 514.10 TI-18
1973 4-Feb-16 soldier pile 4518s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16
1974 4-Feb-16 soldier pile 4519s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16
1975 4-Feb-16 soldier pile 4520 Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16
1976 4-Feb-16 soldier pile 4521s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1977 4-Feb-16 soldier pile 4522s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16
1978 4-Feb-16 soldier pile 4523s Ǿ600 17 17.00 24.00 7.00 1.00 13.50 391.00 TI-16
1979 5-Feb-16 Condo tower A 883 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
1980 5-Feb-16 Condo tower A 864 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
1981 5-Feb-16 Condo tower A 859 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.20 779.80 TI-24
1982 5-Feb-16 Condo tower A 840 Ǿ800 17 17 34.00 32.00 -2.00 1.00 19.00 667.40 TI-24
1983 5-Feb-16 Condo tower A 817 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1984 5-Feb-16 main pile 3110 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1985 5-Feb-16 main pile 3103 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18
1986 5-Feb-16 main pile 3102 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1987 5-Feb-16 main pile 3095 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18
1988 5-Feb-16 main pile 3094 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18
1989 5-Feb-16 main pile 3087 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 TI-18
1990 5-Feb-16 main pile 3086 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.80 511.70 TI-18
1991 5-Feb-16 main pile 3079 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.90 515.10 TI-18
1992 6-Feb-16 Condo tower A 810 Ǿ800 17 17 34.00 33.00 -1.00 1.00 18.50 649.80 TI-24
1993 6-Feb-16 Condo tower A 793 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
1994 6-Feb-16 Condo tower A 786 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
1995 6-Feb-16 Condo tower A 769 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 755.70 TI-24
1996 6-Feb-16 Condo tower A 762 Ǿ800 17 17 34.00 36.50 2.50 1.00 22.90 804.40 TI-24
1997 6-Feb-16 soldier pile 4630s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16
1998 6-Feb-16 soldier pile 4654s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16
1999 6-Feb-16 soldier pile 4661s Ǿ600 17 17.00 24.50 7.50 1.00 10.00 289.60 TI-16
2000 6-Feb-16 soldier pile 4667s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16
2001 6-Feb-16 soldier pile 4675s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16
2002 6-Feb-16 soldier pile 4683s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16
2003 8-Feb-16 Condo tower A 745 Ǿ800 17 17 34.00 35.00 1.00 1.00 23.00 807.90 TI-24
2004 8-Feb-16 Condo tower A 738 Ǿ800 17 17 34.00 38.20 4.20 1.00 23.10 811.40 TI-24
2005 8-Feb-16 Condo tower A 721 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2006 9-Feb-16 Condo tower A 714 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 674.40 TI-24
2007 9-Feb-16 Condo tower A 697 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
2008 9-Feb-16 Condo tower A 690 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2009 9-Feb-16 Condo tower A 673 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 692.00 TI-24
2010 9-Feb-16 Condo tower A 666 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 496.50 TI-24
2011 9-Feb-16 Condo tower A 649 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2012 9-Feb-16 Condo tower A 642 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
2013 9-Feb-16 main pile 2862 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2014 9-Feb-16 main pile 2863 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2015 9-Feb-16 main pile 2867 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2016 9-Feb-16 main pile 2866 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2017 9-Feb-16 main pile 2870 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2018 9-Feb-16 main pile 2871 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2019 9-Feb-16 main pile 2872 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2020 9-Feb-16 main pile 2873 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2021 9-Feb-16 main pile 2874 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2022 9-Feb-16 main pile 2875 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2023 9-Feb-16 main pile 1550 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
2024 9-Feb-16 main pile 1551 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2025 9-Feb-16 main pile 1552 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2026 9-Feb-16 main pile 1648 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2027 9-Feb-16 main pile 1809 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2028 9-Feb-16 main pile 1808 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2029 9-Feb-16 main pile 1807 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2030 9-Feb-16 main pile 1804 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2031 9-Feb-16 main pile 1879 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2032 9-Feb-16 main pile 1878 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2033 9-Feb-16 main pile 1942 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2034 9-Feb-16 main pile 1500 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2035 9-Feb-16 main pile 1499 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
2036 9-Feb-16 main pile 1501 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 TI-21A
2037 9-Feb-16 main pile office 1086 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2038 9-Feb-16 main pile office 1087 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2039 9-Feb-16 main pile office 1088 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2040 9-Feb-16 main pile office 1089 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2041 9-Feb-16 main pile office 1090 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2042 9-Feb-16 main pile office 1091 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
2043 10-Feb-16 Condo tower A 625 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
2044 10-Feb-16 Condo tower A 618 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
2045 10-Feb-16 Condo tower A 601 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
2046 10-Feb-16 Condo tower A 594 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
2047 10-Feb-16 Condo tower A 577 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
2048 10-Feb-16 main pile 2876 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2049 10-Feb-16 main pile 2877 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2050 10-Feb-16 main pile 2878 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2051 10-Feb-16 main pile 2879 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2052 10-Feb-16 main pile 3070 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2053 10-Feb-16 main pile 3071 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2054 10-Feb-16 main pile 3078 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2055 10-Feb-16 main pile 3072 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2056 10-Feb-16 main pile 3073 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2057 10-Feb-16 main pile 3080 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2058 10-Feb-16 main pile 3081 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2059 10-Feb-16 main pile 1805 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 420.00 TI-07
2060 10-Feb-16 main pile 1806 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
2061 10-Feb-16 main pile 1768 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2062 10-Feb-16 main pile 1767 Ǿ600 15 17 32.00 32.80 0.80 1.00 23.70 420.00 TI-07
2063 10-Feb-16 main pile 1766 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2064 10-Feb-16 main pile 1502 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
2065 10-Feb-16 main pile 1503 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A
2066 10-Feb-16 main pile 1504 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2067 10-Feb-16 main pile 1505 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2068 10-Feb-16 main pile 1506 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2069 10-Feb-16 main pile office 1092 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2070 10-Feb-16 main pile office 1093 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2071 10-Feb-16 main pile office 1094 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2072 10-Feb-16 main pile office 1095 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2073 10-Feb-16 main pile office 1102 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2074 10-Feb-16 main pile office 1103 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2075 11-Feb-16 Condo tower A 570 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.40 646.30 TI-24
2076 11-Feb-16 Condo tower A 553 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 660.40 TI-24
2077 11-Feb-16 Condo tower A 546 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
2078 11-Feb-16 Condo tower A 529 Ǿ800 17 17 34.00 31.00 -3.00 1.00 22.50 507.80 TI-24
2079 11-Feb-16 main pile 3088 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2080 11-Feb-16 main pile 3089 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2081 11-Feb-16 main pile 3096 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2082 11-Feb-16 main pile 3097 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16
2083 11-Feb-16 main pile 3104 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2084 11-Feb-16 main pile 3105 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2085 11-Feb-16 main pile 1508 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2086 11-Feb-16 main pile 1507 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2087 11-Feb-16 main pile 1515 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
2088 11-Feb-16 main pile 1516 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2089 12-Feb-16 Condo tower A 522 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
2090 12-Feb-16 Condo tower A 505 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2091 12-Feb-16 Condo tower A 498 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 660.40 TI-24
2092 12-Feb-16 Condo tower A 481 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2093 12-Feb-16 Condo tower A 474 Ǿ800 17 17 34.00 26.00 -8.00 1.00 20.50 462.70 TI-24
2094 12-Feb-16 main pile 3112 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2095 12-Feb-16 main pile 3113 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2096 12-Feb-16 main pile 3120 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 463.40 TI-16
2097 12-Feb-16 main pile 3121 Ǿ600 11 17 28.00 30.00 2.00 1.00 12.50 362.10 TI-16
2098 12-Feb-16 main pile 3128 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2099 12-Feb-16 main pile 3129 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2100 12-Feb-16 main pile office 1104 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2101 12-Feb-16 main pile office 1105 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2102 12-Feb-16 main pile office 1106 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2103 12-Feb-16 main pile office 1107 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2104 12-Feb-16 main pile office 1108 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2105 12-Feb-16 main pile office 1109 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2106 12-Feb-16 main pile office 1110 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2107 12-Feb-16 main pile office 1111 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2108 13-Feb-16 main pile 3136 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2109 13-Feb-16 main pile 3137 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2110 13-Feb-16 main pile 3144 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2111 13-Feb-16 main pile 3145 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2112 13-Feb-16 main pile 2943 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2113 13-Feb-16 main pile 2942 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2114 13-Feb-16 main pile 2937 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2115 13-Feb-16 main pile 2936 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2116 13-Feb-16 main pile 2931 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2117 13-Feb-16 main pile office 1125 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
2118 13-Feb-16 main pile office 1124 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2119 13-Feb-16 main pile office 1114 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2120 13-Feb-16 main pile office 1113 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
2121 13-Feb-16 main pile office 1112 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2122 13-Feb-16 main pile 1517 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2123 13-Feb-16 main pile 1519 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2124 13-Feb-16 main pile 1518 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2125 13-Feb-16 main pile 1567 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2126 13-Feb-16 main pile 1566 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2127 13-Feb-16 main pile 1565 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2128 13-Feb-16 main pile 1771 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 421.00 TI-07
2129 13-Feb-16 main pile 1770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
2130 13-Feb-16 main pile 1769 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
2131 13-Feb-16 main pile 1773 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
2132 13-Feb-16 main pile 1774 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
2133 13-Feb-16 main pile 1798 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
2134 13-Feb-16 main pile 1799 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
2135 13-Feb-16 main pile 1800 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 421.00 TI-07
2136 14-Feb-16 main pile 3153 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2137 14-Feb-16 main pile 3152 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2138 14-Feb-16 main pile 3160 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2139 14-Feb-16 main pile office 1126 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2140 14-Feb-16 main pile office 1127 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2141 14-Feb-16 main pile office 1128 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2142 14-Feb-16 main pile office 1129 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2143 15-Feb-16 main pile 3163 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16
2144 15-Feb-16 main pile 3162 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 448.90 TI-16
2145 15-Feb-16 main pile 3155 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2146 15-Feb-16 main pile 3154 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2147 15-Feb-16 main pile 3147 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2148 15-Feb-16 main pile office 1123 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2149 15-Feb-16 main pile office 1122 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2150 15-Feb-16 main pile office 1121 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2151 15-Feb-16 main pile office 1120 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2152 15-Feb-16 main pile office 1119 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2153 15-Feb-16 main pile office 1140 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2154 16-Feb-16 main pile 3146 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2155 16-Feb-16 main pile 3139 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16
2156 16-Feb-16 main pile 3138 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2157 16-Feb-16 main pile 3131 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2158 16-Feb-16 main pile 3130 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2159 16-Feb-16 main pile 3123 Ǿ600 11 17 28.00 19.00 -9.00 1.00 8.00 100.50 TI-16
2160 16-Feb-16 main pile 3122 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2161 16-Feb-16 main pile 2930 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
2162 16-Feb-16 main pile 3165 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2163 16-Feb-16 main pile 3164 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2164 16-Feb-16 main pile 2894 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2165 16-Feb-16 main pile 2895 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2166 16-Feb-16 main pile 2881 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2167 16-Feb-16 main pile office 1139 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2168 16-Feb-16 main pile office 1138 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2169 16-Feb-16 main pile office 1137 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2170 16-Feb-16 main pile office 1136 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2171 16-Feb-16 main pile office 1135 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2172 16-Feb-16 main pile office 1134 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2173 16-Feb-16 main pile office 1133 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2174 16-Feb-16 main pile office 1132 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2175 17-Feb-16 main pile 2848 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2176 17-Feb-16 main pile 2849 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2177 17-Feb-16 main pile 2847 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2178 17-Feb-16 main pile 2846 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2179 17-Feb-16 main pile 2853 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2180 17-Feb-16 main pile office 1131 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2181 17-Feb-16 main pile office 1130 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2182 17-Feb-16 main pile office 1151 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2183 17-Feb-16 main pile office 1150 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2184 17-Feb-16 main pile office 1149 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2185 17-Feb-16 main pile office 1148 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2186 17-Feb-16 main pile office 1147 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2187 17-Feb-16 main pile office 1146 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2188 18-Feb-16 main pile 2852 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2189 18-Feb-16 main pile 2845 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2190 18-Feb-16 main pile 2844 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26
2191 18-Feb-16 main pile 2843 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2192 18-Feb-16 main pile 2842 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26
2193 18-Feb-16 main pile 2840 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2194 18-Feb-16 main pile 2841 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2195 18-Feb-16 main pile 2839 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26
2196 18-Feb-16 main pile 2838 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2197 18-Feb-16 main pile office 1145 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2198 18-Feb-16 main pile office 1144 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2199 18-Feb-16 main pile office 1142 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2200 18-Feb-16 main pile office 1141 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2201 18-Feb-16 main pile office 1162 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2202 18-Feb-16 main pile office 1161 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2203 18-Feb-16 main pile office 1160 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.90 514.10 TI-18
2204 18-Feb-16 main pile office 1159 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2205 18-Feb-16 main pile office 1158 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2206 19-Feb-16 main pile 3123A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2207 19-Feb-16 main pile 3115 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2208 19-Feb-16 main pile 3114 Ǿ600 11 17 28.00 16.00 -12.00 1.00 9.00 113.00 TI-16
2209 19-Feb-16 main pile 1564 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2210 19-Feb-16 main pile 1563 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2211 19-Feb-16 main pile 1562 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
2212 19-Feb-16 main pile 1966B Ǿ600 15 17 32.00 28.50 -3.50 1.00 24.00 426.50 TI-21A
2213 19-Feb-16 main pile 1966A Ǿ600 15 17 32.00 17.00 -15.00 1.00 24.00 426.50 TI-21A
2214 19-Feb-16 main pile 1725A Ǿ600 15 17 32.00 18.00 -14.00 1.00 24.00 426.50 TI-21A
2215 19-Feb-16 main pile office 1156 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2216 19-Feb-16 main pile office 1155 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2217 19-Feb-16 main pile office 1154 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2218 19-Feb-16 main pile office 1153 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2219 20-Feb-16 main pile office 1152 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2220 20-Feb-16 main pile office 1173 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
2221 20-Feb-16 main pile office 1172 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2222 20-Feb-16 main pile office 1171 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2223 20-Feb-16 main pile office 1170 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2224 21-Feb-16 main pile office 1169 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2225 21-Feb-16 main pile office 1168 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2226 21-Feb-16 main pile office 1167 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2227 21-Feb-16 main pile office 1166 Ǿ600 15 17 32.00 32.00 0.00 1.00 20.60 506.80 TI-18
2228 21-Feb-16 main pile office 1165 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2229 22-Feb-16 main pile office 1163 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2230 22-Feb-16 main pile office 1164 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 TI-18
2231 22-Feb-16 main pile office 1182 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2232 23-Feb-16 main pile office 1181 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2233 23-Feb-16 main pile office 1180 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2234 23-Feb-16 main pile office 1179 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
2235 23-Feb-16 main pile office 1178 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.80 511.70 TI-18
2236 23-Feb-16 soldier pile 4306s Ǿ600 17 17.00 20.00 3.00 1.00 24.20 421.10 TI-03
2237 23-Feb-16 soldier pile 4357s Ǿ600 17 17.00 20.50 3.50 1.00 24.20 421.10 TI-03
2238 23-Feb-16 soldier pile 4336s Ǿ600 17 17.00 24.50 7.50 1.00 20.00 196.00 TI-03
2239 23-Feb-16 main pile 2521A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03
2240 23-Feb-16 main pile 2429A Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 TI-03
2241 23-Feb-16 main pile 2401A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
2242 23-Feb-16 main pile 2397A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03
2243 23-Feb-16 main pile 2600A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
2244 24-Feb-16 main pile office 1177 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2245 24-Feb-16 main pile office 1176 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
2246 24-Feb-16 main pile office 1175 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2247 24-Feb-16 main pile office 1174 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2248 24-Feb-16 main pile office 1195 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2249 24-Feb-16 main pile office 1194 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2250 24-Feb-16 main pile 1772 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2251 24-Feb-16 main pile 1649 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2252 24-Feb-16 main pile 1650 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2253 24-Feb-16 main pile 1674 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2254 24-Feb-16 main pile 1675 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2255 24-Feb-16 main pile 2957A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2256 24-Feb-16 main pile 2956A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2257 25-Feb-16 main pile office 1193 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2258 25-Feb-16 main pile office 1192 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2259 25-Feb-16 main pile office 1191 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2260 25-Feb-16 main pile office 1190 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2261 25-Feb-16 main pile office 1189 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2262 26-Feb-16 main pile office 1188 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2263 26-Feb-16 main pile office 1187 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2264 26-Feb-16 main pile office 1186 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
2265 26-Feb-16 main pile 2940 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2266 26-Feb-16 main pile 2941 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2267 27-Feb-16 main pile office 1203 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2268 27-Feb-16 main pile office 1202 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2269 27-Feb-16 main pile office 1201 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
2270 27-Feb-16 main pile office 1200 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2271 27-Feb-16 main pile office 1199 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2272 27-Feb-16 main pile office 1198 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2273 27-Feb-16 soldier pile 4709s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24
2274 27-Feb-16 soldier pile 4712s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24
2275 27-Feb-16 condo tower A 457 Ǿ800 17 17 34.00 34.50 0.50 1.00 19.90 699.00 TI-24
2276 28-Feb-16 main pile office 1197 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2277 28-Feb-16 main pile office 1196 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2278 28-Feb-16 main pile office 1204 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
2279 28-Feb-16 main pile office 1205 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2280 28-Feb-16 main pile office 1206 Ǿ600 15 17 32.00 31.50 -0.50 1.00 20.90 514.10 TI-18
2281 29-Feb-16 main pile office 1185 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2282 29-Feb-16 main pile office 1184 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
2283 29-Feb-16 main pile office 1183 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2284 29-Feb-16 main pile office 1207 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2285 29-Feb-16 main pile office 1208 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2286 29-Feb-16 main pile office 1209 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2287 29-Feb-16 main pile office 1210 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2288 29-Feb-16 main pile tambahan 10929 Ǿ600 15 17 32.00 37.00 5.00 1.00 16.00 401.90 TI-26
2289 29-Feb-16 main pile tambahan 10930 Ǿ600 15 17 32.00 37.00 5.00 1.00 16.00 401.90 TI-26
2290 29-Feb-16 main pile tambahan 10931 Ǿ600 15 17 32.00 37.00 5.00 1.00 14.00 351.60 TI-26
2291 29-Feb-16 main pile tambahan 10932 Ǿ600 15 17 32.00 37.00 5.00 1.00 15.00 376.70 TI-26
2292 29-Feb-16 Condo tower A 450 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2293 29-Feb-16 Condo tower A 449 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2294 1-Mar-16 main pile office 1211 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2295 1-Mar-16 main pile office 1212 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2296 1-Mar-16 main pile office 1213 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2297 1-Mar-16 main pile office 1214 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2298 1-Mar-16 main pile office 1215 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2299 1-Mar-16 main pile office 1216 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2300 1-Mar-16 main pile office 1217 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2301 1-Mar-16 main pile office 1218 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2302 1-Mar-16 main pile 1779 Ǿ600 15 17 32.00 32.50 0.50 1.00 14.50 420.00 TI-16
2303 1-Mar-16 main pile 1778 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
2304 1-Mar-16 Condo tower A 447 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2305 1-Mar-16 Condo tower A 446 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2306 1-Mar-16 Condo tower A 445 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2307 1-Mar-16 Condo tower A 444 Ǿ800 17 17 34.00 31.00 -3.00 1.00 18.00 632.30 TI-24
2308 2-Mar-16 main pile 1676 Ǿ600 15 17 32.00 28.00 -4.00 1.00 23.70 420.00 TI-07
2309 2-Mar-16 main pile 1680 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2310 2-Mar-16 main pile 1681 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2311 2-Mar-16 main pile 1682 Ǿ600 15 17 32.00 35.20 3.20 1.00 23.70 420.00 TI-07
2312 2-Mar-16 main pile 1780 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
2313 2-Mar-16 Condo tower A 443 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2314 2-Mar-16 Condo tower A 442 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 695.50 TI-24
2315 3-Mar-16 main pile 1683 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2316 3-Mar-16 main pile 1684 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
2317 3-Mar-16 main pile 1685 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 420.00 TI-07
2318 3-Mar-16 main pile office 1219 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2319 3-Mar-16 main pile office 1220 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2320 3-Mar-16 main pile office 1221 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2321 3-Mar-16 main pile office 1222 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2322 3-Mar-16 Condo tower A 464 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2323 3-Mar-16 Condo tower A 463 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2324 3-Mar-16 Condo tower A 462 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2325 3-Mar-16 Condo tower A 461 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2326 3-Mar-16 Condo tower A 460 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2327 4-Mar-16 main pile office 1223 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
2328 4-Mar-16 main pile office 1224 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2329 4-Mar-16 main pile office 1225 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2330 4-Mar-16 main pile office 1226 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2331 4-Mar-16 main pile office 1227 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2332 4-Mar-16 main pile office 1228 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2333 4-Mar-16 main pile office 1229 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2334 4-Mar-16 Condo tower A 458 Ǿ800 17 17 34.00 27.00 -7.00 1.00 23.00 519.10 TI-24
2335 5-Mar-16 main pile 10938 Ǿ600 11 17 28.00 34.00 6.00 1.00 19.00 477.20 TI-26
2336 5-Mar-16 main pile 2882 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26
2337 5-Mar-16 main pile 10936 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2338 5-Mar-16 main pile 2860 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2339 5-Mar-16 main pile 2861 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2340 5-Mar-16 main pile 2856 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26
2341 5-Mar-16 main pile 2857 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26
2342 5-Mar-16 Condo tower A 465 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2343 5-Mar-16 Condo tower A 466 Ǿ800 17 17 34.00 35.00 1.00 1.00 20.00 702.50 TI-24
2344 6-Mar-16 main pile office 1230 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2345 6-Mar-16 main pile office 1231 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2346 6-Mar-16 main pile office 1232 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2347 6-Mar-16 main pile office 1233 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
2348 6-Mar-16 main pile office 1234 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2349 6-Mar-16 main pile office 1235 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
2350 7-Mar-16 Condo tower A 467 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.00 737.70 TI-24
2351 7-Mar-16 Condo tower A 468 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.00 TI-24
2352 8-Mar-16 Condo tower A 469 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
2353 8-Mar-16 Condo tower A 470 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2354 8-Mar-16 main pile office 1236 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
2355 8-Mar-16 main pile office 1237 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
2356 8-Mar-16 main pile office 1238 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2357 8-Mar-16 main pile office 1239 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2358 8-Mar-16 main pile office 1240 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2359 8-Mar-16 main pile office 1241 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2360 8-Mar-16 main pile office 1242 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2361 9-Mar-16 Condo tower A 471 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.10 TI-24
2362 9-Mar-16 Condo tower A 473 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2363 9-Mar-16 Condo tower B 414 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2364 9-Mar-16 Condo tower B 405 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2365 9-Mar-16 main pile 1644 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2366 9-Mar-16 main pile 1643 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
2367 9-Mar-16 main pile 1642 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2368 9-Mar-16 main pile 1558 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2369 9-Mar-16 main pile office 1243 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2370 9-Mar-16 soldier pile 4777s Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A
2371 9-Mar-16 soldier pile 4753s Ǿ600 17 17.00 24.50 7.50 10.00 177.70 TI-21A
2372 10-Mar-16 Condo tower A 489 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 519.10 TI-24
2373 10-Mar-16 Condo tower A 488 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
2374 10-Mar-16 Condo tower B 366 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2375 10-Mar-16 Condo tower B 381 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2376 10-Mar-16 Condo tower B 342 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2377 10-Mar-16 Condo tower B 357 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
2378 10-Mar-16 Condo tower B 406 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2379 10-Mar-16 main pile office 1244 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2380 10-Mar-16 main pile office 1245 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2381 10-Mar-16 main pile office 1246 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2382 10-Mar-16 main pile office 1247 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2383 11-Mar-16 Condo tower B 413 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.40 806.20 TI-25
2384 11-Mar-16 Condo tower B 382 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2385 11-Mar-16 Condo tower B 389 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.30 802.40 TI-25
2386 11-Mar-16 Condo tower B 365 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
2387 11-Mar-16 main pile office 1248 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2388 11-Mar-16 main pile office 1249 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2389 11-Mar-16 main pile office 1250 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2390 11-Mar-16 main pile office 1251 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2391 11-Mar-16 soldier pile 4733 Ǿ600 17 17.00 24.40 7.40 20.00 355.40 TI-21A
2392 11-Mar-16 soldier pile 4726 Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A
2393 11-Mar-16 soldier pile 4722 Ǿ600 17 17.00 16.00 -1.00 24.00 426.50 TI-21A
2394 11-Mar-16 soldier pile 4719 Ǿ600 17 17.00 24.50 7.50 13.00 231.00 TI-21A
2395 12-Mar-16 main pile 3074 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2396 12-Mar-16 main pile 3075 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2397 12-Mar-16 main pile 3082 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16
2398 13-Mar-16 Condo tower B 380 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2399 13-Mar-16 Condo tower B 367 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
2400 13-Mar-16 Condo tower B 404 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2401 14-Mar-16 Condo tower B 391 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2402 14-Mar-16 Condo tower B 416 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2403 14-Mar-16 Condo tower B 427 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.30 614.10 TI-25
2404 14-Mar-16 Condo tower B 428 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2405 14-Mar-16 main pile 3083 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2406 14-Mar-16 main pile 3090 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16
2407 15-Mar-16 Condo tower A 487 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2408 15-Mar-16 Condo tower A 486 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2409 15-Mar-16 Condo tower A 485 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2410 15-Mar-16 Condo tower A 484 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2411 15-Mar-16 Condo tower B 415 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2412 15-Mar-16 Condo tower B 356 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2413 15-Mar-16 main pile 3091 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2414 15-Mar-16 main pile 3098 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2415 15-Mar-16 main pile 3099 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2416 15-Mar-16 main pile 3106 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16
2417 15-Mar-16 main pile office 1253 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2418 15-Mar-16 main pile office 1254 Ǿ600 15 17 32.00 31.50 -0.50 1.00 21.00 516.60 TI-18
2419 15-Mar-16 main pile office 1255 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2420 15-Mar-16 main pile office 1256 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2421 16-Mar-16 Condo tower A 482 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2422 16-Mar-16 Condo tower A 497 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2423 16-Mar-16 Condo tower A 495 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2424 16-Mar-16 Condo tower B 332 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 658.70 TI-25
2425 16-Mar-16 Condo tower B 343 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.60 813.70 TI-25
2426 16-Mar-16 main pile office 1257 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2427 16-Mar-16 main pile office 1258 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2428 16-Mar-16 main pile office 1259 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2429 16-Mar-16 main pile office 1260 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2430 16-Mar-16 sisipan soldier pile 4722s1 Ǿ600 17 17.00 24.50 7.50 11.00 195.50 TI-21A
2431 17-Mar-16 Condo tower A 494 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2432 17-Mar-16 Condo tower A 493 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2433 17-Mar-16 Condo tower A 492 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2434 17-Mar-16 Condo tower A 491 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2435 17-Mar-16 Condo tower A 490 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2436 17-Mar-16 Condo tower A 506 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2437 17-Mar-16 Condo tower A 508 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2438 17-Mar-16 Condo tower B 308 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
2439 17-Mar-16 Condo tower B 319 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2440 17-Mar-16 Condo tower B 379 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
2441 18-Mar-16 Condo tower A 509 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2442 18-Mar-16 Condo tower A 510 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2443 18-Mar-16 Condo tower A 511 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2444 18-Mar-16 Condo tower A 512 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2445 18-Mar-16 Condo tower A 513 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2446 18-Mar-16 Condo tower B 392 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
2447 18-Mar-16 Condo tower B 403 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2448 18-Mar-16 Condo tower B 344 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.40 506.20 TI-25
2449 18-Mar-16 main pile office 1261 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2450 18-Mar-16 main pile office 1252 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2451 18-Mar-16 main pile office 1118 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2452 18-Mar-16 main pile office 1097 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2453 18-Mar-16 main pile office 1096 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2454 18-Mar-16 main pile office 1098 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2455 18-Mar-16 Main pile 1645 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2456 18-Mar-16 Main pile 1646 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.00 420.00 TI-07
2457 18-Mar-16 Main pile 1647 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2458 18-Mar-16 Main pile 1559 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
2459 18-Mar-16 Main pile 1560 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2460 18-Mar-16 Main pile 1561 Ǿ600 15 17 32.00 34.70 2.70 1.00 23.70 420.00 TI-07
2461 18-Mar-16 Main pile 1556 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2462 18-Mar-16 Main pile 1557 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2463 19-Mar-16 main pile office 1115 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2464 19-Mar-16 main pile office 1116 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2465 19-Mar-16 main pile office 1117 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2466 19-Mar-16 main pile office 1100 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 TI-18
2467 19-Mar-16 main pile office 1099 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2468 19-Mar-16 Main pile 1512A Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
2469 19-Mar-16 Main pile 1510A Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
2470 19-Mar-16 Main pile 1503A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
2471 20-Mar-16 Condo tower A 521 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2472 20-Mar-16 Condo tower A 519 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2473 20-Mar-16 Condo tower A 518 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2474 20-Mar-16 Condo tower A 517 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 678.10 TI-26
2475 20-Mar-16 Condo tower B 355 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.40 806.20 TI-25
2476 20-Mar-16 Condo tower B 368 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.90 674.40 TI-25
2477 21-Mar-16 Condo tower A 514 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2478 21-Mar-16 Condo tower A 515 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2479 21-Mar-16 Condo tower A 516 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2480 21-Mar-16 Condo tower B 400 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
2481 21-Mar-16 Main pile 3107 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2482 21-Mar-16 Main pile 1544 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2483 21-Mar-16 Main pile 1545 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2484 22-Mar-16 Condo tower B 419 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 742.20 TI-25
2485 22-Mar-16 Condo tower B 424 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2486 22-Mar-16 Condo tower B 371 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
2487 22-Mar-16 Condo tower B 376 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
2488 22-Mar-16 Main pile 3114A Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2489 22-Mar-16 Main pile 3121A Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16
2490 22-Mar-16 Main pile 1546 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
2491 22-Mar-16 Main pile 1654 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
2492 22-Mar-16 Main pile 1655 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
2493 22-Mar-16 Main pile 1656 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
2494 22-Mar-16 Main pile 1668 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
2495 22-Mar-16 Main pile 1670 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
2496 22-Mar-16 main pile office 1101 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2497 23-Mar-16 Condo tower A 533 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2498 23-Mar-16 Condo tower A 532 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2499 23-Mar-16 Condo tower A 530 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2500 23-Mar-16 Main pile 1669 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2501 23-Mar-16 Main pile 1792 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2502 23-Mar-16 Main pile 1793 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
2503 23-Mar-16 Main pile 1794 Ǿ600 15 17 32.00 30.00 -2.00 1.00 23.70 420.00 TI-07
2504 23-Mar-16 main pile office 1001 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2505 23-Mar-16 main pile office 1002 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2506 23-Mar-16 main pile office 1003 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2507 23-Mar-16 main pile office 1004 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2508 23-Mar-16 main pile office 1005 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2509 24-Mar-16 Condo tower A 537 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2510 24-Mar-16 Condo tower A 536 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2511 24-Mar-16 Condo tower A 535 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2512 24-Mar-16 Condo tower A 534 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2513 24-Mar-16 Condo tower B 299 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 632.90 TI-25
2514 24-Mar-16 main pile office 1085 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 506.90 TI-16
2515 24-Mar-16 Main Pile 2864 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2516 24-Mar-16 Main Pile 2865 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2517 24-Mar-16 Main Pile 2868 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16
2518 24-Mar-16 Main Pile 2869 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2519 25-Mar-16 Main Pile 2859 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16
2520 25-Mar-16 Main Pile 2858 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16
2521 25-Mar-16 Main Pile ofifice 1006 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2522 25-Mar-16 Main Pile ofifice 1007 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2523 25-Mar-16 Main Pile ofifice 1008 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2524 25-Mar-16 Main Pile ofifice 1009 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
2525 26-Mar-16 Main Pile 2855 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2526 26-Mar-16 Main Pile 2854 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16
2527 26-Mar-16 Main Pile 2850 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16
2528 26-Mar-16 Main Pile 2851 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16
2529 26-Mar-16 Main Pile 2837 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2530 26-Mar-16 Main Pile 2836 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16
2531 26-Mar-16 Main Pile ofifice 1011 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2532 26-Mar-16 Main Pile ofifice 1012 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2533 26-Mar-16 Main Pile ofifice 1013 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
2534 26-Mar-16 Main Pile ofifice 1015 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2535 27-Mar-16 Main Pile 2835 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16
2536 27-Mar-16 Main Pile 2834 Ǿ600 11 17 28.00 27.00 -1.00 1.00 14.50 420.00 TI-16
2537 27-Mar-16 Main Pile 10927 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
2538 28-Mar-16 Condo tower A 545 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 565.10 TI-26
2539 28-Mar-16 Condo tower A 543 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2540 28-Mar-16 Condo tower A 542 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2541 29-Mar-16 Condo tower A 538 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 688.10 TI-26
2542 29-Mar-16 Condo tower A 539 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2543 29-Mar-16 Condo tower A 540 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2544 29-Mar-16 Condo tower A 541 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2545 30-Mar-16 Condo tower A 554 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2546 30-Mar-16 Condo tower A 556 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 527.40 TI-26
2547 30-Mar-16 Main Pile 2834A Ǿ600 15 17 32.00 38.00 6.00 1.00 13.00 376.50 TI-16
2548 31-Mar-16 Condo tower A 557 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.80 TI-26
2549 1-Apr-16 Condo tower B 304 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
2550 1-Apr-16 Condo tower B 323 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-25
2551 1-Apr-16 Condo tower B 328 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2552 1-Apr-16 Condo tower B 347 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.50 810.00 TI-25
2553 1-Apr-16 Condo tower B 395 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2554 1-Apr-16 Condo tower B 352 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
2555 1-Apr-16 main pile 4137s Ǿ600 17 17.00 24.50 7.50 1.00 20.00 492.00 TI-218
2556 2-Apr-16 Condo tower A 561 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2557 2-Apr-16 Condo tower A 560 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2558 2-Apr-16 Condo tower A 559 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2559 2-Apr-16 Condo tower A 558 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2560 3-Apr-16 Condo tower A 569 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2561 3-Apr-16 Condo tower A 567 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2562 3-Apr-16 Condo tower A 566 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.00 TI-26
2563 3-Apr-16 Condo tower A 565 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2564 3-Apr-16 Condo tower A 564 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2565 3-Apr-16 Condo tower A 563 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2566 3-Apr-16 main pile 3161A Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-218
2567 3-Apr-16 main pile 4127s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218
2568 3-Apr-16 main pile 4130s Ǿ600 17 17.00 24.50 7.50 18.70 460.00 TI-218
2569 3-Apr-16 main pile 4131s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218
2570 3-Apr-16 main pile 4134s Ǿ600 17 17.00 24.50 7.50 19.00 467.40 TI-218
2571 4-Apr-16 Condo tower B 300 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 745.90 TI-25
2572 4-Apr-16 Condo tower B 303 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2573 4-Apr-16 Condo tower B 324 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2574 5-Apr-16 Condo tower B 327 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2575 5-Apr-16 Condo tower B 348 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
2576 5-Apr-16 Condo tower B 351 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2577 5-Apr-16 Condo tower B 372 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-25
2578 5-Apr-16 Condo tower B 30069 Ǿ800 17 17 34.00 28.00 -6.00 1.00 21.50 810.00 TI-25
2579 6-Apr-16 Condo tower A 578 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2580 6-Apr-16 Condo tower A 580 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2581 6-Apr-16 Condo tower A 581 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2582 6-Apr-16 Condo tower A 582 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2583 6-Apr-16 Condo tower A 583 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2584 6-Apr-16 Condo tower A 584 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
2585 8-Apr-16 Condo tower A 30051 Ǿ800 17 17 34.00 31.00 -3.00 1.00 21.50 810.00 TI-26
2586 8-Apr-16 Condo tower A 30052 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2587 8-Apr-16 Condo tower B 36 Ǿ800 17 17 34.00 32.00 -2.00 1.00 17.00 597.20 TI-24
2588 8-Apr-16 Condo tower B 298 Ǿ800 17 17 34.00 39.00 5.00 1.00 18.50 697.00 TI-25
2589 8-Apr-16 Condo tower B 305 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 817.50 TI-25
2590 8-Apr-16 Condo tower B 322 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
2591 8-Apr-16 Condo tower B 346 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2592 8-Apr-16 Condo tower B 353 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
2593 8-Apr-16 Condo tower B 370 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.20 798.70 TI-25
2594 9-Apr-16 Condo tower B 34 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
2595 9-Apr-16 Condo tower B 377 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
2596 9-Apr-16 Condo tower B 394 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2597 9-Apr-16 Condo tower B 401 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2598 9-Apr-16 Condo tower B 418 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2599 9-Apr-16 Condo tower A 586 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2600 9-Apr-16 Condo tower A 587 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2601 9-Apr-16 Condo tower A 588 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2602 11-Apr-16 Condo tower A 589 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2603 11-Apr-16 Condo tower A 590 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
2604 11-Apr-16 Condo tower A 591 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2605 11-Apr-16 Condo tower A 593 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
2606 12-Apr-16 Condo tower B 33 Ǿ800 17 17 34.00 34.00 0.00 1.00 22.90 804.90 TI-24
2607 12-Apr-16 Condo tower B 32 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2608 13-Apr-16 Condo tower B 31 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2609 13-Apr-16 Condo tower B 30 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
2610 13-Apr-16 Condo tower B 29 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2611 13-Apr-16 Condo tower B 306 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
2612 13-Apr-16 Condo tower B 321 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
2613 13-Apr-16 Condo tower B 330 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.60 813.70 TI-25
2614 13-Apr-16 Condo tower B 345 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2615 13-Apr-16 Condo tower B 354 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.1.1 TI-25
2616 13-Apr-16 Condo tower A 602 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.90 TI-26
2617 13-Apr-16 Condo tower A 604 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2618 13-Apr-16 Condo tower A 605 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
2619 13-Apr-16 Condo tower A 606 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2620 13-Apr-16 Condo tower A 607 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2621 13-Apr-16 Condo tower A 608 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2622 13-Apr-16 Condo tower A 609 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 878.10 TI-26
2623 14-Apr-16 Condo tower B 369 Ǿ800 17 17 34.00 17.50 -16.50 1.00 22.10 836.60 TI-25
2624 14-Apr-16 Condo tower A 617 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
2625 14-Apr-16 Condo tower A 615 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
2626 14-Apr-16 Condo tower A 614 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2627 14-Apr-16 Sisipan Office 1254A Ǿ600 17 15 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
2628 15-Apr-16 Condo tower B 378 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
2629 15-Apr-16 Condo tower B 393 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2630 15-Apr-16 Condo tower B 402 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
2631 15-Apr-16 Condo tower B 417 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.70 817.50 TI-25
2632 15-Apr-16 Condo tower B 25 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2633 15-Apr-16 Condo tower A 613 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2634 15-Apr-16 Condo tower A 612 Ǿ800 17 17 34.00 42.40 8.40 1.00 18.00 678.10 TI-26
2635 15-Apr-16 Condo tower A 611 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2636 15-Apr-16 Condo tower A 610 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2637 16-Apr-16 Condo tower B 26 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2638 16-Apr-16 Condo tower B 27 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.80 800.90 TI-24
2639 16-Apr-16 Condo tower B 28 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.90 804.40 TI-24
2640 17-Apr-16 Condo tower A 626 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
2641 17-Apr-16 Condo tower A 628 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2642 17-Apr-16 Condo tower A 629 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2643 19-Apr-16 Condo tower B 49 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.00 TI-24
2644 19-Apr-16 Condo tower B 48 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2645 19-Apr-16 Condo tower B 47 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2646 19-Apr-16 Condo tower B 46 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2647 19-Apr-16 Condo tower B 45 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2648 19-Apr-16 Condo tower B 292 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.80 783.60 TI-25
2649 19-Apr-16 Condo tower B 311 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.80 821.30 TI-25
2650 19-Apr-16 Condo tower B 316 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
2651 19-Apr-16 Condo tower B 335 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
2652 19-Apr-16 Condo tower A 633 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
2653 19-Apr-16 Condo tower A 632 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2654 19-Apr-16 Condo tower A 631 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2655 19-Apr-16 Condo tower A 630 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2656 20-Apr-16 Condo tower B 44 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2657 20-Apr-16 Condo tower B 43 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 744.20 TI-24
2658 20-Apr-16 Condo tower B 42 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2659 20-Apr-16 Condo tower B 41 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2660 20-Apr-16 Condo tower B 40 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737,7 TI-24
2661 21-Apr-16 Condo tower A 641 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2662 21-Apr-16 Condo tower A 639 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2663 21-Apr-16 Condo tower A 638 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2664 21-Apr-16 Condo tower A 637 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2665 21-Apr-16 Condo tower A 636 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2666 21-Apr-16 Condo tower A 635 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2667 21-Apr-16 Condo tower B 39 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2668 21-Apr-16 Condo tower B 50 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2669 21-Apr-16 Condo tower B 51 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2670 21-Apr-16 Condo tower B 52 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2671 21-Apr-16 Condo tower B 340 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
2672 21-Apr-16 Condo tower B 359 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
2673 21-Apr-16 Condo tower B 364 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2674 22-Apr-16 Condo tower B 53 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2675 22-Apr-16 Condo tower B 54 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2676 22-Apr-16 Condo tower B 55 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.30 713.10 TI-24
2677 22-Apr-16 Condo tower B 56 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.00 807.90 TI-24
2678 22-Apr-16 Condo tower B 57 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2679 22-Apr-16 Condo tower B 58 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
2680 22-Apr-16 Condo tower B 383 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.80 821.30 TI-25
2681 22-Apr-16 Condo tower B 388 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2682 22-Apr-16 Condo tower B 407 Ǿ800 17 17 34.00 37.50 3.50 1.00 22.00 828.80 TI-25
2683 22-Apr-16 Condo tower B 412 Ǿ800 17 17 34.00 32.00 -2.00 1.00 22.00 828.80 TI-25
2684 22-Apr-16 Condo tower B 634 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2685 23-Apr-16 Condo tower B 59 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2686 23-Apr-16 Condo tower B 60 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.90 804.40 TI-24
2687 23-Apr-16 Condo tower B 72 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2688 23-Apr-16 Condo tower B 358 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
2689 23-Apr-16 Condo tower B 293 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
2690 23-Apr-16 Condo tower B 341 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2691 23-Apr-16 Condo tower B 310 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2692 24-Apr-16 Condo tower B 71 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
2693 24-Apr-16 Condo tower B 70 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2694 24-Apr-16 Condo tower B 68 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
2695 24-Apr-16 Condo tower B 73 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2696 24-Apr-16 Condo tower B 317 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
2697 24-Apr-16 Condo tower B 334 Ǿ800 17 17 34.00 42.00 8.00 1.00 14.50 546.30 TI-25
2698 25-Apr-16 Condo tower B 67 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2699 25-Apr-16 Condo tower B 66 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2700 25-Apr-16 Condo tower B 65 Ǿ800 17 17 34.00 40.00 6.00 1.00 22.90 804.40 TI-24
2701 25-Apr-16 Condo tower B 64 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2702 25-Apr-16 Condo tower A 650 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2703 25-Apr-16 Condo tower A 652 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2704 25-Apr-16 Condo tower A 653 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2705 25-Apr-16 Condo tower A 654 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2706 26-Apr-16 Condo tower B 63 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2707 26-Apr-16 Condo tower B 74 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2708 26-Apr-16 Condo tower B 75 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 800.90 TI-24
2709 26-Apr-16 Condo tower B 285 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.20 610.30 TI-25
2710 26-Apr-16 Condo tower B 309 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 828.80 TI-25
2711 26-Apr-16 Condo tower B 294 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
2712 26-Apr-16 Condo tower B 318 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
2713 26-Apr-16 Condo tower B 333 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2714 26-Apr-16 Condo tower A 655 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2715 26-Apr-16 Condo tower A 656 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2716 26-Apr-16 Condo tower A 657 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
2717 27-Apr-16 Condo tower B 76 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2718 27-Apr-16 Condo tower B 77 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2719 27-Apr-16 Condo tower B 78 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2720 27-Apr-16 Condo tower B 79 Ǿ800 17 17 34.00 24.00 -10.00 1.00 23.00 807.90 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2721 27-Apr-16 Condo tower B 80 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2722 27-Apr-16 Condo tower B 81 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2723 27-Apr-16 Condo tower B 82 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2724 27-Apr-16 Condo tower B 235 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.70 817.50 TI-25
2725 27-Apr-16 Condo tower B 248 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2726 27-Apr-16 Condo tower B 259 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2727 27-Apr-16 Condo tower B 272 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 817.50 TI-25
2728 27-Apr-16 Condo tower B 283 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 727.10 TI-25
2729 27-Apr-16 Condo tower A 665 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2730 27-Apr-16 Condo tower A 663 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2731 27-Apr-16 Condo tower A 662 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
2732 27-Apr-16 Condo tower A 661 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
2733 27-Apr-16 Condo tower A 660 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2734 27-Apr-16 Condo tower A 659 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2735 28-Apr-16 Condo tower B 83 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.00 TI-24
2736 28-Apr-16 Condo tower B 84 Ǿ800 17 17 34.00 31.50 -2.50 1.00 23.00 807.90 TI-24
2737 28-Apr-16 Condo tower B 97 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 807.90 TI-24
2738 28-Apr-16 Condo tower B 96 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2739 28-Apr-16 Condo tower B 296 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.70 817.50 TI-25
2740 28-Apr-16 Condo tower B 307 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.80 821.30 TI-25
2741 28-Apr-16 Condo tower B 320 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.80 821.30 TI-25
2742 28-Apr-16 Condo tower B 331 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
2743 28-Apr-16 Condo tower A 674 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2744 29-Apr-16 Condo tower B 95 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2745 29-Apr-16 Condo tower B 94 Ǿ800 17 17 34.00 41.00 7.00 1.00 22.90 804.40 TI-24
2746 29-Apr-16 Condo tower B 93 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
2747 29-Apr-16 Condo tower B 92 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2748 29-Apr-16 Condo tower B 225 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
2749 29-Apr-16 Condo tower B 234 Ǿ800 17 17 34.00 40.00 6.00 1.00 12.00 452.10 TI-25
2750 29-Apr-16 Condo tower B 249 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
2751 29-Apr-16 Condo tower B 258 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.90 825.10 TI-25
2752 29-Apr-16 Condo tower A 676 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2753 29-Apr-16 Condo tower A 677 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2754 29-Apr-16 Condo tower A 678 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
2755 29-Apr-16 Condo tower A 679 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 679.00 TI-26
2756 29-Apr-16 Condo tower A 680 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
2757 30-Apr-16 Condo tower B 91 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2758 30-Apr-16 Condo tower B 90 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2759 30-Apr-16 Condo tower B 89 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2760 30-Apr-16 Condo tower B 273 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.00 828.80 TI-25
2761 30-Apr-16 Condo tower B 282 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
2762 30-Apr-16 Condo tower B 297 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.90 825.10 TI-25
2763 30-Apr-16 Condo tower A 681 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
2764 30-Apr-16 Condo tower A 689 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2765 30-Apr-16 Condo tower A 687 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2766 1-May-16 Condo tower B 226 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 669.30 TI-25
2767 1-May-16 Condo tower B 233 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
2768 1-May-16 Condo tower A 686 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2769 1-May-16 Condo tower A 685 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
2770 1-May-16 Condo tower A 684 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
2771 2-May-16 Condo tower B 250 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2772 2-May-16 Condo tower B 257 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
2773 2-May-16 Condo tower B 274 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2774 2-May-16 Condo tower B 281 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
2775 2-May-16 Condo tower B 88 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2776 2-May-16 Condo tower B 87 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2777 2-May-16 Condo tower A 683 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
2778 2-May-16 Condo tower A 682 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
2779 3-May-16 Condo tower B 227 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
2780 3-May-16 Condo tower B 232 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.00 TI-25
2781 3-May-16 Condo tower B 251 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
2782 3-May-16 Condo tower B 256 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2783 3-May-16 Condo tower B 275 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2784 3-May-16 Condo tower B 98 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2785 3-May-16 Condo tower B 99 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
2786 3-May-16 Condo tower B 100 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2787 3-May-16 Condo tower B 101 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2788 3-May-16 Condo tower B 102 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2789 3-May-16 Condo tower A 698 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2790 4-May-16 Condo tower B 280 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
2791 4-May-16 Condo tower B 103 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2792 4-May-16 Condo tower B 104 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2793 4-May-16 Condo tower B 105 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.60 685.00 TI-24
2794 4-May-16 Condo tower B 106 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2795 4-May-16 Condo tower B 107 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2796 4-May-16 Condo tower B 108 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2797 4-May-16 Condo tower A 701 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 659.30 TI-26
2798 4-May-16 Condo tower A 702 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2799 4-May-16 Condo tower A 703 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
2800 4-May-16 Condo tower A 704 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2801 4-May-16 Condo tower A 705 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
2802 5-May-16 Condo tower B 228 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2803 5-May-16 Condo tower B 231 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2804 5-May-16 Condo tower B 252 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 648.00 TI-25
2805 5-May-16 Condo tower B 255 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2806 5-May-16 Condo tower B 276 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 678.10 TI-25
2807 5-May-16 Condo tower B 279 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2808 5-May-16 Condo tower B 121 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
2809 5-May-16 Condo tower B 120 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2810 5-May-16 Condo tower B 119 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
2811 5-May-16 Condo tower B 118 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2812 5-May-16 Condo tower B 117 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2813 5-May-16 Condo tower B 116 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2814 5-May-16 Condo tower B 115 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2815 5-May-16 Condo tower A 713 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
2816 5-May-16 Condo tower A 711 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2817 5-May-16 Condo tower A 710 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.50 810.00 TI-26
2818 5-May-16 Condo tower A 709 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2819 5-May-16 Condo tower A 708 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2820 5-May-16 Condo tower A 707 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
2821 6-May-16 Condo tower B 253 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 663.10 TI-25
2822 6-May-16 Condo tower B 254 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
2823 6-May-16 Condo tower B 277 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 695.70 TI-25
2824 6-May-16 Condo tower B 278 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2825 6-May-16 Condo tower B 114 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2826 6-May-16 Condo tower B 113 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2827 6-May-16 Condo tower B 112 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2828 6-May-16 Condo tower B 111 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
2829 6-May-16 Condo tower A 706 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
2830 6-May-16 Condo tower A 712 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
2831 6-May-16 Condo tower A 30072 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.70 659.30 TI-26
2832 6-May-16 Condo tower A 723 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
2833 7-May-16 Condo tower B 301 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
2834 7-May-16 Condo tower B 302 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2835 7-May-16 Condo tower B 325 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
2836 7-May-16 Condo tower B 326 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
2837 7-May-16 Condo tower B 349 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
2838 7-May-16 Condo tower B 122 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2839 7-May-16 Condo tower B 123 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
2840 7-May-16 Condo tower B 124 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2841 7-May-16 Condo tower B 125 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2842 7-May-16 Condo tower B 126 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
2843 7-May-16 Condo tower B 127 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2844 7-May-16 Condo tower B 128 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2845 7-May-16 Condo tower A 722 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
2846 7-May-16 Condo tower A 724 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2847 7-May-16 Condo tower A 725 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
2848 7-May-16 Condo tower A 726 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
2849 7-May-16 Condo tower A 727 Ǿ800 17 17 34.00 40.40 6.40 1.00 21.50 810.00 TI-26
2850 8-May-16 Condo tower B 129 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2851 8-May-16 Condo tower B 130 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2852 8-May-16 Condo tower B 131 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
2853 8-May-16 Condo tower B 132 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
2854 9-May-16 Condo tower B 145 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
2855 9-May-16 Condo tower B 144 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.50 790.40 TI-24
2856 9-May-16 Condo tower B 143 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 773.80 TI-24
2857 9-May-16 Condo tower B 350 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2858 9-May-16 Condo tower B 373 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
2859 9-May-16 Condo tower B 374 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-25
2860 9-May-16 Condo tower B 398 Ǿ800 17 17 34.00 39.50 5.50 1.00 22.00 828.80 TI-25
2861 9-May-16 Condo tower B 421 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
2862 9-May-16 Condo tower B 422 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
2863 9-May-16 Condo tower B 441 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 632.90 TI-25
2864 9-May-16 Condo tower A 728 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
2865 9-May-16 Condo tower A 729 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
2866 9-May-16 Condo tower A 737 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
2867 9-May-16 Condo tower A 736 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
2868 10-May-16 Condo tower B 142 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2869 10-May-16 Condo tower B 141 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2870 10-May-16 Condo tower B 140 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2871 10-May-16 Condo tower B 139 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2872 10-May-16 Condo tower B 138 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2873 10-May-16 Condo tower B 137 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2874 10-May-16 Condo tower B 136 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
2875 10-May-16 Condo tower B 434 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2876 10-May-16 Condo tower B 435 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
2877 10-May-16 Condo tower B 436 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.00 TI-25
2878 10-May-16 Condo tower A 735 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
2879 10-May-16 Condo tower A 734 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2880 10-May-16 Condo tower A 733 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
2881 10-May-16 Condo tower A 732 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
2882 10-May-16 Condo tower A 731 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2883 10-May-16 Condo tower A 730 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2884 11-May-16 Condo tower A 746 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2885 11-May-16 Condo tower A 747 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2886 11-May-16 Condo tower A 748 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
2887 11-May-16 Condo tower A 30070 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
2888 11-May-16 Condo tower A 30071 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2889 11-May-16 Condo tower B 135 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2890 11-May-16 Condo tower B 146 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2891 11-May-16 Condo tower B 147 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2892 11-May-16 Condo tower B 148 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
2893 11-May-16 Condo tower B 149 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2894 11-May-16 Condo tower B 437 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
2895 11-May-16 Condo tower B 438 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2896 11-May-16 Condo tower B 439 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
2897 11-May-16 Condo tower B 433 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2898 11-May-16 Condo tower B 432 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2899 11-May-16 Condo tower B 431 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25
2900 12-May-16 Condo tower A 749 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
2901 12-May-16 Condo tower A 750 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
2902 12-May-16 Condo tower A 751 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
2903 12-May-16 Condo tower A 752 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2904 12-May-16 Condo tower A 753 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2905 12-May-16 Condo tower B 150 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2906 12-May-16 Condo tower B 151 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2907 12-May-16 Condo tower B 152 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
2908 12-May-16 Condo tower B 153 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
2909 12-May-16 Condo tower B 154 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.40 TI-24
2910 12-May-16 Condo tower B 430 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2911 12-May-16 Condo tower B 429 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
2912 12-May-16 Condo tower B 426 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2913 12-May-16 Condo tower B 425 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
2914 12-May-16 Condo tower B 30075 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
2915 12-May-16 Condo tower B 410 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2916 13-May-16 Condo tower B 155 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2917 13-May-16 Condo tower B 156 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
2918 13-May-16 Condo tower B 169 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2919 13-May-16 Condo tower B 168 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2920 13-May-16 Condo tower B 167 Ǿ800 17 17 34.00 39.50 5.5 1.00 23.00 807.90 TI-24
2921 13-May-16 Condo tower B 166 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.50 TI-24
2922 13-May-16 Condo tower B 411 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
2923 13-May-16 Condo tower B 408 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
2924 13-May-16 Condo tower B 409 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
2925 13-May-16 Condo tower B 386 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
2926 13-May-16 Condo tower B 387 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2927 13-May-16 Condo tower B 384 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
2928 13-May-16 Condo tower A 30057 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2929 13-May-16 Condo tower A 761 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2930 13-May-16 Condo tower A 760 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
2931 14-May-16 Condo tower B 165 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2932 14-May-16 Condo tower B 164 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2933 14-May-16 Condo tower B 163 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2934 14-May-16 Condo tower B 162 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2935 14-May-16 Condo tower B 161 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.90 804.40 TI-24
2936 14-May-16 Condo tower B 385 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2937 14-May-16 Condo tower B 363 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
2938 14-May-16 Condo tower B 362 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
2939 14-May-16 Condo tower B 360 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2940 14-May-16 Condo tower B 361 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
2941 14-May-16 Condo tower B 339 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2942 14-May-16 Condo tower A 759 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2943 14-May-16 Condo tower A 758 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2944 14-May-16 Condo tower A 757 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
2945 14-May-16 Condo tower A 756 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2946 14-May-16 Condo tower A 755 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2947 14-May-16 Condo tower A 754 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2948 15-May-16 Condo tower A 30056 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26
2949 15-May-16 Condo tower A 770 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2950 15-May-16 Condo tower A 771 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
2951 16-May-16 Condo tower B 160 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2952 16-May-16 Condo tower B 159 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2953 16-May-16 Condo tower B 170 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
2954 17-May-16 Condo tower B 171 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24
2955 17-May-16 Condo tower B 172 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2956 17-May-16 Condo tower B 173 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2957 17-May-16 Condo tower B 174 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2958 17-May-16 Condo tower B 175 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2959 17-May-16 Condo tower B 176 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2960 17-May-16 Condo tower B 177 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2961 17-May-16 Condo tower B 178 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2962 17-May-16 Condo tower B 338 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2963 17-May-16 Condo tower B 313 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
2964 17-May-16 Condo tower B 312 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
2965 17-May-16 Condo tower B 291 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
2966 17-May-16 Condo tower B 290 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25
2967 17-May-16 Condo tower B 288 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
2968 17-May-16 Condo tower B 289 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

2969 17-May-16 Condo tower B 284 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
2970 17-May-16 Condo tower A 772 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
2971 17-May-16 Condo tower A 773 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2972 17-May-16 Condo tower A 774 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
2973 17-May-16 Condo tower A 775 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
2974 17-May-16 Condo tower A 776 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
2975 17-May-16 Condo tower A 777 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
2976 18-May-16 Condo tower B 179 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2977 18-May-16 Condo tower B 180 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2978 18-May-16 Condo tower B 193 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
2979 18-May-16 Condo tower B 192 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2980 18-May-16 Condo tower B 191 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2981 18-May-16 Condo tower B 295 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
2982 18-May-16 Condo tower B 287 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
2983 18-May-16 Condo tower B 286 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
2984 18-May-16 Condo tower B 266 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
2985 18-May-16 Condo tower B 267 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
2986 18-May-16 Condo tower A 785 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
2987 18-May-16 Condo tower A 784 Ǿ800 17 17 34.00 36.50 2.5 1.00 21.50 810.00 TI-26
2988 18-May-16 Condo tower A 783 Ǿ800 17 17 34.00 37.50 3.5 1.00 21.50 810.00 TI-26
2989 19-May-16 Condo tower B 190 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2990 19-May-16 Condo tower B 189 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2991 19-May-16 Condo tower B 188 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2992 19-May-16 Condo tower B 187 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
2993 19-May-16 Condo tower B 186 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
2994 19-May-16 Condo tower B 185 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
2995 19-May-16 Condo tower B 268 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.80 670.80 TI-25
2996 19-May-16 Condo tower B 269 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
2997 19-May-16 Condo tower B 270 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
2998 19-May-16 Condo tower B 271 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
2999 19-May-16 Condo tower B 265 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.10 606.50 TI-25
3000 19-May-16 Condo tower B 264 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3001 19-May-16 Condo tower A 782 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
3002 19-May-16 Condo tower A 781 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3003 19-May-16 Condo tower A 780 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
3004 19-May-16 Condo tower A 779 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
3005 19-May-16 Condo tower A 778 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
3006 20-May-16 Condo tower B 184 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3007 20-May-16 Condo tower B 183 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3008 20-May-16 Condo tower B 182 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
3009 20-May-16 Condo tower B 181 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3010 20-May-16 Condo tower A 794 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3011 20-May-16 Condo tower A 795 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3012 20-May-16 Condo tower A 796 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
3013 20-May-16 Condo tower A 797 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.00 TI-26
3014 20-May-16 Condo tower A 798 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3015 21-May-16 Condo tower B 158 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3016 21-May-16 Condo tower B 157 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3017 21-May-16 Condo tower B 134 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3018 21-May-16 Condo tower B 133 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3019 21-May-16 Condo tower B 263 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
3020 21-May-16 Condo tower B 262 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3021 21-May-16 Condo tower B 261 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3022 21-May-16 Condo tower B 260 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.70 742.20 TI-25
3023 21-May-16 Condo tower A 799 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
3024 21-May-16 Condo tower A 800 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
3025 21-May-16 Condo tower A 801 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
3026 23-May-16 Condo tower B 24 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3027 23-May-16 Condo tower B 23 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.30 TI-24
3028 23-May-16 Condo tower B 22 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3029 23-May-16 Condo tower B 21 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
3030 23-May-16 Condo tower B 242 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

3031 23-May-16 Condo tower B 243 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
3032 23-May-16 Condo tower B 244 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
3033 23-May-16 Condo tower A 30054 Ǿ800 17 17 34.00 35.50 1.5 1.00 21.50 810.00 TI-26
3034 23-May-16 Condo tower A 30055 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-26
3035 23-May-16 Condo tower A 809 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 791.10 TI-26
3036 23-May-16 Condo tower A 808 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3037 23-May-16 Condo tower A 807 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3038 24-May-16 Condo tower B 20 Ǿ800 17 17 34.00 42.00 8.0 1.00 29.00 702.50 TI-24
3039 24-May-16 Condo tower B 19 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3040 24-May-16 Condo tower B 18 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3041 24-May-16 Condo tower B 17 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
3042 24-May-16 Condo tower B 245 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
3043 24-May-16 Condo tower B 246 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
3044 24-May-16 Condo tower B 247 Ǿ800 17 17 34.00 42.00 8.0 1.00 18,1 681,9 TI-25
3045 24-May-16 Condo tower A 806 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3046 24-May-16 Condo tower A 805 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3047 25-May-16 Condo tower B 16 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3048 25-May-16 Condo tower B 15 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3049 25-May-16 Condo tower A 804 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
3050 25-May-16 Condo tower A 803 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
3051 25-May-16 Condo tower A 802 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
3052 25-May-16 Condo tower A 818 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
3053 26-May-16 Condo tower B 14 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3054 26-May-16 Condo tower B 13 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3055 26-May-16 Condo tower B 241 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3056 26-May-16 Condo tower B 240 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.60 813.70 TI-25
3057 26-May-16 Condo tower A 819 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.50 810.00 TI-26
3058 26-May-16 Condo tower A 820 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 20.50 772.30 TI-26
3059 26-May-16 Condo tower A 821 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3060 27-May-16 Condo tower B 1 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3061 27-May-16 Condo tower B 2 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3062 27-May-16 Condo tower B 3 Ǿ800 17 17 34.00 38.50 4.5 1.00 23.00 807.90 TI-24
3063 27-May-16 Condo tower B 4 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3064 27-May-16 Condo tower B 239 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3065 27-May-16 Condo tower B 238 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
3066 27-May-16 Condo tower B 237 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.90 674.40 TI-25
3067 27-May-16 Condo tower B 236 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3068 27-May-16 Condo tower A 822 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3069 27-May-16 Condo tower A 823 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26
3070 27-May-16 Condo tower A 824 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 847.70 TI-26
3071 27-May-16 Condo tower A 825 Ǿ800 17 17 34.00 28.00 -6.0 1.00 22.00 828.80 TI-26
3072 28-May-16 Condo tower B 5 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.60 TI-24
3073 28-May-16 Condo tower B 6 Ǿ800 17 17 34.00 19.50 -14.5 1.00 23.00 807.90 TI-24
3074 28-May-16 Condo tower B 218 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3075 28-May-16 Condo tower B 219 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 838.80 TI-25
3076 28-May-16 Condo tower B 220 Ǿ800 17 17 34.00 36.00 2.0 1.00 12.00 452.10 TI-25
3077 28-May-16 Condo tower B 221 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.60 738.40 TI-25
3078 28-May-16 Condo tower A 835 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
3079 28-May-16 Condo tower A 834 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.00 602.80 TI-26
3080 28-May-16 Condo tower A 833 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 810.00 TI-26
3081 28-May-16 Condo tower A 832 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-26
3082 29-May-16 Condo tower A 831 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-26
3083 29-May-16 Condo tower A 830 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3084 30-May-16 Condo tower B 7 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3085 30-May-16 Condo tower B 8 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3086 30-May-16 Condo tower B 222 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
3087 30-May-16 Condo tower B 223 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3088 30-May-16 Condo tower B 224 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.10 757.20 TI-25
3089 30-May-16 Condo tower B 217 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-25
3090 30-May-16 Condo tower A 829 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3091 30-May-16 Condo tower A 828 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3092 30-May-16 Condo tower A 827 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

3093 30-May-16 Condo tower A 826 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3094 31-May-16 Condo tower B 9 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3095 31-May-16 Condo tower B 10 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3096 31-May-16 Condo tower B 11 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3097 31-May-16 Condo tower B 12 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
3098 31-May-16 Condo tower B 216 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
3099 31-May-16 Condo tower B 215 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3100 31-May-16 Condo tower B 212 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3101 1-Jun-16 Condo tower B 86 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3102 1-Jun-16 Condo tower B 38 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3103 1-Jun-16 Condo tower B 61 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3104 1-Jun-16 Condo tower B 85 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24
3105 1-Jun-16 Condo tower B 211 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 22.20 836.40 TI-25
3106 1-Jun-16 Condo tower B 210 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.70 817.50 TI-25
3107 1-Jun-16 Condo tower B 209 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
3108 1-Jun-16 Condo tower B 208 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3109 1-Jun-16 Condo tower B 207 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
3110 2-Jun-16 Condo tower B 109 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
3111 2-Jun-16 Condo tower B 110 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3112 2-Jun-16 Condo tower B 214 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3113 2-Jun-16 Condo tower B 213 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3114 2-Jun-16 Condo tower B 194 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
3115 2-Jun-16 Condo tower B 195 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
3116 2-Jun-16 Condo tower A 30053 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
3117 2-Jun-16 Condo tower A 841 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-26
3118 2-Jun-16 Condo tower A 842 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3119 2-Jun-16 Condo tower A 843 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 810.00 TI-26
3120 2-Jun-16 Condo tower A 844 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
3121 2-Jun-16 Condo tower A 845 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
3122 3-Jun-16 Condo tower B 30091 Ǿ800 17 17 34.00 32.50 -1.5 1.00 23.00 807.90 TI-24
3123 3-Jun-16 Condo tower B 30092 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
3124 3-Jun-16 Condo tower B 30093 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3125 3-Jun-16 Condo tower B 30094 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3126 3-Jun-16 Condo tower B 196 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3127 3-Jun-16 Condo tower B 197 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3128 3-Jun-16 Condo tower B 198 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
3129 3-Jun-16 Condo tower B 199 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
3130 3-Jun-16 Condo tower B 200 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
3131 3-Jun-16 Condo tower A 846 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
3132 3-Jun-16 Condo tower A 847 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 700.70 TI-26
3133 3-Jun-16 Condo tower A 848 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
3134 3-Jun-16 Condo tower A 849 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
3135 4-Jun-16 Condo tower B 30095 Ǿ800 17 17 34.00 30.00 -4.0 1.00 23.00 808.90 TI-24
3136 4-Jun-16 Condo tower B 30096 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 632.30 TI-24
3137 4-Jun-16 Condo tower B 201 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3138 4-Jun-16 Condo tower B 202 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
3139 4-Jun-16 Condo tower B 203 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
3140 5-Jun-16 Condo tower B 204 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 640.50 TI-25
3141 5-Jun-16 Condo tower B 205 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
3142 5-Jun-16 Condo tower B 206 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
3143 7-Jun-16 Condo tower B 30097 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3144 7-Jun-16 Condo tower B 30081 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24
3145 7-Jun-16 Condo tower B 37 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
3146 7-Jun-16 Condo tower B 30080 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3147 7-Jun-16 Condo tower B 30089 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3148 7-Jun-16 Condo tower B 30088 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.60 813.70 TI-25
3149 7-Jun-16 Condo tower B 30087 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 716.00 TI-25
3150 8-Jun-16 Condo tower B 30098 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
3151 8-Jun-16 Condo tower B 30090 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
3152 8-Jun-16 Condo tower B 230 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25
3153 8-Jun-16 Condo tower B 30079 Ǿ800 17 17 34.00 33.00 -1.0 1.00 22.10 832.60 TI-25
3154 8-Jun-16 Condo tower B 30078 Ǿ800 17 17 34.00 34.50 0.5 1.00 22.00 828.80 TI-25
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

3155 9-Jun-16 Condo tower B 30110 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24
3156 9-Jun-16 Condo tower B 30076 Ǿ800 17 17 34.00 32.50 -1.5 1.00 21.00 527.40 TI-25
3157 9-Jun-16 Condo tower B 30077 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
3158 9-Jun-16 Condo tower B 314 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
3159 9-Jun-16 Condo tower B 315 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
3160 10-Jun-16 Condo tower B 336 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
3161 10-Jun-16 Condo tower B 337 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
3162 10-Jun-16 Condo tower B 30085 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
3163 10-Jun-16 Condo tower B 30084 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 791.10 TI-25
3164 10-Jun-16 Condo tower B 30083 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
3165 10-Jun-16 Condo tower A 858 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3166 10-Jun-16 Condo tower A 857 Ǿ800 17 17 34.00 42.40 8.4 1.00 19.50 734.60 TI-26
3167 10-Jun-16 Condo tower A 856 Ǿ800 17 17 34.00 42.30 8.3 1.00 21.00 791.10 TI-26
3168 10-Jun-16 Condo tower A 855 Ǿ800 17 17 34.00 42.20 8.2 1.00 18.00 678.10 TI-26
3169 11-Jun-16 Condo tower B 30082 Ǿ800 17 17 34.00 32.00 -2.0 1.00 16.10 404.40 TI-25
3170 11-Jun-16 Condo tower A 854 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3171 11-Jun-16 Condo tower A 853 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
3172 11-Jun-16 Condo tower A 852 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 719.80 TI-26
3173 11-Jun-16 Condo tower A 851 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
3174 12-Jun-16 Condo tower A 865 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.50 659.30 TI-26
3175 12-Jun-16 Condo tower A 866 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
3176 12-Jun-16 Condo tower A 867 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3177 12-Jun-16 Condo tower A 868 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.00 TI-26
3178 13-Jun-16 Condo tower A 869 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3179 13-Jun-16 Condo tower A 870 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3180 13-Jun-16 Condo tower A 871 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3181 13-Jun-16 Condo tower A 872 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3182 13-Jun-16 Condo tower A 873 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3183 13-Jun-16 Condo tower B 30086 Ǿ800 17 17 34.00 35.00 1.0 1.00 20.10 757.20 TI-25
3184 14-Jun-16 Condo tower A 882 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
3185 14-Jun-16 Condo tower A 881 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
3186 14-Jun-16 Condo tower A 880 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3187 14-Jun-16 Condo tower A 879 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
3188 14-Jun-16 Condo tower B 30171 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25
3189 14-Jun-16 Condo tower B 30172 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3190 15-Jun-16 Condo tower A 878 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
3191 15-Jun-16 Condo tower A 877 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3192 15-Jun-16 Condo tower A 876 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3193 15-Jun-16 Condo tower A 875 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
3194 15-Jun-16 Condo tower A 850 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3195 15-Jun-16 Condo tower B 30175 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.40 693.20 TI-25
3196 18-Jun-16 Condo tower A 30063 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25
3197 18-Jun-16 Condo tower A 30064 Ǿ800 17 17 34.00 34.25 0.3 1.00 21.70 817.50 TI-25
3198 18-Jun-16 Condo tower A 30062 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
3199 18-Jun-16 Condo tower A 30103 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
3200 18-Jun-16 Condo tower A 30104 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
3201 18-Jun-16 Condo tower A 30105 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
3202 18-Jun-16 Condo tower A 30106 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
3203 19-Jun-16 Condo tower A 30066 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25
3204 19-Jun-16 Condo tower A 30068 Ǿ800 17 17 34.00 35.00 1.0 1.00 21.70 817.50 TI-25
3205 19-Jun-16 Condo tower A 30065 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.80 821.30 TI-25
3206 20-Jun-16 Condo tower A 30074 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
3207 20-Jun-16 Condo tower A 30067 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
3208 20-Jun-16 Condo tower A 30100 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26
3209 20-Jun-16 Condo tower A 30101 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
3210 20-Jun-16 Condo tower A 30102 Ǿ800 17 17 34.00 34.50 0.5 1.00 21.50 810.00 TI-26
3211 21-Jun-16 Condo tower B 30173 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
3212 21-Jun-16 Condo tower B 30174 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
3213 21-Jun-16 Condo tower A 30109 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

TOTAL PEMANCANGAN MAIN PILE 102944.00 114528.51 11584.51 1.00 0.00 3227.00 196.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
: MAIN PILE
: JL.IR SOEKARNO - SURABAYA

: 10 Okt 2015 -
No. of Page

……1….. Of ……1…..

REMARK

VWSG

VWSG
VWSG

790

pengganti IP-18{466)
VWSG
INDIKATOR
INDIKATOR
INDIKATOR
INDIKATOR
INDIKATOR
potong tiang

potong tiang

tiang pecah

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang
REMARK

tiang pecah

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang
REMARK

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang
REMARK

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

Potong tiang

Potong tiang

Potong tiang

potong pile

potong pile

potong pile

potong pile

potong pile

potong pile

potong pile
REMARK

potong tiang

potong pile
potong pile
potong pile
potong pile
potong pile

potong pile
REMARK

potong pile
potong pile
potong pile
potong pile

potong pile

potong pile

potong pile

potong pile
potong pile
potong pile
potong pile
potong pile
potong pile
potong pile

potong pile

potong pile
REMARK

potong pile

potong pile
potong pile
potong pile

potong pile
potong pile
potong pile

potong tiang
potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang
REMARK

potong tiang

potong tiang

potong tiang

potong tiang

potong tiang
potong tiang
REMARK

potong tiang

potong tiang

potong tiang

TENTION
TENTION
REMARK

potong tiang
REMARK

potong tiang

potong tiang

potong tiang
potong tiang
potong tiang
potong tiang

TENTION

potong tiang
REMARK

potong tiang

potong tiang

potong tiang
REMARK

potong tiang

potong tiang
REMARK

potong tiang

potong tiang

potong tiang
potong tiang
REMARK

sisipan
sisipan

potong tiang

sisipan
potong tiang(sisipan)

potong tiang(sisipan)
REMARK

sisipan
potong tiang(sisipan)

sisipan
potong tiang

potong tiang

potong tiang(sisipan)

potong tiang(sisipan)

sisipan
potong tiang(sisipan)

sisipan
potong tiang(sisipan)

potong tiang(sisipan)

potong tiang(sisipan)

potong tiang(sisipan)
REMARK

potong tiang
REMARK

potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan

potong tiang

potong tiang
potong tiang

potong tiang

potong tiang

potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan
potong tiang(sisipan

potong tiang
potong tiang
potong tiang
potong tiang
REMARK

potong tiang

potong tiang
potong tiang

potong tiang
potong tiang
potong tiang
potong tiang
potong tiang

potong tiang
REMARK

potong tiang

potong tiang
REMARK

potong tiang

sisipan

sisipan

sisipan
sisipan
REMARK

tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

potong tiang

potong tiang

potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension
tension

potong tiang

tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
Kondo Twr A
Kondo Twr A
Kondo Twr A
Kondo Twr A
REMARK

tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension

sisipan
sisipan
REMARK

sisipan

tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
REMARK

potong tiang

potong tiang
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension
tension
tension
tension
tension

tension
tension
REMARK

tension
tension
tension

tiang pecah

tiang pecah

tension
tension
tension
tension
SP sisipan
SP sisipan
SP sisipan
SP sisipan
SP sisipan

tiang pecah

tiang pecah

tension
tension
tension
tension
tension
tension
SP sisipan
SP sisipan
SP sisipan
SP sisipan
REMARK

SP sisipan
SP sisipan

tension
tension
tension
tension
tension
tension
tension
tension

sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
Condo tower A
Condo tower A
Condo tower A

potong tiang

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

potong tiang
REMARK

tension
tension
tension
tension
tension
tension
tension
tension
tension
tension
tension

potong tiang

tension
tension
tension
tension
tension
tension

potong tiang
tension
tension
tension
tension
tension
tension(potong)
REMARK

tension
tension
tension
tension
tension
tension
tension
tension
tension

potong tiang
tension
tension
tension

tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension
REMARK

tension
tension
tension
tension

tension
tension
tension
tension
tension

tension
tension
tension
tension
tension
tension
tension
tension
tension

tention
tention
tention

sisipan
sisipan
sisipan
REMARK

sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan

tention
tention

Tension
Tension

sisipan SP
sisipan SP
Pecah

potong tiang
REMARK

pecah

pecah
Tension Tambahan
Tension
Tension Tambahan
Tension
Tension
Tension
Tension

pecah
REMARK

tiang pecah

sisipam sp
sisipam sp
potong tiang

sisipan
sisipan
sisipan(potong tiang)

sisipan
tension
tension
tension

tension
tension
REMARK

tension
tension
tension
tension

potong tiang

sisipan
sisipan
sisipan
REMARK

Tension

Tension
Tension

Potong tiang

salah mancang

Tension
Tension
Tension
Tension
Tension
Tension

Tension
Tension
Tension
Tension
Tension
Tension
REMARK

Tension
Tension
Tension Tambahan

sisipan Tension

sisipan SP

Tension
sisipan SP
sisipan SP
sisipan SP
sisipan SP

potong (sisipan)

sisipan(potong tiang)
sisipan(potong tiang)
tiang pecah
tiang pecah
REMARK

potong tiang

sisipan office
REMARK

Potong tiang

potong tiang

potong tiang
REMARK

potong tiang
potong tiang
REMARK

sisipan
REMARK

sisipan
sisipan
REMARK

sisipan

sisipan

sisipan
REMARK
REMARK

sisipan
sisipan

potong tiang

potong tiang

presur los
REMARK

sisipan

sisipan
sisipan
sisipan
sisipan

sisipan
sisipan

sisipan
sisipan

sisipan
sisipan
sisipan
sisipan
sisipan
sisipan

sisipan
sisipan
REMARK

sisipan
sisipan
sisipan

sisipan
sisipan
sisipan

sisipan

sisipan(pecah)

sisipan
sisipan

sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
sisipan
REMARK

PT. TENO TRACT INDONESIA


PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 05 Aug 2015 - 11 Jan 2016

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 13-Oct-15 Main Pile 2345 Ǿ600 17 15 32.00 30.00 1.00 1 21.00 373.20 12.00 TI-21A tiang pecah

2 21-Oct-15 Main Pile 2283 Ǿ600 15 17 32.00 31.00 - 1.00 1 24.20 421.10 12.00 TI-03 tiang pecah

TOTAL PEMANCANGAN MAIN PILE 64.00 61.00 0.00 0.00 0.00 2.00 2.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 05 Aug 2015 - 11 Jan 2016

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 29-Feb-16 main pile tambahan 10929 Ǿ600 15 17 32.00 37.00 5.0 1.00 16.00 401.90 TI-26
2 29-Feb-16 main pile tambahan 10930 Ǿ600 15 17 32.00 37.00 5.0 1.00 16.00 401.90 TI-26
3 29-Feb-16 main pile tambahan 10931 Ǿ600 15 17 32.00 37.00 5.0 1.00 14.00 351.60 TI-26
4 29-Feb-16 main pile tambahan 10932 Ǿ600 15 17 32.00 37.00 5.0 1.00 15.00 376.70 TI-26
TOTAL PEMANCANGAN MAIN PILE 128.00 148.00 20.00 0.00 0.00 4.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 05 Aug 2015 - 11 Jan 2016

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

195 8-Nov-15 main pile 2183 Ǿ600 15 15.00 14.50 -0.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile

457 3-Dec-15 main pile 2166 Ǿ600 17 17.00 14.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
180 7-Nov-15 main pile 2215 Ǿ600 17 17.00 15.00 -2.00 1.00 24.00 426.50 12.00 TI-21A Potong tiang

224 11-Nov-15 main pile 2083 Ǿ600 15 15.00 15.00 0.00 1.00 24.00 426.50 12.00 TI-21A
254 13-Nov-15 main pile 2144 Ǿ600 15 17 32.00 15.00 -17.00 1.00 17.50 439.50 12.00 TI-26 potong pile
261 14-Nov-15 main pile 1990 Ǿ600 17 17.00 15.00 -2.00 1.00 1 24.00 426.00 12.00 TI-21A potong pile
233 12-Nov-15 main pile 2013 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
300 19-Nov-15 main pile 2038 Ǿ600 17 17.00 15.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A
106 29-Oct-15 main pile 2020 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.70 438.90 12.00 TI-21A potong tiang

173 6-Nov-15 main pile 1976 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang

194 8-Nov-15 main pile 2182 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile

372 26-Nov-15 main pile 2056 Ǿ600 15 17 32.00 16.00 -16.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
458 3-Dec-15 main pile 2167 Ǿ600 17 17.00 16.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
342 24-Nov-15 main pile 2075 Ǿ600 17 15 32.00 16.20 -15.80 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

108 29-Oct-15 main pile 2155 Ǿ600 15 17 32.00 16.50 -15.50 1.00 1 24.70 438.90 12.00 TI-21A potong tiang

144 3-Nov-15 main pile 2127 Ǿ600 15 17 32.00 17.00 -15.00 1.00 1 17.00 439.50 12.00 TI-26 potong tiang

339 24-Nov-15 main pile 2074 Ǿ600 17 15 32.00 17.00 -15.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

179 7-Nov-15 main pile 2214 Ǿ600 15 17 32.00 17.50 -14.50 1.00 24.00 426.50 12.00 TI-21A Potong tiang

664 17-Dec-15 main pile 2983 Ǿ600 17 15 32.00 17.50 -14.50 1.00 1 16.00 463.40 12.00 TI-16 potong tiang

349 25-Nov-15 main pile 2058 Ǿ600 15 10 25.00 18.00 -7.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
81 25-Oct-15 Main Pile 2106 Ǿ600 15 17 32.00 19.00 -13.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

366 25-Nov-15 main pile 2280 Ǿ600 15 17 32.00 19.00 -13.00 1.00 24.20 421.10 12.00 TI-03
572 11-Dec-15 main pile 2398 Ǿ600 17 15 32.00 19.00 -13.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
295 18-Nov-15 main pile 2269 Ǿ600 15 17 32.00 19.50 -12.50 1.00 24.20 421.00 12.00 TI-03
279 16-Nov-15 main pile 2259 Ǿ600 15 17 32.00 20.00 -12.00 1.00 24.50 426.30 12.00 TI-03
323 22-Nov-15 main pile 2047 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

329 23-Nov-15 main pile 2274 Ǿ600 15 17 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
535 10-Dec-15 main pile 2395 Ǿ600 17 15 32.00 20.00 -12.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
64 23-Oct-15 Main Pile 2164 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

301 19-Nov-15 main pile 2040 Ǿ600 15 17 32.00 20.50 -11.50 1.00 1 24.00 426.50 12.00 TI-21A
159 4-Nov-15 main pile 2135 Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang

175 6-Nov-15 main pile 1978 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang

831 7-Jan-16 main pile 2599 Ǿ600 17 15 32.00 22.00 -10.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
237 12-Nov-15 main pile 1999 Ǿ600 15 17 32.00 22.50 -9.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
315 21-Nov-15 main pile 2532 Ǿ600 15 17 32.00 23.00 -9.00 1.00 23.70 420.00 12.00 TI-07
331 23-Nov-15 main pile 2268 Ǿ600 15 17 32.00 23.00 -9.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
249 13-Nov-15 main pile 2002 Ǿ600 15 17 32.00 23.50 -8.50 1.00 24.00 426.50 12.00 TI-21A potong pile
79 24-Oct-15 Main Pile 2292 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

171 6-Nov-15 main pile 2267 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
264 14-Nov-15 main pile 1986 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
322 22-Nov-15 main pile 2042 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

216 10-Nov-15 main pile 2086 Ǿ600 17 15 32.00 24.50 -7.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
90 27-Oct-15 Main Pile 2290 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.20 12.00 TI-03 potong tiang

193 8-Nov-15 main pile 2181 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile

272 14-Nov-15 main pile 2249 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.50 426.30 12.00 TI-03
354 25-Nov-15 main pile 2060 Ǿ600 15 17 32.00 25.00 -7.00 1.00 1 24.00 426.50 12.00 TI-21A
344 25-Nov-15 main pile 2521 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 23.70 420.00 12.00 TI-07
638 15-Dec-15 main pile 2427 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
360 25-Nov-15 main pile 2277 Ǿ600 15 17 32.00 27.00 -5.00 1.00 24.20 421.10 12.00 TI-03
68 23-Oct-15 Main Pile 2352 Ǿ600 15 17 32.00 27.30 -4.70 1.00 24.20 421.10 12.00 TI-03
182 7-Nov-15 main pile 2216 Ǿ600 15 17 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A Potong tiang

227 11-Nov-15 main pile 2014 Ǿ600 17 15 32.00 27.50 -4.50 1.00 23.70 421.10 12.00 TI-21A
289 17-Nov-15 main pile 2036 Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
60 23-Oct-15 Main Pile 2096 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

62 23-Oct-15 Main Pile 2162 Ǿ600 15 7 17 39.00 28.00 -11.00 2.00 1 23.70 421.10 12.00 TI-21A potong tiang

226 11-Nov-15 main pile 2018 Ǿ600 17 15 32.00 28.00 -4.00 1.00 23.70 421.10 12.00 TI-21A
290 17-Nov-15 main pile 2034 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
365 25-Nov-15 main pile 2276 Ǿ600 15 17 32.00 28.00 -4.00 1.00 24.20 421.10 12.00 TI-03
682 19-Dec-15 main pile 2545 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.10 12.00 TI-03
849 9-Jan-16 main pile 2573 Ǿ600 15 17 32.00 28.00 -4.00 1.00 1 24.20 421.1 12.00 TI-03 potong tiang
88 26-Oct-15 Main Pile 2007 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

259 14-Nov-15 main pile 1993 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
318 21-Nov-15 main pile 2041 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

234 12-Nov-15 main pile 1994 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 23.70 421.10 12.00 TI-21A potong pile
260 14-Nov-15 main pile 1989 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.00 426.50 12.00 TI-21A potong pile
613 13-Dec-15 main pile 2416 Ǿ600 15 17 32.00 28.70 -3.30 1.00 1 24.10 421.10 12.00 TI-03 potong tiang
47 21-Oct-15 Main Pile 2091 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

49 21-Oct-15 Main Pile 2111 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

70 24-Oct-15 Main Pile 2163 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

84 25-Oct-15 Main Pile 2010 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

85 26-Oct-15 Main Pile 2003 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.10 421.10 12.00 TI-21A potong tiang

87 26-Oct-15 Main Pile 2005 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

121 30-Oct-15 main pile 2305 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 42.10 12.00 TI-03
123 30-Oct-15 main pile 2219 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A
140 2-Nov-15 main pile 2173 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

149 3-Nov-15 main pile 2158 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

163 4-Nov-15 main pile 2015 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

190 8-Nov-15 main pile 2147 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile

191 8-Nov-15 main pile 2149 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A potong pile

192 8-Nov-15 main pile 2150 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 425.50 12.00 TI-21A potong pile

210 10-Nov-15 main pile 2116 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A
245 13-Nov-15 main pile 1998 Ǿ600 17 15 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A potong pile
248 13-Nov-15 main pile 2001 Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 421.10 12.00 TI-21A potong pile
250 13-Nov-15 main pile 1992 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A potong pile
251 13-Nov-15 main pile 1991 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 12.00 TI-21A potong pile
267 14-Nov-15 main pile 2186 Ǿ600 15 17 32.00 29.00 -3.00 1.00 17.50 439.50 12.00 TI-26 potong pile
274 14-Nov-15 main pile 2247 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03
280 17-Nov-15 main pile 2258 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 25.50 426.30 12.00 TI-03 potong pile
285 17-Nov-15 main pile 1984 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
320 21-Nov-15 main pile 2044 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

325 22-Nov-15 main pile 2028 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

437 1-Dec-15 main pile 2481 Ǿ600 17 17 34.00 29.00 -5.00 1.00 23.70 420.00 12.00 TI-07 potong tiang
460 3-Dec-15 main pile 2168 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
523 8-Dec-15 main pile 2378 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

605 13-Dec-15 main pile 2715 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.30 501.10 12.00 TI-16 potong tiang
663 17-Dec-15 main pile 2982 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 12.00 TI-16 potong tiang

720 23-Dec-15 main pile 2603 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
745 24-Dec-15 main pile 2658 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
235 12-Nov-15 main pile 1996 Ǿ600 15 17 32.00 29.30 -2.70 1.00 1 23.70 421.10 12.00 TI-21A potong pile
56 22-Oct-15 Main Pile 2100 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

57 22-Oct-15 Main Pile 2101 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

72 24-Oct-15 Main Pile 2102 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

128 30-Oct-15 main pile 2154 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A
142 2-Nov-15 main pile 2223 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

143 2-Nov-15 main pile 2226 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

151 3-Nov-15 main pile 2175 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

197 9-Nov-15 main pile 2148 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
262 14-Nov-15 main pile 1988 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
263 14-Nov-15 main pile 1985 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
286 17-Nov-15 main pile 1982 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
287 17-Nov-15 main pile 1983 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.70 421.10 12.00 TI-21A potong pile
304 20-Nov-15 main pile 2027 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
317 21-Nov-15 main pile 2045 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

319 21-Nov-15 main pile 2046 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

324 22-Nov-15 main pile 2043 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

459 3-Dec-15 main pile 2165 Ǿ600 17 15 32.00 29.50 -2.50 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

744 24-Dec-15 main pile 2661 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
7 10-Oct-15 Main Pile 2382 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 23.00 408.70 12.00 TI-12A potong tiang

9 13-Oct-15 Main Pile 2345 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 21.00 373.20 12.00 TI-21A tiang pecah

10 13-Oct-15 Main Pile 2343 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 23.30 421.10 12.00 TI-21A potong tiang

15 14-Oct-15 Main Pile 2304 Ǿ600 17 15 32.00 30.00 -2.00 1.00 23.50 421.10 TI-21A potong tiang

71 24-Oct-15 Main Pile 2161 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

75 24-Oct-15 Main Pile 2289 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

82 25-Oct-15 Main Pile 2006 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

91 27-Oct-15 Main Pile 2291 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

109 29-Oct-15 main pile 2152 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

110 29-Oct-15 main pile 2177 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

111 29-Oct-15 main pile 2180 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

138 2-Nov-15 main pile 2156 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
141 2-Nov-15 main pile 2176 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

147 3-Nov-15 main pile 2132 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.50 439.50 12.00 TI-26 potong tiang

152 3-Nov-15 main pile 2224 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

153 3-Nov-15 main pile 2225 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

236 12-Nov-15 main pile 1995 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong pile
303 20-Nov-15 main pile 2032 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
321 21-Nov-15 main pile 2031 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang

327 23-Nov-15 main pile 2272 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang
350 25-Nov-15 main pile 2055 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
444 1-Dec-15 main pile 2170 Ǿ600 15 17 32.00 30.00 -2.00 1.00 24.00 426.50 12.00 TI-21A
476 4-Dec-15 main pile 2228 Ǿ600 17 15 32.00 30.00 -2.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
26 19-Oct-15 Main Pile 2287 Ǿ600 15 17 32.00 30.20 -1.80 1.00 24.20 421.10 12.00 TI-03 potong tiang

6 10-Oct-15 Main Pile 2381 Ǿ600 17 15 32.00 30.50 -1.50 1.00 1 23.00 408.70 12.00 TI-12A potong tiang

12 14-Oct-15 Main Pile 2301 Ǿ600 17 15 32.00 30.50 -1.50 1.00 23.70 421.10 TI-21A potong tiang

13 14-Oct-15 Main Pile 2302 Ǿ600 17 15 32.00 30.50 -1.50 1.00 23.70 421.10 TI-21A potong tiang

22 18-Oct-15 Main Pile 2297 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.50 426.30 TI-03 potong tiang

23 18-Oct-15 Main Pile 2298 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.50 426.30 TI-03 potong tiang

93 27-Oct-15 Main Pile 2232 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

277 16-Nov-15 main pile 2255 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.20 421.10 12.00 TI-03
291 17-Nov-15 main pile 2037 Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 24.00 426.50 12.00 TI-21A potong pile
356 25-Nov-15 main pile 2279 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.20 421.10 12.00 TI-03
43 21-Oct-15 Main Pile 2283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03 tiang pecah

74 24-Oct-15 Main Pile 2104 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang

393 27-Nov-15 main pile 2314 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

486 4-Dec-15 main pile 2699 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16
487 4-Dec-15 main pile 2702 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 15.50 448.90 12.00 TI-16
519 8-Dec-15 main pile 2683 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16 potong tiang
619 14-Dec-15 main pile 2742 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.50 477.90 12.00 TI-16
803 30-Dec-15 main pile 2787 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.20 421.10 12.00 TI-03
854 9-Jan-16 main pile 2593 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.20 421.1 12.00 TI-03 potong tiang
29 20-Oct-15 Main Pile 2288 Ǿ600 15 17 32.00 31.10 -0.90 1.00 1 24.20 421.10 12.00 TI-03 potong tiang

433 30-Nov-15 main pile 2315 Ǿ600 15 17 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
532 10-Dec-15 main pile 2396 Ǿ600 17 15 32.00 31.70 -0.30 1.00 24.20 421.10 12.00 TI-03
31 20-Oct-15 Main Pile 2236 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
34 20-Oct-15 Main Pile 2088 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
35 20-Oct-15 Main Pile 2092 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
40 21-Oct-15 Main Pile 2240 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
41 21-Oct-15 Main Pile 2241 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
44 21-Oct-15 Main Pile 2282 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
55 22-Oct-15 Main Pile 2099 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
61 23-Oct-15 Main Pile 2094 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
76 24-Oct-15 Main Pile 2294 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
83 25-Oct-15 Main Pile 2009 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
89 26-Oct-15 Main Pile 2011 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
95 27-Oct-15 Main Pile 2234 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
102 28-Oct-15 main pile 2340 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 421.10 12.00 TI-03
119 29-Oct-15 soldier pile 2380 Ǿ600 15 17 32.00 32.00 0.00 1.00 24..2 421.10 12.00 TI-03
120 30-Oct-15 main pile 2354 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
129 30-Oct-15 main pile 2178 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

198 9-Nov-15 main pile 2151 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
211 10-Nov-15 main pile 2117 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
215 10-Nov-15 main pile 2085 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
217 10-Nov-15 main pile 1979 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
219 10-Nov-15 main pile 1980 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.50 439.50 12.00 TI-26
223 11-Nov-15 main pile 2082 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
265 14-Nov-15 main pile 1987 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
271 14-Nov-15 main pile 2250 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
273 14-Nov-15 main pile 2248 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
276 14-Nov-15 main pile 2254 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
288 17-Nov-15 main pile 2035 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
302 19-Nov-15 main pile 2039 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
305 20-Nov-15 main pile 2030 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
306 20-Nov-15 main pile 2033 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
326 22-Nov-15 main pile 2029 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
328 23-Nov-15 main pile 2275 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
332 23-Nov-15 main pile 2270 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
351 25-Nov-15 main pile 2057 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.00 426.50 12.00 TI-21A
352 25-Nov-15 main pile 2061 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
353 25-Nov-15 main pile 2059 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
355 25-Nov-15 main pile 2278 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
357 25-Nov-15 main pile 2307 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
358 25-Nov-15 main pile 2309 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
359 25-Nov-15 main pile 2306 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
363 25-Nov-15 main pile 2243 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
364 25-Nov-15 main pile 2246 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
387 27-Nov-15 main pile 2310 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421,1 12.00 TI-03
389 27-Nov-15 main pile 2336 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
391 27-Nov-15 main pile 2337 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
394 27-Nov-15 main pile 2311 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
407 28-Nov-15 main pile 2313 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
409 28-Nov-15 main pile 2331 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
411 28-Nov-15 main pile 2359 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
427 30-Nov-15 main pile 2317 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
432 30-Nov-15 main pile 2318 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
434 30-Nov-15 main pile 2329 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
435 30-Nov-15 main pile 2316 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
449 1-Dec-15 main pile 2325 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
451 1-Dec-15 main pile 2364 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
452 1-Dec-15 main pile 2367 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
454 2-Dec-15 main pile 2321 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
455 2-Dec-15 main pile 2320 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
456 2-Dec-15 main pile 2323 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
465 3-Dec-15 main pile 2475 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
468 3-Dec-15 main pile 2366 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
469 3-Dec-15 main pile 2363 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
471 3-Dec-15 main pile 2327 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
472 3-Dec-15 main pile 2324 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
473 3-Dec-15 main pile 2322 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
483 4-Dec-15 main pile 2701 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
484 4-Dec-15 main pile 2700 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
485 4-Dec-15 main pile 2698 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
488 4-Dec-15 main pile 2703 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
489 4-Dec-15 main pile 2370 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
490 4-Dec-15 main pile 2368 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
491 4-Dec-15 main pile 2369 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
492 4-Dec-15 main pile 2371 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
493 4-Dec-15 main pile 2372 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
494 5-Dec-15 main pile 2704 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
495 5-Dec-15 main pile 2705 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
496 5-Dec-15 main pile 2694 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
497 5-Dec-15 main pile 2693 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

498 5-Dec-15 main pile 2691 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
499 5-Dec-15 main pile 2692 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
501 5-Dec-15 main pile 2463 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
505 7-Dec-15 main pile 2458 Ǿ600 17 15 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
506 7-Dec-15 main pile 2460 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
508 7-Dec-15 main pile 2461 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
514 8-Dec-15 main pile 2689 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
515 8-Dec-15 main pile 2690 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
516 8-Dec-15 main pile 2687 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
517 8-Dec-15 main pile 2688 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
518 8-Dec-15 main pile 2682 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
520 8-Dec-15 main pile 2684 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
521 8-Dec-15 main pile 2685 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
522 8-Dec-15 main pile 2686 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
524 8-Dec-15 main pile 2377 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
525 8-Dec-15 main pile 2376 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
526 8-Dec-15 main pile 2374 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
529 10-Dec-15 main pile 2392 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
530 10-Dec-15 main pile 2391 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
531 10-Dec-15 main pile 2397 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
533 10-Dec-15 main pile 2393 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
534 10-Dec-15 main pile 2394 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
544 10-Dec-15 main pile 2651 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
545 10-Dec-15 main pile 2650 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
546 10-Dec-15 main pile 2649 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
547 10-Dec-15 main pile 2648 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
548 10-Dec-15 main pile 2647 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
549 10-Dec-15 main pile 2644 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
550 10-Dec-15 main pile 2643 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.00 434.50 12.00 TI-16
551 10-Dec-15 main pile 2645 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
552 10-Dec-15 main pile 2646 Ǿ600 17 15 32.00 32.00 0.00 1.00 15.50 448.90 12.00 TI-16
553 11-Dec-15 main pile 2584 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
566 11-Dec-15 main pile 2653 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
568 11-Dec-15 main pile 2655 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
569 11-Dec-15 main pile 2656 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
570 11-Dec-15 main pile 2400 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.10 421.10 12.00 TI-03
573 11-Dec-15 main pile 2399 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
574 11-Dec-15 main pile 2402 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
575 11-Dec-15 main pile 2403 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
576 11-Dec-15 main pile 2404 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
578 11-Dec-15 main pile 2388 Ǿ600 17 15 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
591 12-Dec-15 main pile 2681 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
595 12-Dec-15 main pile 2383 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
596 12-Dec-15 main pile 2410 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
598 12-Dec-15 main pile 2408 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
600 12-Dec-15 main pile 2412 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
602 12-Dec-15 main pile 2405 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
604 13-Dec-15 main pile 2714 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
607 13-Dec-15 main pile 2717 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
609 13-Dec-15 main pile 2738 Ǿ600 17 15 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
615 13-Dec-15 main pile 2418 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
617 13-Dec-15 main pile 2414 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
622 14-Dec-15 main pile 2428 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
625 14-Dec-15 main pile 2424 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
626 14-Dec-15 main pile 2420 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
628 14-Dec-15 main pile 2422 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.11 12.00 TI-03
629 15-Dec-15 main pile 2426 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
631 15-Dec-15 main pile 2441 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
633 15-Dec-15 main pile 2444 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
636 15-Dec-15 main pile 2438 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
637 15-Dec-15 main pile 2439 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
661 16-Dec-15 main pile 2435 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.70 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

665 17-Dec-15 main pile 2718 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 420.00 12.00 TI-07
785 27-Dec-15 main pile 2730 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 42.70 12.00 TI-03
838 8-Jan-16 main pile 2627 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
844 8-Jan-16 main pile 2597 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
847 9-Jan-16 main pile 2575 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.1 12.00 TI-03
859 11-Jan-16 main pile 2564 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
861 11-Jan-16 main pile 2560 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
865 11-Jan-16 main pile 2568 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
866 11-Jan-16 main pile 2567 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
867 11-Jan-16 main pile 2565 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
868 11-Jan-16 main pile 2566 Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 12.00 TI-03
212 10-Nov-15 main pile 2115 Ǿ600 17 15 32.00 32.10 0.10 1.00 23.70 421.10 12.00 TI-21A
213 10-Nov-15 main pile 2114 Ǿ600 17 15 32.00 32.13 0.13 1.00 23.70 421.10 12.00 TI-21A
54 22-Oct-15 Main Pile 2109 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
86 26-Oct-15 Main Pile 2004 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
127 30-Oct-15 main pile 2153 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
150 3-Nov-15 main pile 2174 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
162 4-Nov-15 main pile 2157 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
165 4-Nov-15 main pile 2017 Ǿ600 15 17 32.00 32.15 0.15 1.00 24.00 426.50 12.00 TI-21A
183 7-Nov-15 main pile 2218 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
196 8-Nov-15 main pile 2184 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
338 24-Nov-15 main pile 2076 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
443 1-Dec-15 main pile 2171 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
448 1-Dec-15 main pile 2229 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
475 4-Dec-15 main pile 2978 Ǿ600 17 15 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
45 21-Oct-15 Main Pile 2089 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
48 21-Oct-15 Main Pile 2110 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
51 21-Oct-15 Main Pile 2113 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
125 30-Oct-15 main pile 2221 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
130 30-Oct-15 main pile 2179 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
181 7-Nov-15 main pile 2217 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
374 26-Nov-15 main pile 2078 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
379 27-Nov-15 main pile 2196 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
382 27-Nov-15 main pile 2205 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
442 1-Dec-15 main pile 2172 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
474 4-Dec-15 main pile 2979 Ǿ600 17 15 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
58 23-Oct-15 Main Pile 2026 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
383 27-Nov-15 main pile 2204 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
426 30-Nov-15 main pile 2202 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
164 4-Nov-15 main pile 2016 Ǿ600 15 17 32.00 32.30 0.30 1.00 24.00 426.50 12.00 TI-21A
246 13-Nov-15 main pile 1997 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
247 13-Nov-15 main pile 2000 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
341 24-Nov-15 main pile 2073 Ǿ600 17 15 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
446 1-Dec-15 main pile 2227 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
507 7-Dec-15 main pile 2462 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
555 11-Dec-15 main pile 2586 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
666 17-Dec-15 main pile 2674 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 420.00 12.00 TI-07
375 26-Nov-15 main pile 2079 Ǿ600 15 17 32.00 32.35 0.35 1.00 23.70 421.10 12.00 TI-21A
308 20-Nov-15 main pile 2528 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
377 26-Nov-15 main pile 2081 Ǿ600 15 17 32.00 32.40 0.40 1.00 23.70 421.10 12.00 TI-21A
461 3-Dec-15 main pile 2478 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
504 5-Dec-15 main pile 2459 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
537 10-Dec-15 main pile 2578 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
556 11-Dec-15 main pile 2587 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
697 21-Dec-15 main pile 2800 Ǿ600 17 15 32.00 32.40 0.40 1.00 23.70 420.00 12.00 TI-07
37 20-Oct-15 Main Pile 2097 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
42 21-Oct-15 Main Pile 2242 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
52 22-Oct-15 Main Pile 2107 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
139 2-Nov-15 main pile 2159 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
214 10-Nov-15 main pile 2084 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
225 11-Nov-15 main pile 2019 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.20 421.10 12.00 TI-21A
296 18-Nov-15 main pile 2530 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

340 24-Nov-15 main pile 2072 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
373 26-Nov-15 main pile 2077 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
376 26-Nov-15 main pile 2080 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
378 26-Nov-15 main pile 2065 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
385 27-Nov-15 main pile 2199 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
408 28-Nov-15 main pile 2330 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
423 30-Nov-15 main pile 2208 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
445 1-Dec-15 main pile 2169 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
447 1-Dec-15 main pile 2230 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
450 1-Dec-15 main pile 2328 Ǿ600 17 15 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
463 3-Dec-15 main pile 2476 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
464 3-Dec-15 main pile 2474 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
500 5-Dec-15 main pile 2464 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
502 5-Dec-15 main pile 2465 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
503 5-Dec-15 main pile 2466 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
536 10-Dec-15 main pile 2577 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
540 10-Dec-15 main pile 2576 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
541 10-Dec-15 main pile 2580 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
543 10-Dec-15 main pile 2583 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
557 11-Dec-15 main pile 2588 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
561 11-Dec-15 main pile 2642 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
562 11-Dec-15 main pile 2641 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
563 11-Dec-15 main pile 2640 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
564 11-Dec-15 main pile 2639 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
565 11-Dec-15 main pile 2652 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
567 11-Dec-15 main pile 2654 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
580 12-Dec-15 main pile 2637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
581 12-Dec-15 main pile 2632 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
582 12-Dec-15 main pile 2631 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
583 12-Dec-15 main pile 2634 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
585 12-Dec-15 main pile 2657 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
586 12-Dec-15 main pile 2676 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
587 12-Dec-15 main pile 2677 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
588 12-Dec-15 main pile 2678 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.50 448.90 12.00 TI-16
589 12-Dec-15 main pile 2679 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
590 12-Dec-15 main pile 2680 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
592 12-Dec-15 main pile 2712 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
593 12-Dec-15 main pile 2713 Ǿ600 17 15 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
606 13-Dec-15 main pile 2716 Ǿ600 17 15 32.00 32.50 0.50 1.00 16.00 463.40 12.00 TI-16
608 13-Dec-15 main pile 2737 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
610 13-Dec-15 main pile 2739 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
611 13-Dec-15 main pile 2740 Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 12.00 TI-16
648 16-Dec-15 main pile 2744 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
652 16-Dec-15 main pile 2719 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
674 19-Dec-15 main pile 2735 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
698 21-Dec-15 main pile 2799 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
739 24-Dec-15 main pile 2613 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.20 421.10 12.00 TI-03
813 2-Jan-16 main pile 2801 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 420.00 12.00 TI-07
646 15-Dec-15 main pile 2748 Ǿ600 15 17 32.00 32.60 0.60 1.00 23.70 420.00 12.00 TI-07
24 18-Oct-15 Main Pile 2299 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 TI-03
33 20-Oct-15 Main Pile 2087 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
36 20-Oct-15 Main Pile 2093 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
38 20-Oct-15 Main Pile 2098 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
39 21-Oct-15 Main Pile 2239 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
46 21-Oct-15 Main Pile 2090 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
50 21-Oct-15 Main Pile 2112 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
59 23-Oct-15 Main Pile 2095 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
63 23-Oct-15 Main Pile 2160 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
96 27-Oct-15 Main Pile 2008 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
97 27-Oct-15 Main Pile 2012 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
98 28-Oct-15 main pile 2021 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
99 28-Oct-15 main pile 2023 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

100 28-Oct-15 main pile 2022 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
101 28-Oct-15 main pile 2024 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
104 28-Oct-15 main pile 2356 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.00 421.10 12.00 TI-03
116 29-Oct-15 main pile 2384 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
124 30-Oct-15 main pile 2220 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
126 30-Oct-15 main pile 2222 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
169 6-Nov-15 main pile 2262 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
174 6-Nov-15 main pile 1977 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
176 6-Nov-15 main pile 2067 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
186 7-Nov-15 main pile 2123 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
199 9-Nov-15 main pile 2257 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
203 9-Nov-15 main pile 2050 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.10 439.50 12.00 TI-26
205 9-Nov-15 main pile 2052 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
218 10-Nov-15 main pile 1981 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
221 10-Nov-15 main pile 2063 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.00 12.00 TI-26
228 11-Nov-15 main pile 2062 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
229 11-Nov-15 main pile 2139 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
231 11-Nov-15 main pile 2137 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
232 11-Nov-15 main pile 2140 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.10 12.00 TI-26
238 12-Nov-15 main pile 2141 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
240 12-Nov-15 main pile 2190 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
269 14-Nov-15 main pile 2187 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.50 439.50 12.00 TI-26
275 14-Nov-15 main pile 2251 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
278 16-Nov-15 main pile 2260 Ǿ600 15 17 32.00 33.00 1.00 1.00 1 24.20 421.10 12.00 TI-03
294 18-Nov-15 main pile 2263 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
330 23-Nov-15 main pile 2273 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
361 25-Nov-15 main pile 2245 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
362 25-Nov-15 main pile 2244 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
380 27-Nov-15 main pile 2198 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
384 27-Nov-15 main pile 2200 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
386 27-Nov-15 main pile 2207 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
388 27-Nov-15 main pile 2333 Ǿ600 17 15 32.00 33.00 1.00 1.00 24,2 421.10 12.00 TI-03
392 27-Nov-15 main pile 2334 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
416 29-Nov-15 main pile 2500 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
419 30-Nov-15 main pile 2482 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
422 30-Nov-15 main pile 2203 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
424 30-Nov-15 main pile 2206 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
425 30-Nov-15 main pile 2201 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
429 30-Nov-15 main pile 2361 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
430 30-Nov-15 main pile 2358 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
431 30-Nov-15 main pile 2332 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
438 1-Dec-15 main pile 2480 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
439 1-Dec-15 main pile 2479 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
453 2-Dec-15 main pile 2319 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
462 3-Dec-15 main pile 2477 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
467 3-Dec-15 main pile 2365 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
470 3-Dec-15 main pile 2326 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
527 8-Dec-15 main pile 2373 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
528 10-Dec-15 main pile 2375 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
539 10-Dec-15 main pile 2579 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
542 10-Dec-15 main pile 2581 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
554 11-Dec-15 main pile 2585 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
577 11-Dec-15 main pile 2389 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
579 11-Dec-15 main pile 2390 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
584 12-Dec-15 main pile 2633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
594 12-Dec-15 main pile 2386 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
601 12-Dec-15 main pile 2413 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
603 12-Dec-15 main pile 2406 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
612 13-Dec-15 main pile 2417 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
616 13-Dec-15 main pile 2419 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
618 14-Dec-15 main pile 2741 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
620 14-Dec-15 main pile 2743 Ǿ600 15 17 32.00 33.00 1.00 1.00 15.50 448.90 12.00 TI-16
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

621 14-Dec-15 main pile 2429 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
623 14-Dec-15 main pile 2425 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
627 14-Dec-15 main pile 2421 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.11 12.00 TI-03
630 15-Dec-15 main pile 2442 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
654 16-Dec-15 main pile 2433 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
655 16-Dec-15 main pile 2434 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
656 16-Dec-15 main pile 2432 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
657 16-Dec-15 main pile 2430 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
658 16-Dec-15 main pile 2431 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
662 16-Dec-15 main pile 2440 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.70 12.00 TI-03
672 17-Dec-15 main pile 2537 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
681 19-Dec-15 main pile 2542 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
723 23-Dec-15 main pile 2556 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
729 23-Dec-15 main pile 2550 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
732 23-Dec-15 main pile 2546 Ǿ600 17 15 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
735 24-Dec-15 main pile 2820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
746 24-Dec-15 main pile 2617 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
760 25-Dec-15 main pile 2666 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
768 26-Dec-15 main pile 2754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 12.00 TI-07
804 30-Dec-15 main pile 2785 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
818 5-Jan-16 main pile 2786 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
839 8-Jan-16 main pile 2628 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
840 8-Jan-16 main pile 2629 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
841 8-Jan-16 main pile 2626 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
842 8-Jan-16 main pile 2625 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
851 9-Jan-16 main pile 2574 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
852 9-Jan-16 main pile 2592 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
855 9-Jan-16 main pile 2590 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
856 9-Jan-16 main pile 2594 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
857 9-Jan-16 main pile 2589 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.1 12.00 TI-03
863 11-Jan-16 main pile 2570 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
864 11-Jan-16 main pile 2569 Ǿ600 15 17 32.00 33.00 1.00 1.00 24.20 421.10 12.00 TI-03
53 22-Oct-15 Main Pile 2108 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
66 23-Oct-15 Main Pile 2296 Ǿ600 15 17 32.00 33.50 1.50 1.00 24.20 421.10 12.00 TI-03
80 25-Oct-15 Main Pile 2103 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
207 9-Nov-15 main pile 2049 Ǿ600 15 17 32.00 33.50 1.50 1.00 17.50 439.50 12.00 TI-26
381 27-Nov-15 main pile 2210 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
560 11-Dec-15 main pile 2638 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
643 15-Dec-15 main pile 2710 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
793 28-Dec-15 main pile 2771 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 12.00 TI-07
21 17-Oct-15 Main Pile 2347 Ǿ600 15 17 32.00 33.80 1.80 1.00 24.20 421.10 TI-03
17 15-Oct-15 Main Pile 2281 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
19 17-Oct-15 Main Pile 2346 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03
27 20-Oct-15 Main Pile 2285 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
28 20-Oct-15 Main Pile 2286 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
30 20-Oct-15 Main Pile 2235 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
32 20-Oct-15 Main Pile 2237 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
65 23-Oct-15 Main Pile 2293 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
67 23-Oct-15 Main Pile 2350 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
77 24-Oct-15 Main Pile 2295 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.10 421.10 12.00 TI-03
92 27-Oct-15 Main Pile 2231 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
115 29-Oct-15 main pile 2379 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
134 1-Nov-15 main pile 1972 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 439.50 12.00 TI-26
145 3-Nov-15 main pile 2128 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
146 3-Nov-15 main pile 2130 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
157 4-Nov-15 main pile 2134 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
160 4-Nov-15 main pile 2195 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
161 4-Nov-15 main pile 2197 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
168 6-Nov-15 main pile 2261 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
170 6-Nov-15 main pile 2266 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
172 6-Nov-15 main pile 2271 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
202 9-Nov-15 main pile 2253 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

206 9-Nov-15 main pile 2048 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
239 12-Nov-15 main pile 2193 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.00 12.00 TI-26
241 12-Nov-15 main pile 2192 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
242 12-Nov-15 main pile 2191 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
244 12-Nov-15 main pile 2118 Ǿ600 17 15 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
253 13-Nov-15 main pile 2143 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
268 14-Nov-15 main pile 2189 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
270 14-Nov-15 main pile 2188 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
283 17-Nov-15 main pile 2212 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 439.50 12.00 TI-26
293 18-Nov-15 main pile 2264 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
390 27-Nov-15 main pile 2335 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
403 28-Nov-15 main pile 2497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
406 28-Nov-15 main pile 2312 Ǿ600 15 15 30.00 34.00 4.00 1.00 24.20 421.10 12.00 TI-03
410 28-Nov-15 main pile 2362 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
428 30-Nov-15 main pile 2360 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
559 11-Dec-15 main pile 2635 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
571 11-Dec-15 main pile 2401 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
597 12-Dec-15 main pile 2409 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
599 12-Dec-15 main pile 2411 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
614 13-Dec-15 main pile 2415 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
624 14-Dec-15 main pile 2423 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.11 12.00 TI-03
632 15-Dec-15 main pile 2443 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
634 15-Dec-15 main pile 2445 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
635 15-Dec-15 main pile 2446 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
649 16-Dec-15 main pile 2745 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
650 16-Dec-15 main pile 2746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
651 16-Dec-15 main pile 2721 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
653 16-Dec-15 main pile 2720 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
659 16-Dec-15 main pile 2437 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
660 16-Dec-15 main pile 2436 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 12.00 TI-03
667 17-Dec-15 main pile 2673 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
668 17-Dec-15 main pile 2672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
669 17-Dec-15 main pile 2539 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
670 17-Dec-15 main pile 2538 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
671 17-Dec-15 main pile 2540 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
678 19-Dec-15 main pile 2776 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
680 19-Dec-15 main pile 2777 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
683 19-Dec-15 main pile 2553 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
684 19-Dec-15 main pile 2554 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
685 19-Dec-15 main pile 2555 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
686 19-Dec-15 main pile 2552 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
687 19-Dec-15 main pile 2544 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
688 19-Dec-15 main pile 2541 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
689 19-Dec-15 main pile 2543 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
690 20-Dec-15 main pile 2775 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
691 20-Dec-15 main pile 2778 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
692 20-Dec-15 main pile 2790 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
693 20-Dec-15 main pile 2793 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
696 20-Dec-15 main pile 2794 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
702 21-Dec-15 main pile 2795 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
703 21-Dec-15 main pile 2805 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
711 23-Dec-15 main pile 2812 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
718 23-Dec-15 main pile 2601 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
719 23-Dec-15 main pile 2604 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
721 23-Dec-15 main pile 2605 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
722 23-Dec-15 main pile 2602 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
724 23-Dec-15 main pile 2559 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
725 23-Dec-15 main pile 2558 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
726 23-Dec-15 main pile 2557 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
727 23-Dec-15 main pile 2549 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
728 23-Dec-15 main pile 2548 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
730 23-Dec-15 main pile 2551 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

731 23-Dec-15 main pile 2547 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
740 24-Dec-15 main pile 2615 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
741 24-Dec-15 main pile 2618 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
742 24-Dec-15 main pile 2659 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
743 24-Dec-15 main pile 2660 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
747 24-Dec-15 main pile 2616 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
755 25-Dec-15 main pile 2670 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
756 25-Dec-15 main pile 2669 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
757 25-Dec-15 main pile 2671 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
758 25-Dec-15 main pile 2668 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
759 25-Dec-15 main pile 2663 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
761 25-Dec-15 main pile 2665 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
762 25-Dec-15 main pile 2664 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
763 25-Dec-15 main pile 2662 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
770 26-Dec-15 main pile 2723 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
771 26-Dec-15 main pile 2724 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
772 26-Dec-15 main pile 2725 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
773 26-Dec-15 main pile 2722 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
774 26-Dec-15 main pile 2667 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
775 26-Dec-15 main pile 2731 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
776 26-Dec-15 main pile 2728 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
782 27-Dec-15 main pile 2726 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
783 27-Dec-15 main pile 2783 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
784 27-Dec-15 main pile 2780 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
786 27-Dec-15 main pile 2727 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
787 27-Dec-15 main pile 2729 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 42.70 12.00 TI-03
790 28-Dec-15 main pile 2753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
791 28-Dec-15 main pile 2772 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
792 28-Dec-15 main pile 2774 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
794 28-Dec-15 main pile 2773 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
805 30-Dec-15 main pile 2788 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
812 2-Jan-16 main pile 2802 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
814 2-Jan-16 main pile 2804 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
815 2-Jan-16 main pile 2803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 12.00 TI-07
816 5-Jan-16 main pile 2784 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
817 5-Jan-16 main pile 2781 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
819 5-Jan-16 main pile 2789 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
820 5-Jan-16 main pile 2782 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
821 6-Jan-16 main pile 2608 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
822 6-Jan-16 main pile 2606 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
823 6-Jan-16 main pile 2609 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
824 6-Jan-16 main pile 2614 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
825 6-Jan-16 main pile 2612 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
826 6-Jan-16 main pile 2611 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
827 6-Jan-16 main pile 2610 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
828 6-Jan-16 main pile 2607 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
829 7-Jan-16 main pile 2624 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
830 7-Jan-16 main pile 2600 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
832 7-Jan-16 main pile 2598 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
833 7-Jan-16 main pile 2619 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
834 7-Jan-16 main pile 2620 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
835 7-Jan-16 main pile 2621 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
836 7-Jan-16 main pile 2622 Ǿ600 17 15 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
837 7-Jan-16 main pile 2623 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
843 8-Jan-16 main pile 2630 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
845 8-Jan-16 main pile 2596 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
846 8-Jan-16 main pile 2595 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
848 9-Jan-16 main pile 2572 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
850 9-Jan-16 main pile 2571 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
853 9-Jan-16 main pile 2591 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.1 12.00 TI-03
858 11-Jan-16 main pile 2563 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
860 11-Jan-16 main pile 2562 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

862 11-Jan-16 main pile 2561 Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 12.00 TI-03
20 17-Oct-15 Main Pile 2348 Ǿ600 15 17 32.00 34.20 2.20 1.00 24.20 421.10 TI-03
18 17-Oct-15 Main Pile 2349 Ǿ600 15 17 32.00 34.30 2.30 1.00 24.20 421.10 TI-03
69 23-Oct-15 Main Pile 2353 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
78 24-Oct-15 Main Pile 2351 Ǿ600 15 17 32.00 34.50 2.50 1.00 24.20 421.10 12.00 TI-03
336 24-Nov-15 main pile 2516 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
673 19-Dec-15 main pile 2732 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
795 28-Dec-15 main pile 2824 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 12.00 TI-07
155 4-Nov-15 main pile 1967 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
156 4-Nov-15 main pile 1968 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
132 1-Nov-15 main pile 1969 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
133 1-Nov-15 main pile 1970 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
131 30-Oct-15 main pile 1971 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.80 421.90 12.00 TI-26
135 1-Nov-15 main pile 1973 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
136 1-Nov-15 main pile 1974 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
137 1-Nov-15 main pile 1975 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
107 29-Oct-15 main pile 2025 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
204 9-Nov-15 main pile 2051 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 439.50 12.00 TI-26
208 9-Nov-15 main pile 2053 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
209 9-Nov-15 main pile 2054 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
222 10-Nov-15 main pile 2064 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
220 10-Nov-15 main pile 2066 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
184 7-Nov-15 main pile 2068 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
177 6-Nov-15 main pile 2069 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 439.50 12.00 TI-26
178 6-Nov-15 main pile 2070 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
185 7-Nov-15 main pile 2071 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
73 24-Oct-15 Main Pile 2105 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
243 12-Nov-15 main pile 2119 Ǿ600 17 15 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
257 13-Nov-15 main pile 2120 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
258 13-Nov-15 main pile 2121 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
189 7-Nov-15 main pile 2122 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
187 7-Nov-15 main pile 2124 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
188 7-Nov-15 main pile 2125 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
167 5-Nov-15 main pile 2126 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
166 5-Nov-15 main pile 2129 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
158 4-Nov-15 main pile 2131 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
148 3-Nov-15 main pile 2133 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
230 11-Nov-15 main pile 2138 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
256 13-Nov-15 main pile 2142 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
255 13-Nov-15 main pile 2145 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
252 13-Nov-15 main pile 2146 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
266 14-Nov-15 main pile 2185 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
154 4-Nov-15 main pile 2194 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.50 439.50 12.00 TI-26
281 17-Nov-15 main pile 2209 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.50 439.50 12.00 TI-26
282 17-Nov-15 main pile 2211 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
284 17-Nov-15 main pile 2213 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 439.50 12.00 TI-26
94 27-Oct-15 Main Pile 2233 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
201 9-Nov-15 main pile 2252 Ǿ600 17 15 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
200 9-Nov-15 main pile 2256 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
292 18-Nov-15 main pile 2265 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
16 14-Oct-15 Main Pile 2284 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
25 18-Oct-15 Main Pile 2300 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.20 421.10 TI-03
14 14-Oct-15 Main Pile 2303 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
122 30-Oct-15 main pile 2308 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
112 29-Oct-15 main pile 2338 Ǿ600 15 17 32.00 37.00 5.00 1.00 24.10 421.10 12.00 TI-03
113 29-Oct-15 main pile 2339 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
114 29-Oct-15 main pile 2341 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
8 12-Oct-15 Main Pile 2342 Ǿ600 17 15 32.00 37.00 5.00 1.00 20.00 355.40 12.00 TI-12A
11 13-Oct-15 Main Pile 2344 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.50 421.10 12.00 TI-21A
103 28-Oct-15 main pile 2355 Ǿ600 15 17 32.00 35.50 3.50 1.00 24.00 421.10 12.00 TI-03
105 28-Oct-15 main pile 2357 Ǿ600 15 17 32.00 36.00 4.00 1.00 24.00 421.10 12.00 TI-03
117 29-Oct-15 main pile 2385 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

118 29-Oct-15 main pile 2387 Ǿ600 15 17 32.00 35.00 3.00 1.00 24.20 421.10 12.00 TI-03
510 8-Dec-15 main pile 2447 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
509 7-Dec-15 main pile 2448 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
513 8-Dec-15 main pile 2449 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
511 8-Dec-15 main pile 2450 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
512 8-Dec-15 main pile 2451 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
811 30-Dec-15 main pile 2452 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
809 30-Dec-15 main pile 2453 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 12.00 TI-18
807 30-Dec-15 main pile 2454 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 206.80 12.00 TI-18
808 30-Dec-15 main pile 2455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
806 30-Dec-15 main pile 2456 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
810 30-Dec-15 main pile 2457 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
482 4-Dec-15 main pile 2467 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
481 4-Dec-15 main pile 2468 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
480 4-Dec-15 main pile 2469 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
479 4-Dec-15 main pile 2470 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
478 4-Dec-15 main pile 2471 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
477 4-Dec-15 main pile 2472 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
466 3-Dec-15 main pile 2473 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
418 30-Nov-15 main pile 2483 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
441 1-Dec-15 main pile 2484 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
440 1-Dec-15 main pile 2485 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
436 1-Dec-15 main pile 2486 Ǿ600 17 17 34.00 37.50 3.50 1.00 23.70 420.00 12.00 TI-07
421 30-Nov-15 main pile 2487 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
420 30-Nov-15 main pile 2488 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
401 28-Nov-15 main pile 2489 Ǿ600 15 17 32.00 37.40 5.40 1.00 23.70 420.00 12.00 TI-07
417 30-Nov-15 main pile 2490 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
412 29-Nov-15 main pile 2491 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
398 27-Nov-15 main pile 2492 Ǿ600 17 15 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
399 27-Nov-15 main pile 2493 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
400 28-Nov-15 main pile 2494 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
413 29-Nov-15 main pile 2495 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
414 29-Nov-15 main pile 2496 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
402 28-Nov-15 main pile 2498 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
415 29-Nov-15 main pile 2499 Ǿ600 17 15 32.00 37.00 5.00 1.00 21.00 373.10 12.00 TI-07
405 28-Nov-15 main pile 2501 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
404 28-Nov-15 main pile 2502 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
348 25-Nov-15 main pile 2503 Ǿ600 17 15 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
347 25-Nov-15 main pile 2504 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
345 25-Nov-15 main pile 2505 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.00 390.00 12.00 TI-07
346 25-Nov-15 main pile 2506 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
395 27-Nov-15 main pile 2507 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
371 26-Nov-15 main pile 2508 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.50 382.10 12.00 TI-07
367 26-Nov-15 main pile 2509 Ǿ600 15 17 32.00 35.80 3.80 1.00 23.70 420.00 12.00 TI-07
368 26-Nov-15 main pile 2510 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
397 27-Nov-15 main pile 2511 Ǿ600 15 17 32.00 38.00 6.00 1.00 23.70 420.00 12.00 TI-07
396 27-Nov-15 main pile 2512 Ǿ600 15 17 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
369 26-Nov-15 main pile 2513 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
370 26-Nov-15 main pile 2514 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
335 24-Nov-15 main pile 2515 Ǿ600 17 15 32.00 37.80 5.80 1.00 23.70 420.00 12.00 TI-07
334 24-Nov-15 main pile 2517 Ǿ600 17 15 32.00 36.70 4.70 1.00 23.70 426.00 12.00 TI-07
333 24-Nov-15 main pile 2518 Ǿ600 17 15 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
337 24-Nov-15 main pile 2519 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.00 355.30 12.00 TI-07
343 25-Nov-15 main pile 2520 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.00 284.00 12.00 TI-07
309 20-Nov-15 main pile 2522 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
310 20-Nov-15 main pile 2523 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
311 20-Nov-15 main pile 2524 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
313 21-Nov-15 main pile 2525 Ǿ600 15 15 30.00 38.00 8.00 1.00 14.00 248.70 12.00 TI-07
312 20-Nov-15 main pile 2526 Ǿ600 15 17 32.00 38.00 6.00 1.00 21.00 373.10 12.00 TI-07
316 21-Nov-15 main pile 2527 Ǿ600 15 17 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
307 20-Nov-15 main pile 2529 Ǿ600 17 15 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
299 19-Nov-15 main pile 2531 Ǿ600 15 17 32.00 38.00 6.00 1.00 18.00 319.80 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

314 21-Nov-15 main pile 2533 Ǿ600 15 15 30.00 35.80 5.80 1.00 23.70 420.00 12.00 TI-07
298 19-Nov-15 main pile 2535 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
297 19-Nov-15 main pile 2536 Ǿ600 15 17 32.00 38.00 6.00 1.00 22.50 399.80 12.00 TI-07
538 10-Dec-15 main pile 2582 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
558 11-Dec-15 main pile 2636 Ǿ600 17 15 32.00 37.50 5.50 1.00 23.70 420.00 12.00 TI-07
748 25-Dec-15 main pile 2695 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
749 25-Dec-15 main pile 2696 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
764 26-Dec-15 main pile 2697 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
639 15-Dec-15 main pile 2706 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
640 15-Dec-15 main pile 2707 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
641 15-Dec-15 main pile 2708 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
642 15-Dec-15 main pile 2709 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
644 15-Dec-15 main pile 2711 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
676 19-Dec-15 main pile 2733 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
675 19-Dec-15 main pile 2734 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
677 19-Dec-15 main pile 2736 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
645 15-Dec-15 main pile 2747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
647 15-Dec-15 main pile 2749 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
781 27-Dec-15 main pile 2750 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
779 27-Dec-15 main pile 2751 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
780 27-Dec-15 main pile 2752 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
765 26-Dec-15 main pile 2755 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 12.00 TI-07
767 26-Dec-15 main pile 2756 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
769 26-Dec-15 main pile 2757 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
766 26-Dec-15 main pile 2758 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
752 25-Dec-15 main pile 2759 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
750 25-Dec-15 main pile 2760 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
751 25-Dec-15 main pile 2761 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
753 25-Dec-15 main pile 2762 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
737 24-Dec-15 main pile 2763 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
754 25-Dec-15 main pile 2764 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
736 24-Dec-15 main pile 2765 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
738 24-Dec-15 main pile 2766 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
788 28-Dec-15 main pile 2767 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
777 27-Dec-15 main pile 2768 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
789 28-Dec-15 main pile 2769 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
778 27-Dec-15 main pile 2770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
679 19-Dec-15 main pile 2779 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
695 20-Dec-15 main pile 2791 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
694 20-Dec-15 main pile 2792 Ǿ600 17 15 32.00 35.40 3.40 1.00 23.70 420.00 12.00 TI-07
701 21-Dec-15 main pile 2796 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
700 21-Dec-15 main pile 2797 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
699 21-Dec-15 main pile 2798 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
704 22-Dec-15 main pile 2806 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
705 22-Dec-15 main pile 2807 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
706 22-Dec-15 main pile 2808 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
707 22-Dec-15 main pile 2809 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
708 22-Dec-15 main pile 2810 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
712 23-Dec-15 main pile 2811 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
710 22-Dec-15 main pile 2813 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
709 22-Dec-15 main pile 2814 Ǿ600 17 15 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
713 23-Dec-15 main pile 2815 Ǿ600 15 17 32.00 36.50 4.50 1.00 23.70 420.00 12.00 TI-07
714 23-Dec-15 main pile 2816 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
716 23-Dec-15 main pile 2817 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
715 23-Dec-15 main pile 2818 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
733 24-Dec-15 main pile 2819 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 12.00 TI-07
734 24-Dec-15 main pile 2821 Ǿ600 15 17 32.00 37.00 5.00 1.00 23.70 420.00 12.00 TI-07
717 23-Dec-15 main pile 2822 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
798 29-Dec-15 main pile 2823 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
796 28-Dec-15 main pile 2825 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
799 29-Dec-15 main pile 2826 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
800 29-Dec-15 main pile 2827 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 868
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

797 29-Dec-15 main pile 2828 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
801 29-Dec-15 main pile 2829 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
802 29-Dec-15 main pile 2830 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 12.00 TI-07
3 10-Aug-15 P - 1/2238 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 18.20 410.80 12.00 TI - 24
5 16-Aug-15 P - 17/2136 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.00 440.80 12.00 TI - 24
4 15-Aug-15 P - 20/2534 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.80 519.90 12.00 TI - 24
2 6-Aug-15 P - 5/2407 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 13.00 456.60 12.00 TI - 24
1 5-Aug-15 P - 9/2675 Ǿ600 13 13 12 38.00 36.50 -1.50 2.00 1.00 14.50 509.30 12.00 TI - 24

TOTAL PEMANCANGAN MAIN PILE 27680.00 28215.13 535.13 0.00 0.00 874.00 133.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 30 Jul 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 30-Jul-15 P - 10/1663 Ǿ600 13 13 12 38.00 35.00 4.00 - - 2.00 1.00 15.50 544.50 12.00 TI - 24
2 22-Dec-15 main pile 1963 Ǿ600 15 17 32.00 15.50 -16.5 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
3 29-Jan-16 main pile 1510 Ǿ600 15 17 32.00 22.00 -10.0 1.00 24.00 426.50 TI-21A
4 26-Jan-16 main pile 1512 Ǿ600 15 17 32.00 23.00 -9.0 1.00 24.00 426.50 TI-21A potong tiang
5 10-Feb-16 main pile 1503 Ǿ600 15 17 32.00 23.00 -9.0 1.00 24.00 426.50 TI-21A potong tiang
6 22-Dec-15 main pile 1966 Ǿ600 15 17 32.00 24.00 -8.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
7 8-Jan-16 main pile 1704 Ǿ600 15 17 32.00 24.00 -8.0 1.00 23.70 421.10 12.00 TI-21A
8 26-Dec-15 main pile 1884 Ǿ600 15 17 32.00 26.00 -6.0 1.00 1 24.00 426.70 12.00 TI-21A potong tiang
9 22-Dec-15 main pile 1851 Ǿ600 15 17 32.00 28.50 -3.5 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
10 23-Dec-15 main pile 1849 Ǿ600 15 17 32.00 29.00 -3.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
11 23-Dec-15 main pile 1848 Ǿ600 17 15 32.00 29.00 -3.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
12 24-Dec-15 main pile 1725 Ǿ600 15 17 32.00 29.00 -3.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
13 11-Jan-16 main pile 1950 Ǿ600 15 17 32.00 29.00 -3.0 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
14 26-Jan-16 main pile 1514 Ǿ600 15 17 32.00 29.00 -3.0 1.00 24.00 426.50 TI-21A potong tiang
15 2-Feb-16 main pile 1755 Ǿ600 15 17 32.00 29.00 -3.0 1.00 24.00 426.50 TI-21A
16 23-Dec-15 main pile 1723 Ǿ600 15 17 32.00 29.50 -2.5 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
17 23-Dec-15 main pile 1722 Ǿ600 15 17 32.00 29.50 -2.5 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
18 26-Dec-15 main pile 1813 Ǿ600 15 17 32.00 29.50 -2.5 1.00 1 23.90 424.70 12.00 TI-21A potong tiang
19 19-Dec-15 main pile 1731 Ǿ600 15 17 32.00 30.00 -2.0 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
20 25-Dec-15 main pile 1765 Ǿ600 15 17 32.00 30.50 -1.5 1.00 24.00 426.50 12.00 TI-21A
21 13-Dec-15 main pile 1915 Ǿ600 17 15 32.00 31.00 -1.0 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
22 21-Dec-15 main pile 1921 Ǿ600 17 15 32.00 31.00 -1.0 1.00 1 23.90 424.70 12.00 TI-21A
23 23-Dec-15 main pile 1922 Ǿ600 15 17 32.00 31.00 -1.0 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
24 9-Jan-16 main pile 1584 Ǿ600 15 17 32.00 31.00 -1.0 1.00 24.00 426.50 12.00 TI-21A
25 30-Jan-16 main pile 1897 Ǿ600 15 17 32.00 31.00 -1.0 1.00 1 23.70 420.00 TI-07
26 30-Jan-16 main pile 1898 Ǿ600 15 17 32.00 31.00 -1.0 1.00 1 23.70 420.00 TI-07
27 9-Feb-16 main pile 1501 Ǿ600 15 17 32.00 31.00 -1.0 1.00 24.00 426.50 TI-21A potong tiang
28 10-Feb-16 main pile 1805 Ǿ600 15 17 32.00 31.00 -1.0 1.00 23.70 420.00 TI-07
29 13-Feb-16 main pile 1800 Ǿ600 15 17 32.00 31.00 -1.0 1.00 23.70 421.00 TI-07 potong tiang
30 13-Dec-15 main pile 1914 Ǿ600 17 15 32.00 31.20 -0.8 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
31 21-Dec-15 main pile 1905 Ǿ600 17 15 32.00 31.25 -0.8 1.00 1 24.00 426.50 12.00 TI-21A
32 14-Dec-15 main pile 1543 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
33 15-Dec-15 main pile 1538 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
34 15-Dec-15 main pile 1537 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
35 19-Dec-15 main pile 1906 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
36 21-Dec-15 main pile 1857 Ǿ600 15 17 32.00 32.00 0.0 1.00 18.00 452.10 12.00 TI-26
37 23-Dec-15 main pile 1923 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
38 25-Dec-15 main pile 1764 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
39 25-Dec-15 main pile 1814 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 12.00 TI-21A
40 23-Jan-16 main pile 1882 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 TI-21A
41 9-Feb-16 main pile 1499 Ǿ600 15 17 32.00 32.00 0.0 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

TOTAL PEMANCANGAN MAIN PILE 1318.00 1205.45 -105.55 0.00 0.00 42.00 20.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 30 Jul 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 19-Mar-16 Main pile 1512A Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A sisipan
2 19-Mar-16 Main pile 1510A Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A sisipan
3 19-Mar-16 Main pile 1503A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A sisipan

TOTAL PEMANCANGAN MAIN PILE 96.00 100.00 4.00 0.00 0.00 3.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 30 Jul 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 30-Jul-15 P - 10/1663 Ǿ600 13 13 12 38.00 35.00 -3.00 2.00 1.00 15.50 544.50 12.00 TI - 24
2 11-Dec-15 main pile 1659 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
3 11-Dec-15 main pile 1658 Ǿ600 17 15 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
4 11-Dec-15 main pile 1664 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
5 11-Dec-15 main pile 1666 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
6 11-Dec-15 main pile 1667 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
7 11-Dec-15 main pile 1665 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
8 11-Dec-15 main pile 1787 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
9 11-Dec-15 main pile 1786 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
10 12-Dec-15 main pile 1784 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
11 12-Dec-15 main pile 1785 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
12 12-Dec-15 main pile 1791 Ǿ600 17 15 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
13 12-Dec-15 main pile 1790 Ǿ600 17 15 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
14 12-Dec-15 main pile 1788 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
15 12-Dec-15 main pile 1789 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
16 12-Dec-15 main pile 1908 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
17 12-Dec-15 main pile 1909 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
18 12-Dec-15 main pile 1913 Ǿ600 15 17 32.00 33.10 1.10 1.00 23.70 421.10 12.00 TI-21A
19 13-Dec-15 main pile 1912 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
20 13-Dec-15 main pile 1914 Ǿ600 17 15 32.00 31.20 -0.80 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
21 13-Dec-15 main pile 1915 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.70 421.10 12.00 TI-21A potong tiang
22 13-Dec-15 main pile 1911 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
23 13-Dec-15 main pile 1910 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
24 13-Dec-15 main pile 1662 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
25 13-Dec-15 main pile 1661 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
26 13-Dec-15 main pile 1660 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
27 14-Dec-15 main pile 1541 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
28 14-Dec-15 main pile 1540 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
29 14-Dec-15 main pile 1543 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
30 14-Dec-15 main pile 1542 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
31 15-Dec-15 main pile 1539 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
32 15-Dec-15 main pile 1538 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
33 15-Dec-15 main pile 1536 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
34 15-Dec-15 main pile 1537 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
35 15-Dec-15 main pile 1535 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
36 15-Dec-15 main pile 1530 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
37 15-Dec-15 main pile 1528 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
38 15-Dec-15 main pile 1525 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.90 424.70 12.00 TI-21A
39 15-Dec-15 main pile 1523 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
40 16-Dec-15 main pile 1534 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
41 16-Dec-15 main pile 1520 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
42 16-Dec-15 main pile 1522 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
43 16-Dec-15 main pile 1521 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
44 16-Dec-15 main pile 1524 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
45 16-Dec-15 main pile 1526 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
46 16-Dec-15 main pile 1529 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
47 16-Dec-15 main pile 1532 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
48 16-Dec-15 main pile 1533 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
49 17-Dec-15 main pile 1527 Ǿ600 15 17 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
50 17-Dec-15 main pile 1531 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
51 18-Dec-15 main pile 1549 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
52 18-Dec-15 main pile 1548 Ǿ600 17 15 32.00 34.15 2.15 1.00 23.70 421.10 12.00 TI-21A
53 18-Dec-15 main pile 1547 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
54 18-Dec-15 main pile 1657 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

55 18-Dec-15 main pile 1673 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
56 18-Dec-15 main pile 1672 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
57 18-Dec-15 main pile 1671 Ǿ600 17 15 32.00 33.20 1.20 1.00 23.70 421.10 12.00 TI-21A
58 18-Dec-15 main pile 1783 Ǿ600 17 15 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
59 19-Dec-15 main pile 1781 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
60 19-Dec-15 main pile 1782 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
61 19-Dec-15 main pile 1797 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
62 19-Dec-15 main pile 1796 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
63 19-Dec-15 main pile 1795 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
64 19-Dec-15 main pile 1906 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
65 19-Dec-15 main pile 1730 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.00 251.20 12.00 TI-26
66 19-Dec-15 main pile 1731 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
67 19-Dec-15 main pile 1732 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
68 19-Dec-15 main pile 1840 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
69 19-Dec-15 main pile 1841 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
70 19-Dec-15 main pile 1842 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
71 20-Dec-15 main pile 1854 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
72 20-Dec-15 main pile 1855 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
73 20-Dec-15 main pile 1856 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
74 20-Dec-15 main pile 1959 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
75 20-Dec-15 main pile 1958 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
76 20-Dec-15 main pile 1960 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
77 20-Dec-15 main pile 1962 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
78 20-Dec-15 main pile 1961 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
79 21-Dec-15 main pile 1905 Ǿ600 17 15 32.00 31.25 -0.75 1.00 1 24.00 426.50 12.00 TI-21A
80 21-Dec-15 main pile 1921 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 23.90 424.70 12.00 TI-21A
81 21-Dec-15 main pile 1920 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
82 21-Dec-15 main pile 1919 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
83 21-Dec-15 main pile 1917 Ǿ600 17 15 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
84 21-Dec-15 main pile 1857 Ǿ600 15 17 32.00 32.00 0.00 1.00 18.00 452.10 12.00 TI-26
85 21-Dec-15 main pile 1858 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 439.50 12.00 TI-26
86 21-Dec-15 main pile 1859 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
87 21-Dec-15 main pile 1843 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
88 21-Dec-15 main pile 1844 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
89 21-Dec-15 main pile 1845 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
90 21-Dec-15 main pile 1733 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
91 21-Dec-15 main pile 1734 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
92 21-Dec-15 main pile 1735 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
93 22-Dec-15 main pile 1926 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
94 22-Dec-15 main pile 1918 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
95 22-Dec-15 main pile 1916 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.90 424.70 12.00 TI-21A
96 22-Dec-15 main pile 1904 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
97 22-Dec-15 main pile 1903 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
98 22-Dec-15 main pile 1902 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
99 22-Dec-15 main pile 1907 Ǿ600 15 17 32.00 32.30 0.30 1.00 23.70 421.10 12.00 TI-21A
100 22-Dec-15 main pile 1965 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
101 22-Dec-15 main pile 1966 Ǿ600 15 17 32.00 24.00 -8.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
102 22-Dec-15 main pile 1964 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
103 22-Dec-15 main pile 1963 Ǿ600 15 17 32.00 15.50 -16.50 1.00 1 17.50 439.50 12.00 TI-26 potong tiang
104 22-Dec-15 main pile 1851 Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
105 23-Dec-15 main pile 1928 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
106 23-Dec-15 main pile 1929 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
107 23-Dec-15 main pile 1931 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
108 23-Dec-15 main pile 1923 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
109 23-Dec-15 main pile 1922 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
110 23-Dec-15 main pile 1927 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
111 23-Dec-15 main pile 1850 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
112 23-Dec-15 main pile 1853 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
113 23-Dec-15 main pile 1852 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
114 23-Dec-15 main pile 1847 Ǿ600 15 17 32.00 37.50 5.50 1.00 17.00 427.00 12.00 TI-26
115 23-Dec-15 main pile 1846 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
116 23-Dec-15 main pile 1849 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

117 23-Dec-15 main pile 1848 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
118 23-Dec-15 main pile 1723 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
119 23-Dec-15 main pile 1722 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
120 24-Dec-15 main pile 1888 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
121 24-Dec-15 main pile 1941 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
122 24-Dec-15 main pile 1886 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
123 24-Dec-15 main pile 1938 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
124 24-Dec-15 main pile 1939 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
125 24-Dec-15 main pile 1940 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
126 24-Dec-15 main pile 1933 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
127 24-Dec-15 main pile 1935 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
128 24-Dec-15 main pile 1724 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
129 24-Dec-15 main pile 1725 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.00 427.00 12.00 TI-26 potong tiang
130 24-Dec-15 main pile 1603 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
131 24-Dec-15 main pile 1602 Ǿ600 15 17 32.00 35.50 3.50 1.00 17.00 427.00 12.00 TI-26
132 24-Dec-15 main pile 1604 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
133 24-Dec-15 main pile 1605 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
134 25-Dec-15 main pile 1887 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
135 25-Dec-15 main pile 1889 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 12.00 TI-21A
136 25-Dec-15 main pile 1763 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.90 424.70 12.00 TI-21A
137 25-Dec-15 main pile 1764 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
138 25-Dec-15 main pile 1765 Ǿ600 15 17 32.00 30.50 -1.50 1.00 24.00 426.50 12.00 TI-21A
139 25-Dec-15 main pile 1815 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
140 25-Dec-15 main pile 1814 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 12.00 TI-21A
141 25-Dec-15 main pile 1727 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
142 25-Dec-15 main pile 1726 Ǿ600 15 17 32.00 34.50 2.50 1.00 17.00 427.00 12.00 TI-26
143 25-Dec-15 main pile 1728 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
144 25-Dec-15 main pile 1729 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
145 25-Dec-15 main pile 1599 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
146 25-Dec-15 main pile 1598 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
147 25-Dec-15 main pile 1601 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
148 25-Dec-15 main pile 1600 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
149 26-Dec-15 main pile 1812 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
150 26-Dec-15 main pile 1811 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
151 26-Dec-15 main pile 1813 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 23.90 424.70 12.00 TI-21A potong tiang
152 26-Dec-15 main pile 1883 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
153 26-Dec-15 main pile 1884 Ǿ600 15 17 32.00 26.00 -6.00 1.00 1 24.00 426.70 12.00 TI-21A potong tiang
154 26-Dec-15 main pile 1810 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
155 26-Dec-15 main pile 1487 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
156 26-Dec-15 main pile 1488 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
157 26-Dec-15 main pile 1485 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 427.00 12.00 TI-26
158 26-Dec-15 main pile 1486 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
159 27-Dec-15 main pile 1762 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
160 27-Dec-15 main pile 1761 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
161 27-Dec-15 main pile 1760 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
162 27-Dec-15 main pile 1688 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
163 27-Dec-15 main pile 1687 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
164 28-Dec-15 main pile 1686 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
165 28-Dec-15 main pile 1691 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
166 28-Dec-15 main pile 1690 Ǿ600 15 17 32.00 32.25 0.25 1.00 23.70 421.10 12.00 TI-21A
167 28-Dec-15 main pile 1689 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
168 28-Dec-15 main pile 1639 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
169 28-Dec-15 main pile 1640 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
170 28-Dec-15 main pile 1641 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
171 28-Dec-15 main pile 1636 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
172 28-Dec-15 main pile 1637 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
173 28-Dec-15 main pile 1606 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
174 28-Dec-15 main pile 1607 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
175 28-Dec-15 main pile 1608 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
176 28-Dec-15 main pile 1609 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
177 28-Dec-15 main pile 1610 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
178 28-Dec-15 main pile 1611 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

179 29-Dec-15 main pile 1716 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 427.00 12.00 TI-26
180 29-Dec-15 main pile 1717 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
181 29-Dec-15 main pile 1718 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 427.00 12.00 TI-26
182 29-Dec-15 main pile 1721 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.00 427.00 12.00 TI-26
183 29-Dec-15 main pile 1720 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 427.00 12.00 TI-26
184 29-Dec-15 main pile 1719 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 427.00 12.00 TI-26
185 2-Jan-16 main pile 1638 Ǿ600 15 17 32.00 32.15 0.15 1.00 23.70 421.10 12.00 TI-21A
186 2-Jan-16 main pile 1617 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
187 2-Jan-16 main pile 1612 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
188 2-Jan-16 main pile 1613 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
189 2-Jan-16 main pile 1614 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
190 3-Jan-16 main pile 1616 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
191 3-Jan-16 main pile 1615 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
192 3-Jan-16 main pile 1589 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
193 3-Jan-16 main pile 1590 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
194 3-Jan-16 main pile 1591 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
195 3-Jan-16 main pile 1586 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
196 3-Jan-16 main pile 1587 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 421.10 12.00 TI-21A
197 3-Jan-16 main pile 1588 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
198 4-Jan-16 main pile 1595 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
199 4-Jan-16 main pile 1596 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
200 4-Jan-16 main pile 1597 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
201 4-Jan-16 main pile 1592 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
202 4-Jan-16 main pile 1593 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
203 4-Jan-16 main pile 1594 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
204 4-Jan-16 main pile 1490 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
205 5-Jan-16 main pile 1489 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
206 5-Jan-16 main pile 1491 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
207 5-Jan-16 main pile 1493 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
208 5-Jan-16 main pile 1492 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
209 5-Jan-16 main pile 1495 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
210 5-Jan-16 main pile 1494 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 12.00 TI-21A
211 5-Jan-16 main pile 1496 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
212 5-Jan-16 main pile 1498 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
213 5-Jan-16 main pile 1497 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
214 7-Jan-16 main pile 1710 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
215 7-Jan-16 main pile 1711 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
216 7-Jan-16 main pile 1712 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
217 7-Jan-16 main pile 1736 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
218 7-Jan-16 main pile 1737 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
219 7-Jan-16 main pile 1738 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
220 7-Jan-16 main pile 1739 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
221 7-Jan-16 main pile 1740 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
222 7-Jan-16 main pile 1741 Ǿ600 15 17 32.00 32.20 0.20 1.00 23.70 421.10 12.00 TI-21A
223 8-Jan-16 main pile 1713 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 12.00 TI-21A
224 8-Jan-16 main pile 1714 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
225 8-Jan-16 main pile 1715 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
226 8-Jan-16 main pile 1744 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
227 8-Jan-16 main pile 1743 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
228 8-Jan-16 main pile 1742 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
229 8-Jan-16 main pile 1706 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
230 8-Jan-16 main pile 1705 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
231 8-Jan-16 main pile 1704 Ǿ600 15 17 32.00 24.00 -8.00 1.00 23.70 421.10 12.00 TI-21A
232 9-Jan-16 main pile 1583 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
233 9-Jan-16 main pile 1620 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
234 9-Jan-16 main pile 1619 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
235 9-Jan-16 main pile 1618 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
236 9-Jan-16 main pile 1582 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 241.10 12.00 TI-21A
237 9-Jan-16 main pile 1581 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
238 9-Jan-16 main pile 1580 Ǿ600 17 15 32.00 33.00 1.00 1.00 23.70 241.10 12.00 TI-21A
239 9-Jan-16 main pile 1585 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
240 9-Jan-16 main pile 1584 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 12.00 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

241 10-Jan-16 main pile 1623 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
242 10-Jan-16 main pile 1622 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
243 10-Jan-16 main pile 1621 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
244 10-Jan-16 main pile 1709 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
245 10-Jan-16 main pile 1708 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
246 10-Jan-16 main pile 1707 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
247 10-Jan-16 main pile 1747 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.10 12.00 TI-21A
248 10-Jan-16 main pile 1746 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
249 10-Jan-16 main pile 1745 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
250 11-Jan-16 main pile 1952 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
251 11-Jan-16 main pile 1833 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
252 11-Jan-16 main pile 1832 Ǿ600 17 15 32.00 34.20 2.20 1.00 23.70 421.10 12.00 TI-21A
253 11-Jan-16 main pile 1831 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
254 11-Jan-16 main pile 1871 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
255 11-Jan-16 main pile 1870 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
256 11-Jan-16 main pile 1869 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
257 11-Jan-16 main pile 1951 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
258 11-Jan-16 main pile 1950 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 24.00 426.50 12.00 TI-21A potong tiang
259 12-Jan-16 main pile 1949 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
260 12-Jan-16 main pile 1948 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
261 12-Jan-16 main pile 1868 Ǿ600 17 15 32.00 35.00 3.00 1.00 23.70 421.10 12.00 TI-21A
262 12-Jan-16 main pile 1867 Ǿ600 15 17 32.00 34.25 2.25 1.00 23.70 421.10 12.00 TI-21A
263 12-Jan-16 main pile 1866 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
264 12-Jan-16 main pile 1830 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
265 12-Jan-16 main pile 1829 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
266 12-Jan-16 main pile 1828 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
267 13-Jan-16 main pile 1836 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
268 13-Jan-16 main pile 1860 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
269 13-Jan-16 main pile 1862 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
270 13-Jan-16 main pile 1953 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
271 13-Jan-16 main pile 1954 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
272 13-Jan-16 main pile 1955 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
273 13-Jan-16 main pile 1957 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 12.00 TI-21A
274 13-Jan-16 main pile 1956 Ǿ600 17 15 32.00 34.50 2.50 1.00 23.70 421.10 12.00 TI-21A
275 14-Jan-16 main pile 1863 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
276 14-Jan-16 main pile 1864 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
277 14-Jan-16 main pile 1865 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
278 14-Jan-16 main pile 1837 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
279 14-Jan-16 main pile 1838 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 241.10 12.00 TI-21A
280 14-Jan-16 main pile 1839 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
281 14-Jan-16 main pile 1834 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
282 14-Jan-16 main pile 1835 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
283 14-Jan-16 main pile 1861 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 241.10 12.00 TI-21A
284 15-Jan-16 main pile 1944 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
285 15-Jan-16 main pile 1943 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
286 15-Jan-16 main pile 1874 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
287 15-Jan-16 main pile 1873 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
288 15-Jan-16 main pile 1872 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
289 15-Jan-16 main pile 1824 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
290 15-Jan-16 main pile 1823 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
291 15-Jan-16 main pile 1822 Ǿ600 17 15 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
292 16-Jan-16 main pile 1750 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
293 16-Jan-16 main pile 1749 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
294 16-Jan-16 main pile 1748 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
295 16-Jan-16 main pile 1700 Ǿ600 15 17 32.00 34.40 2.40 1.00 23.70 421.10 TI-21A
296 16-Jan-16 main pile 1699 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
297 18-Jan-16 main pile 1698 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
298 18-Jan-16 main pile 1626 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
299 18-Jan-16 main pile 1625 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
300 18-Jan-16 main pile 1624 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
301 18-Jan-16 main pile 1576 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
302 18-Jan-16 main pile 1575 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

303 18-Jan-16 main pile 1574 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
304 18-Jan-16 main pile 1579 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
305 19-Jan-16 main pile 1578 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
306 19-Jan-16 main pile 1577 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
307 19-Jan-16 main pile 1629 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
308 19-Jan-16 main pile 1628 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
309 19-Jan-16 main pile 1627 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
310 19-Jan-16 main pile 1703 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
311 19-Jan-16 main pile 1702 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
312 19-Jan-16 main pile 1701 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
313 21-Jan-16 main pile 1753 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
314 21-Jan-16 main pile 1752 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
315 21-Jan-16 main pile 1751 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
316 21-Jan-16 main pile 1827 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
317 21-Jan-16 main pile 1826 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
318 21-Jan-16 main pile 1825 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
319 22-Jan-16 main pile 1937 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
320 22-Jan-16 main pile 1946 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
321 22-Jan-16 main pile 1947 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
322 22-Jan-16 main pile 1945 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
323 22-Jan-16 main pile 1877 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
324 22-Jan-16 main pile 1876 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 421.10 TI-21A
325 22-Jan-16 main pile 1875 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
326 23-Jan-16 main pile 1882 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
327 23-Jan-16 main pile 1881 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
328 23-Jan-16 main pile 1885 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
329 23-Jan-16 main pile 1819 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
330 23-Jan-16 main pile 1820 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
331 23-Jan-16 main pile 1821 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
332 23-Jan-16 main pile 1757 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
333 25-Jan-16 main pile 1932 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
334 25-Jan-16 main pile 1934 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
335 25-Jan-16 main pile 1930 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
336 25-Jan-16 main pile 1936 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
337 26-Jan-16 main pile 1893 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
338 26-Jan-16 main pile 1894 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
339 26-Jan-16 main pile 1895 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
340 26-Jan-16 main pile 1892 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
341 26-Jan-16 main pile 1891 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
342 26-Jan-16 main pile 1890 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
343 26-Jan-16 main pile 1758 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
344 26-Jan-16 main pile 1695 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
345 26-Jan-16 main pile 1759 Ǿ600 15 17 32.00 32.50 0.50 1.00 24.00 426.50 TI-21A
346 26-Jan-16 main pile 1696 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
347 26-Jan-16 main pile 1571 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
348 26-Jan-16 main pile 1572 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
349 26-Jan-16 main pile 1573 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
350 26-Jan-16 main pile 1512 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A potong tiang
351 26-Jan-16 main pile 1513 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
352 26-Jan-16 main pile 1514 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A potong tiang
353 29-Jan-16 main pile 1509 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
354 29-Jan-16 main pile 1510 Ǿ600 15 17 32.00 22.00 -10.00 1.00 24.00 426.50 TI-21A
355 29-Jan-16 main pile 1635 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
356 29-Jan-16 main pile 1568 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
357 29-Jan-16 main pile 1569 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
358 29-Jan-16 main pile 1570 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
359 29-Jan-16 main pile 1511 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
360 30-Jan-16 main pile 1896 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
361 30-Jan-16 main pile 1897 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
362 30-Jan-16 main pile 1898 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 23.70 420.00 TI-07
363 30-Jan-16 main pile 1924 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
364 30-Jan-16 main pile 1925 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

365 30-Jan-16 main pile 1899 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
366 31-Jan-16 main pile 1900 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
367 31-Jan-16 main pile 1901 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
368 31-Jan-16 main pile 1801 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
369 31-Jan-16 main pile 1802 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
370 31-Jan-16 main pile 1803 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
371 2-Feb-16 main pile 1775 Ǿ600 15 17 32.00 33.20 1.20 1.00 23.70 420.00 TI-07
372 2-Feb-16 main pile 1776 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
373 2-Feb-16 main pile 1777 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
374 2-Feb-16 main pile 1677 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
375 2-Feb-16 main pile 1678 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
376 2-Feb-16 main pile 1679 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
377 2-Feb-16 main pile 1651 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
378 2-Feb-16 main pile 1634 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
379 2-Feb-16 main pile 1633 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
380 2-Feb-16 main pile 1697 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
381 2-Feb-16 main pile 1630 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
382 2-Feb-16 main pile 1631 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
383 2-Feb-16 main pile 1632 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
384 2-Feb-16 main pile 1692 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-21A
385 2-Feb-16 main pile 1693 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-21A
386 2-Feb-16 main pile 1694 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-21A
387 2-Feb-16 main pile 1754 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-21A
388 2-Feb-16 main pile 1755 Ǿ600 15 17 32.00 29.00 -3.00 1.00 24.00 426.50 TI-21A
389 3-Feb-16 main pile 1652 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
390 3-Feb-16 main pile 1653 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
391 3-Feb-16 main pile 1553 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
392 3-Feb-16 main pile 1554 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
393 3-Feb-16 main pile 1555 Ǿ600 15 17 32.00 36.00 4.00 1.00 23.70 420.00 TI-07
394 3-Feb-16 main pile 1756 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
395 3-Feb-16 main pile 1816 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
396 3-Feb-16 main pile 1817 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
397 3-Feb-16 main pile 1818 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
398 3-Feb-16 main pile 1880 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
399 9-Feb-16 main pile 1550 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
400 9-Feb-16 main pile 1551 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
401 9-Feb-16 main pile 1552 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
402 9-Feb-16 main pile 1648 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
403 9-Feb-16 main pile 1809 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
404 9-Feb-16 main pile 1808 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
405 9-Feb-16 main pile 1807 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
406 9-Feb-16 main pile 1804 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
407 9-Feb-16 main pile 1879 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
408 9-Feb-16 main pile 1878 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
409 9-Feb-16 main pile 1942 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
410 9-Feb-16 main pile 1500 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
411 9-Feb-16 main pile 1499 Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A
412 9-Feb-16 main pile 1501 Ǿ600 15 17 32.00 31.00 -1.00 1.00 24.00 426.50 TI-21A potong tiang
413 10-Feb-16 main pile 1805 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 420.00 TI-07
414 10-Feb-16 main pile 1806 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07
415 10-Feb-16 main pile 1768 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
416 10-Feb-16 main pile 1767 Ǿ600 15 17 32.00 32.80 0.80 1.00 23.70 420.00 TI-07
417 10-Feb-16 main pile 1766 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
418 10-Feb-16 main pile 1502 Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
419 10-Feb-16 main pile 1503 Ǿ600 15 17 32.00 23.00 -9.00 1.00 24.00 426.50 TI-21A potong tiang
420 10-Feb-16 main pile 1504 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
421 10-Feb-16 main pile 1505 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
422 10-Feb-16 main pile 1506 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
423 11-Feb-16 main pile 1508 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
424 11-Feb-16 main pile 1507 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
425 11-Feb-16 main pile 1515 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.10 TI-21A
426 11-Feb-16 main pile 1516 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

427 13-Feb-16 main pile 1517 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
428 13-Feb-16 main pile 1519 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
429 13-Feb-16 main pile 1518 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
430 13-Feb-16 main pile 1567 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
431 13-Feb-16 main pile 1566 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
432 13-Feb-16 main pile 1565 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 421.10 TI-21A
433 13-Feb-16 main pile 1771 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 421.00 TI-07
434 13-Feb-16 main pile 1770 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
435 13-Feb-16 main pile 1769 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
436 13-Feb-16 main pile 1773 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
437 13-Feb-16 main pile 1774 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
438 13-Feb-16 main pile 1798 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 421.00 TI-07
439 13-Feb-16 main pile 1799 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 421.00 TI-07
440 13-Feb-16 main pile 1800 Ǿ600 15 17 32.00 31.00 -1.00 1.00 23.70 421.00 TI-07 potong tiang
441 19-Feb-16 main pile 1564 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
442 19-Feb-16 main pile 1563 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
443 19-Feb-16 main pile 1562 Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 421.10 TI-21A
444 24-Feb-16 main pile 1772 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
445 24-Feb-16 main pile 1649 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
446 24-Feb-16 main pile 1650 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
447 24-Feb-16 main pile 1674 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
448 24-Feb-16 main pile 1675 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
449 1-Mar-16 main pile 1779 Ǿ600 15 17 32.00 32.50 0.50 1.00 14.50 420.00 TI-16
450 1-Mar-16 main pile 1778 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
451 2-Mar-16 main pile 1676 Ǿ600 15 17 32.00 28.00 -4.00 1.00 23.70 420.00 TI-07
452 2-Mar-16 main pile 1680 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
453 2-Mar-16 main pile 1681 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
454 2-Mar-16 main pile 1682 Ǿ600 15 17 32.00 35.20 3.20 1.00 23.70 420.00 TI-07
455 2-Mar-16 main pile 1780 Ǿ600 15 17 32.00 33.00 1.00 1.00 14.50 420.00 TI-16
456 3-Mar-16 main pile 1683 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
457 3-Mar-16 main pile 1684 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
458 3-Mar-16 main pile 1685 Ǿ600 15 17 32.00 35.30 3.30 1.00 23.70 420.00 TI-07
459 9-Mar-16 main pile 1644 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
460 9-Mar-16 main pile 1643 Ǿ600 15 17 32.00 34.30 2.30 1.00 23.70 420.00 TI-07
461 9-Mar-16 main pile 1642 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
462 9-Mar-16 main pile 1558 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
463 18-Mar-16 Main pile 1645 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
464 18-Mar-16 Main pile 1646 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.00 420.00 TI-07
465 18-Mar-16 Main pile 1647 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
466 18-Mar-16 Main pile 1559 Ǿ600 15 17 32.00 34.50 2.50 1.00 23.70 420.00 TI-07
467 18-Mar-16 Main pile 1560 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
468 18-Mar-16 Main pile 1561 Ǿ600 15 17 32.00 34.70 2.70 1.00 23.70 420.00 TI-07
469 18-Mar-16 Main pile 1556 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
470 18-Mar-16 Main pile 1557 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
471 21-Mar-16 Main pile 1544 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
472 21-Mar-16 Main pile 1545 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
473 22-Mar-16 Main pile 1546 Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 420.00 TI-07
474 22-Mar-16 Main pile 1654 Ǿ600 15 17 32.00 35.50 3.50 1.00 23.70 420.00 TI-07
475 22-Mar-16 Main pile 1655 Ǿ600 15 17 32.00 35.00 3.00 1.00 23.70 420.00 TI-07
476 22-Mar-16 Main pile 1656 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
477 22-Mar-16 Main pile 1668 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
478 22-Mar-16 Main pile 1670 Ǿ600 15 17 32.00 34.20 2.20 1.00 23.70 420.00 TI-07
479 23-Mar-16 Main pile 1669 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
480 23-Mar-16 Main pile 1792 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
481 23-Mar-16 Main pile 1793 Ǿ600 15 17 32.00 33.50 1.50 1.00 23.70 420.00 TI-07
482 23-Mar-16 Main pile 1794 Ǿ600 15 17 32.00 30.00 -2.00 1.00 23.70 420.00 TI-07 Potong tiang

TOTAL PEMANCANGAN MAIN PILE 15430.00 16215.80 785.80 0.00 0.00 483.00 20.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 482
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 25 Ags 2015 -


TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 25-Aug-15 V-4 / 658 Ǿ800 16 16 15 47.00 48.00 1.00 2.00 19.00 715.80 12.00 TI - 26 VWSG
2 27-Aug-15 IP-8 / 874 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15.00 565.10 12.00 TI - 26
3 29-Aug-15 IP-7 / 813 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15.00 565.10 12.00 TI - 26 790
4 1-Sep-15 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI - 26
5 3-Sep-15 IP-18/562 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI -pengganti
26 IP-18{466)
6 5-Jan-16 Condo tower A 700 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 695.50 TI-24
7 5-Jan-16 Condo tower A 699 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
8 5-Jan-16 Condo tower A 688 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
9 5-Jan-16 Condo tower A 675 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
10 7-Jan-16 Condo tower A 627 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
11 7-Jan-16 Condo tower A 640 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
12 7-Jan-16 Condo tower A 651 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
13 7-Jan-16 Condo tower A 664 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.80 800.90 TI-24
14 11-Jan-16 Condo tower A 579 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 609.20 TI-24
15 11-Jan-16 Condo tower A 592 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
16 11-Jan-16 Condo tower A 616 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
17 11-Jan-16 Condo tower A 603 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
18 12-Jan-16 Condo tower A 568 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
19 12-Jan-16 Condo tower A 555 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
20 12-Jan-16 Condo tower A 544 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
21 12-Jan-16 Condo tower A 531 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
22 13-Jan-16 Condo tower A 520 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
23 13-Jan-16 Condo tower A 507 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
24 13-Jan-16 Condo tower A 496 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 590.10 TI-24
25 13-Jan-16 Condo tower A 483 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
26 13-Jan-16 Condo tower A 472 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
27 14-Jan-16 Condo tower A 452 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 618.20 TI-24
28 14-Jan-16 Condo tower A 448 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
29 14-Jan-16 Condo tower A 459 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
30 15-Jan-16 Condo tower A 503 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
31 15-Jan-16 Condo tower A 479 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
32 15-Jan-16 Condo tower A 476 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
33 15-Jan-16 Condo tower A 455 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
34 15-Jan-16 Condo tower A 500 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
35 16-Jan-16 Condo tower A 524 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
36 16-Jan-16 Condo tower A 527 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
37 16-Jan-16 Condo tower A 548 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
38 16-Jan-16 Condo tower A 551 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
39 16-Jan-16 Condo tower A 572 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.70 797.40 TI-24
40 17-Jan-16 Condo tower A 575 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
41 17-Jan-16 Condo tower A 596 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
42 17-Jan-16 Condo tower A 599 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
43 17-Jan-16 Condo tower A 620 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
44 19-Jan-16 Condo tower A 623 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
45 19-Jan-16 Condo tower A 644 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
46 19-Jan-16 Condo tower A 647 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.70 586.60 TI-24
47 19-Jan-16 Condo tower A 668 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 607.70 TI-24
48 19-Jan-16 Condo tower A 671 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
49 19-Jan-16 Condo tower A 692 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
50 20-Jan-16 Condo tower A 695 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

51 20-Jan-16 Condo tower A 716 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
52 20-Jan-16 Condo tower A 719 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 637.30 TI-24
53 20-Jan-16 Condo tower A 740 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
54 20-Jan-16 Condo tower A 743 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
55 20-Jan-16 Condo tower A 764 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
56 21-Jan-16 Condo tower A 767 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
57 21-Jan-16 Condo tower A 788 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
58 21-Jan-16 Condo tower A 791 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
59 21-Jan-16 Condo tower A 812 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
60 21-Jan-16 Condo tower A 815 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
61 21-Jan-16 Condo tower A 836 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
62 22-Jan-16 Condo tower A 839 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
63 22-Jan-16 Condo tower A 860 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
64 22-Jan-16 Condo tower A 863 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
65 22-Jan-16 Condo tower A 884 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
66 23-Jan-16 Condo tower A 763 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
67 23-Jan-16 Condo tower A 768 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
68 23-Jan-16 Condo tower A 787 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
69 23-Jan-16 Condo tower A 792 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
70 23-Jan-16 Condo tower A 811 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
71 23-Jan-16 Condo tower A 816 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
72 25-Jan-16 Condo tower A 744 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
73 25-Jan-16 Condo tower A 739 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
74 25-Jan-16 Condo tower A 720 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.60 793.90 TI-24
75 26-Jan-16 Condo tower A 715 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
76 26-Jan-16 Condo tower A 696 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
77 26-Jan-16 Condo tower A 691 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
78 26-Jan-16 Condo tower A 672 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
79 26-Jan-16 Condo tower A 667 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
80 26-Jan-16 Condo tower A 648 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
81 26-Jan-16 Condo tower A 643 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
82 27-Jan-16 Condo tower A 624 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
83 27-Jan-16 Condo tower A 619 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
84 27-Jan-16 Condo tower A 600 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
85 27-Jan-16 Condo tower A 595 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
86 27-Jan-16 Condo tower A 576 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
87 27-Jan-16 Condo tower A 571 Ǿ800 17 17 34.00 37.00 3.00 1.00 22.80 800.90 TI-24
88 28-Jan-16 Condo tower A 552 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
89 28-Jan-16 Condo tower A 547 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
90 28-Jan-16 Condo tower A 528 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
91 28-Jan-16 Condo tower A 523 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
92 28-Jan-16 Condo tower A 504 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
93 28-Jan-16 Condo tower A 499 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
94 28-Jan-16 Condo tower A 480 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.70 621.70 TI-24
95 29-Jan-16 Condo tower A 453 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
96 29-Jan-16 Condo tower A 451 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
97 29-Jan-16 Condo tower A 456 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
98 29-Jan-16 Condo tower A 475 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
99 30-Jan-16 Condo tower A 454 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.80 800.90 TI-24
100 30-Jan-16 Condo tower A 477 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
101 30-Jan-16 Condo tower A 478 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
102 30-Jan-16 Condo tower A 501 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
103 30-Jan-16 Condo tower A 502 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 624.70 TI-24
104 30-Jan-16 Condo tower A 526 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 597.20 TI-24
105 31-Jan-16 Condo tower A 549 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
106 31-Jan-16 Condo tower A 550 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
107 31-Jan-16 Condo tower A 573 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 632.30 TI-24
108 31-Jan-16 Condo tower A 574 Ǿ800 17 17 34.00 40.03 6.03 1.00 22.80 800.90 TI-24 tiang pecah
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

109 1-Feb-16 Condo tower A 597 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
110 1-Feb-16 Condo tower A 598 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
111 1-Feb-16 Condo tower A 621 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
112 1-Feb-16 Condo tower A 622 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
113 1-Feb-16 Condo tower A 645 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
114 1-Feb-16 Condo tower A 646 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
115 1-Feb-16 Condo tower A 669 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
116 2-Feb-16 Condo tower A 670 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
117 2-Feb-16 Condo tower A 693 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
118 2-Feb-16 Condo tower A 694 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 614.70 TI-24
119 2-Feb-16 Condo tower A 717 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
120 2-Feb-16 Condo tower A 718 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
121 2-Feb-16 Condo tower A 741 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
122 3-Feb-16 Condo tower A 742 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
123 3-Feb-16 Condo tower A 765 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
124 3-Feb-16 Condo tower A 766 Ǿ800 17 17 34.00 34.00 0.00 1.00 20.50 720.10 TI-24 tiang pecah

125 3-Feb-16 Condo tower A 789 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
126 3-Feb-16 Condo tower A 790 Ǿ800 17 17 34.00 36.00 2.00 1.00 20.30 713.10 TI-24 tiang pecah

127 3-Feb-16 Condo tower A 814 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
128 3-Feb-16 Condo tower A 837 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.60 TI-24
129 4-Feb-16 Condo tower A 838 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 709.60 TI-24
130 4-Feb-16 Condo tower A 861 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.20 818.00 TI-24
131 4-Feb-16 Condo tower A 862 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
132 4-Feb-16 Condo tower A 885 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 639.30 TI-24
133 5-Feb-16 Condo tower A 883 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
134 5-Feb-16 Condo tower A 864 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
135 5-Feb-16 Condo tower A 859 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.20 779.80 TI-24
136 5-Feb-16 Condo tower A 840 Ǿ800 17 17 34.00 32.00 -2.00 1.00 19.00 667.40 TI-24 potong

137 5-Feb-16 Condo tower A 817 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
138 6-Feb-16 Condo tower A 810 Ǿ800 17 17 34.00 33.00 -1.00 1.00 18.50 649.80 TI-24 potong

139 6-Feb-16 Condo tower A 793 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
140 6-Feb-16 Condo tower A 786 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
141 6-Feb-16 Condo tower A 769 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 755.70 TI-24 pecah

142 6-Feb-16 Condo tower A 762 Ǿ800 17 17 34.00 36.50 2.50 1.00 22.90 804.40 TI-24
143 8-Feb-16 Condo tower A 745 Ǿ800 17 17 34.00 35.00 1.00 1.00 23.00 807.90 TI-24
144 8-Feb-16 Condo tower A 738 Ǿ800 17 17 34.00 38.20 4.20 1.00 23.10 811.40 TI-24
145 8-Feb-16 Condo tower A 721 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
146 9-Feb-16 Condo tower A 714 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 674.40 TI-24
147 9-Feb-16 Condo tower A 697 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
148 9-Feb-16 Condo tower A 690 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
149 9-Feb-16 Condo tower A 673 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 692.00 TI-24
150 9-Feb-16 Condo tower A 666 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 496.50 TI-24 potong

151 9-Feb-16 Condo tower A 649 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
152 9-Feb-16 Condo tower A 642 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
153 10-Feb-16 Condo tower A 625 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.80 625.30 TI-24
154 10-Feb-16 Condo tower A 618 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
155 10-Feb-16 Condo tower A 601 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 642.80 TI-24
156 10-Feb-16 Condo tower A 594 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
157 10-Feb-16 Condo tower A 577 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.80 660.40 TI-24
158 11-Feb-16 Condo tower A 570 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.40 646.30 TI-24
159 11-Feb-16 Condo tower A 553 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 660.40 TI-24
160 11-Feb-16 Condo tower A 546 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 656.90 TI-24
161 11-Feb-16 Condo tower A 529 Ǿ800 17 17 34.00 31.00 -3.00 1.00 22.50 507.80 TI-24 potong

162 12-Feb-16 Condo tower A 522 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
163 12-Feb-16 Condo tower A 505 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
164 12-Feb-16 Condo tower A 498 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 660.40 TI-24
165 12-Feb-16 Condo tower A 481 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
166 12-Feb-16 Condo tower A 474 Ǿ800 17 17 34.00 26.00 -8.00 1.00 20.50 462.70 TI-24 potong tiang
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

167 27-Feb-16 Condo tower A 457 Ǿ800 17 17 34.00 34.50 0.50 1.00 19.90 699.00 TI-24 pecah

168 29-Feb-16 Condo tower A 450 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
169 29-Feb-16 Condo tower A 449 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
170 1-Mar-16 Condo tower A 447 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
171 1-Mar-16 Condo tower A 446 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
172 1-Mar-16 Condo tower A 445 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
173 1-Mar-16 Condo tower A 444 Ǿ800 17 17 34.00 31.00 -3.00 1.00 18.00 632.30 TI-24 pecah
174 2-Mar-16 Condo tower A 443 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
175 2-Mar-16 Condo tower A 442 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 695.50 TI-24
176 3-Mar-16 Condo tower A 464 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
177 3-Mar-16 Condo tower A 463 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
178 3-Mar-16 Condo tower A 462 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
179 3-Mar-16 Condo tower A 461 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
180 3-Mar-16 Condo tower A 460 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
181 4-Mar-16 Condo tower A 458 Ǿ800 17 17 34.00 27.00 -7.00 1.00 23.00 519.10 TI-24 pecah
182 5-Mar-16 Condo tower A 465 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
183 5-Mar-16 Condo tower A 466 Ǿ800 17 17 34.00 35.00 1.00 1.00 20.00 702.50 TI-24 pecah
184 7-Mar-16 Condo tower A 467 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.00 737.70 TI-24 tiang pecah
185 7-Mar-16 Condo tower A 468 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.00 TI-24
186 8-Mar-16 Condo tower A 469 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 632.30 TI-24
187 8-Mar-16 Condo tower A 470 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
188 9-Mar-16 Condo tower A 471 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.10 TI-24
189 9-Mar-16 Condo tower A 473 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
190 10-Mar-16 Condo tower A 489 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 519.10 TI-24 potong tiang
191 10-Mar-16 Condo tower A 488 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.70 727.10 TI-24
192 15-Mar-16 Condo tower A 487 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
193 15-Mar-16 Condo tower A 486 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
194 15-Mar-16 Condo tower A 485 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
195 15-Mar-16 Condo tower A 484 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
196 16-Mar-16 Condo tower A 482 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
197 16-Mar-16 Condo tower A 497 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
198 16-Mar-16 Condo tower A 495 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
199 17-Mar-16 Condo tower A 494 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
200 17-Mar-16 Condo tower A 493 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
201 17-Mar-16 Condo tower A 492 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
202 17-Mar-16 Condo tower A 491 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
203 17-Mar-16 Condo tower A 490 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
204 17-Mar-16 Condo tower A 506 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
205 17-Mar-16 Condo tower A 508 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
206 18-Mar-16 Condo tower A 509 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
207 18-Mar-16 Condo tower A 510 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
208 18-Mar-16 Condo tower A 511 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
209 18-Mar-16 Condo tower A 512 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
210 18-Mar-16 Condo tower A 513 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
211 20-Mar-16 Condo tower A 521 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
212 20-Mar-16 Condo tower A 519 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.00 TI-26
213 20-Mar-16 Condo tower A 518 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
214 20-Mar-16 Condo tower A 517 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 678.10 TI-26
215 21-Mar-16 Condo tower A 514 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
216 21-Mar-16 Condo tower A 515 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
217 21-Mar-16 Condo tower A 516 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
218 23-Mar-16 Condo tower A 533 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
219 23-Mar-16 Condo tower A 532 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
220 23-Mar-16 Condo tower A 530 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
221 24-Mar-16 Condo tower A 537 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
222 24-Mar-16 Condo tower A 536 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
223 24-Mar-16 Condo tower A 535 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
224 24-Mar-16 Condo tower A 534 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

225 28-Mar-16 Condo tower A 545 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 565.10 TI-26
226 28-Mar-16 Condo tower A 543 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
227 28-Mar-16 Condo tower A 542 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
228 29-Mar-16 Condo tower A 538 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 688.10 TI-26
229 29-Mar-16 Condo tower A 539 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
230 29-Mar-16 Condo tower A 540 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
231 29-Mar-16 Condo tower A 541 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
232 30-Mar-16 Condo tower A 554 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
233 30-Mar-16 Condo tower A 556 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.00 527.40 TI-26
234 31-Mar-16 Condo tower A 557 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.80 TI-26
235 2-Apr-16 Condo tower A 561 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
236 2-Apr-16 Condo tower A 560 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
237 2-Apr-16 Condo tower A 559 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
238 2-Apr-16 Condo tower A 558 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
239 3-Apr-16 Condo tower A 569 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
240 3-Apr-16 Condo tower A 567 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
241 3-Apr-16 Condo tower A 566 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.00 TI-26
242 3-Apr-16 Condo tower A 565 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
243 3-Apr-16 Condo tower A 564 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
244 3-Apr-16 Condo tower A 563 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
245 6-Apr-16 Condo tower A 578 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
246 6-Apr-16 Condo tower A 580 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
247 6-Apr-16 Condo tower A 581 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
248 6-Apr-16 Condo tower A 582 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
249 6-Apr-16 Condo tower A 583 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
250 6-Apr-16 Condo tower A 584 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
251 9-Apr-16 Condo tower A 586 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
252 9-Apr-16 Condo tower A 587 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
253 9-Apr-16 Condo tower A 588 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
254 11-Apr-16 Condo tower A 589 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
255 11-Apr-16 Condo tower A 590 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
256 11-Apr-16 Condo tower A 591 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
257 11-Apr-16 Condo tower A 593 Ǿ800 17 17 34.00 42.00 8.00 1.00 15.50 583.90 TI-26
258 13-Apr-16 Condo tower A 602 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.90 TI-26
259 13-Apr-16 Condo tower A 604 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
260 13-Apr-16 Condo tower A 605 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.00 602.80 TI-26
261 13-Apr-16 Condo tower A 606 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
262 13-Apr-16 Condo tower A 607 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
263 13-Apr-16 Condo tower A 608 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
264 13-Apr-16 Condo tower A 609 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 878.10 TI-26
265 14-Apr-16 Condo tower A 617 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
266 14-Apr-16 Condo tower A 615 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
267 14-Apr-16 Condo tower A 614 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
268 15-Apr-16 Condo tower A 613 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
269 15-Apr-16 Condo tower A 612 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
270 15-Apr-16 Condo tower A 611 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
271 15-Apr-16 Condo tower A 610 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
272 17-Apr-16 Condo tower A 626 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
273 17-Apr-16 Condo tower A 628 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
274 17-Apr-16 Condo tower A 629 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
275 19-Apr-16 Condo tower A 633 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
276 19-Apr-16 Condo tower A 632 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
277 19-Apr-16 Condo tower A 631 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
278 19-Apr-16 Condo tower A 630 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
279 21-Apr-16 Condo tower A 641 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
280 21-Apr-16 Condo tower A 639 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
281 21-Apr-16 Condo tower A 638 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
282 21-Apr-16 Condo tower A 637 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

283 21-Apr-16 Condo tower A 636 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
284 21-Apr-16 Condo tower A 635 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
285 22-Apr-16 Condo tower A 634 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
286 25-Apr-16 Condo tower A 650 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
287 25-Apr-16 Condo tower A 652 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
288 25-Apr-16 Condo tower A 653 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
289 25-Apr-16 Condo tower A 654 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
290 26-Apr-16 Condo tower A 655 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
291 26-Apr-16 Condo tower A 656 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
292 26-Apr-16 Condo tower A 657 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
293 27-Apr-16 Condo tower A 665 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
294 27-Apr-16 Condo tower A 663 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
295 27-Apr-16 Condo tower A 662 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
296 27-Apr-16 Condo tower A 661 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-26
297 27-Apr-16 Condo tower A 660 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
298 27-Apr-16 Condo tower A 659 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
299 28-Apr-16 Condo tower A 674 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
300 29-Apr-16 Condo tower A 676 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
301 29-Apr-16 Condo tower A 677 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
302 29-Apr-16 Condo tower A 678 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-26
303 29-Apr-16 Condo tower A 679 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 679.00 TI-26
304 29-Apr-16 Condo tower A 680 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
305 30-Apr-16 Condo tower A 681 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-26
306 30-Apr-16 Condo tower A 689 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
307 30-Apr-16 Condo tower A 687 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
308 1-May-16 Condo tower A 686 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
309 1-May-16 Condo tower A 685 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
310 1-May-16 Condo tower A 684 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
311 2-May-16 Condo tower A 683 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
312 2-May-16 Condo tower A 682 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
313 3-May-16 Condo tower A 698 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
314 4-May-16 Condo tower A 701 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 659.30 TI-26
315 4-May-16 Condo tower A 702 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
316 4-May-16 Condo tower A 703 Ǿ800 17 17 34.00 37.00 3.00 1.00 21.50 810.00 TI-26
317 4-May-16 Condo tower A 704 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
318 4-May-16 Condo tower A 705 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810.00 TI-26
319 5-May-16 Condo tower A 713 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.00 640.50 TI-26
320 5-May-16 Condo tower A 711 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
321 5-May-16 Condo tower A 710 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.50 810.00 TI-26
322 5-May-16 Condo tower A 709 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
323 5-May-16 Condo tower A 708 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
324 5-May-16 Condo tower A 707 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.50 810.00 TI-26
325 6-May-16 Condo tower A 706 Ǿ800 17 17 34.00 37.50 3.50 1.00 21.50 810.00 TI-26
326 6-May-16 Condo tower A 712 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
327 6-May-16 Condo tower A 723 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-26
328 7-May-16 Condo tower A 722 Ǿ800 17 17 34.00 35.50 1.50 1.00 21.50 810.00 TI-26
329 7-May-16 Condo tower A 724 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
330 7-May-16 Condo tower A 725 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
331 7-May-16 Condo tower A 726 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-26
332 7-May-16 Condo tower A 727 Ǿ800 17 17 34.00 40.40 6.40 1.00 21.50 810.00 TI-26
333 9-May-16 Condo tower A 728 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.50 810.00 TI-26
334 9-May-16 Condo tower A 729 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.50 810 TI-26
335 9-May-16 Condo tower A 737 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
336 9-May-16 Condo tower A 736 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
337 10-May-16 Condo tower A 735 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-26
338 10-May-16 Condo tower A 734 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
339 10-May-16 Condo tower A 733 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
340 10-May-16 Condo tower A 732 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

341 10-May-16 Condo tower A 731 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
342 10-May-16 Condo tower A 730 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
343 11-May-16 Condo tower A 746 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
344 11-May-16 Condo tower A 747 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
345 11-May-16 Condo tower A 748 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-26
346 12-May-16 Condo tower A 749 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
347 12-May-16 Condo tower A 750 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-26
348 12-May-16 Condo tower A 751 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
349 12-May-16 Condo tower A 752 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
350 12-May-16 Condo tower A 753 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
351 13-May-16 Condo tower A 761 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
352 13-May-16 Condo tower A 760 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-26
353 14-May-16 Condo tower A 759 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
354 14-May-16 Condo tower A 758 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
355 14-May-16 Condo tower A 757 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
356 14-May-16 Condo tower A 756 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
357 14-May-16 Condo tower A 755 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
358 14-May-16 Condo tower A 754 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
359 15-May-16 Condo tower A 770 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
360 15-May-16 Condo tower A 771 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
361 17-May-16 Condo tower A 772 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
362 17-May-16 Condo tower A 773 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
363 17-May-16 Condo tower A 774 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
364 17-May-16 Condo tower A 775 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
365 17-May-16 Condo tower A 776 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
366 17-May-16 Condo tower A 777 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
367 18-May-16 Condo tower A 785 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
368 18-May-16 Condo tower A 784 Ǿ800 17 17 34.00 36.50 2.5 1.00 21.50 810.00 TI-26
369 18-May-16 Condo tower A 783 Ǿ800 17 17 34.00 37.50 3.5 1.00 21.50 810.00 TI-26
370 19-May-16 Condo tower A 782 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
371 19-May-16 Condo tower A 781 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
372 19-May-16 Condo tower A 780 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
373 19-May-16 Condo tower A 779 Ǿ800 17 17 34.00 38.50 4.5 1.00 21.50 810.00 TI-26
374 19-May-16 Condo tower A 778 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
375 20-May-16 Condo tower A 794 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
376 20-May-16 Condo tower A 795 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26
377 20-May-16 Condo tower A 796 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
378 20-May-16 Condo tower A 797 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.00 TI-26
379 20-May-16 Condo tower A 798 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
380 21-May-16 Condo tower A 799 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
381 21-May-16 Condo tower A 800 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
382 21-May-16 Condo tower A 801 Ǿ800 17 17 34.00 38.00 4.0 1.00 21.50 810.00 TI-26
383 23-May-16 Condo tower A 809 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
384 23-May-16 Condo tower A 808 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
385 23-May-16 Condo tower A 807 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
386 24-May-16 Condo tower A 806 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
387 24-May-16 Condo tower A 805 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
388 25-May-16 Condo tower A 804 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26
389 25-May-16 Condo tower A 803 Ǿ800 17 17 34.00 39.50 5.5 1.00 21.50 810.00 TI-26
390 25-May-16 Condo tower A 802 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.50 810.00 TI-26
391 25-May-16 Condo tower A 818 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
392 26-May-16 Condo tower A 819 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.50 810.00 TI-26
393 26-May-16 Condo tower A 820 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 20.50 772.30 TI-26
394 26-May-16 Condo tower A 821 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
395 27-May-16 Condo tower A 822 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
396 27-May-16 Condo tower A 823 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26
397 27-May-16 Condo tower A 824 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 847.70 TI-26
398 27-May-16 Condo tower A 825 Ǿ800 17 17 34.00 28.00 -6.0 1.00 22.00 828.80 TI-26 potong tiang
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

399 28-May-16 Condo tower A 835 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
400 28-May-16 Condo tower A 834 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26
401 28-May-16 Condo tower A 833 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.50 810.00 TI-26
402 28-May-16 Condo tower A 832 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.50 772.30 TI-26
403 29-May-16 Condo tower A 831 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.50 772.30 TI-26
404 29-May-16 Condo tower A 830 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
405 30-May-16 Condo tower A 829 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
406 30-May-16 Condo tower A 828 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
407 30-May-16 Condo tower A 827 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26
408 30-May-16 Condo tower A 826 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
409 2-Jun-16 Condo tower A 841 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
410 2-Jun-16 Condo tower A 842 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
411 2-Jun-16 Condo tower A 843 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 810.00 TI-26
412 2-Jun-16 Condo tower A 844 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
413 2-Jun-16 Condo tower A 845 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
414 3-Jun-16 Condo tower A 846 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-26
415 3-Jun-16 Condo tower A 847 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 700.70 TI-26
416 3-Jun-16 Condo tower A 848 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-26
417 3-Jun-16 Condo tower A 849 Ǿ800 17 17 34.00 36.00 2.0 1.00 21.50 810.00 TI-26
418 10-Jun-16 Condo tower A 858 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
419 10-Jun-16 Condo tower A 857 Ǿ800 17 17 34.00 42.40 8.4 1.00 19.50 734.60 TI-26
420 10-Jun-16 Condo tower A 856 Ǿ800 17 17 34.00 42.30 8.3 1.00 21.00 791.10 TI-26
421 10-Jun-16 Condo tower A 855 Ǿ800 17 17 34.00 42.20 8.2 1.00 18.00 678.10 TI-26
422 11-Jun-16 Condo tower A 854 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
423 11-Jun-16 Condo tower A 853 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
424 11-Jun-16 Condo tower A 852 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 719.80 TI-26
425 11-Jun-16 Condo tower A 851 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
426 12-Jun-16 Condo tower A 865 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.50 659.30 TI-26
427 12-Jun-16 Condo tower A 866 Ǿ800 17 17 34.00 37.00 3.0 1.00 21.50 810.00 TI-26
428 12-Jun-16 Condo tower A 867 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
429 12-Jun-16 Condo tower A 868 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.00 TI-26
430 13-Jun-16 Condo tower A 869 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
431 13-Jun-16 Condo tower A 870 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
432 13-Jun-16 Condo tower A 871 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
433 13-Jun-16 Condo tower A 872 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
434 13-Jun-16 Condo tower A 873 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26
435 14-Jun-16 Condo tower A 882 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
436 14-Jun-16 Condo tower A 881 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.00 640.50 TI-26
437 14-Jun-16 Condo tower A 880 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
438 14-Jun-16 Condo tower A 879 Ǿ800 17 17 34.00 42.50 8.5 1.00 21.00 791.10 TI-26
439 15-Jun-16 Condo tower A 878 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.00 753.50 TI-26
440 15-Jun-16 Condo tower A 877 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
441 15-Jun-16 Condo tower A 876 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
442 15-Jun-16 Condo tower A 875 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.50 734.60 TI-26
443 15-Jun-16 Condo tower A 850 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26
444

TOTAL PEMANCANGAN MAIN PILE 15115.00 18241.53 3126.53 448.00 0.00


DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 25 Ags 2015 -


TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 444
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 8-Apr-16 Condo tower A 30051 Ǿ800 17 17 34.00 31.00 -3.0 1.00 21.50 810.00 TI-26 sisipan (SM)
2 8-Apr-16 Condo tower A 30052 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26 sisipan (SM)
3 6-May-16 Condo tower A 30072 Ǿ800 17 17 34.00 42.50 8.5 1.00 17.70 659.30 TI-26 sisipan (SM)
4 11-May-16 Condo tower A 30070 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-26 sisipan
5 11-May-16 Condo tower A 30071 Ǿ800 17 17 34.00 39.00 5.0 1.00 21.50 810.00 TI-26 sisipan
6 13-May-16 Condo tower A 30057 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26 sisipan (SM)
7 15-May-16 Condo tower A 30056 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.50 810.00 TI-26 sisipan (SM)
8 23-May-16 Condo tower A 30054 Ǿ800 17 17 34.00 35.50 1.5 1.00 21.50 810.00 TI-26 sisipan (SM)
9 23-May-16 Condo tower A 30055 Ǿ800 17 17 34.00 42.50 8.5 1.00 20.50 772.30 TI-26 sisipan (SM)
10 2-Jun-16 Condo tower A 30053 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan (SM)
11 18-Jun-16 Condo tower A 30063 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25 sisipan
12 18-Jun-16 Condo tower A 30064 Ǿ800 17 17 34.00 34.25 0.3 1.00 21.70 817.50 TI-25 sisipan
13 18-Jun-16 Condo tower A 30062 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25 sisipan
14 18-Jun-16 Condo tower A 30103 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan
15 18-Jun-16 Condo tower A 30104 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan
16 18-Jun-16 Condo tower A 30105 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.50 697.00 TI-26 sisipan
17 18-Jun-16 Condo tower A 30106 Ǿ800 17 17 34.00 42.50 8.5 1.00 19.00 715.80 TI-26 sisipan
18 19-Jun-16 Condo tower A 30066 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25 sisipan
19 19-Jun-16 Condo tower A 30068 Ǿ800 17 17 34.00 35.00 1.0 1.00 21.70 817.50 TI-25 sisipan
20 19-Jun-16 Condo tower A 30065 Ǿ800 17 17 34.00 40.50 6.5 1.00 21.80 821.30 TI-25 sisipan
21 20-Jun-16 Condo tower A 30074 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25 sisipan
22 20-Jun-16 Condo tower A 30067 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25 sisipan
23 20-Jun-16 Condo tower A 30100 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26 sisipan
24 20-Jun-16 Condo tower A 30101 Ǿ800 17 17 34.00 42.50 8.5 1.00 18.00 678.10 TI-26 sisipan
25 20-Jun-16 Condo tower A 30102 Ǿ800 17 17 34.00 34.50 0.5 1.00 21.50 810.00 TI-26 sisipan
26 21-Jun-16 Condo tower A 30109 Ǿ800 17 17 34.00 42.50 8.5 1.00 16.00 602.80 TI-26 sisipan
27
28
29
30
31
32
33
34

TOTAL PEMANCANGAN MAIN PILE 884.00 1052.25 168.25 26.00 0.00


1.472
1.16
-0.312
DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 08 Spt 2015 -


TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 8-Sep-15 V-3/229 Ǿ800 16 16 15 47.00 44.00 -3.00 2.00 1 21.50 12.00 TI-26 VWSG

2 11-Sep-15 IP-15/390 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 20.00 753.50 12.00 TI-26 INDIKATOR

3 13-Sep-15 IP-14/397 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 16 602.80 12.00 TI-24 INDIKATOR

4 15-Sep-15 IP-16/69 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 18 678.10 12.00 TI-26 INDIKATOR

5 15-Sep-15 IP-19/62 Ǿ800 14 14 14 42.00 42.00 0.00 2.00 15 565.10 12.00 TI-26 INDIKATOR

6 2-Feb-16 Condo tower B 440 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 828.10 TI-26
7 2-Feb-16 Condo tower B 423 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
8 2-Feb-16 Condo tower B 420 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 621.60 TI-26
9 4-Feb-16 Condo tower B 399 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-26
10 4-Feb-16 Condo tower B 396 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-26
11 4-Feb-16 Condo tower B 375 Ǿ800 17 17 34.00 40.00 6.00 1.00 18.50 697.00 TI-26 tiang pecah

12 4-Feb-16 Condo tower B 329 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-26
13 9-Mar-16 Condo tower B 414 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
14 9-Mar-16 Condo tower B 405 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
15 10-Mar-16 Condo tower B 366 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
16 10-Mar-16 Condo tower B 381 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
17 10-Mar-16 Condo tower B 342 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
18 10-Mar-16 Condo tower B 357 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
19 10-Mar-16 Condo tower B 406 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
20 11-Mar-16 Condo tower B 413 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.40 806.20 TI-25
21 11-Mar-16 Condo tower B 382 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
22 11-Mar-16 Condo tower B 389 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.30 802.40 TI-25
23 11-Mar-16 Condo tower B 365 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
24 13-Mar-16 Condo tower B 380 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
25 13-Mar-16 Condo tower B 367 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
26 13-Mar-16 Condo tower B 404 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
27 14-Mar-16 Condo tower B 391 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
28 14-Mar-16 Condo tower B 416 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
29 14-Mar-16 Condo tower B 427 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.30 614.10 TI-25
30 14-Mar-16 Condo tower B 428 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
31 15-Mar-16 Condo tower B 415 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
32 15-Mar-16 Condo tower B 356 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
33 16-Mar-16 Condo tower B 332 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 658.70 TI-25
34 16-Mar-16 Condo tower B 343 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.60 813.70 TI-25
35 17-Mar-16 Condo tower B 308 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
36 17-Mar-16 Condo tower B 319 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
37 17-Mar-16 Condo tower B 379 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
38 18-Mar-16 Condo tower B 392 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
39 18-Mar-16 Condo tower B 403 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
40 18-Mar-16 Condo tower B 344 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.40 506.20 TI-25
41 20-Mar-16 Condo tower B 355 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.40 806.20 TI-25
42 20-Mar-16 Condo tower B 368 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.90 674.40 TI-25
43 21-Mar-16 Condo tower B 400 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
44 22-Mar-16 Condo tower B 419 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.70 742.20 TI-25
45 22-Mar-16 Condo tower B 424 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
46 22-Mar-16 Condo tower B 371 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
47 22-Mar-16 Condo tower B 376 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.10 644.20 TI-25
48 24-Mar-16 Condo tower B 299 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.80 632.90 TI-25
49 1-Apr-16 Condo tower B 304 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
50 1-Apr-16 Condo tower B 323 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.50 810.00 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

51 1-Apr-16 Condo tower B 328 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
52 1-Apr-16 Condo tower B 347 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.50 810.00 TI-25
53 1-Apr-16 Condo tower B 395 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
54 1-Apr-16 Condo tower B 352 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
55 4-Apr-16 Condo tower B 300 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.80 745.90 TI-25
56 4-Apr-16 Condo tower B 303 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
57 4-Apr-16 Condo tower B 324 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
58 5-Apr-16 Condo tower B 327 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
59 5-Apr-16 Condo tower B 348 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.50 810.00 TI-25
60 5-Apr-16 Condo tower B 351 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
61 5-Apr-16 Condo tower B 372 Ǿ800 17 17 34.00 36.00 2.00 1.00 21.50 810.00 TI-25
62 8-Apr-16 Condo tower B 36 Ǿ800 17 17 34.00 32.00 -2.00 1.00 17.00 597.20 TI-24 tiang pecah
63 8-Apr-16 Condo tower B 298 Ǿ800 17 17 34.00 39.00 5.00 1.00 18.50 697.00 TI-25 tiang pecah
64 8-Apr-16 Condo tower B 305 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 817.50 TI-25
65 8-Apr-16 Condo tower B 322 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
66 8-Apr-16 Condo tower B 346 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
67 8-Apr-16 Condo tower B 353 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.50 810.00 TI-25
68 8-Apr-16 Condo tower B 370 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.20 798.70 TI-25
69 9-Apr-16 Condo tower B 34 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.50 579.60 TI-24
70 9-Apr-16 Condo tower B 377 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
71 9-Apr-16 Condo tower B 394 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
72 9-Apr-16 Condo tower B 401 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
73 9-Apr-16 Condo tower B 418 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
74 12-Apr-16 Condo tower B 33 Ǿ800 17 17 34.00 34.00 0.00 1.00 22.90 804.90 TI-24
75 12-Apr-16 Condo tower B 32 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
76 13-Apr-16 Condo tower B 31 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
77 13-Apr-16 Condo tower B 30 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 649.80 TI-24
78 13-Apr-16 Condo tower B 29 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
79 13-Apr-16 Condo tower B 306 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
80 13-Apr-16 Condo tower B 321 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
81 13-Apr-16 Condo tower B 330 Ǿ800 17 17 34.00 38.50 4.50 1.00 21.60 813.70 TI-25
82 13-Apr-16 Condo tower B 345 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
83 13-Apr-16 Condo tower B 354 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.1.1 TI-25
84 14-Apr-16 Condo tower B 369 Ǿ800 17 17 34.00 17.50 -16.50 1.00 22.10 836.60 TI-25 potong tiang
85 15-Apr-16 Condo tower B 378 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
86 15-Apr-16 Condo tower B 393 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
87 15-Apr-16 Condo tower B 402 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
88 15-Apr-16 Condo tower B 417 Ǿ800 17 17 34.00 34.00 0.00 1.00 21.70 817.50 TI-25
89 15-Apr-16 Condo tower B 25 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
90 16-Apr-16 Condo tower B 26 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
91 16-Apr-16 Condo tower B 27 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.80 800.90 TI-24
92 16-Apr-16 Condo tower B 28 Ǿ800 17 17 34.00 40.50 6.50 1.00 22.90 804.40 TI-24
93 19-Apr-16 Condo tower B 49 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.00 TI-24
94 19-Apr-16 Condo tower B 48 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
95 19-Apr-16 Condo tower B 47 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
96 19-Apr-16 Condo tower B 46 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
97 19-Apr-16 Condo tower B 45 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
98 19-Apr-16 Condo tower B 292 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.80 783.60 TI-25
99 19-Apr-16 Condo tower B 311 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.80 821.30 TI-25
100 19-Apr-16 Condo tower B 316 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
101 19-Apr-16 Condo tower B 335 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 810.00 TI-25
102 20-Apr-16 Condo tower B 44 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
103 20-Apr-16 Condo tower B 43 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 744.20 TI-24
104 20-Apr-16 Condo tower B 42 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
105 20-Apr-16 Condo tower B 41 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
106 20-Apr-16 Condo tower B 40 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737,7 TI-24
107 21-Apr-16 Condo tower B 39 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
108 21-Apr-16 Condo tower B 50 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

109 21-Apr-16 Condo tower B 51 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
110 21-Apr-16 Condo tower B 52 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
111 21-Apr-16 Condo tower B 340 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
112 21-Apr-16 Condo tower B 359 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 772.30 TI-25
113 21-Apr-16 Condo tower B 364 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
114 22-Apr-16 Condo tower B 53 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
115 22-Apr-16 Condo tower B 54 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
116 22-Apr-16 Condo tower B 55 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.30 713.10 TI-24
117 22-Apr-16 Condo tower B 56 Ǿ800 17 17 34.00 34.00 0.00 1.00 23.00 807.90 TI-24
118 22-Apr-16 Condo tower B 57 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
119 22-Apr-16 Condo tower B 58 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 677.90 TI-24
120 22-Apr-16 Condo tower B 383 Ǿ800 17 17 34.00 38.00 4.00 1.00 21.80 821.30 TI-25
121 22-Apr-16 Condo tower B 388 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
122 22-Apr-16 Condo tower B 407 Ǿ800 17 17 34.00 37.50 3.50 1.00 22.00 828.80 TI-25
123 22-Apr-16 Condo tower B 412 Ǿ800 17 17 34.00 32.00 -2.00 1.00 22.00 828.80 TI-25 potong tiang
124 23-Apr-16 Condo tower B 59 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
125 23-Apr-16 Condo tower B 60 Ǿ800 17 17 34.00 38.00 4.00 1.00 22.90 804.40 TI-24
126 23-Apr-16 Condo tower B 72 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
127 23-Apr-16 Condo tower B 358 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.10 794.90 TI-25
128 23-Apr-16 Condo tower B 293 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.20 723.30 TI-25
129 23-Apr-16 Condo tower B 341 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
130 23-Apr-16 Condo tower B 310 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
131 24-Apr-16 Condo tower B 71 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.70 762.30 TI-24
132 24-Apr-16 Condo tower B 70 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
133 24-Apr-16 Condo tower B 68 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 804.40 TI-24
134 24-Apr-16 Condo tower B 73 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
135 24-Apr-16 Condo tower B 317 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.90 749.70 TI-25
136 24-Apr-16 Condo tower B 334 Ǿ800 17 17 34.00 42.00 8.00 1.00 14.50 546.30 TI-25
137 25-Apr-16 Condo tower B 67 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
138 25-Apr-16 Condo tower B 66 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
139 25-Apr-16 Condo tower B 65 Ǿ800 17 17 34.00 40.00 6.00 1.00 22.90 804.40 TI-24
140 25-Apr-16 Condo tower B 64 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
141 26-Apr-16 Condo tower B 63 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
142 26-Apr-16 Condo tower B 74 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
143 26-Apr-16 Condo tower B 75 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.90 800.90 TI-24
144 26-Apr-16 Condo tower B 285 Ǿ800 17 17 34.00 42.00 8.00 1.00 16.20 610.30 TI-25
145 26-Apr-16 Condo tower B 309 Ǿ800 17 17 34.00 32.50 -1.50 1.00 22.00 828.80 TI-25 potong tiang
146 26-Apr-16 Condo tower B 294 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
147 26-Apr-16 Condo tower B 318 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.80 821.30 TI-25
148 26-Apr-16 Condo tower B 333 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
149 27-Apr-16 Condo tower B 76 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
150 27-Apr-16 Condo tower B 77 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
151 27-Apr-16 Condo tower B 78 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
152 27-Apr-16 Condo tower B 79 Ǿ800 17 17 34.00 24.00 -10.00 1.00 23.00 807.90 TI-24 potong tiang
153 27-Apr-16 Condo tower B 80 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
154 27-Apr-16 Condo tower B 81 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
155 27-Apr-16 Condo tower B 82 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
156 27-Apr-16 Condo tower B 235 Ǿ800 17 17 34.00 40.00 6.00 1.00 21.70 817.50 TI-25
157 27-Apr-16 Condo tower B 248 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
158 27-Apr-16 Condo tower B 259 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
159 27-Apr-16 Condo tower B 272 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
160 27-Apr-16 Condo tower B 283 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.30 727.10 TI-25
161 28-Apr-16 Condo tower B 83 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.00 TI-24
162 28-Apr-16 Condo tower B 84 Ǿ800 17 17 34.00 31.50 -2.50 1.00 23.00 807.90 TI-24
163 28-Apr-16 Condo tower B 97 Ǿ800 17 17 34.00 31.00 -3.00 1.00 23.00 807.90 TI-24
164 28-Apr-16 Condo tower B 96 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
165 28-Apr-16 Condo tower B 296 Ǿ800 17 17 34.00 41.00 7.00 1.00 21.70 817.50 TI-25
166 28-Apr-16 Condo tower B 307 Ǿ800 17 17 34.00 40.50 6.50 1.00 21.80 821.30 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

167 28-Apr-16 Condo tower B 320 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.80 821.30 TI-25
168 28-Apr-16 Condo tower B 331 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 791.10 TI-25
169 29-Apr-16 Condo tower B 95 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
170 29-Apr-16 Condo tower B 94 Ǿ800 17 17 34.00 41.00 7.00 1.00 22.90 804.40 TI-24
171 29-Apr-16 Condo tower B 93 Ǿ800 17 17 34.00 39.00 5.00 1.00 22.90 804.40 TI-24
172 29-Apr-16 Condo tower B 92 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
173 29-Apr-16 Condo tower B 225 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.10 719.60 TI-25
174 29-Apr-16 Condo tower B 234 Ǿ800 17 17 34.00 40.00 6.00 1.00 12.00 452.10 TI-25
175 29-Apr-16 Condo tower B 249 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
176 29-Apr-16 Condo tower B 258 Ǿ800 17 17 34.00 39.00 5.00 1.00 21.90 825.10 TI-25
177 30-Apr-16 Condo tower B 91 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
178 30-Apr-16 Condo tower B 90 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
179 30-Apr-16 Condo tower B 89 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
180 30-Apr-16 Condo tower B 273 Ǿ800 17 17 34.00 35.00 1.00 1.00 22.00 828.80 TI-25
181 30-Apr-16 Condo tower B 282 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.70 817.50 TI-25
182 30-Apr-16 Condo tower B 297 Ǿ800 17 17 34.00 41.50 7.50 1.00 21.90 825.10 TI-25
183 1-May-16 Condo tower B 226 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 669.30 TI-25
184 1-May-16 Condo tower B 233 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 685.70 TI-25
185 2-May-16 Condo tower B 250 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
186 2-May-16 Condo tower B 257 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.10 757.20 TI-25
187 2-May-16 Condo tower B 274 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
188 2-May-16 Condo tower B 281 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.50 697.00 TI-25
189 2-May-16 Condo tower B 88 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
190 2-May-16 Condo tower B 87 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
191 3-May-16 Condo tower B 227 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.30 651.80 TI-25
192 3-May-16 Condo tower B 232 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.00 TI-25
193 3-May-16 Condo tower B 251 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.60 813.70 TI-25
194 3-May-16 Condo tower B 256 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.70 704.50 TI-25
195 3-May-16 Condo tower B 275 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
196 3-May-16 Condo tower B 98 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
197 3-May-16 Condo tower B 99 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
198 3-May-16 Condo tower B 100 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
199 3-May-16 Condo tower B 101 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
200 3-May-16 Condo tower B 102 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
201 4-May-16 Condo tower B 280 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 753.50 TI-25
202 4-May-16 Condo tower B 103 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
203 4-May-16 Condo tower B 104 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
204 4-May-16 Condo tower B 105 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.60 685.00 TI-24
205 4-May-16 Condo tower B 106 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
206 4-May-16 Condo tower B 107 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
207 4-May-16 Condo tower B 108 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
208 5-May-16 Condo tower B 228 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
209 5-May-16 Condo tower B 231 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
210 5-May-16 Condo tower B 252 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.20 648.00 TI-25
211 5-May-16 Condo tower B 255 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 715.80 TI-25
212 5-May-16 Condo tower B 276 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 678.10 TI-25
213 5-May-16 Condo tower B 279 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
214 5-May-16 Condo tower B 121 Ǿ800 17 17 34.00 41.00 7.00 1.00 23.00 807.90 TI-24
215 5-May-16 Condo tower B 120 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
216 5-May-16 Condo tower B 119 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.50 755.20 TI-24
217 5-May-16 Condo tower B 118 Ǿ800 17 17 34.00 42.00 8.00 1.00 22.00 772.80 TI-24
218 5-May-16 Condo tower B 117 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
219 5-May-16 Condo tower B 116 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
220 5-May-16 Condo tower B 115 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
221 6-May-16 Condo tower B 253 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.60 663.10 TI-25
222 6-May-16 Condo tower B 254 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 734.60 TI-25
223 6-May-16 Condo tower B 277 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.20 695.70 TI-25
224 6-May-16 Condo tower B 278 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

225 6-May-16 Condo tower B 114 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
226 6-May-16 Condo tower B 113 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
227 6-May-16 Condo tower B 112 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.50 685.00 TI-24
228 6-May-16 Condo tower B 111 Ǿ800 17 17 34.00 42.00 8.00 1.00 19.00 667.40 TI-24
229 7-May-16 Condo tower B 301 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.10 681.90 TI-25
230 7-May-16 Condo tower B 302 Ǿ800 17 17 34.00 42.00 8.00 1.00 17.50 659.30 TI-25
231 7-May-16 Condo tower B 325 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.00 678.10 TI-25
232 7-May-16 Condo tower B 326 Ǿ800 17 17 34.00 42.00 8.00 1.00 18.30 689.40 TI-25
233 7-May-16 Condo tower B 349 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.20 761.00 TI-25
234 7-May-16 Condo tower B 122 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
235 7-May-16 Condo tower B 123 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
236 7-May-16 Condo tower B 124 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
237 7-May-16 Condo tower B 125 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
238 7-May-16 Condo tower B 126 Ǿ800 17 17 34.00 42.00 8.00 1.00 21.00 737.70 TI-24
239 7-May-16 Condo tower B 127 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.00 702.50 TI-24
240 7-May-16 Condo tower B 128 Ǿ800 17 17 34.00 42.00 8.00 1.00 20.50 720.10 TI-24
241 8-May-16 Condo tower B 129 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
242 8-May-16 Condo tower B 130 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
243 8-May-16 Condo tower B 131 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
244 8-May-16 Condo tower B 132 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
245 9-May-16 Condo tower B 145 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
246 9-May-16 Condo tower B 144 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
247 9-May-16 Condo tower B 143 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 773.80 TI-24
248 9-May-16 Condo tower B 350 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
249 9-May-16 Condo tower B 373 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
250 9-May-16 Condo tower B 374 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
251 9-May-16 Condo tower B 398 Ǿ800 17 17 34.00 39.50 5.5 1.00 22.00 828.80 TI-25
252 9-May-16 Condo tower B 421 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
253 9-May-16 Condo tower B 422 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
254 9-May-16 Condo tower B 441 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
255 10-May-16 Condo tower B 142 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
256 10-May-16 Condo tower B 141 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
257 10-May-16 Condo tower B 140 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
258 10-May-16 Condo tower B 139 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
259 10-May-16 Condo tower B 138 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
260 10-May-16 Condo tower B 137 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
261 10-May-16 Condo tower B 136 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
262 10-May-16 Condo tower B 434 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
263 10-May-16 Condo tower B 435 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
264 10-May-16 Condo tower B 436 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.00 TI-25
265 11-May-16 Condo tower B 135 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
266 11-May-16 Condo tower B 146 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
267 11-May-16 Condo tower B 147 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
268 11-May-16 Condo tower B 148 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24
269 11-May-16 Condo tower B 149 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
270 11-May-16 Condo tower B 437 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
271 11-May-16 Condo tower B 438 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
272 11-May-16 Condo tower B 439 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
273 11-May-16 Condo tower B 433 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
274 11-May-16 Condo tower B 432 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
275 11-May-16 Condo tower B 431 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25
276 12-May-16 Condo tower B 150 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
277 12-May-16 Condo tower B 151 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
278 12-May-16 Condo tower B 152 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
279 12-May-16 Condo tower B 153 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 720.10 TI-24
280 12-May-16 Condo tower B 154 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.40 TI-24
281 12-May-16 Condo tower B 430 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
282 12-May-16 Condo tower B 429 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

283 12-May-16 Condo tower B 426 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
284 12-May-16 Condo tower B 425 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
285 12-May-16 Condo tower B 410 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
286 13-May-16 Condo tower B 155 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
287 13-May-16 Condo tower B 156 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
288 13-May-16 Condo tower B 169 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
289 13-May-16 Condo tower B 168 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
290 13-May-16 Condo tower B 167 Ǿ800 17 17 34.00 39.50 5.5 1.00 23.00 807.90 TI-24
291 13-May-16 Condo tower B 166 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.50 TI-24
292 13-May-16 Condo tower B 411 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
293 13-May-16 Condo tower B 408 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
294 13-May-16 Condo tower B 409 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
295 13-May-16 Condo tower B 386 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
296 13-May-16 Condo tower B 387 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
297 13-May-16 Condo tower B 384 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
298 14-May-16 Condo tower B 165 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
299 14-May-16 Condo tower B 164 Ǿ800 17 17 34.00 43.00 9.0 1.00 23.00 807.90 TI-24
300 14-May-16 Condo tower B 163 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
301 14-May-16 Condo tower B 162 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
302 14-May-16 Condo tower B 161 Ǿ800 17 17 34.00 42.50 8.5 1.00 22.90 804.40 TI-24
303 14-May-16 Condo tower B 385 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
304 14-May-16 Condo tower B 363 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.10 719.60 TI-25
305 14-May-16 Condo tower B 362 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25
306 14-May-16 Condo tower B 360 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
307 14-May-16 Condo tower B 361 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
308 14-May-16 Condo tower B 339 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
309 16-May-16 Condo tower B 160 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
310 16-May-16 Condo tower B 159 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
311 16-May-16 Condo tower B 170 Ǿ800 17 17 34.00 43.00 9.0 1.00 22.00 772.80 TI-24
312 17-May-16 Condo tower B 171 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24
313 17-May-16 Condo tower B 172 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
314 17-May-16 Condo tower B 173 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
315 17-May-16 Condo tower B 174 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
316 17-May-16 Condo tower B 175 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
317 17-May-16 Condo tower B 176 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
318 17-May-16 Condo tower B 177 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
319 17-May-16 Condo tower B 178 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
320 17-May-16 Condo tower B 338 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
321 17-May-16 Condo tower B 313 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
322 17-May-16 Condo tower B 312 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
323 17-May-16 Condo tower B 291 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
324 17-May-16 Condo tower B 290 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.60 663.10 TI-25
325 17-May-16 Condo tower B 288 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
326 17-May-16 Condo tower B 289 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
327 17-May-16 Condo tower B 284 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
328 18-May-16 Condo tower B 179 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
329 18-May-16 Condo tower B 180 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
330 18-May-16 Condo tower B 193 Ǿ800 17 17 34.00 42.00 8.0 1.00 23.00 807.90 TI-24
331 18-May-16 Condo tower B 192 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
332 18-May-16 Condo tower B 191 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
333 18-May-16 Condo tower B 295 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
334 18-May-16 Condo tower B 287 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
335 18-May-16 Condo tower B 286 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
336 18-May-16 Condo tower B 266 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
337 18-May-16 Condo tower B 267 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
338 19-May-16 Condo tower B 190 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
339 19-May-16 Condo tower B 189 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
340 19-May-16 Condo tower B 188 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

341 19-May-16 Condo tower B 187 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
342 19-May-16 Condo tower B 186 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.50 755.20 TI-24
343 19-May-16 Condo tower B 185 Ǿ800 17 17 34.00 43.00 9.0 1.00 21.00 737.70 TI-24
344 19-May-16 Condo tower B 268 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.80 670.80 TI-25
345 19-May-16 Condo tower B 269 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
346 19-May-16 Condo tower B 270 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25
347 19-May-16 Condo tower B 271 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.50 697.00 TI-25
348 19-May-16 Condo tower B 265 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.10 606.50 TI-25
349 19-May-16 Condo tower B 264 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
350 20-May-16 Condo tower B 184 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
351 20-May-16 Condo tower B 183 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
352 20-May-16 Condo tower B 182 Ǿ800 17 17 34.00 43.00 9.0 1.00 19.50 685.00 TI-24
353 20-May-16 Condo tower B 181 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.50 TI-24
354 21-May-16 Condo tower B 158 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
355 21-May-16 Condo tower B 157 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
356 21-May-16 Condo tower B 134 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
357 21-May-16 Condo tower B 133 Ǿ800 17 17 34.00 43.00 9.0 1.00 20.00 702.30 TI-24
358 21-May-16 Condo tower B 263 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
359 21-May-16 Condo tower B 262 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
360 21-May-16 Condo tower B 261 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
361 21-May-16 Condo tower B 260 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.70 742.20 TI-25
362 23-May-16 Condo tower B 24 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24
363 23-May-16 Condo tower B 23 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.30 TI-24
364 23-May-16 Condo tower B 22 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
365 23-May-16 Condo tower B 21 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 772.80 TI-24
366 23-May-16 Condo tower B 242 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
367 23-May-16 Condo tower B 243 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.80 745.90 TI-25
368 23-May-16 Condo tower B 244 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
369 24-May-16 Condo tower B 20 Ǿ800 17 17 34.00 42.00 8.0 1.00 29.00 702.50 TI-24
370 24-May-16 Condo tower B 19 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
371 24-May-16 Condo tower B 18 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
372 24-May-16 Condo tower B 17 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
373 24-May-16 Condo tower B 245 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
374 24-May-16 Condo tower B 246 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25
375 24-May-16 Condo tower B 247 Ǿ800 17 17 34.00 42.00 8.0 1.00 18,1 681,9 TI-25
376 25-May-16 Condo tower B 16 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
377 25-May-16 Condo tower B 15 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
378 26-May-16 Condo tower B 14 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
379 26-May-16 Condo tower B 13 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
380 26-May-16 Condo tower B 241 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
381 26-May-16 Condo tower B 240 Ǿ800 17 17 34.00 41.50 7.5 1.00 21.60 813.70 TI-25
382 27-May-16 Condo tower B 1 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
383 27-May-16 Condo tower B 2 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
384 27-May-16 Condo tower B 3 Ǿ800 17 17 34.00 38.50 4.5 1.00 23.00 807.90 TI-24
385 27-May-16 Condo tower B 4 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
386 27-May-16 Condo tower B 239 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
387 27-May-16 Condo tower B 238 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
388 27-May-16 Condo tower B 237 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.90 674.40 TI-25
389 27-May-16 Condo tower B 236 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
390 28-May-16 Condo tower B 5 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.60 TI-24
391 28-May-16 Condo tower B 6 Ǿ800 17 17 34.00 19.50 -14.5 1.00 23.00 807.90 TI-24
392 28-May-16 Condo tower B 218 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
393 28-May-16 Condo tower B 219 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.00 838.80 TI-25
394 28-May-16 Condo tower B 220 Ǿ800 17 17 34.00 36.00 2.0 1.00 12.00 452.10 TI-25 presur los
395 28-May-16 Condo tower B 221 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.60 738.40 TI-25
396 30-May-16 Condo tower B 7 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
397 30-May-16 Condo tower B 8 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
398 30-May-16 Condo tower B 222 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25
PILE DATA Final Dolly / PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

399 30-May-16 Condo tower B 223 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
400 30-May-16 Condo tower B 224 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.10 757.20 TI-25
401 30-May-16 Condo tower B 217 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.50 772.30 TI-25
402 31-May-16 Condo tower B 9 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
403 31-May-16 Condo tower B 10 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
404 31-May-16 Condo tower B 11 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
405 31-May-16 Condo tower B 12 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 685.00 TI-24
406 31-May-16 Condo tower B 216 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 715.80 TI-25
407 31-May-16 Condo tower B 215 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
408 31-May-16 Condo tower B 212 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
409 1-Jun-16 Condo tower B 86 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
410 1-Jun-16 Condo tower B 38 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24
411 1-Jun-16 Condo tower B 61 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
412 1-Jun-16 Condo tower B 85 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24
413 1-Jun-16 Condo tower B 211 Ǿ800 17 17 8 42.00 42.00 0.0 1.00 22.20 836.40 TI-25
414 1-Jun-16 Condo tower B 210 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.70 817.50 TI-25
415 1-Jun-16 Condo tower B 209 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.20 723.30 TI-25
416 1-Jun-16 Condo tower B 208 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25
417 1-Jun-16 Condo tower B 207 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
418 2-Jun-16 Condo tower B 109 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.50 755.20 TI-24
419 2-Jun-16 Condo tower B 110 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24
420 2-Jun-16 Condo tower B 214 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
421 2-Jun-16 Condo tower B 213 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
422 2-Jun-16 Condo tower B 194 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
423 2-Jun-16 Condo tower B 195 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
424 3-Jun-16 Condo tower B 196 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
425 3-Jun-16 Condo tower B 197 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
426 3-Jun-16 Condo tower B 198 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.70 666.80 TI-25
427 3-Jun-16 Condo tower B 199 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25
428 3-Jun-16 Condo tower B 200 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.50 734.60 TI-25
429 4-Jun-16 Condo tower B 201 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25
430 4-Jun-16 Condo tower B 202 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 678.10 TI-25
431 4-Jun-16 Condo tower B 203 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.00 640.50 TI-25
432 5-Jun-16 Condo tower B 204 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 640.50 TI-25
433 5-Jun-16 Condo tower B 205 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.30 651.80 TI-25
434 5-Jun-16 Condo tower B 206 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.80 632.90 TI-25
435 7-Jun-16 Condo tower B 37 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 737.70 TI-24
436 8-Jun-16 Condo tower B 230 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.20 648.00 TI-25
437 9-Jun-16 Condo tower B 314 Ǿ800 17 17 34.00 42.00 8.0 1.00 16.50 621.60 TI-25
438 9-Jun-16 Condo tower B 315 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25
439 10-Jun-16 Condo tower B 336 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.90 712.00 TI-25
440 10-Jun-16 Condo tower B 337 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.10 644.20 TI-25

TOTAL PEMANCANGAN MAIN PILE 15013.00 18252.00 3239.00 445.00 1.00


DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 08 Spt 2015 -


TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 440
(mm) Bot Mid Mid Mid (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 5-Apr-16 Condo tower B 30069 Ǿ800 17 17 34.00 28.00 -6.0 1.00 21.50 810.00 TI-25 potong (sisipan)
2 12-May-16 Condo tower B 30075 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.30 727.10 TI-25 sisipan
3 3-Jun-16 Condo tower B 30091 Ǿ800 17 17 34.00 32.50 -1.5 1.00 23.00 807.90 TI-24 sisipan
4 3-Jun-16 Condo tower B 30092 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.50 TI-24 sisipan
5 3-Jun-16 Condo tower B 30093 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
6 3-Jun-16 Condo tower B 30094 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
7 4-Jun-16 Condo tower B 30095 Ǿ800 17 17 34.00 30.00 -4.0 1.00 23.00 808.90 TI-24 sisipan
8 4-Jun-16 Condo tower B 30096 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.00 632.30 TI-24 sisipan
9 7-Jun-16 Condo tower B 30097 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
10 7-Jun-16 Condo tower B 30081 Ǿ800 17 17 34.00 38.00 4.0 1.00 23.00 807.90 TI-24 sisipan (SM)
11 7-Jun-16 Condo tower B 30080 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 753.50 TI-25 sisipan
12 7-Jun-16 Condo tower B 30089 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.10 681.90 TI-25 sisipan (SM)
13 7-Jun-16 Condo tower B 30088 Ǿ800 17 17 34.00 41.00 7.0 1.00 21.60 813.70 TI-25 sisipan
14 7-Jun-16 Condo tower B 30087 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 716.00 TI-25 sisipan
15 8-Jun-16 Condo tower B 30098 Ǿ800 17 17 34.00 42.00 8.0 1.00 19.00 667.40 TI-24 sisipan
16 8-Jun-16 Condo tower B 30090 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.00 702.30 TI-24 sisipan
17 8-Jun-16 Condo tower B 30079 Ǿ800 17 17 34.00 33.00 -1.0 1.00 22.10 832.60 TI-25 sisipan (SM)
18 8-Jun-16 Condo tower B 30078 Ǿ800 17 17 34.00 34.50 0.5 1.00 22.00 828.80 TI-25 sisipan (SM)
19 9-Jun-16 Condo tower B 30110 Ǿ800 17 17 34.00 41.50 7.5 1.00 23.00 807.90 TI-24 sisipan
20 9-Jun-16 Condo tower B 30076 Ǿ800 17 17 34.00 32.50 -1.5 1.00 21.00 527.40 TI-25 sisipan (SM)
21 9-Jun-16 Condo tower B 30077 Ǿ800 17 17 34.00 42.00 8.0 1.00 20.20 761.00 TI-25 sisipan (SM)
22 10-Jun-16 Condo tower B 30085 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.60 700.70 TI-25 sisipan
23 10-Jun-16 Condo tower B 30084 Ǿ800 17 17 34.00 42.00 8.0 1.00 21.00 791.10 TI-25 sisipan
24 10-Jun-16 Condo tower B 30083 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.20 685.70 TI-25 sisipan
25 11-Jun-16 Condo tower B 30082 Ǿ800 17 17 34.00 32.00 -2.0 1.00 16.10 404.40 TI-25 sisipan
26 13-Jun-16 Condo tower B 30086 Ǿ800 17 17 34.00 35.00 1.0 1.00 20.10 757.20 TI-25 sisipan(pecah)
27 14-Jun-16 Condo tower B 30171 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.70 704.50 TI-25 sisipan (SM)
28 14-Jun-16 Condo tower B 30172 Ǿ800 17 17 34.00 42.00 8.0 1.00 17.50 659.30 TI-25 sisipan (SM)
29 15-Jun-16 Condo tower B 30175 Ǿ800 17 17 34.00 42.00 8.0 1.00 18.40 693.20 TI-25 sisipan (SM)
30 21-Jun-16 Condo tower B 30173 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24 sisipan (SM)
31 21-Jun-16 Condo tower B 30174 Ǿ800 17 17 34.00 42.00 8.0 1.00 22.50 790.40 TI-24 sisipan (SM)

TOTAL PEMANCANGAN MAIN PILE 1054.00 1218.00 164.00 31.00 0.00


PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 07 Ags 2015 - 28 Dsm 2015

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 7-Aug-15 P - 3/1299 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 18.50 417.50 12.00 TI - 24
2 7-Aug-15 P - 2/1286 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.70 444.60 12.00 TI - 24
3 11-Aug-15 P - 4/1427 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.50 440.10 12.00 TI - 24
4 18-Aug-15 V-1 / 1336 Ǿ600 15 15 13 43.00 36.00 -7.00 2.00 1.00 15.30 537.40 12.00 TI - 24 VWSG
5 6-Nov-15 Hotel pile 1468 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
6 6-Nov-15 Hotel pile 1469 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
7 6-Nov-15 Hotel pile 1470 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
8 6-Nov-15 Hotel pile 1471 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
9 6-Nov-15 Hotel pile 1472 Ǿ600 15 17 32.00 30.00 -2.00 1.00 1 17.00 418.20 12.00 TI-18 potong tiang

10 6-Nov-15 Hotel pile 1473 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
11 6-Nov-15 Hotel pile 1474 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 17.30 425.60 12.00 TI-18 potong tiang

12 7-Nov-15 Hotel pile 1464 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
13 7-Nov-15 Hotel pile 1465 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
14 7-Nov-15 Hotel pile 1466 Ǿ600 15 17 32.00 37.00 5.00 1.00 18.70 460.00 12.00 TI-18
15 7-Nov-15 Hotel pile 1467 Ǿ600 15 17 32.00 32.00 0.00 1.00 19.40 477.20 12.00 TI-18
16 7-Nov-15 Hotel pile 1475 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
17 7-Nov-15 Hotel pile 1476 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
18 8-Nov-15 Hotel pile 1457 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.30 474.80 12.00 TI-18
19 8-Nov-15 Hotel pile 1458 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
20 8-Nov-15 Hotel pile 1459 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
21 8-Nov-15 Hotel pile 1460 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.40 479.70 12.00 TI-18
22 8-Nov-15 Hotel pile 1461 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.40 477.20 12.00 TI-18
23 8-Nov-15 Hotel pile 1462 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
24 8-Nov-15 Hotel pile 1463 Ǿ600 15 17 32.00 33.00 1.00 1.00 19.10 469.90 12.00 TI-18
25 9-Nov-15 Hotel pile 1452 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.00 418.20 12.00 TI-18
26 9-Nov-15 Hotel pile 1453 Ǿ600 15 17 32.00 38.00 6.00 1.00 16.90 415.70 12.00 TI-18
27 9-Nov-15 Hotel pile 1454 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.60 482.20 12.00 TI-18
28 9-Nov-15 Hotel pile 1455 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
29 9-Nov-15 Hotel pile 1456 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
30 10-Nov-15 Hotel pile 1441 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.80 437.90 12.00 TI-18
31 10-Nov-15 Hotel pile 1442 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.90 440.30 12.00 TI-18
32 10-Nov-15 Hotel pile 1449 Ǿ600 15 17 32.00 37.00 5.00 1.00 17.70 435.40 12.00 TI-18
33 10-Nov-15 Hotel pile 1450 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.50 479.70 12.00 TI-18
34 10-Nov-15 Hotel pile 1451 Ǿ600 15 17 32.00 38.00 6.00 1.00 17.50 430.50 12.00 TI-18
35 11-Nov-15 Hotel pile 1443 Ǿ600 15 17 32.00 33.00 1.00 1.00 20.30 499.40 12.00 TI-18
36 11-Nov-15 Hotel pile 1444 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
37 11-Nov-15 Hotel pile 1445 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.90 489.50 12.00 TI-18
38 11-Nov-15 Hotel pile 1446 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 12.00 TI-18
39 11-Nov-15 Hotel pile 1447 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
40 13-Nov-15 Hotel pile 1274 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16 potong pile
41 13-Nov-15 Hotel pile 1275 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
42 13-Nov-15 Hotel pile 1276 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
43 13-Nov-15 Hotel pile 1277 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
44 13-Nov-15 Hotel pile 1278 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.50 506.90 12.00 TI-16
45 13-Nov-15 Hotel pile 1279 Ǿ600 15 17 32.00 31.00 -1.00 1.00 17.50 506.90 12.00 TI-16 potong pile
46 13-Nov-15 Hotel pile 1404 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 489.50 12.00 TI-18
47 13-Nov-15 Hotel pile 1405 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 12.00 TI-18
48 13-Nov-15 Hotel pile 1406 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.70 489.50 12.00 TI-18
49 13-Nov-15 Hotel pile 1407 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
50 13-Nov-15 Hotel pile 1408 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
51 13-Nov-15 Hotel pile 1409 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
52 13-Nov-15 Hotel pile 1425 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
53 13-Nov-15 Hotel pile 1426 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.70 12.00 TI-18
54 13-Nov-15 Hotel pile 1428 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
55 13-Nov-15 Hotel pile 1429 Ǿ600 15 17 32.00 27.00 -5.00 1.00 20.60 506.40 12.00 TI-18 potong pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

56 14-Nov-15 Hotel pile 1271 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.00 492.40 12.00 TI-16
57 14-Nov-15 Hotel pile 1272 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
58 14-Nov-15 Hotel pile 1273 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
59 14-Nov-15 Hotel pile 1287 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.00 492.40 12.00 TI-16
60 14-Nov-15 Hotel pile 1288 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
61 14-Nov-15 Hotel pile 1430 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.70 484.60 12.00 TI-18
62 14-Nov-15 Hotel pile 1431 Ǿ600 15 17 32.00 38.00 6.00 1.00 19.90 489.50 12.00 TI-18
63 14-Nov-15 Hotel pile 1432 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.30 499.40 12.00 TI-18
64 14-Nov-15 Hotel pile 1433 Ǿ600 15 17 32.00 31.00 -1.00 1.00 20.80 511.70 12.00 TI-18 potong pile
65 16-Nov-15 Hotel pile 1282 Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 12.50 362.10 12.00 TI-16
66 16-Nov-15 Hotel pile 1283 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.00 492.40 12.00 TI-16
67 16-Nov-15 Hotel pile 1284 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 17.50 506.90 12.00 TI-16
68 16-Nov-15 Hotel pile 1285 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.00 492.40 12.00 TI-16
69 17-Nov-15 Hotel pile 1280 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
70 17-Nov-15 Hotel pile 1281 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
71 23-Nov-15 Hotel pile 1290 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
72 23-Nov-15 Hotel pile 1291 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
73 23-Nov-15 Hotel pile 1292 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
74 23-Nov-15 Hotel pile 1293 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
75 23-Nov-15 Hotel pile 1294 Ǿ600 15 17 32.00 32.00 0.00 1.00 17.00 492.40 12.00 TI-16
76 23-Nov-15 Hotel pile 1295 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
77 23-Nov-15 Hotel pile 1296 Ǿ600 15 17 32.00 32.50 0.50 1.00 17.00 492.40 12.00 TI-16
78 23-Nov-15 Hotel pile 1297 Ǿ600 15 17 32.00 32.50 0.50 1.00 16.50 477.90 12.00 TI-16
79 23-Nov-15 Hotel pile 1434 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
80 23-Nov-15 Hotel pile 1435 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 12.00 TI-18
81 23-Nov-15 Hotel pile 1436 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.30 474.80 12.00 TI-18
82 23-Nov-15 Hotel pile 1437 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
83 23-Nov-15 Hotel pile 1438 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
84 23-Nov-15 Hotel pile 1440 Ǿ600 17 15 32.00 37.00 5.00 1.00 19.50 479.70 12.00 TI-18
85 23-Nov-15 Hotel pile 1448 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.50 474.90 12.00 TI-18
86 24-Nov-15 Hotel pile 1289 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
87 24-Nov-15 Hotel pile 1301 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
88 24-Nov-15 Hotel pile 1302 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
89 24-Nov-15 Hotel pile 1303 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
90 24-Nov-15 Hotel pile 1304 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.50 477.90 12.00 TI-16
91 24-Nov-15 Hotel pile 1305 Ǿ600 15 17 32.00 33.00 1.00 1.00 17.00 492.40 12.00 TI-16
92 24-Nov-15 Hotel pile 1306 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.50 477.90 12.00 TI-16
93 24-Nov-15 Hotel pile 1398 Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 20.70 509.20 12.00 TI-18 potong tiang

94 24-Nov-15 Hotel pile 1399 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.80 487.10 12.00 TI-18
95 24-Nov-15 Hotel pile 1400 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 12.00 TI-18
96 24-Nov-15 Hotel pile 1401 Ǿ600 15 17 32.00 37.00 5.00 1.00 19.00 467.40 12.00 TI-18
97 24-Nov-15 Hotel pile 1402 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
98 25-Nov-15 Hotel pile 1298 Ǿ600 15 17 32.00 22.00 -10.00 1.00 1 17.50 506.90 12.00 TI-16
99 25-Nov-15 Hotel pile 1300 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.50 477.90 12.00 TI-16
100 25-Nov-15 Hotel pile 1311 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
101 25-Nov-15 Hotel pile 1312 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
102 25-Nov-15 Hotel pile 1313 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
103 25-Nov-15 Hotel pile 1314 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
104 25-Nov-15 Hotel pile 1315 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
105 25-Nov-15 Hotel pile 1403 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.50 430.50 12.00 TI-18 potong tiang
106 25-Nov-15 Hotel pile 1420 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.10 469.90 12.00 TI-18
107 25-Nov-15 Hotel pile 1421 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
108 25-Nov-15 Hotel pile 1422 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
109 25-Nov-15 Hotel pile 1439 Ǿ600 15 17 32.00 35.00 3.00 1.00 17.70 435.40 12.00 TI-18
110 26-Nov-15 Hotel pile 1307 Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 12.00 TI-16 potong tiang

111 26-Nov-15 Hotel pile 1308 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
112 26-Nov-15 Hotel pile 1309 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
113 26-Nov-15 Hotel pile 1310 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
114 26-Nov-15 Hotel pile 1322 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
115 26-Nov-15 Hotel pile 1323 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
116 26-Nov-15 Hotel pile 1324 Ǿ600 15 17 32.00 32.00 0.00 1.00 16.50 477.90 12.00 TI-16
117 26-Nov-15 Hotel pile 1392 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

118 26-Nov-15 Hotel pile 1393 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506,8 12.00 TI-18
119 26-Nov-15 Hotel pile 1394 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.00 492.00 12.00 TI-18
120 26-Nov-15 Hotel pile 1395 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 12.00 TI-18
121 26-Nov-15 Hotel pile 1396 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.20 49.6.9 12.00 TI-18
122 26-Nov-15 Hotel pile 1397 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
123 26-Nov-15 Hotel pile 1419 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.30 499.40 12.00 TI-18
124 26-Nov-15 Hotel pile 1423 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
125 26-Nov-15 Hotel pile 1424 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
126 27-Nov-15 Hotel pile 1415 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
127 27-Nov-15 Hotel pile 1416 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
128 27-Nov-15 Hotel pile 1417 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
129 27-Nov-15 Hotel pile 1418 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.70 484.60 12.00 TI-18
130 28-Nov-15 Hotel pile 1316 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
131 28-Nov-15 Hotel pile 1317 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
132 28-Nov-15 Hotel pile 1318 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
133 28-Nov-15 Hotel pile 1319 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
134 28-Nov-15 Hotel pile 1381 Ǿ600 5 17 22.00 35.00 13.00 1.00 17.00 418.20 12.00 TI-18
135 28-Nov-15 Hotel pile 1382 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
136 28-Nov-15 Hotel pile 1383 Ǿ600 15 17 32.00 36.00 4.00 1.00 19.00 467.40 12.00 TI-18
137 28-Nov-15 Hotel pile 1384 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
138 28-Nov-15 Hotel pile 1385 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
139 29-Nov-15 Hotel pile 1320 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
140 29-Nov-15 Hotel pile 1321 Ǿ600 15 17 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
141 29-Nov-15 Hotel pile 1331 Ǿ600 15 17 32.00 31.00 -1.00 1.00 16.00 463.40 12.00 TI-16
142 29-Nov-15 Hotel pile 1332 Ǿ600 15 17 32.00 33.00 1.00 1.00 16.00 463.40 12.00 TI-16
143 29-Nov-15 Hotel pile 1333 Ǿ600 15 17 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
144 30-Nov-15 Hotel pile 1325 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
145 30-Nov-15 Hotel pile 1326 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
146 30-Nov-15 Hotel pile 1327 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
147 30-Nov-15 Hotel pile 1328 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
148 30-Nov-15 Hotel pile 1329 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
149 30-Nov-15 Hotel pile 1330 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 463.40 12.00 TI-16
150 30-Nov-15 Hotel pile 1380 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
151 30-Nov-15 Hotel pile 1410 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
152 30-Nov-15 Hotel pile 1411 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
153 30-Nov-15 Hotel pile 1412 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.60 482.20 12.00 TI-18
154 30-Nov-15 Hotel pile 1414 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
155 1-Dec-15 Hotel pile 1262 Ǿ600 17 15 32.00 35.00 3.00 1.00 16.00 463.40 12.00 TI-16
156 1-Dec-15 Hotel pile 1263 Ǿ600 17 15 32.00 31.00 -1.00 1.00 15.50 448.90 12.00 TI-16 potong tiang
157 1-Dec-15 Hotel pile 1264 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
158 1-Dec-15 Hotel pile 1265 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
159 1-Dec-15 Hotel pile 1266 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
160 1-Dec-15 Hotel pile 1267 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
161 1-Dec-15 Hotel pile 1386 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
162 1-Dec-15 Hotel pile 1387 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
163 1-Dec-15 Hotel pile 1388 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
164 1-Dec-15 Hotel pile 1389 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
165 1-Dec-15 Hotel pile 1390 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
166 1-Dec-15 Hotel pile 1391 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
167 1-Dec-15 Hotel pile 1413 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.50 479.70 12.00 TI-18
168 2-Dec-15 Hotel pile 1268 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
169 2-Dec-15 Hotel pile 1269 Ǿ600 17 15 32.00 31.00 -1.00 1.00 1 16.00 463.40 12.00 TI-16 potong tiang
170 2-Dec-15 Hotel pile 1270 Ǿ600 17 15 32.00 32.00 0.00 1.00 16.00 463.40 12.00 TI-16
171 2-Dec-15 Hotel pile 1366 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
172 2-Dec-15 Hotel pile 1367 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.70 484.60 12.00 TI-18
173 2-Dec-15 Hotel pile 1374 Ǿ600 17 15 32.00 36.00 4.00 1.00 19.50 479.70 12.00 TI-18
174 2-Dec-15 Hotel pile 1375 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.70 484.60 12.00 TI-18
175 2-Dec-15 Hotel pile 1376 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
176 2-Dec-15 Hotel pile 1377 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
177 2-Dec-15 Hotel pile 1378 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.40 477.20 12.00 TI-18
178 2-Dec-15 Hotel pile 1379 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.00 492.00 12.00 TI-18
179 4-Dec-15 Hotel pile 1365 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 223
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

180 6-Dec-15 Hotel pile 1363 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.60 482.20 12.00 TI-18
181 6-Dec-15 Hotel pile 1364 Ǿ600 17 15 32.00 34.00 2.00 1.00 16.00 413.70 12.00 TI-18
182 6-Dec-15 Hotel pile 1372 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.10 494.50 12.00 TI-18
183 7-Dec-15 Hotel pile 1352 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.00 467.40 12.00 TI-18
184 7-Dec-15 Hotel pile 1353 Ǿ600 17 15 32.00 35.00 3.00 1.00 20.50 504.30 12.00 TI-18
185 7-Dec-15 Hotel pile 1354 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
186 7-Dec-15 Hotel pile 1371 Ǿ600 17 15 32.00 29.00 -3.00 1.00 19.10 469.90 12.00 TI-18
187 7-Dec-15 Hotel pile 1373 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.70 489.50 12.00 TI-18
188 8-Dec-15 Hotel pile 1355 Ǿ600 17 15 32.00 33.00 1.00 1.00 19.20 472.30 12.00 TI-18
189 8-Dec-15 Hotel pile 1356 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.30 499.40 12.00 TI-18
190 8-Dec-15 Hotel pile 1357 Ǿ600 17 15 32.00 21.00 -11.00 1.00 1 20.00 246.00 12.00 TI-18 potong tiang

191 11-Dec-15 Hotel pile 1358 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
192 11-Dec-15 Hotel pile 1359 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.20 472.30 12.00 TI-18
193 11-Dec-15 Hotel pile 1368 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.50 479.70 12.00 TI-18
194 11-Dec-15 Hotel pile 1369 Ǿ600 17 15 32.00 34.00 2.00 1.00 20.00 492.00 12.00 TI-18
195 11-Dec-15 Hotel pile 1370 Ǿ600 17 15 32.00 35.00 3.00 1.00 19.30 474.80 12.00 TI-18
196 12-Dec-15 Hotel pile 1477 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
197 12-Dec-15 Hotel pile 1478 Ǿ600 15 17 32.00 34.00 2.00 1.00 17.80 437.90 12.00 TI-18
198 12-Dec-15 Hotel pile 1479 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.70 460.00 12.00 TI-18
199 12-Dec-15 Hotel pile 1480 Ǿ600 15 17 32.00 34.00 2.00 1.00 18.50 455.10 12.00 TI-18
200 14-Dec-15 Hotel pile 1481 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
201 14-Dec-15 Hotel pile 1482 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.20 472.30 12.00 TI-18
202 14-Dec-15 Hotel pile 1483 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
203 14-Dec-15 Hotel pile 1484 Ǿ600 15 17 32.00 34.00 2.00 1.00 19.30 474.80 12.00 TI-18
204 19-Dec-15 Hotel pile 1360 Ǿ600 15 17 32.00 35.00 3.00 1.00 19.00 467.40 12.00 TI-18
205 23-Dec-15 Hotel pile 1345 Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 20.90 514.10 12.00 TI-18 potong tiang
206 23-Dec-15 Hotel pile 1346 Ǿ600 17 15 32.00 32.00 0.00 1.00 20.70 509.20 12.00 TI-18
207 23-Dec-15 Hotel pile 1347 Ǿ600 17 15 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
208 23-Dec-15 Hotel pile 1348 Ǿ600 17 15 32.00 36.00 4.00 1.00 20.70 509.20 12.00 TI-18
209 23-Dec-15 Hotel pile 1349 Ǿ600 17 15 32.00 38.00 6.00 1.00 20.40 504.30 12.00 TI-18
210 23-Dec-15 Hotel pile 1350 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
211 23-Dec-15 Hotel pile 1351 Ǿ600 17 15 32.00 34.00 2.00 1.00 19.00 467.40 12.00 TI-18
212 24-Dec-15 Hotel pile 1334 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 12.00 TI-18
213 24-Dec-15 Hotel pile 1335 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 12.00 TI-18
214 24-Dec-15 Hotel pile 1337 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 12.00 TI-18
215 24-Dec-15 Hotel pile 1338 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 12.00 TI-18
216 24-Dec-15 Hotel pile 1343 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18
217 24-Dec-15 Hotel pile 1344 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.50 504.30 12.00 TI-18
218 25-Dec-15 Hotel pile 1339 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
219 25-Dec-15 Hotel pile 1340 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.60 506.80 12.00 TI-18
220 25-Dec-15 Hotel pile 1341 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 12.00 TI-18
221 25-Dec-15 Hotel pile 1342 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
222 28-Dec-15 Hotel pile 1361 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 12.00 TI-18
223 28-Dec-15 Hotel pile 1362 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.70 509.20 12.00 TI-18

TOTAL PEMANCANGAN MAIN PILE 7155.00 7672.00 517.00 0.00 0.00 227.00 13.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 28 Jul 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 28-Jul-15 P - 13/1143 Ǿ600 13 13 12 38.00 38.00 0.00 - - 2.00 18.00 406.20 TI - 24


2 28-Jul-15 P - 12/1072 Ǿ600 13 13 12 38.00 38.00 0.00 - - 2.00 15.00 526.90 TI - 24
3 14-Aug-15 P - 11/1042 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 19.50 440.10 12.00 TI - 24
4 24-Aug-15 V-2 / 1157 Ǿ600 15 15 13 43.00 40.00 -3.00 2.00 1.00 14.60 512.90 12.00 TI - 24 VWSG
5 21-Jan-16 main pile office 1016 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
6 21-Jan-16 main pile office 1017 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
7 21-Jan-16 main pile office 1018 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
8 21-Jan-16 main pile office 1019 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
9 21-Jan-16 main pile office 1020 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
10 22-Jan-16 main pile office 1024 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
11 22-Jan-16 main pile office 1023 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
12 22-Jan-16 main pile office 1021 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
13 22-Jan-16 main pile office 1022 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
14 22-Jan-16 main pile office 1027 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
15 22-Jan-16 main pile office 1026 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
16 22-Jan-16 main pile office 1025 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
17 23-Jan-16 main pile office 1033 Ǿ600 15 17 32.00 35.0 3.00 1.00 20.70 509.20 TI-18
18 23-Jan-16 main pile office 1032 Ǿ600 15 17 32.00 35.0 3.00 1.00 20.60 506.80 TI-18
19 23-Jan-16 main pile office 1031 Ǿ600 15 17 32.00 34.0 2.00 1.00 20.50 504.30 TI-18
20 23-Jan-16 main pile office 1030 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
21 23-Jan-16 main pile office 1029 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
22 23-Jan-16 main pile office 1028 Ǿ600 15 17 32.00 36.0 4.00 1.00 20.80 511.70 TI-18
23 24-Jan-16 main pile office 1041 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
24 24-Jan-16 main pile office 1040 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
25 24-Jan-16 main pile office 1039 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
26 24-Jan-16 main pile office 1038 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
27 24-Jan-16 main pile office 1037 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
28 24-Jan-16 main pile office 1036 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
29 24-Jan-16 main pile office 1035 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
30 24-Jan-16 main pile office 1034 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
31 25-Jan-16 main pile office 1043 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
32 25-Jan-16 main pile office 1044 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
33 25-Jan-16 main pile office 1045 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
34 25-Jan-16 main pile office 1046 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
35 25-Jan-16 main pile office 1047 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.90 514.10 TI-18
36 25-Jan-16 main pile office 1048 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
37 26-Jan-16 main pile office 1058 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
38 26-Jan-16 main pile office 1057 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.90 514.10 TI-18
39 26-Jan-16 main pile office 1056 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
40 26-Jan-16 main pile office 1055 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
41 26-Jan-16 main pile office 1054 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
42 26-Jan-16 main pile office 1053 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
43 26-Jan-16 main pile office 1052 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
44 26-Jan-16 main pile office 1051 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
45 26-Jan-16 main pile office 1050 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
46 26-Jan-16 main pile office 1049 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 505.30 TI-18
47 27-Jan-16 main pile office 1064 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
48 27-Jan-16 main pile office 1063 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
49 27-Jan-16 main pile office 1062 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.40 501.80 TI-18
50 27-Jan-16 main pile office 1061 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
51 27-Jan-16 main pile office 1060 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
52 27-Jan-16 main pile office 1059 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
53 28-Jan-16 main pile office 1071 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
54 28-Jan-16 main pile office 1070 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

55 28-Jan-16 main pile office 1069 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
56 28-Jan-16 main pile office 1068 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
57 28-Jan-16 main pile office 1067 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
58 28-Jan-16 main pile office 1066 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
59 28-Jan-16 main pile office 1065 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
60 29-Jan-16 main pile office 1073 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
61 29-Jan-16 main pile office 1074 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
62 29-Jan-16 main pile office 1075 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
63 29-Jan-16 main pile office 1076 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
64 29-Jan-16 main pile office 1077 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
65 29-Jan-16 main pile office 1078 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.90 514.10 TI-18
66 29-Jan-16 main pile office 1079 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.70 509.20 TI-18
67 30-Jan-16 main pile office 1080 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.50 504.30 TI-18
68 30-Jan-16 main pile office 1081 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
69 30-Jan-16 main pile office 1082 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
70 30-Jan-16 main pile office 1083 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.60 506.80 TI-18
71 30-Jan-16 main pile office 1084 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
72 9-Feb-16 main pile office 1086 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
73 9-Feb-16 main pile office 1087 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
74 9-Feb-16 main pile office 1088 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
75 9-Feb-16 main pile office 1089 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
76 9-Feb-16 main pile office 1090 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
77 9-Feb-16 main pile office 1091 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.50 504.30 TI-18
78 10-Feb-16 main pile office 1092 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
79 10-Feb-16 main pile office 1093 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
80 10-Feb-16 main pile office 1094 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
81 10-Feb-16 main pile office 1095 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
82 10-Feb-16 main pile office 1102 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
83 10-Feb-16 main pile office 1103 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
84 12-Feb-16 main pile office 1104 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
85 12-Feb-16 main pile office 1105 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
86 12-Feb-16 main pile office 1106 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
87 12-Feb-16 main pile office 1107 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
88 12-Feb-16 main pile office 1108 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
89 12-Feb-16 main pile office 1109 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
90 12-Feb-16 main pile office 1110 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
91 12-Feb-16 main pile office 1111 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
92 13-Feb-16 main pile office 1125 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
93 13-Feb-16 main pile office 1124 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
94 13-Feb-16 main pile office 1114 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
95 13-Feb-16 main pile office 1113 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.70 509.20 TI-18
96 13-Feb-16 main pile office 1112 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
97 14-Feb-16 main pile office 1126 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
98 14-Feb-16 main pile office 1127 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
99 14-Feb-16 main pile office 1128 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
100 14-Feb-16 main pile office 1129 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
101 15-Feb-16 main pile office 1123 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
102 15-Feb-16 main pile office 1122 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
103 15-Feb-16 main pile office 1121 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
104 15-Feb-16 main pile office 1120 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
105 15-Feb-16 main pile office 1119 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
106 15-Feb-16 main pile office 1140 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
107 16-Feb-16 main pile office 1139 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
108 16-Feb-16 main pile office 1138 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
109 16-Feb-16 main pile office 1137 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
110 16-Feb-16 main pile office 1136 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
111 16-Feb-16 main pile office 1135 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
112 16-Feb-16 main pile office 1134 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
113 16-Feb-16 main pile office 1133 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
114 16-Feb-16 main pile office 1132 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
115 17-Feb-16 main pile office 1131 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
116 17-Feb-16 main pile office 1130 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

117 17-Feb-16 main pile office 1151 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
118 17-Feb-16 main pile office 1150 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
119 17-Feb-16 main pile office 1149 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
120 17-Feb-16 main pile office 1148 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
121 17-Feb-16 main pile office 1147 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
122 17-Feb-16 main pile office 1146 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
123 18-Feb-16 main pile office 1145 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
124 18-Feb-16 main pile office 1144 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
125 18-Feb-16 main pile office 1142 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
126 18-Feb-16 main pile office 1141 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
127 18-Feb-16 main pile office 1162 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
128 18-Feb-16 main pile office 1161 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
129 18-Feb-16 main pile office 1160 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.90 514.10 TI-18
130 18-Feb-16 main pile office 1159 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
131 18-Feb-16 main pile office 1158 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
132 19-Feb-16 main pile office 1156 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
133 19-Feb-16 main pile office 1155 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
134 19-Feb-16 main pile office 1154 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
135 19-Feb-16 main pile office 1153 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
136 20-Feb-16 main pile office 1152 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
137 20-Feb-16 main pile office 1173 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.80 511.70 TI-18
138 20-Feb-16 main pile office 1172 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
139 20-Feb-16 main pile office 1171 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
140 20-Feb-16 main pile office 1170 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
141 21-Feb-16 main pile office 1169 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
142 21-Feb-16 main pile office 1168 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
143 21-Feb-16 main pile office 1167 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
144 21-Feb-16 main pile office 1166 Ǿ600 15 17 32.00 32.00 0.00 1.00 20.60 506.80 TI-18
145 21-Feb-16 main pile office 1165 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
146 22-Feb-16 main pile office 1163 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
147 22-Feb-16 main pile office 1164 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.50 504.30 TI-18
148 22-Feb-16 main pile office 1182 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
149 23-Feb-16 main pile office 1181 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
150 23-Feb-16 main pile office 1180 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
151 23-Feb-16 main pile office 1179 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
152 23-Feb-16 main pile office 1178 Ǿ600 15 17 32.00 38.00 6.00 1.00 20.80 511.70 TI-18
153 24-Feb-16 main pile office 1177 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
154 24-Feb-16 main pile office 1176 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
155 24-Feb-16 main pile office 1175 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
156 24-Feb-16 main pile office 1174 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
157 24-Feb-16 main pile office 1195 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
158 24-Feb-16 main pile office 1194 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
159 25-Feb-16 main pile office 1193 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
160 25-Feb-16 main pile office 1192 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
161 25-Feb-16 main pile office 1191 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
162 25-Feb-16 main pile office 1190 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
163 25-Feb-16 main pile office 1189 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
164 26-Feb-16 main pile office 1188 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
165 26-Feb-16 main pile office 1187 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
166 26-Feb-16 main pile office 1186 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
167 27-Feb-16 main pile office 1203 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
168 27-Feb-16 main pile office 1202 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
169 27-Feb-16 main pile office 1201 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.60 506.80 TI-18
170 27-Feb-16 main pile office 1200 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
171 27-Feb-16 main pile office 1199 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
172 27-Feb-16 main pile office 1198 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
173 28-Feb-16 main pile office 1197 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
174 28-Feb-16 main pile office 1196 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
175 28-Feb-16 main pile office 1204 Ǿ600 15 17 32.00 35.00 3.00 1.00 20.80 511.70 TI-18
176 28-Feb-16 main pile office 1205 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
177 28-Feb-16 main pile office 1206 Ǿ600 15 17 32.00 31.50 -0.50 1.00 20.90 514.10 TI-18 potong tiang
178 29-Feb-16 main pile office 1185 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

179 29-Feb-16 main pile office 1184 Ǿ600 15 17 32.00 34.00 2.00 1.00 20.80 511.70 TI-18
180 29-Feb-16 main pile office 1183 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
181 29-Feb-16 main pile office 1207 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
182 29-Feb-16 main pile office 1208 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
183 29-Feb-16 main pile office 1209 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
184 29-Feb-16 main pile office 1210 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
185 1-Mar-16 main pile office 1211 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
186 1-Mar-16 main pile office 1212 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
187 1-Mar-16 main pile office 1213 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
188 1-Mar-16 main pile office 1214 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
189 1-Mar-16 main pile office 1215 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
190 1-Mar-16 main pile office 1216 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
191 1-Mar-16 main pile office 1217 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
192 1-Mar-16 main pile office 1218 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
193 3-Mar-16 main pile office 1219 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
194 3-Mar-16 main pile office 1220 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
195 3-Mar-16 main pile office 1221 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
196 3-Mar-16 main pile office 1222 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
197 4-Mar-16 main pile office 1223 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.40 501.80 TI-18
198 4-Mar-16 main pile office 1224 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
199 4-Mar-16 main pile office 1225 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
200 4-Mar-16 main pile office 1226 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
201 4-Mar-16 main pile office 1227 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
202 4-Mar-16 main pile office 1228 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
203 4-Mar-16 main pile office 1229 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
204 6-Mar-16 main pile office 1230 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
205 6-Mar-16 main pile office 1231 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
206 6-Mar-16 main pile office 1232 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
207 6-Mar-16 main pile office 1233 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
208 6-Mar-16 main pile office 234 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
209 6-Mar-16 main pile office 1235 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 504.80 TI-18
210 8-Mar-16 main pile office 1236 Ǿ600 15 17 32.00 36.00 4.00 1.00 20.70 509.20 TI-18
211 8-Mar-16 main pile office 1237 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.80 511.70 TI-18
212 8-Mar-16 main pile office 1238 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
213 8-Mar-16 main pile office 1239 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
214 8-Mar-16 main pile office 1240 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
215 8-Mar-16 main pile office 1241 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
216 8-Mar-16 main pile office 1242 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
217 9-Mar-16 main pile office 1243 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
218 10-Mar-16 main pile office 1244 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
219 10-Mar-16 main pile office 1245 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
220 10-Mar-16 main pile office 1246 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
221 10-Mar-16 main pile office 1247 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
222 11-Mar-16 main pile office 1248 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
223 11-Mar-16 main pile office 1249 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
224 11-Mar-16 main pile office 1250 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
225 11-Mar-16 main pile office 1251 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
226 15-Mar-16 main pile office 1253 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
227 15-Mar-16 main pile office 1254 Ǿ600 15 17 32.00 31.50 -0.50 1.00 21.00 516.60 TI-18 potong tiang
228 15-Mar-16 main pile office 1255 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
229 15-Mar-16 main pile office 1256 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
230 16-Mar-16 main pile office 1257 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
231 16-Mar-16 main pile office 1258 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
232 16-Mar-16 main pile office 1259 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
233 16-Mar-16 main pile office 1260 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
234 18-Mar-16 main pile office 1261 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
235 18-Mar-16 main pile office 1252 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
236 18-Mar-16 main pile office 1118 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
237 18-Mar-16 main pile office 1097 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
238 18-Mar-16 main pile office 1096 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
239 18-Mar-16 main pile office 1098 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
240 19-Mar-16 main pile office 1115 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 261
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

241 19-Mar-16 main pile office 1116 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
242 19-Mar-16 main pile office 1117 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
243 19-Mar-16 main pile office 1100 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.00 492.00 TI-18
244 19-Mar-16 main pile office 1099 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
245 22-Mar-16 main pile office 1101 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
246 23-Mar-16 main pile office 1001 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
247 23-Mar-16 main pile office 1002 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
248 23-Mar-16 main pile office 1003 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
249 23-Mar-16 main pile office 1004 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
250 24-Mar-16 main pile office 1085 Ǿ600 15 17 32.00 36.00 4.00 1.00 17.50 506.90 TI-16
251 25-Mar-16 Main Pile ofifice 1006 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
252 25-Mar-16 Main Pile ofifice 1007 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
253 25-Mar-16 Main Pile ofifice 1008 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
254 25-Mar-16 Main Pile ofifice 1009 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.60 506.80 TI-18
255 26-Mar-16 Main Pile ofifice 1011 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.50 504.30 TI-18
256 26-Mar-16 Main Pile ofifice 1012 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
257 26-Mar-16 Main Pile ofifice 1013 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
258 26-Mar-16 Main Pile ofifice 1015 Ǿ600 15 17 32.00 37.00 5.00 1.00 20.70 509.20 TI-18
259 14-Apr-16 Sisipan Office 1254A Ǿ600 17 15 32.00 37.00 5.00 1.00 20.50 504.30 TI-18 sisipan

TOTAL PEMANCANGAN MAIN PILE 8317.00 9438.00 1121.00 0.00 0.00 263.00 1.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
5
6
6
8
5
3
6
39
3/3/2016
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 19 Ags 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 19-Aug-15 T-1 / 3059 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 14.00 440.80 12.00 TI - 24
2 23-Sep-15 T-2/3161 Ǿ600 13 13 12 38.00 38.00 0.00 2.00 20.50 504.30 12.00 TI-18 INDIKATOR
3 27-Nov-15 main pile(tention) 2952 Ǿ600 17 17 34.00 31.50 -2.50 1.00 1 17.50 506.90 12.00 TI-16 Tension
4 27-Nov-15 main pile(tention) 3055 Ǿ600 17 17 34.00 34.00 0.00 1.00 13.50 391.00 12.00 TI-16 Tension
5 3-Dec-15 main pile(tention) 2880 Ǿ600 17 17 34.00 34.00 0.00 1.00 14.00 405.50 12.00 TI-16 Tension
6 2-Jan-16 main pile(tention) 3016 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
7 2-Jan-16 main pile(tention) 3017 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
8 2-Jan-16 main pile(tention) 2996 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
9 2-Jan-16 main pile(tention) 2997 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
10 3-Jan-16 main pile(tention) 2984 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
11 3-Jan-16 main pile(tention) 2985 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
12 3-Jan-16 main pile(tention) 2980 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26 Tension
13 3-Jan-16 main pile(tention) 2981 Ǿ600 13 15 28.00 34.00 6.00 1.00 17.00 427.00 12.00 TI-26 Tension
14 4-Jan-16 main pile(tention) 3018 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
15 4-Jan-16 main pile(tention) 3019 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
16 4-Jan-16 main pile(tention) 2999 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
17 4-Jan-16 main pile(tention) 2998 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
18 4-Jan-16 main pile(tention) 2986 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
19 4-Jan-16 main pile(tention) 2987 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
20 5-Jan-16 main pile(tention) 3021 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
21 5-Jan-16 main pile(tention) 3020 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
22 5-Jan-16 main pile(tention) 3001 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
23 5-Jan-16 main pile(tention) 2989 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
24 5-Jan-16 main pile(tention) 2988 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
25 5-Jan-16 main pile(tention) 2990 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
26 5-Jan-16 main pile(tention) 2991 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
27 5-Jan-16 main pile(tention) 2992 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
28 5-Jan-16 main pile(tention) 2922 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
29 5-Jan-16 main pile(tention) 2923 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
30 5-Jan-16 main pile(tention) 2924 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
31 5-Jan-16 main pile(tention) 2925 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
32 5-Jan-16 main pile(tention) 2928 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
33 5-Jan-16 main pile(tention) 2929 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
34 5-Jan-16 main pile(tention) 2934 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
35 5-Jan-16 main pile(tention) 2935 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
36 6-Jan-16 main pile(tention) 2993 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
37 6-Jan-16 main pile(tention) 2994 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
38 6-Jan-16 main pile(tention) 2995 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
39 6-Jan-16 main pile(tention) 3013 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26 Tension
40 6-Jan-16 main pile(tention) 3012 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
41 6-Jan-16 main pile(tention) 3011 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 376.70 12.00 TI-26 Tension
42 6-Jan-16 main pile(tention) 3010 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
43 6-Jan-16 main pile(tention) 2939 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
44 6-Jan-16 main pile(tention) 2938 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
45 6-Jan-16 main pile(tention) 2933 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18 Tension
46 6-Jan-16 main pile(tention) 2932 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 509.20 12.00 TI-18 Tension
47 6-Jan-16 main pile(tention) 2927 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
48 6-Jan-16 main pile(tention) 2926 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
49 7-Jan-16 main pile(tention) 2920 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
50 7-Jan-16 main pile(tention) 2921 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
51 7-Jan-16 main pile(tention) 2919 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
52 7-Jan-16 main pile(tention) 2918 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.50 509.20 12.00 TI-18 Tension
53 7-Jan-16 main pile(tention) 2916 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
54 7-Jan-16 main pile(tention) 2917 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
55 7-Jan-16 main pile(tention) 2912 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
56 7-Jan-16 main pile(tention) 2913 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

57 8-Jan-16 main pile(tention) 2906 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
58 8-Jan-16 main pile(tention) 2907 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
59 8-Jan-16 main pile(tention) 2900 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
60 8-Jan-16 main pile(tention) 2901 Ǿ600 11 17 28.00 43.00 15.00 1.00 20.60 506.80 12.00 TI-18 Tension
61 8-Jan-16 main pile(tention) 2902 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
62 8-Jan-16 main pile(tention) 2903 Ǿ600 13 15 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
63 8-Jan-16 main pile(tention) 2977 Ǿ600 13 15 28.00 34.00 6.00 1.00 16.50 477.90 12.00 TI-16 Tension
64 8-Jan-16 main pile(tention) 2976 Ǿ600 13 15 28.00 34.00 6.00 1.00 15.00 434.50 12.00 TI-16 Tension
65 8-Jan-16 main pile(tention) 2974 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16 Tension
66 8-Jan-16 main pile(tention) 2975 Ǿ600 13 15 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16 Tension
67 8-Jan-16 main pile(tention) 2973 Ǿ600 13 15 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16 Tension
68 8-Jan-16 main pile(tention) 3008 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
69 8-Jan-16 main pile(tention) 3009 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.50 339.10 12.00 TI-26 Tension
70 8-Jan-16 main pile(tention) 3007 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
71 8-Jan-16 main pile(tention) 3006 Ǿ600 13 15 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26 Tension
72 8-Jan-16 main pile(tention) 3005 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
73 8-Jan-16 main pile(tention) 3004 Ǿ600 13 15 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
74 9-Jan-16 main pile 2908 Ǿ600 13 15 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
75 9-Jan-16 main pile 2899 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
76 9-Jan-16 main pile 2898 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 505.30 12.00 TI-18 Tension
77 9-Jan-16 main pile 2909 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 12.00 TI-18 Tension
78 9-Jan-16 main pile 2914 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 511.70 12.00 TI-18 Tension
79 9-Jan-16 main pile 2915 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 12.00 TI-18 Tension
80 9-Jan-16 main pile 3026 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 12.00 TI-26 Tension
81 9-Jan-16 main pile 3027 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
82 9-Jan-16 main pile 3028 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
83 9-Jan-16 main pile 3029 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
84 9-Jan-16 main pile 3031 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 12.00 TI-26 Tension
85 10-Jan-16 main pile 2910 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.70 509.20 12.00 TI-18 Tension
86 10-Jan-16 main pile 2911 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 12.00 TI-18 Tension
87 10-Jan-16 main pile 2904 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
88 10-Jan-16 main pile 2905 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.80 511.70 12.00 TI-18 Tension
89 10-Jan-16 main pile 2897 Ǿ600 11 17 28.00 28.00 0.00 1.00 20.90 514.10 12.00 TI-18 Tension
90 11-Jan-16 main pile 3030 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
91 11-Jan-16 main pile 3032 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
92 11-Jan-16 main pile 3033 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
93 11-Jan-16 main pile 3034 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.90 12.00 TI-26 Tension
94 12-Jan-16 main pile 3035 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
95 12-Jan-16 main pile 3036 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
96 12-Jan-16 main pile 3037 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 301.40 12.00 TI-26 Tension
97 12-Jan-16 main pile 3038 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 12.00 TI-26 Tension
98 12-Jan-16 main pile 3039 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 12.00 TI-26 Tension
99 12-Jan-16 main pile 3040 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 12.00 TI-26 Tension
100 12-Jan-16 main pile 2890 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 12.00 TI-18 Tension
101 12-Jan-16 main pile 2896 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 12.00 TI-18 Tension
102 12-Jan-16 main pile 2893 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
103 12-Jan-16 main pile 2891 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 12.00 TI-18 Tension
104 12-Jan-16 main pile 2892 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 12.00 TI-18 Tension
105 14-Jan-16 main pile 2971 Ǿ600 11 17 28.00 31.00 3.00 1.00 17.50 506.90 12.00 TI-16 Tension
106 14-Jan-16 main pile 2972 Ǿ600 11 17 28.00 30.00 2.00 1.00 17.50 506.90 12.00 TI-16 Tension
107 14-Jan-16 main pile 2970 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16 Tension
108 14-Jan-16 main pile 2968 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 12.00 TI-16 Tension
109 14-Jan-16 main pile 2969 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 12.00 TI-16 Tension
110 14-Jan-16 main pile 2965 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 12.00 TI-16 Tension
111 15-Jan-16 main pile 3041 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
112 15-Jan-16 main pile 3042 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
113 15-Jan-16 main pile 3043 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
114 15-Jan-16 main pile 3044 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
115 15-Jan-16 main pile 3045 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
116 15-Jan-16 main pile 3047 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
117 15-Jan-16 main pile 3046 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
118 18-Jan-16 main pile 2967 Ǿ600 11 17 28.00 33.00 5.00 1.00 17.50 506.90 TI-16 Tension
119 18-Jan-16 main pile 2966 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
120 18-Jan-16 main pile 2964 Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16 Tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

121 18-Jan-16 main pile 2962 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16 Tension
122 18-Jan-16 main pile 2963 Ǿ600 11 17 28.00 31.50 3.50 1.00 17.50 506.90 TI-16 Tension
123 18-Jan-16 main pile 2886 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.70 509.20 TI-18 Tension
124 18-Jan-16 main pile 2883 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18 Tension
125 18-Jan-16 main pile 2884 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18 Tension
126 18-Jan-16 main pile 2888 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.60 506.80 TI-18 Tension
127 18-Jan-16 main pile 2887 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.50 504.30 TI-18 Tension
128 18-Jan-16 main pile 2885 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.50 504.30 TI-18 Tension
129 18-Jan-16 main pile 2889 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
130 19-Jan-16 main pile 2961 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
131 19-Jan-16 main pile 2960 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
132 19-Jan-16 main pile 2959 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
133 19-Jan-16 main pile 2958 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
134 19-Jan-16 main pile 3022 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
135 19-Jan-16 main pile 3023 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
136 19-Jan-16 main pile 3000 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
137 19-Jan-16 main pile 3002 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
138 19-Jan-16 main pile 3003 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
139 19-Jan-16 main pile 3024 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
140 19-Jan-16 main pile 3025 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
141 20-Jan-16 main pile 3050 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
142 20-Jan-16 main pile 3048 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
143 20-Jan-16 main pile 3049 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
144 20-Jan-16 main pile 3051 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
145 20-Jan-16 main pile 3056 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
146 20-Jan-16 main pile 3057 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
147 21-Jan-16 main pile 3064 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
148 21-Jan-16 main pile 3065 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
149 21-Jan-16 main pile 3067 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
150 21-Jan-16 main pile 3066 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
151 21-Jan-16 main pile 3059A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
152 21-Jan-16 main pile 3058 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
153 21-Jan-16 main pile 3015 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
154 21-Jan-16 main pile 3014 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
155 22-Jan-16 main pile 2949 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
156 22-Jan-16 main pile 2948 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
157 22-Jan-16 main pile 2946 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
158 22-Jan-16 main pile 2947 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
159 22-Jan-16 main pile 2945 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
160 26-Jan-16 main pile 2944 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
161 26-Jan-16 main pile 2950 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
162 26-Jan-16 main pile 2954 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.50 414.40 TI-26 Tension
163 26-Jan-16 main pile 2955 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 401.40 TI-26 Tension
164 26-Jan-16 main pile 2953 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
165 26-Jan-16 main pile 2951 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
166 26-Jan-16 main pile 3063 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
167 26-Jan-16 main pile 3062 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
168 26-Jan-16 main pile 3054 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
169 27-Jan-16 main pile 3052 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
170 27-Jan-16 main pile 3053 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
171 27-Jan-16 main pile 3060 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
172 27-Jan-16 main pile 3061 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
173 27-Jan-16 main pile 3068 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
174 27-Jan-16 main pile 3069 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
175 27-Jan-16 main pile 3076 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
176 27-Jan-16 main pile 3077 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
177 28-Jan-16 main pile 3084 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
178 28-Jan-16 main pile 3085 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
179 28-Jan-16 main pile 3092 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
180 28-Jan-16 main pile 3093 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
181 28-Jan-16 main pile 3100 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
182 28-Jan-16 main pile 3101 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
183 28-Jan-16 main pile 3108 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
184 28-Jan-16 main pile 3109 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

185 28-Jan-16 main pile 3116 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
186 28-Jan-16 main pile 3117 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
187 29-Jan-16 main pile 3124 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
188 29-Jan-16 main pile 3125 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
189 29-Jan-16 main pile 3132 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
190 29-Jan-16 main pile 3133 Ǿ600 11 17 28.00 33.00 5.00 1.00 12.50 313.90 TI-26 Tension
191 29-Jan-16 main pile 3140 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
192 29-Jan-16 main pile 3141 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
193 29-Jan-16 main pile 3148 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
194 29-Jan-16 main pile 3149 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
195 30-Jan-16 main pile 3156 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
196 30-Jan-16 main pile 3157 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
197 2-Feb-16 main pile 3159 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
198 2-Feb-16 main pile 3158 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
199 2-Feb-16 main pile 3151 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
200 3-Feb-16 main pile 3150 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
201 3-Feb-16 main pile 3143 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
202 3-Feb-16 main pile 3142 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
203 3-Feb-16 main pile 3135 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
204 4-Feb-16 main pile 3134 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
205 4-Feb-16 main pile 3127 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
206 4-Feb-16 main pile 3126 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.60 506.80 TI-18 Tension
207 4-Feb-16 main pile 3119 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.70 509.20 TI-18 Tension
208 4-Feb-16 main pile 3118 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
209 4-Feb-16 main pile 3111 Ǿ600 11 17 28.00 33.00 5.00 1.00 20.80 514.10 TI-18 Tension
210 5-Feb-16 main pile 3110 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
211 5-Feb-16 main pile 3103 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-18 Tension
212 5-Feb-16 main pile 3102 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
213 5-Feb-16 main pile 3095 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.70 509.20 TI-18 Tension
214 5-Feb-16 main pile 3094 Ǿ600 11 17 28.00 34.00 6.00 1.00 20.60 506.80 TI-18 Tension
215 5-Feb-16 main pile 3087 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.80 511.70 TI-18 Tension
216 5-Feb-16 main pile 3086 Ǿ600 11 17 28.00 31.00 3.00 1.00 20.80 511.70 TI-18 Tension
217 5-Feb-16 main pile 3079 Ǿ600 11 17 28.00 32.00 4.00 1.00 20.90 515.10 TI-18 Tension
218 9-Feb-16 main pile 2862 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
219 9-Feb-16 main pile 2863 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
220 9-Feb-16 main pile 2867 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
221 9-Feb-16 main pile 2866 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
222 9-Feb-16 main pile 2870 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
223 9-Feb-16 main pile 2871 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
224 9-Feb-16 main pile 2872 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
225 9-Feb-16 main pile 2873 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
226 9-Feb-16 main pile 2874 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
227 9-Feb-16 main pile 2875 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
228 10-Feb-16 main pile 2876 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
229 10-Feb-16 main pile 2877 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
230 10-Feb-16 main pile 2878 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
231 10-Feb-16 main pile 2879 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
232 10-Feb-16 main pile 3070 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
233 10-Feb-16 main pile 3071 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
234 10-Feb-16 main pile 3078 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
235 10-Feb-16 main pile 3072 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
236 10-Feb-16 main pile 3073 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
237 10-Feb-16 main pile 3080 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
238 10-Feb-16 main pile 3081 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
239 11-Feb-16 main pile 3088 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
240 11-Feb-16 main pile 3089 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
241 11-Feb-16 main pile 3096 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
242 11-Feb-16 main pile 3097 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16 Tension
243 11-Feb-16 main pile 3104 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
244 11-Feb-16 main pile 3105 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
245 12-Feb-16 main pile 3112 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
246 12-Feb-16 main pile 3113 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
247 12-Feb-16 main pile 3120 Ǿ600 11 17 28.00 34.00 6.00 1.00 16.00 463.40 TI-16 Tension
248 12-Feb-16 main pile 3121 Ǿ600 11 17 28.00 30.00 2.00 1.00 12.50 362.10 TI-16 tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

249 12-Feb-16 main pile 3128 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
250 12-Feb-16 main pile 3129 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
251 13-Feb-16 main pile 3136 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16 Tension
252 13-Feb-16 main pile 3137 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
253 13-Feb-16 main pile 3144 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
254 13-Feb-16 main pile 3145 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
255 13-Feb-16 main pile 2943 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
256 13-Feb-16 main pile 2942 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
257 13-Feb-16 main pile 2937 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
258 13-Feb-16 main pile 2936 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
259 13-Feb-16 main pile 2931 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
260 14-Feb-16 main pile 3153 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
261 14-Feb-16 main pile 3152 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
262 14-Feb-16 main pile 3160 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
263 15-Feb-16 main pile 3163 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16 Tension
264 15-Feb-16 main pile 3162 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 448.90 TI-16 Tension
265 15-Feb-16 main pile 3155 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
266 15-Feb-16 main pile 3154 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
267 15-Feb-16 main pile 3147 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
268 16-Feb-16 main pile 3146 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16 Tension
269 16-Feb-16 main pile 3139 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16 Tension
270 16-Feb-16 main pile 3138 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16 Tension
271 16-Feb-16 main pile 3131 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
272 16-Feb-16 main pile 3130 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
273 16-Feb-16 main pile 3123 Ǿ600 11 17 28.00 19.00 -9.00 1.00 8.00 100.50 TI-16 Tension
274 16-Feb-16 main pile 3122 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
275 16-Feb-16 main pile 2930 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
276 16-Feb-16 main pile 3165 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 313.90 TI-26 Tension
277 16-Feb-16 main pile 3164 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
278 16-Feb-16 main pile 2894 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
279 16-Feb-16 main pile 2895 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
280 16-Feb-16 main pile 2881 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
281 17-Feb-16 main pile 2848 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
282 17-Feb-16 main pile 2849 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
283 17-Feb-16 main pile 2847 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
284 17-Feb-16 main pile 2846 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
285 17-Feb-16 main pile 2853 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
286 18-Feb-16 main pile 2852 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
287 18-Feb-16 main pile 2845 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
288 18-Feb-16 main pile 2844 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 364.20 TI-26 Tension
289 18-Feb-16 main pile 2843 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
290 18-Feb-16 main pile 2842 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 339.10 TI-26 Tension
291 18-Feb-16 main pile 2840 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
292 18-Feb-16 main pile 2841 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
293 18-Feb-16 main pile 2839 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 326.50 TI-26 Tension
294 18-Feb-16 main pile 2838 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
295 19-Feb-16 main pile 3115 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
296 19-Feb-16 main pile 3114 Ǿ600 11 17 28.00 16.00 -12.00 1.00 9.00 113.00 TI-16 Tension
297 24-Feb-16 main pile 2957A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
298 24-Feb-16 main pile 2956A Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
299 26-Feb-16 main pile 2940 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
300 26-Feb-16 main pile 2941 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
301 5-Mar-16 main pile 2882 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.50 389.30 TI-26 Tension
302 5-Mar-16 main pile 2860 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
303 5-Mar-16 main pile 2861 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
304 5-Mar-16 main pile 2856 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 351.60 TI-26 Tension
305 5-Mar-16 main pile 2857 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 Tension
306 12-Mar-16 main pile 3074 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
307 12-Mar-16 main pile 3075 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
308 12-Mar-16 main pile 3082 Ǿ600 11 17 28.00 32.00 4.00 1.00 17.50 506.90 TI-16 Tension
309 14-Mar-16 main pile 3083 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 tension
310 14-Mar-16 main pile 3090 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16 tension
311 15-Mar-16 main pile 3091 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 tension
312 15-Mar-16 main pile 3098 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 tension
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

313 15-Mar-16 main pile 3099 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 tension
314 15-Mar-16 main pile 3106 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16 tension
315 21-Mar-16 Main pile 3107 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
316 24-Mar-16 Main Pile 2864 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
317 24-Mar-16 Main Pile 2865 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
318 24-Mar-16 Main Pile 2868 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.50 362.10 TI-16 Tension
319 24-Mar-16 Main Pile 2869 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
320 25-Mar-16 Main Pile 2859 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.00 405.50 TI-16 Tension
321 25-Mar-16 Main Pile 2858 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 434.50 TI-16 Tension
322 26-Mar-16 Main Pile 2855 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
323 26-Mar-16 Main Pile 2854 Ǿ600 11 17 28.00 34.00 6.00 1.00 14.50 420.00 TI-16 Tension
324 26-Mar-16 Main Pile 2850 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 Tension
325 26-Mar-16 Main Pile 2851 Ǿ600 11 17 28.00 34.00 6.00 1.00 13.50 391.00 TI-16 Tension
326 26-Mar-16 Main Pile 2837 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
327 26-Mar-16 Main Pile 2836 Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 Tension
328 27-Mar-16 Main Pile 2835 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.00 318.60 TI-16 Tension
329 27-Mar-16 Main Pile 2834 Ǿ600 11 17 28.00 27.00 -1.00 1.00 14.50 420.00 TI-16 Tension

TOTAL PEMANCANGAN MAIN PILE 9250.00 11056.00 1806.00 0.00 0.00 331.00 1.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
14/1/16
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 19 Ags 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 19-Feb-16 main pile 3123A Ǿ600 11 17 28.00 34.00 6.00 1.00 13.00 376.50 TI-16 sisipan Tension
2 22-Mar-16 Main pile 3114A Ǿ600 11 17 28.00 34.00 6.00 1.00 12.00 347.60 TI-16 sisipan Tension
3 22-Mar-16 Main pile 3121A Ǿ600 11 17 28.00 28.50 0.50 1.00 17.50 506.90 TI-16 sisipan Tension
4 30-Mar-16 Main Pile 2834A Ǿ600 15 17 32.00 38.00 6.00 1.00 13.00 376.50 TI-16 sisipan Tension
5 3-Apr-16 main pile 3161A Ǿ600 11 17 28.00 34.00 6.00 1.00 20.50 504.30 TI-218 sisipan Tension

TOTAL PEMANCANGAN MAIN PILE 144.00 168.50 24.50 0.00 0.00 5.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

SUNTORO ONY S. DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 19 Ags 2015 -

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 330
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 5-Mar-16 main pile 10928 Ǿ600 11 17 28.00 34.00 6.00 1.00 19.00 477.20 TI-26 TAMBAHAN
2 5-Mar-16 main pile 10936 Ǿ600 11 17 28.00 34.00 6.00 1.00 15.00 376.70 TI-26 TAMBAHAN
3 27-Mar-16 Main Pile 10927 Ǿ600 11 17 28.00 34.00 6.00 1.00 11.50 333.10 TI-16
Tension tambahan

TOTAL PEMANCANGAN MAIN PILE 84.00 102.00 18.00 0.00 0.00 3.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
TAMBAHAN
TAMBAHAN
Tension tambahan
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 19 Feb 2016 - 23 Feb 2016

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 54
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 19-Feb-16 main pile 1966B Ǿ600 15 17 32.00 28.50 -3.50 1.00 24.00 426.50 TI-21A sisipan
2 19-Feb-16 main pile 1966A Ǿ600 15 17 32.00 17.00 -15.00 1.00 24.00 426.50 TI-21A sisipan
3 19-Feb-16 main pile 1725A Ǿ600 15 17 32.00 18.00 -14.00 1.00 24.00 426.50 TI-21A sisipan
4 23-Feb-16 main pile 2521A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03 sisipan
5 23-Feb-16 main pile 2429A Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 TI-03 sisipan
6 23-Feb-16 main pile 2401A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan
7 23-Feb-16 main pile 2398A Ǿ600 15 17 32.00 37.00 5.00 1.00 24.20 421.10 TI-03 sisipan
8 23-Feb-16 main pile 2600A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan

TOTAL PEMANCANGAN MAIN PILE 256.00 237.50 -18.50 0.00 0.00 8.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 14 Des 2015 - 21 Jan 2016

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 54
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 14-Dec-15 main pile 1663B Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A sisipan
2 14-Dec-15 main pile 1663A Ǿ600 15 17 32.00 32.00 0.00 1.00 23.70 421.10 TI-21A sisipan
3 14-Dec-15 main pile 1543A Ǿ600 15 17 32.00 34.00 2.00 1.00 23.70 421.10 TI-21A
4 14-Dec-15 main pile 1543B Ǿ600 15 17 32.00 32.50 0.50 1.00 23.70 421.10 TI-21A
5 16-Dec-15 main pile 2047A Ǿ600 17 15 32.00 32.50 0.50 1.00 15.00 434.50 TI-16 sisipan
6 16-Dec-15 main pile 2040A Ǿ600 17 15 32.00 16.00 -16.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)

7 16-Dec-15 main pile 2061B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)

8 17-Dec-15 main pile 1975C Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
9 17-Dec-15 main pile 1975D Ǿ600 15 17 32.00 31.00 -1.00 1.00 1 15.00 405.50 TI-16 potong tiang(sisipan)

10 17-Dec-15 main pile 1975B Ǿ600 15 17 32.00 32.00 0.00 1.00 16.00 463.40 TI-16 sisipan
11 17-Dec-15 main pile 1975A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)

12 18-Dec-15 main pile 2130A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)

13 18-Dec-15 main pile 1978A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
14 18-Dec-15 main pile 1978B Ǿ600 15 17 32.00 28.50 -3.50 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)

15 18-Dec-15 main pile 1990B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan
16 19-Dec-15 main pile 1990A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)

17 19-Dec-15 main pile 2040B Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)

18 19-Dec-15 main pile 2076B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan)

19 19-Dec-15 main pile 2076A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan)

20 22-Dec-15 main pile 2086A Ǿ600 15 17 32.00 21.00 -11.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan

21 22-Dec-15 main pile 2019A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan

22 22-Dec-15 main pile 2979C Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan

23 22-Dec-15 main pile 2979B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan

24 22-Dec-15 main pile 2979D Ǿ600 15 17 32.00 27.50 -4.50 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan

25 22-Dec-15 main pile 2979A Ǿ600 15 17 32.00 29.50 -2.50 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan

26 23-Dec-15 main pile 2979E Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan

27 23-Dec-15 main pile 2979F Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang(sisipan

28 23-Dec-15 main pile 2026A Ǿ600 17 15 32.00 29.00 -3.00 1.00 1 15.50 448.90 TI-16 potong tiang(sisipan

29 23-Dec-15 main pile 2002A Ǿ600 17 15 32.00 26.00 -6.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan

30 23-Dec-15 main pile 2002B Ǿ600 17 15 32.00 25.00 -7.00 1.00 1 16.00 463.40 TI-16 potong tiang(sisipan

31 24-Dec-15 main pile 2146A Ǿ600 17 15 32.00 20.50 -11.50 1.00 1 15.00 434.50 TI-16 potong tiang
32 24-Dec-15 main pile 2135A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang
33 24-Dec-15 main pile 2155A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 16.00 463.40 TI-16 potong tiang
34 24-Dec-15 main pile 2164A Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang
35 24-Dec-15 main pile 2184B Ǿ600 15 17 32.00 29.00 -3.00 1.00 1 15.00 434.50 TI-16 potong tiang
36 25-Dec-15 main pile 2184A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.00 434.00 TI-16 sisipan

37 25-Dec-15 main pile 2218B Ǿ600 15 17 32.00 30.50 -1.50 1.00 15.50 228.90 TI-16 sisipan

38 25-Dec-15 main pile 2218A Ǿ600 15 17 32.00 29.00 -3.00 1.00 15.50 228.90 TI-16 sisipan

39 25-Dec-15 main pile 2280A Ǿ600 15 17 32.00 27.00 -5.00 1.00 16.00 463.40 TI-16 sisipan

40 27-Dec-15 main pile 2275A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan

41 27-Dec-15 main pile 2367A Ǿ600 15 17 32.00 32.50 0.50 1.00 15.00 434.50 TI-16 sisipan

42 27-Dec-15 main pile 2367B Ǿ600 15 17 32.00 32.00 0.00 1.00 15.50 448.90 TI-16 sisipan

43 27-Dec-15 main pile 2328A Ǿ600 15 17 32.00 32.00 0.00 1.00 15.00 434.50 TI-16 sisipan

44 27-Dec-15 main pile 2328B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 TI-16 sisipan

45 27-Dec-15 main pile 2260A Ǿ600 15 17 32.00 30.50 -1.50 1.00 1 14.50 420.00 TI-16 potong tiang

46 27-Dec-15 main pile 2270A Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 TI-16 sisipan

47 28-Dec-15 main pile 2270B Ǿ600 15 17 32.00 32.00 0.00 1.00 14.50 420.00 TI-16 sisipan

48 28-Dec-15 main pile 2784A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.70 TI-03 sisipan

49 30-Dec-15 main pile 2789A Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan

50 30-Dec-15 main pile 2784B Ǿ600 15 17 32.00 34.00 2.00 1.00 24.20 421.10 TI-03 sisipan

51 5-Jan-16 main pile 2789B Ǿ600 15 17 32.00 32.00 0.00 1.00 24.20 421.10 TI-03 sisipan

52 21-Jan-16 main pile 2061A Ǿ600 15 17 32.00 33.00 1.00 1.00 23.70 420.00 TI-07 sisipan
53 21-Jan-16 main pile 2168B Ǿ600 15 17 32.00 29.00 -3.00 1.00 23.70 420.00 TI-07 sisipan
54 21-Jan-16 main pile 2168A Ǿ600 15 17 32.00 29.50 -2.50 1.00 23.70 420.00 TI-07 sisipan
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 54
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

TOTAL PEMANCANGAN MAIN PILE 1728.00 1607.50 -120.50 0.00 0.00 54.00 27.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : MAIN PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 14 Des 2015 - 21 Jan 2016

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile f ≤ 1= 1 54
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 3-Feb-16 soldier pile 4495s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
2 3-Feb-16 soldier pile 4509s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16 SP sisipan
3 3-Feb-16 soldier pile 4513s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16 SP sisipan
4 3-Feb-16 soldier pile 4516s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
5 3-Feb-16 soldier pile 4517s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
6 4-Feb-16 soldier pile 4518s Ǿ600 17 17.00 24.50 7.50 1.00 13.00 376.50 TI-16 SP sisipan
7 4-Feb-16 soldier pile 4519s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16 SP sisipan
8 4-Feb-16 soldier pile 4520s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16 SP sisipan
9 4-Feb-16 soldier pile 4521s Ǿ600 17 17.00 24.50 7.50 1.00 12.50 362.10 TI-16 SP sisipan
10 4-Feb-16 soldier pile 4522s Ǿ600 17 17.00 24.50 7.50 1.00 12.00 347.60 TI-16 SP sisipan
11 4-Feb-16 soldier pile 4523s Ǿ600 17 17.00 24.00 7.00 1.00 13.50 391.00 TI-16 SP sisipan
12 6-Feb-16 soldier pile 4630s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16 sisipan
13 6-Feb-16 soldier pile 4654s Ǿ600 17 17.00 24.50 7.50 1.00 10.50 304.10 TI-16 sisipan
14 6-Feb-16 soldier pile 4661s Ǿ600 17 17.00 24.50 7.50 1.00 10.00 289.60 TI-16 sisipan
15 6-Feb-16 soldier pile 4667s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16 sisipan
16 6-Feb-16 soldier pile 4675s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16 sisipan
17 6-Feb-16 soldier pile 4683s Ǿ600 17 17.00 24.50 7.50 1.00 9.50 275.20 TI-16 sisipan
18 23-Feb-16 soldier pile 4306s Ǿ600 17 17.00 20.00 3.00 1.00 24.20 421.10 TI-03 sisipan
19 23-Feb-16 soldier pile 4357s Ǿ600 17 17.00 20.50 3.50 1.00 24.20 421.10 TI-03 sisipan
20 23-Feb-16 soldier pile 4336s Ǿ600 17 17.00 24.50 7.50 1.00 20.00 196.00 TI-03 sisipan
21 27-Feb-16 soldier pile 4709s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24 sisipan
22 27-Feb-16 soldier pile 4712s Ǿ800 17 17.00 24.00 7.00 17.00 383.70 TI-24 sisipan
23 9-Mar-16 soldier pile 4777s Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A sisipan
24 9-Mar-16 soldier pile 4753s Ǿ600 17 17.00 24.50 7.50 10.00 177.70 TI-21A sisipan
25 11-Mar-16 soldier pile 4733S Ǿ600 17 17.00 24.40 7.40 20.00 355.40 TI-21A sisipan
26 11-Mar-16 soldier pile 4726s Ǿ600 17 17.00 24.50 7.50 21.00 162.80 TI-21A sisipan
27 11-Mar-16 soldier pile 4722s Ǿ600 17 17.00 16.00 -1.00 24.00 426.50 TI-21A sisipan(potong tiang)
28 11-Mar-16 soldier pile 4719s Ǿ600 17 17.00 24.50 7.50 13.00 231.00 TI-21A sisipan
29 16-Mar-16 soldier pile 4722s1 Ǿ600 17 17.00 24.50 7.50 11.00 195.50 TI-21A sisipan soldier pile

30 1-Apr-16 main pile 4137s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218 sisipan SP
31 3-Apr-16 main pile 4127s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218 sisipan SP
32 3-Apr-16 main pile 4130s Ǿ600 17 17.00 24.50 7.50 18.70 460.00 TI-218 sisipan SP
33 3-Apr-16 main pile 4131s Ǿ600 17 17.00 24.50 7.50 20.00 492.00 TI-218 sisipan SP
34 3-Apr-16 main pile 4134s Ǿ600 17 17.00 24.50 7.50 19.00 467.40 TI-218 sisipan SP

TOTAL PEMANCANGAN MAIN PILE 578.00 814.40 236.40 0.00 0.00 20.00 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : SOLDIER PILE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 08 AGUST'15 - 25 DES'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

1 8-Aug-15 Soldier pile 4128 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 14.50 356.70 TI-18 Soldier Pile

2 8-Aug-15 Soldier pile 4129 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 15.00 369.00 TI-18 Soldier Pile

3 12-Aug-15 Soldier pile 4130 Ǿ800 17 11 28.00 23.00 -5.00 - - 1.00 1.00 18.00 442.80 TI-18 Soldier Pile

4 13-Aug-15 Soldier pile 4147 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 15.00 369.00 12.00 TI-18 Soldier Pile

5 13-Aug-15 Soldier pile 4148 Ǿ800 17 11 28.00 23.00 -5.00 - - 1.00 1.00 18.00 442.80 12.00 TI-18 Soldier Pile

6 14-Aug-15 Soldier pile 4149 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 15.00 376.70 12.00 TI-26 Soldier Pile

7 14-Aug-15 Soldier pile 4150 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 - 14.50 364.20 12.00 TI-26 Soldier Pile

8 15-Aug-15 Soldier pile 4151 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile

9 16-Aug-15 Soldier pile 4146 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile

10 16-Aug-15 Soldier pile 4145 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 13.00 326.50 12.00 TI-26 Soldier Pile

11 16-Aug-15 Soldier pile 4144 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

12 18-Aug-15 Soldier pile 4143 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 13.00 326.50 12.00 TI-26 Soldier Pile

13 18-Aug-15 Soldier pile 4142 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.50 364.20 12.00 TI-26 Soldier Pile

14 18-Aug-15 Soldier pile 4141 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.50 364.20 12.00 TI-26 Soldier Pile

15 18-Aug-15 Soldier pile 4140 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 16.00 401.90 12.00 TI-26 Soldier Pile

16 19-Aug-15 Soldier pile 4137 Ǿ800 17 11 28.00 23.50 -4.50 - - 1.00 1.00 23.00 577.70 12.00 TI-26 Soldier Pile

17 19-Aug-15 Soldier pile 4139 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

18 19-Aug-15 Soldier pile 4138 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 16.50 414.40 12.00 TI-26 Soldier Pile

19 19-Aug-15 Soldier pile 4136 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile

20 20-Aug-15 Soldier pile 4131 Ǿ800 17 11 28.00 19.00 -9.00 - - 1.00 23.00 577.70 12.00 TI-26 Soldier Pile

21 20-Aug-15 Soldier pile 4134 Ǿ800 17 11 28.00 22.50 -5.50 - - 1.00 1.00 23.00 577.70 12.00 TI-26 Soldier Pile

22 20-Aug-15 Soldier pile 4135 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 13.50 339.10 12.00 TI-26 Soldier Pile

23 20-Aug-15 Soldier pile 4133 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 14.00 351.60 12.00 TI-26 Soldier Pile

24 20-Aug-15 Soldier pile 4132 Ǿ800 17 11 28.00 28.00 0.00 - - 1.00 20.00 502.30 12.00 TI-26 Soldier Pile

25 27-Aug-15 Soldier pile 4433 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.80 401.70 12.00 TI-24 Soldier Pile

26 27-Aug-15 Soldier pile 4434 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24 Soldier Pile

27 27-Aug-15 Soldier pile 4435 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile

28 27-Aug-15 Soldier pile 4436 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

29 28-Aug-15 Soldier pile 4437 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

30 28-Aug-15 Soldier pile 4438 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

31 28-Aug-15 Soldier pile 4439 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

32 28-Aug-15 Soldier pile 4440 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.70 376.90 12.00 TI-24 Soldier Pile

33 28-Aug-15 Soldier pile 4441 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile

34 28-Aug-15 Soldier pile 4442 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile

35 29-Aug-15 Soldier pile 4443 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.80 379.20 12.00 TI-24 Soldier Pile

36 29-Aug-15 Soldier pile 4444 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

37 29-Aug-15 Soldier pile 4445 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

38 29-Aug-15 Soldier pile 4446 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.90 381.40 12.00 TI-24 Soldier Pile

39 29-Aug-15 Soldier pile 4447 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24 Soldier Pile

40 29-Aug-15 Soldier pile 4448 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

41 31-Aug-15 Soldier pile 4453 Ǿ800 17 11 28.00 27.00 -1.00 1.00 1.00 16.80 379.20 12.00 TI-24 Soldier Pile

42 31-Aug-15 Soldier pile 4449 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

43 31-Aug-15 Soldier pile 4450 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile

44 31-Aug-15 Soldier pile 4451 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

45 31-Aug-15 Soldier pile 4452 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile

46 31-Aug-15 Soldier pile 4454 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

47 31-Aug-15 Soldier pile 4455 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24 Soldier Pile

48 1-Sep-15 Soldier pile 4456 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24 Soldier Pile

49 1-Sep-15 Soldier pile 4457 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile

50 1-Sep-15 Soldier pile 4458 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile

51 1-Sep-15 Soldier pile 4459 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

52 1-Sep-15 Soldier pile 4460 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

53 1-Sep-15 Soldier pile 4461 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

54 1-Sep-15 Soldier pile 4462 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.00 12.00 TI-24 Soldier Pile

55 1-Sep-15 Soldier pile 4463 Ǿ800 17 11 28.00 28.00 0.00 1.00 17 383.70 12.00 TI-24 Soldier Pile

56 2-Sep-15 Soldier pile 4464 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.80 401.70 12.00 TI-24 Soldier Pile

57 2-Sep-15 Soldier pile 4465 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.40 392.70 12.00 TI-24 Soldier Pile

58 2-Sep-15 Soldier pile 4466 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

59 2-Sep-15 Soldier pile 4467 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24 Soldier Pile

60 2-Sep-15 Soldier pile 4468 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

61 2-Sep-15 Soldier pile 4469 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

62 2-Sep-15 Soldier pile 4470 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

63 2-Sep-15 Soldier pile 4471 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.2 388.20 12.00 TI-24 Soldier Pile

64 3-Sep-15 Soldier pile 4472 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

65 3-Sep-15 Soldier pile 4473 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.70 12.00 TI-24 Soldier Pile

66 3-Sep-15 Soldier pile 4474 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24 Soldier Pile

67 3-Sep-15 Soldier pile 4475 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

68 3-Sep-15 Soldier pile 4476 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

69 3-Sep-15 Soldier pile 4477 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

70 3-Sep-15 Soldier pile 4478 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

71 3-Sep-15 Soldier pile 4479 Ǿ800 17 11 28.00 28.00 0.00 1.00 19 428.80 12.00 TI-24 Soldier Pile

72 4-Sep-15 Soldier pile 4480 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile

73 4-Sep-15 Soldier pile 4481 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24 Soldier Pile

74 4-Sep-15 Soldier pile 4482 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

75 4-Sep-15 Soldier pile 4483 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

76 4-Sep-15 Soldier pile 4484 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

77 4-Sep-15 Soldier pile 4485 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 410.80 12.00 TI-24 Soldier Pile

78 4-Sep-15 Soldier pile 4486 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

79 4-Sep-15 Soldier pile 4487 Ǿ800 17 11 28.00 28.00 0.00 1.00 20 451.40 12.00 TI-24 Soldier Pile

80 6-Sep-15 Soldier pile 4495 Ǿ800 17 11 28.00 19.50 -8.50 1.00 1 17.5 614.70 12.00 TI-24 Soldier Pile

81 6-Sep-15 Soldier pile 4488 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

82 6-Sep-15 Soldier pile 4489 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24 Soldier Pile

83 6-Sep-15 Soldier pile 4490 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

84 6-Sep-15 Soldier pile 4491 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

85 6-Sep-15 Soldier pile 4492 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

86 6-Sep-15 Soldier pile 4493 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

87 6-Sep-15 Soldier pile 4494 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

88 7-Sep-15 Soldier pile 4496 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

89 7-Sep-15 Soldier pile 4497 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

90 7-Sep-15 Soldier pile 4498 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.30 502.30 12.00 TI-24 Soldier Pile

91 7-Sep-15 Soldier pile 4499 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

92 7-Sep-15 Soldier pile 4500 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

93 7-Sep-15 Soldier pile 4501 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.70 516.40 12.00 TI-24 Soldier Pile

94 7-Sep-15 Soldier pile 4502 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24 Soldier Pile

95 7-Sep-15 Soldier pile 4503 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.5 440.10 12.00 TI-24 Soldier Pile

96 7-Sep-15 Soldier pile 4504 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.5 395.00 12.00 TI-24 Soldier Pile

97 8-Sep-15 Soldier pile 4505 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24 Soldier Pile

98 8-Sep-15 Soldier pile 4506 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 562.00 12.00 TI-24 Soldier Pile

99 8-Sep-15 Soldier pile 4507 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.20 569.10 12.00 TI-24 Soldier Pile

100 8-Sep-15 Soldier pile 4508 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.20 569.10 12.00 TI-24 Soldier Pile

101 9-Sep-15 Soldier pile 4509 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.50 579.60 12.00 TI-24 Soldier Pile

102 9-Sep-15 Soldier pile 4510 Ǿ800 17 11 28.00 24.00 -4.00 1.00 1 16.50 579.60 12.00 TI-24 Soldier Pile

103 9-Sep-15 Soldier pile 4511 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

104 10-Sep-15 Soldier pile 4513 Ǿ800 17 11 28.00 21.00 -7.00 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile

105 10-Sep-15 Soldier pile 4519 Ǿ800 17 11 28.00 22.50 -5.50 1.00 1 16.80 590.00 12.00 TI-24 Soldier Pile

106 10-Sep-15 Soldier pile 4516 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile

107 10-Sep-15 Soldier pile 4517 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile

108 10-Sep-15 Soldier pile 4518 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile

109 10-Sep-15 Soldier pile 4512 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile

110 10-Sep-15 Soldier pile 4514 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

111 10-Sep-15 Soldier pile 4515 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

112 11-Sep-15 Soldier pile 4520 Ǿ800 17 11 28.00 23.00 -5.00 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile

113 11-Sep-15 Soldier pile 4521 Ǿ800 17 11 28.00 23.00 -5.00 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile

114 11-Sep-15 Soldier pile 4522 Ǿ800 17 11 28.00 23.00 -5.00 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile

115 11-Sep-15 Soldier pile 4523 Ǿ800 17 11 28.00 23.50 -4.50 1.00 1 16.70 586.60 12.00 TI-24 Soldier Pile

116 11-Sep-15 Soldier pile 4524 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

117 11-Sep-15 Soldier pile 4525 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

118 11-Sep-15 Soldier pile 4526 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

119 14-Sep-15 Soldier pile 4527 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24 Soldier Pile

120 14-Sep-15 Soldier pile 4528 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

121 14-Sep-15 Soldier pile 4529 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

122 14-Sep-15 Soldier pile 4530 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile

123 14-Sep-15 Soldier pile 4531 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.90 12.00 TI-24 Soldier Pile

124 14-Sep-15 Soldier pile 4532 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

125 15-Sep-15 Soldier pile 4533 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

126 15-Sep-15 Soldier pile 4534 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24 Soldier Pile

127 15-Sep-15 Soldier pile 4535 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

128 15-Sep-15 Soldier pile 4536 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

129 15-Sep-15 Soldier pile 4537 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile

130 15-Sep-15 Soldier pile 4538 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.80 424.30 12.00 TI-24 Soldier Pile

131 15-Sep-15 Soldier pile 4539 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

132 15-Sep-15 Soldier pile 4540 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24 Soldier Pile

133 16-Sep-15 Soldier pile 4541 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

134 16-Sep-15 Soldier pile 4542 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24 Soldier Pile

135 16-Sep-15 Soldier pile 4543 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

136 16-Sep-15 Soldier pile 4544 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.70 422.00 12.00 TI-24 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

137 16-Sep-15 Soldier pile 4545 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile

138 17-Sep-15 Soldier pile 4546 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.30 467.20 12.00 TI-24 Soldier Pile

139 17-Sep-15 Soldier pile 4547 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

140 17-Sep-15 Soldier pile 4548 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

141 17-Sep-15 Soldier pile 4549 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24 Soldier Pile

142 17-Sep-15 Soldier pile 4550 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

143 17-Sep-15 Soldier pile 4551 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

144 17-Sep-15 Soldier pile 4552 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

145 17-Sep-15 Soldier pile 4553 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

146 18-Sep-15 Soldier pile 4558 Ǿ800 17 11 28.00 18.50 -9.50 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile

147 18-Sep-15 Soldier pile 4554 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

148 18-Sep-15 Soldier pile 4555 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

149 18-Sep-15 Soldier pile 4556 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

150 18-Sep-15 Soldier pile 4557 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

151 18-Sep-15 Soldier pile 4559 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

152 18-Sep-15 Soldier pile 4560 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

153 19-Sep-15 Soldier pile 4566 Ǿ800 17 11 28.00 22.00 -6.00 1.00 1 16.90 593.60 12.00 TI-24 Soldier Pile

154 19-Sep-15 Soldier pile 4561 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

155 19-Sep-15 Soldier pile 4562 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

156 19-Sep-15 Soldier pile 4563 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

157 19-Sep-15 Soldier pile 4564 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 414.50 12.00 TI-24 Soldier Pile

158 19-Sep-15 Soldier pile 4565 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24 Soldier Pile

159 22-Sep-15 Soldier pile 4567 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

160 22-Sep-15 Soldier pile 4568 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

161 22-Sep-15 Soldier pile 4569 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24 Soldier Pile

162 22-Sep-15 Soldier pile 4570 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

163 22-Sep-15 Soldier pile 4571 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

164 22-Sep-15 Soldier pile 4572 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile

165 22-Sep-15 Soldier pile 4573 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

166 22-Sep-15 Soldier pile 4574 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24 Soldier Pile

167 22-Sep-15 Soldier pile 4575 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

168 23-Sep-15 Soldier pile 4576 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24 Soldier Pile

169 23-Sep-15 Soldier pile 4577 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24 Soldier Pile

170 23-Sep-15 Soldier pile 4578 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

171 23-Sep-15 Soldier pile 4579 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

172 23-Sep-15 Soldier pile 4580 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

173 23-Sep-15 Soldier pile 4581 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

174 23-Sep-15 Soldier pile 4582 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

175 23-Sep-15 Soldier pile 4583 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile

176 23-Sep-15 Soldier pile 4584 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.00 456.60 12.00 TI-24 Soldier Pile

177 25-Sep-15 Soldier pile 4588 Ǿ800 17 11 28.00 24.00 -4.00 1.00 1 16.50 579.60 12.00 TI-24 Soldier Pile

178 25-Sep-15 Soldier pile 4585 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24 Soldier Pile

179 25-Sep-15 Soldier pile 4586 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 544.40 12.00 TI-24 Soldier Pile

180 25-Sep-15 Soldier pile 4587 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

181 25-Sep-15 Soldier pile 4589 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

182 25-Sep-15 Soldier pile 4590 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

183 26-Sep-15 Soldier pile 4593 Ǿ800 17 11 28.00 24.00 -4.00 1.00 1 16.80 590.10 12.00 TI-24 Soldier Pile

184 26-Sep-15 Soldier pile 4591 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

185 26-Sep-15 Soldier pile 4592 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

186 26-Sep-15 Soldier pile 4594 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

187 26-Sep-15 Soldier pile 4595 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.40 12.00 TI-24 Soldier Pile

188 26-Sep-15 Soldier pile 4596 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24 Soldier Pile

189 26-Sep-15 Soldier pile 4597 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile

190 28-Sep-15 Soldier pile 4598 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 529.90 12.00 TI-24 Soldier Pile

191 28-Sep-15 Soldier pile 4599 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 555.00 12.00 TI-24 Soldier Pile

192 28-Sep-15 Soldier pile 4600 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 555.00 12.00 TI-24 Soldier Pile

193 28-Sep-15 Soldier pile 4601 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

194 28-Sep-15 Soldier pile 4286 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.70 496.90 12.00 TI-18 Soldier Pile

195 29-Sep-15 Soldier pile 4602 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 555.00 12.00 TI-24 Soldier Pile

196 29-Sep-15 Soldier pile 4603 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.60 12.00 TI-24 Soldier Pile

197 29-Sep-15 Soldier pile 4604 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile

198 29-Sep-15 Soldier pile 4605 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.70 551.50 12.00 TI-24 Soldier Pile

199 29-Sep-15 Soldier pile 4606 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

200 29-Sep-15 Soldier pile 4607 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

201 29-Sep-15 Soldier pile 4608 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.80 519.90 12.00 TI-24 Soldier Pile

202 29-Sep-15 Soldier pile 4609 Ǿ800 17 11 28.00 28.00 0.00 1.00 13.50 474.20 12.00 TI-24 Soldier Pile

203 29-Sep-15 Soldier pile 4610 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

204 29-Sep-15 Soldier pile 4287 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

205 29-Sep-15 Soldier pile 4288 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 467.40 12.00 TI-18 Soldier Pile

206 29-Sep-15 Soldier pile 4289 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.20 494.50 12.00 TI-18 Soldier Pile

207 29-Sep-15 Soldier pile 4290 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

208 29-Sep-15 Soldier pile 4291 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

209 29-Sep-15 Soldier pile 4292 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 490.00 12.00 TI-18 Soldier Pile

210 29-Sep-15 Soldier pile 4293 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.20 496.90 12.00 TI-18 Soldier Pile

211 29-Sep-15 Soldier pile 4294 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile

212 29-Sep-15 Soldier pile 4295 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.90 489.50 12.00 TI-18 Soldier Pile

213 30-Sep-15 Soldier pile 4611 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

214 30-Sep-15 Soldier pile 4612 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

215 30-Sep-15 Soldier pile 4613 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

216 30-Sep-15 Soldier pile 4614 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

217 30-Sep-15 Soldier pile 4615 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile

218 30-Sep-15 Soldier pile 4616 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile

219 30-Sep-15 Soldier pile 4617 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

220 30-Sep-15 Soldier pile 4618 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 509.30 12.00 TI-24 Soldier Pile

221 30-Sep-15 Soldier pile 4619 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

222 30-Sep-15 Soldier pile 4296 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

223 30-Sep-15 Soldier pile 4297 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 487.10 12.00 TI-18 Soldier Pile

224 30-Sep-15 Soldier pile 4298 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile

225 30-Sep-15 Soldier pile 4299 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

226 30-Sep-15 Soldier pile 4300 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile

227 30-Sep-15 Soldier pile 4301 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 519.10 12.00 TI-18 Soldier Pile

228 1-Oct-15 Soldier pile 4620 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

229 1-Oct-15 Soldier pile 4621 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

230 1-Oct-15 Soldier pile 4622 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

231 1-Oct-15 Soldier pile 4623 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

232 1-Oct-15 Soldier pile 4624 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.50 439.10 12.00 TI-24 Soldier Pile

233 1-Oct-15 Soldier pile 4625 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile

234 1-Oct-15 Soldier pile 4626 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile

235 1-Oct-15 Soldier pile 4627 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile

236 1-Oct-15 Soldier pile 4302 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 494.00 12.00 TI-18 Soldier Pile

237 1-Oct-15 Soldier pile 4303 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 487.10 12.00 TI-18 Soldier Pile

238 1-Oct-15 Soldier pile 4304 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.20 496.90 12.00 TI-18 Soldier Pile

239 1-Oct-15 Soldier pile 4305 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile

240 1-Oct-15 Soldier pile 4306 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.10 469.90 12.00 TI-18 Soldier Pile

241 1-Oct-15 Soldier pile 4307 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 474.80 12.00 TI-18 Soldier Pile

242 1-Oct-15 Soldier pile 4308 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile

243 1-Oct-15 Soldier pile 4309 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

244 2-Oct-15 Soldier pile 4630 Ǿ800 17 11 28.00 22.00 -6.00 1 1.00 1 16.80 590 12.00 TI-24 Soldier Pile

245 2-Oct-15 Soldier pile 4628 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

246 2-Oct-15 Soldier pile 4629 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

247 2-Oct-15 Soldier pile 4631 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24 Soldier Pile

248 2-Oct-15 Soldier pile 4632 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 526.90 12.00 TI-24 Soldier Pile

249 2-Oct-15 Soldier pile 4633 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 562.00 12.00 TI-24 Soldier Pile

250 2-Oct-15 Soldier pile 4634 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.80 519.90 12.00 TI-24 Soldier Pile

251 2-Oct-15 Soldier pile 4635 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.70 516.40 12.00 TI-24 Soldier Pile

252 2-Oct-15 Soldier pile 4310 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

253 2-Oct-15 Soldier pile 4311 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile

254 2-Oct-15 Soldier pile 4312 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile

255 2-Oct-15 Soldier pile 4313 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.90 489.50 12.00 TI-18 Soldier Pile

256 2-Oct-15 Soldier pile 4314 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile

257 2-Oct-15 Soldier pile 4315 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.60 467.40 12.00 TI-18 Soldier Pile

258 2-Oct-15 Soldier pile 4316 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

259 3-Oct-15 Soldier pile 4121 Ǿ800 17 11 28.00 22.00 -6.00 1.00 1 15.00 565.10 12.00 TI-26 Soldier Pile

260 3-Oct-15 Soldier pile 4127 Ǿ800 17 11 28.00 25.00 -3.00 1.00 1 15.00 565.10 12.00 TI-26 Soldier Pile

261 3-Oct-15 Soldier pile 4317 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.60 482.20 12.00 TI-18 Soldier Pile

262 3-Oct-15 Soldier pile 4318 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.20 472.30 12.00 TI-18 Soldier Pile

263 3-Oct-15 Soldier pile 4319 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492 12.00 TI-18 Soldier Pile

264 3-Oct-15 Soldier pile 4320 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 496.45 12.00 TI-18 Soldier Pile

265 3-Oct-15 Soldier pile 4321 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile

266 3-Oct-15 Soldier pile 4126 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 Soldier Pile

267 3-Oct-15 Soldier pile 4125 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile

268 3-Oct-15 Soldier pile 4124 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile

269 3-Oct-15 Soldier pile 4123 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

270 3-Oct-15 Soldier pile 4122 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

271 3-Oct-15 Soldier pile 4120 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26 Soldier Pile

272 4-Oct-15 Soldier pile 4119 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile

273 4-Oct-15 Soldier pile 4118 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.70 519.90 12.00 TI-26 Soldier Pile

274 4-Oct-15 Soldier pile 4117 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 Soldier Pile

275 4-Oct-15 Soldier pile 4116 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

276 4-Oct-15 Soldier pile 4115 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.30 12.00 TI-26 Soldier Pile

277 4-Oct-15 Soldier pile 4114 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

278 4-Oct-15 Soldier pile 4113 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

279 4-Oct-15 Soldier pile 4112 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 Soldier Pile

280 5-Oct-15 Soldier pile 4322 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

281 5-Oct-15 Soldier pile 4323 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.40 477.20 12.00 TI-18 Soldier Pile

282 5-Oct-15 Soldier pile 4324 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

283 5-Oct-15 Soldier pile 4325 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

284 5-Oct-15 Soldier pile 4326 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile

285 5-Oct-15 Soldier pile 4327 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile

286 5-Oct-15 Soldier pile 4328 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 474.80 12.00 TI-18 Soldier Pile

287 5-Oct-15 Soldier pile 4329 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile

288 6-Oct-15 Soldier pile 4336 Ǿ800 17 17.00 17.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile

289 6-Oct-15 Soldier pile 4330 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile

290 6-Oct-15 Soldier pile 4331 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

291 6-Oct-15 Soldier pile 4332 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.50 504.30 12.00 TI-18 Soldier Pile

292 6-Oct-15 Soldier pile 4333 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile

293 6-Oct-15 Soldier pile 4334 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile

294 6-Oct-15 Soldier pile 4335 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 484.60 12.00 TI-18 Soldier Pile

295 7-Oct-15 Soldier pile 4339 Ǿ800 17 11 28.00 25.00 -3.00 1.00 1 20.10 494.50 12.00 TI-18 Soldier Pile

296 7-Oct-15 Soldier pile 4337 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 492.00 12.00 TI-18 Soldier Pile

297 7-Oct-15 Soldier pile 4338 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.30 499.40 12.00 TI-18 Soldier Pile

298 7-Oct-15 Soldier pile 4340 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 479.70 12.00 TI-18 Soldier Pile

299 7-Oct-15 Soldier pile 4341 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.10 494.50 12.00 TI-18 Soldier Pile

300 12-Oct-15 Soldier pile 4636 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.50 12.00 TI-24 Soldier Pile

301 12-Oct-15 Soldier pile 4637 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile

302 12-Oct-15 Soldier pile 4638 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24 Soldier Pile

303 12-Oct-15 Soldier pile 4639 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.50 462.70 12.00 TI-24 Soldier Pile

304 12-Oct-15 Soldier pile 4640 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24 Soldier Pile

305 12-Oct-15 Soldier pile 4641 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 441.60 12.00 TI-24 Soldier Pile

306 13-Oct-15 Soldier pile 4645 Ǿ800 17 11 28.00 27.50 -0.50 1.00 16.60 586.60 12.00 TI-24 potong tiang

307 13-Oct-15 Soldier pile 4642 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
308 13-Oct-15 Soldier pile 4643 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
309 13-Oct-15 Soldier pile 4644 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
310 13-Oct-15 Soldier pile 4646 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24
311 13-Oct-15 Soldier pile 4647 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
312 13-Oct-15 Soldier pile 4734 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 464.60 12.00 TI-26
313 13-Oct-15 Soldier pile 4735 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 477.20 12.00 TI-26
314 13-Oct-15 Soldier pile 4736 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 464.60 12.00 TI-26
315 13-Oct-15 Soldier pile 4737 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 464.60 12.00 TI-26
316 13-Oct-15 Soldier pile 4738 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
317 13-Oct-15 Soldier pile 4739 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
318 13-Oct-15 Soldier pile 4740 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
319 13-Oct-15 Soldier pile 4741 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
320 14-Oct-15 Soldier pile 4654 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 16.90 593.60 12.00 TI-24 potong tiang

321 14-Oct-15 Soldier pile 4648 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
322 14-Oct-15 Soldier pile 4649 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
323 14-Oct-15 Soldier pile 4650 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
324 14-Oct-15 Soldier pile 4651 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
325 14-Oct-15 Soldier pile 4652 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 444.60 12.00 TI-24
326 14-Oct-15 Soldier pile 4653 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
327 14-Oct-15 Soldier pile 4655 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
328 14-Oct-15 Soldier pile 4742 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
329 14-Oct-15 Soldier pile 4743 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
330 14-Oct-15 Soldier pile 4744 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
331 14-Oct-15 Soldier pile 4745 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
332 14-Oct-15 Soldier pile 4746 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
333 14-Oct-15 Soldier pile 4747 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
334 14-Oct-15 Soldier pile 4748 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
335 14-Oct-15 Soldier pile 4749 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
336 15-Oct-15 Soldier pile 4656 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 444.60 12.00 TI-24
337 15-Oct-15 Soldier pile 4657 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
338 15-Oct-15 Soldier pile 4658 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
339 15-Oct-15 Soldier pile 4659 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
340 16-Oct-15 Soldier pile 4661 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 16.90 593.60 12.00 TI-24 potong tiang

341 16-Oct-15 Soldier pile 4660 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
342 16-Oct-15 Soldier pile 4662 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
343 16-Oct-15 Soldier pile 4663 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
344 16-Oct-15 Soldier pile 4664 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.70 444.60 12.00 TI-24
345 16-Oct-15 Soldier pile 4665 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
346 17-Oct-15 Soldier pile 4667 Ǿ800 17 11 28.00 21.50 -6.50 1.00 20.00 451.40 12.00 TI-24
347 17-Oct-15 Soldier pile 4666 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 544.50 12.00 TI-24
348 17-Oct-15 Soldier pile 4668 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
349 17-Oct-15 Soldier pile 4669 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
350 17-Oct-15 Soldier pile 4670 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.80 446.90 12.00 TI-24
351 17-Oct-15 Soldier pile 4671 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
352 17-Oct-15 Soldier pile 4672 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

353 17-Oct-15 Soldier pile 4673 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
354 19-Oct-15 Soldier pile 4675 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 19.00 428.80 12.00 TI-24 potong tiang

355 19-Oct-15 Soldier pile 4674 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
356 19-Oct-15 Soldier pile 4676 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
357 19-Oct-15 Soldier pile 4677 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
358 19-Oct-15 Soldier pile 4678 Ǿ800 17 11 28.00 28.00 0.00 1.00 20.00 451.40 12.00 TI-24
359 19-Oct-15 Soldier pile 4679 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24
360 19-Oct-15 Soldier pile 4680 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
361 20-Oct-15 Soldier pile 4683 Ǿ800 17 11 28.00 21.50 -6.50 1.00 1 17.00 597.20 12.00 TI-24 potong tiang

362 20-Oct-15 Soldier pile 4681 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.70 12.00 TI-24
363 20-Oct-15 Soldier pile 4682 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
364 20-Oct-15 Soldier pile 4684 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
365 20-Oct-15 Soldier pile 4685 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
366 20-Oct-15 Soldier pile 4686 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
367 20-Oct-15 Soldier pile 4687 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.70 422.00 12.00 TI-24
368 20-Oct-15 Soldier pile 4688 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 440.10 12.00 TI-24
369 20-Oct-15 Soldier pile 4689 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
370 21-Oct-15 Soldier pile 4690 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
371 21-Oct-15 Soldier pile 4691 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.80 424.30 12.00 TI-24
372 21-Oct-15 Soldier pile 4692 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.60 419.80 12.00 TI-24
373 21-Oct-15 Soldier pile 4693 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24
374 21-Oct-15 Soldier pile 4694 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
375 21-Oct-15 Soldier pile 4695 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
376 21-Oct-15 Soldier pile 4696 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
377 21-Oct-15 Soldier pile 4697 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.30 435.60 12.00 TI-24
378 21-Oct-15 Soldier pile 4698 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.40 415.30 12.00 TI-24
379 23-Oct-15 Soldier pile 4285 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.60 374.60 12.00 TI-24
380 23-Oct-15 Soldier pile 4284 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
381 23-Oct-15 Soldier pile 4283 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
382 23-Oct-15 Soldier pile 4282 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
383 23-Oct-15 Soldier pile 4281 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
384 23-Oct-15 Soldier pile 4280 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
385 23-Oct-15 Soldier pile 4279 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
386 23-Oct-15 Soldier pile 4278 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
387 24-Oct-15 Soldier pile 4274 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
388 24-Oct-15 Soldier pile 4275 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
389 24-Oct-15 Soldier pile 4276 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
390 24-Oct-15 Soldier pile 4277 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.40 415.30 12.00 TI-24
391 26-Oct-15 Soldier pile 4273 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
392 26-Oct-15 Soldier pile 4272 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
393 26-Oct-15 Soldier pile 4271 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
394 26-Oct-15 Soldier pile 4270 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
395 26-Oct-15 Soldier pile 4269 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
396 26-Oct-15 Soldier pile 4268 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
397 26-Oct-15 Soldier pile 4267 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
398 26-Oct-15 Soldier pile 4266 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
399 27-Oct-15 Soldier pile 4265 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
400 27-Oct-15 Soldier pile 4264 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
401 27-Oct-15 Soldier pile 4263 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
402 27-Oct-15 Soldier pile 4262 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
403 27-Oct-15 Soldier pile 4261 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
404 27-Oct-15 Soldier pile 4260 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
405 27-Oct-15 Soldier pile 4259 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
406 27-Oct-15 Soldier pile 4258 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
407 27-Oct-15 Soldier pile 4257 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.30 413.00 12.00 TI-24
408 27-Oct-15 Soldier pile 4256 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
409 28-Oct-15 Soldier pile 4255 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 345.00 12.00 TI-24
410 28-Oct-15 Soldier pile 4254 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
411 28-Oct-15 Soldier pile 4253 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
412 28-Oct-15 Soldier pile 4252 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
413 28-Oct-15 Soldier pile 4251 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.20 410.80 12.00 TI-24
414 28-Oct-15 Soldier pile 4250 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
415 28-Oct-15 Soldier pile 4249 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
416 29-Oct-15 Soldier pile 4248 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
417 29-Oct-15 Soldier pile 4247 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
418 29-Oct-15 Soldier pile 4246 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 338.50 12.00 TI-24
419 29-Oct-15 Soldier pile 4245 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
420 29-Oct-15 Soldier pile 4244 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
421 29-Oct-15 Soldier pile 4243 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
422 29-Oct-15 Soldier pile 4242 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
423 29-Oct-15 Soldier pile 4241 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
424 29-Oct-15 Soldier pile 4240 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

425 29-Oct-15 Soldier pile 4239 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
426 30-Oct-15 Soldier pile 4238 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
427 30-Oct-15 Soldier pile 4237 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
428 30-Oct-15 Soldier pile 4236 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
429 30-Oct-15 Soldier pile 4235 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24
430 30-Oct-15 Soldier pile 4234 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
431 30-Oct-15 Soldier pile 4233 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
432 30-Oct-15 Soldier pile 4232 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
433 30-Oct-15 Soldier pile 4231 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
434 30-Oct-15 Soldier pile 4230 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
435 31-Oct-15 Soldier pile 4229 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
436 31-Oct-15 Soldier pile 4228 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
437 31-Oct-15 Soldier pile 4227 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
438 31-Oct-15 Soldier pile 4226 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.70 354.30 12.00 TI-24
439 31-Oct-15 Soldier pile 4225 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
440 31-Oct-15 Soldier pile 4224 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
441 31-Oct-15 Soldier pile 4223 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
442 31-Oct-15 Soldier pile 4222 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
443 2-Nov-15 Soldier pile 4221 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
444 2-Nov-15 Soldier pile 4220 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
445 2-Nov-15 Soldier pile 4219 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
446 2-Nov-15 Soldier pile 4218 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
447 2-Nov-15 Soldier pile 4217 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
448 2-Nov-15 Soldier pile 4216 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
449 2-Nov-15 Soldier pile 4215 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
450 3-Nov-15 Soldier pile 4214 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
451 3-Nov-15 Soldier pile 4213 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.20 365.60 12.00 TI-24
452 3-Nov-15 Soldier pile 4212 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
453 3-Nov-15 Soldier pile 4211 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 388.20 12.00 TI-24
454 3-Nov-15 Soldier pile 4210 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
455 3-Nov-15 Soldier pile 4209 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
456 3-Nov-15 Soldier pile 4208 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
457 3-Nov-15 Soldier pile 4207 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
458 3-Nov-15 Soldier pile 4206 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
459 4-Nov-15 Soldier pile 4205 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
460 4-Nov-15 Soldier pile 4204 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
461 4-Nov-15 Soldier pile 4203 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 491.80 12.00 TI-24
462 4-Nov-15 Soldier pile 4202 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
463 4-Nov-15 Soldier pile 4201 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
464 5-Nov-15 Soldier pile 4347 Ǿ800 17 11 28.00 22.00 -6.00 1.00 1 16.50 579.60 12.00 TI-24 potong tiang

465 5-Nov-15 Soldier pile 4342 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 394.00 12.00 TI-24
466 5-Nov-15 Soldier pile 4343 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
467 5-Nov-15 Soldier pile 4344 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
468 5-Nov-15 Soldier pile 4345 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
469 5-Nov-15 Soldier pile 4346 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
470 5-Nov-15 Soldier pile 4348 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
471 5-Nov-15 Soldier pile 4349 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
472 6-Nov-15 Soldier pile 4357 Ǿ800 17 11 28.00 20.00 -8.00 1.00 1 16.70 586.60 12.00 TI-24 potong tiang

473 6-Nov-15 Soldier pile 4350 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
474 6-Nov-15 Soldier pile 4351 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
475 6-Nov-15 Soldier pile 4352 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
476 6-Nov-15 Soldier pile 4353 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
477 6-Nov-15 Soldier pile 4354 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
478 6-Nov-15 Soldier pile 4355 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
479 6-Nov-15 Soldier pile 4356 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
480 6-Nov-15 Soldier pile 4358 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
481 6-Nov-15 Soldier pile 4359 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
482 7-Nov-15 Soldier pile 4366 Ǿ800 17 11 28.00 21.00 -7.00 1.00 1 16.80 590.10 12.00 TI-24 potong tiang

483 7-Nov-15 Soldier pile 4360 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
484 7-Nov-15 Soldier pile 4361 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
485 7-Nov-15 Soldier pile 4362 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
486 7-Nov-15 Soldier pile 4363 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
487 7-Nov-15 Soldier pile 4364 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
488 7-Nov-15 Soldier pile 4365 Ǿ800 17 11 28.00 28.00 0.00 1.00 12.00 421.50 12.00 TI-24
489 9-Nov-15 Soldier pile 4367 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
490 9-Nov-15 Soldier pile 4368 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
491 9-Nov-15 Soldier pile 4369 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
492 9-Nov-15 Soldier pile 4370 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
493 9-Nov-15 Soldier pile 4371 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
494 9-Nov-15 Soldier pile 4372 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
495 9-Nov-15 Soldier pile 4373 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 395.00 12.00 TI-24
496 9-Nov-15 Soldier pile 4374 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

497 10-Nov-15 Soldier pile 4375 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
498 10-Nov-15 Soldier pile 4376 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
499 10-Nov-15 Soldier pile 4377 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
500 10-Nov-15 Soldier pile 4378 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
501 10-Nov-15 Soldier pile 4379 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
502 10-Nov-15 Soldier pile 4380 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
503 10-Nov-15 Soldier pile 4381 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
504 10-Nov-15 Soldier pile 4382 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 428.80 12.00 TI-24
505 11-Nov-15 Soldier pile 4383 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
506 11-Nov-15 Soldier pile 4384 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.60 397.00 12.00 TI-24
507 11-Nov-15 Soldier pile 4385 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
508 11-Nov-15 Soldier pile 4386 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
509 11-Nov-15 Soldier pile 4387 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
510 11-Nov-15 Soldier pile 4388 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.60 397.20 12.00 TI-24
511 11-Nov-15 Soldier pile 4389 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 390.40 12.00 TI-24
512 11-Nov-15 Soldier pile 4390 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
513 12-Nov-15 Soldier pile 4391 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
514 12-Nov-15 Soldier pile 4392 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.70 399.50 12.00 TI-24
515 12-Nov-15 Soldier pile 4393 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
516 12-Nov-15 Soldier pile 4394 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
517 12-Nov-15 Soldier pile 4395 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.60 367.90 12.00 TI-24
518 12-Nov-15 Soldier pile 4396 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
519 12-Nov-15 Soldier pile 4397 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
520 12-Nov-15 Soldier pile 4398 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
521 12-Nov-15 Soldier pile 4399 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.70 12.00 TI-24
522 12-Nov-15 Soldier pile 4400 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
523 13-Nov-15 Soldier pile 4401 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
524 13-Nov-15 Soldier pile 4402 Ǿ800 17 11 28.00 28.00 0.00 1.00 18.00 466.20 12.00 TI-24
525 13-Nov-15 Soldier pile 4403 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
526 13-Nov-15 Soldier pile 4404 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
527 13-Nov-15 Soldier pile 4405 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
528 13-Nov-15 Soldier pile 4406 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
529 13-Nov-15 Soldier pile 4407 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
530 13-Nov-15 Soldier pile 4408 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
531 13-Nov-15 Soldier pile 4409 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
532 13-Nov-15 Soldier pile 4410 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
533 18-Nov-15 Soldier pile 4411 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
534 18-Nov-15 Soldier pile 4412 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
535 18-Nov-15 Soldier pile 4413 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
536 18-Nov-15 Soldier pile 4414 Ǿ800 17 1 18.00 28.00 10.00 1.00 17.00 383.70 12.00 TI-24
537 18-Nov-15 Soldier pile 4415 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
538 18-Nov-15 Soldier pile 4416 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
539 20-Nov-15 Soldier pile 4152 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
540 20-Nov-15 Soldier pile 4153 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
541 20-Nov-15 Soldier pile 4154 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
542 20-Nov-15 Soldier pile 4155 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
543 20-Nov-15 Soldier pile 4156 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
544 20-Nov-15 Soldier pile 4157 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
545 20-Nov-15 Soldier pile 4158 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
546 20-Nov-15 Soldier pile 4159 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
547 20-Nov-15 Soldier pile 4160 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
548 21-Nov-15 Soldier pile 4161 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
549 21-Nov-15 Soldier pile 4162 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
550 21-Nov-15 Soldier pile 4163 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
551 21-Nov-15 Soldier pile 4164 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
552 21-Nov-15 Soldier pile 4165 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
553 21-Nov-15 Soldier pile 4166 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
554 21-Nov-15 Soldier pile 4167 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.60 12.00 TI-24
555 23-Nov-15 Soldier pile 4168 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
556 23-Nov-15 Soldier pile 4169 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
557 23-Nov-15 Soldier pile 4170 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
558 23-Nov-15 Soldier pile 4171 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
559 23-Nov-15 Soldier pile 4172 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
560 23-Nov-15 Soldier pile 4173 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
561 23-Nov-15 Soldier pile 4174 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
562 23-Nov-15 Soldier pile 4175 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
563 24-Nov-15 Soldier pile 4185 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
564 24-Nov-15 Soldier pile 4184 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
565 24-Nov-15 Soldier pile 4183 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.70 354.30 12.00 TI-24
566 24-Nov-15 Soldier pile 4182 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
567 24-Nov-15 Soldier pile 4181 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
568 24-Nov-15 Soldier pile 4180 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

569 24-Nov-15 Soldier pile 4179 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
570 24-Nov-15 Soldier pile 4178 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
571 24-Nov-15 Soldier pile 4177 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
572 24-Nov-15 Soldier pile 4176 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
573 24-Nov-15 Soldier pile 4699 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
574 24-Nov-15 Soldier pile 4700 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
575 24-Nov-15 Soldier pile 4701 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.60 12.00 TI-26
576 24-Nov-15 Soldier pile 4702 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.60 12.00 TI-26
577 24-Nov-15 Soldier pile 4703 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
578 24-Nov-15 Soldier pile 4704 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
579 24-Nov-15 Soldier pile 4705 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
580 25-Nov-15 Soldier pile 4709 Ǿ800 12 16 28.00 15.00 -13.00 1.00 21.00 527.40 12.00 TI-26
581 25-Nov-15 Soldier pile 4712 Ǿ800 12 16 28.00 15.00 -13.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang

582 25-Nov-15 Soldier pile 4194 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
583 25-Nov-15 Soldier pile 4193 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
584 25-Nov-15 Soldier pile 4192 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
585 25-Nov-15 Soldier pile 4191 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.70 331.80 12.00 TI-24
586 25-Nov-15 Soldier pile 4190 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
587 25-Nov-15 Soldier pile 4189 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
588 25-Nov-15 Soldier pile 4188 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
589 25-Nov-15 Soldier pile 4187 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
590 25-Nov-15 Soldier pile 4186 Ǿ800 12 16 28.00 28.00 0.00 1.00 18.50 417.50 12.00 TI-24
591 25-Nov-15 Soldier pile 4706 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
592 25-Nov-15 Soldier pile 4707 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
593 25-Nov-15 Soldier pile 4708 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
594 25-Nov-15 Soldier pile 4710 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
595 25-Nov-15 Soldier pile 4711 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
596 25-Nov-15 Soldier pile 4713 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
597 26-Nov-15 Soldier pile 4719 Ǿ800 12 16 28.00 20.00 -8.00 1.00 1 14.50 546.30 12.00 TI-26 potong tiang

598 26-Nov-15 Soldier pile 4195 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.30 345.30 12.00 TI-24
599 26-Nov-15 Soldier pile 4196 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
600 26-Nov-15 Soldier pile 4197 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 12.00 TI-24
601 26-Nov-15 Soldier pile 4714 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.50 439.50 12.00 TI-26
602 26-Nov-15 Soldier pile 4715 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
603 26-Nov-15 Soldier pile 4716 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
604 26-Nov-15 Soldier pile 4717 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
605 26-Nov-15 Soldier pile 4718 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
606 27-Nov-15 Soldier pile 4722 Ǿ800 12 16 28.00 22.00 -6.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
607 27-Nov-15 Soldier pile 4726 Ǿ800 12 16 28.00 22.50 -5.50 1.00 1 21.50 540.00 12.00 TI-26 potong tiang
608 27-Nov-15 Soldier pile 4198 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
609 27-Nov-15 Soldier pile 4199 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
610 27-Nov-15 Soldier pile 4200 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
611 27-Nov-15 Soldier pile 4720 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
612 27-Nov-15 Soldier pile 4721 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
613 27-Nov-15 Soldier pile 4723 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
614 27-Nov-15 Soldier pile 4724 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
615 27-Nov-15 Soldier pile 4725 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
616 27-Nov-15 Soldier pile 4727 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
617 27-Nov-15 soldier pile 4728 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26 blm masuk progres
618 28-Nov-15 Soldier pile 4733 Ǿ800 12 16 28.00 22.00 -6.00 1.00 1 21.50 540.00 12.00 TI-26 potong tiang
619 28-Nov-15 Soldier pile 4111 Ǿ800 12 16 28.00 28.00 0.00 1.00 18.00 406.20 12.00 TI-24
620 28-Nov-15 Soldier pile 4110 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
621 28-Nov-15 Soldier pile 4109 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
622 28-Nov-15 Soldier pile 4108 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
623 28-Nov-15 Soldier pile 4107 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
624 28-Nov-15 Soldier pile 4106 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
625 28-Nov-15 Soldier pile 4105 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
626 28-Nov-15 Soldier pile 4729 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
627 28-Nov-15 Soldier pile 4730 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
628 28-Nov-15 Soldier pile 4731 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
629 28-Nov-15 Soldier pile 4732 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
630 29-Nov-15 Soldier pile 4753 Ǿ800 17 11 28.00 19.50 -8.50 1.00 21.50 540.00 12.00 TI-26
631 29-Nov-15 Soldier pile 4750 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 439.50 12.00 TI-26
632 29-Nov-15 Soldier pile 4751 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 427.00 12.00 TI-26
633 29-Nov-15 Soldier pile 4752 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
634 29-Nov-15 Soldier pile 4754 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
635 29-Nov-15 Soldier pile 4755 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
636 30-Nov-15 Soldier pile 4104 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
637 30-Nov-15 Soldier pile 4103 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
638 30-Nov-15 Soldier pile 4102 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
639 30-Nov-15 Soldier pile 4101 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
640 30-Nov-15 Soldier pile 4100 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

641 30-Nov-15 Soldier pile 4099 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
642 30-Nov-15 Soldier pile 4098 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
643 30-Nov-15 Soldier pile 4097 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
644 1-Dec-15 Soldier pile 4096 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
645 1-Dec-15 Soldier pile 4095 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
646 1-Dec-15 Soldier pile 4094 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
647 1-Dec-15 Soldier pile 4093 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
648 1-Dec-15 Soldier pile 4092 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.50 395.00 12.00 TI-24
649 1-Dec-15 Soldier pile 4091 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
650 1-Dec-15 Soldier pile 4090 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 316.60 12.00 TI-24
651 1-Dec-15 Soldier pile 4089 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
652 1-Dec-15 Soldier pile 4088 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
653 1-Dec-15 Soldier pile 4087 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
654 1-Dec-15 Soldier pile 4756 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.17 12.00 TI-26
655 1-Dec-15 Soldier pile 4758 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
656 1-Dec-15 Soldier pile 4759 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
657 1-Dec-15 Soldier pile 4760 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 439.50 12.00 TI-26
658 1-Dec-15 Soldier pile 4761 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
659 1-Dec-15 Soldier pile 4762 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.90 12.00 TI-26
660 1-Dec-15 Soldier pile 4763 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
661 1-Dec-15 Soldier pile 4764 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
662 1-Dec-15 Soldier pile 4765 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
663 1-Dec-15 Soldier pile 4766 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 389.30 12.00 TI-26
664 2-Dec-15 Soldier pile 4767 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.70 12.00 TI-26
665 2-Dec-15 Soldier pile 4768 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.40 12.00 TI-26
666 2-Dec-15 Soldier pile 4769 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 401.40 12.00 TI-26
667 2-Dec-15 Soldier pile 4770 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
668 2-Dec-15 Soldier pile 4771 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.70 12.00 TI-26
669 2-Dec-15 Soldier pile 4772 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
670 2-Dec-15 Soldier pile 4773 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
671 2-Dec-15 Soldier pile 4774 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.50 389.70 12.00 TI-26
672 2-Dec-15 Soldier pile 4775 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.10 12.00 TI-26
673 2-Dec-15 Soldier pile 4086 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
674 2-Dec-15 Soldier pile 4085 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
675 2-Dec-15 Soldier pile 4084 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
676 2-Dec-15 Soldier pile 4083 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
677 2-Dec-15 Soldier pile 4082 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
678 2-Dec-15 Soldier pile 4081 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
679 2-Dec-15 Soldier pile 4080 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
680 2-Dec-15 Soldier pile 4079 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.70 331.40 12.00 TI-24
681 2-Dec-15 Soldier pile 4078 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
682 2-Dec-15 Soldier pile 4077 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
683 3-Dec-15 Soldier pile 4076 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
684 3-Dec-15 Soldier pile 4075 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
685 3-Dec-15 Soldier pile 4074 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
686 3-Dec-15 Soldier pile 4073 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
687 3-Dec-15 Soldier pile 4072 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
688 3-Dec-15 Soldier pile 4071 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
689 3-Dec-15 Soldier pile 4070 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 327.20 12.00 TI-24
690 3-Dec-15 Soldier pile 4069 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
691 3-Dec-15 Soldier pile 4068 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
692 3-Dec-15 Soldier pile 4067 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
693 3-Dec-15 Soldier pile 4776 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
694 3-Dec-15 Soldier pile 4777 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.00 376.70 12.00 TI-26
695 3-Dec-15 Soldier pile 4778 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
696 3-Dec-15 Soldier pile 4779 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
697 3-Dec-15 Soldier pile 4780 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
698 3-Dec-15 Soldier pile 4781 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
699 3-Dec-15 Soldier pile 4782 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
700 4-Dec-15 Soldier pile 4066 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
701 4-Dec-15 Soldier pile 4065 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
702 4-Dec-15 Soldier pile 4064 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
703 4-Dec-15 Soldier pile 4063 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
704 4-Dec-15 Soldier pile 4062 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
705 4-Dec-15 Soldier pile 4061 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
706 4-Dec-15 Soldier pile 4060 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
707 4-Dec-15 Soldier pile 4059 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
708 4-Dec-15 Soldier pile 4058 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
709 4-Dec-15 Soldier pile 4057 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
710 5-Dec-15 Soldier pile 4836 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
711 5-Dec-15 Soldier pile 4835 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
712 5-Dec-15 Soldier pile 4834 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

713 5-Dec-15 Soldier pile 4833 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
714 5-Dec-15 Soldier pile 4832 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
715 5-Dec-15 Soldier pile 4056 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
716 5-Dec-15 Soldier pile 4055 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
717 5-Dec-15 Soldier pile 4054 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
718 5-Dec-15 Soldier pile 4053 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.70 331.80 12.00 TI-24
719 5-Dec-15 Soldier pile 4052 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
720 5-Dec-15 Soldier pile 4051 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 316.00 12.00 TI-24
721 5-Dec-15 Soldier pile 4050 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
722 7-Dec-15 Soldier pile 4049 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
723 7-Dec-15 Soldier pile 4048 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
724 7-Dec-15 Soldier pile 4047 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
725 7-Dec-15 Soldier pile 4046 Ǿ600 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
726 7-Dec-15 Soldier pile 4045 Ǿ600 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
727 7-Dec-15 Soldier pile 4044 Ǿ600 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
728 7-Dec-15 Soldier pile 4043 Ǿ600 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
729 7-Dec-15 Soldier pile 4042 Ǿ600 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
730 8-Dec-15 Soldier pile 4041 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
731 8-Dec-15 Soldier pile 4040 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
732 8-Dec-15 Soldier pile 4039 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
733 8-Dec-15 Soldier pile 4038 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
734 8-Dec-15 Soldier pile 4037 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
735 8-Dec-15 Soldier pile 4036 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
736 8-Dec-15 Soldier pile 4035 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
737 8-Dec-15 Soldier pile 4034 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
738 8-Dec-15 Soldier pile 4033 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
739 8-Dec-15 Soldier pile 4032 Ǿ800 12 16 28.00 28.00 0.00 1.00 17.00 383.70 12.00 TI-24
740 8-Dec-15 Soldier pile 4831 Ǿ800 12 16 28.00 28.00 0.00 1.00 13.00 326.50 12.00 TI-26 0
741 8-Dec-15 Soldier pile 4830 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 54
742 8-Dec-15 Soldier pile 4829 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 8
743 8-Dec-15 Soldier pile 4828 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 308
744 8-Dec-15 Soldier pile 4827 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 221
745 8-Dec-15 Soldier pile 4826 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 223
746 8-Dec-15 Soldier pile 4825 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26 462
747 11-Dec-15 Soldier pile 4824 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26 868
748 11-Dec-15 Soldier pile 4823 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26 4
749 11-Dec-15 Soldier pile 4822 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
750 11-Dec-15 Soldier pile 4821 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
751 11-Dec-15 Soldier pile 4820 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
752 11-Dec-15 Soldier pile 4819 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
753 11-Dec-15 Soldier pile 4818 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
754 11-Dec-15 Soldier pile 4817 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 389.30 12.00 TI-26
755 11-Dec-15 Soldier pile 4816 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
756 12-Dec-15 Soldier pile 4811 Ǿ800 12 16 28.00 26.00 -2.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
757 12-Dec-15 Soldier pile 4815 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
758 12-Dec-15 Soldier pile 4814 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
759 12-Dec-15 Soldier pile 4813 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 414.40 12.00 TI-26
760 12-Dec-15 Soldier pile 4812 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
761 12-Dec-15 Soldier pile 4810 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
762 12-Dec-15 Soldier pile 4809 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
763 12-Dec-15 Soldier pile 4808 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
764 12-Dec-15 Soldier pile 4031 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
765 12-Dec-15 Soldier pile 4030 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
766 12-Dec-15 Soldier pile 4029 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
767 12-Dec-15 Soldier pile 4028 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
768 12-Dec-15 Soldier pile 4027 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
769 12-Dec-15 Soldier pile 4026 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.00 383.70 12.00 TI-24
770 13-Dec-15 Soldier pile 4025 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
771 13-Dec-15 Soldier pile 4024 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24
772 13-Dec-15 Soldier pile 4023 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.70 12.00 TI-24
773 13-Dec-15 Soldier pile 4022 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.80 12.00 TI-24
774 13-Dec-15 Soldier pile 4021 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
775 14-Dec-15 Soldier pile 4020 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
776 14-Dec-15 Soldier pile 4019 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.30 345.30 12.00 TI-24
777 14-Dec-15 Soldier pile 4018 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
778 14-Dec-15 Soldier pile 4017 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 383.55 12.00 TI-24
779 14-Dec-15 Soldier pile 4016 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
780 14-Dec-15 Soldier pile 4015 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
781 14-Dec-15 Soldier pile 4014 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
782 14-Dec-15 Soldier pile 4807 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
783 14-Dec-15 Soldier pile 4806 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
784 14-Dec-15 Soldier pile 4805 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
Preboring
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile (Soil Slurry Rig REMARK
1 2 3 4 pressure force Coloums)
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (m) (code)

785 14-Dec-15 Soldier pile 4804 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
786 15-Dec-15 Soldier pile 4797 Ǿ800 17 11 28.00 20.00 -8.00 1.00 1 21.00 527.40 12.00 TI-26 potong tiang
787 15-Dec-15 Soldier pile 4803 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
788 15-Dec-15 Soldier pile 4802 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
789 15-Dec-15 Soldier pile 4801 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
790 15-Dec-15 Soldier pile 4800 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
791 15-Dec-15 Soldier pile 4799 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
792 15-Dec-15 Soldier pile 4798 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
793 16-Dec-15 Soldier pile 4796 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.50 489.80 12.00 TI-26
794 16-Dec-15 Soldier pile 4795 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
795 16-Dec-15 Soldier pile 4794 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
796 16-Dec-15 Soldier pile 4793 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
797 16-Dec-15 Soldier pile 4792 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
798 16-Dec-15 Soldier pile 4791 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.00 376.70 12.00 TI-26
799 16-Dec-15 Soldier pile 4790 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
800 16-Dec-15 Soldier pile 4789 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
801 16-Dec-15 Soldier pile 4788 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
802 17-Dec-15 Soldier pile 4787 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
803 17-Dec-15 Soldier pile 4786 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
804 17-Dec-15 Soldier pile 4785 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
805 17-Dec-15 Soldier pile 4784 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.00 351.60 12.00 TI-26
806 17-Dec-15 Soldier pile 4783 Ǿ800 17 11 28.00 28.00 0.00 1.00 14.50 364.20 12.00 TI-26
807 17-Dec-15 Soldier pile 4013 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
808 17-Dec-15 Soldier pile 4012 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
809 17-Dec-15 Soldier pile 4011 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.30 367.90 12.00 TI-24
810 17-Dec-15 Soldier pile 4010 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.50 372.40 12.00 TI-24
811 17-Dec-15 Soldier pile 4009 Ǿ800 12 16 28.00 28.00 0.00 1.00 14.40 327.20 12.00 TI-24
812 17-Dec-15 Soldier pile 4008 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
813 17-Dec-15 Soldier pile 4007 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
814 17-Dec-15 Soldier pile 4006 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
815 17-Dec-15 Soldier pile 4005 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.50 349.40 12.00 TI-24
816 19-Dec-15 Soldier pile 4432 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 430.50 12.00 TI-18
817 19-Dec-15 Soldier pile 4431 Ǿ800 17 11 28.00 28.00 0.00 1.00 15.80 388.70 12.00 TI-18
818 19-Dec-15 Soldier pile 4430 Ǿ800 17 11 28.00 28.00 0.00 1.00 19.00 467.40 12.00 TI-18
819 19-Dec-15 Soldier pile 4429 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.80 437.90 12.00 TI-18
820 20-Dec-15 Soldier pile 4423 Ǿ800 17 11 28.00 28.00 0.00 1.00 16.90 415.70 12.00 TI-18
821 20-Dec-15 Soldier pile 4424 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
822 20-Dec-15 Soldier pile 4425 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
823 20-Dec-15 Soldier pile 4426 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.60 433.00 12.00 TI-18
824 20-Dec-15 Soldier pile 4427 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
825 20-Dec-15 Soldier pile 4428 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 425.60 12.00 TI-18
826 22-Dec-15 Soldier pile 4422 Ǿ800 17 11 28.00 25.00 -3.00 1.00 1 20.30 499.40 12.00 TI-18 potong tiang
827 22-Dec-15 Soldier pile 4418 Ǿ800 17 11 28.00 26.00 -2.00 1.00 1 17.90 440.30 12.00 TI-18 potong tiang
828 22-Dec-15 Soldier pile 4421 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.30 423.10 12.00 TI-18
829 22-Dec-15 Soldier pile 4420 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.50 430.50 12.00 TI-18
830 22-Dec-15 Soldier pile 4419 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.20 423.10 12.00 TI-18
831 22-Dec-15 Soldier pile 4417 Ǿ800 17 11 28.00 28.00 0.00 1.00 17.00 418.20 12.00 TI-18
832 25-Dec-15 Soldier pile 4004 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.10 12.00 TI-24
833 25-Dec-15 Soldier pile 4003 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.00 12.00 TI-24
834 25-Dec-15 Soldier pile 4002 Ǿ800 12 16 28.00 28.00 0.00 1.00 16.00 361.00 12.00 TI-24
835 25-Dec-15 Soldier pile 4001 Ǿ800 12 16 28.00 28.00 0.00 1.00 15.00 338.50 12.00 TI-24

Total Pemancangan Soldier Pile 23359.00 23106.00 -253.00 0.00 1.00 835.00 41.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : SOIL FLURRY / BORE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABA


Date : 05 AGUST'15 - 31 OKT'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

809 30-Nov-15 4001 Ǿ500 12.00 TC-15 Bor soldier pile

810 30-Nov-15 4002 Ǿ500 12.00 TC-15 Bor soldier pile

811 30-Nov-15 4003 Ǿ500 12.00 TC-15 Bor soldier pile

812 30-Nov-15 4004 Ǿ500 12.00 TC-15 Bor soldier pile

813 30-Nov-15 4005 Ǿ500 12.00 TC-15 Bor soldier pile

814 30-Nov-15 4006 Ǿ500 12.00 TC-15 Bor soldier pile

815 30-Nov-15 4007 Ǿ500 12.00 TC-15 Bor soldier pile

816 30-Nov-15 4008 Ǿ500 12.00 TC-15 Bor soldier pile

817 30-Nov-15 4009 Ǿ500 12.00 TC-15 Bor soldier pile

818 30-Nov-15 4010 Ǿ500 12.00 TC-15 Bor soldier pile

819 30-Nov-15 4011 Ǿ500 12.00 TC-15 Bor soldier pile

820 30-Nov-15 4012 Ǿ500 12.00 TC-15 Bor soldier pile

821 30-Nov-15 4013 Ǿ500 12.00 TC-15 Bor soldier pile

822 30-Nov-15 4014 Ǿ500 12.00 TC-15 Bor soldier pile

823 30-Nov-15 4015 Ǿ500 12.00 TC-15 Bor soldier pile

824 30-Nov-15 4016 Ǿ500 12.00 TC-15 Bor soldier pile

753 27-Nov-15 4017 Ǿ500 12.00 TC-15 Bor soldier pile

754 27-Nov-15 4018 Ǿ500 12.00 TC-15 Bor soldier pile

755 27-Nov-15 4019 Ǿ500 12.00 TC-15 Bor soldier pile

756 27-Nov-15 4020 Ǿ500 12.00 TC-15 Bor soldier pile

757 27-Nov-15 4021 Ǿ500 12.00 TC-15 Bor soldier pile

758 27-Nov-15 4022 Ǿ500 12.00 TC-15 Bor soldier pile

759 27-Nov-15 4023 Ǿ500 12.00 TC-15 Bor soldier pile

760 27-Nov-15 4024 Ǿ500 12.00 TC-15 Bor soldier pile

761 27-Nov-15 4025 Ǿ500 12.00 TC-15 Bor soldier pile

762 27-Nov-15 4026 Ǿ500 12.00 TC-15 Bor soldier pile

763 27-Nov-15 4027 Ǿ500 12.00 TC-15 Bor soldier pile

764 27-Nov-15 4028 Ǿ500 12.00 TC-15 Bor soldier pile

765 27-Nov-15 4029 Ǿ500 12.00 TC-15 Bor soldier pile

766 27-Nov-15 4030 Ǿ500 12.00 TC-15 Bor soldier pile

767 27-Nov-15 4031 Ǿ500 12.00 TC-15 Bor soldier pile

768 27-Nov-15 4032 Ǿ500 12.00 TC-15 Bor soldier pile

769 27-Nov-15 4033 Ǿ500 12.00 TC-15 Bor soldier pile

770 27-Nov-15 4034 Ǿ500 12.00 TC-15 Bor soldier pile

771 27-Nov-15 4035 Ǿ500 12.00 TC-15 Bor soldier pile

772 27-Nov-15 4036 Ǿ500 12.00 TC-15 Bor soldier pile

773 27-Nov-15 4037 Ǿ500 12.00 TC-15 Bor soldier pile

774 27-Nov-15 4038 Ǿ500 12.00 TC-15 Bor soldier pile

775 27-Nov-15 4039 Ǿ500 12.00 TC-15 Bor soldier pile

776 27-Nov-15 4040 Ǿ500 12.00 TC-15 Bor soldier pile

777 27-Nov-15 4041 Ǿ500 12.00 TC-15 Bor soldier pile

778 27-Nov-15 4042 Ǿ500 12.00 TC-15 Bor soldier pile

779 27-Nov-15 4043 Ǿ500 12.00 TC-15 Bor soldier pile

780 27-Nov-15 4044 Ǿ500 12.00 TC-15 Bor soldier pile

781 27-Nov-15 4045 Ǿ500 12.00 TC-15 Bor soldier pile

782 27-Nov-15 4046 Ǿ500 12.00 TC-15 Bor soldier pile

783 27-Nov-15 4047 Ǿ500 12.00 TC-15 Bor soldier pile

784 27-Nov-15 4048 Ǿ500 12.00 TC-15 Bor soldier pile

785 27-Nov-15 4049 Ǿ500 12.00 TC-15 Bor soldier pile

786 27-Nov-15 4050 Ǿ500 12.00 TC-15 Bor soldier pile

787 27-Nov-15 4051 Ǿ500 12.00 TC-15 Bor soldier pile

825 30-Nov-15 4052 Ǿ500 12.00 TC-15 Bor soldier pile

826 30-Nov-15 4053 Ǿ500 12.00 TC-15 Bor soldier pile

827 30-Nov-15 4054 Ǿ500 12.00 TC-15 Bor soldier pile

828 30-Nov-15 4055 Ǿ500 12.00 TC-15 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

829 30-Nov-15 4056 Ǿ500 12.00 TC-15 Bor soldier pile

830 30-Nov-15 4057 Ǿ500 12.00 TC-15 Bor soldier pile

831 30-Nov-15 4058 Ǿ500 12.00 TC-15 Bor soldier pile

832 30-Nov-15 4059 Ǿ500 12.00 TC-15 Bor soldier pile

833 30-Nov-15 4060 Ǿ500 12.00 TC-15 Bor soldier pile

834 30-Nov-15 4061 Ǿ500 12.00 TC-15 Bor soldier pile

835 30-Nov-15 4062 Ǿ500 12.00 TC-15 Bor soldier pile

836 30-Nov-15 4063 Ǿ500 12.00 TC-15 Bor soldier pile

837 30-Nov-15 4064 Ǿ500 12.00 TC-15 Bor soldier pile

838 30-Nov-15 4065 Ǿ500 12.00 TC-15 Bor soldier pile

839 30-Nov-15 4066 Ǿ500 12.00 TC-15 Bor soldier pile

840 30-Nov-15 4067 Ǿ500 12.00 TC-15 Bor soldier pile

841 30-Nov-15 4068 Ǿ500 12.00 TC-15 Bor soldier pile

842 30-Nov-15 4069 Ǿ500 12.00 TC-15 Bor soldier pile

788 27-Nov-15 4070 Ǿ500 12.00 TC-15 Bor soldier pile

789 27-Nov-15 4071 Ǿ500 12.00 TC-15 Bor soldier pile

790 27-Nov-15 4072 Ǿ500 12.00 TC-15 Bor soldier pile

791 27-Nov-15 4073 Ǿ500 12.00 TC-15 Bor soldier pile

792 27-Nov-15 4074 Ǿ500 12.00 TC-15 Bor soldier pile

793 27-Nov-15 4075 Ǿ500 12.00 TC-15 Bor soldier pile

794 27-Nov-15 4076 Ǿ500 12.00 TC-15 Bor soldier pile

795 27-Nov-15 4077 Ǿ500 12.00 TC-15 Bor soldier pile

796 27-Nov-15 4078 Ǿ500 12.00 TC-15 Bor soldier pile

797 27-Nov-15 4079 Ǿ500 12.00 TC-15 Bor soldier pile

798 27-Nov-15 4080 Ǿ500 12.00 TC-15 Bor soldier pile

799 27-Nov-15 4081 Ǿ500 12.00 TC-15 Bor soldier pile

800 27-Nov-15 4082 Ǿ500 12.00 TC-15 Bor soldier pile

801 27-Nov-15 4083 Ǿ500 12.00 TC-15 Bor soldier pile

802 27-Nov-15 4084 Ǿ500 12.00 TC-15 Bor soldier pile

803 27-Nov-15 4085 Ǿ500 12.00 TC-15 Bor soldier pile

804 27-Nov-15 4086 Ǿ500 12.00 TC-15 Bor soldier pile

805 27-Nov-15 4087 Ǿ500 12.00 TC-15 Bor soldier pile

806 27-Nov-15 4088 Ǿ500 12.00 TC-15 Bor soldier pile

807 27-Nov-15 4089 Ǿ500 12.00 TC-15 Bor soldier pile

808 27-Nov-15 4090 Ǿ500 12.00 TC-15 Bor soldier pile

749 27-Nov-15 4091 Ǿ500 12.00 TC-53 Bor soldier pile

748 27-Nov-15 4092 Ǿ500 12.00 TC-53 Bor soldier pile

747 27-Nov-15 4093 Ǿ500 12.00 TC-53 Bor soldier pile

746 27-Nov-15 4094 Ǿ500 12.00 TC-53 Bor soldier pile

745 27-Nov-15 4095 Ǿ500 12.00 TC-53 Bor soldier pile

744 27-Nov-15 4096 Ǿ500 12.00 TC-53 Bor soldier pile

743 27-Nov-15 4097 Ǿ500 12.00 TC-53 Bor soldier pile

742 27-Nov-15 4098 Ǿ500 12.00 TC-53 Bor soldier pile

741 27-Nov-15 4099 Ǿ500 12.00 TC-53 Bor soldier pile

740 27-Nov-15 4100 Ǿ500 12.00 TC-53 Bor soldier pile

739 27-Nov-15 4101 Ǿ500 12.00 TC-53 Bor soldier pile

738 27-Nov-15 4102 Ǿ500 12.00 TC-53 Bor soldier pile

737 27-Nov-15 4103 Ǿ500 12.00 TC-53 Bor soldier pile

736 27-Nov-15 4104 Ǿ500 12.00 TC-53 Bor soldier pile

735 27-Nov-15 4105 Ǿ500 12.00 TC-53 Bor soldier pile

734 27-Nov-15 4106 Ǿ500 12.00 TC-53 Bor soldier pile

733 27-Nov-15 4107 Ǿ500 12.00 TC-53 Bor soldier pile

732 27-Nov-15 4108 Ǿ500 12.00 TC-53 Bor soldier pile

731 27-Nov-15 4109 Ǿ500 12.00 TC-53 Bor soldier pile

730 27-Nov-15 4110 Ǿ500 12.00 TC-53 Bor soldier pile

729 27-Nov-15 4111 Ǿ500 12.00 TC-53 Bor soldier pile

527 3-Oct-15 4112 Ǿ500 12.00 TC-19 Soldier Pile

47 20-Aug-15 4113 Ǿ500 12.00 TC-19 SOLDIER

46 20-Aug-15 4114 Ǿ500 12.00 TC-19 SOLDIER

45 20-Aug-15 4115 Ǿ500 12.00 TC-19 SOLDIER

44 20-Aug-15 4116 Ǿ500 12.00 TC-19 SOLDIER

43 20-Aug-15 4117 Ǿ500 12.00 TC-19 SOLDIER

39 19-Aug-15 4118 Ǿ500 - 12.00 TC-19 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

38 19-Aug-15 4119 Ǿ500 - 12.00 TC-19 SOLDIER

37 19-Aug-15 4120 Ǿ500 - 12.00 TC-19 SOLDIER

36 19-Aug-15 4121 Ǿ500 - 12.00 TC-19 SOLDIER

35 19-Aug-15 4122 Ǿ500 - 12.00 TC-19 SOLDIER

34 19-Aug-15 4123 Ǿ500 - 12.00 TC-19 SOLDIER

33 19-Aug-15 4124 Ǿ500 - 12.00 TC-19 SOLDIER

31 18-Aug-15 4125 Ǿ500 - 12.00 TC-19 SOLDIER

30 18-Aug-15 4126 Ǿ500 - 12.00 TC-19 SOLDIER

29 18-Aug-15 4127 Ǿ500 - 12.00 TC-19 SOLDIER

28 18-Aug-15 4131 Ǿ500 - 12.00 TC-19 SOLDIER

27 18-Aug-15 4132 Ǿ500 - 12.00 TC-19 SOLDIER

26 18-Aug-15 4133 Ǿ500 - 12.00 TC-19 SOLDIER

25 18-Aug-15 4134 Ǿ500 - 12.00 TC-19 SOLDIER

24 16-Aug-15 4135 Ǿ500 - 12.00 TC-53 SOLDIER

23 16-Aug-15 4136 Ǿ500 - 12.00 TC-53 SOLDIER

22 16-Aug-15 4137 Ǿ500 - 12.00 TC-53 SOLDIER

21 16-Aug-15 4138 Ǿ500 - 12.00 TC-53 SOLDIER

20 16-Aug-15 4139 Ǿ500 - 12.00 TC-53 SOLDIER

19 16-Aug-15 4140 Ǿ500 - 12.00 TC-53 SOLDIER

17 15-Aug-15 4141 Ǿ500 - 12.00 TC-53 SOLDIER

16 15-Aug-15 4142 Ǿ500 - 12.00 TC-53 SOLDIER

15 15-Aug-15 4143 Ǿ500 - 12.00 TC-53 SOLDIER

14 15-Aug-15 4144 Ǿ500 - 12.00 TC-53 SOLDIER

13 15-Aug-15 4145 Ǿ500 - 12.00 TC-53 SOLDIER

12 15-Aug-15 4146 Ǿ500 - 12.00 TC-53 SOLDIER

8 14-Aug-15 4149 Ǿ500 - 12.00 - - - TC-53 SOLDIER

9 14-Aug-15 4150 Ǿ500 - 12.00 - - - TC-53 SOLDIER

10 14-Aug-15 4151 Ǿ500 - 12.00 TC-53 SOLDIER

674 19-Nov-15 4152 Ǿ500 12.00 TC-53 Bor soldier pile

675 19-Nov-15 4153 Ǿ500 12.00 TC-53 Bor soldier pile

676 19-Nov-15 4154 Ǿ500 12.00 TC-53 Bor soldier pile

677 19-Nov-15 4155 Ǿ500 12.00 TC-53 Bor soldier pile

678 19-Nov-15 4156 Ǿ500 12.00 TC-53 Bor soldier pile

679 19-Nov-15 4157 Ǿ500 12.00 TC-53 Bor soldier pile

680 19-Nov-15 4158 Ǿ500 12.00 TC-53 Bor soldier pile

681 19-Nov-15 4159 Ǿ500 12.00 TC-53 Bor soldier pile

682 19-Nov-15 4160 Ǿ500 12.00 TC-53 Bor soldier pile

683 19-Nov-15 4161 Ǿ500 12.00 TC-53 Bor soldier pile

684 19-Nov-15 4162 Ǿ500 12.00 TC-53 Bor soldier pile

685 19-Nov-15 4163 Ǿ500 12.00 TC-53 Bor soldier pile

686 19-Nov-15 4164 Ǿ500 12.00 TC-53 Bor soldier pile

687 19-Nov-15 4165 Ǿ500 12.00 TC-53 Bor soldier pile

688 19-Nov-15 4166 Ǿ500 12.00 TC-53 Bor soldier pile

689 19-Nov-15 4167 Ǿ500 12.00 TC-53 Bor soldier pile

690 19-Nov-15 4168 Ǿ500 12.00 TC-53 Bor soldier pile

691 19-Nov-15 4169 Ǿ500 12.00 TC-53 Bor soldier pile

692 19-Nov-15 4170 Ǿ500 12.00 TC-53 Bor soldier pile

693 19-Nov-15 4171 Ǿ500 12.00 TC-53 Bor soldier pile

694 19-Nov-15 4172 Ǿ500 12.00 TC-53 Bor soldier pile

695 19-Nov-15 4173 Ǿ500 12.00 TC-53 Bor soldier pile

696 19-Nov-15 4174 Ǿ500 12.00 TC-53 Bor soldier pile

697 19-Nov-15 4175 Ǿ500 12.00 TC-53 Bor soldier pile

698 19-Nov-15 4176 Ǿ500 12.00 TC-53 Bor soldier pile

699 19-Nov-15 4177 Ǿ500 12.00 TC-53 Bor soldier pile

710 20-Nov-15 4178 Ǿ500 12.00 TC-53 Bor soldier pile

711 20-Nov-15 4179 Ǿ500 12.00 TC-53 Bor soldier pile

712 20-Nov-15 4180 Ǿ500 12.00 TC-53 Bor soldier pile

713 20-Nov-15 4181 Ǿ500 12.00 TC-53 Bor soldier pile

714 20-Nov-15 4182 Ǿ500 12.00 TC-53 Bor soldier pile

715 20-Nov-15 4183 Ǿ500 12.00 TC-53 Bor soldier pile

716 20-Nov-15 4184 Ǿ500 12.00 TC-53 Bor soldier pile

717 20-Nov-15 4185 Ǿ500 12.00 TC-53 Bor soldier pile

718 20-Nov-15 4186 Ǿ500 12.00 TC-53 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

719 20-Nov-15 4187 Ǿ500 12.00 TC-53 Bor soldier pile

720 20-Nov-15 4188 Ǿ500 12.00 TC-53 Bor soldier pile

721 20-Nov-15 4189 Ǿ500 12.00 TC-53 Bor soldier pile

722 20-Nov-15 4190 Ǿ500 12.00 TC-53 Bor soldier pile

723 20-Nov-15 4191 Ǿ500 12.00 TC-53 Bor soldier pile

724 20-Nov-15 4192 Ǿ500 12.00 TC-53 Bor soldier pile

725 20-Nov-15 4193 Ǿ500 12.00 TC-53 Bor soldier pile

726 20-Nov-15 4194 Ǿ500 12.00 TC-53 Bor soldier pile

727 20-Nov-15 4195 Ǿ500 12.00 TC-53 Bor soldier pile

728 20-Nov-15 4196 Ǿ500 12.00 TC-53 Bor soldier pile

750 27-Nov-15 4198 Ǿ500 12.00 TC-53 Bor soldier pile

751 27-Nov-15 4199 Ǿ500 12.00 TC-53 Bor soldier pile

649 2-Nov-15 4200 Ǿ500 12.00 TC-19 soldier pile

752 27-Nov-15 4200 Ǿ500 12.00 TC-53 Bor soldier pile

648 2-Nov-15 4201 Ǿ500 12.00 TC-19 soldier pile

647 2-Nov-15 4202 Ǿ500 12.00 TC-19 soldier pile

646 2-Nov-15 4203 Ǿ500 12.00 TC-19 soldier pile

645 2-Nov-15 4204 Ǿ500 12.00 TC-19 soldier pile

644 2-Nov-15 4205 Ǿ500 12.00 TC-19 soldier pile

643 2-Nov-15 4206 Ǿ500 12.00 TC-19 soldier pile

642 2-Nov-15 4207 Ǿ500 12.00 TC-19 soldier pile

629 24-Oct-15 4208 Ǿ500 12.00 TC-53 soldier pile

628 24-Oct-15 4209 Ǿ500 12.00 TC-53 soldier pile

627 24-Oct-15 4210 Ǿ500 12.00 TC-53 soldier pile

626 24-Oct-15 4211 Ǿ500 12.00 TC-53 soldier pile

625 24-Oct-15 4212 Ǿ500 12.00 TC-53 soldier pile

624 24-Oct-15 4213 Ǿ500 12.00 TC-53 soldier pile

623 24-Oct-15 4214 Ǿ500 12.00 TC-53 soldier pile

622 24-Oct-15 4215 Ǿ500 12.00 TC-53 soldier pile

621 24-Oct-15 4216 Ǿ500 12.00 TC-53 soldier pile

620 24-Oct-15 4217 Ǿ500 12.00 TC-53 soldier pile

619 24-Oct-15 4218 Ǿ500 12.00 TC-53 soldier pile

618 24-Oct-15 4219 Ǿ500 12.00 TC-53 soldier pile

617 24-Oct-15 4220 Ǿ500 12.00 TC-53 soldier pile

616 24-Oct-15 4221 Ǿ500 12.00 TC-53 soldier pile

615 24-Oct-15 4222 Ǿ500 12.00 TC-53 soldier pile

614 23-Oct-15 4223 Ǿ500 12.00 TC-53 Soldier Pile

613 23-Oct-15 4224 Ǿ500 12.00 TC-53 Soldier Pile

612 23-Oct-15 4225 Ǿ500 12.00 TC-53 Soldier Pile

611 23-Oct-15 4226 Ǿ500 12.00 TC-53 Soldier Pile

610 23-Oct-15 4227 Ǿ500 12.00 TC-53 Soldier Pile

609 23-Oct-15 4228 Ǿ500 12.00 TC-53 Soldier Pile

608 23-Oct-15 4229 Ǿ500 12.00 TC-53 Soldier Pile

607 23-Oct-15 4230 Ǿ500 12.00 TC-53 Soldier Pile

606 23-Oct-15 4231 Ǿ500 12.00 TC-53 Soldier Pile

605 23-Oct-15 4232 Ǿ500 12.00 TC-53 Soldier Pile

604 23-Oct-15 4233 Ǿ500 12.00 TC-53 Soldier Pile

603 23-Oct-15 4234 Ǿ500 12.00 TC-53 Soldier Pile

602 23-Oct-15 4235 Ǿ500 12.00 TC-53 Soldier Pile

601 23-Oct-15 4236 Ǿ500 12.00 TC-53 Soldier Pile

600 23-Oct-15 4237 Ǿ500 12.00 TC-53 Soldier Pile

599 23-Oct-15 4238 Ǿ500 12.00 TC-53 Soldier Pile

598 23-Oct-15 4239 Ǿ500 12.00 TC-53 Soldier Pile

597 23-Oct-15 4240 Ǿ500 12.00 TC-53 Soldier Pile

596 23-Oct-15 4241 Ǿ500 12.00 TC-53 Soldier Pile

595 23-Oct-15 4242 Ǿ500 12.00 TC-53 Soldier Pile

594 22-Oct-15 4243 Ǿ500 12.00 TC-53 Soldier Pile

593 22-Oct-15 4244 Ǿ500 12.00 TC-53 Soldier Pile

592 22-Oct-15 4245 Ǿ500 12.00 TC-53 Soldier Pile

591 22-Oct-15 4246 Ǿ500 12.00 TC-53 Soldier Pile

590 22-Oct-15 4247 Ǿ500 12.00 TC-53 Soldier Pile

589 22-Oct-15 4248 Ǿ500 12.00 TC-53 Soldier Pile

588 22-Oct-15 4249 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

587 22-Oct-15 4250 Ǿ500 12.00 TC-53 Soldier Pile

586 22-Oct-15 4251 Ǿ500 12.00 TC-53 Soldier Pile

585 22-Oct-15 4252 Ǿ500 12.00 TC-53 Soldier Pile

584 22-Oct-15 4253 Ǿ500 12.00 TC-53 Soldier Pile

583 22-Oct-15 4254 Ǿ500 12.00 TC-53 Soldier Pile

582 22-Oct-15 4255 Ǿ500 12.00 TC-53 Soldier Pile

581 22-Oct-15 4256 Ǿ500 12.00 TC-53 Soldier Pile

580 22-Oct-15 4257 Ǿ500 12.00 TC-53 Soldier Pile

579 22-Oct-15 4258 Ǿ500 12.00 TC-53 Soldier Pile

578 22-Oct-15 4259 Ǿ500 12.00 TC-53 Soldier Pile

577 22-Oct-15 4260 Ǿ500 12.00 TC-53 Soldier Pile

576 22-Oct-15 4261 Ǿ500 12.00 TC-53 Soldier Pile

575 22-Oct-15 4262 Ǿ500 12.00 TC-53 Soldier Pile

574 22-Oct-15 4263 Ǿ500 12.00 TC-53 Soldier Pile

573 22-Oct-15 4264 Ǿ500 12.00 TC-53 Soldier Pile

572 22-Oct-15 4265 Ǿ500 12.00 TC-53 Soldier Pile

571 22-Oct-15 4266 Ǿ500 12.00 TC-53 Soldier Pile

570 22-Oct-15 4267 Ǿ500 12.00 TC-53 Soldier Pile

569 21-Oct-15 4268 Ǿ500 12.00 TC-53 Soldier Pile

568 21-Oct-15 4269 Ǿ500 12.00 TC-53 Soldier Pile

567 21-Oct-15 4270 Ǿ500 12.00 TC-53 Soldier Pile

566 21-Oct-15 4271 Ǿ500 12.00 TC-53 Soldier Pile

565 21-Oct-15 4272 Ǿ500 12.00 TC-53 Soldier Pile

564 21-Oct-15 4273 Ǿ500 12.00 TC-53 Soldier Pile

563 21-Oct-15 4274 Ǿ500 12.00 TC-53 Soldier Pile

562 21-Oct-15 4275 Ǿ500 12.00 TC-53 Soldier Pile

561 21-Oct-15 4276 Ǿ500 12.00 TC-53 Soldier Pile

560 21-Oct-15 4277 Ǿ500 12.00 TC-53 Soldier Pile

559 21-Oct-15 4278 Ǿ500 12.00 TC-53 Soldier Pile

558 21-Oct-15 4279 Ǿ500 12.00 TC-53 Soldier Pile

557 21-Oct-15 4280 Ǿ500 12.00 TC-53 Soldier Pile

556 21-Oct-15 4281 Ǿ500 12.00 TC-53 Soldier Pile

555 21-Oct-15 4282 Ǿ500 12.00 TC-53 Soldier Pile

554 21-Oct-15 4283 Ǿ500 12.00 TC-53 Soldier Pile

553 21-Oct-15 4284 Ǿ500 12.00 TC-53 Soldier Pile

552 21-Oct-15 4285 Ǿ500 12.00 TC-53 Soldier Pile

258 22-Sep-15 4286 Ǿ500 12.00 TC-15 Soldier Pile

259 22-Sep-15 4287 Ǿ500 12.00 TC-15 Soldier Pile

260 22-Sep-15 4288 Ǿ500 12.00 TC-15 Soldier Pile

261 22-Sep-15 4289 Ǿ500 12.00 TC-15 Soldier Pile

262 22-Sep-15 4290 Ǿ500 12.00 TC-15 Soldier Pile

263 22-Sep-15 4291 Ǿ500 12.00 TC-15 Soldier Pile

264 22-Sep-15 4292 Ǿ500 12.00 TC-15 Soldier Pile

265 22-Sep-15 4293 Ǿ500 12.00 TC-15 Soldier Pile

266 22-Sep-15 4294 Ǿ500 12.00 TC-15 Soldier Pile

267 22-Sep-15 4295 Ǿ500 12.00 TC-15 Soldier Pile

268 22-Sep-15 4296 Ǿ500 12.00 TC-15 Soldier Pile

269 22-Sep-15 4297 Ǿ500 12.00 TC-15 Soldier Pile

270 22-Sep-15 4298 Ǿ500 12.00 TC-15 Soldier Pile

271 22-Sep-15 4299 Ǿ500 12.00 TC-15 Soldier Pile

282 23-Sep-15 4300 Ǿ500 12.00 TC-15 Soldier Pile

283 23-Sep-15 4301 Ǿ500 12.00 TC-15 Soldier Pile

284 23-Sep-15 4302 Ǿ500 12.00 TC-15 Soldier Pile

285 23-Sep-15 4303 Ǿ500 12.00 TC-15 Soldier Pile

286 23-Sep-15 4304 Ǿ500 12.00 TC-15 Soldier Pile

287 23-Sep-15 4305 Ǿ500 12.00 TC-15 Soldier Pile

288 23-Sep-15 4306 Ǿ500 12.00 TC-15 Soldier Pile

289 23-Sep-15 4307 Ǿ500 12.00 TC-15 Soldier Pile

290 23-Sep-15 4308 Ǿ500 12.00 TC-15 Soldier Pile

291 23-Sep-15 4309 Ǿ500 12.00 TC-15 Soldier Pile

292 23-Sep-15 4310 Ǿ500 12.00 TC-15 Soldier Pile

293 23-Sep-15 4311 Ǿ500 12.00 TC-15 Soldier Pile

294 23-Sep-15 4312 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

306 25-Sep-15 4313 Ǿ500 12.00 TC-15 Soldier Pile

307 25-Sep-15 4314 Ǿ500 12.00 TC-15 Soldier Pile

308 25-Sep-15 4315 Ǿ500 12.00 TC-15 Soldier Pile

309 25-Sep-15 4316 Ǿ500 12.00 TC-15 Soldier Pile

310 25-Sep-15 4317 Ǿ500 12.00 TC-15 Soldier Pile

311 25-Sep-15 4318 Ǿ500 12.00 TC-15 Soldier Pile

312 25-Sep-15 4319 Ǿ500 12.00 TC-15 Soldier Pile

313 25-Sep-15 4320 Ǿ500 12.00 TC-15 Soldier Pile

314 25-Sep-15 4321 Ǿ500 12.00 TC-15 Soldier Pile

315 25-Sep-15 4322 Ǿ500 12.00 TC-15 Soldier Pile

316 25-Sep-15 4323 Ǿ500 12.00 TC-15 Soldier Pile

317 25-Sep-15 4324 Ǿ500 12.00 TC-15 Soldier Pile

318 25-Sep-15 4325 Ǿ500 12.00 TC-15 Soldier Pile

319 26-Sep-15 4326 Ǿ500 12.00 TC-15 Soldier Pile

320 26-Sep-15 4327 Ǿ500 12.00 TC-15 Soldier Pile

321 26-Sep-15 4328 Ǿ500 12.00 TC-15 Soldier Pile

322 26-Sep-15 4329 Ǿ500 12.00 TC-15 Soldier Pile

323 26-Sep-15 4330 Ǿ500 12.00 TC-15 Soldier Pile

324 26-Sep-15 4331 Ǿ500 12.00 TC-15 Soldier Pile

325 26-Sep-15 4332 Ǿ500 12.00 TC-15 Soldier Pile

326 26-Sep-15 4333 Ǿ500 12.00 TC-15 Soldier Pile

327 26-Sep-15 4334 Ǿ500 12.00 TC-15 Soldier Pile

328 26-Sep-15 4335 Ǿ500 12.00 TC-15 Soldier Pile

329 26-Sep-15 4336 Ǿ500 12.00 TC-15 Soldier Pile

330 26-Sep-15 4337 Ǿ500 12.00 TC-15 Soldier Pile

331 26-Sep-15 4338 Ǿ500 12.00 TC-15 Soldier Pile

332 28-Sep-15 4339 Ǿ500 12.00 TC-15 Soldier Pile

333 28-Sep-15 4340 Ǿ500 12.00 TC-15 Soldier Pile

334 28-Sep-15 4341 Ǿ500 12.00 TC-15 Soldier Pile

335 28-Sep-15 4342 Ǿ500 12.00 TC-15 Soldier Pile

336 28-Sep-15 4343 Ǿ500 12.00 TC-15 Soldier Pile

337 28-Sep-15 4344 Ǿ500 12.00 TC-15 Soldier Pile

338 28-Sep-15 4345 Ǿ500 12.00 TC-15 Soldier Pile

339 28-Sep-15 4346 Ǿ500 12.00 TC-15 Soldier Pile

340 28-Sep-15 4347 Ǿ500 12.00 TC-15 Soldier Pile

341 28-Sep-15 4348 Ǿ500 12.00 TC-15 Soldier Pile

342 28-Sep-15 4349 Ǿ500 12.00 TC-15 Soldier Pile

343 28-Sep-15 4350 Ǿ500 12.00 TC-15 Soldier Pile

344 29-Sep-15 4351 Ǿ500 12.00 TC-15 Soldier Pile

345 29-Sep-15 4352 Ǿ500 12.00 TC-15 Soldier Pile

346 29-Sep-15 4353 Ǿ500 12.00 TC-15 Soldier Pile

347 29-Sep-15 4354 Ǿ500 12.00 TC-15 Soldier Pile

348 29-Sep-15 4355 Ǿ500 12.00 TC-15 Soldier Pile

349 29-Sep-15 4356 Ǿ500 12.00 TC-15 Soldier Pile

350 29-Sep-15 4357 Ǿ500 12.00 TC-15 Soldier Pile

351 29-Sep-15 4358 Ǿ500 12.00 TC-15 Soldier Pile

352 29-Sep-15 4359 Ǿ500 12.00 TC-15 Soldier Pile

353 29-Sep-15 4360 Ǿ500 12.00 TC-15 Soldier Pile

354 29-Sep-15 4361 Ǿ500 12.00 TC-15 Soldier Pile

355 29-Sep-15 4362 Ǿ500 12.00 TC-15 Soldier Pile

356 29-Sep-15 4363 Ǿ500 12.00 TC-15 Soldier Pile

357 29-Sep-15 4364 Ǿ500 12.00 TC-15 Soldier Pile

358 29-Sep-15 4365 Ǿ500 12.00 TC-15 Soldier Pile

359 30-Sep-15 4366 Ǿ500 12.00 TC-15 Soldier Pile

360 30-Sep-15 4367 Ǿ500 12.00 TC-15 Soldier Pile

361 30-Sep-15 4368 Ǿ500 12.00 TC-15 Soldier Pile

362 30-Sep-15 4369 Ǿ500 12.00 TC-15 Soldier Pile

363 30-Sep-15 4370 Ǿ500 12.00 TC-15 Soldier Pile

364 30-Sep-15 4371 Ǿ500 12.00 TC-15 Soldier Pile

365 30-Sep-15 4372 Ǿ500 12.00 TC-15 Soldier Pile

366 30-Sep-15 4373 Ǿ500 12.00 TC-15 Soldier Pile

367 30-Sep-15 4374 Ǿ500 12.00 TC-15 Soldier Pile

368 30-Sep-15 4375 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

369 30-Sep-15 4376 Ǿ500 12.00 TC-15 Soldier Pile

370 30-Sep-15 4377 Ǿ500 12.00 TC-15 Soldier Pile

371 30-Sep-15 4378 Ǿ500 12.00 TC-15 Soldier Pile

372 30-Sep-15 4379 Ǿ500 12.00 TC-15 Soldier Pile

373 30-Sep-15 4380 Ǿ500 12.00 TC-15 Soldier Pile

374 30-Sep-15 4381 Ǿ500 12.00 TC-15 Soldier Pile

395 1-Oct-15 4382 Ǿ500 12.00 TC-15 Soldier Pile

396 1-Oct-15 4383 Ǿ500 12.00 TC-15 Soldier Pile

397 1-Oct-15 4384 Ǿ500 12.00 TC-15 Soldier Pile

398 1-Oct-15 4385 Ǿ500 12.00 TC-15 Soldier Pile

399 1-Oct-15 4386 Ǿ500 12.00 TC-15 Soldier Pile

400 1-Oct-15 4387 Ǿ500 12.00 TC-15 Soldier Pile

401 1-Oct-15 4388 Ǿ500 12.00 TC-15 Soldier Pile

402 1-Oct-15 4389 Ǿ500 12.00 TC-15 Soldier Pile

403 1-Oct-15 4390 Ǿ500 12.00 TC-15 Soldier Pile

404 1-Oct-15 4391 Ǿ500 12.00 TC-15 Soldier Pile

405 1-Oct-15 4392 Ǿ500 12.00 TC-15 Soldier Pile

406 1-Oct-15 4393 Ǿ500 12.00 TC-15 Soldier Pile

407 1-Oct-15 4394 Ǿ500 12.00 TC-15 Soldier Pile

408 1-Oct-15 4395 Ǿ500 12.00 TC-15 Soldier Pile

450 2-Oct-15 4396 Ǿ500 12.00 TC-15 Soldier Pile

451 2-Oct-15 4397 Ǿ500 12.00 TC-15 Soldier Pile

452 2-Oct-15 4398 Ǿ500 12.00 TC-15 Soldier Pile

453 2-Oct-15 4399 Ǿ500 12.00 TC-15 Soldier Pile

454 2-Oct-15 4400 Ǿ500 12.00 TC-15 Soldier Pile

455 2-Oct-15 4401 Ǿ500 12.00 TC-15 Soldier Pile

456 2-Oct-15 4402 Ǿ500 12.00 TC-15 Soldier Pile

457 2-Oct-15 4403 Ǿ500 12.00 TC-15 Soldier Pile

458 2-Oct-15 4404 Ǿ500 12.00 TC-15 Soldier Pile

459 2-Oct-15 4405 Ǿ500 12.00 TC-15 Soldier Pile

460 2-Oct-15 4406 Ǿ500 12.00 TC-15 Soldier Pile

461 2-Oct-15 4407 Ǿ500 12.00 TC-15 Soldier Pile

462 2-Oct-15 4408 Ǿ500 12.00 TC-15 Soldier Pile

463 2-Oct-15 4409 Ǿ500 12.00 TC-15 Soldier Pile

464 2-Oct-15 4410 Ǿ500 12.00 TC-15 Soldier Pile

465 2-Oct-15 4411 Ǿ500 12.00 TC-15 Soldier Pile

508 3-Oct-15 4412 Ǿ500 12.00 TC-15 Soldier Pile

509 3-Oct-15 4413 Ǿ500 12.00 TC-15 Soldier Pile

510 3-Oct-15 4414 Ǿ500 12.00 TC-15 Soldier Pile

511 3-Oct-15 4415 Ǿ500 12.00 TC-15 Soldier Pile

512 3-Oct-15 4416 Ǿ500 12.00 TC-15 Soldier Pile

513 3-Oct-15 4417 Ǿ500 12.00 TC-15 Soldier Pile

514 3-Oct-15 4418 Ǿ500 12.00 TC-15 Soldier Pile

515 3-Oct-15 4419 Ǿ500 12.00 TC-15 Soldier Pile

516 3-Oct-15 4420 Ǿ500 12.00 TC-15 Soldier Pile

517 3-Oct-15 4421 Ǿ500 12.00 TC-15 Soldier Pile

518 3-Oct-15 4422 Ǿ500 12.00 TC-15 Soldier Pile

519 3-Oct-15 4423 Ǿ500 12.00 TC-15 Soldier Pile

520 3-Oct-15 4424 Ǿ500 12.00 TC-15 Soldier Pile

521 3-Oct-15 4425 Ǿ500 12.00 TC-15 Soldier Pile

522 3-Oct-15 4426 Ǿ500 12.00 TC-15 Soldier Pile

523 3-Oct-15 4427 Ǿ500 12.00 TC-15 Soldier Pile

524 3-Oct-15 4428 Ǿ500 12.00 TC-15 Soldier Pile

525 3-Oct-15 4429 Ǿ500 12.00 TC-15 Soldier Pile

526 3-Oct-15 4430 Ǿ500 12.00 TC-15 Soldier Pile

52 26-Aug-15 4433 Ǿ500 12.00 TC-53 SOLDIER

53 26-Aug-15 4434 Ǿ500 12.00 TC-53 SOLDIER

54 26-Aug-15 4435 Ǿ500 12.00 TC-53 SOLDIER

55 26-Aug-15 4436 Ǿ500 12.00 TC-53 SOLDIER

56 26-Aug-15 4437 Ǿ500 12.00 TC-53 SOLDIER

57 26-Aug-15 4438 Ǿ500 12.00 TC-53 SOLDIER

58 26-Aug-15 4439 Ǿ500 12.00 TC-53 SOLDIER

59 26-Aug-15 4440 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

60 26-Aug-15 4441 Ǿ500 12.00 TC-53 SOLDIER

61 27-Aug-15 4442 Ǿ500 12.00 TC-53 SOLDIER

62 27-Aug-15 4443 Ǿ500 12.00 TC-53 SOLDIER

63 27-Aug-15 4444 Ǿ500 12.00 TC-53 SOLDIER

64 27-Aug-15 4445 Ǿ500 12.00 TC-53 SOLDIER

65 27-Aug-15 4446 Ǿ500 12.00 TC-53 SOLDIER

66 27-Aug-15 4447 Ǿ500 12.00 TC-53 SOLDIER

67 27-Aug-15 4448 Ǿ500 12.00 TC-53 SOLDIER

68 27-Aug-15 4449 Ǿ500 12.00 TC-53 SOLDIER

69 27-Aug-15 4450 Ǿ500 12.00 TC-53 SOLDIER

70 27-Aug-15 4451 Ǿ500 12.00 TC-53 SOLDIER

71 28-Aug-15 4452 Ǿ500 12.00 TC-53 SOLDIER

72 28-Aug-15 4453 Ǿ500 12.00 TC-53 SOLDIER

73 28-Aug-15 4454 Ǿ500 12.00 TC-53 SOLDIER

74 28-Aug-15 4455 Ǿ500 12.00 TC-53 SOLDIER

75 28-Aug-15 4456 Ǿ500 12.00 TC-53 SOLDIER

76 28-Aug-15 4457 Ǿ500 12.00 TC-53 SOLDIER

77 28-Aug-15 4458 Ǿ500 12.00 TC-53 SOLDIER

78 28-Aug-15 4459 Ǿ500 12.00 TC-53 SOLDIER

79 28-Aug-15 4460 Ǿ500 12.00 TC-53 SOLDIER

80 28-Aug-15 4461 Ǿ500 12.00 TC-53 SOLDIER

81 28-Aug-15 4462 Ǿ500 12.00 TC-53 SOLDIER

82 29-Aug-15 4463 Ǿ500 12.00 TC-53 SOLDIER

83 29-Aug-15 4464 Ǿ500 12.00 TC-53 SOLDIER

84 29-Aug-15 4465 Ǿ500 12.00 TC-53 SOLDIER

85 29-Aug-15 4466 Ǿ500 12.00 TC-53 SOLDIER

86 29-Aug-15 4467 Ǿ500 12.00 TC-53 SOLDIER

87 29-Aug-15 4468 Ǿ500 12.00 TC-53 SOLDIER

88 29-Aug-15 4469 Ǿ500 12.00 TC-53 SOLDIER

89 29-Aug-15 4470 Ǿ500 12.00 TC-53 SOLDIER

90 29-Aug-15 4471 Ǿ500 12.00 TC-53 SOLDIER

91 29-Aug-15 4472 Ǿ500 12.00 TC-53 SOLDIER

92 29-Aug-15 4473 Ǿ500 12.00 TC-53 SOLDIER

93 29-Aug-15 4474 Ǿ500 12.00 TC-53 SOLDIER

94 29-Aug-15 4475 Ǿ500 12.00 TC-53 SOLDIER

95 31-Aug-15 4476 Ǿ500 12.00 TC-53 SOLDIER

96 31-Aug-15 4477 Ǿ500 12.00 TC-53 SOLDIER

97 31-Aug-15 4478 Ǿ500 12.00 TC-53 SOLDIER

98 31-Aug-15 4479 Ǿ500 12.00 TC-53 SOLDIER

99 31-Aug-15 4480 Ǿ500 12.00 TC-53 SOLDIER

100 31-Aug-15 4481 Ǿ500 12.00 TC-53 SOLDIER

101 31-Aug-15 4482 Ǿ500 12.00 TC-53 SOLDIER

102 31-Aug-15 4483 Ǿ500 12.00 TC-53 SOLDIER

103 31-Aug-15 4484 Ǿ500 12.00 TC-53 SOLDIER

104 31-Aug-15 4485 Ǿ500 12.00 TC-53 SOLDIER

105 31-Aug-15 4486 Ǿ500 12.00 TC-53 SOLDIER

106 31-Aug-15 4487 Ǿ500 12.00 TC-53 SOLDIER

107 31-Aug-15 4488 Ǿ500 12.00 TC-53 SOLDIER

108 1-Sep-15 4489 Ǿ500 12.00 TC-53 SOLDIER

109 1-Sep-15 4490 Ǿ500 12.00 TC-53 SOLDIER

110 1-Sep-15 4491 Ǿ500 12.00 TC-53 SOLDIER

111 1-Sep-15 4492 Ǿ500 12.00 TC-53 SOLDIER

112 1-Sep-15 4493 Ǿ500 12.00 TC-53 SOLDIER

113 1-Sep-15 4494 Ǿ500 12.00 TC-53 SOLDIER

114 1-Sep-15 4495 Ǿ500 12.00 TC-53 SOLDIER

115 1-Sep-15 4496 Ǿ500 12.00 TC-53 SOLDIER

116 1-Sep-15 4497 Ǿ500 12.00 TC-53 SOLDIER

117 1-Sep-15 4498 Ǿ500 12.00 TC-53 SOLDIER

118 1-Sep-15 4499 Ǿ500 12.00 TC-53 SOLDIER

119 1-Sep-15 4500 Ǿ500 12.00 TC-53 SOLDIER

120 1-Sep-15 4501 Ǿ500 12.00 TC-53 SOLDIER

121 2-Sep-15 4502 Ǿ500 12.00 TC-53 SOLDIER

122 2-Sep-15 4503 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

123 2-Sep-15 4504 Ǿ500 12.00 TC-53 SOLDIER

124 2-Sep-15 4505 Ǿ500 12.00 TC-53 SOLDIER

125 2-Sep-15 4506 Ǿ500 12.00 TC-53 SOLDIER

126 2-Sep-15 4507 Ǿ500 12.00 TC-53 SOLDIER

127 2-Sep-15 4508 Ǿ500 12.00 TC-53 SOLDIER

128 2-Sep-15 4509 Ǿ500 12.00 TC-53 SOLDIER

129 2-Sep-15 4510 Ǿ500 12.00 TC-53 SOLDIER

130 2-Sep-15 4511 Ǿ500 12.00 TC-53 SOLDIER

131 2-Sep-15 4512 Ǿ500 12.00 TC-53 SOLDIER

132 2-Sep-15 4513 Ǿ500 12.00 TC-53 SOLDIER

133 2-Sep-15 4514 Ǿ500 12.00 TC-53 SOLDIER

135 3-Sep-15 4515 Ǿ500 12.00 TC-53 SOLDIER

136 3-Sep-15 4516 Ǿ500 12.00 TC-53 SOLDIER

137 3-Sep-15 4517 Ǿ500 12.00 TC-53 SOLDIER

138 3-Sep-15 4518 Ǿ500 12.00 TC-53 SOLDIER

139 3-Sep-15 4519 Ǿ500 12.00 TC-53 SOLDIER

140 3-Sep-15 4520 Ǿ500 12.00 TC-53 SOLDIER

141 3-Sep-15 4521 Ǿ500 12.00 TC-53 SOLDIER

142 3-Sep-15 4522 Ǿ500 12.00 TC-53 SOLDIER

143 3-Sep-15 4523 Ǿ500 12.00 TC-53 SOLDIER

144 3-Sep-15 4524 Ǿ500 12.00 TC-53 SOLDIER

145 3-Sep-15 4525 Ǿ500 12.00 TC-53 SOLDIER

146 3-Sep-15 4526 Ǿ500 12.00 TC-53 SOLDIER

147 3-Sep-15 4527 Ǿ500 12.00 TC-53 SOLDIER

148 3-Sep-15 4528 Ǿ500 12.00 TC-53 SOLDIER

149 4-Sep-15 4529 Ǿ500 12.00 TC-53 SOLDIER

150 4-Sep-15 4530 Ǿ500 12.00 TC-53 SOLDIER

151 4-Sep-15 4531 Ǿ500 12.00 TC-53 SOLDIER

152 4-Sep-15 4532 Ǿ500 12.00 TC-53 SOLDIER

153 4-Sep-15 4533 Ǿ500 12.00 TC-53 SOLDIER

154 4-Sep-15 4534 Ǿ500 12.00 TC-53 SOLDIER

155 4-Sep-15 4535 Ǿ500 12.00 TC-53 SOLDIER

156 4-Sep-15 4536 Ǿ500 12.00 TC-53 SOLDIER

157 4-Sep-15 4537 Ǿ500 12.00 TC-53 SOLDIER

158 4-Sep-15 4538 Ǿ500 12.00 TC-53 SOLDIER

159 4-Sep-15 4539 Ǿ500 12.00 TC-53 SOLDIER

160 6-Sep-15 4540 Ǿ500 12.00 TC-53 SOLDIER

161 6-Sep-15 4541 Ǿ500 12.00 TC-53 SOLDIER

162 6-Sep-15 4542 Ǿ500 12.00 TC-53 SOLDIER

163 6-Sep-15 4543 Ǿ500 12.00 TC-53 SOLDIER

164 6-Sep-15 4544 Ǿ500 12.00 TC-53 SOLDIER

165 6-Sep-15 4545 Ǿ500 12.00 TC-53 SOLDIER

166 6-Sep-15 4546 Ǿ500 12.00 TC-53 SOLDIER

167 6-Sep-15 4547 Ǿ500 12.00 TC-53 SOLDIER

168 6-Sep-15 4548 Ǿ500 12.00 TC-53 SOLDIER

169 6-Sep-15 4549 Ǿ500 12.00 TC-53 SOLDIER

170 6-Sep-15 4550 Ǿ500 12.00 TC-53 SOLDIER

171 6-Sep-15 4551 Ǿ500 12.00 TC-53 SOLDIER

172 7-Sep-15 4552 Ǿ500 12.00 TC-53 SOLDIER

173 7-Sep-15 4553 Ǿ500 12.00 TC-53 SOLDIER

174 7-Sep-15 4554 Ǿ500 12.00 TC-53 SOLDIER

175 7-Sep-15 4555 Ǿ500 12.00 TC-53 SOLDIER

176 7-Sep-15 4556 Ǿ500 12.00 TC-53 SOLDIER

177 7-Sep-15 4557 Ǿ500 12.00 TC-53 SOLDIER

178 7-Sep-15 4558 Ǿ500 12.00 TC-53 SOLDIER

179 7-Sep-15 4559 Ǿ500 12.00 TC-53 SOLDIER

180 7-Sep-15 4560 Ǿ500 12.00 TC-53 SOLDIER

181 7-Sep-15 4561 Ǿ500 12.00 TC-53 SOLDIER

182 7-Sep-15 4562 Ǿ500 12.00 TC-53 SOLDIER

183 7-Sep-15 4563 Ǿ500 12.00 TC-53 SOLDIER

184 7-Sep-15 4564 Ǿ500 12.00 TC-53 SOLDIER

186 8-Sep-15 4565 Ǿ500 12.00 TC-53 SOLDIER

187 8-Sep-15 4566 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

188 8-Sep-15 4567 Ǿ500 12.00 TC-53 SOLDIER

189 8-Sep-15 4568 Ǿ500 12.00 TC-53 SOLDIER

190 8-Sep-15 4569 Ǿ500 12.00 TC-53 SOLDIER

191 8-Sep-15 4570 Ǿ500 12.00 TC-53 SOLDIER

192 8-Sep-15 4571 Ǿ500 12.00 TC-53 SOLDIER

193 8-Sep-15 4572 Ǿ500 12.00 TC-53 SOLDIER

194 8-Sep-15 4573 Ǿ500 12.00 TC-53 SOLDIER

195 8-Sep-15 4574 Ǿ500 12.00 TC-53 SOLDIER

196 8-Sep-15 4575 Ǿ500 12.00 TC-53 SOLDIER

197 8-Sep-15 4576 Ǿ500 12.00 TC-53 SOLDIER

198 8-Sep-15 4577 Ǿ500 12.00 TC-53 SOLDIER

200 10-Sep-15 4578 Ǿ500 12.00 TC-53 SOLDIER

201 10-Sep-15 4579 Ǿ500 12.00 TC-53 SOLDIER

202 10-Sep-15 4580 Ǿ500 12.00 TC-53 SOLDIER

203 10-Sep-15 4581 Ǿ500 12.00 TC-53 SOLDIER

204 10-Sep-15 4582 Ǿ500 12.00 TC-53 SOLDIER

205 10-Sep-15 4583 Ǿ500 12.00 TC-53 SOLDIER

206 10-Sep-15 4584 Ǿ500 12.00 TC-53 SOLDIER

207 10-Sep-15 4585 Ǿ500 12.00 TC-53 SOLDIER

208 10-Sep-15 4586 Ǿ500 12.00 TC-53 SOLDIER

209 10-Sep-15 4587 Ǿ500 12.00 TC-53 SOLDIER

210 10-Sep-15 4588 Ǿ500 12.00 TC-53 SOLDIER

211 10-Sep-15 4589 Ǿ500 12.00 TC-53 SOLDIER

212 10-Sep-15 4590 Ǿ500 12.00 TC-53 SOLDIER

213 10-Sep-15 4591 Ǿ500 12.00 TC-53 SOLDIER

214 10-Sep-15 4592 Ǿ500 12.00 TC-53 SOLDIER

215 10-Sep-15 4593 Ǿ500 12.00 TC-53 SOLDIER

216 10-Sep-15 4594 Ǿ500 12.00 TC-53 SOLDIER

217 10-Sep-15 4595 Ǿ500 12.00 TC-53 SOLDIER

218 10-Sep-15 4596 Ǿ500 12.00 TC-53 SOLDIER

219 10-Sep-15 4597 Ǿ500 12.00 TC-53 SOLDIER

220 10-Sep-15 4598 Ǿ500 12.00 TC-53 SOLDIER

221 10-Sep-15 4599 Ǿ500 12.00 TC-53 SOLDIER

225 21-Sep-15 4600 Ǿ500 12.00 TC-53 Soldier Pile

226 21-Sep-15 4601 Ǿ500 12.00 TC-53 Soldier Pile

227 21-Sep-15 4602 Ǿ500 12.00 TC-53 Soldier Pile

228 21-Sep-15 4603 Ǿ500 12.00 TC-53 Soldier Pile

229 21-Sep-15 4604 Ǿ500 12.00 TC-53 Soldier Pile

230 21-Sep-15 4605 Ǿ500 12.00 TC-53 Soldier Pile

231 21-Sep-15 4606 Ǿ500 12.00 TC-53 Soldier Pile

232 21-Sep-15 4607 Ǿ500 12.00 TC-53 Soldier Pile

233 21-Sep-15 4608 Ǿ500 12.00 TC-53 Soldier Pile

234 21-Sep-15 4609 Ǿ500 12.00 TC-53 Soldier Pile

235 21-Sep-15 4610 Ǿ500 12.00 TC-53 Soldier Pile

236 21-Sep-15 4611 Ǿ500 12.00 TC-53 Soldier Pile

237 21-Sep-15 4612 Ǿ500 12.00 TC-53 Soldier Pile

238 21-Sep-15 4613 Ǿ500 12.00 TC-53 Soldier Pile

239 21-Sep-15 4614 Ǿ500 12.00 TC-53 Soldier Pile

240 21-Sep-15 4615 Ǿ500 12.00 TC-53 Soldier Pile

241 22-Sep-15 4616 Ǿ500 12.00 TC-53 Soldier Pile

242 22-Sep-15 4617 Ǿ500 12.00 TC-53 Soldier Pile

243 22-Sep-15 4618 Ǿ500 12.00 TC-53 Soldier Pile

244 22-Sep-15 4619 Ǿ500 12.00 TC-53 Soldier Pile

245 22-Sep-15 4620 Ǿ500 12.00 TC-53 Soldier Pile

246 22-Sep-15 4621 Ǿ500 12.00 TC-53 Soldier Pile

247 22-Sep-15 4622 Ǿ500 12.00 TC-53 Soldier Pile

248 22-Sep-15 4623 Ǿ500 12.00 TC-53 Soldier Pile

249 22-Sep-15 4624 Ǿ500 12.00 TC-53 Soldier Pile

250 22-Sep-15 4625 Ǿ500 12.00 TC-53 Soldier Pile

251 22-Sep-15 4626 Ǿ500 12.00 TC-53 Soldier Pile

252 22-Sep-15 4627 Ǿ500 12.00 TC-53 Soldier Pile

253 22-Sep-15 4628 Ǿ500 12.00 TC-53 Soldier Pile

254 22-Sep-15 4629 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

255 22-Sep-15 4630 Ǿ500 12.00 TC-53 Soldier Pile

256 22-Sep-15 4631 Ǿ500 12.00 TC-53 Soldier Pile

272 23-Sep-15 4632 Ǿ500 12.00 TC-53 Soldier Pile

273 23-Sep-15 4633 Ǿ500 12.00 TC-53 Soldier Pile

274 23-Sep-15 4634 Ǿ500 12.00 TC-53 Soldier Pile

275 23-Sep-15 4635 Ǿ500 12.00 TC-53 Soldier Pile

276 23-Sep-15 4636 Ǿ500 12.00 TC-53 Soldier Pile

277 23-Sep-15 4637 Ǿ500 12.00 TC-53 Soldier Pile

278 23-Sep-15 4638 Ǿ500 12.00 TC-53 Soldier Pile

279 23-Sep-15 4639 Ǿ500 12.00 TC-53 Soldier Pile

280 23-Sep-15 4640 Ǿ500 12.00 TC-53 Soldier Pile

281 23-Sep-15 4641 Ǿ500 12.00 TC-53 Soldier Pile

295 25-Sep-15 4642 Ǿ500 12.00 TC-53 Soldier Pile

296 25-Sep-15 4643 Ǿ500 12.00 TC-53 Soldier Pile

297 25-Sep-15 4644 Ǿ500 12.00 TC-53 Soldier Pile

298 25-Sep-15 4645 Ǿ500 12.00 TC-53 Soldier Pile

299 25-Sep-15 4646 Ǿ500 12.00 TC-53 Soldier Pile

300 25-Sep-15 4647 Ǿ500 12.00 TC-53 Soldier Pile

301 25-Sep-15 4648 Ǿ500 12.00 TC-53 Soldier Pile

302 25-Sep-15 4649 Ǿ500 12.00 TC-53 Soldier Pile

303 25-Sep-15 4650 Ǿ500 12.00 TC-53 Soldier Pile

304 25-Sep-15 4651 Ǿ500 12.00 TC-53 Soldier Pile

305 25-Sep-15 4652 Ǿ500 12.00 TC-53 Soldier Pile

429 1-Oct-15 4652 Ǿ500 12.00 TC-53 Soldier Pile

430 1-Oct-15 4653 Ǿ500 12.00 TC-53 Soldier Pile

431 1-Oct-15 4654 Ǿ500 12.00 TC-53 Soldier Pile

432 1-Oct-15 4655 Ǿ500 12.00 TC-53 Soldier Pile

433 1-Oct-15 4656 Ǿ500 12.00 TC-53 Soldier Pile

434 1-Oct-15 4657 Ǿ500 12.00 TC-53 Soldier Pile

435 1-Oct-15 4658 Ǿ500 12.00 TC-53 Soldier Pile

436 1-Oct-15 4659 Ǿ500 12.00 TC-53 Soldier Pile

437 1-Oct-15 4660 Ǿ500 12.00 TC-53 Soldier Pile

438 1-Oct-15 4661 Ǿ500 12.00 TC-53 Soldier Pile

439 1-Oct-15 4662 Ǿ500 12.00 TC-53 Soldier Pile

440 1-Oct-15 4663 Ǿ500 12.00 TC-53 Soldier Pile

441 1-Oct-15 4664 Ǿ500 12.00 TC-53 Soldier Pile

442 1-Oct-15 4665 Ǿ500 12.00 TC-53 Soldier Pile

443 1-Oct-15 4666 Ǿ500 12.00 TC-53 Soldier Pile

444 1-Oct-15 4667 Ǿ500 12.00 TC-53 Soldier Pile

445 1-Oct-15 4668 Ǿ500 12.00 TC-53 Soldier Pile

446 1-Oct-15 4669 Ǿ500 12.00 TC-53 Soldier Pile

447 1-Oct-15 4670 Ǿ500 12.00 TC-53 Soldier Pile

448 1-Oct-15 4671 Ǿ500 12.00 TC-53 Soldier Pile

449 1-Oct-15 4672 Ǿ500 12.00 TC-53 Soldier Pile

482 2-Oct-15 4673 Ǿ500 12.00 TC-53 Soldier Pile

483 2-Oct-15 4674 Ǿ500 12.00 TC-53 Soldier Pile

484 2-Oct-15 4675 Ǿ500 12.00 TC-53 Soldier Pile

485 2-Oct-15 4676 Ǿ500 12.00 TC-53 Soldier Pile

486 2-Oct-15 4677 Ǿ500 12.00 TC-53 Soldier Pile

487 2-Oct-15 4678 Ǿ500 12.00 TC-53 Soldier Pile

488 2-Oct-15 4679 Ǿ500 12.00 TC-53 Soldier Pile

489 2-Oct-15 4680 Ǿ500 12.00 TC-53 Soldier Pile

490 2-Oct-15 4681 Ǿ500 12.00 TC-53 Soldier Pile

491 2-Oct-15 4682 Ǿ500 12.00 TC-53 Soldier Pile

492 2-Oct-15 4683 Ǿ500 12.00 TC-53 Soldier Pile

493 2-Oct-15 4684 Ǿ500 12.00 TC-53 Soldier Pile

494 2-Oct-15 4685 Ǿ500 12.00 TC-53 Soldier Pile

495 2-Oct-15 4686 Ǿ500 12.00 TC-53 Soldier Pile

496 2-Oct-15 4687 Ǿ500 12.00 TC-53 Soldier Pile

497 2-Oct-15 4688 Ǿ500 12.00 TC-53 Soldier Pile

498 2-Oct-15 4689 Ǿ500 12.00 TC-53 Soldier Pile

499 2-Oct-15 4690 Ǿ500 12.00 TC-53 Soldier Pile

500 2-Oct-15 4691 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

501 2-Oct-15 4692 Ǿ500 12.00 TC-53 Soldier Pile

502 2-Oct-15 4693 Ǿ500 12.00 TC-53 Soldier Pile

503 2-Oct-15 4694 Ǿ500 12.00 TC-53 Soldier Pile

504 2-Oct-15 4695 Ǿ500 12.00 TC-53 Soldier Pile

505 2-Oct-15 4696 Ǿ500 12.00 TC-53 Soldier Pile

506 2-Oct-15 4697 Ǿ500 12.00 TC-53 Soldier Pile

507 2-Oct-15 4698 Ǿ500 12.00 TC-53 Soldier Pile

700 20-Nov-15 4700 Ǿ500 12.00 TC-15 Bor soldier pile

701 20-Nov-15 4701 Ǿ500 12.00 TC-15 Bor soldier pile

702 20-Nov-15 4702 Ǿ500 12.00 TC-15 Bor soldier pile

703 20-Nov-15 4703 Ǿ500 12.00 TC-15 Bor soldier pile

704 20-Nov-15 4704 Ǿ500 12.00 TC-15 Bor soldier pile

705 20-Nov-15 4705 Ǿ500 12.00 TC-15 Bor soldier pile

706 20-Nov-15 4706 Ǿ500 12.00 TC-15 Bor soldier pile

707 20-Nov-15 4707 Ǿ500 12.00 TC-15 Bor soldier pile

708 20-Nov-15 4708 Ǿ500 12.00 TC-15 Bor soldier pile

709 20-Nov-15 4709 Ǿ500 12.00 TC-15 Bor soldier pile

650 19-Nov-15 4710 Ǿ500 12.00 TC-15 Bor soldier pile

651 19-Nov-15 4711 Ǿ500 12.00 TC-15 Bor soldier pile

652 19-Nov-15 4712 Ǿ500 12.00 TC-15 Bor soldier pile

653 19-Nov-15 4713 Ǿ500 12.00 TC-15 Bor soldier pile

654 19-Nov-15 4714 Ǿ500 12.00 TC-15 Bor soldier pile

655 19-Nov-15 4715 Ǿ500 12.00 TC-15 Bor soldier pile

656 19-Nov-15 4716 Ǿ500 12.00 TC-15 Bor soldier pile

657 19-Nov-15 4717 Ǿ500 12.00 TC-15 Bor soldier pile

658 19-Nov-15 4718 Ǿ500 12.00 TC-15 Bor soldier pile

659 19-Nov-15 4719 Ǿ500 12.00 TC-15 Bor soldier pile

660 19-Nov-15 4720 Ǿ500 12.00 TC-15 Bor soldier pile

661 19-Nov-15 4721 Ǿ500 12.00 TC-15 Bor soldier pile

662 19-Nov-15 4722 Ǿ500 12.00 TC-15 Bor soldier pile

663 19-Nov-15 4723 Ǿ500 12.00 TC-15 Bor soldier pile

664 19-Nov-15 4724 Ǿ500 12.00 TC-15 Bor soldier pile

665 19-Nov-15 4725 Ǿ500 12.00 TC-15 Bor soldier pile

666 19-Nov-15 4726 Ǿ500 12.00 TC-15 Bor soldier pile

667 19-Nov-15 4727 Ǿ500 12.00 TC-15 Bor soldier pile

668 19-Nov-15 4728 Ǿ500 12.00 TC-15 Bor soldier pile

669 19-Nov-15 4729 Ǿ500 12.00 TC-15 Bor soldier pile

670 19-Nov-15 4730 Ǿ500 12.00 TC-15 Bor soldier pile

671 19-Nov-15 4731 Ǿ500 12.00 TC-15 Bor soldier pile

672 19-Nov-15 4732 Ǿ500 12.00 TC-15 Bor soldier pile

673 19-Nov-15 4733 Ǿ500 12.00 TC-15 Bor soldier pile

375 30-Sep-15 4734 Ǿ500 12.00 TC-19 Soldier Pile

376 30-Sep-15 4735 Ǿ500 12.00 TC-19 Soldier Pile

377 30-Sep-15 4736 Ǿ500 12.00 TC-19 Soldier Pile

378 30-Sep-15 4737 Ǿ500 12.00 TC-19 Soldier Pile

379 30-Sep-15 4738 Ǿ500 12.00 TC-19 Soldier Pile

380 30-Sep-15 4739 Ǿ500 12.00 TC-19 Soldier Pile

381 30-Sep-15 4740 Ǿ500 12.00 TC-19 Soldier Pile

382 30-Sep-15 4741 Ǿ500 12.00 TC-19 Soldier Pile

383 30-Sep-15 4742 Ǿ500 12.00 TC-19 Soldier Pile

384 30-Sep-15 4743 Ǿ500 12.00 TC-19 Soldier Pile

385 30-Sep-15 4744 Ǿ500 12.00 TC-19 Soldier Pile

386 30-Sep-15 4745 Ǿ500 12.00 TC-19 Soldier Pile

387 30-Sep-15 4746 Ǿ500 12.00 TC-19 Soldier Pile

388 30-Sep-15 4747 Ǿ500 12.00 TC-19 Soldier Pile

389 30-Sep-15 4748 Ǿ500 12.00 TC-19 Soldier Pile

390 30-Sep-15 4749 Ǿ500 12.00 TC-19 Soldier Pile

391 30-Sep-15 4750 Ǿ500 12.00 TC-19 Soldier Pile

392 30-Sep-15 4751 Ǿ500 12.00 TC-19 Soldier Pile

393 30-Sep-15 4752 Ǿ500 12.00 TC-19 Soldier Pile

394 30-Sep-15 4753 Ǿ500 12.00 TC-19 Soldier Pile

409 1-Oct-15 4754 Ǿ500 12.00 TC-19 Soldier Pile

410 1-Oct-15 4755 Ǿ500 12.00 TC-19 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

411 1-Oct-15 4756 Ǿ500 12.00 TC-19 Soldier Pile

412 1-Oct-15 4757 Ǿ500 12.00 TC-19 Soldier Pile

413 1-Oct-15 4758 Ǿ500 12.00 TC-19 Soldier Pile

414 1-Oct-15 4759 Ǿ500 12.00 TC-19 Soldier Pile

415 1-Oct-15 4760 Ǿ500 12.00 TC-19 Soldier Pile

416 1-Oct-15 4761 Ǿ500 12.00 TC-19 Soldier Pile

417 1-Oct-15 4762 Ǿ500 12.00 TC-19 Soldier Pile

418 1-Oct-15 4763 Ǿ500 12.00 TC-19 Soldier Pile

419 1-Oct-15 4764 Ǿ500 12.00 TC-19 Soldier Pile

420 1-Oct-15 4765 Ǿ500 12.00 TC-19 Soldier Pile

421 1-Oct-15 4766 Ǿ500 12.00 TC-19 Soldier Pile

422 1-Oct-15 4767 Ǿ500 12.00 TC-19 Soldier Pile

423 1-Oct-15 4768 Ǿ500 12.00 TC-19 Soldier Pile

424 1-Oct-15 4769 Ǿ500 12.00 TC-19 Soldier Pile

425 1-Oct-15 4770 Ǿ500 12.00 TC-19 Soldier Pile

426 1-Oct-15 4771 Ǿ500 12.00 TC-19 Soldier Pile

427 1-Oct-15 4772 Ǿ500 12.00 TC-19 Soldier Pile

428 1-Oct-15 4773 Ǿ500 12.00 TC-19 Soldier Pile

466 2-Oct-15 4774 Ǿ500 12.00 TC-19 Soldier Pile

467 2-Oct-15 4775 Ǿ500 12.00 TC-19 Soldier Pile

468 2-Oct-15 4776 Ǿ500 12.00 TC-19 Soldier Pile

469 2-Oct-15 4777 Ǿ500 12.00 TC-19 Soldier Pile

470 2-Oct-15 4778 Ǿ500 12.00 TC-19 Soldier Pile

471 2-Oct-15 4779 Ǿ500 12.00 TC-19 Soldier Pile

472 2-Oct-15 4780 Ǿ500 12.00 TC-19 Soldier Pile

473 2-Oct-15 4781 Ǿ500 12.00 TC-19 Soldier Pile

474 2-Oct-15 4782 Ǿ500 12.00 TC-19 Soldier Pile

475 2-Oct-15 4783 Ǿ500 12.00 TC-19 Soldier Pile

476 2-Oct-15 4784 Ǿ500 12.00 TC-19 Soldier Pile

477 2-Oct-15 4785 Ǿ500 12.00 TC-19 Soldier Pile

478 2-Oct-15 4786 Ǿ500 12.00 TC-19 Soldier Pile

479 2-Oct-15 4787 Ǿ500 12.00 TC-19 Soldier Pile

480 2-Oct-15 4788 Ǿ500 12.00 TC-19 Soldier Pile

481 2-Oct-15 4789 Ǿ500 12.00 TC-19 Soldier Pile

528 3-Oct-15 4790 Ǿ500 12.00 TC-19 Soldier Pile

529 3-Oct-15 4791 Ǿ500 12.00 TC-19 Soldier Pile

530 3-Oct-15 4792 Ǿ500 12.00 TC-19 Soldier Pile

531 3-Oct-15 4793 Ǿ500 12.00 TC-19 Soldier Pile

532 3-Oct-15 4794 Ǿ500 12.00 TC-19 Soldier Pile

533 3-Oct-15 4795 Ǿ500 12.00 TC-19 Soldier Pile

534 3-Oct-15 4796 Ǿ500 12.00 TC-19 Soldier Pile

535 3-Oct-15 4797 Ǿ500 12.00 TC-19 Soldier Pile

536 3-Oct-15 4798 Ǿ500 12.00 TC-19 Soldier Pile

537 3-Oct-15 4799 Ǿ500 12.00 TC-19 Soldier Pile

538 3-Oct-15 4800 Ǿ500 12.00 TC-19 Soldier Pile

539 3-Oct-15 4801 Ǿ500 12.00 TC-19 Soldier Pile

540 3-Oct-15 4802 Ǿ500 12.00 TC-19 Soldier Pile

541 3-Oct-15 4803 Ǿ500 12.00 TC-19 Soldier Pile

542 3-Oct-15 4804 Ǿ500 12.00 TC-19 Soldier Pile

543 3-Oct-15 4805 Ǿ500 12.00 TC-19 Soldier Pile

544 3-Oct-15 4806 Ǿ500 12.00 TC-19 Soldier Pile

545 3-Oct-15 4807 Ǿ500 12.00 TC-19 Soldier Pile

546 3-Oct-15 4808 Ǿ500 12.00 TC-19 Soldier Pile

547 3-Oct-15 4809 Ǿ500 12.00 TC-19 Soldier Pile

548 3-Oct-15 4810 Ǿ500 12.00 TC-19 Soldier Pile

549 3-Oct-15 4811 Ǿ500 12.00 TC-19 Soldier Pile

550 3-Oct-15 4812 Ǿ500 12.00 TC-19 Soldier Pile

551 3-Oct-15 4813 Ǿ500 12.00 TC-19 Soldier Pile

630 24-Oct-15 4814 Ǿ500 12.00 TC-19 Soldier Pile

631 24-Oct-15 4815 Ǿ500 12.00 TC-19 Soldier Pile

632 24-Oct-15 4816 Ǿ500 12.00 TC-19 Soldier Pile

633 24-Oct-15 4817 Ǿ500 12.00 TC-19 Soldier Pile

634 24-Oct-15 4818 Ǿ500 12.00 TC-19 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

635 24-Oct-15 4819 Ǿ500 12.00 TC-19 Soldier Pile

636 24-Oct-15 4820 Ǿ500 12.00 TC-19 Soldier Pile

637 24-Oct-15 4821 Ǿ500 12.00 TC-19 Soldier Pile

638 24-Oct-15 4822 Ǿ500 12.00 TC-19 Soldier Pile

639 24-Oct-15 4823 Ǿ500 12.00 TC-19 Soldier Pile

640 24-Oct-15 4824 Ǿ500 12.00 TC-19 Soldier Pile

641 24-Oct-15 4825 Ǿ500 12.00 TC-19 Soldier Pile

18 16-Aug-15 1P-17 Ǿ500 - 12.00 - - - TC-53 INDIKATOR

5 10-Aug-15 IP-1 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

7 14-Aug-15 IP-11 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

222 11-Sep-15 IP-14/397 Ǿ500 12.00 TC-15 INDIKATOR

199 8-Sep-15 IP-15/390 Ǿ500 12.00 TC-19 INDIKATOR

223 14-Sep-15 IP-16/69 Ǿ500 12.00 TC-19 Indikator

134 2-Sep-15 IP-18/562 Ǿ500 12.00 TC-19 INDIKATOR

224 15-Sep-15 IP-19/69 Ǿ500 12.00 TC-19 INDIKATOR

4 7-Aug-15 IP-2 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

11 15-Aug-15 IP-20 Ǿ500 - 12.00 - - - TC-53 INDIKATOR

3 7-Aug-15 IP-3 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

6 11-Aug-15 IP-4 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

2 6-Aug-15 IP-5 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

1 5-Aug-15 IP-9 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

49 21-Aug-15 P-18 / 466 Ǿ500 12.00 TC-53 INDIKATOR

50 21-Aug-15 P-6 / 526 Ǿ500 12.00 TC-53 INDIKATOR

41 20-Aug-15 P-7 / 813 Ǿ500 12.00 TC-53 INDIKATOR

42 20-Aug-15 P-8 / 874 Ǿ500 12.00 TC-53 INDIKATOR

40 19-Aug-15 T-1 / 3059 Ǿ500 12.00 TC-53 INDIKATOR

257 22-Sep-15 T-2 Ǿ500 12.00 TC-15 INDIKATOR

32 18-Aug-15 V-1 / 1336 12.00 TC-53 INDIKATOR

48 20-Aug-15 V-2 / 1157 Ǿ500 12.00 TC-19 SOLDIER

185 7-Sep-15 V3-229 Ǿ500 12.00 TC-19 INDIKATOR

51 24-Aug-15 V-4 / 681 Ǿ500 12.00 TC-53 INDIKATOR

TOTAL PREBORING 10104.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : SOIL FLURRY / BORE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABA


Date : 05 AGUST'15 - 31 OKT'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1 5-Aug-15 IP-9 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

2 6-Aug-15 IP-5 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

3 7-Aug-15 IP-3 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

4 7-Aug-15 IP-2 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

5 10-Aug-15 IP-1 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

6 11-Aug-15 IP-4 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

7 14-Aug-15 IP-11 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

8 14-Aug-15 4149 Ǿ500 - 12.00 - - - TC-53 SOLDIER

9 14-Aug-15 4150 Ǿ500 - 12.00 - - - TC-53 SOLDIER

10 14-Aug-15 4151 Ǿ500 - 12.00 TC-53 SOLDIER

11 15-Aug-15 IP-20 Ǿ500 - 12.00 - - - TC-53 INDIKATOR

12 15-Aug-15 4146 Ǿ500 - 12.00 TC-53 SOLDIER

13 15-Aug-15 4145 Ǿ500 - 12.00 TC-53 SOLDIER

14 15-Aug-15 4144 Ǿ500 - 12.00 TC-53 SOLDIER

15 15-Aug-15 4143 Ǿ500 - 12.00 TC-53 SOLDIER

16 15-Aug-15 4142 Ǿ500 - 12.00 TC-53 SOLDIER

17 15-Aug-15 4141 Ǿ500 - 12.00 TC-53 SOLDIER

18 16-Aug-15 1P-17 Ǿ500 - 12.00 - - - TC-53 INDIKATOR

19 16-Aug-15 4140 Ǿ500 - 12.00 TC-53 SOLDIER

20 16-Aug-15 4139 Ǿ500 - 12.00 TC-53 SOLDIER

21 16-Aug-15 4138 Ǿ500 - 12.00 TC-53 SOLDIER

22 16-Aug-15 4137 Ǿ500 - 12.00 TC-53 SOLDIER

23 16-Aug-15 4136 Ǿ500 - 12.00 TC-53 SOLDIER

24 16-Aug-15 4135 Ǿ500 - 12.00 TC-53 SOLDIER

25 18-Aug-15 4134 Ǿ500 - 12.00 TC-19 SOLDIER

26 18-Aug-15 4133 Ǿ500 - 12.00 TC-19 SOLDIER

27 18-Aug-15 4132 Ǿ500 - 12.00 TC-19 SOLDIER

28 18-Aug-15 4131 Ǿ500 - 12.00 TC-19 SOLDIER

29 18-Aug-15 4127 Ǿ500 - 12.00 TC-19 SOLDIER

30 18-Aug-15 4126 Ǿ500 - 12.00 TC-19 SOLDIER

31 18-Aug-15 4125 Ǿ500 - 12.00 TC-19 SOLDIER

32 18-Aug-15 V-1 / 1336 12.00 TC-53 INDIKATOR

33 19-Aug-15 4124 Ǿ500 - 12.00 TC-19 SOLDIER

34 19-Aug-15 4123 Ǿ500 - 12.00 TC-19 SOLDIER

35 19-Aug-15 4122 Ǿ500 - 12.00 TC-19 SOLDIER

36 19-Aug-15 4121 Ǿ500 - 12.00 TC-19 SOLDIER

37 19-Aug-15 4120 Ǿ500 - 12.00 TC-19 SOLDIER

38 19-Aug-15 4119 Ǿ500 - 12.00 TC-19 SOLDIER

39 19-Aug-15 4118 Ǿ500 - 12.00 TC-19 SOLDIER

40 19-Aug-15 T-1 / 3059Ǿ500 12.00 TC-53 INDIKATOR

41 20-Aug-15 P-7 / 813 Ǿ500 12.00 TC-53 INDIKATOR

42 20-Aug-15 P-8 / 874 Ǿ500 12.00 TC-53 INDIKATOR

43 20-Aug-15 4117 Ǿ500 12.00 TC-19 SOLDIER

44 20-Aug-15 4116 Ǿ500 12.00 TC-19 SOLDIER

45 20-Aug-15 4115 Ǿ500 12.00 TC-19 SOLDIER

46 20-Aug-15 4114 Ǿ500 12.00 TC-19 SOLDIER

47 20-Aug-15 4113 Ǿ500 12.00 TC-19 SOLDIER

48 20-Aug-15 V-2 / 1157 Ǿ500 12.00 TC-19 SOLDIER

49 21-Aug-15 P-18 / 466 Ǿ500 12.00 TC-53 INDIKATOR

50 21-Aug-15 P-6 / 526 Ǿ500 12.00 TC-53 INDIKATOR

51 24-Aug-15 V-4 / 681 Ǿ500 12.00 TC-53 INDIKATOR

52 26-Aug-15 4433 Ǿ500 12.00 TC-53 SOLDIER

53 26-Aug-15 4434 Ǿ500 12.00 TC-53 SOLDIER

54 26-Aug-15 4435 Ǿ500 12.00 TC-53 SOLDIER

55 26-Aug-15 4436 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

56 26-Aug-15 4437 Ǿ500 12.00 TC-53 SOLDIER

57 26-Aug-15 4438 Ǿ500 12.00 TC-53 SOLDIER

58 26-Aug-15 4439 Ǿ500 12.00 TC-53 SOLDIER

59 26-Aug-15 4440 Ǿ500 12.00 TC-53 SOLDIER

60 26-Aug-15 4441 Ǿ500 12.00 TC-53 SOLDIER

61 27-Aug-15 4442 Ǿ500 12.00 TC-53 SOLDIER

62 27-Aug-15 4443 Ǿ500 12.00 TC-53 SOLDIER

63 27-Aug-15 4444 Ǿ500 12.00 TC-53 SOLDIER

64 27-Aug-15 4445 Ǿ500 12.00 TC-53 SOLDIER

65 27-Aug-15 4446 Ǿ500 12.00 TC-53 SOLDIER

66 27-Aug-15 4447 Ǿ500 12.00 TC-53 SOLDIER

67 27-Aug-15 4448 Ǿ500 12.00 TC-53 SOLDIER

68 27-Aug-15 4449 Ǿ500 12.00 TC-53 SOLDIER

69 27-Aug-15 4450 Ǿ500 12.00 TC-53 SOLDIER

70 27-Aug-15 4451 Ǿ500 12.00 TC-53 SOLDIER

71 28-Aug-15 4452 Ǿ500 12.00 TC-53 SOLDIER

72 28-Aug-15 4453 Ǿ500 12.00 TC-53 SOLDIER

73 28-Aug-15 4454 Ǿ500 12.00 TC-53 SOLDIER

74 28-Aug-15 4455 Ǿ500 12.00 TC-53 SOLDIER

75 28-Aug-15 4456 Ǿ500 12.00 TC-53 SOLDIER

76 28-Aug-15 4457 Ǿ500 12.00 TC-53 SOLDIER

77 28-Aug-15 4458 Ǿ500 12.00 TC-53 SOLDIER

78 28-Aug-15 4459 Ǿ500 12.00 TC-53 SOLDIER

79 28-Aug-15 4460 Ǿ500 12.00 TC-53 SOLDIER

80 28-Aug-15 4461 Ǿ500 12.00 TC-53 SOLDIER

81 28-Aug-15 4462 Ǿ500 12.00 TC-53 SOLDIER

82 29-Aug-15 4463 Ǿ500 12.00 TC-53 SOLDIER

83 29-Aug-15 4464 Ǿ500 12.00 TC-53 SOLDIER

84 29-Aug-15 4465 Ǿ500 12.00 TC-53 SOLDIER

85 29-Aug-15 4466 Ǿ500 12.00 TC-53 SOLDIER

86 29-Aug-15 4467 Ǿ500 12.00 TC-53 SOLDIER

87 29-Aug-15 4468 Ǿ500 12.00 TC-53 SOLDIER

88 29-Aug-15 4469 Ǿ500 12.00 TC-53 SOLDIER

89 29-Aug-15 4470 Ǿ500 12.00 TC-53 SOLDIER

90 29-Aug-15 4471 Ǿ500 12.00 TC-53 SOLDIER

91 29-Aug-15 4472 Ǿ500 12.00 TC-53 SOLDIER

92 29-Aug-15 4473 Ǿ500 12.00 TC-53 SOLDIER

93 29-Aug-15 4474 Ǿ500 12.00 TC-53 SOLDIER

94 29-Aug-15 4475 Ǿ500 12.00 TC-53 SOLDIER

95 31-Aug-15 4476 Ǿ500 12.00 TC-53 SOLDIER

96 31-Aug-15 4477 Ǿ500 12.00 TC-53 SOLDIER

97 31-Aug-15 4478 Ǿ500 12.00 TC-53 SOLDIER

98 31-Aug-15 4479 Ǿ500 12.00 TC-53 SOLDIER

99 31-Aug-15 4480 Ǿ500 12.00 TC-53 SOLDIER

100 31-Aug-15 4481 Ǿ500 12.00 TC-53 SOLDIER

101 31-Aug-15 4482 Ǿ500 12.00 TC-53 SOLDIER

102 31-Aug-15 4483 Ǿ500 12.00 TC-53 SOLDIER

103 31-Aug-15 4484 Ǿ500 12.00 TC-53 SOLDIER

104 31-Aug-15 4485 Ǿ500 12.00 TC-53 SOLDIER

105 31-Aug-15 4486 Ǿ500 12.00 TC-53 SOLDIER

106 31-Aug-15 4487 Ǿ500 12.00 TC-53 SOLDIER

107 31-Aug-15 4488 Ǿ500 12.00 TC-53 SOLDIER

108 1-Sep-15 4489 Ǿ500 12.00 TC-53 SOLDIER

109 1-Sep-15 4490 Ǿ500 12.00 TC-53 SOLDIER

110 1-Sep-15 4491 Ǿ500 12.00 TC-53 SOLDIER

111 1-Sep-15 4492 Ǿ500 12.00 TC-53 SOLDIER

112 1-Sep-15 4493 Ǿ500 12.00 TC-53 SOLDIER

113 1-Sep-15 4494 Ǿ500 12.00 TC-53 SOLDIER

114 1-Sep-15 4495 Ǿ500 12.00 TC-53 SOLDIER

115 1-Sep-15 4496 Ǿ500 12.00 TC-53 SOLDIER

116 1-Sep-15 4497 Ǿ500 12.00 TC-53 SOLDIER

117 1-Sep-15 4498 Ǿ500 12.00 TC-53 SOLDIER

118 1-Sep-15 4499 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

119 1-Sep-15 4500 Ǿ500 12.00 TC-53 SOLDIER

120 1-Sep-15 4501 Ǿ500 12.00 TC-53 SOLDIER

121 2-Sep-15 4502 Ǿ500 12.00 TC-53 SOLDIER

122 2-Sep-15 4503 Ǿ500 12.00 TC-53 SOLDIER

123 2-Sep-15 4504 Ǿ500 12.00 TC-53 SOLDIER

124 2-Sep-15 4505 Ǿ500 12.00 TC-53 SOLDIER

125 2-Sep-15 4506 Ǿ500 12.00 TC-53 SOLDIER

126 2-Sep-15 4507 Ǿ500 12.00 TC-53 SOLDIER

127 2-Sep-15 4508 Ǿ500 12.00 TC-53 SOLDIER

128 2-Sep-15 4509 Ǿ500 12.00 TC-53 SOLDIER

129 2-Sep-15 4510 Ǿ500 12.00 TC-53 SOLDIER

130 2-Sep-15 4511 Ǿ500 12.00 TC-53 SOLDIER

131 2-Sep-15 4512 Ǿ500 12.00 TC-53 SOLDIER

132 2-Sep-15 4513 Ǿ500 12.00 TC-53 SOLDIER

133 2-Sep-15 4514 Ǿ500 12.00 TC-53 SOLDIER

134 2-Sep-15 IP-18/562 Ǿ500 12.00 TC-19 INDIKATOR

135 3-Sep-15 4515 Ǿ500 12.00 TC-53 SOLDIER

136 3-Sep-15 4516 Ǿ500 12.00 TC-53 SOLDIER

137 3-Sep-15 4517 Ǿ500 12.00 TC-53 SOLDIER

138 3-Sep-15 4518 Ǿ500 12.00 TC-53 SOLDIER

139 3-Sep-15 4519 Ǿ500 12.00 TC-53 SOLDIER

140 3-Sep-15 4520 Ǿ500 12.00 TC-53 SOLDIER

141 3-Sep-15 4521 Ǿ500 12.00 TC-53 SOLDIER

142 3-Sep-15 4522 Ǿ500 12.00 TC-53 SOLDIER

143 3-Sep-15 4523 Ǿ500 12.00 TC-53 SOLDIER

144 3-Sep-15 4524 Ǿ500 12.00 TC-53 SOLDIER

145 3-Sep-15 4525 Ǿ500 12.00 TC-53 SOLDIER

146 3-Sep-15 4526 Ǿ500 12.00 TC-53 SOLDIER

147 3-Sep-15 4527 Ǿ500 12.00 TC-53 SOLDIER

148 3-Sep-15 4528 Ǿ500 12.00 TC-53 SOLDIER

149 4-Sep-15 4529 Ǿ500 12.00 TC-53 SOLDIER

150 4-Sep-15 4530 Ǿ500 12.00 TC-53 SOLDIER

151 4-Sep-15 4531 Ǿ500 12.00 TC-53 SOLDIER

152 4-Sep-15 4532 Ǿ500 12.00 TC-53 SOLDIER

153 4-Sep-15 4533 Ǿ500 12.00 TC-53 SOLDIER

154 4-Sep-15 4534 Ǿ500 12.00 TC-53 SOLDIER

155 4-Sep-15 4535 Ǿ500 12.00 TC-53 SOLDIER

156 4-Sep-15 4536 Ǿ500 12.00 TC-53 SOLDIER

157 4-Sep-15 4537 Ǿ500 12.00 TC-53 SOLDIER

158 4-Sep-15 4538 Ǿ500 12.00 TC-53 SOLDIER

159 4-Sep-15 4539 Ǿ500 12.00 TC-53 SOLDIER

160 6-Sep-15 4540 Ǿ500 12.00 TC-53 SOLDIER

161 6-Sep-15 4541 Ǿ500 12.00 TC-53 SOLDIER

162 6-Sep-15 4542 Ǿ500 12.00 TC-53 SOLDIER

163 6-Sep-15 4543 Ǿ500 12.00 TC-53 SOLDIER

164 6-Sep-15 4544 Ǿ500 12.00 TC-53 SOLDIER

165 6-Sep-15 4545 Ǿ500 12.00 TC-53 SOLDIER

166 6-Sep-15 4546 Ǿ500 12.00 TC-53 SOLDIER

167 6-Sep-15 4547 Ǿ500 12.00 TC-53 SOLDIER

168 6-Sep-15 4548 Ǿ500 12.00 TC-53 SOLDIER

169 6-Sep-15 4549 Ǿ500 12.00 TC-53 SOLDIER

170 6-Sep-15 4550 Ǿ500 12.00 TC-53 SOLDIER

171 6-Sep-15 4551 Ǿ500 12.00 TC-53 SOLDIER

172 7-Sep-15 4552 Ǿ500 12.00 TC-53 SOLDIER

173 7-Sep-15 4553 Ǿ500 12.00 TC-53 SOLDIER

174 7-Sep-15 4554 Ǿ500 12.00 TC-53 SOLDIER

175 7-Sep-15 4555 Ǿ500 12.00 TC-53 SOLDIER

176 7-Sep-15 4556 Ǿ500 12.00 TC-53 SOLDIER

177 7-Sep-15 4557 Ǿ500 12.00 TC-53 SOLDIER

178 7-Sep-15 4558 Ǿ500 12.00 TC-53 SOLDIER

179 7-Sep-15 4559 Ǿ500 12.00 TC-53 SOLDIER

180 7-Sep-15 4560 Ǿ500 12.00 TC-53 SOLDIER

181 7-Sep-15 4561 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

182 7-Sep-15 4562 Ǿ500 12.00 TC-53 SOLDIER

183 7-Sep-15 4563 Ǿ500 12.00 TC-53 SOLDIER

184 7-Sep-15 4564 Ǿ500 12.00 TC-53 SOLDIER

185 7-Sep-15 V3-229 Ǿ500 12.00 TC-19 INDIKATOR

186 8-Sep-15 4565 Ǿ500 12.00 TC-53 SOLDIER

187 8-Sep-15 4566 Ǿ500 12.00 TC-53 SOLDIER

188 8-Sep-15 4567 Ǿ500 12.00 TC-53 SOLDIER

189 8-Sep-15 4568 Ǿ500 12.00 TC-53 SOLDIER

190 8-Sep-15 4569 Ǿ500 12.00 TC-53 SOLDIER

191 8-Sep-15 4570 Ǿ500 12.00 TC-53 SOLDIER

192 8-Sep-15 4571 Ǿ500 12.00 TC-53 SOLDIER

193 8-Sep-15 4572 Ǿ500 12.00 TC-53 SOLDIER

194 8-Sep-15 4573 Ǿ500 12.00 TC-53 SOLDIER

195 8-Sep-15 4574 Ǿ500 12.00 TC-53 SOLDIER

196 8-Sep-15 4575 Ǿ500 12.00 TC-53 SOLDIER

197 8-Sep-15 4576 Ǿ500 12.00 TC-53 SOLDIER

198 8-Sep-15 4577 Ǿ500 12.00 TC-53 SOLDIER

199 8-Sep-15 IP-15/390 Ǿ500 12.00 TC-19 INDIKATOR

200 10-Sep-15 4578 Ǿ500 12.00 TC-53 SOLDIER

201 10-Sep-15 4579 Ǿ500 12.00 TC-53 SOLDIER

202 10-Sep-15 4580 Ǿ500 12.00 TC-53 SOLDIER

203 10-Sep-15 4581 Ǿ500 12.00 TC-53 SOLDIER

204 10-Sep-15 4582 Ǿ500 12.00 TC-53 SOLDIER

205 10-Sep-15 4583 Ǿ500 12.00 TC-53 SOLDIER

206 10-Sep-15 4584 Ǿ500 12.00 TC-53 SOLDIER

207 10-Sep-15 4585 Ǿ500 12.00 TC-53 SOLDIER

208 10-Sep-15 4586 Ǿ500 12.00 TC-53 SOLDIER

209 10-Sep-15 4587 Ǿ500 12.00 TC-53 SOLDIER

210 10-Sep-15 4588 Ǿ500 12.00 TC-53 SOLDIER

211 10-Sep-15 4589 Ǿ500 12.00 TC-53 SOLDIER

212 10-Sep-15 4590 Ǿ500 12.00 TC-53 SOLDIER

213 10-Sep-15 4591 Ǿ500 12.00 TC-53 SOLDIER

214 10-Sep-15 4592 Ǿ500 12.00 TC-53 SOLDIER

215 10-Sep-15 4593 Ǿ500 12.00 TC-53 SOLDIER

216 10-Sep-15 4594 Ǿ500 12.00 TC-53 SOLDIER

217 10-Sep-15 4595 Ǿ500 12.00 TC-53 SOLDIER

218 10-Sep-15 4596 Ǿ500 12.00 TC-53 SOLDIER

219 10-Sep-15 4597 Ǿ500 12.00 TC-53 SOLDIER

220 10-Sep-15 4598 Ǿ500 12.00 TC-53 SOLDIER

221 10-Sep-15 4599 Ǿ500 12.00 TC-53 SOLDIER

222 11-Sep-15 IP-14/397 Ǿ500 12.00 TC-15 INDIKATOR

223 14-Sep-15 IP-16/69 Ǿ500 12.00 TC-19 Indikator

224 15-Sep-15 IP-19/69 Ǿ500 12.00 TC-19 INDIKATOR

225 21-Sep-15 4600 Ǿ500 12.00 TC-53 Soldier Pile

226 21-Sep-15 4601 Ǿ500 12.00 TC-53 Soldier Pile

227 21-Sep-15 4602 Ǿ500 12.00 TC-53 Soldier Pile

228 21-Sep-15 4603 Ǿ500 12.00 TC-53 Soldier Pile

229 21-Sep-15 4604 Ǿ500 12.00 TC-53 Soldier Pile

230 21-Sep-15 4605 Ǿ500 12.00 TC-53 Soldier Pile

231 21-Sep-15 4606 Ǿ500 12.00 TC-53 Soldier Pile

232 21-Sep-15 4607 Ǿ500 12.00 TC-53 Soldier Pile

233 21-Sep-15 4608 Ǿ500 12.00 TC-53 Soldier Pile

234 21-Sep-15 4609 Ǿ500 12.00 TC-53 Soldier Pile

235 21-Sep-15 4610 Ǿ500 12.00 TC-53 Soldier Pile

236 21-Sep-15 4611 Ǿ500 12.00 TC-53 Soldier Pile

237 21-Sep-15 4612 Ǿ500 12.00 TC-53 Soldier Pile

238 21-Sep-15 4613 Ǿ500 12.00 TC-53 Soldier Pile

239 21-Sep-15 4614 Ǿ500 12.00 TC-53 Soldier Pile

240 21-Sep-15 4615 Ǿ500 12.00 TC-53 Soldier Pile

241 22-Sep-15 4616 Ǿ500 12.00 TC-53 Soldier Pile

242 22-Sep-15 4617 Ǿ500 12.00 TC-53 Soldier Pile

243 22-Sep-15 4618 Ǿ500 12.00 TC-53 Soldier Pile

244 22-Sep-15 4619 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

245 22-Sep-15 4620 Ǿ500 12.00 TC-53 Soldier Pile

246 22-Sep-15 4621 Ǿ500 12.00 TC-53 Soldier Pile

247 22-Sep-15 4622 Ǿ500 12.00 TC-53 Soldier Pile

248 22-Sep-15 4623 Ǿ500 12.00 TC-53 Soldier Pile

249 22-Sep-15 4624 Ǿ500 12.00 TC-53 Soldier Pile

250 22-Sep-15 4625 Ǿ500 12.00 TC-53 Soldier Pile

251 22-Sep-15 4626 Ǿ500 12.00 TC-53 Soldier Pile

252 22-Sep-15 4627 Ǿ500 12.00 TC-53 Soldier Pile

253 22-Sep-15 4628 Ǿ500 12.00 TC-53 Soldier Pile

254 22-Sep-15 4629 Ǿ500 12.00 TC-53 Soldier Pile

255 22-Sep-15 4630 Ǿ500 12.00 TC-53 Soldier Pile

256 22-Sep-15 4631 Ǿ500 12.00 TC-53 Soldier Pile

257 22-Sep-15 T-2 Ǿ500 12.00 TC-15 INDIKATOR

258 22-Sep-15 4286 Ǿ500 12.00 TC-15 Soldier Pile

259 22-Sep-15 4287 Ǿ500 12.00 TC-15 Soldier Pile

260 22-Sep-15 4288 Ǿ500 12.00 TC-15 Soldier Pile

261 22-Sep-15 4289 Ǿ500 12.00 TC-15 Soldier Pile

262 22-Sep-15 4290 Ǿ500 12.00 TC-15 Soldier Pile

263 22-Sep-15 4291 Ǿ500 12.00 TC-15 Soldier Pile

264 22-Sep-15 4292 Ǿ500 12.00 TC-15 Soldier Pile

265 22-Sep-15 4293 Ǿ500 12.00 TC-15 Soldier Pile

266 22-Sep-15 4294 Ǿ500 12.00 TC-15 Soldier Pile

267 22-Sep-15 4295 Ǿ500 12.00 TC-15 Soldier Pile

268 22-Sep-15 4296 Ǿ500 12.00 TC-15 Soldier Pile

269 22-Sep-15 4297 Ǿ500 12.00 TC-15 Soldier Pile

270 22-Sep-15 4298 Ǿ500 12.00 TC-15 Soldier Pile

271 22-Sep-15 4299 Ǿ500 12.00 TC-15 Soldier Pile

272 23-Sep-15 4632 Ǿ500 12.00 TC-53 Soldier Pile

273 23-Sep-15 4633 Ǿ500 12.00 TC-53 Soldier Pile

274 23-Sep-15 4634 Ǿ500 12.00 TC-53 Soldier Pile

275 23-Sep-15 4635 Ǿ500 12.00 TC-53 Soldier Pile

276 23-Sep-15 4636 Ǿ500 12.00 TC-53 Soldier Pile

277 23-Sep-15 4637 Ǿ500 12.00 TC-53 Soldier Pile

278 23-Sep-15 4638 Ǿ500 12.00 TC-53 Soldier Pile

279 23-Sep-15 4639 Ǿ500 12.00 TC-53 Soldier Pile

280 23-Sep-15 4640 Ǿ500 12.00 TC-53 Soldier Pile

281 23-Sep-15 4641 Ǿ500 12.00 TC-53 Soldier Pile

282 23-Sep-15 4300 Ǿ500 12.00 TC-15 Soldier Pile

283 23-Sep-15 4301 Ǿ500 12.00 TC-15 Soldier Pile

284 23-Sep-15 4302 Ǿ500 12.00 TC-15 Soldier Pile

285 23-Sep-15 4303 Ǿ500 12.00 TC-15 Soldier Pile

286 23-Sep-15 4304 Ǿ500 12.00 TC-15 Soldier Pile

287 23-Sep-15 4305 Ǿ500 12.00 TC-15 Soldier Pile

288 23-Sep-15 4306 Ǿ500 12.00 TC-15 Soldier Pile

289 23-Sep-15 4307 Ǿ500 12.00 TC-15 Soldier Pile

290 23-Sep-15 4308 Ǿ500 12.00 TC-15 Soldier Pile

291 23-Sep-15 4309 Ǿ500 12.00 TC-15 Soldier Pile

292 23-Sep-15 4310 Ǿ500 12.00 TC-15 Soldier Pile

293 23-Sep-15 4311 Ǿ500 12.00 TC-15 Soldier Pile

294 23-Sep-15 4312 Ǿ500 12.00 TC-15 Soldier Pile

295 25-Sep-15 4642 Ǿ500 12.00 TC-53 Soldier Pile

296 25-Sep-15 4643 Ǿ500 12.00 TC-53 Soldier Pile

297 25-Sep-15 4644 Ǿ500 12.00 TC-53 Soldier Pile

298 25-Sep-15 4645 Ǿ500 12.00 TC-53 Soldier Pile

299 25-Sep-15 4646 Ǿ500 12.00 TC-53 Soldier Pile

300 25-Sep-15 4647 Ǿ500 12.00 TC-53 Soldier Pile

301 25-Sep-15 4648 Ǿ500 12.00 TC-53 Soldier Pile

302 25-Sep-15 4649 Ǿ500 12.00 TC-53 Soldier Pile

303 25-Sep-15 4650 Ǿ500 12.00 TC-53 Soldier Pile

304 25-Sep-15 4651 Ǿ500 12.00 TC-53 Soldier Pile

305 25-Sep-15 4652 Ǿ500 12.00 TC-53 Soldier Pile

306 25-Sep-15 4313 Ǿ500 12.00 TC-15 Soldier Pile

307 25-Sep-15 4314 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

308 25-Sep-15 4315 Ǿ500 12.00 TC-15 Soldier Pile

309 25-Sep-15 4316 Ǿ500 12.00 TC-15 Soldier Pile

310 25-Sep-15 4317 Ǿ500 12.00 TC-15 Soldier Pile

311 25-Sep-15 4318 Ǿ500 12.00 TC-15 Soldier Pile

312 25-Sep-15 4319 Ǿ500 12.00 TC-15 Soldier Pile

313 25-Sep-15 4320 Ǿ500 12.00 TC-15 Soldier Pile

314 25-Sep-15 4321 Ǿ500 12.00 TC-15 Soldier Pile

315 25-Sep-15 4322 Ǿ500 12.00 TC-15 Soldier Pile

316 25-Sep-15 4323 Ǿ500 12.00 TC-15 Soldier Pile

317 25-Sep-15 4324 Ǿ500 12.00 TC-15 Soldier Pile

318 25-Sep-15 4325 Ǿ500 12.00 TC-15 Soldier Pile

319 26-Sep-15 4326 Ǿ500 12.00 TC-15 Soldier Pile

320 26-Sep-15 4327 Ǿ500 12.00 TC-15 Soldier Pile

321 26-Sep-15 4328 Ǿ500 12.00 TC-15 Soldier Pile

322 26-Sep-15 4329 Ǿ500 12.00 TC-15 Soldier Pile

323 26-Sep-15 4330 Ǿ500 12.00 TC-15 Soldier Pile

324 26-Sep-15 4331 Ǿ500 12.00 TC-15 Soldier Pile

325 26-Sep-15 4332 Ǿ500 12.00 TC-15 Soldier Pile

326 26-Sep-15 4333 Ǿ500 12.00 TC-15 Soldier Pile

327 26-Sep-15 4334 Ǿ500 12.00 TC-15 Soldier Pile

328 26-Sep-15 4335 Ǿ500 12.00 TC-15 Soldier Pile

329 26-Sep-15 4336 Ǿ500 12.00 TC-15 Soldier Pile

330 26-Sep-15 4337 Ǿ500 12.00 TC-15 Soldier Pile

331 26-Sep-15 4338 Ǿ500 12.00 TC-15 Soldier Pile

332 28-Sep-15 4339 Ǿ500 12.00 TC-15 Soldier Pile

333 28-Sep-15 4340 Ǿ500 12.00 TC-15 Soldier Pile

334 28-Sep-15 4341 Ǿ500 12.00 TC-15 Soldier Pile

335 28-Sep-15 4342 Ǿ500 12.00 TC-15 Soldier Pile

336 28-Sep-15 4343 Ǿ500 12.00 TC-15 Soldier Pile

337 28-Sep-15 4344 Ǿ500 12.00 TC-15 Soldier Pile

338 28-Sep-15 4345 Ǿ500 12.00 TC-15 Soldier Pile

339 28-Sep-15 4346 Ǿ500 12.00 TC-15 Soldier Pile

340 28-Sep-15 4347 Ǿ500 12.00 TC-15 Soldier Pile

341 28-Sep-15 4348 Ǿ500 12.00 TC-15 Soldier Pile

342 28-Sep-15 4349 Ǿ500 12.00 TC-15 Soldier Pile

343 28-Sep-15 4350 Ǿ500 12.00 TC-15 Soldier Pile

344 29-Sep-15 4351 Ǿ500 12.00 TC-15 Soldier Pile

345 29-Sep-15 4352 Ǿ500 12.00 TC-15 Soldier Pile

346 29-Sep-15 4353 Ǿ500 12.00 TC-15 Soldier Pile

347 29-Sep-15 4354 Ǿ500 12.00 TC-15 Soldier Pile

348 29-Sep-15 4355 Ǿ500 12.00 TC-15 Soldier Pile

349 29-Sep-15 4356 Ǿ500 12.00 TC-15 Soldier Pile

350 29-Sep-15 4357 Ǿ500 12.00 TC-15 Soldier Pile

351 29-Sep-15 4358 Ǿ500 12.00 TC-15 Soldier Pile

352 29-Sep-15 4359 Ǿ500 12.00 TC-15 Soldier Pile

353 29-Sep-15 4360 Ǿ500 12.00 TC-15 Soldier Pile

354 29-Sep-15 4361 Ǿ500 12.00 TC-15 Soldier Pile

355 29-Sep-15 4362 Ǿ500 12.00 TC-15 Soldier Pile

356 29-Sep-15 4363 Ǿ500 12.00 TC-15 Soldier Pile

357 29-Sep-15 4364 Ǿ500 12.00 TC-15 Soldier Pile

358 29-Sep-15 4365 Ǿ500 12.00 TC-15 Soldier Pile

359 30-Sep-15 4366 Ǿ500 12.00 TC-15 Soldier Pile

360 30-Sep-15 4367 Ǿ500 12.00 TC-15 Soldier Pile

361 30-Sep-15 4368 Ǿ500 12.00 TC-15 Soldier Pile

362 30-Sep-15 4369 Ǿ500 12.00 TC-15 Soldier Pile

363 30-Sep-15 4370 Ǿ500 12.00 TC-15 Soldier Pile

364 30-Sep-15 4371 Ǿ500 12.00 TC-15 Soldier Pile

365 30-Sep-15 4372 Ǿ500 12.00 TC-15 Soldier Pile

366 30-Sep-15 4373 Ǿ500 12.00 TC-15 Soldier Pile

367 30-Sep-15 4374 Ǿ500 12.00 TC-15 Soldier Pile

368 30-Sep-15 4375 Ǿ500 12.00 TC-15 Soldier Pile

369 30-Sep-15 4376 Ǿ500 12.00 TC-15 Soldier Pile

370 30-Sep-15 4377 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

371 30-Sep-15 4378 Ǿ500 12.00 TC-15 Soldier Pile

372 30-Sep-15 4379 Ǿ500 12.00 TC-15 Soldier Pile

373 30-Sep-15 4380 Ǿ500 12.00 TC-15 Soldier Pile

374 30-Sep-15 4381 Ǿ500 12.00 TC-15 Soldier Pile

375 30-Sep-15 4734 Ǿ500 12.00 TC-19 Soldier Pile

376 30-Sep-15 4735 Ǿ500 12.00 TC-19 Soldier Pile

377 30-Sep-15 4736 Ǿ500 12.00 TC-19 Soldier Pile

378 30-Sep-15 4737 Ǿ500 12.00 TC-19 Soldier Pile

379 30-Sep-15 4738 Ǿ500 12.00 TC-19 Soldier Pile

380 30-Sep-15 4739 Ǿ500 12.00 TC-19 Soldier Pile

381 30-Sep-15 4740 Ǿ500 12.00 TC-19 Soldier Pile

382 30-Sep-15 4741 Ǿ500 12.00 TC-19 Soldier Pile

383 30-Sep-15 4742 Ǿ500 12.00 TC-19 Soldier Pile

384 30-Sep-15 4743 Ǿ500 12.00 TC-19 Soldier Pile

385 30-Sep-15 4744 Ǿ500 12.00 TC-19 Soldier Pile

386 30-Sep-15 4745 Ǿ500 12.00 TC-19 Soldier Pile

387 30-Sep-15 4746 Ǿ500 12.00 TC-19 Soldier Pile

388 30-Sep-15 4747 Ǿ500 12.00 TC-19 Soldier Pile

389 30-Sep-15 4748 Ǿ500 12.00 TC-19 Soldier Pile

390 30-Sep-15 4749 Ǿ500 12.00 TC-19 Soldier Pile

391 30-Sep-15 4750 Ǿ500 12.00 TC-19 Soldier Pile

392 30-Sep-15 4751 Ǿ500 12.00 TC-19 Soldier Pile

393 30-Sep-15 4752 Ǿ500 12.00 TC-19 Soldier Pile

394 30-Sep-15 4753 Ǿ500 12.00 TC-19 Soldier Pile

395 1-Oct-15 4382 Ǿ500 12.00 TC-15 Soldier Pile

396 1-Oct-15 4383 Ǿ500 12.00 TC-15 Soldier Pile

397 1-Oct-15 4384 Ǿ500 12.00 TC-15 Soldier Pile

398 1-Oct-15 4385 Ǿ500 12.00 TC-15 Soldier Pile

399 1-Oct-15 4386 Ǿ500 12.00 TC-15 Soldier Pile

400 1-Oct-15 4387 Ǿ500 12.00 TC-15 Soldier Pile

401 1-Oct-15 4388 Ǿ500 12.00 TC-15 Soldier Pile

402 1-Oct-15 4389 Ǿ500 12.00 TC-15 Soldier Pile

403 1-Oct-15 4390 Ǿ500 12.00 TC-15 Soldier Pile

404 1-Oct-15 4391 Ǿ500 12.00 TC-15 Soldier Pile

405 1-Oct-15 4392 Ǿ500 12.00 TC-15 Soldier Pile

406 1-Oct-15 4393 Ǿ500 12.00 TC-15 Soldier Pile

407 1-Oct-15 4394 Ǿ500 12.00 TC-15 Soldier Pile

408 1-Oct-15 4395 Ǿ500 12.00 TC-15 Soldier Pile

409 1-Oct-15 4754 Ǿ500 12.00 TC-19 Soldier Pile

410 1-Oct-15 4755 Ǿ500 12.00 TC-19 Soldier Pile

411 1-Oct-15 4756 Ǿ500 12.00 TC-19 Soldier Pile

412 1-Oct-15 4757 Ǿ500 12.00 TC-19 Soldier Pile

413 1-Oct-15 4758 Ǿ500 12.00 TC-19 Soldier Pile

414 1-Oct-15 4759 Ǿ500 12.00 TC-19 Soldier Pile

415 1-Oct-15 4760 Ǿ500 12.00 TC-19 Soldier Pile

416 1-Oct-15 4761 Ǿ500 12.00 TC-19 Soldier Pile

417 1-Oct-15 4762 Ǿ500 12.00 TC-19 Soldier Pile

418 1-Oct-15 4763 Ǿ500 12.00 TC-19 Soldier Pile

419 1-Oct-15 4764 Ǿ500 12.00 TC-19 Soldier Pile

420 1-Oct-15 4765 Ǿ500 12.00 TC-19 Soldier Pile

421 1-Oct-15 4766 Ǿ500 12.00 TC-19 Soldier Pile

422 1-Oct-15 4767 Ǿ500 12.00 TC-19 Soldier Pile

423 1-Oct-15 4768 Ǿ500 12.00 TC-19 Soldier Pile

424 1-Oct-15 4769 Ǿ500 12.00 TC-19 Soldier Pile

425 1-Oct-15 4770 Ǿ500 12.00 TC-19 Soldier Pile

426 1-Oct-15 4771 Ǿ500 12.00 TC-19 Soldier Pile

427 1-Oct-15 4772 Ǿ500 12.00 TC-19 Soldier Pile

428 1-Oct-15 4773 Ǿ500 12.00 TC-19 Soldier Pile

429 1-Oct-15 4652 Ǿ500 12.00 TC-53 Soldier Pile

430 1-Oct-15 4653 Ǿ500 12.00 TC-53 Soldier Pile

431 1-Oct-15 4654 Ǿ500 12.00 TC-53 Soldier Pile

432 1-Oct-15 4655 Ǿ500 12.00 TC-53 Soldier Pile

433 1-Oct-15 4656 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

434 1-Oct-15 4657 Ǿ500 12.00 TC-53 Soldier Pile

435 1-Oct-15 4658 Ǿ500 12.00 TC-53 Soldier Pile

436 1-Oct-15 4659 Ǿ500 12.00 TC-53 Soldier Pile

437 1-Oct-15 4660 Ǿ500 12.00 TC-53 Soldier Pile

438 1-Oct-15 4661 Ǿ500 12.00 TC-53 Soldier Pile

439 1-Oct-15 4662 Ǿ500 12.00 TC-53 Soldier Pile

440 1-Oct-15 4663 Ǿ500 12.00 TC-53 Soldier Pile

441 1-Oct-15 4664 Ǿ500 12.00 TC-53 Soldier Pile

442 1-Oct-15 4665 Ǿ500 12.00 TC-53 Soldier Pile

443 1-Oct-15 4666 Ǿ500 12.00 TC-53 Soldier Pile

444 1-Oct-15 4667 Ǿ500 12.00 TC-53 Soldier Pile

445 1-Oct-15 4668 Ǿ500 12.00 TC-53 Soldier Pile

446 1-Oct-15 4669 Ǿ500 12.00 TC-53 Soldier Pile

447 1-Oct-15 4670 Ǿ500 12.00 TC-53 Soldier Pile

448 1-Oct-15 4671 Ǿ500 12.00 TC-53 Soldier Pile

449 1-Oct-15 4672 Ǿ500 12.00 TC-53 Soldier Pile

450 2-Oct-15 4396 Ǿ500 12.00 TC-15 Soldier Pile

451 2-Oct-15 4397 Ǿ500 12.00 TC-15 Soldier Pile

452 2-Oct-15 4398 Ǿ500 12.00 TC-15 Soldier Pile

453 2-Oct-15 4399 Ǿ500 12.00 TC-15 Soldier Pile

454 2-Oct-15 4400 Ǿ500 12.00 TC-15 Soldier Pile

455 2-Oct-15 4401 Ǿ500 12.00 TC-15 Soldier Pile

456 2-Oct-15 4402 Ǿ500 12.00 TC-15 Soldier Pile

457 2-Oct-15 4403 Ǿ500 12.00 TC-15 Soldier Pile

458 2-Oct-15 4404 Ǿ500 12.00 TC-15 Soldier Pile

459 2-Oct-15 4405 Ǿ500 12.00 TC-15 Soldier Pile

460 2-Oct-15 4406 Ǿ500 12.00 TC-15 Soldier Pile

461 2-Oct-15 4407 Ǿ500 12.00 TC-15 Soldier Pile

462 2-Oct-15 4408 Ǿ500 12.00 TC-15 Soldier Pile

463 2-Oct-15 4409 Ǿ500 12.00 TC-15 Soldier Pile

464 2-Oct-15 4410 Ǿ500 12.00 TC-15 Soldier Pile

465 2-Oct-15 4411 Ǿ500 12.00 TC-15 Soldier Pile

466 2-Oct-15 4774 Ǿ500 12.00 TC-19 Soldier Pile

467 2-Oct-15 4775 Ǿ500 12.00 TC-19 Soldier Pile

468 2-Oct-15 4776 Ǿ500 12.00 TC-19 Soldier Pile

469 2-Oct-15 4777 Ǿ500 12.00 TC-19 Soldier Pile

470 2-Oct-15 4778 Ǿ500 12.00 TC-19 Soldier Pile

471 2-Oct-15 4779 Ǿ500 12.00 TC-19 Soldier Pile

472 2-Oct-15 4780 Ǿ500 12.00 TC-19 Soldier Pile

473 2-Oct-15 4781 Ǿ500 12.00 TC-19 Soldier Pile

474 2-Oct-15 4782 Ǿ500 12.00 TC-19 Soldier Pile

475 2-Oct-15 4783 Ǿ500 12.00 TC-19 Soldier Pile

476 2-Oct-15 4784 Ǿ500 12.00 TC-19 Soldier Pile

477 2-Oct-15 4785 Ǿ500 12.00 TC-19 Soldier Pile

478 2-Oct-15 4786 Ǿ500 12.00 TC-19 Soldier Pile

479 2-Oct-15 4787 Ǿ500 12.00 TC-19 Soldier Pile

480 2-Oct-15 4788 Ǿ500 12.00 TC-19 Soldier Pile

481 2-Oct-15 4789 Ǿ500 12.00 TC-19 Soldier Pile

482 2-Oct-15 4673 Ǿ500 12.00 TC-53 Soldier Pile

483 2-Oct-15 4674 Ǿ500 12.00 TC-53 Soldier Pile

484 2-Oct-15 4675 Ǿ500 12.00 TC-53 Soldier Pile

485 2-Oct-15 4676 Ǿ500 12.00 TC-53 Soldier Pile

486 2-Oct-15 4677 Ǿ500 12.00 TC-53 Soldier Pile

487 2-Oct-15 4678 Ǿ500 12.00 TC-53 Soldier Pile

488 2-Oct-15 4679 Ǿ500 12.00 TC-53 Soldier Pile

489 2-Oct-15 4680 Ǿ500 12.00 TC-53 Soldier Pile

490 2-Oct-15 4681 Ǿ500 12.00 TC-53 Soldier Pile

491 2-Oct-15 4682 Ǿ500 12.00 TC-53 Soldier Pile

492 2-Oct-15 4683 Ǿ500 12.00 TC-53 Soldier Pile

493 2-Oct-15 4684 Ǿ500 12.00 TC-53 Soldier Pile

494 2-Oct-15 4685 Ǿ500 12.00 TC-53 Soldier Pile

495 2-Oct-15 4686 Ǿ500 12.00 TC-53 Soldier Pile

496 2-Oct-15 4687 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

497 2-Oct-15 4688 Ǿ500 12.00 TC-53 Soldier Pile

498 2-Oct-15 4689 Ǿ500 12.00 TC-53 Soldier Pile

499 2-Oct-15 4690 Ǿ500 12.00 TC-53 Soldier Pile

500 2-Oct-15 4691 Ǿ500 12.00 TC-53 Soldier Pile

501 2-Oct-15 4692 Ǿ500 12.00 TC-53 Soldier Pile

502 2-Oct-15 4693 Ǿ500 12.00 TC-53 Soldier Pile

503 2-Oct-15 4694 Ǿ500 12.00 TC-53 Soldier Pile

504 2-Oct-15 4695 Ǿ500 12.00 TC-53 Soldier Pile

505 2-Oct-15 4696 Ǿ500 12.00 TC-53 Soldier Pile

506 2-Oct-15 4697 Ǿ500 12.00 TC-53 Soldier Pile

507 2-Oct-15 4698 Ǿ500 12.00 TC-53 Soldier Pile

508 3-Oct-15 4412 Ǿ500 12.00 TC-15 Soldier Pile

509 3-Oct-15 4413 Ǿ500 12.00 TC-15 Soldier Pile

510 3-Oct-15 4414 Ǿ500 12.00 TC-15 Soldier Pile

511 3-Oct-15 4415 Ǿ500 12.00 TC-15 Soldier Pile

512 3-Oct-15 4416 Ǿ500 12.00 TC-15 Soldier Pile

513 3-Oct-15 4417 Ǿ500 12.00 TC-15 Soldier Pile

514 3-Oct-15 4418 Ǿ500 12.00 TC-15 Soldier Pile

515 3-Oct-15 4419 Ǿ500 12.00 TC-15 Soldier Pile

516 3-Oct-15 4420 Ǿ500 12.00 TC-15 Soldier Pile

517 3-Oct-15 4421 Ǿ500 12.00 TC-15 Soldier Pile

518 3-Oct-15 4422 Ǿ500 12.00 TC-15 Soldier Pile

519 3-Oct-15 4423 Ǿ500 12.00 TC-15 Soldier Pile

520 3-Oct-15 4424 Ǿ500 12.00 TC-15 Soldier Pile

521 3-Oct-15 4425 Ǿ500 12.00 TC-15 Soldier Pile

522 3-Oct-15 4426 Ǿ500 12.00 TC-15 Soldier Pile

523 3-Oct-15 4427 Ǿ500 12.00 TC-15 Soldier Pile

524 3-Oct-15 4428 Ǿ500 12.00 TC-15 Soldier Pile

525 3-Oct-15 4429 Ǿ500 12.00 TC-15 Soldier Pile

526 3-Oct-15 4430 Ǿ500 12.00 TC-15 Soldier Pile

527 3-Oct-15 4112 Ǿ500 12.00 TC-19 Soldier Pile

528 3-Oct-15 4790 Ǿ500 12.00 TC-19 Soldier Pile

529 3-Oct-15 4791 Ǿ500 12.00 TC-19 Soldier Pile

530 3-Oct-15 4792 Ǿ500 12.00 TC-19 Soldier Pile

531 3-Oct-15 4793 Ǿ500 12.00 TC-19 Soldier Pile

532 3-Oct-15 4794 Ǿ500 12.00 TC-19 Soldier Pile

533 3-Oct-15 4795 Ǿ500 12.00 TC-19 Soldier Pile

534 3-Oct-15 4796 Ǿ500 12.00 TC-19 Soldier Pile

535 3-Oct-15 4797 Ǿ500 12.00 TC-19 Soldier Pile

536 3-Oct-15 4798 Ǿ500 12.00 TC-19 Soldier Pile

537 3-Oct-15 4799 Ǿ500 12.00 TC-19 Soldier Pile

538 3-Oct-15 4800 Ǿ500 12.00 TC-19 Soldier Pile

539 3-Oct-15 4801 Ǿ500 12.00 TC-19 Soldier Pile

540 3-Oct-15 4802 Ǿ500 12.00 TC-19 Soldier Pile

541 3-Oct-15 4803 Ǿ500 12.00 TC-19 Soldier Pile

542 3-Oct-15 4804 Ǿ500 12.00 TC-19 Soldier Pile

543 3-Oct-15 4805 Ǿ500 12.00 TC-19 Soldier Pile

544 3-Oct-15 4806 Ǿ500 12.00 TC-19 Soldier Pile

545 3-Oct-15 4807 Ǿ500 12.00 TC-19 Soldier Pile

546 3-Oct-15 4808 Ǿ500 12.00 TC-19 Soldier Pile

547 3-Oct-15 4809 Ǿ500 12.00 TC-19 Soldier Pile

548 3-Oct-15 4810 Ǿ500 12.00 TC-19 Soldier Pile

549 3-Oct-15 4811 Ǿ500 12.00 TC-19 Soldier Pile

550 3-Oct-15 4812 Ǿ500 12.00 TC-19 Soldier Pile

551 3-Oct-15 4813 Ǿ500 12.00 TC-19 Soldier Pile

552 11-Oct-15 2381 Ǿ500 12.00 TC-15 Main Pile

553 11-Oct-15 2382 Ǿ500 12.00 TC-15 Main Pile

554 11-Oct-15 2342 Ǿ500 12.00 TC-15 Main Pile

555 11-Oct-15 2343 Ǿ500 12.00 TC-15 Main Pile

556 11-Oct-15 2344 Ǿ500 12.00 TC-15 Main Pile

557 11-Oct-15 2345 Ǿ500 12.00 TC-15 Main Pile

558 11-Oct-15 2301 Ǿ500 12.00 TC-15 Main Pile

559 11-Oct-15 2302 Ǿ500 12.00 TC-15 Main Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

560 11-Oct-15 2303 Ǿ500 12.00 TC-15 Main Pile

561 11-Oct-15 2304 Ǿ500 12.00 TC-15 Main Pile

562 11-Oct-15 2346 Ǿ500 12.00 TC-15 Main Pile

563 11-Oct-15 2347 Ǿ500 12.00 TC-15 Main Pile

564 11-Oct-15 2348 Ǿ500 12.00 TC-15 Main Pile

565 11-Oct-15 2349 Ǿ500 12.00 TC-15 Main Pile

566 11-Oct-15 2297 Ǿ500 12.00 TC-15 Main Pile

567 11-Oct-15 2298 Ǿ500 12.00 TC-15 Main Pile

568 11-Oct-15 2299 Ǿ500 12.00 TC-15 Main Pile

569 11-Oct-15 2300 Ǿ500 12.00 TC-15 Main Pile

570 11-Oct-15 2350 Ǿ500 12.00 TC-15 Main Pile

571 11-Oct-15 2351 Ǿ500 12.00 TC-15 Main Pile

572 11-Oct-15 2352 Ǿ500 12.00 TC-15 Main Pile

573 11-Oct-15 2353 Ǿ500 12.00 TC-15 Main Pile

574 11-Oct-15 2293 Ǿ500 12.00 TC-15 Main Pile

575 11-Oct-15 2294 Ǿ500 12.00 TC-15 Main Pile

576 11-Oct-15 2295 Ǿ500 12.00 TC-15 Main Pile

577 11-Oct-15 2296 Ǿ500 12.00 TC-15 Main Pile

578 12-Oct-15 2281 Ǿ500 12.00 TC-15 Main Pile

579 12-Oct-15 2282 Ǿ500 12.00 TC-15 Main Pile

580 12-Oct-15 2283 Ǿ500 12.00 TC-15 Main Pile

581 12-Oct-15 2284 Ǿ500 12.00 TC-15 Main Pile

582 12-Oct-15 2285 Ǿ500 12.00 TC-15 Main Pile

583 12-Oct-15 2286 Ǿ500 12.00 TC-15 Main Pile

584 12-Oct-15 2287 Ǿ500 12.00 TC-15 Main Pile

585 12-Oct-15 2288 Ǿ500 12.00 TC-15 Main Pile

586 12-Oct-15 2239 Ǿ500 12.00 TC-15 Main Pile

587 12-Oct-15 2240 Ǿ500 12.00 TC-15 Main Pile

588 12-Oct-15 2241 Ǿ500 12.00 TC-15 Main Pile

589 12-Oct-15 2242 Ǿ500 12.00 TC-15 Main Pile

590 12-Oct-15 2235 Ǿ500 12.00 TC-15 Main Pile

591 12-Oct-15 2236 Ǿ500 12.00 TC-15 Main Pile

592 12-Oct-15 2237 Ǿ500 12.00 TC-15 Main Pile

593 14-Oct-15 2003 Ǿ500 12.00 TC-15 Main Pile

594 14-Oct-15 2004 Ǿ500 12.00 TC-15 Main Pile

595 14-Oct-15 2005 Ǿ500 12.00 TC-15 Main Pile

596 14-Oct-15 2006 Ǿ500 12.00 TC-15 Main Pile

597 14-Oct-15 2007 Ǿ500 12.00 TC-15 Main Pile

598 14-Oct-15 2008 Ǿ500 12.00 TC-15 Main Pile

599 14-Oct-15 2009 Ǿ500 12.00 TC-15 Main Pile

600 14-Oct-15 2010 Ǿ500 12.00 TC-15 Main Pile

601 14-Oct-15 2011 Ǿ500 12.00 TC-15 Main Pile

602 14-Oct-15 2012 Ǿ500 12.00 TC-15 Main Pile

603 14-Oct-15 2013 Ǿ500 12.00 TC-15 Main Pile

604 14-Oct-15 2014 Ǿ500 12.00 TC-15 Main Pile

605 14-Oct-15 2015 Ǿ500 12.00 TC-15 Main Pile

606 14-Oct-15 2016 Ǿ500 12.00 TC-15 Main Pile

607 14-Oct-15 2017 Ǿ500 12.00 TC-15 Main Pile

608 14-Oct-15 2018 Ǿ500 12.00 TC-15 Main Pile

609 14-Oct-15 2019 Ǿ500 12.00 TC-15 Main Pile

610 14-Oct-15 2092 Ǿ500 12.00 TC-15 Main Pile

611 14-Oct-15 2093 Ǿ500 12.00 TC-15 Main Pile

612 14-Oct-15 2094 Ǿ500 12.00 TC-15 Main Pile

613 15-Oct-15 2095 Ǿ500 12.00 TC-15 Main Pile

614 15-Oct-15 2096 Ǿ500 12.00 TC-15 Main Pile

615 15-Oct-15 2097 Ǿ500 12.00 TC-15 Main Pile

616 15-Oct-15 2098 Ǿ500 12.00 TC-15 Main Pile

617 15-Oct-15 2099 Ǿ500 12.00 TC-15 Main Pile

618 15-Oct-15 2100 Ǿ500 12.00 TC-15 Main Pile

619 15-Oct-15 2101 Ǿ500 12.00 TC-15 Main Pile

620 15-Oct-15 2102 Ǿ500 12.00 TC-15 Main Pile

621 15-Oct-15 2103 Ǿ500 12.00 TC-15 Main Pile

622 15-Oct-15 2104 Ǿ500 12.00 TC-15 Main Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

623 15-Oct-15 2105 Ǿ500 12.00 TC-15 Main Pile

624 15-Oct-15 2106 Ǿ500 12.00 TC-15 Main Pile

625 15-Oct-15 2107 Ǿ500 12.00 TC-15 Main Pile

626 15-Oct-15 2108 Ǿ500 12.00 TC-15 Main Pile

627 15-Oct-15 2109 Ǿ500 12.00 TC-15 Main Pile

628 15-Oct-15 2110 Ǿ500 12.00 TC-15 Main Pile

629 15-Oct-15 2111 Ǿ500 12.00 TC-15 Main Pile

630 15-Oct-15 2112 Ǿ500 12.00 TC-15 Main Pile

631 15-Oct-15 2113 Ǿ500 12.00 TC-15 Main Pile

632 15-Oct-15 2090 Ǿ500 12.00 TC-15 Main Pile

633 16-Oct-15 2020 Ǿ500 12.00 TC-15 Main Pile

634 16-Oct-15 2021 Ǿ500 12.00 TC-15 Main Pile

635 16-Oct-15 2022 Ǿ500 12.00 TC-15 Main Pile

636 16-Oct-15 2023 Ǿ500 12.00 TC-15 Main Pile

637 16-Oct-15 2024 Ǿ500 12.00 TC-15 Main Pile

638 16-Oct-15 2025 Ǿ500 12.00 TC-15 Main Pile

639 16-Oct-15 2087 Ǿ500 12.00 TC-15 Main Pile

640 16-Oct-15 2088 Ǿ500 12.00 TC-15 Main Pile

641 16-Oct-15 2089 Ǿ500 12.00 TC-15 Main Pile

642 16-Oct-15 2091 Ǿ500 12.00 TC-15 Main Pile

643 16-Oct-15 2026 Ǿ500 12.00 TC-15 Main Pile

644 21-Oct-15 4285 Ǿ500 12.00 TC-53 Soldier Pile

645 21-Oct-15 4284 Ǿ500 12.00 TC-53 Soldier Pile

646 21-Oct-15 4283 Ǿ500 12.00 TC-53 Soldier Pile

647 21-Oct-15 4282 Ǿ500 12.00 TC-53 Soldier Pile

648 21-Oct-15 4281 Ǿ500 12.00 TC-53 Soldier Pile

649 21-Oct-15 4280 Ǿ500 12.00 TC-53 Soldier Pile

650 21-Oct-15 4279 Ǿ500 12.00 TC-53 Soldier Pile

651 21-Oct-15 4278 Ǿ500 12.00 TC-53 Soldier Pile

652 21-Oct-15 4277 Ǿ500 12.00 TC-53 Soldier Pile

653 21-Oct-15 4276 Ǿ500 12.00 TC-53 Soldier Pile

654 21-Oct-15 4275 Ǿ500 12.00 TC-53 Soldier Pile

655 21-Oct-15 4274 Ǿ500 12.00 TC-53 Soldier Pile

656 21-Oct-15 4273 Ǿ500 12.00 TC-53 Soldier Pile

657 21-Oct-15 4272 Ǿ500 12.00 TC-53 Soldier Pile

658 21-Oct-15 4271 Ǿ500 12.00 TC-53 Soldier Pile

659 21-Oct-15 4270 Ǿ500 12.00 TC-53 Soldier Pile

660 21-Oct-15 4269 Ǿ500 12.00 TC-53 Soldier Pile

661 21-Oct-15 4268 Ǿ500 12.00 TC-53 Soldier Pile

662 22-Oct-15 4267 Ǿ500 12.00 TC-53 Soldier Pile

663 22-Oct-15 4266 Ǿ500 12.00 TC-53 Soldier Pile

664 22-Oct-15 4265 Ǿ500 12.00 TC-53 Soldier Pile

665 22-Oct-15 4264 Ǿ500 12.00 TC-53 Soldier Pile

666 22-Oct-15 4263 Ǿ500 12.00 TC-53 Soldier Pile

667 22-Oct-15 4262 Ǿ500 12.00 TC-53 Soldier Pile

668 22-Oct-15 4261 Ǿ500 12.00 TC-53 Soldier Pile

669 22-Oct-15 4260 Ǿ500 12.00 TC-53 Soldier Pile

670 22-Oct-15 4259 Ǿ500 12.00 TC-53 Soldier Pile

671 22-Oct-15 4258 Ǿ500 12.00 TC-53 Soldier Pile

672 22-Oct-15 4257 Ǿ500 12.00 TC-53 Soldier Pile

673 22-Oct-15 4256 Ǿ500 12.00 TC-53 Soldier Pile

674 22-Oct-15 4255 Ǿ500 12.00 TC-53 Soldier Pile

675 22-Oct-15 4254 Ǿ500 12.00 TC-53 Soldier Pile

676 22-Oct-15 4253 Ǿ500 12.00 TC-53 Soldier Pile

677 22-Oct-15 4252 Ǿ500 12.00 TC-53 Soldier Pile

678 22-Oct-15 4251 Ǿ500 12.00 TC-53 Soldier Pile

679 22-Oct-15 4250 Ǿ500 12.00 TC-53 Soldier Pile

680 22-Oct-15 4249 Ǿ500 12.00 TC-53 Soldier Pile

681 22-Oct-15 4248 Ǿ500 12.00 TC-53 Soldier Pile

682 22-Oct-15 4247 Ǿ500 12.00 TC-53 Soldier Pile

683 22-Oct-15 4246 Ǿ500 12.00 TC-53 Soldier Pile

684 22-Oct-15 4245 Ǿ500 12.00 TC-53 Soldier Pile

685 22-Oct-15 4244 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

686 22-Oct-15 4243 Ǿ500 12.00 TC-53 Soldier Pile

687 23-Oct-15 4242 Ǿ500 12.00 TC-53 Soldier Pile

688 23-Oct-15 4241 Ǿ500 12.00 TC-53 Soldier Pile

689 23-Oct-15 4240 Ǿ500 12.00 TC-53 Soldier Pile

690 23-Oct-15 4239 Ǿ500 12.00 TC-53 Soldier Pile

691 23-Oct-15 4238 Ǿ500 12.00 TC-53 Soldier Pile

692 23-Oct-15 4237 Ǿ500 12.00 TC-53 Soldier Pile

693 23-Oct-15 4236 Ǿ500 12.00 TC-53 Soldier Pile

694 23-Oct-15 4235 Ǿ500 12.00 TC-53 Soldier Pile

695 23-Oct-15 4234 Ǿ500 12.00 TC-53 Soldier Pile

696 23-Oct-15 4233 Ǿ500 12.00 TC-53 Soldier Pile

697 23-Oct-15 4232 Ǿ500 12.00 TC-53 Soldier Pile

698 23-Oct-15 4231 Ǿ500 12.00 TC-53 Soldier Pile

699 23-Oct-15 4230 Ǿ500 12.00 TC-53 Soldier Pile

700 23-Oct-15 4229 Ǿ500 12.00 TC-53 Soldier Pile

701 23-Oct-15 4228 Ǿ500 12.00 TC-53 Soldier Pile

702 23-Oct-15 4227 Ǿ500 12.00 TC-53 Soldier Pile

703 23-Oct-15 4226 Ǿ500 12.00 TC-53 Soldier Pile

704 23-Oct-15 4225 Ǿ500 12.00 TC-53 Soldier Pile

705 23-Oct-15 4224 Ǿ500 12.00 TC-53 Soldier Pile

706 23-Oct-15 4223 Ǿ500 12.00 TC-53 Soldier Pile

707 23-Oct-15 2160 Ǿ500 12.00 TC-19 Main Pile

708 23-Oct-15 2161 Ǿ500 12.00 TC-19 Main Pile

709 23-Oct-15 2162 Ǿ500 12.00 TC-19 Main Pile

710 23-Oct-15 2163 Ǿ500 12.00 TC-19 Main Pile

711 23-Oct-15 2164 Ǿ500 12.00 TC-19 Main Pile

712 23-Oct-15 2231 Ǿ500 12.00 TC-19 Main Pile

713 23-Oct-15 2232 Ǿ500 12.00 TC-19 Main Pile

714 23-Oct-15 2233 Ǿ500 12.00 TC-19 Main Pile

715 23-Oct-15 2234 Ǿ500 12.00 TC-19 Main Pile

716 23-Oct-15 2289 Ǿ500 12.00 TC-19 Main Pile

717 23-Oct-15 2290 Ǿ500 12.00 TC-19 Main Pile

718 23-Oct-15 2291 Ǿ500 12.00 TC-19 Main Pile

719 23-Oct-15 2292 Ǿ500 12.00 TC-19 Main Pile

720 24-Oct-15 4222 Ǿ500 12.00 TC-53 Soldier Pile

721 24-Oct-15 4221 Ǿ500 12.00 TC-53 Soldier Pile

722 24-Oct-15 4220 Ǿ500 12.00 TC-53 Soldier Pile

723 24-Oct-15 4219 Ǿ500 12.00 TC-53 Soldier Pile

724 24-Oct-15 4218 Ǿ500 12.00 TC-53 Soldier Pile

725 24-Oct-15 4217 Ǿ500 12.00 TC-53 Soldier Pile

726 24-Oct-15 4216 Ǿ500 12.00 TC-53 Soldier Pile

727 24-Oct-15 4215 Ǿ500 12.00 TC-53 Soldier Pile

728 24-Oct-15 4214 Ǿ500 12.00 TC-53 Soldier Pile

729 24-Oct-15 4213 Ǿ500 12.00 TC-53 Soldier Pile

730 24-Oct-15 4212 Ǿ500 12.00 TC-53 Soldier Pile

731 24-Oct-15 4211 Ǿ500 12.00 TC-53 Soldier Pile

732 24-Oct-15 4210 Ǿ500 12.00 TC-53 Soldier Pile

733 24-Oct-15 4209 Ǿ500 12.00 TC-53 Soldier Pile

734 24-Oct-15 4208 Ǿ500 12.00 TC-53 Soldier Pile

735 24-Oct-15 4814 Ǿ500 12.00 TC-19 Soldier Pile

736 24-Oct-15 4815 Ǿ500 12.00 TC-19 Soldier Pile

737 24-Oct-15 4816 Ǿ500 12.00 TC-19 Soldier Pile

738 24-Oct-15 4817 Ǿ500 12.00 TC-19 Soldier Pile

739 24-Oct-15 4818 Ǿ500 12.00 TC-19 Soldier Pile

740 24-Oct-15 4819 Ǿ500 12.00 TC-19 Soldier Pile

741 24-Oct-15 4820 Ǿ500 12.00 TC-19 Soldier Pile

742 24-Oct-15 4821 Ǿ500 12.00 TC-19 Soldier Pile

743 24-Oct-15 4822 Ǿ500 12.00 TC-19 Soldier Pile

744 24-Oct-15 4823 Ǿ500 12.00 TC-19 Soldier Pile

745 24-Oct-15 4824 Ǿ500 12.00 TC-19 Soldier Pile

746 24-Oct-15 4825 Ǿ500 12.00 TC-19 Soldier Pile

747 28-Oct-15 2379 Ǿ500 12.00 TC-19 Main Pile

748 28-Oct-15 2380 Ǿ500 12.00 TC-19 Main Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

749 28-Oct-15 2354 Ǿ500 12.00 TC-19 Main Pile

750 28-Oct-15 2355 Ǿ500 12.00 TC-19 Main Pile

751 28-Oct-15 2356 Ǿ500 12.00 TC-19 Main Pile

752 28-Oct-15 2357 Ǿ500 12.00 TC-19 Main Pile

753 28-Oct-15 2338 Ǿ500 12.00 TC-19 Main Pile

754 28-Oct-15 2339 Ǿ500 12.00 TC-19 Main Pile

755 28-Oct-15 2340 Ǿ500 12.00 TC-19 Main Pile

756 28-Oct-15 2342 Ǿ500 12.00 TC-19 Main Pile

757 29-Oct-15 2305 Ǿ500 12.00 TC-19 Main Pile

758 29-Oct-15 2306 Ǿ500 12.00 TC-19 Main Pile

759 29-Oct-15 2307 Ǿ500 12.00 TC-19 Main Pile

760 29-Oct-15 2308 Ǿ500 12.00 TC-19 Main Pile

761 29-Oct-15 2309 Ǿ500 12.00 TC-19 Main Pile

762 29-Oct-15 2276 Ǿ500 12.00 TC-19 Main Pile

763 29-Oct-15 2277 Ǿ500 12.00 TC-19 Main Pile

764 29-Oct-15 2278 Ǿ500 12.00 TC-19 Main Pile

765 29-Oct-15 2279 Ǿ500 12.00 TC-19 Main Pile

766 29-Oct-15 2280 Ǿ500 12.00 TC-19 Main Pile

767 29-Oct-15 2384 Ǿ500 12.00 TC-19 Main Pile

768 29-Oct-15 2385 Ǿ500 12.00 TC-19 Main Pile

769 29-Oct-15 2387 Ǿ500 12.00 TC-19 Main Pile

770 29-Oct-15 2152 Ǿ500 12.00 TC-15 Main Pile

771 29-Oct-15 2153 Ǿ500 12.00 TC-15 Main Pile

772 29-Oct-15 2154 Ǿ500 12.00 TC-15 Main Pile

773 29-Oct-15 2155 Ǿ500 12.00 TC-15 Main Pile

774 29-Oct-15 2177 Ǿ500 12.00 TC-15 Main Pile

775 29-Oct-15 2178 Ǿ500 12.00 TC-15 Main Pile

776 29-Oct-15 2179 Ǿ500 12.00 TC-15 Main Pile

777 29-Oct-15 2180 Ǿ500 12.00 TC-15 Main Pile

778 29-Oct-15 2219 Ǿ500 12.00 TC-15 Main Pile

779 29-Oct-15 2220 Ǿ500 12.00 TC-15 Main Pile

780 29-Oct-15 2221 Ǿ500 12.00 TC-15 Main Pile

781 29-Oct-15 2222 Ǿ500 12.00 TC-15 Main Pile

782 30-Oct-15 1967 Ǿ500 12.00 TC-19 Main Pile

783 30-Oct-15 1968 Ǿ500 12.00 TC-19 Main Pile

784 30-Oct-15 1969 Ǿ500 12.00 TC-19 Main Pile

785 30-Oct-15 1970 Ǿ500 12.00 TC-19 Main Pile

786 30-Oct-15 1971 Ǿ500 12.00 TC-19 Main Pile

787 30-Oct-15 1972 Ǿ500 12.00 TC-19 Main Pile

788 30-Oct-15 1973 Ǿ500 12.00 TC-19 Main Pile

789 30-Oct-15 1974 Ǿ500 12.00 TC-19 Main Pile

790 30-Oct-15 1975 Ǿ500 12.00 TC-19 Main Pile

791 30-Oct-15 2226 Ǿ500 12.00 TC-15 Main Pile

792 30-Oct-15 2227 Ǿ500 12.00 TC-15 Main Pile

793 30-Oct-15 2228 Ǿ500 12.00 TC-15 Main Pile

794 30-Oct-15 2229 Ǿ500 12.00 TC-15 Main Pile

795 30-Oct-15 2230 Ǿ500 12.00 TC-15 Main Pile

796 30-Oct-15 2169 Ǿ500 12.00 TC-15 Main Pile

797 30-Oct-15 2170 Ǿ500 12.00 TC-15 Main Pile

798 30-Oct-15 2171 Ǿ500 12.00 TC-15 Main Pile

799 30-Oct-15 2172 Ǿ500 12.00 TC-15 Main Pile

800 30-Oct-15 2156 Ǿ500 12.00 TC-15 Main Pile

801 30-Oct-15 2157 Ǿ500 12.00 TC-15 Main Pile

802 30-Oct-15 2158 Ǿ500 12.00 TC-15 Main Pile

803 30-Oct-15 2159 Ǿ500 12.00 TC-15 Main Pile

804 30-Oct-15 2173 Ǿ500 12.00 TC-15 Main Pile

805 30-Oct-15 2174 Ǿ500 12.00 TC-15 Main Pile

806 30-Oct-15 2175 Ǿ500 12.00 TC-15 Main Pile

807 30-Oct-15 2176 Ǿ500 12.00 TC-15 Main Pile

808 30-Oct-15 2223 Ǿ500 12.00 TC-15 Main Pile

809 30-Oct-15 2224 Ǿ500 12.00 TC-15 Main Pile

810 30-Oct-15 2225 Ǿ500 12.00 TC-15 Main Pile

811 31-Oct-15 2243 Ǿ500 12.00 TC-19 Main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

812 31-Oct-15 2244 Ǿ500 12.00 TC-19 Main pile

813 31-Oct-15 2245 Ǿ500 12.00 TC-19 Main pile

814 31-Oct-15 2246 Ǿ500 12.00 TC-19 Main pile

815 2-Nov-15 4207 Ǿ500 12.00 TC-19 soldier pile

816 2-Nov-15 4206 Ǿ500 12.00 TC-19 soldier pile

817 2-Nov-15 4205 Ǿ500 12.00 TC-19 soldier pile

818 2-Nov-15 4204 Ǿ500 12.00 TC-19 soldier pile

819 2-Nov-15 4203 Ǿ500 12.00 TC-19 soldier pile

820 2-Nov-15 4202 Ǿ500 12.00 TC-19 soldier pile

821 2-Nov-15 4201 Ǿ500 12.00 TC-19 soldier pile

822 2-Nov-15 4200 Ǿ500 12.00 TC-19 soldier pile

823 2-Nov-15 1996 Ǿ500 12.00 TC-15 Main pile

824 2-Nov-15 1995 Ǿ500 12.00 TC-15 Main pile

825 2-Nov-15 1994 Ǿ500 12.00 TC-15 Main pile

826 2-Nov-15 1993 Ǿ500 12.00 TC-15 Main pile

827 2-Nov-15 1992 Ǿ500 12.00 TC-15 Main pile

828 2-Nov-15 1991 Ǿ500 12.00 TC-15 Main pile

829 2-Nov-15 1990 Ǿ500 12.00 TC-15 Main pile

830 2-Nov-15 1989 Ǿ500 12.00 TC-15 Main pile

831 2-Nov-15 1988 Ǿ500 12.00 TC-15 Main pile

832 2-Nov-15 1987 Ǿ500 12.00 TC-15 Main pile

833 2-Nov-15 1986 Ǿ500 12.00 TC-15 Main pile

834 2-Nov-15 1985 Ǿ500 12.00 TC-15 Main pile

835 2-Nov-15 1984 Ǿ500 12.00 TC-15 Main pile

836 2-Nov-15 1983 Ǿ500 12.00 TC-15 Main pile

837 2-Nov-15 1982 Ǿ500 12.00 TC-15 Main pile

838 2-Nov-15 1981 Ǿ500 12.00 TC-15 Main pile

839 2-Nov-15 1980 Ǿ500 12.00 TC-15 Main pile

840 2-Nov-15 1979 Ǿ500 12.00 TC-15 Main pile

841 2-Nov-15 1978 Ǿ500 12.00 TC-15 Main pile

842 2-Nov-15 1977 Ǿ500 12.00 TC-15 Main pile

843 2-Nov-15 1976 Ǿ500 12.00 TC-15 Main pile

844 3-Nov-15 2261 Ǿ500 12.00 TC-19 Main pile

845 3-Nov-15 2251 Ǿ500 12.00 TC-19 Main pile

846 3-Nov-15 2250 Ǿ500 12.00 TC-19 Main pile

847 3-Nov-15 2249 Ǿ500 12.00 TC-19 Main pile

848 3-Nov-15 2248 Ǿ500 12.00 TC-19 Main pile

849 3-Nov-15 2247 Ǿ500 12.00 TC-19 Main pile

850 3-Nov-15 2272 Ǿ500 12.00 TC-19 Main pile

851 3-Nov-15 2271 Ǿ500 12.00 TC-19 Main pile

852 3-Nov-15 2267 Ǿ500 12.00 TC-19 Main pile

853 3-Nov-15 2266 Ǿ500 12.00 TC-19 Main pile

854 3-Nov-15 2262 Ǿ500 12.00 TC-19 Main pile

855 3-Nov-15 2126 Ǿ500 12.00 TC-15 Main pile

856 3-Nov-15 2127 Ǿ500 12.00 TC-15 Main pile

857 3-Nov-15 2128 Ǿ500 12.00 TC-15 Main pile

858 3-Nov-15 2129 Ǿ500 12.00 TC-15 Main pile

859 3-Nov-15 2130 Ǿ500 12.00 TC-15 Main pile

860 3-Nov-15 2131 Ǿ500 12.00 TC-15 Main pile

861 3-Nov-15 2132 Ǿ500 12.00 TC-15 Main pile

862 3-Nov-15 2133 Ǿ500 12.00 TC-15 Main pile

863 3-Nov-15 2134 Ǿ500 12.00 TC-15 Main pile

864 3-Nov-15 2135 Ǿ500 12.00 TC-15 Main pile

865 4-Nov-15 2194 Ǿ500 12.00 TC-15 Main pile

866 4-Nov-15 2195 Ǿ500 12.00 TC-15 Main pile

867 4-Nov-15 2196 Ǿ500 12.00 TC-15 Main pile

868 4-Nov-15 2197 Ǿ500 12.00 TC-15 Main pile

869 4-Nov-15 2198 Ǿ500 12.00 TC-15 Main pile

870 4-Nov-15 2199 Ǿ500 12.00 TC-15 Main pile

871 4-Nov-15 2200 Ǿ500 12.00 TC-15 Main pile

872 4-Nov-15 2201 Ǿ500 12.00 TC-15 Main pile

873 4-Nov-15 2202 Ǿ500 12.00 TC-15 Main pile

874 4-Nov-15 2203 Ǿ500 12.00 TC-15 Main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

875 5-Nov-15 1468 Ǿ500 12.00 TC-19 bor hotel pile

876 5-Nov-15 1469 Ǿ500 12.00 TC-19 bor hotel pile

877 5-Nov-15 1470 Ǿ500 12.00 TC-19 bor hotel pile

878 5-Nov-15 1471 Ǿ500 12.00 TC-19 bor hotel pile

879 5-Nov-15 1472 Ǿ500 12.00 TC-19 bor hotel pile

880 5-Nov-15 1473 Ǿ500 12.00 TC-19 bor hotel pile

881 5-Nov-15 1474 Ǿ500 12.00 TC-19 bor hotel pile

882 5-Nov-15 1475 Ǿ500 12.00 TC-19 bor hotel pile

883 5-Nov-15 1476 Ǿ500 12.00 TC-19 bor hotel pile

884 6-Nov-15 2048 Ǿ500 12.00 TC-15 Main pile

885 6-Nov-15 2049 Ǿ500 12.00 TC-15 Main pile

886 6-Nov-15 2050 Ǿ500 12.00 TC-15 Main pile

887 6-Nov-15 2051 Ǿ500 12.00 TC-15 Main pile

888 6-Nov-15 2052 Ǿ500 12.00 TC-15 Main pile

889 6-Nov-15 2053 Ǿ500 12.00 TC-15 Main pile

890 6-Nov-15 2054 Ǿ500 12.00 TC-15 Main pile

891 6-Nov-15 2067 Ǿ500 12.00 TC-15 Main pile

892 6-Nov-15 2068 Ǿ500 12.00 TC-15 Main pile

893 6-Nov-15 2069 Ǿ500 12.00 TC-15 Main pile

894 6-Nov-15 2070 Ǿ500 12.00 TC-15 Main pile

895 6-Nov-15 2071 Ǿ500 12.00 TC-15 Main pile

896 6-Nov-15 2122 Ǿ500 12.00 TC-15 Main pile

897 6-Nov-15 2123 Ǿ500 12.00 TC-15 Main pile

898 6-Nov-15 2124 Ǿ500 12.00 TC-15 Main pile

899 6-Nov-15 2125 Ǿ500 12.00 TC-15 Main pile

900 6-Nov-15 2137 Ǿ500 12.00 TC-15 Main pile

901 6-Nov-15 2138 Ǿ500 12.00 TC-15 Main pile

902 6-Nov-15 2139 Ǿ500 12.00 TC-15 Main pile

903 6-Nov-15 2140 Ǿ500 12.00 TC-15 Main pile

904 6-Nov-15 2141 Ǿ500 12.00 TC-15 Main pile

905 7-Nov-15 1467 Ǿ500 12.00 TC-19 Bor hotel pile

906 7-Nov-15 1466 Ǿ500 12.00 TC-19 Bor hotel pile

907 7-Nov-15 1465 Ǿ500 12.00 TC-19 Bor hotel pile

908 7-Nov-15 1464 Ǿ500 12.00 TC-19 Bor hotel pile

909 7-Nov-15 1463 Ǿ500 12.00 TC-19 Bor hotel pile

910 7-Nov-15 1462 Ǿ500 12.00 TC-19 Bor hotel pile

911 7-Nov-15 1461 Ǿ500 12.00 TC-19 Bor hotel pile

912 7-Nov-15 1460 Ǿ500 12.00 TC-19 Bor hotel pile

913 7-Nov-15 1459 Ǿ500 12.00 TC-19 Bor hotel pile

914 7-Nov-15 1458 Ǿ500 12.00 TC-19 Bor hotel pile

915 7-Nov-15 1457 Ǿ500 12.00 TC-19 Bor hotel pile

916 7-Nov-15 1456 Ǿ500 12.00 TC-19 Bor hotel pile

917 7-Nov-15 1455 Ǿ500 12.00 TC-19 Bor hotel pile

918 7-Nov-15 1454 Ǿ500 12.00 TC-19 Bor hotel pile

919 7-Nov-15 1453 Ǿ500 12.00 TC-19 Bor hotel pile

920 7-Nov-15 1452 Ǿ500 12.00 TC-19 Bor hotel pile

921 7-Nov-15 1451 Ǿ500 12.00 TC-19 Bor hotel pile

922 7-Nov-15 1450 Ǿ500 12.00 TC-19 Bor hotel pile

923 7-Nov-15 2214 Ǿ500 12.00 TC-15 Bor main pile

924 7-Nov-15 2215 Ǿ500 12.00 TC-15 Bor main pile

925 7-Nov-15 2216 Ǿ500 12.00 TC-15 Bor main pile

926 7-Nov-15 2217 Ǿ500 12.00 TC-15 Bor main pile

927 7-Nov-15 2218 Ǿ500 12.00 TC-15 Bor main pile

928 7-Nov-15 2181 Ǿ500 12.00 TC-15 Bor main pile

929 7-Nov-15 2182 Ǿ500 12.00 TC-15 Bor main pile

930 7-Nov-15 2183 Ǿ500 12.00 TC-15 Bor main pile

931 7-Nov-15 2184 Ǿ500 12.00 TC-15 Bor main pile

932 7-Nov-15 2268 Ǿ500 12.00 TC-15 Bor main pile

933 7-Nov-15 2269 Ǿ500 12.00 TC-15 Bor main pile

934 7-Nov-15 2270 Ǿ500 12.00 TC-15 Bor main pile

935 7-Nov-15 2265 Ǿ500 12.00 TC-15 Bor main pile

936 7-Nov-15 2264 Ǿ500 12.00 TC-15 Bor main pile

937 7-Nov-15 2263 Ǿ500 12.00 TC-15 Bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

938 8-Nov-15 2275 Ǿ500 12.00 TC-15 Bor main pile

939 8-Nov-15 2274 Ǿ500 12.00 TC-15 Bor main pile

940 8-Nov-15 2273 Ǿ500 12.00 TC-15 Bor main pile

941 8-Nov-15 2255 Ǿ500 12.00 TC-15 Bor main pile

942 8-Nov-15 2254 Ǿ500 12.00 TC-15 Bor main pile

943 8-Nov-15 2253 Ǿ500 12.00 TC-15 Bor main pile

944 8-Nov-15 2252 Ǿ500 12.00 TC-15 Bor main pile

945 8-Nov-15 2260 Ǿ500 12.00 TC-15 Bor main pile

946 8-Nov-15 2259 Ǿ500 12.00 TC-15 Bor main pile

947 8-Nov-15 2258 Ǿ500 12.00 TC-15 Bor main pile

948 8-Nov-15 2257 Ǿ500 12.00 TC-15 Bor main pile

949 8-Nov-15 2256 Ǿ500 12.00 TC-15 Bor main pile

950 8-Nov-15 1997 Ǿ500 12.00 TC-15 Bor main pile

951 8-Nov-15 1998 Ǿ500 12.00 TC-15 Bor main pile

952 8-Nov-15 1999 Ǿ500 12.00 TC-15 Bor main pile

953 8-Nov-15 2000 Ǿ500 12.00 TC-15 Bor main pile

954 8-Nov-15 2001 Ǿ500 12.00 TC-15 Bor main pile

955 8-Nov-15 2002 Ǿ500 12.00 TC-15 Bor main pile

956 8-Nov-15 2147 Ǿ500 12.00 TC-15 Bor main pile

957 8-Nov-15 2148 Ǿ500 12.00 TC-15 Bor main pile

958 8-Nov-15 2149 Ǿ500 12.00 TC-15 Bor main pile

959 8-Nov-15 2150 Ǿ500 12.00 TC-15 Bor main pile

960 8-Nov-15 2151 Ǿ500 12.00 TC-15 Bor main pile

961 9-Nov-15 2114 Ǿ500 12.00 TC-15 Bor main pile

962 9-Nov-15 2115 Ǿ500 12.00 TC-15 Bor main pile

963 9-Nov-15 2116 Ǿ500 12.00 TC-15 Bor main pile

964 9-Nov-15 2117 Ǿ500 12.00 TC-15 Bor main pile

965 9-Nov-15 2082 Ǿ500 12.00 TC-15 Bor main pile

966 9-Nov-15 2083 Ǿ500 12.00 TC-15 Bor main pile

967 9-Nov-15 2084 Ǿ500 12.00 TC-15 Bor main pile

968 9-Nov-15 2085 Ǿ500 12.00 TC-15 Bor main pile

969 9-Nov-15 2086 Ǿ500 12.00 TC-15 Bor main pile

970 10-Nov-15 2055 Ǿ500 12.00 TC-15 Bor main pile

971 10-Nov-15 2056 Ǿ500 12.00 TC-15 Bor main pile

972 10-Nov-15 2057 Ǿ500 12.00 TC-15 Bor main pile

973 10-Nov-15 2058 Ǿ500 12.00 TC-15 Bor main pile

974 10-Nov-15 2059 Ǿ500 12.00 TC-15 Bor main pile

975 10-Nov-15 2060 Ǿ500 12.00 TC-15 Bor main pile

976 10-Nov-15 2061 Ǿ500 12.00 TC-15 Bor main pile

977 10-Nov-15 2062 Ǿ500 12.00 TC-15 Bor main pile

978 10-Nov-15 2063 Ǿ500 12.00 TC-15 Bor main pile

979 10-Nov-15 2064 Ǿ500 12.00 TC-15 Bor main pile

980 10-Nov-15 2065 Ǿ500 12.00 TC-15 Bor main pile

981 10-Nov-15 2066 Ǿ500 12.00 TC-15 Bor main pile

982 10-Nov-15 1430 Ǿ500 12.00 TC-19 Bor hotel pile

983 10-Nov-15 1431 Ǿ500 12.00 TC-19 Bor hotel pile

984 10-Nov-15 1432 Ǿ500 12.00 TC-19 Bor hotel pile

985 10-Nov-15 1433 Ǿ500 12.00 TC-19 Bor hotel pile

986 10-Nov-15 1434 Ǿ500 12.00 TC-19 Bor hotel pile

987 10-Nov-15 1435 Ǿ500 12.00 TC-19 Bor hotel pile

988 10-Nov-15 1436 Ǿ500 12.00 TC-19 Bor hotel pile

989 10-Nov-15 1437 Ǿ500 12.00 TC-19 Bor hotel pile

990 10-Nov-15 1438 Ǿ500 12.00 TC-19 Bor hotel pile

991 10-Nov-15 1439 Ǿ500 12.00 TC-19 Bor hotel pile

992 10-Nov-15 1440 Ǿ500 12.00 TC-19 Bor hotel pile

993 10-Nov-15 1441 Ǿ500 12.00 TC-19 Bor hotel pile

994 10-Nov-15 1442 Ǿ500 12.00 TC-19 Bor hotel pile

995 10-Nov-15 1443 Ǿ500 12.00 TC-19 Bor hotel pile

996 10-Nov-15 1444 Ǿ500 12.00 TC-19 Bor hotel pile

997 10-Nov-15 1445 Ǿ500 12.00 TC-19 Bor hotel pile

998 10-Nov-15 1446 Ǿ500 12.00 TC-19 Bor hotel pile

999 10-Nov-15 1447 Ǿ500 12.00 TC-19 Bor hotel pile

1000 10-Nov-15 1448 Ǿ500 12.00 TC-19 Bor hotel pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1001 10-Nov-15 1449 Ǿ500 12.00 TC-19 Bor hotel pile

1002 11-Nov-15 2027 Ǿ500 12.00 TC-15 Bor main pile

1003 11-Nov-15 2028 Ǿ500 12.00 TC-15 Bor main pile

1004 11-Nov-15 2029 Ǿ500 12.00 TC-15 Bor main pile

1005 11-Nov-15 2030 Ǿ500 12.00 TC-15 Bor main pile

1006 11-Nov-15 2031 Ǿ500 12.00 TC-15 Bor main pile

1007 11-Nov-15 2032 Ǿ500 12.00 TC-15 Bor main pile

1008 11-Nov-15 2033 Ǿ500 12.00 TC-15 Bor main pile

1009 11-Nov-15 2034 Ǿ500 12.00 TC-15 Bor main pile

1010 11-Nov-15 2035 Ǿ500 12.00 TC-15 Bor main pile

1011 11-Nov-15 2036 Ǿ500 12.00 TC-15 Bor main pile

1012 11-Nov-15 2037 Ǿ500 12.00 TC-15 Bor main pile

1013 11-Nov-15 2038 Ǿ500 12.00 TC-15 Bor main pile

1014 11-Nov-15 2039 Ǿ500 12.00 TC-15 Bor main pile

1015 11-Nov-15 2040 Ǿ500 12.00 TC-15 Bor main pile

1016 11-Nov-15 2041 Ǿ500 12.00 TC-15 Bor main pile

1017 11-Nov-15 2042 Ǿ500 12.00 TC-15 Bor main pile

1018 11-Nov-15 2043 Ǿ500 12.00 TC-15 Bor main pile

1019 11-Nov-15 2044 Ǿ500 12.00 TC-15 Bor main pile

1020 11-Nov-15 2045 Ǿ500 12.00 TC-15 Bor main pile

1021 11-Nov-15 2046 Ǿ500 12.00 TC-15 Bor main pile

1022 11-Nov-15 2047 Ǿ500 12.00 TC-15 Bor main pile

1023 12-Nov-15 2074 Ǿ500 12.00 TC-15 Bor main pile

1024 12-Nov-15 2075 Ǿ500 12.00 TC-15 Bor main pile

1025 12-Nov-15 2076 Ǿ500 12.00 TC-15 Bor main pile

1026 12-Nov-15 1271 Ǿ500 12.00 TC-15 Bor main pile

1027 12-Nov-15 1272 Ǿ500 12.00 TC-15 Bor main pile

1028 12-Nov-15 1273 Ǿ500 12.00 TC-15 Bor main pile

1029 12-Nov-15 1274 Ǿ500 12.00 TC-15 Bor main pile

1030 12-Nov-15 1275 Ǿ500 12.00 TC-15 Bor main pile

1031 12-Nov-15 1276 Ǿ500 12.00 TC-15 Bor main pile

1032 12-Nov-15 1277 Ǿ500 12.00 TC-15 Bor main pile

1033 12-Nov-15 1278 Ǿ500 12.00 TC-15 Bor main pile

1034 12-Nov-15 1279 Ǿ500 12.00 TC-15 Bor main pile

1035 12-Nov-15 2190 Ǿ500 12.00 TC-15 Bor main pile

1036 12-Nov-15 2191 Ǿ500 12.00 TC-15 Bor main pile

1037 12-Nov-15 2192 Ǿ500 12.00 TC-15 Bor main pile

1038 12-Nov-15 2193 Ǿ500 12.00 TC-15 Bor main pile

1039 12-Nov-15 2185 Ǿ500 12.00 TC-15 Bor main pile

1040 12-Nov-15 2186 Ǿ500 12.00 TC-15 Bor main pile

1041 12-Nov-15 2187 Ǿ500 12.00 TC-15 Bor main pile

1042 12-Nov-15 2188 Ǿ500 12.00 TC-15 Bor main pile

1043 12-Nov-15 2189 Ǿ500 12.00 TC-15 Bor main pile

1044 12-Nov-15 2142 Ǿ500 12.00 TC-15 Bor main pile

1045 12-Nov-15 2143 Ǿ500 12.00 TC-15 Bor main pile

1046 12-Nov-15 2144 Ǿ500 12.00 TC-15 Bor main pile

1047 12-Nov-15 2145 Ǿ500 12.00 TC-15 Bor main pile

1048 12-Nov-15 2146 Ǿ500 12.00 TC-15 Bor main pile

1049 12-Nov-15 2118 Ǿ500 12.00 TC-15 Bor main pile

1050 12-Nov-15 2119 Ǿ500 12.00 TC-15 Bor main pile

1051 12-Nov-15 2120 Ǿ500 12.00 TC-15 Bor main pile

1052 12-Nov-15 2121 Ǿ500 12.00 TC-15 Bor main pile

1053 12-Nov-15 2072 Ǿ500 12.00 TC-15 Bor main pile

1054 12-Nov-15 2173 Ǿ500 12.00 TC-15 Bor main pile

1055 13-Nov-15 2515 Ǿ500 12.00 TC-53 Bor main pile

1056 13-Nov-15 2516 Ǿ500 12.00 TC-53 Bor main pile

1057 13-Nov-15 2517 Ǿ500 12.00 TC-53 Bor main pile

1058 13-Nov-15 2518 Ǿ500 12.00 TC-53 Bor main pile

1059 13-Nov-15 2522 Ǿ500 12.00 TC-53 Bor main pile

1060 13-Nov-15 2524 Ǿ500 12.00 TC-53 Bor main pile

1061 13-Nov-15 2525 Ǿ500 12.00 TC-53 Bor main pile

1062 13-Nov-15 2529 Ǿ500 12.00 TC-53 Bor main pile

1063 13-Nov-15 2530 Ǿ500 12.00 TC-53 Bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1064 13-Nov-15 2531 Ǿ500 12.00 TC-53 Bor main pile

1065 13-Nov-15 2536 Ǿ500 12.00 TC-53 Bor main pile

1066 14-Nov-15 1280 Ǿ500 12.00 TC-19 Bor hotel pile

1067 14-Nov-15 1281 Ǿ500 12.00 TC-19 Bor hotel pile

1068 14-Nov-15 1282 Ǿ500 12.00 TC-19 Bor hotel pile

1069 14-Nov-15 1283 Ǿ500 12.00 TC-19 Bor hotel pile

1070 14-Nov-15 1284 Ǿ500 12.00 TC-19 Bor hotel pile

1071 14-Nov-15 1285 Ǿ500 12.00 TC-19 Bor hotel pile

1072 14-Nov-15 1287 Ǿ500 12.00 TC-19 Bor hotel pile

1073 14-Nov-15 1288 Ǿ500 12.00 TC-19 Bor hotel pile

1074 14-Nov-15 1297 Ǿ500 12.00 TC-19 Bor hotel pile

1075 14-Nov-15 1296 Ǿ500 12.00 TC-19 Bor hotel pile

1076 14-Nov-15 1295 Ǿ500 12.00 TC-19 Bor hotel pile

1077 14-Nov-15 1294 Ǿ500 12.00 TC-19 Bor hotel pile

1078 14-Nov-15 1293 Ǿ500 12.00 TC-19 Bor hotel pile

1079 14-Nov-15 1292 Ǿ500 12.00 TC-19 Bor hotel pile

1080 14-Nov-15 1291 Ǿ500 12.00 TC-19 Bor hotel pile

1081 14-Nov-15 1290 Ǿ500 12.00 TC-19 Bor hotel pile

1082 14-Nov-15 1289 Ǿ500 12.00 TC-19 Bor hotel pile

1083 18-Nov-15 2204 Ǿ270 18.00 TC-15 Bor main pile

1084 18-Nov-15 2205 Ǿ270 18.00 TC-15 Bor main pile

1085 18-Nov-15 2206 Ǿ270 18.00 TC-15 Bor main pile

1086 18-Nov-15 2207 Ǿ270 18.00 TC-15 Bor main pile

1087 18-Nov-15 2208 Ǿ270 18.00 TC-15 Bor main pile

1088 18-Nov-15 2209 Ǿ270 18.00 TC-15 Bor main pile

1089 18-Nov-15 2210 Ǿ270 18.00 TC-15 Bor main pile

1090 18-Nov-15 2211 Ǿ270 18.00 TC-15 Bor main pile

1091 18-Nov-15 2212 Ǿ270 18.00 TC-15 Bor main pile

1092 18-Nov-15 2213 Ǿ270 18.00 TC-15 Bor main pile

1093 19-Nov-15 4710 Ǿ500 12.00 TC-15 Bor soldier pile

1094 19-Nov-15 4711 Ǿ500 12.00 TC-15 Bor soldier pile

1095 19-Nov-15 4712 Ǿ500 12.00 TC-15 Bor soldier pile

1096 19-Nov-15 4713 Ǿ500 12.00 TC-15 Bor soldier pile

1097 19-Nov-15 4714 Ǿ500 12.00 TC-15 Bor soldier pile

1098 19-Nov-15 4715 Ǿ500 12.00 TC-15 Bor soldier pile

1099 19-Nov-15 4716 Ǿ500 12.00 TC-15 Bor soldier pile

1100 19-Nov-15 4717 Ǿ500 12.00 TC-15 Bor soldier pile

1101 19-Nov-15 4718 Ǿ500 12.00 TC-15 Bor soldier pile

1102 19-Nov-15 4719 Ǿ500 12.00 TC-15 Bor soldier pile

1103 19-Nov-15 4720 Ǿ500 12.00 TC-15 Bor soldier pile

1104 19-Nov-15 4721 Ǿ500 12.00 TC-15 Bor soldier pile

1105 19-Nov-15 4722 Ǿ500 12.00 TC-15 Bor soldier pile

1106 19-Nov-15 4723 Ǿ500 12.00 TC-15 Bor soldier pile

1107 19-Nov-15 4724 Ǿ500 12.00 TC-15 Bor soldier pile

1108 19-Nov-15 4725 Ǿ500 12.00 TC-15 Bor soldier pile

1109 19-Nov-15 4726 Ǿ500 12.00 TC-15 Bor soldier pile

1110 19-Nov-15 4727 Ǿ500 12.00 TC-15 Bor soldier pile

1111 19-Nov-15 4728 Ǿ500 12.00 TC-15 Bor soldier pile

1112 19-Nov-15 4729 Ǿ500 12.00 TC-15 Bor soldier pile

1113 19-Nov-15 4730 Ǿ500 12.00 TC-15 Bor soldier pile

1114 19-Nov-15 4731 Ǿ500 12.00 TC-15 Bor soldier pile

1115 19-Nov-15 4732 Ǿ500 12.00 TC-15 Bor soldier pile

1116 19-Nov-15 4733 Ǿ500 12.00 TC-15 Bor soldier pile

1117 19-Nov-15 4152 Ǿ500 12.00 TC-53 Bor soldier pile

1118 19-Nov-15 4153 Ǿ500 12.00 TC-53 Bor soldier pile

1119 19-Nov-15 4154 Ǿ500 12.00 TC-53 Bor soldier pile

1120 19-Nov-15 4155 Ǿ500 12.00 TC-53 Bor soldier pile

1121 19-Nov-15 4156 Ǿ500 12.00 TC-53 Bor soldier pile

1122 19-Nov-15 4157 Ǿ500 12.00 TC-53 Bor soldier pile

1123 19-Nov-15 4158 Ǿ500 12.00 TC-53 Bor soldier pile

1124 19-Nov-15 4159 Ǿ500 12.00 TC-53 Bor soldier pile

1125 19-Nov-15 4160 Ǿ500 12.00 TC-53 Bor soldier pile

1126 19-Nov-15 4161 Ǿ500 12.00 TC-53 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1127 19-Nov-15 4162 Ǿ500 12.00 TC-53 Bor soldier pile

1128 19-Nov-15 4163 Ǿ500 12.00 TC-53 Bor soldier pile

1129 19-Nov-15 4164 Ǿ500 12.00 TC-53 Bor soldier pile

1130 19-Nov-15 4165 Ǿ500 12.00 TC-53 Bor soldier pile

1131 19-Nov-15 4166 Ǿ500 12.00 TC-53 Bor soldier pile

1132 19-Nov-15 4167 Ǿ500 12.00 TC-53 Bor soldier pile

1133 19-Nov-15 4168 Ǿ500 12.00 TC-53 Bor soldier pile

1134 19-Nov-15 4169 Ǿ500 12.00 TC-53 Bor soldier pile

1135 19-Nov-15 4170 Ǿ500 12.00 TC-53 Bor soldier pile

1136 19-Nov-15 4171 Ǿ500 12.00 TC-53 Bor soldier pile

1137 19-Nov-15 4172 Ǿ500 12.00 TC-53 Bor soldier pile

1138 19-Nov-15 4173 Ǿ500 12.00 TC-53 Bor soldier pile

1139 19-Nov-15 4174 Ǿ500 12.00 TC-53 Bor soldier pile

1140 19-Nov-15 4175 Ǿ500 12.00 TC-53 Bor soldier pile

1141 19-Nov-15 4176 Ǿ500 12.00 TC-53 Bor soldier pile

1142 19-Nov-15 4177 Ǿ500 12.00 TC-53 Bor soldier pile

1143 20-Nov-15 4700 Ǿ500 12.00 TC-15 Bor soldier pile

1144 20-Nov-15 4701 Ǿ500 12.00 TC-15 Bor soldier pile

1145 20-Nov-15 4702 Ǿ500 12.00 TC-15 Bor soldier pile

1146 20-Nov-15 4703 Ǿ500 12.00 TC-15 Bor soldier pile

1147 20-Nov-15 4704 Ǿ500 12.00 TC-15 Bor soldier pile

1148 20-Nov-15 4705 Ǿ500 12.00 TC-15 Bor soldier pile

1149 20-Nov-15 4706 Ǿ500 12.00 TC-15 Bor soldier pile

1150 20-Nov-15 4707 Ǿ500 12.00 TC-15 Bor soldier pile

1151 20-Nov-15 4708 Ǿ500 12.00 TC-15 Bor soldier pile

1152 20-Nov-15 4709 Ǿ500 12.00 TC-15 Bor soldier pile

1153 20-Nov-15 2523 Ǿ500 12.00 TC-53 Bor main pile

1154 20-Nov-15 2526 Ǿ500 12.00 TC-53 Bor main pile

1155 20-Nov-15 2527 Ǿ500 12.00 TC-53 Bor main pile

1156 20-Nov-15 2528 Ǿ500 12.00 TC-53 Bor main pile

1157 20-Nov-15 2532 Ǿ500 12.00 TC-53 Bor main pile

1158 20-Nov-15 2533 Ǿ500 12.00 TC-53 Bor main pile

1159 20-Nov-15 2535 Ǿ500 12.00 TC-53 Bor main pile

1160 20-Nov-15 4178 Ǿ500 12.00 TC-53 Bor soldier pile

1161 20-Nov-15 4179 Ǿ500 12.00 TC-53 Bor soldier pile

1162 20-Nov-15 4180 Ǿ500 12.00 TC-53 Bor soldier pile

1163 20-Nov-15 4181 Ǿ500 12.00 TC-53 Bor soldier pile

1164 20-Nov-15 4182 Ǿ500 12.00 TC-53 Bor soldier pile

1165 20-Nov-15 4183 Ǿ500 12.00 TC-53 Bor soldier pile

1166 20-Nov-15 4184 Ǿ500 12.00 TC-53 Bor soldier pile

1167 20-Nov-15 4185 Ǿ500 12.00 TC-53 Bor soldier pile

1168 20-Nov-15 4186 Ǿ500 12.00 TC-53 Bor soldier pile

1169 20-Nov-15 4187 Ǿ500 12.00 TC-53 Bor soldier pile

1170 20-Nov-15 4188 Ǿ500 12.00 TC-53 Bor soldier pile

1171 20-Nov-15 4189 Ǿ500 12.00 TC-53 Bor soldier pile

1172 20-Nov-15 4190 Ǿ500 12.00 TC-53 Bor soldier pile

1173 20-Nov-15 4191 Ǿ500 12.00 TC-53 Bor soldier pile

1174 20-Nov-15 4192 Ǿ500 12.00 TC-53 Bor soldier pile

1175 20-Nov-15 4193 Ǿ500 12.00 TC-53 Bor soldier pile

1176 20-Nov-15 4194 Ǿ500 12.00 TC-53 Bor soldier pile

1177 20-Nov-15 4195 Ǿ500 12.00 TC-53 Bor soldier pile

1178 20-Nov-15 4196 Ǿ500 12.00 TC-53 Bor soldier pile

1179 21-Nov-15 2506 Ǿ500 12.00 TC-53 Bor main pile

1180 21-Nov-15 2503 Ǿ500 12.00 TC-53 Bor main pile

1181 21-Nov-15 2504 Ǿ500 12.00 TC-53 Bor main pile

1182 21-Nov-15 2505 Ǿ500 12.00 TC-53 Bor main pile

1183 21-Nov-15 2520 Ǿ500 12.00 TC-53 Bor main pile

1184 21-Nov-15 2519 Ǿ500 12.00 TC-53 Bor main pile

1185 21-Nov-15 2521 Ǿ500 12.00 TC-53 Bor main pile

1186 21-Nov-15 2511 Ǿ500 12.00 TC-53 Bor main pile

1187 21-Nov-15 2512 Ǿ500 12.00 TC-53 Bor main pile

1188 21-Nov-15 2513 Ǿ500 12.00 TC-53 Bor main pile

1189 21-Nov-15 2514 Ǿ500 12.00 TC-53 Bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1190 21-Nov-15 2508 Ǿ500 12.00 TC-53 Bor main pile

1191 21-Nov-15 2507 Ǿ500 12.00 TC-53 Bor main pile

1192 21-Nov-15 2509 Ǿ500 12.00 TC-53 Bor main pile

1193 21-Nov-15 2510 Ǿ500 12.00 TC-53 Bor main pile

1194 24-Nov-15 1306 Ǿ500 12.00 TC-19 Bor hotel pile

1195 24-Nov-15 1305 Ǿ500 12.00 TC-19 Bor hotel pile

1196 24-Nov-15 1304 Ǿ500 12.00 TC-19 Bor hotel pile

1197 24-Nov-15 1303 Ǿ500 12.00 TC-19 Bor hotel pile

1198 24-Nov-15 1302 Ǿ500 12.00 TC-19 Bor hotel pile

1199 24-Nov-15 1301 Ǿ500 12.00 TC-19 Bor hotel pile

1200 24-Nov-15 1300 Ǿ500 12.00 TC-19 Bor hotel pile

1201 24-Nov-15 1298 Ǿ500 12.00 TC-19 Bor hotel pile

1202 24-Nov-15 1315 Ǿ500 12.00 TC-19 Bor hotel pile

1203 24-Nov-15 1314 Ǿ500 12.00 TC-19 Bor hotel pile

1204 24-Nov-15 1313 Ǿ500 12.00 TC-19 Bor hotel pile

1205 24-Nov-15 1312 Ǿ500 12.00 TC-19 Bor hotel pile

1206 24-Nov-15 1311 Ǿ500 12.00 TC-19 Bor hotel pile

1207 24-Nov-15 1310 Ǿ500 12.00 TC-19 Bor hotel pile

1208 24-Nov-15 1309 Ǿ500 12.00 TC-19 Bor hotel pile

1209 24-Nov-15 1308 Ǿ500 12.00 TC-19 Bor hotel pile

1210 24-Nov-15 1307 Ǿ500 12.00 TC-19 Bor hotel pile

1211 24-Nov-15 1398 Ǿ500 12.00 TC-19 Bor hotel pile

1212 24-Nov-15 1399 Ǿ500 12.00 TC-19 Bor hotel pile

1213 24-Nov-15 1400 Ǿ500 12.00 TC-19 Bor hotel pile

1214 24-Nov-15 1401 Ǿ500 12.00 TC-19 Bor hotel pile

1215 24-Nov-15 1402 Ǿ500 12.00 TC-19 Bor hotel pile

1216 24-Nov-15 1403 Ǿ500 12.00 TC-19 Bor hotel pile

1217 24-Nov-15 1420 Ǿ500 12.00 TC-19 Bor hotel pile

1218 24-Nov-15 1421 Ǿ500 12.00 TC-19 Bor hotel pile

1219 24-Nov-15 1422 Ǿ500 12.00 TC-19 Bor hotel pile

1220 24-Nov-15 1423 Ǿ500 12.00 TC-19 Bor hotel pile

1221 24-Nov-15 1424 Ǿ500 12.00 TC-19 Bor hotel pile

1222 24-Nov-15 2073 Ǿ500 12.00 TC-19 Bor main pile

1223 24-Nov-15 2077 Ǿ500 12.00 TC-19 Bor main pile

1224 24-Nov-15 2078 Ǿ500 12.00 TC-19 Bor main pile

1225 24-Nov-15 2079 Ǿ500 12.00 TC-19 Bor main pile

1226 24-Nov-15 2080 Ǿ500 12.00 TC-19 Bor main pile

1227 24-Nov-15 2081 Ǿ500 12.00 TC-19 Bor main pile

1228 25-Nov-15 2499 Ǿ500 12.00 TC-53 Bor main pile

1229 25-Nov-15 2500 Ǿ500 12.00 TC-53 Bor main pile

1230 25-Nov-15 2501 Ǿ500 12.00 TC-53 Bor main pile

1231 25-Nov-15 2502 Ǿ500 12.00 TC-53 Bor main pile

1232 25-Nov-15 2495 Ǿ500 12.00 TC-53 Bor main pile

1233 25-Nov-15 2496 Ǿ500 12.00 TC-53 Bor main pile

1234 25-Nov-15 2497 Ǿ500 12.00 TC-53 Bor main pile

1235 25-Nov-15 2498 Ǿ500 12.00 TC-53 Bor main pile

1236 25-Nov-15 2489 Ǿ500 12.00 TC-53 Bor main pile

1237 25-Nov-15 2490 Ǿ500 12.00 TC-53 Bor main pile

1238 25-Nov-15 2491 Ǿ500 12.00 TC-53 Bor main pile

1239 25-Nov-15 2492 Ǿ500 12.00 TC-53 Bor main pile

1240 25-Nov-15 2493 Ǿ500 12.00 TC-53 Bor main pile

1241 25-Nov-15 2494 Ǿ500 12.00 TC-53 Bor main pile

1242 25-Nov-15 2479 Ǿ500 12.00 TC-53 Bor main pile

1243 25-Nov-15 2480 Ǿ500 12.00 TC-53 Bor main pile

1244 25-Nov-15 2481 Ǿ500 12.00 TC-53 Bor main pile

1245 25-Nov-15 2482 Ǿ500 12.00 TC-53 Bor main pile

1246 25-Nov-15 2483 Ǿ500 12.00 TC-53 Bor main pile

1247 25-Nov-15 2484 Ǿ500 12.00 TC-53 Bor main pile

1248 25-Nov-15 2485 Ǿ500 12.00 TC-53 Bor main pile

1249 25-Nov-15 2486 Ǿ500 12.00 TC-53 Bor main pile

1250 25-Nov-15 2487 Ǿ500 12.00 TC-53 Bor main pile

1251 25-Nov-15 2488 Ǿ500 12.00 TC-53 Bor main pile

1252 25-Nov-15 2474 Ǿ500 12.00 TC-53 Bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1253 25-Nov-15 2475 Ǿ500 12.00 TC-53 Bor main pile

1254 25-Nov-15 2476 Ǿ500 12.00 TC-53 Bor main pile

1255 25-Nov-15 2477 Ǿ500 12.00 TC-53 Bor main pile

1256 25-Nov-15 2478 Ǿ500 12.00 TC-53 Bor main pile

1257 26-Nov-15 2467 Ǿ500 12.00 TC-53 Bor main pile

1258 26-Nov-15 2468 Ǿ500 12.00 TC-53 Bor main pile

1259 26-Nov-15 2469 Ǿ500 12.00 TC-53 Bor main pile

1260 26-Nov-15 2470 Ǿ500 12.00 TC-53 Bor main pile

1261 26-Nov-15 2471 Ǿ500 12.00 TC-53 Bor main pile

1262 26-Nov-15 2472 Ǿ500 12.00 TC-53 Bor main pile

1263 26-Nov-15 2473 Ǿ500 12.00 TC-53 Bor main pile

1264 26-Nov-15 2463 Ǿ500 12.00 TC-53 Bor main pile

1265 26-Nov-15 2464 Ǿ500 12.00 TC-53 Bor main pile

1266 26-Nov-15 2465 Ǿ500 12.00 TC-53 Bor main pile

1267 26-Nov-15 2466 Ǿ500 12.00 TC-53 Bor main pile

1268 26-Nov-15 2459 Ǿ500 12.00 TC-53 Bor main pile

1269 26-Nov-15 2460 Ǿ500 12.00 TC-53 Bor main pile

1270 26-Nov-15 2458 Ǿ500 12.00 TC-53 Bor main pile

1271 26-Nov-15 2461 Ǿ500 12.00 TC-53 Bor main pile

1272 26-Nov-15 2462 Ǿ500 12.00 TC-53 Bor main pile

1273 26-Nov-15 2310 Ǿ500 12.00 TC-15 Bor main pile

1274 26-Nov-15 2311 Ǿ500 12.00 TC-15 Bor main pile

1275 26-Nov-15 2312 Ǿ500 12.00 TC-15 Bor main pile

1276 26-Nov-15 2313 Ǿ500 12.00 TC-15 Bor main pile

1277 26-Nov-15 2314 Ǿ500 12.00 TC-15 Bor main pile

1278 26-Nov-15 2315 Ǿ500 12.00 TC-15 Bor main pile

1279 26-Nov-15 2316 Ǿ500 12.00 TC-15 Bor main pile

1280 26-Nov-15 2317 Ǿ500 12.00 TC-15 Bor main pile

1281 26-Nov-15 2318 Ǿ500 12.00 TC-15 Bor main pile

1282 26-Nov-15 2329 Ǿ500 12.00 TC-15 Bor main pile

1283 26-Nov-15 2330 Ǿ500 12.00 TC-15 Bor main pile

1284 26-Nov-15 2331 Ǿ500 12.00 TC-15 Bor main pile

1285 26-Nov-15 2332 Ǿ500 12.00 TC-15 Bor main pile

1286 26-Nov-15 2333 Ǿ500 12.00 TC-15 Bor main pile

1287 26-Nov-15 2334 Ǿ500 12.00 TC-15 Bor main pile

1288 26-Nov-15 2335 Ǿ500 12.00 TC-15 Bor main pile

1289 26-Nov-15 2336 Ǿ500 12.00 TC-15 Bor main pile

1290 26-Nov-15 2337 Ǿ500 12.00 TC-15 Bor main pile

1291 26-Nov-15 2358 Ǿ500 12.00 TC-15 Bor main pile

1292 26-Nov-15 2359 Ǿ500 12.00 TC-15 Bor main pile

1293 26-Nov-15 2360 Ǿ500 12.00 TC-15 Bor main pile

1294 26-Nov-15 2361 Ǿ500 12.00 TC-15 Bor main pile

1295 26-Nov-15 2362 Ǿ500 12.00 TC-15 Bor main pile

1296 26-Nov-15 2952 Ǿ500 12.00 TC-19 Bor main pile

1297 26-Nov-15 1316 Ǿ500 12.00 TC-19 Bor main pile

1298 26-Nov-15 1317 Ǿ500 12.00 TC-19 Bor main pile

1299 26-Nov-15 1318 Ǿ500 12.00 TC-19 Bor main pile

1300 26-Nov-15 1319 Ǿ500 12.00 TC-19 Bor main pile

1301 26-Nov-15 1320 Ǿ500 12.00 TC-19 Bor main pile

1302 26-Nov-15 1321 Ǿ500 12.00 TC-19 Bor main pile

1303 26-Nov-15 1322 Ǿ500 12.00 TC-19 Bor main pile

1304 26-Nov-15 1323 Ǿ500 12.00 TC-19 Bor main pile

1305 26-Nov-15 1324 Ǿ500 12.00 TC-19 Bor main pile

1306 26-Nov-15 1325 Ǿ500 12.00 TC-19 Bor main pile

1307 26-Nov-15 1326 Ǿ500 12.00 TC-19 Bor main pile

1308 26-Nov-15 1327 Ǿ500 12.00 TC-19 Bor main pile

1309 26-Nov-15 1328 Ǿ500 12.00 TC-19 Bor main pile

1310 26-Nov-15 1329 Ǿ500 12.00 TC-19 Bor main pile

1311 26-Nov-15 1330 Ǿ500 12.00 TC-19 Bor main pile

1312 26-Nov-15 1331 Ǿ500 12.00 TC-19 Bor main pile

1313 26-Nov-15 1332 Ǿ500 12.00 TC-19 Bor main pile

1314 26-Nov-15 1333 Ǿ500 12.00 TC-19 Bor main pile

1315 26-Nov-15 1392 Ǿ500 12.00 TC-19 Bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1316 26-Nov-15 1393 Ǿ500 12.00 TC-19 Bor main pile

1317 26-Nov-15 1394 Ǿ500 12.00 TC-19 Bor main pile

1318 26-Nov-15 1395 Ǿ500 12.00 TC-19 Bor main pile

1319 26-Nov-15 1396 Ǿ500 12.00 TC-19 Bor main pile

1320 26-Nov-15 1397 Ǿ500 12.00 TC-19 Bor main pile

1321 26-Nov-15 1386 Ǿ500 12.00 TC-19 Bor main pile

1322 26-Nov-15 1387 Ǿ500 12.00 TC-19 Bor main pile

1323 26-Nov-15 1388 Ǿ500 12.00 TC-19 Bor main pile

1324 26-Nov-15 1389 Ǿ500 12.00 TC-19 Bor main pile

1325 26-Nov-15 1390 Ǿ500 12.00 TC-19 Bor main pile

1326 26-Nov-15 1391 Ǿ500 12.00 TC-19 Bor main pile

1327 26-Nov-15 1415 Ǿ500 12.00 TC-19 Bor main pile

1328 26-Nov-15 1416 Ǿ500 12.00 TC-19 Bor main pile

1329 26-Nov-15 1417 Ǿ500 12.00 TC-19 Bor main pile

1330 26-Nov-15 1418 Ǿ500 12.00 TC-19 Bor main pile

1331 26-Nov-15 1419 Ǿ500 12.00 TC-19 Bor main pile

1332 27-Nov-15 4111 Ǿ500 12.00 TC-53 Bor soldier pile

1333 27-Nov-15 4110 Ǿ500 12.00 TC-53 Bor soldier pile

1334 27-Nov-15 4109 Ǿ500 12.00 TC-53 Bor soldier pile

1335 27-Nov-15 4108 Ǿ500 12.00 TC-53 Bor soldier pile

1336 27-Nov-15 4107 Ǿ500 12.00 TC-53 Bor soldier pile

1337 27-Nov-15 4106 Ǿ500 12.00 TC-53 Bor soldier pile

1338 27-Nov-15 4105 Ǿ500 12.00 TC-53 Bor soldier pile

1339 27-Nov-15 4104 Ǿ500 12.00 TC-53 Bor soldier pile

1340 27-Nov-15 4103 Ǿ500 12.00 TC-53 Bor soldier pile

1341 27-Nov-15 4102 Ǿ500 12.00 TC-53 Bor soldier pile

1342 27-Nov-15 4101 Ǿ500 12.00 TC-53 Bor soldier pile

1343 27-Nov-15 4100 Ǿ500 12.00 TC-53 Bor soldier pile

1344 27-Nov-15 4099 Ǿ500 12.00 TC-53 Bor soldier pile

1345 27-Nov-15 4098 Ǿ500 12.00 TC-53 Bor soldier pile

1346 27-Nov-15 4097 Ǿ500 12.00 TC-53 Bor soldier pile

1347 27-Nov-15 4096 Ǿ500 12.00 TC-53 Bor soldier pile

1348 27-Nov-15 4095 Ǿ500 12.00 TC-53 Bor soldier pile

1349 27-Nov-15 4094 Ǿ500 12.00 TC-53 Bor soldier pile

1350 27-Nov-15 4093 Ǿ500 12.00 TC-53 Bor soldier pile

1351 27-Nov-15 4092 Ǿ500 12.00 TC-53 Bor soldier pile

1352 27-Nov-15 4091 Ǿ500 12.00 TC-53 Bor soldier pile

1353 27-Nov-15 4198 Ǿ500 12.00 TC-53 Bor soldier pile

1354 27-Nov-15 4199 Ǿ500 12.00 TC-53 Bor soldier pile

1355 27-Nov-15 4200 Ǿ500 12.00 TC-53 Bor soldier pile

1356 27-Nov-15 4017 Ǿ500 12.00 TC-15 Bor soldier pile

1357 27-Nov-15 4018 Ǿ500 12.00 TC-15 Bor soldier pile

1358 27-Nov-15 4019 Ǿ500 12.00 TC-15 Bor soldier pile

1359 27-Nov-15 4020 Ǿ500 12.00 TC-15 Bor soldier pile

1360 27-Nov-15 4021 Ǿ500 12.00 TC-15 Bor soldier pile

1361 27-Nov-15 4022 Ǿ500 12.00 TC-15 Bor soldier pile

1362 27-Nov-15 4023 Ǿ500 12.00 TC-15 Bor soldier pile

1363 27-Nov-15 4024 Ǿ500 12.00 TC-15 Bor soldier pile

1364 27-Nov-15 4025 Ǿ500 12.00 TC-15 Bor soldier pile

1365 27-Nov-15 4026 Ǿ500 12.00 TC-15 Bor soldier pile

1366 27-Nov-15 4027 Ǿ500 12.00 TC-15 Bor soldier pile

1367 27-Nov-15 4028 Ǿ500 12.00 TC-15 Bor soldier pile

1368 27-Nov-15 4029 Ǿ500 12.00 TC-15 Bor soldier pile

1369 27-Nov-15 4030 Ǿ500 12.00 TC-15 Bor soldier pile

1370 27-Nov-15 4031 Ǿ500 12.00 TC-15 Bor soldier pile

1371 27-Nov-15 4032 Ǿ500 12.00 TC-15 Bor soldier pile

1372 27-Nov-15 4033 Ǿ500 12.00 TC-15 Bor soldier pile

1373 27-Nov-15 4034 Ǿ500 12.00 TC-15 Bor soldier pile

1374 27-Nov-15 4035 Ǿ500 12.00 TC-15 Bor soldier pile

1375 27-Nov-15 4036 Ǿ500 12.00 TC-15 Bor soldier pile

1376 27-Nov-15 4037 Ǿ500 12.00 TC-15 Bor soldier pile

1377 27-Nov-15 4038 Ǿ500 12.00 TC-15 Bor soldier pile

1378 27-Nov-15 4039 Ǿ500 12.00 TC-15 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1379 27-Nov-15 4040 Ǿ500 12.00 TC-15 Bor soldier pile

1380 27-Nov-15 4041 Ǿ500 12.00 TC-15 Bor soldier pile

1381 27-Nov-15 4042 Ǿ500 12.00 TC-15 Bor soldier pile

1382 27-Nov-15 4043 Ǿ500 12.00 TC-15 Bor soldier pile

1383 27-Nov-15 4044 Ǿ500 12.00 TC-15 Bor soldier pile

1384 27-Nov-15 4045 Ǿ500 12.00 TC-15 Bor soldier pile

1385 27-Nov-15 4046 Ǿ500 12.00 TC-15 Bor soldier pile

1386 27-Nov-15 4047 Ǿ500 12.00 TC-15 Bor soldier pile

1387 27-Nov-15 4048 Ǿ500 12.00 TC-15 Bor soldier pile

1388 27-Nov-15 4049 Ǿ500 12.00 TC-15 Bor soldier pile

1389 27-Nov-15 4050 Ǿ500 12.00 TC-15 Bor soldier pile

1390 27-Nov-15 4051 Ǿ500 12.00 TC-15 Bor soldier pile

1391 27-Nov-15 4070 Ǿ500 12.00 TC-15 Bor soldier pile

1392 27-Nov-15 4071 Ǿ500 12.00 TC-15 Bor soldier pile

1393 27-Nov-15 4072 Ǿ500 12.00 TC-15 Bor soldier pile

1394 27-Nov-15 4073 Ǿ500 12.00 TC-15 Bor soldier pile

1395 27-Nov-15 4074 Ǿ500 12.00 TC-15 Bor soldier pile

1396 27-Nov-15 4075 Ǿ500 12.00 TC-15 Bor soldier pile

1397 27-Nov-15 4076 Ǿ500 12.00 TC-15 Bor soldier pile

1398 27-Nov-15 4077 Ǿ500 12.00 TC-15 Bor soldier pile

1399 27-Nov-15 4078 Ǿ500 12.00 TC-15 Bor soldier pile

1400 27-Nov-15 4079 Ǿ500 12.00 TC-15 Bor soldier pile

1401 27-Nov-15 4080 Ǿ500 12.00 TC-15 Bor soldier pile

1402 27-Nov-15 4081 Ǿ500 12.00 TC-15 Bor soldier pile

1403 27-Nov-15 4082 Ǿ500 12.00 TC-15 Bor soldier pile

1404 27-Nov-15 4083 Ǿ500 12.00 TC-15 Bor soldier pile

1405 27-Nov-15 4084 Ǿ500 12.00 TC-15 Bor soldier pile

1406 27-Nov-15 4085 Ǿ500 12.00 TC-15 Bor soldier pile

1407 27-Nov-15 4086 Ǿ500 12.00 TC-15 Bor soldier pile

1408 27-Nov-15 4087 Ǿ500 12.00 TC-15 Bor soldier pile

1409 27-Nov-15 4088 Ǿ500 12.00 TC-15 Bor soldier pile

1410 27-Nov-15 4089 Ǿ500 12.00 TC-15 Bor soldier pile

1411 27-Nov-15 4090 Ǿ500 12.00 TC-15 Bor soldier pile

1412 27-Nov-15 1380 Ǿ500 12.00 TC-19 Bor main pile

1413 27-Nov-15 1381 Ǿ500 12.00 TC-19 Bor main pile

1414 27-Nov-15 1382 Ǿ500 12.00 TC-19 Bor main pile

1415 27-Nov-15 1383 Ǿ500 12.00 TC-19 Bor main pile

1416 27-Nov-15 1384 Ǿ500 12.00 TC-19 Bor main pile

1417 27-Nov-15 1385 Ǿ500 12.00 TC-19 Bor main pile

1418 27-Nov-15 2055 Ǿ500 12.00 TC-19 Bor main pile

1419 30-Nov-15 4001 Ǿ500 12.00 TC-15 Bor soldier pile

1420 30-Nov-15 4002 Ǿ500 12.00 TC-15 Bor soldier pile

1421 30-Nov-15 4003 Ǿ500 12.00 TC-15 Bor soldier pile

1422 30-Nov-15 4004 Ǿ500 12.00 TC-15 Bor soldier pile

1423 30-Nov-15 4005 Ǿ500 12.00 TC-15 Bor soldier pile

1424 30-Nov-15 4006 Ǿ500 12.00 TC-15 Bor soldier pile

1425 30-Nov-15 4007 Ǿ500 12.00 TC-15 Bor soldier pile

1426 30-Nov-15 4008 Ǿ500 12.00 TC-15 Bor soldier pile

1427 30-Nov-15 4009 Ǿ500 12.00 TC-15 Bor soldier pile

1428 30-Nov-15 4010 Ǿ500 12.00 TC-15 Bor soldier pile

1429 30-Nov-15 4011 Ǿ500 12.00 TC-15 Bor soldier pile

1430 30-Nov-15 4012 Ǿ500 12.00 TC-15 Bor soldier pile

1431 30-Nov-15 4013 Ǿ500 12.00 TC-15 Bor soldier pile

1432 30-Nov-15 4014 Ǿ500 12.00 TC-15 Bor soldier pile

1433 30-Nov-15 4015 Ǿ500 12.00 TC-15 Bor soldier pile

1434 30-Nov-15 4016 Ǿ500 12.00 TC-15 Bor soldier pile

1435 30-Nov-15 4052 Ǿ500 12.00 TC-15 Bor soldier pile

1436 30-Nov-15 4053 Ǿ500 12.00 TC-15 Bor soldier pile

1437 30-Nov-15 4054 Ǿ500 12.00 TC-15 Bor soldier pile

1438 30-Nov-15 4055 Ǿ500 12.00 TC-15 Bor soldier pile

1439 30-Nov-15 4056 Ǿ500 12.00 TC-15 Bor soldier pile

1440 30-Nov-15 4057 Ǿ500 12.00 TC-15 Bor soldier pile

1441 30-Nov-15 4058 Ǿ500 12.00 TC-15 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1442 30-Nov-15 4059 Ǿ500 12.00 TC-15 Bor soldier pile

1443 30-Nov-15 4060 Ǿ500 12.00 TC-15 Bor soldier pile

1444 30-Nov-15 4061 Ǿ500 12.00 TC-15 Bor soldier pile

1445 30-Nov-15 4062 Ǿ500 12.00 TC-15 Bor soldier pile

1446 30-Nov-15 4063 Ǿ500 12.00 TC-15 Bor soldier pile

1447 30-Nov-15 4064 Ǿ500 12.00 TC-15 Bor soldier pile

1448 30-Nov-15 4065 Ǿ500 12.00 TC-15 Bor soldier pile

1449 30-Nov-15 4066 Ǿ500 12.00 TC-15 Bor soldier pile

1450 30-Nov-15 4067 Ǿ500 12.00 TC-15 Bor soldier pile

1451 30-Nov-15 4068 Ǿ500 12.00 TC-15 Bor soldier pile

1452 30-Nov-15 4069 Ǿ500 12.00 TC-15 Bor soldier pile

1453 1-Dec-15 2324 Ǿ500 12.00 TC-15 Bor main pile

1454 1-Dec-15 2325 Ǿ500 12.00 TC-15 Bor main pile

1455 1-Dec-15 2326 Ǿ500 12.00 TC-15 Bor main pile

1456 1-Dec-15 2327 Ǿ500 12.00 TC-15 Bor main pile

1457 1-Dec-15 2328 Ǿ500 12.00 TC-15 Bor main pile

1458 1-Dec-15 2363 Ǿ500 12.00 TC-15 Bor main pile

1459 1-Dec-15 2364 Ǿ500 12.00 TC-15 Bor main pile

1460 1-Dec-15 2365 Ǿ500 12.00 TC-15 Bor main pile

1461 1-Dec-15 2366 Ǿ500 12.00 TC-15 Bor main pile

1462 1-Dec-15 2367 Ǿ500 12.00 TC-15 Bor main pile

1463 1-Dec-15 2978 Ǿ500 12.00 TC-15 Bor main pile

1464 1-Dec-15 2979 Ǿ500 12.00 TC-15 Bor main pile

1465 1-Dec-15 2165 Ǿ500 12.00 TC-15 Bor main pile

1466 1-Dec-15 2166 Ǿ500 12.00 TC-15 Bor main pile

1467 1-Dec-15 2167 Ǿ500 12.00 TC-15 Bor main pile

1468 1-Dec-15 2168 Ǿ500 12.00 TC-15 Bor main pile

1469 1-Dec-15 2319 Ǿ500 12.00 TC-15 Bor main pile

1470 1-Dec-15 2320 Ǿ500 12.00 TC-15 Bor main pile

1471 1-Dec-15 2321 Ǿ500 12.00 TC-15 Bor main pile

1472 1-Dec-15 2322 Ǿ500 12.00 TC-15 Bor main pile

1473 1-Dec-15 2323 Ǿ500 12.00 TC-15 Bor main pile

1474 1-Dec-15 1262 Ǿ500 12.00 TC-15 Bor main pile

1475 1-Dec-15 1263 Ǿ500 12.00 TC-15 Bor main pile

1476 1-Dec-15 1264 Ǿ500 12.00 TC-15 Bor main pile

1477 1-Dec-15 1265 Ǿ500 12.00 TC-15 Bor main pile

1478 1-Dec-15 1266 Ǿ500 12.00 TC-15 Bor main pile

1479 1-Dec-15 1267 Ǿ500 12.00 TC-15 Bor main pile

1480 1-Dec-15 1268 Ǿ500 12.00 TC-15 Bor main pile

1481 1-Dec-15 1269 Ǿ500 12.00 TC-15 Bor main pile

1482 1-Dec-15 1270 Ǿ500 12.00 TC-15 Bor main pile

1483 2-Dec-15 2880 Ǿ500 12.00 TC-19 Bor main pile

1484 2-Dec-15 2687 Ǿ500 12.00 TC-19 Bor main pile

1485 2-Dec-15 2694 Ǿ500 12.00 TC-19 Bor main pile

1486 2-Dec-15 2691 Ǿ500 12.00 TC-19 Bor main pile

1487 2-Dec-15 2692 Ǿ500 12.00 TC-19 Bor main pile

1488 2-Dec-15 2693 Ǿ500 12.00 TC-19 Bor main pile

1489 2-Dec-15 2689 Ǿ500 12.00 TC-19 Bor main pile

1490 2-Dec-15 1001 Ǿ500 12.00 TC-19 Bor MP office

1491 2-Dec-15 1027 Ǿ500 12.00 TC-19 Bor MP office

1492 2-Dec-15 1002 Ǿ500 12.00 TC-19 Bor MP office

1493 2-Dec-15 1026 Ǿ500 12.00 TC-19 Bor MP office

1494 2-Dec-15 1003 Ǿ500 12.00 TC-19 Bor MP office

1495 2-Dec-15 1025 Ǿ500 12.00 TC-19 Bor MP office

1496 2-Dec-15 1004 Ǿ500 12.00 TC-19 Bor MP office

1497 2-Dec-15 1024 Ǿ500 12.00 TC-19 Bor MP office

1498 2-Dec-15 1006 Ǿ500 12.00 TC-19 Bor MP office

1499 2-Dec-15 1023 Ǿ500 12.00 TC-19 Bor MP office

1500 2-Dec-15 1007 Ǿ500 12.00 TC-19 Bor MP office

1501 2-Dec-15 1022 Ǿ500 12.00 TC-19 Bor MP office

1502 2-Dec-15 1008 Ǿ500 12.00 TC-19 Bor MP office

1503 3-Dec-15 2698 Ǿ500 12.00 TC-19 bor main pile

1504 3-Dec-15 2699 Ǿ500 12.00 TC-19 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1505 3-Dec-15 2700 Ǿ500 12.00 TC-19 bor main pile

1506 3-Dec-15 2701 Ǿ500 12.00 TC-19 bor main pile

1507 3-Dec-15 2702 Ǿ500 12.00 TC-19 bor main pile

1508 3-Dec-15 2703 Ǿ500 12.00 TC-19 bor main pile

1509 3-Dec-15 2704 Ǿ500 12.00 TC-19 bor main pile

1510 3-Dec-15 2705 Ǿ500 12.00 TC-19 bor main pile

1511 3-Dec-15 2688 Ǿ500 12.00 TC-19 bor main pile

1512 3-Dec-15 2690 Ǿ500 12.00 TC-19 bor main pile

1513 3-Dec-15 2682 Ǿ500 12.00 TC-19 bor main pile

1514 3-Dec-15 2683 Ǿ500 12.00 TC-19 bor main pile

1515 3-Dec-15 2684 Ǿ500 12.00 TC-19 bor main pile

1516 3-Dec-15 2685 Ǿ500 12.00 TC-19 bor main pile

1517 3-Dec-15 2686 Ǿ500 12.00 TC-19 bor main pile

1518 3-Dec-15 2640 Ǿ500 12.00 TC-19 bor main pile

1519 3-Dec-15 2641 Ǿ500 12.00 TC-19 bor main pile

1520 3-Dec-15 2642 Ǿ500 12.00 TC-19 bor main pile

1521 3-Dec-15 2639 Ǿ500 12.00 TC-19 bor main pile

1522 3-Dec-15 2643 Ǿ500 12.00 TC-19 bor main pile

1523 3-Dec-15 2644 Ǿ500 12.00 TC-19 bor main pile

1524 3-Dec-15 2645 Ǿ500 12.00 TC-19 bor main pile

1525 3-Dec-15 2646 Ǿ500 12.00 TC-19 bor main pile

1526 3-Dec-15 2647 Ǿ500 12.00 TC-19 bor main pile

1527 3-Dec-15 2648 Ǿ500 12.00 TC-19 bor main pile

1528 3-Dec-15 2649 Ǿ500 12.00 TC-19 bor main pile

1529 3-Dec-15 2650 Ǿ500 12.00 TC-19 bor main pile

1530 3-Dec-15 2651 Ǿ500 12.00 TC-19 bor main pile

1531 3-Dec-15 2374 Ǿ500 12.00 TC-15 bor main pile

1532 3-Dec-15 2375 Ǿ500 12.00 TC-15 bor main pile

1533 3-Dec-15 2376 Ǿ500 12.00 TC-15 bor main pile

1534 3-Dec-15 2377 Ǿ500 12.00 TC-15 bor main pile

1535 3-Dec-15 2378 Ǿ500 12.00 TC-15 bor main pile

1536 3-Dec-15 2393 Ǿ500 12.00 TC-15 bor main pile

1537 3-Dec-15 2394 Ǿ500 12.00 TC-15 bor main pile

1538 3-Dec-15 2395 Ǿ500 12.00 TC-15 bor main pile

1539 3-Dec-15 2396 Ǿ500 12.00 TC-15 bor main pile

1540 3-Dec-15 2397 Ǿ500 12.00 TC-15 bor main pile

1541 3-Dec-15 2388 Ǿ500 12.00 TC-15 bor main pile

1542 3-Dec-15 2389 Ǿ500 12.00 TC-15 bor main pile

1543 3-Dec-15 2390 Ǿ500 12.00 TC-15 bor main pile

1544 3-Dec-15 2391 Ǿ500 12.00 TC-15 bor main pile

1545 3-Dec-15 2392 Ǿ500 12.00 TC-15 bor main pile

1546 3-Dec-15 2398 Ǿ500 12.00 TC-15 bor main pile

1547 3-Dec-15 2399 Ǿ500 12.00 TC-15 bor main pile

1548 3-Dec-15 2400 Ǿ500 12.00 TC-15 bor main pile

1549 3-Dec-15 2401 Ǿ500 12.00 TC-15 bor main pile

1550 3-Dec-15 2402 Ǿ500 12.00 TC-15 bor main pile

1551 3-Dec-15 2403 Ǿ500 12.00 TC-15 bor main pile

1552 3-Dec-15 2404 Ǿ500 12.00 TC-15 bor main pile

1553 3-Dec-15 2405 Ǿ500 12.00 TC-15 bor main pile

1554 3-Dec-15 2406 Ǿ500 12.00 TC-15 bor main pile

1555 4-Dec-15 4826 Ǿ500 12.00 TC-15 Bor soldier pile

1556 4-Dec-15 4827 Ǿ500 12.00 TC-15 Bor soldier pile

1557 4-Dec-15 4828 Ǿ500 12.00 TC-15 Bor soldier pile

1558 4-Dec-15 4829 Ǿ500 12.00 TC-15 Bor soldier pile

1559 4-Dec-15 4830 Ǿ500 12.00 TC-15 Bor soldier pile

1560 4-Dec-15 4831 Ǿ500 12.00 TC-15 Bor soldier pile

1561 4-Dec-15 4832 Ǿ500 12.00 TC-15 Bor soldier pile

1562 4-Dec-15 4833 Ǿ500 12.00 TC-15 Bor soldier pile

1563 4-Dec-15 4834 Ǿ500 12.00 TC-15 Bor soldier pile

1564 4-Dec-15 4835 Ǿ500 12.00 TC-15 Bor soldier pile

1565 4-Dec-15 4836 Ǿ500 12.00 TC-15 Bor soldier pile

1566 5-Dec-15 2458 Ǿ500 12.00 TC-19 bor main pile

1567 5-Dec-15 2459 Ǿ500 12.00 TC-19 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1568 5-Dec-15 2460 Ǿ500 12.00 TC-19 bor main pile

1569 5-Dec-15 2461 Ǿ500 12.00 TC-19 bor main pile

1570 5-Dec-15 2462 Ǿ500 12.00 TC-19 bor main pile

1571 5-Dec-15 2463 Ǿ500 12.00 TC-19 bor main pile

1572 5-Dec-15 2464 Ǿ500 12.00 TC-19 bor main pile

1573 5-Dec-15 2465 Ǿ500 12.00 TC-19 bor main pile

1574 5-Dec-15 2466 Ǿ500 12.00 TC-19 bor main pile

1575 5-Dec-15 1797 Ǿ500 12.00 TC-19 bor main pile

1576 5-Dec-15 1778 Ǿ500 12.00 TC-19 bor main pile

1577 5-Dec-15 1779 Ǿ500 12.00 TC-19 bor main pile

1578 5-Dec-15 1780 Ǿ500 12.00 TC-19 bor main pile

1579 5-Dec-15 1781 Ǿ500 12.00 TC-19 bor main pile

1580 5-Dec-15 1782 Ǿ500 12.00 TC-19 bor main pile

1581 5-Dec-15 1783 Ǿ500 12.00 TC-19 bor main pile

1582 5-Dec-15 1784 Ǿ500 12.00 TC-19 bor main pile

1583 5-Dec-15 1785 Ǿ500 12.00 TC-19 bor main pile

1584 5-Dec-15 1786 Ǿ500 12.00 TC-19 bor main pile

1585 5-Dec-15 1787 Ǿ500 12.00 TC-19 bor main pile

1586 5-Dec-15 1788 Ǿ500 12.00 TC-19 bor main pile

1587 5-Dec-15 1789 Ǿ500 12.00 TC-19 bor main pile

1588 5-Dec-15 1790 Ǿ500 12.00 TC-19 bor main pile

1589 5-Dec-15 1791 Ǿ500 12.00 TC-19 bor main pile

1590 5-Dec-15 1792 Ǿ500 12.00 TC-19 bor main pile

1591 5-Dec-15 1793 Ǿ500 12.00 TC-19 bor main pile

1592 5-Dec-15 1794 Ǿ500 12.00 TC-19 bor main pile

1593 5-Dec-15 1795 Ǿ500 12.00 TC-19 bor main pile

1594 5-Dec-15 1796 Ǿ500 12.00 TC-19 bor main pile

1595 5-Dec-15 Ǿ500 6.00 TC-19 bor samping tention

1596 5-Dec-15 Ǿ500 6.00 TC-19 bor samping tention

1597 5-Dec-15 Ǿ500 6.00 TC-19 bor samping tention

1598 5-Dec-15 Ǿ500 6.00 TC-19 bor samping tention

1599 8-Dec-15 2447 Ǿ500 12.00 TC-53 bor main pile

1600 8-Dec-15 2448 Ǿ500 12.00 TC-53 bor main pile

1601 8-Dec-15 2449 Ǿ500 12.00 TC-53 bor main pile

1602 8-Dec-15 2450 Ǿ500 12.00 TC-53 bor main pile

1603 8-Dec-15 2451 Ǿ500 12.00 TC-53 bor main pile

1604 8-Dec-15 1477 Ǿ500 12.00 TC-53 bor main pile

1605 8-Dec-15 1478 Ǿ500 12.00 TC-53 bor main pile

1606 8-Dec-15 1479 Ǿ500 12.00 TC-53 bor main pile

1607 8-Dec-15 1480 Ǿ500 12.00 TC-53 bor main pile

1608 8-Dec-15 1481 Ǿ500 12.00 TC-53 bor main pile

1609 8-Dec-15 1482 Ǿ500 12.00 TC-53 bor main pile

1610 8-Dec-15 1483 Ǿ500 12.00 TC-53 bor main pile

1611 8-Dec-15 1484 Ǿ500 12.00 TC-53 bor main pile

1612 8-Dec-15 2625 Ǿ500 12.00 TC-53 bor main pile

1613 8-Dec-15 2626 Ǿ500 12.00 TC-53 bor main pile

1614 8-Dec-15 2627 Ǿ500 12.00 TC-53 bor main pile

1615 8-Dec-15 2628 Ǿ500 12.00 TC-53 bor main pile

1616 8-Dec-15 2629 Ǿ500 12.00 TC-53 bor main pile

1617 8-Dec-15 2630 Ǿ500 12.00 TC-53 bor main pile

1618 8-Dec-15 2631 Ǿ500 12.00 TC-53 bor main pile

1619 8-Dec-15 2632 Ǿ500 12.00 TC-53 bor main pile

1620 8-Dec-15 2633 Ǿ500 12.00 TC-53 bor main pile

1621 8-Dec-15 2634 Ǿ500 12.00 TC-53 bor main pile

1622 8-Dec-15 2635 Ǿ500 12.00 TC-53 bor main pile

1623 8-Dec-15 2636 Ǿ500 12.00 TC-53 bor main pile

1624 8-Dec-15 2637 Ǿ500 12.00 TC-53 bor main pile

1625 8-Dec-15 2638 Ǿ500 12.00 TC-53 bor main pile

1626 8-Dec-15 2583 Ǿ500 12.00 TC-53 bor main pile

1627 8-Dec-15 2584 Ǿ500 12.00 TC-53 bor main pile

1628 8-Dec-15 2585 Ǿ500 12.00 TC-53 bor main pile

1629 8-Dec-15 2586 Ǿ500 12.00 TC-53 bor main pile

1630 8-Dec-15 2587 Ǿ500 12.00 TC-53 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1631 8-Dec-15 2588 Ǿ500 12.00 TC-53 bor main pile

1632 8-Dec-15 2576 Ǿ500 12.00 TC-53 bor main pile

1633 8-Dec-15 2577 Ǿ500 12.00 TC-53 bor main pile

1634 8-Dec-15 2578 Ǿ500 12.00 TC-53 bor main pile

1635 8-Dec-15 2579 Ǿ500 12.00 TC-53 bor main pile

1636 8-Dec-15 2580 Ǿ500 12.00 TC-53 bor main pile

1637 8-Dec-15 2581 Ǿ500 12.00 TC-53 bor main pile

1638 8-Dec-15 2582 Ǿ500 12.00 TC-53 bor main pile

1639 10-Dec-15 1668 Ǿ500 12.00 TC-15 bor main pile

1640 10-Dec-15 1669 Ǿ500 12.00 TC-15 bor main pile

1641 10-Dec-15 1700 Ǿ500 12.00 TC-15 bor main pile

1642 10-Dec-15 1701 Ǿ500 12.00 TC-15 bor main pile

1643 10-Dec-15 1702 Ǿ500 12.00 TC-15 bor main pile

1644 10-Dec-15 1703 Ǿ500 12.00 TC-15 bor main pile

1645 10-Dec-15 1772 Ǿ500 12.00 TC-15 bor main pile

1646 10-Dec-15 1773 Ǿ500 12.00 TC-15 bor main pile

1647 10-Dec-15 1774 Ǿ500 12.00 TC-15 bor main pile

1648 10-Dec-15 1775 Ǿ500 12.00 TC-15 bor main pile

1649 10-Dec-15 1776 Ǿ500 12.00 TC-15 bor main pile

1650 10-Dec-15 1777 Ǿ500 12.00 TC-15 bor main pile

1651 10-Dec-15 1798 Ǿ500 12.00 TC-15 bor main pile

1652 10-Dec-15 1799 Ǿ500 12.00 TC-15 bor main pile

1653 10-Dec-15 1800 Ǿ500 12.00 TC-15 bor main pile

1654 10-Dec-15 1801 Ǿ500 12.00 TC-15 bor main pile

1655 10-Dec-15 1802 Ǿ500 12.00 TC-15 bor main pile

1656 10-Dec-15 1803 Ǿ500 12.00 TC-15 bor main pile

1657 10-Dec-15 1896 Ǿ500 12.00 TC-15 bor main pile

1658 10-Dec-15 1897 Ǿ500 12.00 TC-15 bor main pile

1659 10-Dec-15 1898 Ǿ500 12.00 TC-15 bor main pile

1660 10-Dec-15 1899 Ǿ500 12.00 TC-15 bor main pile

1661 10-Dec-15 1900 Ǿ500 12.00 TC-15 bor main pile

1662 10-Dec-15 1901 Ǿ500 12.00 TC-15 bor main pile

1663 10-Dec-15 1902 Ǿ500 12.00 TC-15 bor main pile

1664 10-Dec-15 1903 Ǿ500 12.00 TC-15 bor main pile

1665 10-Dec-15 1904 Ǿ500 12.00 TC-15 bor main pile

1666 10-Dec-15 1905 Ǿ500 12.00 TC-15 bor main pile

1667 10-Dec-15 1906 Ǿ500 12.00 TC-15 bor main pile

1668 10-Dec-15 1907 Ǿ500 12.00 TC-15 bor main pile

1669 10-Dec-15 1654 Ǿ500 12.00 TC-15 bor main pile

1670 10-Dec-15 1655 Ǿ500 12.00 TC-15 bor main pile

1671 10-Dec-15 1656 Ǿ500 12.00 TC-15 bor main pile

1672 10-Dec-15 1657 Ǿ500 12.00 TC-15 bor main pile

1673 10-Dec-15 1658 Ǿ500 12.00 TC-15 bor main pile

1674 10-Dec-15 1659 Ǿ500 12.00 TC-15 bor main pile

1675 10-Dec-15 1664 Ǿ500 12.00 TC-15 bor main pile

1676 10-Dec-15 1665 Ǿ500 12.00 TC-15 bor main pile

1677 10-Dec-15 1666 Ǿ500 12.00 TC-15 bor main pile

1678 10-Dec-15 1667 Ǿ500 12.00 TC-15 bor main pile

1679 11-Dec-15 1636 Ǿ500 12.00 TC-15 bor main pile

1680 11-Dec-15 1637 Ǿ500 12.00 TC-15 bor main pile

1681 11-Dec-15 1638 Ǿ500 12.00 TC-15 bor main pile

1682 11-Dec-15 1639 Ǿ500 12.00 TC-15 bor main pile

1683 11-Dec-15 1640 Ǿ500 12.00 TC-15 bor main pile

1684 11-Dec-15 1641 Ǿ500 12.00 TC-15 bor main pile

1685 11-Dec-15 1642 Ǿ500 12.00 TC-15 bor main pile

1686 11-Dec-15 1643 Ǿ500 12.00 TC-15 bor main pile

1687 11-Dec-15 1644 Ǿ500 12.00 TC-15 bor main pile

1688 11-Dec-15 1645 Ǿ500 12.00 TC-15 bor main pile

1689 11-Dec-15 1646 Ǿ500 12.00 TC-15 bor main pile

1690 11-Dec-15 1647 Ǿ500 12.00 TC-15 bor main pile

1691 11-Dec-15 1680 Ǿ500 12.00 TC-15 bor main pile

1692 11-Dec-15 1681 Ǿ500 12.00 TC-15 bor main pile

1693 11-Dec-15 1682 Ǿ500 12.00 TC-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1694 11-Dec-15 1683 Ǿ500 12.00 TC-15 bor main pile

1695 11-Dec-15 1684 Ǿ500 12.00 TC-15 bor main pile

1696 11-Dec-15 1685 Ǿ500 12.00 TC-15 bor main pile

1697 11-Dec-15 1686 Ǿ500 12.00 TC-15 bor main pile

1698 11-Dec-15 1687 Ǿ500 12.00 TC-15 bor main pile

1699 11-Dec-15 1688 Ǿ500 12.00 TC-15 bor main pile

1700 11-Dec-15 1689 Ǿ500 12.00 TC-15 bor main pile

1701 11-Dec-15 1690 Ǿ500 12.00 TC-15 bor main pile

1702 11-Dec-15 1691 Ǿ500 12.00 TC-15 bor main pile

1703 11-Dec-15 1760 Ǿ500 12.00 TC-15 bor main pile

1704 11-Dec-15 1761 Ǿ500 12.00 TC-15 bor main pile

1705 11-Dec-15 1762 Ǿ500 12.00 TC-15 bor main pile

1706 11-Dec-15 1763 Ǿ500 12.00 TC-15 bor main pile

1707 11-Dec-15 1764 Ǿ500 12.00 TC-15 bor main pile

1708 11-Dec-15 1765 Ǿ500 12.00 TC-15 bor main pile

1709 11-Dec-15 1810 Ǿ500 12.00 TC-15 bor main pile

1710 11-Dec-15 1811 Ǿ500 12.00 TC-15 bor main pile

1711 11-Dec-15 1812 Ǿ500 12.00 TC-15 bor main pile

1712 11-Dec-15 1813 Ǿ500 12.00 TC-15 bor main pile

1713 11-Dec-15 1814 Ǿ500 12.00 TC-15 bor main pile

1714 11-Dec-15 1815 Ǿ500 12.00 TC-15 bor main pile

1715 11-Dec-15 2652 Ǿ500 12.00 TC-53 bor main pile

1716 11-Dec-15 2653 Ǿ500 12.00 TC-53 bor main pile

1717 11-Dec-15 2654 Ǿ500 12.00 TC-53 bor main pile

1718 11-Dec-15 2655 Ǿ500 12.00 TC-53 bor main pile

1719 11-Dec-15 2656 Ǿ500 12.00 TC-53 bor main pile

1720 11-Dec-15 2657 Ǿ500 12.00 TC-53 bor main pile

1721 11-Dec-15 2676 Ǿ500 12.00 TC-19 bor main pile

1722 11-Dec-15 2677 Ǿ500 12.00 TC-19 bor main pile

1723 11-Dec-15 2678 Ǿ500 12.00 TC-19 bor main pile

1724 11-Dec-15 2679 Ǿ500 12.00 TC-19 bor main pile

1725 11-Dec-15 2680 Ǿ500 12.00 TC-19 bor main pile

1726 11-Dec-15 2681 Ǿ500 12.00 TC-19 bor main pile

1727 11-Dec-15 2712 Ǿ500 12.00 TC-19 bor main pile

1728 11-Dec-15 2713 Ǿ500 12.00 TC-19 bor main pile

1729 11-Dec-15 2714 Ǿ500 12.00 TC-19 bor main pile

1730 11-Dec-15 2715 Ǿ500 12.00 TC-19 bor main pile

1731 11-Dec-15 2716 Ǿ500 12.00 TC-19 bor main pile

1732 11-Dec-15 2717 Ǿ500 12.00 TC-19 bor main pile

1733 11-Dec-15 2737 Ǿ500 12.00 TC-19 bor main pile

1734 11-Dec-15 2738 Ǿ500 12.00 TC-19 bor main pile

1735 11-Dec-15 2739 Ǿ500 12.00 TC-19 bor main pile

1736 12-Dec-15 2408 Ǿ500 12.00 TC-53 bor main pile

1737 12-Dec-15 2409 Ǿ500 12.00 TC-53 bor main pile

1738 12-Dec-15 2410 Ǿ500 12.00 TC-53 bor main pile

1739 12-Dec-15 2411 Ǿ500 12.00 TC-53 bor main pile

1740 12-Dec-15 2412 Ǿ500 12.00 TC-53 bor main pile

1741 12-Dec-15 2413 Ǿ500 12.00 TC-53 bor main pile

1742 12-Dec-15 2414 Ǿ500 12.00 TC-53 bor main pile

1743 12-Dec-15 2415 Ǿ500 12.00 TC-53 bor main pile

1744 12-Dec-15 2416 Ǿ500 12.00 TC-53 bor main pile

1745 12-Dec-15 2417 Ǿ500 12.00 TC-53 bor main pile

1746 12-Dec-15 2418 Ǿ500 12.00 TC-53 bor main pile

1747 12-Dec-15 2419 Ǿ500 12.00 TC-53 bor main pile

1748 12-Dec-15 2420 Ǿ500 12.00 TC-53 bor main pile

1749 12-Dec-15 2421 Ǿ500 12.00 TC-53 bor main pile

1750 12-Dec-15 2422 Ǿ500 12.00 TC-53 bor main pile

1751 12-Dec-15 2423 Ǿ500 12.00 TC-53 bor main pile

1752 12-Dec-15 2424 Ǿ500 12.00 TC-53 bor main pile

1753 12-Dec-15 2425 Ǿ500 12.00 TC-53 bor main pile

1754 12-Dec-15 2426 Ǿ500 12.00 TC-53 bor main pile

1755 12-Dec-15 2427 Ǿ500 12.00 TC-53 bor main pile

1756 12-Dec-15 2428 Ǿ500 12.00 TC-53 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1757 12-Dec-15 2429 Ǿ500 12.00 TC-53 bor main pile

1758 12-Dec-15 1360 Ǿ500 12.00 TC-53 bor main pile

1759 12-Dec-15 1361 Ǿ500 12.00 TC-53 bor main pile

1760 12-Dec-15 1362 Ǿ500 12.00 TC-53 bor main pile

1761 12-Dec-15 2741 Ǿ500 12.00 TC-19 bor main pile

1762 12-Dec-15 2740 Ǿ500 12.00 TC-19 bor main pile

1763 12-Dec-15 2743 Ǿ500 12.00 TC-19 bor main pile

1764 12-Dec-15 2742 Ǿ500 12.00 TC-19 bor main pile

1765 12-Dec-15 1908 Ǿ500 12.00 TC-19 bor main pile

1766 12-Dec-15 1909 Ǿ500 12.00 TC-19 bor main pile

1767 12-Dec-15 1910 Ǿ500 12.00 TC-19 bor main pile

1768 12-Dec-15 1911 Ǿ500 12.00 TC-19 bor main pile

1769 12-Dec-15 1912 Ǿ500 12.00 TC-19 bor main pile

1770 12-Dec-15 1913 Ǿ500 12.00 TC-19 bor main pile

1771 12-Dec-15 1914 Ǿ500 12.00 TC-19 bor main pile

1772 12-Dec-15 1915 Ǿ500 12.00 TC-19 bor main pile

1773 12-Dec-15 1916 Ǿ500 12.00 TC-19 bor main pile

1774 12-Dec-15 1917 Ǿ500 12.00 TC-19 bor main pile

1775 12-Dec-15 1918 Ǿ500 12.00 TC-19 bor main pile

1776 12-Dec-15 1919 Ǿ500 12.00 TC-19 bor main pile

1777 12-Dec-15 1920 Ǿ500 12.00 TC-19 bor main pile

1778 12-Dec-15 1921 Ǿ500 12.00 TC-19 bor main pile

1779 14-Dec-15 2706 Ǿ500 12.00 TC-19 bor main pile

1780 14-Dec-15 2707 Ǿ500 12.00 TC-19 bor main pile

1781 14-Dec-15 2708 Ǿ500 12.00 TC-19 bor main pile

1782 14-Dec-15 2709 Ǿ500 12.00 TC-19 bor main pile

1783 14-Dec-15 2710 Ǿ500 12.00 TC-19 bor main pile

1784 14-Dec-15 2711 Ǿ500 12.00 TC-19 bor main pile

1785 14-Dec-15 2746 Ǿ500 12.00 TC-19 bor main pile

1786 14-Dec-15 2745 Ǿ500 12.00 TC-19 bor main pile

1787 14-Dec-15 2744 Ǿ500 12.00 TC-19 bor main pile

1788 14-Dec-15 2747 Ǿ500 12.00 TC-19 bor main pile

1789 14-Dec-15 2748 Ǿ500 12.00 TC-19 bor main pile

1790 14-Dec-15 2749 Ǿ500 12.00 TC-19 bor main pile

1791 14-Dec-15 1663A Ǿ500 12.00 TC-15 bor main pile

1792 14-Dec-15 1663B Ǿ500 12.00 TC-15 bor main pile

1793 14-Dec-15 1543A Ǿ500 12.00 TC-15 bor main pile

1794 14-Dec-15 1543B Ǿ500 12.00 TC-15 bor main pile

1795 14-Dec-15 1540 Ǿ500 12.00 TC-15 bor main pile

1796 14-Dec-15 1541 Ǿ500 12.00 TC-15 bor main pile

1797 14-Dec-15 1542 Ǿ500 12.00 TC-15 bor main pile

1798 14-Dec-15 1543 Ǿ500 12.00 TC-15 bor main pile

1799 14-Dec-15 1536 Ǿ500 12.00 TC-15 bor main pile

1800 14-Dec-15 1537 Ǿ500 12.00 TC-15 bor main pile

1801 14-Dec-15 1538 Ǿ500 12.00 TC-15 bor main pile

1802 14-Dec-15 1539 Ǿ500 12.00 TC-15 bor main pile

1803 14-Dec-15 1520 Ǿ500 12.00 TC-15 bor main pile

1804 14-Dec-15 1521 Ǿ500 12.00 TC-15 bor main pile

1805 14-Dec-15 1522 Ǿ500 12.00 TC-15 bor main pile

1806 14-Dec-15 1523 Ǿ500 12.00 TC-15 bor main pile

1807 14-Dec-15 1524 Ǿ500 12.00 TC-15 bor main pile

1808 14-Dec-15 1556 Ǿ500 12.00 TC-15 bor main pile

1809 14-Dec-15 1557 Ǿ500 12.00 TC-15 bor main pile

1810 14-Dec-15 1558 Ǿ500 12.00 TC-15 bor main pile

1811 14-Dec-15 1559 Ǿ500 12.00 TC-15 bor main pile

1812 14-Dec-15 1560 Ǿ500 12.00 TC-15 bor main pile

1813 14-Dec-15 1561 Ǿ500 12.00 TC-15 bor main pile

1814 14-Dec-15 1550 Ǿ500 12.00 TC-15 bor main pile

1815 14-Dec-15 1528 Ǿ500 12.00 TC-15 bor main pile

1816 14-Dec-15 1529 Ǿ500 12.00 TC-15 bor main pile

1817 14-Dec-15 1530 Ǿ500 12.00 TC-15 bor main pile

1818 14-Dec-15 1531 Ǿ500 12.00 TC-15 bor main pile

1819 14-Dec-15 1532 Ǿ500 12.00 TC-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1820 14-Dec-15 1533 Ǿ500 12.00 TC-15 bor main pile

1821 14-Dec-15 1534 Ǿ500 12.00 TC-15 bor main pile

1822 14-Dec-15 1535 Ǿ500 12.00 TC-15 bor main pile

1823 14-Dec-15 1551 Ǿ500 12.00 TC-15 bor main pile

1824 14-Dec-15 1552 Ǿ500 12.00 TC-15 bor main pile

1825 14-Dec-15 1553 Ǿ500 12.00 TC-15 bor main pile

1826 14-Dec-15 1554 Ǿ500 12.00 TC-15 bor main pile

1827 14-Dec-15 1555 Ǿ500 12.00 TC-15 bor main pile

1828 14-Dec-15 1544 Ǿ500 12.00 TC-15 bor main pile

1829 14-Dec-15 1545 Ǿ500 12.00 TC-15 bor main pile

1830 14-Dec-15 1546 Ǿ500 12.00 TC-15 bor main pile

1831 14-Dec-15 1547 Ǿ500 12.00 TC-15 bor main pile

1832 14-Dec-15 1548 Ǿ500 12.00 TC-15 bor main pile

1833 14-Dec-15 1549 Ǿ500 12.00 TC-15 bor main pile

1834 14-Dec-15 1525 Ǿ500 12.00 TC-15 bor main pile

1835 14-Dec-15 1526 Ǿ500 12.00 TC-15 bor main pile

1836 14-Dec-15 1527 Ǿ500 12.00 TC-15 bor main pile

1837 15-Dec-15 2672 Ǿ500 12.00 TC-19 bor main pile

1838 15-Dec-15 2673 Ǿ500 12.00 TC-19 bor main pile

1839 15-Dec-15 2674 Ǿ500 12.00 TC-19 bor main pile

1840 15-Dec-15 2718 Ǿ500 12.00 TC-19 bor main pile

1841 15-Dec-15 2719 Ǿ500 12.00 TC-19 bor main pile

1842 15-Dec-15 2720 Ǿ500 12.00 TC-19 bor main pile

1843 15-Dec-15 2721 Ǿ500 12.00 TC-19 bor main pile

1844 15-Dec-15 2732 Ǿ500 12.00 TC-19 bor main pile

1845 15-Dec-15 2733 Ǿ500 12.00 TC-19 bor main pile

1846 15-Dec-15 2734 Ǿ500 12.00 TC-19 bor main pile

1847 15-Dec-15 2735 Ǿ500 12.00 TC-19 bor main pile

1848 15-Dec-15 2736 Ǿ500 12.00 TC-19 bor main pile

1849 15-Dec-15 2775 Ǿ500 12.00 TC-19 bor main pile

1850 15-Dec-15 2776 Ǿ500 12.00 TC-19 bor main pile

1851 15-Dec-15 2777 Ǿ500 12.00 TC-19 bor main pile

1852 15-Dec-15 2778 Ǿ500 12.00 TC-19 bor main pile

1853 15-Dec-15 2779 Ǿ500 12.00 TC-19 bor main pile

1854 15-Dec-15 2430 Ǿ500 12.00 TC-53 bor main pile

1855 15-Dec-15 2431 Ǿ500 12.00 TC-53 bor main pile

1856 15-Dec-15 2432 Ǿ500 12.00 TC-53 bor main pile

1857 15-Dec-15 2433 Ǿ500 12.00 TC-53 bor main pile

1858 15-Dec-15 2434 Ǿ500 12.00 TC-53 bor main pile

1859 15-Dec-15 2441 Ǿ500 12.00 TC-53 bor main pile

1860 15-Dec-15 2442 Ǿ500 12.00 TC-53 bor main pile

1861 15-Dec-15 2443 Ǿ500 12.00 TC-53 bor main pile

1862 15-Dec-15 2444 Ǿ500 12.00 TC-53 bor main pile

1863 15-Dec-15 2445 Ǿ500 12.00 TC-53 bor main pile

1864 15-Dec-15 2446 Ǿ500 12.00 TC-53 bor main pile

1865 15-Dec-15 2452 Ǿ500 12.00 TC-53 bor main pile

1866 15-Dec-15 2453 Ǿ500 12.00 TC-53 bor main pile

1867 15-Dec-15 2454 Ǿ500 12.00 TC-53 bor main pile

1868 15-Dec-15 2455 Ǿ500 12.00 TC-53 bor main pile

1869 15-Dec-15 2456 Ǿ500 12.00 TC-53 bor main pile

1870 15-Dec-15 2457 Ǿ500 12.00 TC-53 bor main pile

1871 15-Dec-15 2435 Ǿ500 12.00 TC-53 bor main pile

1872 15-Dec-15 2436 Ǿ500 12.00 TC-53 bor main pile

1873 15-Dec-15 2437 Ǿ500 12.00 TC-53 bor main pile

1874 15-Dec-15 2438 Ǿ500 12.00 TC-53 bor main pile

1875 15-Dec-15 2439 Ǿ500 12.00 TC-53 bor main pile

1876 15-Dec-15 2440 Ǿ500 12.00 TC-53 bor main pile

1877 15-Dec-15 2537 Ǿ500 12.00 TC-53 bor main pile

1878 15-Dec-15 2538 Ǿ500 12.00 TC-53 bor main pile

1879 15-Dec-15 2539 Ǿ500 12.00 TC-53 bor main pile

1880 15-Dec-15 2540 Ǿ500 12.00 TC-53 bor main pile

1881 15-Dec-15 1351 Ǿ500 12.00 TC-53 bor main pile

1882 15-Dec-15 1350 Ǿ500 12.00 TC-53 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1883 15-Dec-15 1349 Ǿ500 12.00 TC-53 bor main pile

1884 15-Dec-15 1348 Ǿ500 12.00 TC-53 bor main pile

1885 15-Dec-15 1347 Ǿ500 12.00 TC-53 bor main pile

1886 15-Dec-15 1346 Ǿ500 12.00 TC-53 bor main pile

1887 15-Dec-15 1345 Ǿ500 12.00 TC-53 bor main pile

1888 15-Dec-15 1344 Ǿ500 12.00 TC-53 bor main pile

1889 15-Dec-15 1343 Ǿ500 12.00 TC-53 bor main pile

1890 15-Dec-15 1342 Ǿ500 12.00 TC-53 bor main pile

1891 15-Dec-15 1341 Ǿ500 12.00 TC-53 bor main pile

1892 15-Dec-15 1340 Ǿ500 12.00 TC-53 bor main pile

1893 15-Dec-15 1339 Ǿ500 12.00 TC-53 bor main pile

1894 15-Dec-15 1338 Ǿ500 12.00 TC-53 bor main pile

1895 15-Dec-15 1337 Ǿ500 12.00 TC-53 bor main pile

1896 15-Dec-15 1335 Ǿ500 12.00 TC-53 bor main pile

1897 15-Dec-15 1334 Ǿ500 12.00 TC-53 bor main pile

1898 17-Dec-15 1730 Ǿ500 12.00 TC-15 bor main pile

1899 17-Dec-15 1731 Ǿ500 12.00 TC-15 bor main pile

1900 17-Dec-15 1732 Ǿ500 12.00 TC-15 bor main pile

1901 17-Dec-15 1733 Ǿ500 12.00 TC-15 bor main pile

1902 17-Dec-15 1734 Ǿ500 12.00 TC-15 bor main pile

1903 17-Dec-15 1735 Ǿ500 12.00 TC-15 bor main pile

1904 17-Dec-15 1958 Ǿ500 12.00 TC-15 bor main pile

1905 17-Dec-15 1959 Ǿ500 12.00 TC-15 bor main pile

1906 17-Dec-15 1960 Ǿ500 12.00 TC-15 bor main pile

1907 17-Dec-15 1961 Ǿ500 12.00 TC-15 bor main pile

1908 17-Dec-15 1962 Ǿ500 12.00 TC-15 bor main pile

1909 17-Dec-15 1854 Ǿ500 12.00 TC-15 bor main pile

1910 17-Dec-15 1855 Ǿ500 12.00 TC-15 bor main pile

1911 17-Dec-15 1856 Ǿ500 12.00 TC-15 bor main pile

1912 17-Dec-15 1857 Ǿ500 12.00 TC-15 bor main pile

1913 17-Dec-15 1858 Ǿ500 12.00 TC-15 bor main pile

1914 17-Dec-15 1859 Ǿ500 12.00 TC-15 bor main pile

1915 17-Dec-15 1840 Ǿ500 12.00 TC-15 bor main pile

1916 17-Dec-15 1841 Ǿ500 12.00 TC-15 bor main pile

1917 17-Dec-15 1842 Ǿ500 12.00 TC-15 bor main pile

1918 17-Dec-15 1843 Ǿ500 12.00 TC-15 bor main pile

1919 17-Dec-15 1844 Ǿ500 12.00 TC-15 bor main pile

1920 17-Dec-15 1845 Ǿ500 12.00 TC-15 bor main pile

1921 17-Dec-15 2545 Ǿ500 12.00 TC-19 bor main pile

1922 17-Dec-15 2544 Ǿ500 12.00 TC-19 bor main pile

1923 17-Dec-15 2543 Ǿ500 12.00 TC-19 bor main pile

1924 17-Dec-15 2542 Ǿ500 12.00 TC-19 bor main pile

1925 17-Dec-15 2541 Ǿ500 12.00 TC-19 bor main pile

1926 17-Dec-15 2551 Ǿ500 12.00 TC-19 bor main pile

1927 17-Dec-15 2658 Ǿ500 12.00 TC-19 bor main pile

1928 17-Dec-15 2659 Ǿ500 12.00 TC-19 bor main pile

1929 17-Dec-15 2660 Ǿ500 12.00 TC-19 bor main pile

1930 17-Dec-15 2661 Ǿ500 12.00 TC-19 bor main pile

1931 17-Dec-15 2616 Ǿ500 12.00 TC-19 bor main pile

1932 17-Dec-15 2615 Ǿ500 12.00 TC-19 bor main pile

1933 17-Dec-15 2617 Ǿ500 12.00 TC-19 bor main pile

1934 17-Dec-15 2618 Ǿ500 12.00 TC-19 bor main pile

1935 17-Dec-15 2601 Ǿ500 12.00 TC-19 bor main pile

1936 17-Dec-15 2602 Ǿ500 12.00 TC-19 bor main pile

1937 17-Dec-15 2603 Ǿ500 12.00 TC-19 bor main pile

1938 17-Dec-15 2604 Ǿ500 12.00 TC-19 bor main pile

1939 17-Dec-15 2605 Ǿ500 12.00 TC-19 bor main pile

1940 17-Dec-15 2557 Ǿ500 12.00 TC-19 bor main pile

1941 17-Dec-15 2556 Ǿ500 12.00 TC-19 bor main pile

1942 17-Dec-15 2558 Ǿ500 12.00 TC-19 bor main pile

1943 17-Dec-15 2559 Ǿ500 12.00 TC-19 bor main pile

1944 17-Dec-15 2548 Ǿ500 12.00 TC-19 bor main pile

1945 17-Dec-15 2547 Ǿ500 12.00 TC-19 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1946 17-Dec-15 2546 Ǿ500 12.00 TC-19 bor main pile

1947 17-Dec-15 2549 Ǿ500 12.00 TC-19 bor main pile

1948 17-Dec-15 2550 Ǿ500 12.00 TC-19 bor main pile

1949 17-Dec-15 3750 Ǿ500 12.00 TC-53 bor main pile

1950 17-Dec-15 3751 Ǿ500 12.00 TC-53 bor main pile

1951 17-Dec-15 3752 Ǿ500 12.00 TC-53 bor main pile

1952 17-Dec-15 3753 Ǿ500 12.00 TC-53 bor main pile

1953 17-Dec-15 3754 Ǿ500 12.00 TC-53 bor main pile

1954 17-Dec-15 3755 Ǿ500 12.00 TC-53 bor main pile

1955 17-Dec-15 3756 Ǿ500 12.00 TC-53 bor main pile

1956 17-Dec-15 3757 Ǿ500 12.00 TC-53 bor main pile

1957 17-Dec-15 3758 Ǿ500 12.00 TC-53 bor main pile

1958 17-Dec-15 3759 Ǿ500 12.00 TC-53 bor main pile

1959 17-Dec-15 3760 Ǿ500 12.00 TC-53 bor main pile

1960 17-Dec-15 3761 Ǿ500 12.00 TC-53 bor main pile

1961 17-Dec-15 3762 Ǿ500 12.00 TC-53 bor main pile

1962 17-Dec-15 3763 Ǿ500 12.00 TC-53 bor main pile

1963 17-Dec-15 3764 Ǿ500 12.00 TC-53 bor main pile

1964 17-Dec-15 3765 Ǿ500 12.00 TC-53 bor main pile

1965 17-Dec-15 3766 Ǿ500 12.00 TC-53 bor main pile

1966 17-Dec-15 3767 Ǿ500 12.00 TC-53 bor main pile

1967 17-Dec-15 3768 Ǿ500 12.00 TC-53 bor main pile

1968 17-Dec-15 3769 Ǿ500 12.00 TC-53 bor main pile

1969 17-Dec-15 3770 Ǿ500 12.00 TC-53 bor main pile

1970 17-Dec-15 3771 Ǿ500 12.00 TC-53 bor main pile

1971 17-Dec-15 3772 Ǿ500 12.00 TC-53 bor main pile

1972 17-Dec-15 3773 Ǿ500 12.00 TC-53 bor main pile

1973 17-Dec-15 3774 Ǿ500 12.00 TC-53 bor main pile

1974 17-Dec-15 2805 Ǿ500 12.00 TC-53 bor main pile

1975 17-Dec-15 2806 Ǿ500 12.00 TC-53 bor main pile

1976 17-Dec-15 2807 Ǿ500 12.00 TC-53 bor main pile

1977 17-Dec-15 2808 Ǿ500 12.00 TC-53 bor main pile

1978 17-Dec-15 2809 Ǿ500 12.00 TC-53 bor main pile

1979 17-Dec-15 2810 Ǿ500 12.00 TC-53 bor main pile

1980 17-Dec-15 2811 Ǿ500 12.00 TC-53 bor main pile

1981 17-Dec-15 2812 Ǿ500 12.00 TC-53 bor main pile

1982 17-Dec-15 2813 Ǿ500 12.00 TC-53 bor main pile

1983 17-Dec-15 2814 Ǿ500 12.00 TC-53 bor main pile

1984 17-Dec-15 2815 Ǿ500 12.00 TC-53 bor main pile

1985 17-Dec-15 2816 Ǿ500 12.00 TC-53 bor main pile

1986 17-Dec-15 2817 Ǿ500 12.00 TC-53 bor main pile

1987 17-Dec-15 2818 Ǿ500 12.00 TC-53 bor main pile

1988 18-Dec-15 1963 Ǿ500 12.00 TC-15 bor main pile

1989 18-Dec-15 1964 Ǿ500 12.00 TC-15 bor main pile

1990 18-Dec-15 1965 Ǿ500 12.00 TC-15 bor main pile

1991 18-Dec-15 1966 Ǿ500 12.00 TC-15 bor main pile

1992 18-Dec-15 1850 Ǿ500 12.00 TC-15 bor main pile

1993 18-Dec-15 1851 Ǿ500 12.00 TC-15 bor main pile

1994 18-Dec-15 1852 Ǿ500 12.00 TC-15 bor main pile

1995 18-Dec-15 1853 Ǿ500 12.00 TC-15 bor main pile

1996 18-Dec-15 1846 Ǿ500 12.00 TC-15 bor main pile

1997 18-Dec-15 1847 Ǿ500 12.00 TC-15 bor main pile

1998 18-Dec-15 1848 Ǿ500 12.00 TC-15 bor main pile

1999 18-Dec-15 1849 Ǿ500 12.00 TC-15 bor main pile

2000 18-Dec-15 2790 Ǿ500 12.00 TC-53 bor main pile

2001 18-Dec-15 2791 Ǿ500 12.00 TC-53 bor main pile

2002 18-Dec-15 2792 Ǿ500 12.00 TC-53 bor main pile

2003 18-Dec-15 2793 Ǿ500 12.00 TC-53 bor main pile

2004 18-Dec-15 2794 Ǿ500 12.00 TC-53 bor main pile

2005 18-Dec-15 2795 Ǿ500 12.00 TC-53 bor main pile

2006 18-Dec-15 2796 Ǿ500 12.00 TC-53 bor main pile

2007 18-Dec-15 2797 Ǿ500 12.00 TC-53 bor main pile

2008 18-Dec-15 2798 Ǿ500 12.00 TC-53 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2009 18-Dec-15 2799 Ǿ500 12.00 TC-53 bor main pile

2010 18-Dec-15 2800 Ǿ500 12.00 TC-53 bor main pile

2011 18-Dec-15 2819 Ǿ500 12.00 TC-53 bor main pile

2012 18-Dec-15 2820 Ǿ500 12.00 TC-53 bor main pile

2013 18-Dec-15 2821 Ǿ500 12.00 TC-53 bor main pile

2014 18-Dec-15 2822 Ǿ500 12.00 TC-53 bor main pile

2015 19-Dec-15 2722 Ǿ500 12.00 TC-19 bor main pile

2016 19-Dec-15 2723 Ǿ500 12.00 TC-19 bor main pile

2017 19-Dec-15 2724 Ǿ500 12.00 TC-19 bor main pile

2018 19-Dec-15 2725 Ǿ500 12.00 TC-19 bor main pile

2019 19-Dec-15 2726 Ǿ500 12.00 TC-19 bor main pile

2020 19-Dec-15 2667 Ǿ500 12.00 TC-19 bor main pile

2021 19-Dec-15 2668 Ǿ500 12.00 TC-19 bor main pile

2022 19-Dec-15 2669 Ǿ500 12.00 TC-19 bor main pile

2023 19-Dec-15 2670 Ǿ500 12.00 TC-19 bor main pile

2024 19-Dec-15 2671 Ǿ500 12.00 TC-19 bor main pile

2025 19-Dec-15 2662 Ǿ500 12.00 TC-19 bor main pile

2026 19-Dec-15 2663 Ǿ500 12.00 TC-19 bor main pile

2027 19-Dec-15 2664 Ǿ500 12.00 TC-19 bor main pile

2028 19-Dec-15 2665 Ǿ500 12.00 TC-19 bor main pile

2029 19-Dec-15 2666 Ǿ500 12.00 TC-19 bor main pile

2030 19-Dec-15 2612 Ǿ500 12.00 TC-19 bor main pile

2031 19-Dec-15 2611 Ǿ500 12.00 TC-19 bor main pile

2032 19-Dec-15 2613 Ǿ500 12.00 TC-19 bor main pile

2033 19-Dec-15 2614 Ǿ500 12.00 TC-19 bor main pile

2034 19-Dec-15 2606 Ǿ500 12.00 TC-19 bor main pile

2035 19-Dec-15 2607 Ǿ500 12.00 TC-19 bor main pile

2036 19-Dec-15 2608 Ǿ500 12.00 TC-19 bor main pile

2037 19-Dec-15 2609 Ǿ500 12.00 TC-19 bor main pile

2038 19-Dec-15 2610 Ǿ500 12.00 TC-19 bor main pile

2039 19-Dec-15 2552 Ǿ500 12.00 TC-19 bor main pile

2040 19-Dec-15 2553 Ǿ500 12.00 TC-19 bor main pile

2041 19-Dec-15 2554 Ǿ500 12.00 TC-19 bor main pile

2042 19-Dec-15 2555 Ǿ270 12.00 TC-19 bor main pile

2043 22-Dec-15 1598 Ǿ500 12.00 TC-53 bor main pile

2044 22-Dec-15 1599 Ǿ500 12.00 TC-53 bor main pile

2045 22-Dec-15 1600 Ǿ500 12.00 TC-53 bor main pile

2046 22-Dec-15 1601 Ǿ500 12.00 TC-53 bor main pile

2047 22-Dec-15 1602 Ǿ500 12.00 TC-53 bor main pile

2048 22-Dec-15 1603 Ǿ500 12.00 TC-53 bor main pile

2049 22-Dec-15 1604 Ǿ500 12.00 TC-53 bor main pile

2050 22-Dec-15 1605 Ǿ500 12.00 TC-53 bor main pile

2051 22-Dec-15 1722 Ǿ500 12.00 TC-53 bor main pile

2052 22-Dec-15 1723 Ǿ500 12.00 TC-53 bor main pile

2053 22-Dec-15 1724 Ǿ500 12.00 TC-53 bor main pile

2054 22-Dec-15 1725 Ǿ500 12.00 TC-53 bor main pile

2055 22-Dec-15 1726 Ǿ500 12.00 TC-53 bor main pile

2056 22-Dec-15 1727 Ǿ500 12.00 TC-53 bor main pile

2057 22-Dec-15 1728 Ǿ500 12.00 TC-53 bor main pile

2058 22-Dec-15 1729 Ǿ500 12.00 TC-53 bor main pile

2059 22-Dec-15 1716 Ǿ500 12.00 TC-53 bor main pile

2060 22-Dec-15 1717 Ǿ500 12.00 TC-53 bor main pile

2061 22-Dec-15 1718 Ǿ500 12.00 TC-53 bor main pile

2062 22-Dec-15 1719 Ǿ500 12.00 TC-53 bor main pile

2063 22-Dec-15 1720 Ǿ500 12.00 TC-53 bor main pile

2064 22-Dec-15 1721 Ǿ500 12.00 TC-53 bor main pile

2065 22-Dec-15 1606 Ǿ500 12.00 TC-53 bor main pile

2066 22-Dec-15 1607 Ǿ500 12.00 TC-53 bor main pile

2067 22-Dec-15 1608 Ǿ500 12.00 TC-53 bor main pile

2068 22-Dec-15 1609 Ǿ500 12.00 TC-53 bor main pile

2069 22-Dec-15 1610 Ǿ500 12.00 TC-53 bor main pile

2070 22-Dec-15 1611 Ǿ500 12.00 TC-53 bor main pile

2071 22-Dec-15 2565 Ǿ500 12.00 TC-19 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2072 22-Dec-15 2566 Ǿ500 12.00 TC-19 bor main pile

2073 22-Dec-15 2567 Ǿ500 12.00 TC-19 bor main pile

2074 22-Dec-15 2568 Ǿ500 12.00 TC-19 bor main pile

2075 22-Dec-15 2569 Ǿ500 12.00 TC-19 bor main pile

2076 22-Dec-15 2570 Ǿ500 12.00 TC-19 bor main pile

2077 22-Dec-15 2727 Ǿ500 12.00 TC-19 bor main pile

2078 22-Dec-15 2728 Ǿ500 12.00 TC-19 bor main pile

2079 22-Dec-15 2729 Ǿ500 12.00 TC-19 bor main pile

2080 22-Dec-15 2730 Ǿ500 12.00 TC-19 bor main pile

2081 22-Dec-15 2731 Ǿ500 12.00 TC-19 bor main pile

2082 22-Dec-15 2780 Ǿ500 12.00 TC-19 bor main pile

2083 22-Dec-15 2781 Ǿ500 12.00 TC-19 bor main pile

2084 22-Dec-15 2782 Ǿ500 12.00 TC-19 bor main pile

2085 22-Dec-15 2783 Ǿ500 12.00 TC-19 bor main pile

2086 22-Dec-15 2784 Ǿ500 12.00 TC-19 bor main pile

2087 22-Dec-15 2784A Ǿ500 12.00 TC-19 bor main pile

2088 22-Dec-15 2784B Ǿ500 12.00 TC-19 bor main pile

2089 22-Dec-15 2785 Ǿ500 12.00 TC-19 bor main pile

2090 22-Dec-15 2786 Ǿ500 12.00 TC-19 bor main pile

2091 22-Dec-15 2787 Ǿ500 12.00 TC-19 bor main pile

2092 22-Dec-15 2788 Ǿ500 12.00 TC-19 bor main pile

2093 22-Dec-15 2789 Ǿ500 12.00 TC-19 bor main pile

2094 22-Dec-15 2789A Ǿ500 12.00 TC-19 bor main pile

2095 22-Dec-15 2789B Ǿ500 12.00 TC-19 bor main pile

2096 23-Dec-15 1926 Ǿ500 12.00 TC-15 bor main pile

2097 23-Dec-15 1925 Ǿ500 12.00 TC-15 bor main pile

2098 23-Dec-15 1924 Ǿ500 12.00 TC-15 bor main pile

2099 23-Dec-15 1923 Ǿ500 12.00 TC-15 bor main pile

2100 23-Dec-15 1922 Ǿ500 12.00 TC-15 bor main pile

2101 23-Dec-15 1679 Ǿ500 12.00 TC-15 bor main pile

2102 23-Dec-15 1678 Ǿ500 12.00 TC-15 bor main pile

2103 23-Dec-15 1677 Ǿ500 12.00 TC-15 bor main pile

2104 23-Dec-15 1676 Ǿ500 12.00 TC-15 bor main pile

2105 23-Dec-15 1675 Ǿ500 12.00 TC-15 bor main pile

2106 23-Dec-15 1674 Ǿ500 12.00 TC-15 bor main pile

2107 23-Dec-15 1653 Ǿ500 12.00 TC-15 bor main pile

2108 23-Dec-15 1652 Ǿ500 12.00 TC-15 bor main pile

2109 23-Dec-15 1651 Ǿ500 12.00 TC-15 bor main pile

2110 23-Dec-15 1650 Ǿ500 12.00 TC-15 bor main pile

2111 23-Dec-15 1649 Ǿ500 12.00 TC-15 bor main pile

2112 23-Dec-15 1648 Ǿ500 12.00 TC-15 bor main pile

2113 23-Dec-15 1630 Ǿ500 12.00 TC-15 bor main pile

2114 23-Dec-15 1631 Ǿ500 12.00 TC-15 bor main pile

2115 23-Dec-15 1632 Ǿ500 12.00 TC-15 bor main pile

2116 23-Dec-15 1633 Ǿ500 12.00 TC-15 bor main pile

2117 23-Dec-15 1634 Ǿ500 12.00 TC-15 bor main pile

2118 23-Dec-15 1635 Ǿ500 12.00 TC-15 bor main pile

2119 23-Dec-15 1692 Ǿ500 12.00 TC-15 bor main pile

2120 23-Dec-15 1693 Ǿ500 12.00 TC-15 bor main pile

2121 23-Dec-15 1694 Ǿ500 12.00 TC-15 bor main pile

2122 23-Dec-15 1695 Ǿ500 12.00 TC-15 bor main pile

2123 23-Dec-15 1696 Ǿ500 12.00 TC-15 bor main pile

2124 23-Dec-15 1697 Ǿ500 12.00 TC-15 bor main pile

2125 23-Dec-15 1932 Ǿ500 12.00 TC-15 bor main pile

2126 23-Dec-15 1933 Ǿ500 12.00 TC-15 bor main pile

2127 23-Dec-15 1934 Ǿ500 12.00 TC-15 bor main pile

2128 23-Dec-15 1935 Ǿ500 12.00 TC-15 bor main pile

2129 23-Dec-15 1936 Ǿ500 12.00 TC-15 bor main pile

2130 23-Dec-15 1513 Ǿ500 12.00 TC-15 bor main pile

2131 23-Dec-15 1514 Ǿ500 12.00 TC-15 bor main pile

2132 23-Dec-15 1568 Ǿ500 12.00 TC-15 bor main pile

2133 23-Dec-15 1569 Ǿ500 12.00 TC-15 bor main pile

2134 23-Dec-15 1570 Ǿ500 12.00 TC-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2135 23-Dec-15 1571 Ǿ500 12.00 TC-15 bor main pile

2136 23-Dec-15 1572 Ǿ500 12.00 TC-15 bor main pile

2137 23-Dec-15 1573 Ǿ500 12.00 TC-15 bor main pile

2138 23-Dec-15 1509 Ǿ500 12.00 TC-15 bor main pile

2139 23-Dec-15 1510 Ǿ500 12.00 TC-15 bor main pile

2140 23-Dec-15 1511 Ǿ500 12.00 TC-15 bor main pile

2141 23-Dec-15 1512 Ǿ500 12.00 TC-15 bor main pile

2142 23-Dec-15 1567 Ǿ500 12.00 TC-15 bor main pile

2143 23-Dec-15 1566 Ǿ500 12.00 TC-15 bor main pile

2144 23-Dec-15 1565 Ǿ500 12.00 TC-15 bor main pile

2145 23-Dec-15 1564 Ǿ500 12.00 TC-15 bor main pile

2146 23-Dec-15 1563 Ǿ500 12.00 TC-15 bor main pile

2147 23-Dec-15 1562 Ǿ500 12.00 TC-15 bor main pile

2148 23-Dec-15 1519 Ǿ500 12.00 TC-15 bor main pile

2149 23-Dec-15 1518 Ǿ500 12.00 TC-15 bor main pile

2150 23-Dec-15 1517 Ǿ500 12.00 TC-15 bor main pile

2151 23-Dec-15 1516 Ǿ500 12.00 TC-15 bor main pile

2152 23-Dec-15 1515 Ǿ500 12.00 TC-15 bor main pile

2153 23-Dec-15 2600 Ǿ500 12.00 TC-19 bor main pile

2154 23-Dec-15 2619 Ǿ500 12.00 TC-19 bor main pile

2155 23-Dec-15 2620 Ǿ500 12.00 TC-19 bor main pile

2156 23-Dec-15 2621 Ǿ500 12.00 TC-19 bor main pile

2157 23-Dec-15 2622 Ǿ500 12.00 TC-19 bor main pile

2158 23-Dec-15 2623 Ǿ500 12.00 TC-19 bor main pile

2159 23-Dec-15 2624 Ǿ500 12.00 TC-19 bor main pile

2160 23-Dec-15 2595 Ǿ500 12.00 TC-19 bor main pile

2161 23-Dec-15 2596 Ǿ500 12.00 TC-19 bor main pile

2162 23-Dec-15 2597 Ǿ500 12.00 TC-19 bor main pile

2163 23-Dec-15 2598 Ǿ500 12.00 TC-19 bor main pile

2164 23-Dec-15 2599 Ǿ500 12.00 TC-19 bor main pile

2165 23-Dec-15 2560 Ǿ500 12.00 TC-19 bor main pile

2166 23-Dec-15 2561 Ǿ500 12.00 TC-19 bor main pile

2167 23-Dec-15 2562 Ǿ500 12.00 TC-19 bor main pile

2168 23-Dec-15 2563 Ǿ500 12.00 TC-19 bor main pile

2169 23-Dec-15 2564 Ǿ500 12.00 TC-19 bor main pile

2170 24-Dec-15 1939 Ǿ500 12.00 TC-15 bor main pile

2171 24-Dec-15 1940 Ǿ500 12.00 TC-15 bor main pile

2172 24-Dec-15 1941 Ǿ500 12.00 TC-15 bor main pile

2173 24-Dec-15 1942 Ǿ500 12.00 TC-15 bor main pile

2174 24-Dec-15 1809 Ǿ500 12.00 TC-15 bor main pile

2175 24-Dec-15 1808 Ǿ500 12.00 TC-15 bor main pile

2176 24-Dec-15 1807 Ǿ500 12.00 TC-15 bor main pile

2177 24-Dec-15 1806 Ǿ500 12.00 TC-15 bor main pile

2178 24-Dec-15 1805 Ǿ500 12.00 TC-15 bor main pile

2179 24-Dec-15 1804 Ǿ500 12.00 TC-15 bor main pile

2180 24-Dec-15 1766 Ǿ500 12.00 TC-15 bor main pile

2181 24-Dec-15 1767 Ǿ500 12.00 TC-15 bor main pile

2182 24-Dec-15 1768 Ǿ500 12.00 TC-15 bor main pile

2183 24-Dec-15 1769 Ǿ500 12.00 TC-15 bor main pile

2184 24-Dec-15 1770 Ǿ500 12.00 TC-15 bor main pile

2185 24-Dec-15 1771 Ǿ500 12.00 TC-15 bor main pile

2186 24-Dec-15 1754 Ǿ500 12.00 TC-15 bor main pile

2187 24-Dec-15 1755 Ǿ500 12.00 TC-15 bor main pile

2188 24-Dec-15 1756 Ǿ500 12.00 TC-15 bor main pile

2189 24-Dec-15 1757 Ǿ500 12.00 TC-15 bor main pile

2190 24-Dec-15 1758 Ǿ500 12.00 TC-15 bor main pile

2191 24-Dec-15 1759 Ǿ500 12.00 TC-15 bor main pile

2192 24-Dec-15 1816 Ǿ500 12.00 TC-15 bor main pile

2193 24-Dec-15 1817 Ǿ500 12.00 TC-15 bor main pile

2194 24-Dec-15 1818 Ǿ500 12.00 TC-15 bor main pile

2195 24-Dec-15 1819 Ǿ500 12.00 TC-15 bor main pile

2196 24-Dec-15 1820 Ǿ500 12.00 TC-15 bor main pile

2197 24-Dec-15 1821 Ǿ500 12.00 TC-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2198 24-Dec-15 1590 Ǿ500 12.00 TC-53 bor main pile

2199 24-Dec-15 1591 Ǿ500 12.00 TC-53 bor main pile

2200 24-Dec-15 1612 Ǿ500 12.00 TC-53 bor main pile

2201 24-Dec-15 1613 Ǿ500 12.00 TC-53 bor main pile

2202 24-Dec-15 1614 Ǿ500 12.00 TC-53 bor main pile

2203 24-Dec-15 1615 Ǿ500 12.00 TC-53 bor main pile

2204 24-Dec-15 1616 Ǿ500 12.00 TC-53 bor main pile

2205 24-Dec-15 1617 Ǿ500 12.00 TC-53 bor main pile

2206 24-Dec-15 1592 Ǿ500 12.00 TC-53 bor main pile

2207 24-Dec-15 1593 Ǿ500 12.00 TC-53 bor main pile

2208 24-Dec-15 1594 Ǿ500 12.00 TC-53 bor main pile

2209 24-Dec-15 1595 Ǿ500 12.00 TC-53 bor main pile

2210 24-Dec-15 1596 Ǿ500 12.00 TC-53 bor main pile

2211 24-Dec-15 1597 Ǿ500 12.00 TC-53 bor main pile

2212 24-Dec-15 1489 Ǿ500 12.00 TC-53 bor main pile

2213 24-Dec-15 1490 Ǿ500 12.00 TC-53 bor main pile

2214 24-Dec-15 1491 Ǿ500 12.00 TC-53 bor main pile

2215 24-Dec-15 1492 Ǿ500 12.00 TC-53 bor main pile

2216 24-Dec-15 1493 Ǿ500 12.00 TC-53 bor main pile

2217 24-Dec-15 1485 Ǿ500 12.00 TC-53 bor main pile

2218 24-Dec-15 1486 Ǿ500 12.00 TC-53 bor main pile

2219 24-Dec-15 1487 Ǿ500 12.00 TC-53 bor main pile

2220 24-Dec-15 1488 Ǿ500 12.00 TC-53 bor main pile

2221 24-Dec-15 1494 Ǿ500 12.00 TC-53 bor main pile

2222 24-Dec-15 1495 Ǿ500 12.00 TC-53 bor main pile

2223 24-Dec-15 1496 Ǿ500 12.00 TC-53 bor main pile

2224 24-Dec-15 1497 Ǿ500 12.00 TC-53 bor main pile

2225 24-Dec-15 1498 Ǿ500 12.00 TC-53 bor main pile

2226 24-Dec-15 1586 Ǿ500 12.00 TC-53 bor main pile

2227 24-Dec-15 1587 Ǿ500 12.00 TC-53 bor main pile

2228 24-Dec-15 1588 Ǿ500 12.00 TC-53 bor main pile

2229 24-Dec-15 1589 Ǿ500 12.00 TC-53 bor main pile

2230 28-Dec-15 2944 Ǿ500 12.00 TI-15 bor main pile

2231 28-Dec-15 2945 Ǿ500 12.00 TI-15 bor main pile

2232 28-Dec-15 2946 Ǿ500 12.00 TI-15 bor main pile

2233 28-Dec-15 2947 Ǿ500 12.00 TI-15 bor main pile

2234 28-Dec-15 2948 Ǿ500 12.00 TI-15 bor main pile

2235 28-Dec-15 2949 Ǿ500 12.00 TI-15 bor main pile

2236 28-Dec-15 2950 Ǿ500 12.00 TI-15 bor main pile

2237 28-Dec-15 2951 Ǿ500 12.00 TI-15 bor main pile

2238 28-Dec-15 2953 Ǿ500 12.00 TI-15 bor main pile

2239 28-Dec-15 2954 Ǿ500 12.00 TI-15 bor main pile

2240 28-Dec-15 2955 Ǿ500 12.00 TI-15 bor main pile

2241 28-Dec-15 1938 Ǿ500 12.00 TI-15 bor main pile

2242 28-Dec-15 1937 Ǿ500 12.00 TI-15 bor main pile

2243 28-Dec-15 1889 Ǿ500 12.00 TI-15 bor main pile

2244 28-Dec-15 1888 Ǿ500 12.00 TI-15 bor main pile

2245 28-Dec-15 1887 Ǿ500 12.00 TI-15 bor main pile

2246 28-Dec-15 1886 Ǿ500 12.00 TI-15 bor main pile

2247 28-Dec-15 1885 Ǿ500 12.00 TI-15 bor main pile

2248 28-Dec-15 1884 Ǿ500 12.00 TI-15 bor main pile

2249 29-Dec-15 2968 Ǿ500 12.00 TI-19 bor main pile

2250 29-Dec-15 2969 Ǿ500 12.00 TI-19 bor main pile

2251 29-Dec-15 2970 Ǿ500 12.00 TI-19 bor main pile

2252 29-Dec-15 2971 Ǿ500 12.00 TI-19 bor main pile

2253 29-Dec-15 2972 Ǿ500 12.00 TI-19 bor main pile

2254 29-Dec-15 2973 Ǿ500 12.00 TI-19 bor main pile

2255 29-Dec-15 2974 Ǿ500 12.00 TI-19 bor main pile

2256 29-Dec-15 2975 Ǿ500 12.00 TI-19 bor main pile

2257 29-Dec-15 2976 Ǿ500 12.00 TI-19 bor main pile

2258 29-Dec-15 2977 Ǿ500 12.00 TI-19 bor main pile

2259 29-Dec-15 2571 Ǿ500 12.00 TI-19 bor main pile

2260 29-Dec-15 2572 Ǿ500 12.00 TI-19 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2261 29-Dec-15 2573 Ǿ500 12.00 TI-19 bor main pile

2262 29-Dec-15 2574 Ǿ500 12.00 TI-19 bor main pile

2263 29-Dec-15 2575 Ǿ500 12.00 TI-19 bor main pile

2264 29-Dec-15 2589 Ǿ500 12.00 TI-19 bor main pile

2265 29-Dec-15 2590 Ǿ500 12.00 TI-19 bor main pile

2266 29-Dec-15 2591 Ǿ500 12.00 TI-19 bor main pile

2267 29-Dec-15 2592 Ǿ500 12.00 TI-19 bor main pile

2268 29-Dec-15 2593 Ǿ500 12.00 TI-19 bor main pile

2269 29-Dec-15 2594 Ǿ500 12.00 TI-19 bor main pile

2270 30-Dec-15 3019 Ǿ500 12.00 TI-53 bor main pile

2271 30-Dec-15 3018 Ǿ500 12.00 TI-53 bor main pile

2272 30-Dec-15 2999 Ǿ500 12.00 TI-53 bor main pile

2273 30-Dec-15 2998 Ǿ500 12.00 TI-53 bor main pile

2274 30-Dec-15 2988 Ǿ500 12.00 TI-53 bor main pile

2275 30-Dec-15 2989 Ǿ500 12.00 TI-53 bor main pile

2276 30-Dec-15 2990 Ǿ500 12.00 TI-53 bor main pile

2277 30-Dec-15 2991 Ǿ500 12.00 TI-53 bor main pile

2278 30-Dec-15 3002 Ǿ500 12.00 TI-53 bor main pile

2279 30-Dec-15 3003 Ǿ500 12.00 TI-53 bor main pile

2280 30-Dec-15 3004 Ǿ500 12.00 TI-53 bor main pile

2281 30-Dec-15 3005 Ǿ500 12.00 TI-53 bor main pile

2282 30-Dec-15 3022 Ǿ500 12.00 TI-53 bor main pile

2283 30-Dec-15 3023 Ǿ500 12.00 TI-53 bor main pile

2284 30-Dec-15 3024 Ǿ500 12.00 TI-53 bor main pile

2285 30-Dec-15 3025 Ǿ500 12.00 TI-53 bor main pile

2286 30-Dec-15 3001 Ǿ500 12.00 TI-53 bor main pile

2287 30-Dec-15 3000 Ǿ500 12.00 TI-53 bor main pile

2288 30-Dec-15 3020 Ǿ500 12.00 TI-53 bor main pile

2289 30-Dec-15 3021 Ǿ500 12.00 TI-53 bor main pile

2290 30-Dec-15 2980 Ǿ500 12.00 TI-53 bor main pile

2291 30-Dec-15 2981 Ǿ500 12.00 TI-53 bor main pile

2292 30-Dec-15 2984 Ǿ500 12.00 TI-53 bor main pile

2293 30-Dec-15 2985 Ǿ500 12.00 TI-53 bor main pile

2294 30-Dec-15 2996 Ǿ500 12.00 TI-53 bor main pile

2295 30-Dec-15 2997 Ǿ500 12.00 TI-53 bor main pile

2296 30-Dec-15 3016 Ǿ500 12.00 TI-53 bor main pile

2297 30-Dec-15 3017 Ǿ500 12.00 TI-53 bor main pile

2298 30-Dec-15 2986 Ǿ500 12.00 TI-53 bor main pile

2299 30-Dec-15 2987 Ǿ500 12.00 TI-53 bor main pile

2300 4-Jan-16 1947 Ǿ500 12.00 TC-15 bor main pile

2301 4-Jan-16 1872 Ǿ500 12.00 TC-15 bor main pile

2302 4-Jan-16 1973 Ǿ500 12.00 TC-15 bor main pile

2303 4-Jan-16 1874 Ǿ500 12.00 TC-15 bor main pile

2304 4-Jan-16 1875 Ǿ500 12.00 TC-15 bor main pile

2305 4-Jan-16 1876 Ǿ500 12.00 TC-15 bor main pile

2306 4-Jan-16 1877 Ǿ500 12.00 TC-15 bor main pile

2307 4-Jan-16 1822 Ǿ500 12.00 TC-15 bor main pile

2308 4-Jan-16 1823 Ǿ500 12.00 TC-15 bor main pile

2309 4-Jan-16 1824 Ǿ500 12.00 TC-15 bor main pile

2310 4-Jan-16 1825 Ǿ500 12.00 TC-15 bor main pile

2311 4-Jan-16 1826 Ǿ500 12.00 TC-15 bor main pile

2312 4-Jan-16 1827 Ǿ500 12.00 TC-15 bor main pile

2313 4-Jan-16 1748 Ǿ500 12.00 TC-15 bor main pile

2314 4-Jan-16 1749 Ǿ500 12.00 TC-15 bor main pile

2315 4-Jan-16 1750 Ǿ500 12.00 TC-15 bor main pile

2316 4-Jan-16 1751 Ǿ500 12.00 TC-15 bor main pile

2317 4-Jan-16 1752 Ǿ500 12.00 TC-15 bor main pile

2318 4-Jan-16 1753 Ǿ500 12.00 TC-15 bor main pile

2319 4-Jan-16 1698 Ǿ500 12.00 TC-15 bor main pile

2320 4-Jan-16 1878 Ǿ500 12.00 TC-15 bor main pile

2321 4-Jan-16 1879 Ǿ500 12.00 TC-15 bor main pile

2322 4-Jan-16 1880 Ǿ500 12.00 TC-15 bor main pile

2323 4-Jan-16 1881 Ǿ500 12.00 TC-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2324 4-Jan-16 1882 Ǿ500 12.00 TC-15 bor main pile

2325 4-Jan-16 1883 Ǿ500 12.00 TC-15 bor main pile

2326 4-Jan-16 1953 Ǿ500 12.00 TC-15 bor main pile

2327 4-Jan-16 1954 Ǿ500 12.00 TC-15 bor main pile

2328 4-Jan-16 1955 Ǿ500 12.00 TC-15 bor main pile

2329 4-Jan-16 1956 Ǿ500 12.00 TC-15 bor main pile

2330 4-Jan-16 1957 Ǿ500 12.00 TC-15 bor main pile

2331 4-Jan-16 1948 Ǿ500 12.00 TC-15 bor main pile

2332 4-Jan-16 1949 Ǿ500 12.00 TC-15 bor main pile

2333 4-Jan-16 1950 Ǿ500 12.00 TC-15 bor main pile

2334 4-Jan-16 1951 Ǿ500 12.00 TC-15 bor main pile

2335 4-Jan-16 1952 Ǿ500 12.00 TC-15 bor main pile

2336 4-Jan-16 1943 Ǿ500 12.00 TC-15 bor main pile

2337 4-Jan-16 1944 Ǿ500 12.00 TC-15 bor main pile

2338 4-Jan-16 1945 Ǿ500 12.00 TC-15 bor main pile

2339 4-Jan-16 1946 Ǿ500 12.00 TC-15 bor main pile

2340 4-Jan-16 1839 Ǿ500 12.00 TC-15 bor main pile

2341 4-Jan-16 1736 Ǿ500 12.00 TC-15 bor main pile

2342 4-Jan-16 1737 Ǿ500 12.00 TC-15 bor main pile

2343 4-Jan-16 1738 Ǿ500 12.00 TC-15 bor main pile

2344 4-Jan-16 1739 Ǿ500 12.00 TC-15 bor main pile

2345 4-Jan-16 1740 Ǿ500 12.00 TC-15 bor main pile

2346 4-Jan-16 1741 Ǿ500 12.00 TC-15 bor main pile

2347 4-Jan-16 1710 Ǿ500 12.00 TC-15 bor main pile

2348 4-Jan-16 1711 Ǿ500 12.00 TC-15 bor main pile

2349 4-Jan-16 1712 Ǿ500 12.00 TC-15 bor main pile

2350 4-Jan-16 1713 Ǿ500 12.00 TC-15 bor main pile

2351 4-Jan-16 1714 Ǿ500 12.00 TC-15 bor main pile

2352 4-Jan-16 1715 Ǿ500 12.00 TC-15 bor main pile

2353 5-Jan-16 1699 Ǿ500 12.00 TC-15 bor main pile

2354 5-Jan-16 1890 Ǿ500 12.00 TC-15 bor main pile

2355 5-Jan-16 1891 Ǿ500 12.00 TC-15 bor main pile

2356 5-Jan-16 1892 Ǿ500 12.00 TC-15 bor main pile

2357 5-Jan-16 1893 Ǿ500 12.00 TC-15 bor main pile

2358 5-Jan-16 1866 Ǿ500 12.00 TC-15 bor main pile

2359 5-Jan-16 1867 Ǿ500 12.00 TC-15 bor main pile

2360 5-Jan-16 1868 Ǿ500 12.00 TC-15 bor main pile

2361 5-Jan-16 1869 Ǿ500 12.00 TC-15 bor main pile

2362 5-Jan-16 1870 Ǿ500 12.00 TC-15 bor main pile

2363 5-Jan-16 1871 Ǿ500 12.00 TC-15 bor main pile

2364 5-Jan-16 1828 Ǿ500 12.00 TC-15 bor main pile

2365 5-Jan-16 1829 Ǿ500 12.00 TC-15 bor main pile

2366 5-Jan-16 1830 Ǿ500 12.00 TC-15 bor main pile

2367 5-Jan-16 1831 Ǿ500 12.00 TC-15 bor main pile

2368 5-Jan-16 1832 Ǿ500 12.00 TC-15 bor main pile

2369 5-Jan-16 1833 Ǿ500 12.00 TC-15 bor main pile

2370 5-Jan-16 1742 Ǿ500 12.00 TC-15 bor main pile

2371 5-Jan-16 1743 Ǿ500 12.00 TC-15 bor main pile

2372 5-Jan-16 1744 Ǿ500 12.00 TC-15 bor main pile

2373 5-Jan-16 1745 Ǿ500 12.00 TC-15 bor main pile

2374 5-Jan-16 1746 Ǿ500 12.00 TC-15 bor main pile

2375 5-Jan-16 1747 Ǿ500 12.00 TC-15 bor main pile

2376 5-Jan-16 1704 Ǿ500 12.00 TC-15 bor main pile

2377 5-Jan-16 1705 Ǿ500 12.00 TC-15 bor main pile

2378 5-Jan-16 1706 Ǿ500 12.00 TC-15 bor main pile

2379 5-Jan-16 1707 Ǿ500 12.00 TC-15 bor main pile

2380 5-Jan-16 1708 Ǿ500 12.00 TC-15 bor main pile

2381 5-Jan-16 1709 Ǿ500 12.00 TC-15 bor main pile

2382 5-Jan-16 1860 Ǿ500 12.00 TC-15 bor main pile

2383 5-Jan-16 1861 Ǿ500 12.00 TC-15 bor main pile

2384 5-Jan-16 1862 Ǿ500 12.00 TC-15 bor main pile

2385 5-Jan-16 1863 Ǿ500 12.00 TC-15 bor main pile

2386 5-Jan-16 1864 Ǿ500 12.00 TC-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2387 5-Jan-16 1865 Ǿ500 12.00 TC-15 bor main pile

2388 5-Jan-16 1834 Ǿ500 12.00 TC-15 bor main pile

2389 5-Jan-16 1835 Ǿ500 12.00 TC-15 bor main pile

2390 5-Jan-16 1836 Ǿ500 12.00 TC-15 bor main pile

2391 5-Jan-16 1837 Ǿ500 12.00 TC-15 bor main pile

2392 5-Jan-16 1838 Ǿ500 12.00 TC-15 bor main pile

2393 5-Jan-16 2992 Ǿ500 12.00 TC-15 bor main pile

2394 5-Jan-16 2993 Ǿ500 12.00 TC-15 bor main pile

2395 5-Jan-16 2994 Ǿ500 12.00 TC-15 bor main pile

2396 5-Jan-16 2995 Ǿ500 12.00 TC-15 bor main pile

2397 5-Jan-16 2928 Ǿ500 12.00 TC-19 bor main pile

2398 5-Jan-16 2929 Ǿ500 12.00 TC-19 bor main pile

2399 5-Jan-16 2934 Ǿ500 12.00 TC-19 bor main pile

2400 5-Jan-16 2935 Ǿ500 12.00 TC-19 bor main pile

2401 5-Jan-16 2902 Ǿ500 12.00 TC-19 bor main pile

2402 5-Jan-16 2901 Ǿ500 12.00 TC-19 bor main pile

2403 5-Jan-16 2900 Ǿ500 12.00 TC-19 bor main pile

2404 5-Jan-16 2899 Ǿ500 12.00 TC-19 bor main pile

2405 5-Jan-16 2898 Ǿ500 12.00 TC-19 bor main pile

2406 5-Jan-16 2926 Ǿ500 12.00 TC-19 bor main pile

2407 5-Jan-16 2927 Ǿ500 12.00 TC-19 bor main pile

2408 5-Jan-16 2932 Ǿ500 12.00 TC-19 bor main pile

2409 5-Jan-16 2933 Ǿ500 12.00 TC-19 bor main pile

2410 5-Jan-16 2938 Ǿ500 12.00 TC-19 bor main pile

2411 5-Jan-16 2939 Ǿ500 12.00 TC-19 bor main pile

2412 5-Jan-16 2922 Ǿ500 12.00 TC-19 bor main pile

2413 5-Jan-16 2923 Ǿ500 12.00 TC-19 bor main pile

2414 5-Jan-16 2924 Ǿ500 12.00 TC-19 bor main pile

2415 5-Jan-16 2925 Ǿ500 12.00 TC-19 bor main pile

2416 5-Jan-16 2915 Ǿ500 12.00 TC-19 bor main pile

2417 5-Jan-16 2914 Ǿ500 12.00 TC-19 bor main pile

2418 5-Jan-16 2913 Ǿ500 12.00 TC-19 bor main pile

2419 5-Jan-16 2912 Ǿ500 12.00 TC-19 bor main pile

2420 5-Jan-16 2911 Ǿ500 12.00 TC-19 bor main pile

2421 5-Jan-16 2910 Ǿ500 12.00 TC-19 bor main pile

2422 5-Jan-16 2909 Ǿ500 12.00 TC-19 bor main pile

2423 5-Jan-16 2908 Ǿ500 12.00 TC-19 bor main pile

2424 5-Jan-16 2907 Ǿ500 12.00 TC-19 bor main pile

2425 5-Jan-16 2906 Ǿ500 12.00 TC-19 bor main pile

2426 5-Jan-16 2905 Ǿ500 12.00 TC-19 bor main pile

2427 5-Jan-16 2904 Ǿ500 12.00 TC-19 bor main pile

2428 5-Jan-16 2903 Ǿ500 12.00 TC-19 bor main pile

2429 5-Jan-16 2920 Ǿ500 12.00 TC-19 bor main pile

2430 5-Jan-16 2921 Ǿ500 12.00 TC-19 bor main pile

2431 5-Jan-16 2919 Ǿ500 12.00 TC-19 bor main pile

2432 5-Jan-16 2918 Ǿ500 12.00 TC-19 bor main pile

2433 5-Jan-16 2917 Ǿ500 12.00 TC-19 bor main pile

2434 5-Jan-16 2916 Ǿ500 12.00 TC-19 bor main pile

2435 7-Jan-16 2869 Ǿ500 12.00 TC-19 bor main pile

2436 7-Jan-16 2865 Ǿ500 12.00 TC-19 bor main pile

2437 7-Jan-16 2863 Ǿ500 12.00 TC-19 bor main pile

2438 7-Jan-16 2862 Ǿ500 12.00 TC-19 bor main pile

2439 7-Jan-16 2881 Ǿ500 12.00 TC-19 bor main pile

2440 7-Jan-16 2879 Ǿ500 12.00 TC-19 bor main pile

2441 7-Jan-16 2878 Ǿ500 12.00 TC-19 bor main pile

2442 7-Jan-16 2877 Ǿ500 12.00 TC-19 bor main pile

2443 7-Jan-16 2876 Ǿ500 12.00 TC-19 bor main pile

2444 7-Jan-16 2875 Ǿ500 12.00 TC-19 bor main pile

2445 7-Jan-16 2874 Ǿ500 12.00 TC-19 bor main pile

2446 7-Jan-16 2873 Ǿ500 12.00 TC-19 bor main pile

2447 7-Jan-16 2872 Ǿ500 12.00 TC-19 bor main pile

2448 7-Jan-16 2871 Ǿ500 12.00 TC-19 bor main pile

2449 7-Jan-16 2870 Ǿ500 12.00 TC-19 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2450 7-Jan-16 2866 Ǿ500 12.00 TC-19 bor main pile

2451 7-Jan-16 2867 Ǿ500 12.00 TC-19 bor main pile

2452 7-Jan-16 2864 Ǿ500 12.00 TC-19 bor main pile

2453 7-Jan-16 2868 Ǿ500 12.00 TC-19 bor main pile

2454 7-Jan-16 3008 Ǿ500 12.00 TC-19 bor main pile

2455 7-Jan-16 3009 Ǿ500 12.00 TC-19 bor main pile

2456 7-Jan-16 3010 Ǿ500 12.00 TC-19 bor main pile

2457 7-Jan-16 3011 Ǿ500 12.00 TC-19 bor main pile

2458 7-Jan-16 3012 Ǿ500 12.00 TC-19 bor main pile

2459 7-Jan-16 3013 Ǿ500 12.00 TC-19 bor main pile

2460 7-Jan-16 3026 Ǿ500 12.00 TC-53 bor main pile

2461 7-Jan-16 3027 Ǿ500 12.00 TC-53 bor main pile

2462 7-Jan-16 3028 Ǿ500 12.00 TC-53 bor main pile

2463 7-Jan-16 3029 Ǿ500 12.00 TC-53 bor main pile

2464 7-Jan-16 3030 Ǿ500 12.00 TC-53 bor main pile

2465 7-Jan-16 3031 Ǿ500 12.00 TC-53 bor main pile

2466 7-Jan-16 3032 Ǿ500 12.00 TC-53 bor main pile

2467 7-Jan-16 3033 Ǿ500 12.00 TC-53 bor main pile

2468 7-Jan-16 3034 Ǿ500 12.00 TC-53 bor main pile

2469 7-Jan-16 1930 Ǿ500 12.00 TC-53 bor main pile

2470 7-Jan-16 1894 Ǿ500 12.00 TC-53 bor main pile

2471 7-Jan-16 1895 Ǿ500 12.00 TC-53 bor main pile

2472 7-Jan-16 3006 Ǿ500 12.00 TC-53 bor main pile

2473 7-Jan-16 3007 Ǿ500 12.00 TC-53 bor main pile

2474 7-Jan-16 3035 Ǿ500 12.00 TC-53 bor main pile

2475 8-Jan-16 2886 Ǿ500 12.00 TC-19 bor main pile

2476 8-Jan-16 2887 Ǿ500 12.00 TC-19 bor main pile

2477 8-Jan-16 2884 Ǿ500 12.00 TC-19 bor main pile

2478 8-Jan-16 2885 Ǿ500 12.00 TC-19 bor main pile

2479 8-Jan-16 2882 Ǿ500 12.00 TC-19 bor main pile

2480 8-Jan-16 2883 Ǿ500 12.00 TC-19 bor main pile

2481 8-Jan-16 2843 Ǿ500 12.00 TC-19 bor main pile

2482 8-Jan-16 2842 Ǿ500 12.00 TC-19 bor main pile

2483 8-Jan-16 2841 Ǿ500 12.00 TC-19 bor main pile

2484 8-Jan-16 2840 Ǿ500 12.00 TC-19 bor main pile

2485 8-Jan-16 2844 Ǿ500 12.00 TC-19 bor main pile

2486 8-Jan-16 2845 Ǿ500 12.00 TC-19 bor main pile

2487 8-Jan-16 2846 Ǿ500 12.00 TC-19 bor main pile

2488 8-Jan-16 2847 Ǿ500 12.00 TC-19 bor main pile

2489 8-Jan-16 2850 Ǿ500 12.00 TC-19 bor main pile

2490 8-Jan-16 2851 Ǿ500 12.00 TC-19 bor main pile

2491 8-Jan-16 2852 Ǿ500 12.00 TC-19 bor main pile

2492 8-Jan-16 2853 Ǿ500 12.00 TC-19 bor main pile

2493 8-Jan-16 2854 Ǿ500 12.00 TC-19 bor main pile

2494 8-Jan-16 2855 Ǿ500 12.00 TC-19 bor main pile

2495 8-Jan-16 2856 Ǿ500 12.00 TC-19 bor main pile

2496 8-Jan-16 2857 Ǿ500 12.00 TC-19 bor main pile

2497 8-Jan-16 2858 Ǿ500 12.00 TC-19 bor main pile

2498 8-Jan-16 2859 Ǿ500 12.00 TC-19 bor main pile

2499 8-Jan-16 2860 Ǿ500 12.00 TC-19 bor main pile

2500 8-Jan-16 2861 Ǿ500 12.00 TC-19 bor main pile

2501 8-Jan-16 2888 Ǿ500 12.00 TC-19 bor main pile

2502 8-Jan-16 2889 Ǿ500 12.00 TC-19 bor main pile

2503 8-Jan-16 2890 Ǿ500 12.00 TC-19 bor main pile

2504 8-Jan-16 2891 Ǿ500 12.00 TC-19 bor main pile

2505 8-Jan-16 3046 Ǿ500 12.00 TC-53 bor main pile

2506 8-Jan-16 3047 Ǿ500 12.00 TC-53 bor main pile

2507 8-Jan-16 3048 Ǿ500 12.00 TC-53 bor main pile

2508 8-Jan-16 3049 Ǿ500 12.00 TC-53 bor main pile

2509 8-Jan-16 3050 Ǿ500 12.00 TC-53 bor main pile

2510 8-Jan-16 3051 Ǿ500 12.00 TC-53 bor main pile

2511 8-Jan-16 3054 Ǿ500 12.00 TC-53 bor main pile

2512 8-Jan-16 3056 Ǿ500 12.00 TC-53 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2513 8-Jan-16 3057 Ǿ500 12.00 TC-53 bor main pile

2514 8-Jan-16 3058 Ǿ500 12.00 TC-53 bor main pile

2515 8-Jan-16 3038 Ǿ500 12.00 TC-53 bor main pile

2516 8-Jan-16 3039 Ǿ500 12.00 TC-53 bor main pile

2517 8-Jan-16 3040 Ǿ500 12.00 TC-53 bor main pile

2518 8-Jan-16 3041 Ǿ500 12.00 TC-53 bor main pile

2519 8-Jan-16 3042 Ǿ500 12.00 TC-53 bor main pile

2520 8-Jan-16 3043 Ǿ500 12.00 TC-53 bor main pile

2521 8-Jan-16 3044 Ǿ500 12.00 TC-53 bor main pile

2522 8-Jan-16 3045 Ǿ500 12.00 TC-53 bor main pile

2523 8-Jan-16 1624 Ǿ500 12.00 TC-15 bor main pile

2524 8-Jan-16 1625 Ǿ500 12.00 TC-15 bor main pile

2525 8-Jan-16 1626 Ǿ500 12.00 TC-15 bor main pile

2526 8-Jan-16 1627 Ǿ500 12.00 TC-15 bor main pile

2527 8-Jan-16 1628 Ǿ500 12.00 TC-15 bor main pile

2528 8-Jan-16 1629 Ǿ500 12.00 TC-15 bor main pile

2529 8-Jan-16 1574 Ǿ500 12.00 TC-15 bor main pile

2530 8-Jan-16 1575 Ǿ500 12.00 TC-15 bor main pile

2531 8-Jan-16 1576 Ǿ500 12.00 TC-15 bor main pile

2532 8-Jan-16 1577 Ǿ500 12.00 TC-15 bor main pile

2533 8-Jan-16 1578 Ǿ500 12.00 TC-15 bor main pile

2534 8-Jan-16 1579 Ǿ500 12.00 TC-15 bor main pile

2535 8-Jan-16 1504 Ǿ500 12.00 TC-15 bor main pile

2536 8-Jan-16 1505 Ǿ500 12.00 TC-15 bor main pile

2537 8-Jan-16 1506 Ǿ500 12.00 TC-15 bor main pile

2538 8-Jan-16 1507 Ǿ500 12.00 TC-15 bor main pile

2539 8-Jan-16 1508 Ǿ500 12.00 TC-15 bor main pile

2540 8-Jan-16 1618 Ǿ500 12.00 TC-15 bor main pile

2541 8-Jan-16 1619 Ǿ500 12.00 TC-15 bor main pile

2542 8-Jan-16 1620 Ǿ500 12.00 TC-15 bor main pile

2543 8-Jan-16 1621 Ǿ500 12.00 TC-15 bor main pile

2544 8-Jan-16 1622 Ǿ500 12.00 TC-15 bor main pile

2545 8-Jan-16 1623 Ǿ500 12.00 TC-15 bor main pile

2546 8-Jan-16 1580 Ǿ500 12.00 TC-15 bor main pile

2547 8-Jan-16 1581 Ǿ500 12.00 TC-15 bor main pile

2548 8-Jan-16 1582 Ǿ500 12.00 TC-15 bor main pile

2549 8-Jan-16 1583 Ǿ500 12.00 TC-15 bor main pile

2550 8-Jan-16 1584 Ǿ500 12.00 TC-15 bor main pile

2551 8-Jan-16 1585 Ǿ500 12.00 TC-15 bor main pile

2552 8-Jan-16 1499 Ǿ500 12.00 TC-15 bor main pile

2553 8-Jan-16 1500 Ǿ500 12.00 TC-15 bor main pile

2554 8-Jan-16 1501 Ǿ500 12.00 TC-15 bor main pile

2555 8-Jan-16 1502 Ǿ500 12.00 TC-15 bor main pile

2556 8-Jan-16 1503 Ǿ500 12.00 TC-15 bor main pile

2557 11-Jan-16 3052 Ǿ500 12.00 TC-53 bor main pile

2558 11-Jan-16 3053 Ǿ500 12.00 TC-53 bor main pile

2559 11-Jan-16 3060 Ǿ500 12.00 TC-53 bor main pile

2560 11-Jan-16 3061 Ǿ500 12.00 TC-53 bor main pile

2561 11-Jan-16 3062 Ǿ500 12.00 TC-53 bor main pile

2562 11-Jan-16 3063 Ǿ500 12.00 TC-53 bor main pile

2563 11-Jan-16 3064 Ǿ500 12.00 TC-53 bor main pile

2564 11-Jan-16 3065 Ǿ500 12.00 TC-53 bor main pile

2565 11-Jan-16 3068 Ǿ500 12.00 TC-53 bor main pile

2566 11-Jan-16 3069 Ǿ500 12.00 TC-53 bor main pile

2567 11-Jan-16 3071 Ǿ500 12.00 TC-53 bor main pile

2568 11-Jan-16 3070 Ǿ500 12.00 TC-53 bor main pile

2569 11-Jan-16 2930 Ǿ500 12.00 TC-53 bor main pile

2570 11-Jan-16 2931 Ǿ500 12.00 TC-53 bor main pile

2571 11-Jan-16 2936 Ǿ500 12.00 TC-53 bor main pile

2572 11-Jan-16 2937 Ǿ500 12.00 TC-53 bor main pile

2573 11-Jan-16 2940 Ǿ500 12.00 TC-53 bor main pile

2574 11-Jan-16 2941 Ǿ500 12.00 TC-53 bor main pile

2575 11-Jan-16 2942 Ǿ500 12.00 TC-53 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2576 11-Jan-16 2943 Ǿ500 12.00 TC-53 bor main pile

2577 11-Jan-16 3164 Ǿ500 12.00 TC-53 bor main pile

2578 11-Jan-16 3165 Ǿ500 12.00 TC-53 bor main pile

2579 11-Jan-16 3036 Ǿ500 12.00 TC-53 bor main pile

2580 11-Jan-16 3037 Ǿ500 12.00 TC-53 bor main pile

2581 13-Jan-16 3066 Ǿ500 12.00 TI-53 bor main pile

2582 13-Jan-16 3067 Ǿ500 12.00 TI-53 bor main pile

2583 13-Jan-16 3072 Ǿ500 12.00 TI-53 bor main pile

2584 13-Jan-16 3073 Ǿ500 12.00 TI-53 bor main pile

2585 13-Jan-16 3074 Ǿ500 12.00 TI-53 bor main pile

2586 13-Jan-16 3075 Ǿ500 12.00 TI-53 bor main pile

2587 13-Jan-16 3076 Ǿ500 12.00 TI-53 bor main pile

2588 13-Jan-16 3077 Ǿ500 12.00 TI-53 bor main pile

2589 13-Jan-16 3078 Ǿ500 12.00 TI-53 bor main pile

2590 13-Jan-16 3079 Ǿ500 12.00 TI-53 bor main pile

2591 13-Jan-16 3080 Ǿ500 12.00 TI-53 bor main pile

2592 13-Jan-16 3081 Ǿ500 12.00 TI-53 bor main pile

2593 13-Jan-16 3082 Ǿ500 12.00 TI-53 bor main pile

2594 13-Jan-16 3083 Ǿ500 12.00 TI-53 bor main pile

2595 13-Jan-16 3084 Ǿ500 12.00 TI-53 bor main pile

2596 13-Jan-16 3085 Ǿ500 12.00 TI-53 bor main pile

2597 13-Jan-16 3086 Ǿ500 12.00 TI-53 bor main pile

2598 13-Jan-16 3087 Ǿ500 12.00 TI-53 bor main pile

2599 13-Jan-16 3088 Ǿ500 12.00 TI-53 bor main pile

2600 13-Jan-16 3089 Ǿ500 12.00 TI-53 bor main pile

2601 13-Jan-16 3090 Ǿ500 12.00 TI-53 bor main pile

2602 13-Jan-16 3091 Ǿ500 12.00 TI-53 bor main pile

2603 13-Jan-16 3092 Ǿ500 12.00 TI-53 bor main pile

2604 13-Jan-16 3093 Ǿ500 12.00 TI-53 bor main pile

2605 13-Jan-16 3094 Ǿ500 12.00 TI-53 bor main pile

2606 13-Jan-16 3095 Ǿ500 12.00 TI-53 bor main pile

2607 13-Jan-16 3096 Ǿ500 12.00 TI-53 bor main pile

2608 13-Jan-16 3097 Ǿ500 12.00 TI-53 bor main pile

2609 13-Jan-16 3098 Ǿ500 12.00 TI-53 bor main pile

2610 13-Jan-16 3099 Ǿ500 12.00 TI-53 bor main pile

2611 13-Jan-16 3100 Ǿ500 12.00 TI-53 bor main pile

2612 13-Jan-16 3101 Ǿ500 12.00 TI-53 bor main pile

2613 13-Jan-16 3102 Ǿ500 12.00 TI-53 bor main pile

2614 13-Jan-16 3103 Ǿ500 12.00 TI-53 bor main pile

2615 13-Jan-16 3104 Ǿ500 12.00 TI-53 bor main pile

2616 13-Jan-16 3105 Ǿ500 12.00 TI-53 bor main pile

2617 13-Jan-16 3106 Ǿ500 12.00 TI-53 bor main pile

2618 13-Jan-16 3107 Ǿ500 12.00 TI-53 bor main pile

2619 13-Jan-16 3116 Ǿ500 12.00 TI-15 bor main pile

2620 13-Jan-16 3117 Ǿ500 12.00 TI-15 bor main pile

2621 13-Jan-16 3118 Ǿ500 12.00 TI-15 bor main pile

2622 13-Jan-16 3119 Ǿ500 12.00 TI-15 bor main pile

2623 13-Jan-16 3120 Ǿ500 12.00 TI-15 bor main pile

2624 13-Jan-16 3121 Ǿ500 12.00 TI-15 bor main pile

2625 13-Jan-16 3122 Ǿ500 12.00 TI-15 bor main pile

2626 13-Jan-16 3123 Ǿ500 12.00 TI-15 bor main pile

2627 13-Jan-16 3124 Ǿ500 12.00 TI-15 bor main pile

2628 13-Jan-16 3125 Ǿ500 12.00 TI-15 bor main pile

2629 13-Jan-16 3126 Ǿ500 12.00 TI-15 bor main pile

2630 13-Jan-16 3127 Ǿ500 12.00 TI-15 bor main pile

2631 13-Jan-16 3128 Ǿ500 12.00 TI-15 bor main pile

2632 13-Jan-16 3129 Ǿ500 12.00 TI-15 bor main pile

2633 13-Jan-16 3130 Ǿ500 12.00 TI-15 bor main pile

2634 13-Jan-16 3131 Ǿ500 12.00 TI-15 bor main pile

2635 13-Jan-16 3132 Ǿ500 12.00 TI-15 bor main pile

2636 13-Jan-16 3133 Ǿ500 12.00 TI-15 bor main pile

2637 13-Jan-16 3134 Ǿ500 12.00 TI-15 bor main pile

2638 13-Jan-16 3135 Ǿ500 12.00 TI-15 bor main pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2639 13-Jan-16 3136 Ǿ500 12.00 TI-15 bor main pile

2640 13-Jan-16 3137 Ǿ500 12.00 TI-15 bor main pile

2641 13-Jan-16 3138 Ǿ500 12.00 TI-15 bor main pile

2642 13-Jan-16 3139 Ǿ500 12.00 TI-15 bor main pile

2643 13-Jan-16 3140 Ǿ500 12.00 TI-15 bor main pile

2644 13-Jan-16 3141 Ǿ500 12.00 TI-15 bor main pile

2645 13-Jan-16 3142 Ǿ500 12.00 TI-15 bor main pile

2646 13-Jan-16 3143 Ǿ500 12.00 TI-15 bor main pile

2647 13-Jan-16 3144 Ǿ500 12.00 TI-15 bor main pile

2648 13-Jan-16 3145 Ǿ500 12.00 TI-15 bor main pile

2649 13-Jan-16 3146 Ǿ500 12.00 TI-15 bor main pile

2650 13-Jan-16 3147 Ǿ500 12.00 TI-15 bor main pile

2651 13-Jan-16 3148 Ǿ500 12.00 TI-15 bor main pile

2652 13-Jan-16 3149 Ǿ500 12.00 TI-15 bor main pile

2653 15-Jan-16 3150 Ǿ500 12.00 TI-15 bor main pile

2654 15-Jan-16 3151 Ǿ500 12.00 TI-15 bor main pile

2655 15-Jan-16 3152 Ǿ500 12.00 TI-15 bor main pile

2656 15-Jan-16 3153 Ǿ500 12.00 TI-15 bor main pile

2657 15-Jan-16 3154 Ǿ500 12.00 TI-15 bor main pile

2658 15-Jan-16 3155 Ǿ500 12.00 TI-15 bor main pile

2659 15-Jan-16 3108 Ǿ500 12.00 TI-15 bor main pile

2660 15-Jan-16 3109 Ǿ500 12.00 TI-15 bor main pile

2661 15-Jan-16 3110 Ǿ500 12.00 TI-15 bor main pile

2662 15-Jan-16 3111 Ǿ500 12.00 TI-15 bor main pile

2663 15-Jan-16 3112 Ǿ500 12.00 TI-15 bor main pile

2664 15-Jan-16 3113 Ǿ500 12.00 TI-15 bor main pile

2665 15-Jan-16 3114 Ǿ500 12.00 TI-15 bor main pile

2666 15-Jan-16 3115 Ǿ500 12.00 TI-15 bor main pile

2667 15-Jan-16 3156 Ǿ500 12.00 TI-15 bor main pile

2668 15-Jan-16 3157 Ǿ500 12.00 TI-15 bor main pile

2669 15-Jan-16 3158 Ǿ500 12.00 TI-15 bor main pile

2670 15-Jan-16 3159 Ǿ500 12.00 TI-15 bor main pile

2671 15-Jan-16 3160 Ǿ500 12.00 TI-15 bor main pile

2672 15-Jan-16 3162 Ǿ500 12.00 TI-15 bor main pile

2673 15-Jan-16 3163 Ǿ500 12.00 TI-15 bor main pile

2674 20-Jan-16 1021 Ǿ600 12.00 TI-15 Bor MP office

2675 20-Jan-16 1020 Ǿ600 12.00 TI-15 Bor MP office

2676 20-Jan-16 1019 Ǿ600 12.00 TI-15 Bor MP office

2677 20-Jan-16 1018 Ǿ600 12.00 TI-15 Bor MP office

2678 20-Jan-16 1017 Ǿ600 12.00 TI-15 Bor MP office

2679 20-Jan-16 1016 Ǿ600 12.00 TI-15 Bor MP office

2680 20-Jan-16 1015 Ǿ600 12.00 TI-15 Bor MP office

2681 20-Jan-16 1014 Ǿ600 12.00 TI-15 Bor MP office

2682 20-Jan-16 1013 Ǿ600 12.00 TI-15 Bor MP office

2683 20-Jan-16 1012 Ǿ600 12.00 TI-15 Bor MP office

2684 20-Jan-16 1011 Ǿ600 12.00 TI-15 Bor MP office

2685 20-Jan-16 1010 Ǿ600 12.00 TI-15 Bor MP office

2686 20-Jan-16 1009 Ǿ600 12.00 TI-15 Bor MP office

2687 20-Jan-16 1039 Ǿ600 12.00 TI-15 Bor MP office

2688 20-Jan-16 1038 Ǿ600 12.00 TI-15 Bor MP office

2689 20-Jan-16 1037 Ǿ600 12.00 TI-15 Bor MP office

2690 20-Jan-16 1036 Ǿ600 12.00 TI-15 Bor MP office

2691 20-Jan-16 1035 Ǿ600 12.00 TI-15 Bor MP office

2692 20-Jan-16 1034 Ǿ600 12.00 TI-15 Bor MP office

2693 20-Jan-16 1033 Ǿ600 12.00 TI-15 Bor MP office

2694 20-Jan-16 1032 Ǿ600 12.00 TI-15 Bor MP office

2695 20-Jan-16 1031 Ǿ600 12.00 TI-15 Bor MP office

2696 20-Jan-16 1030 Ǿ600 12.00 TI-15 Bor MP office

2697 20-Jan-16 1029 Ǿ600 12.00 TI-15 Bor MP office

2698 20-Jan-16 1028 Ǿ600 12.00 TI-15 Bor MP office

2699 20-Jan-16 1051 Ǿ600 12.00 TI-15 Bor MP office

2700 20-Jan-16 1050 Ǿ600 12.00 TI-15 Bor MP office

2701 20-Jan-16 1049 Ǿ600 12.00 TI-15 Bor MP office


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2702 20-Jan-16 1048 Ǿ600 12.00 TI-15 Bor MP office

2703 20-Jan-16 1047 Ǿ600 12.00 TI-15 Bor MP office

2704 20-Jan-16 1046 Ǿ600 12.00 TI-15 Bor MP office

2705 20-Jan-16 1045 Ǿ600 12.00 TI-15 Bor MP office

2706 20-Jan-16 1044 Ǿ600 12.00 TI-15 Bor MP office

2707 20-Jan-16 1043 Ǿ600 12.00 TI-15 Bor MP office

2708 20-Jan-16 1042 Ǿ600 12.00 TI-15 Bor MP office

2709 20-Jan-16 1041 Ǿ600 12.00 TI-15 Bor MP office

2710 20-Jan-16 1040 Ǿ600 12.00 TI-15 Bor MP office

2711 23-Jan-16 1074 Ǿ600 - 12.00 TI-15 Bor MP office

2712 23-Jan-16 1073 Ǿ600 - 12.00 TI-15 Bor MP office

2713 23-Jan-16 1071 Ǿ600 - 12.00 TI-15 Bor MP office

2714 23-Jan-16 1070 Ǿ600 - 12.00 TI-15 Bor MP office

2715 23-Jan-16 1069 Ǿ600 - 12.00 TI-15 Bor MP office

2716 23-Jan-16 1068 Ǿ600 - 12.00 TI-15 Bor MP office

2717 23-Jan-16 1067 Ǿ600 - 12.00 TI-15 Bor MP office

2718 23-Jan-16 1066 Ǿ600 - 12.00 TI-15 Bor MP office

2719 23-Jan-16 1065 Ǿ600 - 12.00 TI-15 Bor MP office

2720 23-Jan-16 1064 Ǿ600 - 12.00 TI-15 Bor MP office

2721 23-Jan-16 1063 Ǿ600 - 12.00 TI-15 Bor MP office

2722 23-Jan-16 1062 Ǿ600 - 12.00 TI-15 Bor MP office

2723 23-Jan-16 1061 Ǿ600 - 12.00 TI-15 Bor MP office

2724 23-Jan-16 1060 Ǿ600 - 12.00 TI-15 Bor MP office

2725 23-Jan-16 1059 Ǿ600 - 12.00 TI-15 Bor MP office

2726 23-Jan-16 1058 Ǿ600 - 12.00 TI-15 Bor MP office

2727 23-Jan-16 1057 Ǿ600 - 12.00 TI-15 Bor MP office

2728 23-Jan-16 1056 Ǿ600 - 12.00 TI-15 Bor MP office

2729 23-Jan-16 1055 Ǿ600 - 12.00 TI-15 Bor MP office

2730 23-Jan-16 1054 Ǿ600 - 12.00 TI-15 Bor MP office

2731 23-Jan-16 1053 Ǿ600 - 12.00 TI-15 Bor MP office

2732 23-Jan-16 1052 Ǿ600 - 12.00 TI-15 Bor MP office

2733 26-Jan-16 2848 Ǿ500 12.00 TC-53 Bor MP office

2734 26-Jan-16 2849 Ǿ500 12.00 TC-53 Bor MP office

2735 26-Jan-16 2839 Ǿ500 12.00 TC-53 Bor MP office

2736 26-Jan-16 2838 Ǿ500 12.00 TC-53 Bor MP office

2737 26-Jan-16 2984 Ǿ500 12.00 TC-53 Bor MP office

2738 26-Jan-16 2895 Ǿ500 12.00 TC-53 Bor MP office

2739 26-Jan-16 1075 Ǿ500 12.00 TC-53 Bor MP office

2740 26-Jan-16 1076 Ǿ500 12.00 TC-53 Bor MP office

2741 26-Jan-16 1077 Ǿ500 12.00 TC-53 Bor MP office

2742 26-Jan-16 1078 Ǿ500 12.00 TC-53 Bor MP office

2743 26-Jan-16 1079 Ǿ500 12.00 TC-53 Bor MP office

2744 26-Jan-16 1080 Ǿ500 12.00 TC-53 Bor MP office

2745 26-Jan-16 1081 Ǿ500 12.00 TC-53 Bor MP office

2746 26-Jan-16 1082 Ǿ500 12.00 TC-53 Bor MP office

2747 26-Jan-16 1083 Ǿ500 12.00 TC-53 Bor MP office

2748 26-Jan-16 1084 Ǿ500 12.00 TC-53 Bor MP office

2749 26-Jan-16 1085 Ǿ500 12.00 TC-53 Bor MP office

2750 26-Jan-16 1086 Ǿ500 12.00 TC-53 Bor MP office

2751 26-Jan-16 1087 Ǿ500 12.00 TC-53 Bor MP office

2752 26-Jan-16 1088 Ǿ500 12.00 TC-53 Bor MP office

2753 26-Jan-16 1089 Ǿ500 12.00 TC-53 Bor MP office

2754 26-Jan-16 1090 Ǿ500 12.00 TC-53 Bor MP office

2755 26-Jan-16 1091 Ǿ500 12.00 TC-53 Bor MP office

2756 26-Jan-16 1092 Ǿ500 12.00 TC-53 Bor MP office

2757 26-Jan-16 1093 Ǿ500 12.00 TC-53 Bor MP office

2758 26-Jan-16 1094 Ǿ500 12.00 TC-53 Bor MP office

2759 26-Jan-16 1095 Ǿ500 12.00 TC-53 Bor MP office

2760 26-Jan-16 1096 Ǿ500 12.00 TC-53 Bor MP office

2761 26-Jan-16 1097 Ǿ500 12.00 TC-53 Bor MP office

2762 26-Jan-16 1098 Ǿ500 12.00 TC-53 Bor MP office

2763 26-Jan-16 1099 Ǿ500 12.00 TC-53 Bor MP office

2764 26-Jan-16 1100 Ǿ500 12.00 TC-53 Bor MP office


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2765 26-Jan-16 1101 Ǿ500 12.00 TC-53 Bor MP office

2766 26-Jan-16 1102 Ǿ500 12.00 TC-53 Bor MP office

2767 26-Jan-16 1103 Ǿ500 12.00 TC-53 Bor MP office

2768 26-Jan-16 1104 Ǿ500 12.00 TC-53 Bor MP office

2769 26-Jan-16 1105 Ǿ500 12.00 TC-53 Bor MP office

2770 26-Jan-16 1106 Ǿ500 12.00 TC-53 Bor MP office

2771 26-Jan-16 1107 Ǿ500 12.00 TC-53 Bor MP office

2772 1-Feb-16 1108 Ǿ500 12.00 TC-53 Bor MP office

2773 1-Feb-16 1109 Ǿ500 12.00 TC-53 Bor MP office

2774 1-Feb-16 1110 Ǿ500 12.00 TC-53 Bor MP office

2775 1-Feb-16 1111 Ǿ500 12.00 TC-53 Bor MP office

2776 1-Feb-16 1112 Ǿ500 12.00 TC-53 Bor MP office

2777 1-Feb-16 1113 Ǿ500 12.00 TC-53 Bor MP office

2778 1-Feb-16 1114 Ǿ500 12.00 TC-53 Bor MP office

2779 1-Feb-16 1115 Ǿ500 12.00 TC-53 Bor MP office

2780 1-Feb-16 1116 Ǿ500 12.00 TC-53 Bor MP office

2781 1-Feb-16 1117 Ǿ500 12.00 TC-53 Bor MP office

2782 1-Feb-16 1118 Ǿ500 12.00 TC-53 Bor MP office

2783 1-Feb-16 1119 Ǿ500 12.00 TC-53 Bor MP office

2784 1-Feb-16 1120 Ǿ500 12.00 TC-53 Bor MP office

2785 1-Feb-16 1121 Ǿ500 12.00 TC-53 Bor MP office

2786 1-Feb-16 1122 Ǿ500 12.00 TC-53 Bor MP office

2787 1-Feb-16 1123 Ǿ500 12.00 TC-53 Bor MP office

2788 1-Feb-16 1124 Ǿ500 12.00 TC-53 Bor MP office

2789 1-Feb-16 1125 Ǿ500 12.00 TC-53 Bor MP office

2790 1-Feb-16 1126 Ǿ500 12.00 TC-53 Bor MP office

2791 1-Feb-16 1127 Ǿ500 12.00 TC-53 Bor MP office

2792 1-Feb-16 1128 Ǿ500 12.00 TC-53 Bor MP office

2793 1-Feb-16 1129 Ǿ500 12.00 TC-53 Bor MP office

2794 1-Feb-16 1130 Ǿ500 12.00 TC-53 Bor MP office

2795 1-Feb-16 1131 Ǿ500 12.00 TC-53 Bor MP office

2796 1-Feb-16 1132 Ǿ500 12.00 TC-53 Bor MP office

2797 1-Feb-16 1133 Ǿ500 12.00 TC-53 Bor MP office

2798 1-Feb-16 1134 Ǿ500 12.00 TC-53 Bor MP office

2799 1-Feb-16 1135 Ǿ500 12.00 TC-53 Bor MP office

2800 1-Feb-16 1136 Ǿ500 12.00 TC-53 Bor MP office

2801 1-Feb-16 1137 Ǿ500 12.00 TC-53 Bor MP office

2802 1-Feb-16 1138 Ǿ500 12.00 TC-53 Bor MP office

2803 1-Feb-16 1139 Ǿ500 12.00 TC-53 Bor MP office

2804 1-Feb-16 1140 Ǿ500 12.00 TC-53 Bor MP office

2805 1-Feb-16 1141 Ǿ500 12.00 TC-53 Bor MP office

2806 1-Feb-16 1142 Ǿ500 12.00 TC-53 Bor MP office

2807 1-Feb-16 1144 Ǿ500 12.00 TC-53 Bor MP office

2808 1-Feb-16 1145 Ǿ500 12.00 TC-53 Bor MP office

2809 1-Feb-16 1146 Ǿ500 12.00 TC-53 Bor MP office

2810 1-Feb-16 1147 Ǿ500 12.00 TC-53 Bor MP office

2811 1-Feb-16 1148 Ǿ500 12.00 TC-53 Bor MP office

2812 1-Feb-16 1149 Ǿ500 12.00 TC-53 Bor MP office

2813 1-Feb-16 1150 Ǿ500 12.00 TC-53 Bor MP office

2814 1-Feb-16 1151 Ǿ500 12.00 TC-53 Bor MP office

2815 1-Feb-16 1152 Ǿ500 12.00 TC-53 Bor MP office

2816 1-Feb-16 1153 Ǿ500 12.00 TC-53 Bor MP office

2817 1-Feb-16 1154 Ǿ500 12.00 TC-53 Bor MP office

2818 1-Feb-16 1155 Ǿ500 12.00 TC-53 Bor MP office

2819 1-Feb-16 1156 Ǿ500 12.00 TC-53 Bor MP office

2820 1-Feb-16 1158 Ǿ500 12.00 TC-53 Bor MP office

2821 1-Feb-16 1159 Ǿ500 12.00 TC-53 Bor MP office

2822 1-Feb-16 1160 Ǿ500 12.00 TC-53 Bor MP office

2823 1-Feb-16 1161 Ǿ500 12.00 TC-53 Bor MP office

2824 1-Feb-16 1162 Ǿ500 12.00 TC-53 Bor MP office

2825 19-Feb-16 1163 Ǿ500 12.00 TC-15 Bor MP office

2826 19-Feb-16 1164 Ǿ500 12.00 TC-15 Bor MP office

2827 19-Feb-16 1165 Ǿ500 12.00 TC-15 Bor MP office


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2828 19-Feb-16 1166 Ǿ500 12.00 TC-15 Bor MP office

2829 19-Feb-16 1167 Ǿ500 12.00 TC-15 Bor MP office

2830 19-Feb-16 1168 Ǿ500 12.00 TC-15 Bor MP office

2831 19-Feb-16 1169 Ǿ500 12.00 TC-15 Bor MP office

2832 19-Feb-16 1170 Ǿ500 12.00 TC-15 Bor MP office

2833 19-Feb-16 1171 Ǿ500 12.00 TC-15 Bor MP office

2834 19-Feb-16 1172 Ǿ500 12.00 TC-15 Bor MP office

2835 19-Feb-16 1173 Ǿ500 12.00 TC-15 Bor MP office

2836 19-Feb-16 1174 Ǿ500 12.00 TC-15 Bor MP office

2837 19-Feb-16 1175 Ǿ500 12.00 TC-15 Bor MP office

2838 19-Feb-16 1176 Ǿ500 12.00 TC-15 Bor MP office

2839 19-Feb-16 1177 Ǿ500 12.00 TC-15 Bor MP office

2840 19-Feb-16 1178 Ǿ500 12.00 TC-15 Bor MP office

2841 19-Feb-16 1179 Ǿ500 12.00 TC-15 Bor MP office

2842 19-Feb-16 1180 Ǿ500 12.00 TC-15 Bor MP office

2843 19-Feb-16 1181 Ǿ500 12.00 TC-15 Bor MP office

2844 19-Feb-16 1182 Ǿ500 12.00 TC-15 Bor MP office

2845 19-Feb-16 1183 Ǿ500 12.00 TC-15 Bor MP office

2846 19-Feb-16 1184 Ǿ500 12.00 TC-15 Bor MP office

2847 19-Feb-16 1185 Ǿ500 12.00 TC-15 Bor MP office

2848 19-Feb-16 1186 Ǿ500 12.00 TC-15 Bor MP office

2849 19-Feb-16 1187 Ǿ500 12.00 TC-15 Bor MP office

2850 19-Feb-16 1188 Ǿ500 12.00 TC-15 Bor MP office

2851 19-Feb-16 1189 Ǿ500 12.00 TC-15 Bor MP office

2852 19-Feb-16 1190 Ǿ500 12.00 TC-15 Bor MP office

2853 19-Feb-16 1191 Ǿ500 12.00 TC-15 Bor MP office

2854 19-Feb-16 1192 Ǿ500 12.00 TC-15 Bor MP office

2855 19-Feb-16 1193 Ǿ500 12.00 TC-15 Bor MP office

2856 19-Feb-16 1194 Ǿ500 12.00 TC-15 Bor MP office

2857 19-Feb-16 1195 Ǿ500 12.00 TC-15 Bor MP office

2858 19-Feb-16 1196 Ǿ500 12.00 TC-15 Bor MP office

2859 19-Feb-16 1197 Ǿ500 12.00 TC-15 Bor MP office

2860 19-Feb-16 1198 Ǿ500 12.00 TC-15 Bor MP office

2861 19-Feb-16 1199 Ǿ500 12.00 TC-15 Bor MP office

2862 19-Feb-16 1200 Ǿ500 12.00 TC-15 Bor MP office

2863 19-Feb-16 1201 Ǿ500 12.00 TC-15 Bor MP office

2864 19-Feb-16 1202 Ǿ500 12.00 TC-15 Bor MP office

2865 19-Feb-16 1203 Ǿ500 12.00 TC-15 Bor MP office

2866 19-Feb-16 1204 Ǿ500 12.00 TC-15 Bor MP office

2867 19-Feb-16 1205 Ǿ500 12.00 TC-15 Bor MP office

2868 19-Feb-16 1206 Ǿ500 12.00 TC-15 Bor MP office

2869 19-Feb-16 1207 Ǿ500 12.00 TC-15 Bor MP office

2870 19-Feb-16 1208 Ǿ500 12.00 TC-15 Bor MP office

2871 19-Feb-16 1209 Ǿ500 12.00 TC-15 Bor MP office

2872 19-Feb-16 1210 Ǿ500 12.00 TC-15 Bor MP office

2873 19-Feb-16 1211 Ǿ500 12.00 TC-15 Bor MP office

2874 19-Feb-16 1212 Ǿ500 12.00 TC-15 Bor MP office

2875 19-Feb-16 1213 Ǿ500 12.00 TC-15 Bor MP office

2876 19-Feb-16 1214 Ǿ500 12.00 TC-15 Bor MP office

2877 19-Feb-16 1215 Ǿ500 12.00 TC-15 Bor MP office

2878 19-Feb-16 1216 Ǿ500 12.00 TC-15 Bor MP office

2879 19-Feb-16 1217 Ǿ500 12.00 TC-15 Bor MP office

2880 19-Feb-16 2834 Ǿ500 12.00 TC-15 Bor tention


2881 19-Feb-16 2835 Ǿ500 12.00 TC-15 Bor tention
2882 19-Feb-16 2836 Ǿ500 12.00 TC-15 Bor tention
2883 19-Feb-16 2837 Ǿ500 12.00 TC-15 Bor tention
2884 26-Feb-16 1218 Ǿ500 12.00 TC-15 Bor MP office

2885 26-Feb-16 1219 Ǿ500 12.00 TC-15 Bor MP office

2886 26-Feb-16 1220 Ǿ500 12.00 TC-15 Bor MP office

2887 26-Feb-16 1221 Ǿ500 12.00 TC-15 Bor MP office

2888 26-Feb-16 1222 Ǿ500 12.00 TC-15 Bor MP office

2889 26-Feb-16 1223 Ǿ500 12.00 TC-15 Bor MP office

2890 26-Feb-16 1224 Ǿ500 12.00 TC-15 Bor MP office


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2891 26-Feb-16 1225 Ǿ500 12.00 TC-15 Bor MP office

2892 26-Feb-16 1226 Ǿ500 12.00 TC-15 Bor MP office

2893 26-Feb-16 1227 Ǿ500 12.00 TC-15 Bor MP office

2894 26-Feb-16 1228 Ǿ500 12.00 TC-15 Bor MP office

2895 26-Feb-16 1229 Ǿ500 12.00 TC-15 Bor MP office

2896 26-Feb-16 1230 Ǿ500 12.00 TC-15 Bor MP office

2897 26-Feb-16 1231 Ǿ500 12.00 TC-15 Bor MP office

2898 26-Feb-16 1232 Ǿ500 12.00 TC-15 Bor MP office

2899 26-Feb-16 1233 Ǿ500 12.00 TC-15 Bor MP office

2900 26-Feb-16 1234 Ǿ500 12.00 TC-15 Bor MP office

2901 26-Feb-16 1235 Ǿ500 12.00 TC-15 Bor MP office

2902 26-Feb-16 1236 Ǿ500 12.00 TC-15 Bor MP office

2903 26-Feb-16 1237 Ǿ500 12.00 TC-15 Bor MP office

2904 26-Feb-16 1238 Ǿ500 12.00 TC-15 Bor MP office

2905 26-Feb-16 1239 Ǿ500 12.00 TC-15 Bor MP office

2906 26-Feb-16 1240 Ǿ500 12.00 TC-15 Bor MP office

2907 26-Feb-16 1241 Ǿ500 12.00 TC-15 Bor MP office

2908 26-Feb-16 1242 Ǿ500 12.00 TC-15 Bor MP office

2909 26-Feb-16 1243 Ǿ500 12.00 TC-15 Bor MP office

2910 26-Feb-16 1244 Ǿ500 12.00 TC-15 Bor MP office

2911 26-Feb-16 1245 Ǿ500 12.00 TC-15 Bor MP office

2912 26-Feb-16 1246 Ǿ500 12.00 TC-15 Bor MP office

2913 26-Feb-16 1247 Ǿ500 12.00 TC-15 Bor MP office

2914 26-Feb-16 1248 Ǿ500 12.00 TC-15 Bor MP office

2915 26-Feb-16 1249 Ǿ500 12.00 TC-15 Bor MP office

2916 26-Feb-16 1250 Ǿ500 12.00 TC-15 Bor MP office

2917 26-Feb-16 1251 Ǿ500 12.00 TC-15 Bor MP office

2918 26-Feb-16 1252 Ǿ500 12.00 TC-15 Bor MP office

2919 26-Feb-16 1253 Ǿ500 12.00 TC-15 Bor MP office

2920 26-Feb-16 1254 Ǿ500 12.00 TC-15 Bor MP office

2921 26-Feb-16 1255 Ǿ500 12.00 TC-15 Bor MP office

2922 26-Feb-16 1256 Ǿ500 12.00 TC-15 Bor MP office

2923 26-Feb-16 1257 Ǿ500 12.00 TC-15 Bor MP office

2924 26-Feb-16 1258 Ǿ500 12.00 TC-15 Bor MP office

2925 26-Feb-16 1259 Ǿ500 12.00 TC-15 Bor MP office

2926 26-Feb-16 1260 Ǿ500 12.00 TC-15 Bor MP office

2927 26-Feb-16 1261 Ǿ500 12.00 TC-15 Bor MP office

2928 15-Mar-16 1 Ǿ500 12.00 TC-15 Condo tower B

2929 15-Mar-16 2 Ǿ500 12.00 TC-15 Condo tower B

2930 15-Mar-16 3 Ǿ500 12.00 TC-15 Condo tower B

2931 15-Mar-16 4 Ǿ500 12.00 TC-15 Condo tower B

2932 15-Mar-16 5 Ǿ500 12.00 TC-15 Condo tower B

2933 15-Mar-16 6 Ǿ500 12.00 TC-15 Condo tower B

2934 15-Mar-16 7 Ǿ500 12.00 TC-15 Condo tower B

2935 15-Mar-16 8 Ǿ500 12.00 TC-15 Condo tower B

2936 15-Mar-16 9 Ǿ500 12.00 TC-15 Condo tower B

2937 15-Mar-16 10 Ǿ500 12.00 TC-15 Condo tower B

2938 15-Mar-16 11 Ǿ500 12.00 TC-15 Condo tower B

2939 15-Mar-16 12 Ǿ500 12.00 TC-15 Condo tower B

2940 15-Mar-16 24 Ǿ500 12.00 TC-15 Condo tower B

2941 15-Mar-16 25 Ǿ500 12.00 TC-15 Condo tower B

2942 15-Mar-16 49 Ǿ500 12.00 TC-15 Condo tower B

2943 15-Mar-16 50 Ǿ500 12.00 TC-15 Condo tower B

2944 15-Mar-16 73 Ǿ500 12.00 TC-15 Condo tower B

2945 15-Mar-16 74 Ǿ500 12.00 TC-15 Condo tower B

2946 15-Mar-16 97 Ǿ500 12.00 TC-15 Condo tower B

2947 15-Mar-16 98 Ǿ500 12.00 TC-15 Condo tower B

2948 17-Mar-16 121 Ǿ500 12.00 TC-15 Condo tower B

2949 17-Mar-16 122 Ǿ500 12.00 TC-15 Condo tower B

2950 17-Mar-16 145 Ǿ500 12.00 TC-15 Condo tower B

2951 17-Mar-16 146 Ǿ500 12.00 TC-15 Condo tower B

2952 17-Mar-16 169 Ǿ500 12.00 TC-15 Condo tower B

2953 17-Mar-16 170 Ǿ500 12.00 TC-15 Condo tower B


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

2954 17-Mar-16 217 Ǿ500 12.00 TC-15 Condo tower B

2955 17-Mar-16 218 Ǿ500 12.00 TC-15 Condo tower B

2956 17-Mar-16 193 Ǿ500 12.00 TC-15 Condo tower B

2957 17-Mar-16 194 Ǿ500 12.00 TC-15 Condo tower B

2958 22-Mar-16 30050 Ǿ500 12.00 TC-15 Condo tower A

2959 22-Mar-16 30001 Ǿ500 12.00 TC-15 Condo tower A

2960 22-Mar-16 30002 Ǿ500 12.00 TC-15 Condo tower A

2961 22-Mar-16 30003 Ǿ500 12.00 TC-15 Condo tower A

2962 22-Mar-16 30004 Ǿ500 12.00 TC-15 Condo tower A

2963 22-Mar-16 30005 Ǿ500 12.00 TC-15 Condo tower A

2964 22-Mar-16 30006 Ǿ500 12.00 TC-15 Condo tower A

2965 22-Mar-16 30007 Ǿ500 12.00 TC-15 Condo tower A

2966 22-Mar-16 30008 Ǿ500 12.00 TC-15 Condo tower A

2967 22-Mar-16 30009 Ǿ500 12.00 TC-15 Condo tower A

2968 22-Mar-16 30010 Ǿ500 12.00 TC-15 Condo tower A

2969 22-Mar-16 30011 Ǿ500 12.00 TC-15 Condo tower A

2970 22-Mar-16 30012 Ǿ500 12.00 TC-15 Condo tower A

2971 22-Mar-16 30013 Ǿ500 12.00 TC-15 Condo tower A

2972 22-Mar-16 30014 Ǿ500 12.00 TC-15 Condo tower A

2973 22-Mar-16 30015 Ǿ500 12.00 TC-15 Condo tower A

2974 22-Mar-16 30016 Ǿ500 12.00 TC-15 Condo tower A

2975 22-Mar-16 30017 Ǿ500 12.00 TC-15 Condo tower A

2976 22-Mar-16 30018 Ǿ500 12.00 TC-15 Condo tower A

2977 22-Mar-16 30019 Ǿ500 12.00 TC-15 Condo tower A

2978 22-Mar-16 30020 Ǿ500 12.00 TC-15 Condo tower A

2979 22-Mar-16 30021 Ǿ500 12.00 TC-15 Condo tower A

2980 22-Mar-16 30022 Ǿ500 12.00 TC-15 Condo tower A

2981 23-Mar-16 30023 Ǿ500 12.00 TC-15 Condo tower A

2982 23-Mar-16 30024 Ǿ500 12.00 TC-15 Condo tower A

2983 23-Mar-16 30025 Ǿ500 12.00 TC-15 Condo tower A

2984 23-Mar-16 30026 Ǿ500 12.00 TC-15 Condo tower A

2985 23-Mar-16 30027 Ǿ500 12.00 TC-15 Condo tower A

2986 23-Mar-16 30028 Ǿ500 12.00 TC-15 Condo tower A

2987 23-Mar-16 30029 Ǿ500 12.00 TC-15 Condo tower A

2988 23-Mar-16 30030 Ǿ500 12.00 TC-15 Condo tower A

2989 23-Mar-16 30031 Ǿ500 12.00 TC-15 Condo tower A

2990 23-Mar-16 30032 Ǿ500 12.00 TC-15 Condo tower A

2991 23-Mar-16 30033 Ǿ500 12.00 TC-15 Condo tower A

2992 23-Mar-16 30034 Ǿ500 12.00 TC-15 Condo tower A

2993 23-Mar-16 30035 Ǿ500 12.00 TC-15 Condo tower A

2994 23-Mar-16 30036 Ǿ500 12.00 TC-15 Condo tower A

2995 23-Mar-16 30037 Ǿ500 12.00 TC-15 Condo tower A

2996 23-Mar-16 30038 Ǿ500 12.00 TC-15 Condo tower A

2997 23-Mar-16 30039 Ǿ500 12.00 TC-15 Condo tower A

2998 23-Mar-16 30040 Ǿ500 12.00 TC-15 Condo tower A

2999 23-Mar-16 30041 Ǿ500 12.00 TC-15 Condo tower A

3000 23-Mar-16 30042 Ǿ500 12.00 TC-15 Condo tower A

3001 23-Mar-16 30043 Ǿ500 12.00 TC-15 Condo tower A

3002 23-Mar-16 30044 Ǿ500 12.00 TC-15 Condo tower A

3003 23-Mar-16 30045 Ǿ500 12.00 TC-15 Condo tower A

3004 23-Mar-16 30046 Ǿ500 12.00 TC-15 Condo tower A

3005 23-Mar-16 30047 Ǿ500 12.00 TC-15 Condo tower A

3006 23-Mar-16 30048 Ǿ500 12.00 TC-15 Condo tower A

3007 23-Mar-16 30049 Ǿ500 12.00 TC-15 Condo tower A

3008 4-May-16 Condo tower B 430 Ǿ500 12.00 TC-15 Condo tower B

3009 4-May-16 Condo tower B 431 Ǿ500 12.00 TC-15 Condo tower B

3010 4-May-16 Condo tower B 432 Ǿ500 12.00 TC-15 Condo tower B

3011 4-May-16 Condo tower B 433 Ǿ500 12.00 TC-15 Condo tower B

3012 4-May-16 Condo tower B 410 Ǿ500 12.00 TC-15 Condo tower B

3013 4-May-16 Condo tower B 409 Ǿ500 12.00 TC-15 Condo tower B

3014 4-May-16 Condo tower B 386 Ǿ500 12.00 TC-15 Condo tower B

3015 4-May-16 Condo tower B 385 Ǿ500 12.00 TC-15 Condo tower B

3016 4-May-16 Condo tower B 362 Ǿ500 12.00 TC-15 Condo tower B
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

3017 4-May-16 Condo tower B 361 Ǿ500 12.00 TC-15 Condo tower B

3018 4-May-16 Condo tower B 338 Ǿ500 12.00 TC-15 Condo tower B

3019 4-May-16 Condo tower B 337 Ǿ500 12.00 TC-15 Condo tower B

3020 4-May-16 Condo tower B 314 Ǿ500 12.00 TC-15 Condo tower B

3021 4-May-16 Condo tower B 313 Ǿ500 12.00 TC-15 Condo tower B

3022 4-May-16 Condo tower B 290 Ǿ500 12.00 TC-15 Condo tower B

3023 4-May-16 Condo tower B 289 Ǿ500 12.00 TC-15 Condo tower B

3024 4-May-16 Condo tower B 266 Ǿ500 12.00 TC-15 Condo tower B

3025 4-May-16 Condo tower B 265 Ǿ500 12.00 TC-15 Condo tower B

3026 4-May-16 Condo tower B 242 Ǿ500 12.00 TC-15 Condo tower B

3027 4-May-16 Condo tower B 241 Ǿ500 12.00 TC-15 Condo tower B

3028 4-May-16 Condo tower B 218 Ǿ500 12.00 TC-15 Condo tower B

3029 4-May-16 Condo tower B 217 Ǿ500 12.00 TC-15 Condo tower B

3030 4-May-16 Condo tower B 194 Ǿ500 12.00 TC-15 Condo tower B

3031 27-May-16 Bor Condo Tower B 363A Ǿ500 12.00 TC-15


3032 27-May-16 Bor Condo Tower B 360A Ǿ500 12.00 TC-15
3033 27-May-16 Bor Condo Tower B 337 Ǿ500 12.00 TC-15 bor ulang
3034 27-May-16 Bor Condo Tower B 314 Ǿ500 12.00 TC-15 bor ulang
3035 27-May-16 Bor Condo Tower B 312A Ǿ500 12.00 TC-15
3036 27-May-16 Bor Condo Tower B 291A Ǿ500 12.00 TC-15
3037 27-May-16 Bor Condo Tower B 288A Ǿ500 12.00 TC-15
3038 27-May-16 Bor Condo Tower B 267A Ǿ500 12.00 TC-15
3039 27-May-16 Bor Condo Tower B 264A Ǿ500 12.00 TC-15
3040 27-May-16 Bor Condo Tower B 243A Ǿ500 12.00 TC-15
3041 27-May-16 Bor Condo Tower B 218 Ǿ500 12.00 TC-15 bor ulang
3042 27-May-16 Bor Condo Tower B 217 Ǿ500 12.00 TC-15 bor ulang
3043 27-May-16 Bor Condo Tower B 194 Ǿ500 12.00 TC-15 bor ulang
3044 27-May-16 Bor Condo Tower B 192A Ǿ500 12.00 TC-15
3045 27-May-16 Bor Condo Tower B 171A Ǿ500 12.00 TC-15
3046 27-May-16 Bor Condo Tower B 168A Ǿ500 12.00 TC-15
3047 27-May-16 Bor Condo Tower B 147A Ǿ500 12.00 TC-15
3048 27-May-16 Bor Condo Tower B 144A Ǿ500 12.00 TC-15
3049 27-May-16 Bor Condo Tower B 123A Ǿ500 12.00 TC-15
3050 27-May-16 Bor Condo Tower B 120A Ǿ500 12.00 TC-15
3051 27-May-16 Bor Condo Tower B 99A Ǿ500 12.00 TC-15
3052 27-May-16 Bor Condo Tower B 30091 Ǿ500 12.00 TC-15 sisipan
3053 27-May-16 Bor Condo Tower B 75A Ǿ500 12.00 TC-15
3054 27-May-16 Bor Condo Tower B 72A Ǿ500 12.00 TC-15
3055 27-May-16 Bor Condo Tower B 51A Ǿ500 12.00 TC-15
3056 27-May-16 Bor Condo Tower B 48A Ǿ500 12.00 TC-15
3057 27-May-16 Bor Condo Tower B 26A Ǿ500 12.00 TC-15
3058 27-May-16 Bor Condo Tower B 23A Ǿ500 12.00 TC-15
3059 12-Jun-16 Condo tower B 56A Ǿ500 11.00 TC-15 Bor SLT
3060 12-Jun-16 Condo tower B 56B Ǿ500 11.00 TC-15 Bor SLT
3061 12-Jun-16 Condo tower B 56C Ǿ500 11.00 TC-15 Bor SLT
3062 12-Jun-16 Condo tower B 56D Ǿ500 11.00 TC-15 Bor SLT
3063 12-Jun-16 Condo tower B 56E Ǿ500 11.00 TC-15 Bor SLT
3064 12-Jun-16 Condo tower B 56F Ǿ500 11.00 TC-15 Bor SLT
3065 18-Jun-16 Condo tower A 30062 Ǿ500 12.00 TC-15 bor titik sisipan
3066 18-Jun-16 Condo tower A 30063 Ǿ500 12.00 TC-15 bor titik sisipan
3067 18-Jun-16 Condo tower A 30064 Ǿ500 12.00 TC-15 bor titik sisipan
3068 18-Jun-16 Condo tower A 30065 Ǿ500 12.00 TC-15 bor titik sisipan
3069 18-Jun-16 Condo tower A 30066 Ǿ500 12.00 TC-15 bor titik sisipan
3070 18-Jun-16 Condo tower A 30067 Ǿ500 12.00 TC-15 bor titik sisipan
3071 18-Jun-16 Condo tower A 30068 Ǿ500 12.00 TC-15 bor titik sisipan

TOTAL PREBORING 36882.00


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil
pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile pressu Rig REMARK
1 2 3 4 force
re
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : SOIL FLURRY / BORE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABA


Date : 05 AGUST'15 - 31 OKT'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1 2-Dec-15 1001 Ǿ500 12.00 TC-19 Bor MP office

2 2-Dec-15 1027 Ǿ500 12.00 TC-19 Bor MP office

3 2-Dec-15 1002 Ǿ500 12.00 TC-19 Bor MP office

4 2-Dec-15 1026 Ǿ500 12.00 TC-19 Bor MP office

5 2-Dec-15 1003 Ǿ500 12.00 TC-19 Bor MP office

6 2-Dec-15 1025 Ǿ500 12.00 TC-19 Bor MP office

7 2-Dec-15 1004 Ǿ500 12.00 TC-19 Bor MP office

8 2-Dec-15 1024 Ǿ500 12.00 TC-19 Bor MP office

9 2-Dec-15 1006 Ǿ500 12.00 TC-19 Bor MP office

10 2-Dec-15 1023 Ǿ500 12.00 TC-19 Bor MP office

11 2-Dec-15 1007 Ǿ500 12.00 TC-19 Bor MP office

12 2-Dec-15 1022 Ǿ500 12.00 TC-19 Bor MP office

13 2-Dec-15 1008 Ǿ500 12.00 TC-19 Bor MP office

14 20-Jan-16 1021 Ǿ600 12.00 TI-15 Bor MP office

15 20-Jan-16 1020 Ǿ600 12.00 TI-15 Bor MP office

16 20-Jan-16 1019 Ǿ600 12.00 TI-15 Bor MP office

17 20-Jan-16 1018 Ǿ600 12.00 TI-15 Bor MP office

18 20-Jan-16 1017 Ǿ600 12.00 TI-15 Bor MP office

19 20-Jan-16 1016 Ǿ600 12.00 TI-15 Bor MP office

20 20-Jan-16 1015 Ǿ600 12.00 TI-15 Bor MP office

21 20-Jan-16 1014 Ǿ600 12.00 TI-15 Bor MP office

22 20-Jan-16 1013 Ǿ600 12.00 TI-15 Bor MP office

23 20-Jan-16 1012 Ǿ600 12.00 TI-15 Bor MP office

24 20-Jan-16 1011 Ǿ600 12.00 TI-15 Bor MP office

25 20-Jan-16 1010 Ǿ600 12.00 TI-15 Bor MP office

26 20-Jan-16 1009 Ǿ600 12.00 TI-15 Bor MP office

27 20-Jan-16 1039 Ǿ600 12.00 TI-15 Bor MP office

28 20-Jan-16 1038 Ǿ600 12.00 TI-15 Bor MP office

29 20-Jan-16 1037 Ǿ600 12.00 TI-15 Bor MP office

30 20-Jan-16 1036 Ǿ600 12.00 TI-15 Bor MP office

31 20-Jan-16 1035 Ǿ600 12.00 TI-15 Bor MP office

32 20-Jan-16 1034 Ǿ600 12.00 TI-15 Bor MP office

33 20-Jan-16 1033 Ǿ600 12.00 TI-15 Bor MP office

34 20-Jan-16 1032 Ǿ600 12.00 TI-15 Bor MP office

35 20-Jan-16 1031 Ǿ600 12.00 TI-15 Bor MP office

36 20-Jan-16 1030 Ǿ600 12.00 TI-15 Bor MP office

37 20-Jan-16 1029 Ǿ600 12.00 TI-15 Bor MP office

38 20-Jan-16 1028 Ǿ600 12.00 TI-15 Bor MP office

39 20-Jan-16 1051 Ǿ600 12.00 TI-15 Bor MP office

40 20-Jan-16 1050 Ǿ600 12.00 TI-15 Bor MP office

41 20-Jan-16 1049 Ǿ600 12.00 TI-15 Bor MP office

42 20-Jan-16 1048 Ǿ600 12.00 TI-15 Bor MP office

43 20-Jan-16 1047 Ǿ600 12.00 TI-15 Bor MP office

44 20-Jan-16 1046 Ǿ600 12.00 TI-15 Bor MP office

45 20-Jan-16 1045 Ǿ600 12.00 TI-15 Bor MP office

46 20-Jan-16 1044 Ǿ600 12.00 TI-15 Bor MP office

47 20-Jan-16 1043 Ǿ600 12.00 TI-15 Bor MP office

48 20-Jan-16 1042 Ǿ600 12.00 TI-15 Bor MP office

49 20-Jan-16 1041 Ǿ600 12.00 TI-15 Bor MP office

50 20-Jan-16 1040 Ǿ600 12.00 TI-15 Bor MP office

51 23-Jan-16 1074 Ǿ600 - 12.00 TI-15 Bor MP office

52 23-Jan-16 1073 Ǿ600 - 12.00 TI-15 Bor MP office

53 23-Jan-16 1071 Ǿ600 - 12.00 TI-15 Bor MP office

54 23-Jan-16 1070 Ǿ600 - 12.00 TI-15 Bor MP office

55 23-Jan-16 1069 Ǿ600 - 12.00 TI-15 Bor MP office


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

56 23-Jan-16 1068 Ǿ600 - 12.00 TI-15 Bor MP office

57 23-Jan-16 1067 Ǿ600 - 12.00 TI-15 Bor MP office

58 23-Jan-16 1066 Ǿ600 - 12.00 TI-15 Bor MP office

59 23-Jan-16 1065 Ǿ600 - 12.00 TI-15 Bor MP office

60 23-Jan-16 1064 Ǿ600 - 12.00 TI-15 Bor MP office

61 23-Jan-16 1063 Ǿ600 - 12.00 TI-15 Bor MP office

62 23-Jan-16 1062 Ǿ600 - 12.00 TI-15 Bor MP office

63 23-Jan-16 1061 Ǿ600 - 12.00 TI-15 Bor MP office

64 23-Jan-16 1060 Ǿ600 - 12.00 TI-15 Bor MP office

65 23-Jan-16 1059 Ǿ600 - 12.00 TI-15 Bor MP office

66 23-Jan-16 1058 Ǿ600 - 12.00 TI-15 Bor MP office

67 23-Jan-16 1057 Ǿ600 - 12.00 TI-15 Bor MP office

68 23-Jan-16 1056 Ǿ600 - 12.00 TI-15 Bor MP office

69 23-Jan-16 1055 Ǿ600 - 12.00 TI-15 Bor MP office

70 23-Jan-16 1054 Ǿ600 - 12.00 TI-15 Bor MP office

71 23-Jan-16 1053 Ǿ600 - 12.00 TI-15 Bor MP office

72 23-Jan-16 1052 Ǿ600 - 12.00 TI-15 Bor MP office

TOTAL PREBORING 864.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : SOIL FLURRY / BORE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABA


Date : 05 AGUST'15 - 31 OKT'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

843 5-Aug-15 IP-9 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

842 6-Aug-15 IP-5 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

838 7-Aug-15 IP-2 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

840 7-Aug-15 IP-3 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

831 10-Aug-15 IP-1 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

841 11-Aug-15 IP-4 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

144 14-Aug-15 4149 Ǿ500 - 12.00 - - - TC-53 SOLDIER

145 14-Aug-15 4150 Ǿ500 - 12.00 - - - TC-53 SOLDIER

146 14-Aug-15 4151 Ǿ500 - 12.00 TC-53 SOLDIER

832 14-Aug-15 IP-11 Ǿ500 - 12.00 - - - - TC-53 INDIKATOR

138 15-Aug-15 4141 Ǿ500 - 12.00 TC-53 SOLDIER

139 15-Aug-15 4142 Ǿ500 - 12.00 TC-53 SOLDIER

140 15-Aug-15 4143 Ǿ500 - 12.00 TC-53 SOLDIER

141 15-Aug-15 4144 Ǿ500 - 12.00 TC-53 SOLDIER

142 15-Aug-15 4145 Ǿ500 - 12.00 TC-53 SOLDIER

143 15-Aug-15 4146 Ǿ500 - 12.00 TC-53 SOLDIER

839 15-Aug-15 IP-20 Ǿ500 - 12.00 - - - TC-53 INDIKATOR

132 16-Aug-15 4135 Ǿ500 - 12.00 TC-53 SOLDIER

133 16-Aug-15 4136 Ǿ500 - 12.00 TC-53 SOLDIER

134 16-Aug-15 4137 Ǿ500 - 12.00 TC-53 SOLDIER

135 16-Aug-15 4138 Ǿ500 - 12.00 TC-53 SOLDIER

136 16-Aug-15 4139 Ǿ500 - 12.00 TC-53 SOLDIER

137 16-Aug-15 4140 Ǿ500 - 12.00 TC-53 SOLDIER

830 16-Aug-15 1P-17 Ǿ500 - 12.00 - - - TC-53 INDIKATOR

125 18-Aug-15 4125 Ǿ500 - 12.00 TC-19 SOLDIER

126 18-Aug-15 4126 Ǿ500 - 12.00 TC-19 SOLDIER

127 18-Aug-15 4127 Ǿ500 - 12.00 TC-19 SOLDIER

128 18-Aug-15 4131 Ǿ500 - 12.00 TC-19 SOLDIER

129 18-Aug-15 4132 Ǿ500 - 12.00 TC-19 SOLDIER

130 18-Aug-15 4133 Ǿ500 - 12.00 TC-19 SOLDIER

131 18-Aug-15 4134 Ǿ500 - 12.00 TC-19 SOLDIER

850 18-Aug-15 V-1 / 1336 12.00 TC-53 INDIKATOR

118 19-Aug-15 4118 Ǿ500 - 12.00 TC-19 SOLDIER

119 19-Aug-15 4119 Ǿ500 - 12.00 TC-19 SOLDIER

120 19-Aug-15 4120 Ǿ500 - 12.00 TC-19 SOLDIER

121 19-Aug-15 4121 Ǿ500 - 12.00 TC-19 SOLDIER

122 19-Aug-15 4122 Ǿ500 - 12.00 TC-19 SOLDIER

123 19-Aug-15 4123 Ǿ500 - 12.00 TC-19 SOLDIER

124 19-Aug-15 4124 Ǿ500 - 12.00 TC-19 SOLDIER

848 19-Aug-15 T-1 / 3059Ǿ500 12.00 TC-53 INDIKATOR

113 20-Aug-15 4113 Ǿ500 12.00 TC-19 SOLDIER

114 20-Aug-15 4114 Ǿ500 12.00 TC-19 SOLDIER

115 20-Aug-15 4115 Ǿ500 12.00 TC-19 SOLDIER

116 20-Aug-15 4116 Ǿ500 12.00 TC-19 SOLDIER

117 20-Aug-15 4117 Ǿ500 12.00 TC-19 SOLDIER

846 20-Aug-15 P-7 / 813 Ǿ500 12.00 TC-53 INDIKATOR

847 20-Aug-15 P-8 / 874 Ǿ500 12.00 TC-53 INDIKATOR

851 20-Aug-15 V-2 / 1157 Ǿ500 12.00 TC-19 SOLDIER

844 21-Aug-15 P-18 / 466 Ǿ500 12.00 TC-53 INDIKATOR

845 21-Aug-15 P-6 / 526 Ǿ500 12.00 TC-53 INDIKATOR

853 24-Aug-15 V-4 / 681 Ǿ500 12.00 TC-53 INDIKATOR

426 26-Aug-15 4433 Ǿ500 12.00 TC-53 SOLDIER

427 26-Aug-15 4434 Ǿ500 12.00 TC-53 SOLDIER

428 26-Aug-15 4435 Ǿ500 12.00 TC-53 SOLDIER

429 26-Aug-15 4436 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

430 26-Aug-15 4437 Ǿ500 12.00 TC-53 SOLDIER

431 26-Aug-15 4438 Ǿ500 12.00 TC-53 SOLDIER

432 26-Aug-15 4439 Ǿ500 12.00 TC-53 SOLDIER

433 26-Aug-15 4440 Ǿ500 12.00 TC-53 SOLDIER

434 26-Aug-15 4441 Ǿ500 12.00 TC-53 SOLDIER

435 27-Aug-15 4442 Ǿ500 12.00 TC-53 SOLDIER

436 27-Aug-15 4443 Ǿ500 12.00 TC-53 SOLDIER

437 27-Aug-15 4444 Ǿ500 12.00 TC-53 SOLDIER

438 27-Aug-15 4445 Ǿ500 12.00 TC-53 SOLDIER

439 27-Aug-15 4446 Ǿ500 12.00 TC-53 SOLDIER

440 27-Aug-15 4447 Ǿ500 12.00 TC-53 SOLDIER

441 27-Aug-15 4448 Ǿ500 12.00 TC-53 SOLDIER

442 27-Aug-15 4449 Ǿ500 12.00 TC-53 SOLDIER

443 27-Aug-15 4450 Ǿ500 12.00 TC-53 SOLDIER

444 27-Aug-15 4451 Ǿ500 12.00 TC-53 SOLDIER

445 28-Aug-15 4452 Ǿ500 12.00 TC-53 SOLDIER

446 28-Aug-15 4453 Ǿ500 12.00 TC-53 SOLDIER

447 28-Aug-15 4454 Ǿ500 12.00 TC-53 SOLDIER

448 28-Aug-15 4455 Ǿ500 12.00 TC-53 SOLDIER

449 28-Aug-15 4456 Ǿ500 12.00 TC-53 SOLDIER

450 28-Aug-15 4457 Ǿ500 12.00 TC-53 SOLDIER

451 28-Aug-15 4458 Ǿ500 12.00 TC-53 SOLDIER

452 28-Aug-15 4459 Ǿ500 12.00 TC-53 SOLDIER

453 28-Aug-15 4460 Ǿ500 12.00 TC-53 SOLDIER

454 28-Aug-15 4461 Ǿ500 12.00 TC-53 SOLDIER

455 28-Aug-15 4462 Ǿ500 12.00 TC-53 SOLDIER

456 29-Aug-15 4463 Ǿ500 12.00 TC-53 SOLDIER

457 29-Aug-15 4464 Ǿ500 12.00 TC-53 SOLDIER

458 29-Aug-15 4465 Ǿ500 12.00 TC-53 SOLDIER

459 29-Aug-15 4466 Ǿ500 12.00 TC-53 SOLDIER

460 29-Aug-15 4467 Ǿ500 12.00 TC-53 SOLDIER

461 29-Aug-15 4468 Ǿ500 12.00 TC-53 SOLDIER

462 29-Aug-15 4469 Ǿ500 12.00 TC-53 SOLDIER

463 29-Aug-15 4470 Ǿ500 12.00 TC-53 SOLDIER

464 29-Aug-15 4471 Ǿ500 12.00 TC-53 SOLDIER

465 29-Aug-15 4472 Ǿ500 12.00 TC-53 SOLDIER

466 29-Aug-15 4473 Ǿ500 12.00 TC-53 SOLDIER

467 29-Aug-15 4474 Ǿ500 12.00 TC-53 SOLDIER

468 29-Aug-15 4475 Ǿ500 12.00 TC-53 SOLDIER

469 31-Aug-15 4476 Ǿ500 12.00 TC-53 SOLDIER

470 31-Aug-15 4477 Ǿ500 12.00 TC-53 SOLDIER

471 31-Aug-15 4478 Ǿ500 12.00 TC-53 SOLDIER

472 31-Aug-15 4479 Ǿ500 12.00 TC-53 SOLDIER

473 31-Aug-15 4480 Ǿ500 12.00 TC-53 SOLDIER

474 31-Aug-15 4481 Ǿ500 12.00 TC-53 SOLDIER

475 31-Aug-15 4482 Ǿ500 12.00 TC-53 SOLDIER

476 31-Aug-15 4483 Ǿ500 12.00 TC-53 SOLDIER

477 31-Aug-15 4484 Ǿ500 12.00 TC-53 SOLDIER

478 31-Aug-15 4485 Ǿ500 12.00 TC-53 SOLDIER

479 31-Aug-15 4486 Ǿ500 12.00 TC-53 SOLDIER

480 31-Aug-15 4487 Ǿ500 12.00 TC-53 SOLDIER

481 31-Aug-15 4488 Ǿ500 12.00 TC-53 SOLDIER

482 1-Sep-15 4489 Ǿ500 12.00 TC-53 SOLDIER

483 1-Sep-15 4490 Ǿ500 12.00 TC-53 SOLDIER

484 1-Sep-15 4491 Ǿ500 12.00 TC-53 SOLDIER

485 1-Sep-15 4492 Ǿ500 12.00 TC-53 SOLDIER

486 1-Sep-15 4493 Ǿ500 12.00 TC-53 SOLDIER

487 1-Sep-15 4494 Ǿ500 12.00 TC-53 SOLDIER

488 1-Sep-15 4495 Ǿ500 12.00 TC-53 SOLDIER

489 1-Sep-15 4496 Ǿ500 12.00 TC-53 SOLDIER

490 1-Sep-15 4497 Ǿ500 12.00 TC-53 SOLDIER

491 1-Sep-15 4498 Ǿ500 12.00 TC-53 SOLDIER

492 1-Sep-15 4499 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

493 1-Sep-15 4500 Ǿ500 12.00 TC-53 SOLDIER

494 1-Sep-15 4501 Ǿ500 12.00 TC-53 SOLDIER

495 2-Sep-15 4502 Ǿ500 12.00 TC-53 SOLDIER

496 2-Sep-15 4503 Ǿ500 12.00 TC-53 SOLDIER

497 2-Sep-15 4504 Ǿ500 12.00 TC-53 SOLDIER

498 2-Sep-15 4505 Ǿ500 12.00 TC-53 SOLDIER

499 2-Sep-15 4506 Ǿ500 12.00 TC-53 SOLDIER

500 2-Sep-15 4507 Ǿ500 12.00 TC-53 SOLDIER

501 2-Sep-15 4508 Ǿ500 12.00 TC-53 SOLDIER

502 2-Sep-15 4509 Ǿ500 12.00 TC-53 SOLDIER

503 2-Sep-15 4510 Ǿ500 12.00 TC-53 SOLDIER

504 2-Sep-15 4511 Ǿ500 12.00 TC-53 SOLDIER

505 2-Sep-15 4512 Ǿ500 12.00 TC-53 SOLDIER

506 2-Sep-15 4513 Ǿ500 12.00 TC-53 SOLDIER

507 2-Sep-15 4514 Ǿ500 12.00 TC-53 SOLDIER

836 2-Sep-15 IP-18/562 Ǿ500 12.00 TC-19 INDIKATOR

508 3-Sep-15 4515 Ǿ500 12.00 TC-53 SOLDIER

509 3-Sep-15 4516 Ǿ500 12.00 TC-53 SOLDIER

510 3-Sep-15 4517 Ǿ500 12.00 TC-53 SOLDIER

511 3-Sep-15 4518 Ǿ500 12.00 TC-53 SOLDIER

512 3-Sep-15 4519 Ǿ500 12.00 TC-53 SOLDIER

513 3-Sep-15 4520 Ǿ500 12.00 TC-53 SOLDIER

514 3-Sep-15 4521 Ǿ500 12.00 TC-53 SOLDIER

515 3-Sep-15 4522 Ǿ500 12.00 TC-53 SOLDIER

516 3-Sep-15 4523 Ǿ500 12.00 TC-53 SOLDIER

517 3-Sep-15 4524 Ǿ500 12.00 TC-53 SOLDIER

518 3-Sep-15 4525 Ǿ500 12.00 TC-53 SOLDIER

519 3-Sep-15 4526 Ǿ500 12.00 TC-53 SOLDIER

520 3-Sep-15 4527 Ǿ500 12.00 TC-53 SOLDIER

521 3-Sep-15 4528 Ǿ500 12.00 TC-53 SOLDIER

522 4-Sep-15 4529 Ǿ500 12.00 TC-53 SOLDIER

523 4-Sep-15 4530 Ǿ500 12.00 TC-53 SOLDIER

524 4-Sep-15 4531 Ǿ500 12.00 TC-53 SOLDIER

525 4-Sep-15 4532 Ǿ500 12.00 TC-53 SOLDIER

526 4-Sep-15 4533 Ǿ500 12.00 TC-53 SOLDIER

527 4-Sep-15 4534 Ǿ500 12.00 TC-53 SOLDIER

528 4-Sep-15 4535 Ǿ500 12.00 TC-53 SOLDIER

529 4-Sep-15 4536 Ǿ500 12.00 TC-53 SOLDIER

530 4-Sep-15 4537 Ǿ500 12.00 TC-53 SOLDIER

531 4-Sep-15 4538 Ǿ500 12.00 TC-53 SOLDIER

532 4-Sep-15 4539 Ǿ500 12.00 TC-53 SOLDIER

533 6-Sep-15 4540 Ǿ500 12.00 TC-53 SOLDIER

534 6-Sep-15 4541 Ǿ500 12.00 TC-53 SOLDIER

535 6-Sep-15 4542 Ǿ500 12.00 TC-53 SOLDIER

536 6-Sep-15 4543 Ǿ500 12.00 TC-53 SOLDIER

537 6-Sep-15 4544 Ǿ500 12.00 TC-53 SOLDIER

538 6-Sep-15 4545 Ǿ500 12.00 TC-53 SOLDIER

539 6-Sep-15 4546 Ǿ500 12.00 TC-53 SOLDIER

540 6-Sep-15 4547 Ǿ500 12.00 TC-53 SOLDIER

541 6-Sep-15 4548 Ǿ500 12.00 TC-53 SOLDIER

542 6-Sep-15 4549 Ǿ500 12.00 TC-53 SOLDIER

543 6-Sep-15 4550 Ǿ500 12.00 TC-53 SOLDIER

544 6-Sep-15 4551 Ǿ500 12.00 TC-53 SOLDIER

545 7-Sep-15 4552 Ǿ500 12.00 TC-53 SOLDIER

546 7-Sep-15 4553 Ǿ500 12.00 TC-53 SOLDIER

547 7-Sep-15 4554 Ǿ500 12.00 TC-53 SOLDIER

548 7-Sep-15 4555 Ǿ500 12.00 TC-53 SOLDIER

549 7-Sep-15 4556 Ǿ500 12.00 TC-53 SOLDIER

550 7-Sep-15 4557 Ǿ500 12.00 TC-53 SOLDIER

551 7-Sep-15 4558 Ǿ500 12.00 TC-53 SOLDIER

552 7-Sep-15 4559 Ǿ500 12.00 TC-53 SOLDIER

553 7-Sep-15 4560 Ǿ500 12.00 TC-53 SOLDIER

554 7-Sep-15 4561 Ǿ500 12.00 TC-53 SOLDIER


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

555 7-Sep-15 4562 Ǿ500 12.00 TC-53 SOLDIER

556 7-Sep-15 4563 Ǿ500 12.00 TC-53 SOLDIER

557 7-Sep-15 4564 Ǿ500 12.00 TC-53 SOLDIER

852 7-Sep-15 V3-229 Ǿ500 12.00 TC-19 INDIKATOR

558 8-Sep-15 4565 Ǿ500 12.00 TC-53 SOLDIER

559 8-Sep-15 4566 Ǿ500 12.00 TC-53 SOLDIER

560 8-Sep-15 4567 Ǿ500 12.00 TC-53 SOLDIER

561 8-Sep-15 4568 Ǿ500 12.00 TC-53 SOLDIER

562 8-Sep-15 4569 Ǿ500 12.00 TC-53 SOLDIER

563 8-Sep-15 4570 Ǿ500 12.00 TC-53 SOLDIER

564 8-Sep-15 4571 Ǿ500 12.00 TC-53 SOLDIER

565 8-Sep-15 4572 Ǿ500 12.00 TC-53 SOLDIER

566 8-Sep-15 4573 Ǿ500 12.00 TC-53 SOLDIER

567 8-Sep-15 4574 Ǿ500 12.00 TC-53 SOLDIER

568 8-Sep-15 4575 Ǿ500 12.00 TC-53 SOLDIER

569 8-Sep-15 4576 Ǿ500 12.00 TC-53 SOLDIER

570 8-Sep-15 4577 Ǿ500 12.00 TC-53 SOLDIER

834 8-Sep-15 IP-15/390 Ǿ500 12.00 TC-19 INDIKATOR

571 10-Sep-15 4578 Ǿ500 12.00 TC-53 SOLDIER

572 10-Sep-15 4579 Ǿ500 12.00 TC-53 SOLDIER

573 10-Sep-15 4580 Ǿ500 12.00 TC-53 SOLDIER

574 10-Sep-15 4581 Ǿ500 12.00 TC-53 SOLDIER

575 10-Sep-15 4582 Ǿ500 12.00 TC-53 SOLDIER

576 10-Sep-15 4583 Ǿ500 12.00 TC-53 SOLDIER

577 10-Sep-15 4584 Ǿ500 12.00 TC-53 SOLDIER

578 10-Sep-15 4585 Ǿ500 12.00 TC-53 SOLDIER

579 10-Sep-15 4586 Ǿ500 12.00 TC-53 SOLDIER

580 10-Sep-15 4587 Ǿ500 12.00 TC-53 SOLDIER

581 10-Sep-15 4588 Ǿ500 12.00 TC-53 SOLDIER

582 10-Sep-15 4589 Ǿ500 12.00 TC-53 SOLDIER

583 10-Sep-15 4590 Ǿ500 12.00 TC-53 SOLDIER

584 10-Sep-15 4591 Ǿ500 12.00 TC-53 SOLDIER

585 10-Sep-15 4592 Ǿ500 12.00 TC-53 SOLDIER

586 10-Sep-15 4593 Ǿ500 12.00 TC-53 SOLDIER

587 10-Sep-15 4594 Ǿ500 12.00 TC-53 SOLDIER

588 10-Sep-15 4595 Ǿ500 12.00 TC-53 SOLDIER

589 10-Sep-15 4596 Ǿ500 12.00 TC-53 SOLDIER

590 10-Sep-15 4597 Ǿ500 12.00 TC-53 SOLDIER

591 10-Sep-15 4598 Ǿ500 12.00 TC-53 SOLDIER

592 10-Sep-15 4599 Ǿ500 12.00 TC-53 SOLDIER

833 11-Sep-15 IP-14/397 Ǿ500 12.00 TC-15 INDIKATOR

835 14-Sep-15 IP-16/69 Ǿ500 12.00 TC-19 Indikator

837 15-Sep-15 IP-19/69 Ǿ500 12.00 TC-19 INDIKATOR

593 21-Sep-15 4600 Ǿ500 12.00 TC-53 Soldier Pile

594 21-Sep-15 4601 Ǿ500 12.00 TC-53 Soldier Pile

595 21-Sep-15 4602 Ǿ500 12.00 TC-53 Soldier Pile

596 21-Sep-15 4603 Ǿ500 12.00 TC-53 Soldier Pile

597 21-Sep-15 4604 Ǿ500 12.00 TC-53 Soldier Pile

598 21-Sep-15 4605 Ǿ500 12.00 TC-53 Soldier Pile

599 21-Sep-15 4606 Ǿ500 12.00 TC-53 Soldier Pile

600 21-Sep-15 4607 Ǿ500 12.00 TC-53 Soldier Pile

601 21-Sep-15 4608 Ǿ500 12.00 TC-53 Soldier Pile

602 21-Sep-15 4609 Ǿ500 12.00 TC-53 Soldier Pile

603 21-Sep-15 4610 Ǿ500 12.00 TC-53 Soldier Pile

604 21-Sep-15 4611 Ǿ500 12.00 TC-53 Soldier Pile

605 21-Sep-15 4612 Ǿ500 12.00 TC-53 Soldier Pile

606 21-Sep-15 4613 Ǿ500 12.00 TC-53 Soldier Pile

607 21-Sep-15 4614 Ǿ500 12.00 TC-53 Soldier Pile

608 21-Sep-15 4615 Ǿ500 12.00 TC-53 Soldier Pile

281 22-Sep-15 4286 Ǿ500 12.00 TC-15 Soldier Pile

282 22-Sep-15 4287 Ǿ500 12.00 TC-15 Soldier Pile

283 22-Sep-15 4288 Ǿ500 12.00 TC-15 Soldier Pile

284 22-Sep-15 4289 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

285 22-Sep-15 4290 Ǿ500 12.00 TC-15 Soldier Pile

286 22-Sep-15 4291 Ǿ500 12.00 TC-15 Soldier Pile

287 22-Sep-15 4292 Ǿ500 12.00 TC-15 Soldier Pile

288 22-Sep-15 4293 Ǿ500 12.00 TC-15 Soldier Pile

289 22-Sep-15 4294 Ǿ500 12.00 TC-15 Soldier Pile

290 22-Sep-15 4295 Ǿ500 12.00 TC-15 Soldier Pile

291 22-Sep-15 4296 Ǿ500 12.00 TC-15 Soldier Pile

292 22-Sep-15 4297 Ǿ500 12.00 TC-15 Soldier Pile

293 22-Sep-15 4298 Ǿ500 12.00 TC-15 Soldier Pile

294 22-Sep-15 4299 Ǿ500 12.00 TC-15 Soldier Pile

609 22-Sep-15 4616 Ǿ500 12.00 TC-53 Soldier Pile

610 22-Sep-15 4617 Ǿ500 12.00 TC-53 Soldier Pile

611 22-Sep-15 4618 Ǿ500 12.00 TC-53 Soldier Pile

612 22-Sep-15 4619 Ǿ500 12.00 TC-53 Soldier Pile

613 22-Sep-15 4620 Ǿ500 12.00 TC-53 Soldier Pile

614 22-Sep-15 4621 Ǿ500 12.00 TC-53 Soldier Pile

615 22-Sep-15 4622 Ǿ500 12.00 TC-53 Soldier Pile

616 22-Sep-15 4623 Ǿ500 12.00 TC-53 Soldier Pile

617 22-Sep-15 4624 Ǿ500 12.00 TC-53 Soldier Pile

618 22-Sep-15 4625 Ǿ500 12.00 TC-53 Soldier Pile

619 22-Sep-15 4626 Ǿ500 12.00 TC-53 Soldier Pile

620 22-Sep-15 4627 Ǿ500 12.00 TC-53 Soldier Pile

621 22-Sep-15 4628 Ǿ500 12.00 TC-53 Soldier Pile

622 22-Sep-15 4629 Ǿ500 12.00 TC-53 Soldier Pile

623 22-Sep-15 4630 Ǿ500 12.00 TC-53 Soldier Pile

624 22-Sep-15 4631 Ǿ500 12.00 TC-53 Soldier Pile

849 22-Sep-15 T-2 Ǿ500 12.00 TC-15 INDIKATOR

295 23-Sep-15 4300 Ǿ500 12.00 TC-15 Soldier Pile

296 23-Sep-15 4301 Ǿ500 12.00 TC-15 Soldier Pile

297 23-Sep-15 4302 Ǿ500 12.00 TC-15 Soldier Pile

298 23-Sep-15 4303 Ǿ500 12.00 TC-15 Soldier Pile

299 23-Sep-15 4304 Ǿ500 12.00 TC-15 Soldier Pile

300 23-Sep-15 4305 Ǿ500 12.00 TC-15 Soldier Pile

301 23-Sep-15 4306 Ǿ500 12.00 TC-15 Soldier Pile

302 23-Sep-15 4307 Ǿ500 12.00 TC-15 Soldier Pile

303 23-Sep-15 4308 Ǿ500 12.00 TC-15 Soldier Pile

304 23-Sep-15 4309 Ǿ500 12.00 TC-15 Soldier Pile

305 23-Sep-15 4310 Ǿ500 12.00 TC-15 Soldier Pile

306 23-Sep-15 4311 Ǿ500 12.00 TC-15 Soldier Pile

307 23-Sep-15 4312 Ǿ500 12.00 TC-15 Soldier Pile

625 23-Sep-15 4632 Ǿ500 12.00 TC-53 Soldier Pile

626 23-Sep-15 4633 Ǿ500 12.00 TC-53 Soldier Pile

627 23-Sep-15 4634 Ǿ500 12.00 TC-53 Soldier Pile

628 23-Sep-15 4635 Ǿ500 12.00 TC-53 Soldier Pile

629 23-Sep-15 4636 Ǿ500 12.00 TC-53 Soldier Pile

630 23-Sep-15 4637 Ǿ500 12.00 TC-53 Soldier Pile

631 23-Sep-15 4638 Ǿ500 12.00 TC-53 Soldier Pile

632 23-Sep-15 4639 Ǿ500 12.00 TC-53 Soldier Pile

633 23-Sep-15 4640 Ǿ500 12.00 TC-53 Soldier Pile

634 23-Sep-15 4641 Ǿ500 12.00 TC-53 Soldier Pile

308 25-Sep-15 4313 Ǿ500 12.00 TC-15 Soldier Pile

309 25-Sep-15 4314 Ǿ500 12.00 TC-15 Soldier Pile

310 25-Sep-15 4315 Ǿ500 12.00 TC-15 Soldier Pile

311 25-Sep-15 4316 Ǿ500 12.00 TC-15 Soldier Pile

312 25-Sep-15 4317 Ǿ500 12.00 TC-15 Soldier Pile

313 25-Sep-15 4318 Ǿ500 12.00 TC-15 Soldier Pile

314 25-Sep-15 4319 Ǿ500 12.00 TC-15 Soldier Pile

315 25-Sep-15 4320 Ǿ500 12.00 TC-15 Soldier Pile

316 25-Sep-15 4321 Ǿ500 12.00 TC-15 Soldier Pile

317 25-Sep-15 4322 Ǿ500 12.00 TC-15 Soldier Pile

318 25-Sep-15 4323 Ǿ500 12.00 TC-15 Soldier Pile

319 25-Sep-15 4324 Ǿ500 12.00 TC-15 Soldier Pile

320 25-Sep-15 4325 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

635 25-Sep-15 4642 Ǿ500 12.00 TC-53 Soldier Pile

636 25-Sep-15 4643 Ǿ500 12.00 TC-53 Soldier Pile

637 25-Sep-15 4644 Ǿ500 12.00 TC-53 Soldier Pile

638 25-Sep-15 4645 Ǿ500 12.00 TC-53 Soldier Pile

639 25-Sep-15 4646 Ǿ500 12.00 TC-53 Soldier Pile

640 25-Sep-15 4647 Ǿ500 12.00 TC-53 Soldier Pile

641 25-Sep-15 4648 Ǿ500 12.00 TC-53 Soldier Pile

642 25-Sep-15 4649 Ǿ500 12.00 TC-53 Soldier Pile

643 25-Sep-15 4650 Ǿ500 12.00 TC-53 Soldier Pile

644 25-Sep-15 4651 Ǿ500 12.00 TC-53 Soldier Pile

645 25-Sep-15 4652 Ǿ500 12.00 TC-53 Soldier Pile

321 26-Sep-15 4326 Ǿ500 12.00 TC-15 Soldier Pile

322 26-Sep-15 4327 Ǿ500 12.00 TC-15 Soldier Pile

323 26-Sep-15 4328 Ǿ500 12.00 TC-15 Soldier Pile

324 26-Sep-15 4329 Ǿ500 12.00 TC-15 Soldier Pile

325 26-Sep-15 4330 Ǿ500 12.00 TC-15 Soldier Pile

326 26-Sep-15 4331 Ǿ500 12.00 TC-15 Soldier Pile

327 26-Sep-15 4332 Ǿ500 12.00 TC-15 Soldier Pile

328 26-Sep-15 4333 Ǿ500 12.00 TC-15 Soldier Pile

329 26-Sep-15 4334 Ǿ500 12.00 TC-15 Soldier Pile

330 26-Sep-15 4335 Ǿ500 12.00 TC-15 Soldier Pile

331 26-Sep-15 4336 Ǿ500 12.00 TC-15 Soldier Pile

332 26-Sep-15 4337 Ǿ500 12.00 TC-15 Soldier Pile

333 26-Sep-15 4338 Ǿ500 12.00 TC-15 Soldier Pile

334 28-Sep-15 4339 Ǿ500 12.00 TC-15 Soldier Pile

335 28-Sep-15 4340 Ǿ500 12.00 TC-15 Soldier Pile

336 28-Sep-15 4341 Ǿ500 12.00 TC-15 Soldier Pile

337 28-Sep-15 4342 Ǿ500 12.00 TC-15 Soldier Pile

338 28-Sep-15 4343 Ǿ500 12.00 TC-15 Soldier Pile

339 28-Sep-15 4344 Ǿ500 12.00 TC-15 Soldier Pile

340 28-Sep-15 4345 Ǿ500 12.00 TC-15 Soldier Pile

341 28-Sep-15 4346 Ǿ500 12.00 TC-15 Soldier Pile

342 28-Sep-15 4347 Ǿ500 12.00 TC-15 Soldier Pile

343 28-Sep-15 4348 Ǿ500 12.00 TC-15 Soldier Pile

344 28-Sep-15 4349 Ǿ500 12.00 TC-15 Soldier Pile

345 28-Sep-15 4350 Ǿ500 12.00 TC-15 Soldier Pile

346 29-Sep-15 4351 Ǿ500 12.00 TC-15 Soldier Pile

347 29-Sep-15 4352 Ǿ500 12.00 TC-15 Soldier Pile

348 29-Sep-15 4353 Ǿ500 12.00 TC-15 Soldier Pile

349 29-Sep-15 4354 Ǿ500 12.00 TC-15 Soldier Pile

350 29-Sep-15 4355 Ǿ500 12.00 TC-15 Soldier Pile

351 29-Sep-15 4356 Ǿ500 12.00 TC-15 Soldier Pile

352 29-Sep-15 4357 Ǿ500 12.00 TC-15 Soldier Pile

353 29-Sep-15 4358 Ǿ500 12.00 TC-15 Soldier Pile

354 29-Sep-15 4359 Ǿ500 12.00 TC-15 Soldier Pile

355 29-Sep-15 4360 Ǿ500 12.00 TC-15 Soldier Pile

356 29-Sep-15 4361 Ǿ500 12.00 TC-15 Soldier Pile

357 29-Sep-15 4362 Ǿ500 12.00 TC-15 Soldier Pile

358 29-Sep-15 4363 Ǿ500 12.00 TC-15 Soldier Pile

359 29-Sep-15 4364 Ǿ500 12.00 TC-15 Soldier Pile

360 29-Sep-15 4365 Ǿ500 12.00 TC-15 Soldier Pile

361 30-Sep-15 4366 Ǿ500 12.00 TC-15 Soldier Pile

362 30-Sep-15 4367 Ǿ500 12.00 TC-15 Soldier Pile

363 30-Sep-15 4368 Ǿ500 12.00 TC-15 Soldier Pile

364 30-Sep-15 4369 Ǿ500 12.00 TC-15 Soldier Pile

365 30-Sep-15 4370 Ǿ500 12.00 TC-15 Soldier Pile

366 30-Sep-15 4371 Ǿ500 12.00 TC-15 Soldier Pile

367 30-Sep-15 4372 Ǿ500 12.00 TC-15 Soldier Pile

368 30-Sep-15 4373 Ǿ500 12.00 TC-15 Soldier Pile

369 30-Sep-15 4374 Ǿ500 12.00 TC-15 Soldier Pile

370 30-Sep-15 4375 Ǿ500 12.00 TC-15 Soldier Pile

371 30-Sep-15 4376 Ǿ500 12.00 TC-15 Soldier Pile

372 30-Sep-15 4377 Ǿ500 12.00 TC-15 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

373 30-Sep-15 4378 Ǿ500 12.00 TC-15 Soldier Pile

374 30-Sep-15 4379 Ǿ500 12.00 TC-15 Soldier Pile

375 30-Sep-15 4380 Ǿ500 12.00 TC-15 Soldier Pile

376 30-Sep-15 4381 Ǿ500 12.00 TC-15 Soldier Pile

727 30-Sep-15 4734 Ǿ500 12.00 TC-19 Soldier Pile

728 30-Sep-15 4735 Ǿ500 12.00 TC-19 Soldier Pile

729 30-Sep-15 4736 Ǿ500 12.00 TC-19 Soldier Pile

730 30-Sep-15 4737 Ǿ500 12.00 TC-19 Soldier Pile

731 30-Sep-15 4738 Ǿ500 12.00 TC-19 Soldier Pile

732 30-Sep-15 4739 Ǿ500 12.00 TC-19 Soldier Pile

733 30-Sep-15 4740 Ǿ500 12.00 TC-19 Soldier Pile

734 30-Sep-15 4741 Ǿ500 12.00 TC-19 Soldier Pile

735 30-Sep-15 4742 Ǿ500 12.00 TC-19 Soldier Pile

736 30-Sep-15 4743 Ǿ500 12.00 TC-19 Soldier Pile

737 30-Sep-15 4744 Ǿ500 12.00 TC-19 Soldier Pile

738 30-Sep-15 4745 Ǿ500 12.00 TC-19 Soldier Pile

739 30-Sep-15 4746 Ǿ500 12.00 TC-19 Soldier Pile

740 30-Sep-15 4747 Ǿ500 12.00 TC-19 Soldier Pile

741 30-Sep-15 4748 Ǿ500 12.00 TC-19 Soldier Pile

742 30-Sep-15 4749 Ǿ500 12.00 TC-19 Soldier Pile

743 30-Sep-15 4750 Ǿ500 12.00 TC-19 Soldier Pile

744 30-Sep-15 4751 Ǿ500 12.00 TC-19 Soldier Pile

745 30-Sep-15 4752 Ǿ500 12.00 TC-19 Soldier Pile

746 30-Sep-15 4753 Ǿ500 12.00 TC-19 Soldier Pile

377 1-Oct-15 4382 Ǿ500 12.00 TC-15 Soldier Pile

378 1-Oct-15 4383 Ǿ500 12.00 TC-15 Soldier Pile

379 1-Oct-15 4384 Ǿ500 12.00 TC-15 Soldier Pile

380 1-Oct-15 4385 Ǿ500 12.00 TC-15 Soldier Pile

381 1-Oct-15 4386 Ǿ500 12.00 TC-15 Soldier Pile

382 1-Oct-15 4387 Ǿ500 12.00 TC-15 Soldier Pile

383 1-Oct-15 4388 Ǿ500 12.00 TC-15 Soldier Pile

384 1-Oct-15 4389 Ǿ500 12.00 TC-15 Soldier Pile

385 1-Oct-15 4390 Ǿ500 12.00 TC-15 Soldier Pile

386 1-Oct-15 4391 Ǿ500 12.00 TC-15 Soldier Pile

387 1-Oct-15 4392 Ǿ500 12.00 TC-15 Soldier Pile

388 1-Oct-15 4393 Ǿ500 12.00 TC-15 Soldier Pile

389 1-Oct-15 4394 Ǿ500 12.00 TC-15 Soldier Pile

390 1-Oct-15 4395 Ǿ500 12.00 TC-15 Soldier Pile

646 1-Oct-15 4652 Ǿ500 12.00 TC-53 Soldier Pile

647 1-Oct-15 4653 Ǿ500 12.00 TC-53 Soldier Pile

648 1-Oct-15 4654 Ǿ500 12.00 TC-53 Soldier Pile

649 1-Oct-15 4655 Ǿ500 12.00 TC-53 Soldier Pile

650 1-Oct-15 4656 Ǿ500 12.00 TC-53 Soldier Pile

651 1-Oct-15 4657 Ǿ500 12.00 TC-53 Soldier Pile

652 1-Oct-15 4658 Ǿ500 12.00 TC-53 Soldier Pile

653 1-Oct-15 4659 Ǿ500 12.00 TC-53 Soldier Pile

654 1-Oct-15 4660 Ǿ500 12.00 TC-53 Soldier Pile

655 1-Oct-15 4661 Ǿ500 12.00 TC-53 Soldier Pile

656 1-Oct-15 4662 Ǿ500 12.00 TC-53 Soldier Pile

657 1-Oct-15 4663 Ǿ500 12.00 TC-53 Soldier Pile

658 1-Oct-15 4664 Ǿ500 12.00 TC-53 Soldier Pile

659 1-Oct-15 4665 Ǿ500 12.00 TC-53 Soldier Pile

660 1-Oct-15 4666 Ǿ500 12.00 TC-53 Soldier Pile

661 1-Oct-15 4667 Ǿ500 12.00 TC-53 Soldier Pile

662 1-Oct-15 4668 Ǿ500 12.00 TC-53 Soldier Pile

663 1-Oct-15 4669 Ǿ500 12.00 TC-53 Soldier Pile

664 1-Oct-15 4670 Ǿ500 12.00 TC-53 Soldier Pile

665 1-Oct-15 4671 Ǿ500 12.00 TC-53 Soldier Pile

666 1-Oct-15 4672 Ǿ500 12.00 TC-53 Soldier Pile

747 1-Oct-15 4754 Ǿ500 12.00 TC-19 Soldier Pile

748 1-Oct-15 4755 Ǿ500 12.00 TC-19 Soldier Pile

749 1-Oct-15 4756 Ǿ500 12.00 TC-19 Soldier Pile

750 1-Oct-15 4757 Ǿ500 12.00 TC-19 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

751 1-Oct-15 4758 Ǿ500 12.00 TC-19 Soldier Pile

752 1-Oct-15 4759 Ǿ500 12.00 TC-19 Soldier Pile

753 1-Oct-15 4760 Ǿ500 12.00 TC-19 Soldier Pile

754 1-Oct-15 4761 Ǿ500 12.00 TC-19 Soldier Pile

755 1-Oct-15 4762 Ǿ500 12.00 TC-19 Soldier Pile

756 1-Oct-15 4763 Ǿ500 12.00 TC-19 Soldier Pile

757 1-Oct-15 4764 Ǿ500 12.00 TC-19 Soldier Pile

758 1-Oct-15 4765 Ǿ500 12.00 TC-19 Soldier Pile

759 1-Oct-15 4766 Ǿ500 12.00 TC-19 Soldier Pile

760 1-Oct-15 4767 Ǿ500 12.00 TC-19 Soldier Pile

761 1-Oct-15 4768 Ǿ500 12.00 TC-19 Soldier Pile

762 1-Oct-15 4769 Ǿ500 12.00 TC-19 Soldier Pile

763 1-Oct-15 4770 Ǿ500 12.00 TC-19 Soldier Pile

764 1-Oct-15 4771 Ǿ500 12.00 TC-19 Soldier Pile

765 1-Oct-15 4772 Ǿ500 12.00 TC-19 Soldier Pile

766 1-Oct-15 4773 Ǿ500 12.00 TC-19 Soldier Pile

391 2-Oct-15 4396 Ǿ500 12.00 TC-15 Soldier Pile

392 2-Oct-15 4397 Ǿ500 12.00 TC-15 Soldier Pile

393 2-Oct-15 4398 Ǿ500 12.00 TC-15 Soldier Pile

394 2-Oct-15 4399 Ǿ500 12.00 TC-15 Soldier Pile

395 2-Oct-15 4400 Ǿ500 12.00 TC-15 Soldier Pile

396 2-Oct-15 4401 Ǿ500 12.00 TC-15 Soldier Pile

397 2-Oct-15 4402 Ǿ500 12.00 TC-15 Soldier Pile

398 2-Oct-15 4403 Ǿ500 12.00 TC-15 Soldier Pile

399 2-Oct-15 4404 Ǿ500 12.00 TC-15 Soldier Pile

400 2-Oct-15 4405 Ǿ500 12.00 TC-15 Soldier Pile

401 2-Oct-15 4406 Ǿ500 12.00 TC-15 Soldier Pile

402 2-Oct-15 4407 Ǿ500 12.00 TC-15 Soldier Pile

403 2-Oct-15 4408 Ǿ500 12.00 TC-15 Soldier Pile

404 2-Oct-15 4409 Ǿ500 12.00 TC-15 Soldier Pile

405 2-Oct-15 4410 Ǿ500 12.00 TC-15 Soldier Pile

406 2-Oct-15 4411 Ǿ500 12.00 TC-15 Soldier Pile

667 2-Oct-15 4673 Ǿ500 12.00 TC-53 Soldier Pile

668 2-Oct-15 4674 Ǿ500 12.00 TC-53 Soldier Pile

669 2-Oct-15 4675 Ǿ500 12.00 TC-53 Soldier Pile

670 2-Oct-15 4676 Ǿ500 12.00 TC-53 Soldier Pile

671 2-Oct-15 4677 Ǿ500 12.00 TC-53 Soldier Pile

672 2-Oct-15 4678 Ǿ500 12.00 TC-53 Soldier Pile

673 2-Oct-15 4679 Ǿ500 12.00 TC-53 Soldier Pile

674 2-Oct-15 4680 Ǿ500 12.00 TC-53 Soldier Pile

675 2-Oct-15 4681 Ǿ500 12.00 TC-53 Soldier Pile

676 2-Oct-15 4682 Ǿ500 12.00 TC-53 Soldier Pile

677 2-Oct-15 4683 Ǿ500 12.00 TC-53 Soldier Pile

678 2-Oct-15 4684 Ǿ500 12.00 TC-53 Soldier Pile

679 2-Oct-15 4685 Ǿ500 12.00 TC-53 Soldier Pile

680 2-Oct-15 4686 Ǿ500 12.00 TC-53 Soldier Pile

681 2-Oct-15 4687 Ǿ500 12.00 TC-53 Soldier Pile

682 2-Oct-15 4688 Ǿ500 12.00 TC-53 Soldier Pile

683 2-Oct-15 4689 Ǿ500 12.00 TC-53 Soldier Pile

684 2-Oct-15 4690 Ǿ500 12.00 TC-53 Soldier Pile

685 2-Oct-15 4691 Ǿ500 12.00 TC-53 Soldier Pile

686 2-Oct-15 4692 Ǿ500 12.00 TC-53 Soldier Pile

687 2-Oct-15 4693 Ǿ500 12.00 TC-53 Soldier Pile

688 2-Oct-15 4694 Ǿ500 12.00 TC-53 Soldier Pile

689 2-Oct-15 4695 Ǿ500 12.00 TC-53 Soldier Pile

690 2-Oct-15 4696 Ǿ500 12.00 TC-53 Soldier Pile

691 2-Oct-15 4697 Ǿ500 12.00 TC-53 Soldier Pile

692 2-Oct-15 4698 Ǿ500 12.00 TC-53 Soldier Pile

767 2-Oct-15 4774 Ǿ500 12.00 TC-19 Soldier Pile

768 2-Oct-15 4775 Ǿ500 12.00 TC-19 Soldier Pile

769 2-Oct-15 4776 Ǿ500 12.00 TC-19 Soldier Pile

770 2-Oct-15 4777 Ǿ500 12.00 TC-19 Soldier Pile

771 2-Oct-15 4778 Ǿ500 12.00 TC-19 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

772 2-Oct-15 4779 Ǿ500 12.00 TC-19 Soldier Pile

773 2-Oct-15 4780 Ǿ500 12.00 TC-19 Soldier Pile

774 2-Oct-15 4781 Ǿ500 12.00 TC-19 Soldier Pile

775 2-Oct-15 4782 Ǿ500 12.00 TC-19 Soldier Pile

776 2-Oct-15 4783 Ǿ500 12.00 TC-19 Soldier Pile

777 2-Oct-15 4784 Ǿ500 12.00 TC-19 Soldier Pile

778 2-Oct-15 4785 Ǿ500 12.00 TC-19 Soldier Pile

779 2-Oct-15 4786 Ǿ500 12.00 TC-19 Soldier Pile

780 2-Oct-15 4787 Ǿ500 12.00 TC-19 Soldier Pile

781 2-Oct-15 4788 Ǿ500 12.00 TC-19 Soldier Pile

782 2-Oct-15 4789 Ǿ500 12.00 TC-19 Soldier Pile

112 3-Oct-15 4112 Ǿ500 12.00 TC-19 Soldier Pile

407 3-Oct-15 4412 Ǿ500 12.00 TC-15 Soldier Pile

408 3-Oct-15 4413 Ǿ500 12.00 TC-15 Soldier Pile

409 3-Oct-15 4414 Ǿ500 12.00 TC-15 Soldier Pile

410 3-Oct-15 4415 Ǿ500 12.00 TC-15 Soldier Pile

411 3-Oct-15 4416 Ǿ500 12.00 TC-15 Soldier Pile

412 3-Oct-15 4417 Ǿ500 12.00 TC-15 Soldier Pile

413 3-Oct-15 4418 Ǿ500 12.00 TC-15 Soldier Pile

414 3-Oct-15 4419 Ǿ500 12.00 TC-15 Soldier Pile

415 3-Oct-15 4420 Ǿ500 12.00 TC-15 Soldier Pile

416 3-Oct-15 4421 Ǿ500 12.00 TC-15 Soldier Pile

417 3-Oct-15 4422 Ǿ500 12.00 TC-15 Soldier Pile

418 3-Oct-15 4423 Ǿ500 12.00 TC-15 Soldier Pile

419 3-Oct-15 4424 Ǿ500 12.00 TC-15 Soldier Pile

420 3-Oct-15 4425 Ǿ500 12.00 TC-15 Soldier Pile

421 3-Oct-15 4426 Ǿ500 12.00 TC-15 Soldier Pile

422 3-Oct-15 4427 Ǿ500 12.00 TC-15 Soldier Pile

423 3-Oct-15 4428 Ǿ500 12.00 TC-15 Soldier Pile

424 3-Oct-15 4429 Ǿ500 12.00 TC-15 Soldier Pile

425 3-Oct-15 4430 Ǿ500 12.00 TC-15 Soldier Pile

783 3-Oct-15 4790 Ǿ500 12.00 TC-19 Soldier Pile

784 3-Oct-15 4791 Ǿ500 12.00 TC-19 Soldier Pile

785 3-Oct-15 4792 Ǿ500 12.00 TC-19 Soldier Pile

786 3-Oct-15 4793 Ǿ500 12.00 TC-19 Soldier Pile

787 3-Oct-15 4794 Ǿ500 12.00 TC-19 Soldier Pile

788 3-Oct-15 4795 Ǿ500 12.00 TC-19 Soldier Pile

789 3-Oct-15 4796 Ǿ500 12.00 TC-19 Soldier Pile

790 3-Oct-15 4797 Ǿ500 12.00 TC-19 Soldier Pile

791 3-Oct-15 4798 Ǿ500 12.00 TC-19 Soldier Pile

792 3-Oct-15 4799 Ǿ500 12.00 TC-19 Soldier Pile

793 3-Oct-15 4800 Ǿ500 12.00 TC-19 Soldier Pile

794 3-Oct-15 4801 Ǿ500 12.00 TC-19 Soldier Pile

795 3-Oct-15 4802 Ǿ500 12.00 TC-19 Soldier Pile

796 3-Oct-15 4803 Ǿ500 12.00 TC-19 Soldier Pile

797 3-Oct-15 4804 Ǿ500 12.00 TC-19 Soldier Pile

798 3-Oct-15 4805 Ǿ500 12.00 TC-19 Soldier Pile

799 3-Oct-15 4806 Ǿ500 12.00 TC-19 Soldier Pile

800 3-Oct-15 4807 Ǿ500 12.00 TC-19 Soldier Pile

801 3-Oct-15 4808 Ǿ500 12.00 TC-19 Soldier Pile

802 3-Oct-15 4809 Ǿ500 12.00 TC-19 Soldier Pile

803 3-Oct-15 4810 Ǿ500 12.00 TC-19 Soldier Pile

804 3-Oct-15 4811 Ǿ500 12.00 TC-19 Soldier Pile

805 3-Oct-15 4812 Ǿ500 12.00 TC-19 Soldier Pile

806 3-Oct-15 4813 Ǿ500 12.00 TC-19 Soldier Pile

263 21-Oct-15 4268 Ǿ500 12.00 TC-53 Soldier Pile

264 21-Oct-15 4269 Ǿ500 12.00 TC-53 Soldier Pile

265 21-Oct-15 4270 Ǿ500 12.00 TC-53 Soldier Pile

266 21-Oct-15 4271 Ǿ500 12.00 TC-53 Soldier Pile

267 21-Oct-15 4272 Ǿ500 12.00 TC-53 Soldier Pile

268 21-Oct-15 4273 Ǿ500 12.00 TC-53 Soldier Pile

269 21-Oct-15 4274 Ǿ500 12.00 TC-53 Soldier Pile

270 21-Oct-15 4275 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

271 21-Oct-15 4276 Ǿ500 12.00 TC-53 Soldier Pile

272 21-Oct-15 4277 Ǿ500 12.00 TC-53 Soldier Pile

273 21-Oct-15 4278 Ǿ500 12.00 TC-53 Soldier Pile

274 21-Oct-15 4279 Ǿ500 12.00 TC-53 Soldier Pile

275 21-Oct-15 4280 Ǿ500 12.00 TC-53 Soldier Pile

276 21-Oct-15 4281 Ǿ500 12.00 TC-53 Soldier Pile

277 21-Oct-15 4282 Ǿ500 12.00 TC-53 Soldier Pile

278 21-Oct-15 4283 Ǿ500 12.00 TC-53 Soldier Pile

279 21-Oct-15 4284 Ǿ500 12.00 TC-53 Soldier Pile

280 21-Oct-15 4285 Ǿ500 12.00 TC-53 Soldier Pile

238 22-Oct-15 4243 Ǿ500 12.00 TC-53 Soldier Pile

239 22-Oct-15 4244 Ǿ500 12.00 TC-53 Soldier Pile

240 22-Oct-15 4245 Ǿ500 12.00 TC-53 Soldier Pile

241 22-Oct-15 4246 Ǿ500 12.00 TC-53 Soldier Pile

242 22-Oct-15 4247 Ǿ500 12.00 TC-53 Soldier Pile

243 22-Oct-15 4248 Ǿ500 12.00 TC-53 Soldier Pile

244 22-Oct-15 4249 Ǿ500 12.00 TC-53 Soldier Pile

245 22-Oct-15 4250 Ǿ500 12.00 TC-53 Soldier Pile

246 22-Oct-15 4251 Ǿ500 12.00 TC-53 Soldier Pile

247 22-Oct-15 4252 Ǿ500 12.00 TC-53 Soldier Pile

248 22-Oct-15 4253 Ǿ500 12.00 TC-53 Soldier Pile

249 22-Oct-15 4254 Ǿ500 12.00 TC-53 Soldier Pile

250 22-Oct-15 4255 Ǿ500 12.00 TC-53 Soldier Pile

251 22-Oct-15 4256 Ǿ500 12.00 TC-53 Soldier Pile

252 22-Oct-15 4257 Ǿ500 12.00 TC-53 Soldier Pile

253 22-Oct-15 4258 Ǿ500 12.00 TC-53 Soldier Pile

254 22-Oct-15 4259 Ǿ500 12.00 TC-53 Soldier Pile

255 22-Oct-15 4260 Ǿ500 12.00 TC-53 Soldier Pile

256 22-Oct-15 4261 Ǿ500 12.00 TC-53 Soldier Pile

257 22-Oct-15 4262 Ǿ500 12.00 TC-53 Soldier Pile

258 22-Oct-15 4263 Ǿ500 12.00 TC-53 Soldier Pile

259 22-Oct-15 4264 Ǿ500 12.00 TC-53 Soldier Pile

260 22-Oct-15 4265 Ǿ500 12.00 TC-53 Soldier Pile

261 22-Oct-15 4266 Ǿ500 12.00 TC-53 Soldier Pile

262 22-Oct-15 4267 Ǿ500 12.00 TC-53 Soldier Pile

218 23-Oct-15 4223 Ǿ500 12.00 TC-53 Soldier Pile

219 23-Oct-15 4224 Ǿ500 12.00 TC-53 Soldier Pile

220 23-Oct-15 4225 Ǿ500 12.00 TC-53 Soldier Pile

221 23-Oct-15 4226 Ǿ500 12.00 TC-53 Soldier Pile

222 23-Oct-15 4227 Ǿ500 12.00 TC-53 Soldier Pile

223 23-Oct-15 4228 Ǿ500 12.00 TC-53 Soldier Pile

224 23-Oct-15 4229 Ǿ500 12.00 TC-53 Soldier Pile

225 23-Oct-15 4230 Ǿ500 12.00 TC-53 Soldier Pile

226 23-Oct-15 4231 Ǿ500 12.00 TC-53 Soldier Pile

227 23-Oct-15 4232 Ǿ500 12.00 TC-53 Soldier Pile

228 23-Oct-15 4233 Ǿ500 12.00 TC-53 Soldier Pile

229 23-Oct-15 4234 Ǿ500 12.00 TC-53 Soldier Pile

230 23-Oct-15 4235 Ǿ500 12.00 TC-53 Soldier Pile

231 23-Oct-15 4236 Ǿ500 12.00 TC-53 Soldier Pile

232 23-Oct-15 4237 Ǿ500 12.00 TC-53 Soldier Pile

233 23-Oct-15 4238 Ǿ500 12.00 TC-53 Soldier Pile

234 23-Oct-15 4239 Ǿ500 12.00 TC-53 Soldier Pile

235 23-Oct-15 4240 Ǿ500 12.00 TC-53 Soldier Pile

236 23-Oct-15 4241 Ǿ500 12.00 TC-53 Soldier Pile

237 23-Oct-15 4242 Ǿ500 12.00 TC-53 Soldier Pile

203 24-Oct-15 4208 Ǿ500 12.00 TC-53 Soldier Pile

204 24-Oct-15 4209 Ǿ500 12.00 TC-53 Soldier Pile

205 24-Oct-15 4210 Ǿ500 12.00 TC-53 Soldier Pile

206 24-Oct-15 4211 Ǿ500 12.00 TC-53 Soldier Pile

207 24-Oct-15 4212 Ǿ500 12.00 TC-53 Soldier Pile

208 24-Oct-15 4213 Ǿ500 12.00 TC-53 Soldier Pile

209 24-Oct-15 4214 Ǿ500 12.00 TC-53 Soldier Pile

210 24-Oct-15 4215 Ǿ500 12.00 TC-53 Soldier Pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

211 24-Oct-15 4216 Ǿ500 12.00 TC-53 Soldier Pile

212 24-Oct-15 4217 Ǿ500 12.00 TC-53 Soldier Pile

213 24-Oct-15 4218 Ǿ500 12.00 TC-53 Soldier Pile

214 24-Oct-15 4219 Ǿ500 12.00 TC-53 Soldier Pile

215 24-Oct-15 4220 Ǿ500 12.00 TC-53 Soldier Pile

216 24-Oct-15 4221 Ǿ500 12.00 TC-53 Soldier Pile

217 24-Oct-15 4222 Ǿ500 12.00 TC-53 Soldier Pile

807 24-Oct-15 4814 Ǿ500 12.00 TC-19 Soldier Pile

808 24-Oct-15 4815 Ǿ500 12.00 TC-19 Soldier Pile

809 24-Oct-15 4816 Ǿ500 12.00 TC-19 Soldier Pile

810 24-Oct-15 4817 Ǿ500 12.00 TC-19 Soldier Pile

811 24-Oct-15 4818 Ǿ500 12.00 TC-19 Soldier Pile

812 24-Oct-15 4819 Ǿ500 12.00 TC-19 Soldier Pile

813 24-Oct-15 4820 Ǿ500 12.00 TC-19 Soldier Pile

814 24-Oct-15 4821 Ǿ500 12.00 TC-19 Soldier Pile

815 24-Oct-15 4822 Ǿ500 12.00 TC-19 Soldier Pile

816 24-Oct-15 4823 Ǿ500 12.00 TC-19 Soldier Pile

817 24-Oct-15 4824 Ǿ500 12.00 TC-19 Soldier Pile

818 24-Oct-15 4825 Ǿ500 12.00 TC-19 Soldier Pile

194 2-Nov-15 4200 Ǿ500 12.00 TC-19 soldier pile

196 2-Nov-15 4201 Ǿ500 12.00 TC-19 soldier pile

197 2-Nov-15 4202 Ǿ500 12.00 TC-19 soldier pile

198 2-Nov-15 4203 Ǿ500 12.00 TC-19 soldier pile

199 2-Nov-15 4204 Ǿ500 12.00 TC-19 soldier pile

200 2-Nov-15 4205 Ǿ500 12.00 TC-19 soldier pile

201 2-Nov-15 4206 Ǿ500 12.00 TC-19 soldier pile

202 2-Nov-15 4207 Ǿ500 12.00 TC-19 soldier pile

147 19-Nov-15 4152 Ǿ500 12.00 TC-53 Bor soldier pile

148 19-Nov-15 4153 Ǿ500 12.00 TC-53 Bor soldier pile

149 19-Nov-15 4154 Ǿ500 12.00 TC-53 Bor soldier pile

150 19-Nov-15 4155 Ǿ500 12.00 TC-53 Bor soldier pile

151 19-Nov-15 4156 Ǿ500 12.00 TC-53 Bor soldier pile

152 19-Nov-15 4157 Ǿ500 12.00 TC-53 Bor soldier pile

153 19-Nov-15 4158 Ǿ500 12.00 TC-53 Bor soldier pile

154 19-Nov-15 4159 Ǿ500 12.00 TC-53 Bor soldier pile

155 19-Nov-15 4160 Ǿ500 12.00 TC-53 Bor soldier pile

156 19-Nov-15 4161 Ǿ500 12.00 TC-53 Bor soldier pile

157 19-Nov-15 4162 Ǿ500 12.00 TC-53 Bor soldier pile

158 19-Nov-15 4163 Ǿ500 12.00 TC-53 Bor soldier pile

159 19-Nov-15 4164 Ǿ500 12.00 TC-53 Bor soldier pile

160 19-Nov-15 4165 Ǿ500 12.00 TC-53 Bor soldier pile

161 19-Nov-15 4166 Ǿ500 12.00 TC-53 Bor soldier pile

162 19-Nov-15 4167 Ǿ500 12.00 TC-53 Bor soldier pile

163 19-Nov-15 4168 Ǿ500 12.00 TC-53 Bor soldier pile

164 19-Nov-15 4169 Ǿ500 12.00 TC-53 Bor soldier pile

165 19-Nov-15 4170 Ǿ500 12.00 TC-53 Bor soldier pile

166 19-Nov-15 4171 Ǿ500 12.00 TC-53 Bor soldier pile

167 19-Nov-15 4172 Ǿ500 12.00 TC-53 Bor soldier pile

168 19-Nov-15 4173 Ǿ500 12.00 TC-53 Bor soldier pile

169 19-Nov-15 4174 Ǿ500 12.00 TC-53 Bor soldier pile

170 19-Nov-15 4175 Ǿ500 12.00 TC-53 Bor soldier pile

171 19-Nov-15 4176 Ǿ500 12.00 TC-53 Bor soldier pile

172 19-Nov-15 4177 Ǿ500 12.00 TC-53 Bor soldier pile

703 19-Nov-15 4710 Ǿ500 12.00 TC-15 Bor soldier pile

704 19-Nov-15 4711 Ǿ500 12.00 TC-15 Bor soldier pile

705 19-Nov-15 4712 Ǿ500 12.00 TC-15 Bor soldier pile

706 19-Nov-15 4713 Ǿ500 12.00 TC-15 Bor soldier pile

707 19-Nov-15 4714 Ǿ500 12.00 TC-15 Bor soldier pile

708 19-Nov-15 4715 Ǿ500 12.00 TC-15 Bor soldier pile

709 19-Nov-15 4716 Ǿ500 12.00 TC-15 Bor soldier pile

710 19-Nov-15 4717 Ǿ500 12.00 TC-15 Bor soldier pile

711 19-Nov-15 4718 Ǿ500 12.00 TC-15 Bor soldier pile

712 19-Nov-15 4719 Ǿ500 12.00 TC-15 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

713 19-Nov-15 4720 Ǿ500 12.00 TC-15 Bor soldier pile

714 19-Nov-15 4721 Ǿ500 12.00 TC-15 Bor soldier pile

715 19-Nov-15 4722 Ǿ500 12.00 TC-15 Bor soldier pile

716 19-Nov-15 4723 Ǿ500 12.00 TC-15 Bor soldier pile

717 19-Nov-15 4724 Ǿ500 12.00 TC-15 Bor soldier pile

718 19-Nov-15 4725 Ǿ500 12.00 TC-15 Bor soldier pile

719 19-Nov-15 4726 Ǿ500 12.00 TC-15 Bor soldier pile

720 19-Nov-15 4727 Ǿ500 12.00 TC-15 Bor soldier pile

721 19-Nov-15 4728 Ǿ500 12.00 TC-15 Bor soldier pile

722 19-Nov-15 4729 Ǿ500 12.00 TC-15 Bor soldier pile

723 19-Nov-15 4730 Ǿ500 12.00 TC-15 Bor soldier pile

724 19-Nov-15 4731 Ǿ500 12.00 TC-15 Bor soldier pile

725 19-Nov-15 4732 Ǿ500 12.00 TC-15 Bor soldier pile

726 19-Nov-15 4733 Ǿ500 12.00 TC-15 Bor soldier pile

173 20-Nov-15 4178 Ǿ500 12.00 TC-53 Bor soldier pile

174 20-Nov-15 4179 Ǿ500 12.00 TC-53 Bor soldier pile

175 20-Nov-15 4180 Ǿ500 12.00 TC-53 Bor soldier pile

176 20-Nov-15 4181 Ǿ500 12.00 TC-53 Bor soldier pile

177 20-Nov-15 4182 Ǿ500 12.00 TC-53 Bor soldier pile

178 20-Nov-15 4183 Ǿ500 12.00 TC-53 Bor soldier pile

179 20-Nov-15 4184 Ǿ500 12.00 TC-53 Bor soldier pile

180 20-Nov-15 4185 Ǿ500 12.00 TC-53 Bor soldier pile

181 20-Nov-15 4186 Ǿ500 12.00 TC-53 Bor soldier pile

182 20-Nov-15 4187 Ǿ500 12.00 TC-53 Bor soldier pile

183 20-Nov-15 4188 Ǿ500 12.00 TC-53 Bor soldier pile

184 20-Nov-15 4189 Ǿ500 12.00 TC-53 Bor soldier pile

185 20-Nov-15 4190 Ǿ500 12.00 TC-53 Bor soldier pile

186 20-Nov-15 4191 Ǿ500 12.00 TC-53 Bor soldier pile

187 20-Nov-15 4192 Ǿ500 12.00 TC-53 Bor soldier pile

188 20-Nov-15 4193 Ǿ500 12.00 TC-53 Bor soldier pile

189 20-Nov-15 4194 Ǿ500 12.00 TC-53 Bor soldier pile

190 20-Nov-15 4195 Ǿ500 12.00 TC-53 Bor soldier pile

191 20-Nov-15 4196 Ǿ500 12.00 TC-53 Bor soldier pile

693 20-Nov-15 4700 Ǿ500 12.00 TC-15 Bor soldier pile

694 20-Nov-15 4701 Ǿ500 12.00 TC-15 Bor soldier pile

695 20-Nov-15 4702 Ǿ500 12.00 TC-15 Bor soldier pile

696 20-Nov-15 4703 Ǿ500 12.00 TC-15 Bor soldier pile

697 20-Nov-15 4704 Ǿ500 12.00 TC-15 Bor soldier pile

698 20-Nov-15 4705 Ǿ500 12.00 TC-15 Bor soldier pile

699 20-Nov-15 4706 Ǿ500 12.00 TC-15 Bor soldier pile

700 20-Nov-15 4707 Ǿ500 12.00 TC-15 Bor soldier pile

701 20-Nov-15 4708 Ǿ500 12.00 TC-15 Bor soldier pile

702 20-Nov-15 4709 Ǿ500 12.00 TC-15 Bor soldier pile

17 27-Nov-15 4017 Ǿ500 12.00 TC-15 Bor soldier pile

18 27-Nov-15 4018 Ǿ500 12.00 TC-15 Bor soldier pile

19 27-Nov-15 4019 Ǿ500 12.00 TC-15 Bor soldier pile

20 27-Nov-15 4020 Ǿ500 12.00 TC-15 Bor soldier pile

21 27-Nov-15 4021 Ǿ500 12.00 TC-15 Bor soldier pile

22 27-Nov-15 4022 Ǿ500 12.00 TC-15 Bor soldier pile

23 27-Nov-15 4023 Ǿ500 12.00 TC-15 Bor soldier pile

24 27-Nov-15 4024 Ǿ500 12.00 TC-15 Bor soldier pile

25 27-Nov-15 4025 Ǿ500 12.00 TC-15 Bor soldier pile

26 27-Nov-15 4026 Ǿ500 12.00 TC-15 Bor soldier pile

27 27-Nov-15 4027 Ǿ500 12.00 TC-15 Bor soldier pile

28 27-Nov-15 4028 Ǿ500 12.00 TC-15 Bor soldier pile

29 27-Nov-15 4029 Ǿ500 12.00 TC-15 Bor soldier pile

30 27-Nov-15 4030 Ǿ500 12.00 TC-15 Bor soldier pile

31 27-Nov-15 4031 Ǿ500 12.00 TC-15 Bor soldier pile

32 27-Nov-15 4032 Ǿ500 12.00 TC-15 Bor soldier pile

33 27-Nov-15 4033 Ǿ500 12.00 TC-15 Bor soldier pile

34 27-Nov-15 4034 Ǿ500 12.00 TC-15 Bor soldier pile

35 27-Nov-15 4035 Ǿ500 12.00 TC-15 Bor soldier pile

36 27-Nov-15 4036 Ǿ500 12.00 TC-15 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

37 27-Nov-15 4037 Ǿ500 12.00 TC-15 Bor soldier pile

38 27-Nov-15 4038 Ǿ500 12.00 TC-15 Bor soldier pile

39 27-Nov-15 4039 Ǿ500 12.00 TC-15 Bor soldier pile

40 27-Nov-15 4040 Ǿ500 12.00 TC-15 Bor soldier pile

41 27-Nov-15 4041 Ǿ500 12.00 TC-15 Bor soldier pile

42 27-Nov-15 4042 Ǿ500 12.00 TC-15 Bor soldier pile

43 27-Nov-15 4043 Ǿ500 12.00 TC-15 Bor soldier pile

44 27-Nov-15 4044 Ǿ500 12.00 TC-15 Bor soldier pile

45 27-Nov-15 4045 Ǿ500 12.00 TC-15 Bor soldier pile

46 27-Nov-15 4046 Ǿ500 12.00 TC-15 Bor soldier pile

47 27-Nov-15 4047 Ǿ500 12.00 TC-15 Bor soldier pile

48 27-Nov-15 4048 Ǿ500 12.00 TC-15 Bor soldier pile

49 27-Nov-15 4049 Ǿ500 12.00 TC-15 Bor soldier pile

50 27-Nov-15 4050 Ǿ500 12.00 TC-15 Bor soldier pile

51 27-Nov-15 4051 Ǿ500 12.00 TC-15 Bor soldier pile

70 27-Nov-15 4070 Ǿ500 12.00 TC-15 Bor soldier pile

71 27-Nov-15 4071 Ǿ500 12.00 TC-15 Bor soldier pile

72 27-Nov-15 4072 Ǿ500 12.00 TC-15 Bor soldier pile

73 27-Nov-15 4073 Ǿ500 12.00 TC-15 Bor soldier pile

74 27-Nov-15 4074 Ǿ500 12.00 TC-15 Bor soldier pile

75 27-Nov-15 4075 Ǿ500 12.00 TC-15 Bor soldier pile

76 27-Nov-15 4076 Ǿ500 12.00 TC-15 Bor soldier pile

77 27-Nov-15 4077 Ǿ500 12.00 TC-15 Bor soldier pile

78 27-Nov-15 4078 Ǿ500 12.00 TC-15 Bor soldier pile

79 27-Nov-15 4079 Ǿ500 12.00 TC-15 Bor soldier pile

80 27-Nov-15 4080 Ǿ500 12.00 TC-15 Bor soldier pile

81 27-Nov-15 4081 Ǿ500 12.00 TC-15 Bor soldier pile

82 27-Nov-15 4082 Ǿ500 12.00 TC-15 Bor soldier pile

83 27-Nov-15 4083 Ǿ500 12.00 TC-15 Bor soldier pile

84 27-Nov-15 4084 Ǿ500 12.00 TC-15 Bor soldier pile

85 27-Nov-15 4085 Ǿ500 12.00 TC-15 Bor soldier pile

86 27-Nov-15 4086 Ǿ500 12.00 TC-15 Bor soldier pile

87 27-Nov-15 4087 Ǿ500 12.00 TC-15 Bor soldier pile

88 27-Nov-15 4088 Ǿ500 12.00 TC-15 Bor soldier pile

89 27-Nov-15 4089 Ǿ500 12.00 TC-15 Bor soldier pile

90 27-Nov-15 4090 Ǿ500 12.00 TC-15 Bor soldier pile

91 27-Nov-15 4091 Ǿ500 12.00 TC-53 Bor soldier pile

92 27-Nov-15 4092 Ǿ500 12.00 TC-53 Bor soldier pile

93 27-Nov-15 4093 Ǿ500 12.00 TC-53 Bor soldier pile

94 27-Nov-15 4094 Ǿ500 12.00 TC-53 Bor soldier pile

95 27-Nov-15 4095 Ǿ500 12.00 TC-53 Bor soldier pile

96 27-Nov-15 4096 Ǿ500 12.00 TC-53 Bor soldier pile

97 27-Nov-15 4097 Ǿ500 12.00 TC-53 Bor soldier pile

98 27-Nov-15 4098 Ǿ500 12.00 TC-53 Bor soldier pile

99 27-Nov-15 4099 Ǿ500 12.00 TC-53 Bor soldier pile

100 27-Nov-15 4100 Ǿ500 12.00 TC-53 Bor soldier pile

101 27-Nov-15 4101 Ǿ500 12.00 TC-53 Bor soldier pile

102 27-Nov-15 4102 Ǿ500 12.00 TC-53 Bor soldier pile

103 27-Nov-15 4103 Ǿ500 12.00 TC-53 Bor soldier pile

104 27-Nov-15 4104 Ǿ500 12.00 TC-53 Bor soldier pile

105 27-Nov-15 4105 Ǿ500 12.00 TC-53 Bor soldier pile

106 27-Nov-15 4106 Ǿ500 12.00 TC-53 Bor soldier pile

107 27-Nov-15 4107 Ǿ500 12.00 TC-53 Bor soldier pile

108 27-Nov-15 4108 Ǿ500 12.00 TC-53 Bor soldier pile

109 27-Nov-15 4109 Ǿ500 12.00 TC-53 Bor soldier pile

110 27-Nov-15 4110 Ǿ500 12.00 TC-53 Bor soldier pile

111 27-Nov-15 4111 Ǿ500 12.00 TC-53 Bor soldier pile

192 27-Nov-15 4198 Ǿ500 12.00 TC-53 Bor soldier pile

193 27-Nov-15 4199 Ǿ500 12.00 TC-53 Bor soldier pile

195 27-Nov-15 4200 Ǿ500 12.00 TC-53 Bor soldier pile

1 30-Nov-15 4001 Ǿ500 12.00 TC-15 Bor soldier pile

2 30-Nov-15 4002 Ǿ500 12.00 TC-15 Bor soldier pile

3 30-Nov-15 4003 Ǿ500 12.00 TC-15 Bor soldier pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

4 30-Nov-15 4004 Ǿ500 12.00 TC-15 Bor soldier pile

5 30-Nov-15 4005 Ǿ500 12.00 TC-15 Bor soldier pile

6 30-Nov-15 4006 Ǿ500 12.00 TC-15 Bor soldier pile

7 30-Nov-15 4007 Ǿ500 12.00 TC-15 Bor soldier pile

8 30-Nov-15 4008 Ǿ500 12.00 TC-15 Bor soldier pile

9 30-Nov-15 4009 Ǿ500 12.00 TC-15 Bor soldier pile

10 30-Nov-15 4010 Ǿ500 12.00 TC-15 Bor soldier pile

11 30-Nov-15 4011 Ǿ500 12.00 TC-15 Bor soldier pile

12 30-Nov-15 4012 Ǿ500 12.00 TC-15 Bor soldier pile

13 30-Nov-15 4013 Ǿ500 12.00 TC-15 Bor soldier pile

14 30-Nov-15 4014 Ǿ500 12.00 TC-15 Bor soldier pile

15 30-Nov-15 4015 Ǿ500 12.00 TC-15 Bor soldier pile

16 30-Nov-15 4016 Ǿ500 12.00 TC-15 Bor soldier pile

52 30-Nov-15 4052 Ǿ500 12.00 TC-15 Bor soldier pile

53 30-Nov-15 4053 Ǿ500 12.00 TC-15 Bor soldier pile

54 30-Nov-15 4054 Ǿ500 12.00 TC-15 Bor soldier pile

55 30-Nov-15 4055 Ǿ500 12.00 TC-15 Bor soldier pile

56 30-Nov-15 4056 Ǿ500 12.00 TC-15 Bor soldier pile

57 30-Nov-15 4057 Ǿ500 12.00 TC-15 Bor soldier pile

58 30-Nov-15 4058 Ǿ500 12.00 TC-15 Bor soldier pile

59 30-Nov-15 4059 Ǿ500 12.00 TC-15 Bor soldier pile

60 30-Nov-15 4060 Ǿ500 12.00 TC-15 Bor soldier pile

61 30-Nov-15 4061 Ǿ500 12.00 TC-15 Bor soldier pile

62 30-Nov-15 4062 Ǿ500 12.00 TC-15 Bor soldier pile

63 30-Nov-15 4063 Ǿ500 12.00 TC-15 Bor soldier pile

64 30-Nov-15 4064 Ǿ500 12.00 TC-15 Bor soldier pile

65 30-Nov-15 4065 Ǿ500 12.00 TC-15 Bor soldier pile

66 30-Nov-15 4066 Ǿ500 12.00 TC-15 Bor soldier pile

67 30-Nov-15 4067 Ǿ500 12.00 TC-15 Bor soldier pile

68 30-Nov-15 4068 Ǿ500 12.00 TC-15 Bor soldier pile

69 30-Nov-15 4069 Ǿ500 12.00 TC-15 Bor soldier pile

819 4-Dec-15 4826 Ǿ500 12.00 TC-15 Bor soldier pile

820 4-Dec-15 4827 Ǿ500 12.00 TC-15 Bor soldier pile

821 4-Dec-15 4828 Ǿ500 12.00 TC-15 Bor soldier pile

822 4-Dec-15 4829 Ǿ500 12.00 TC-15 Bor soldier pile

823 4-Dec-15 4830 Ǿ500 12.00 TC-15 Bor soldier pile

824 4-Dec-15 4831 Ǿ500 12.00 TC-15 Bor soldier pile

825 4-Dec-15 4832 Ǿ500 12.00 TC-15 Bor soldier pile

826 4-Dec-15 4833 Ǿ500 12.00 TC-15 Bor soldier pile

827 4-Dec-15 4834 Ǿ500 12.00 TC-15 Bor soldier pile

828 4-Dec-15 4835 Ǿ500 12.00 TC-15 Bor soldier pile

829 4-Dec-15 4836 Ǿ500 12.00 TC-15 Bor soldier pile

TOTAL PREBORING 10236.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : SOIL FLURRY / BORE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABA


Date : 05 AGUST'15 - 31 OKT'15

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1490 2-Dec-15 1001 Ǿ500 12.00 TC-19 Bor main pile

1492 2-Dec-15 1002 Ǿ500 12.00 TC-19 Bor main pile

1494 2-Dec-15 1003 Ǿ500 12.00 TC-19 Bor main pile

1496 2-Dec-15 1004 Ǿ500 12.00 TC-19 Bor main pile

1498 2-Dec-15 1006 Ǿ500 12.00 TC-19 Bor main pile

1500 2-Dec-15 1007 Ǿ500 12.00 TC-19 Bor main pile

1502 2-Dec-15 1008 Ǿ500 12.00 TC-19 Bor main pile

1501 2-Dec-15 1022 Ǿ500 12.00 TC-19 Bor main pile

1499 2-Dec-15 1023 Ǿ500 12.00 TC-19 Bor main pile

1497 2-Dec-15 1024 Ǿ500 12.00 TC-19 Bor main pile

1495 2-Dec-15 1025 Ǿ500 12.00 TC-19 Bor main pile

1493 2-Dec-15 1026 Ǿ500 12.00 TC-19 Bor main pile

1491 2-Dec-15 1027 Ǿ500 12.00 TC-19 Bor main pile

1474 1-Dec-15 1262 Ǿ500 12.00 TC-15 Bor hotel pile

1475 1-Dec-15 1263 Ǿ500 12.00 TC-15 Bor hotel pile

1476 1-Dec-15 1264 Ǿ500 12.00 TC-15 Bor hotel pile

1477 1-Dec-15 1265 Ǿ500 12.00 TC-15 Bor hotel pile

1478 1-Dec-15 1266 Ǿ500 12.00 TC-15 Bor hotel pile

1479 1-Dec-15 1267 Ǿ500 12.00 TC-15 Bor hotel pile

1480 1-Dec-15 1268 Ǿ500 12.00 TC-15 Bor hotel pile

1481 1-Dec-15 1269 Ǿ500 12.00 TC-15 Bor hotel pile

1482 1-Dec-15 1270 Ǿ500 12.00 TC-15 Bor hotel pile

1026 12-Nov-15 1271 Ǿ500 12.00 TC-15 Bor hotel pile

1027 12-Nov-15 1272 Ǿ500 12.00 TC-15 Bor hotel pile

1028 12-Nov-15 1273 Ǿ500 12.00 TC-15 Bor hotel pile

1029 12-Nov-15 1274 Ǿ500 12.00 TC-15 Bor hotel pile

1030 12-Nov-15 1275 Ǿ500 12.00 TC-15 Bor hotel pile

1031 12-Nov-15 1276 Ǿ500 12.00 TC-15 Bor hotel pile

1032 12-Nov-15 1277 Ǿ500 12.00 TC-15 Bor hotel pile

1033 12-Nov-15 1278 Ǿ500 12.00 TC-15 Bor hotel pile

1034 12-Nov-15 1279 Ǿ500 12.00 TC-15 Bor hotel pile

1066 14-Nov-15 1280 Ǿ500 12.00 TC-19 Bor hotel pile

1067 14-Nov-15 1281 Ǿ500 12.00 TC-19 Bor hotel pile

1068 14-Nov-15 1282 Ǿ500 12.00 TC-19 Bor hotel pile

1069 14-Nov-15 1283 Ǿ500 12.00 TC-19 Bor hotel pile

1070 14-Nov-15 1284 Ǿ500 12.00 TC-19 Bor hotel pile

1071 14-Nov-15 1285 Ǿ500 12.00 TC-19 Bor hotel pile

1072 14-Nov-15 1287 Ǿ500 12.00 TC-19 Bor hotel pile

1073 14-Nov-15 1288 Ǿ500 12.00 TC-19 Bor hotel pile

1082 14-Nov-15 1289 Ǿ500 12.00 TC-19 Bor hotel pile

1081 14-Nov-15 1290 Ǿ500 12.00 TC-19 Bor hotel pile

1080 14-Nov-15 1291 Ǿ500 12.00 TC-19 Bor hotel pile

1079 14-Nov-15 1292 Ǿ500 12.00 TC-19 Bor hotel pile

1078 14-Nov-15 1293 Ǿ500 12.00 TC-19 Bor hotel pile

1077 14-Nov-15 1294 Ǿ500 12.00 TC-19 Bor hotel pile

1076 14-Nov-15 1295 Ǿ500 12.00 TC-19 Bor hotel pile

1075 14-Nov-15 1296 Ǿ500 12.00 TC-19 Bor hotel pile

1074 14-Nov-15 1297 Ǿ500 12.00 TC-19 Bor hotel pile

1201 24-Nov-15 1298 Ǿ500 12.00 TC-19 Bor hotel pile

1200 24-Nov-15 1300 Ǿ500 12.00 TC-19 Bor hotel pile

1199 24-Nov-15 1301 Ǿ500 12.00 TC-19 Bor hotel pile

1198 24-Nov-15 1302 Ǿ500 12.00 TC-19 Bor hotel pile

1197 24-Nov-15 1303 Ǿ500 12.00 TC-19 Bor hotel pile

1196 24-Nov-15 1304 Ǿ500 12.00 TC-19 Bor hotel pile

1195 24-Nov-15 1305 Ǿ500 12.00 TC-19 Bor hotel pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1194 24-Nov-15 1306 Ǿ500 12.00 TC-19 Bor hotel pile

1210 24-Nov-15 1307 Ǿ500 12.00 TC-19 Bor hotel pile

1209 24-Nov-15 1308 Ǿ500 12.00 TC-19 Bor hotel pile

1208 24-Nov-15 1309 Ǿ500 12.00 TC-19 Bor hotel pile

1207 24-Nov-15 1310 Ǿ500 12.00 TC-19 Bor hotel pile

1206 24-Nov-15 1311 Ǿ500 12.00 TC-19 Bor hotel pile

1205 24-Nov-15 1312 Ǿ500 12.00 TC-19 Bor hotel pile

1204 24-Nov-15 1313 Ǿ500 12.00 TC-19 Bor hotel pile

1203 24-Nov-15 1314 Ǿ500 12.00 TC-19 Bor hotel pile

1202 24-Nov-15 1315 Ǿ500 12.00 TC-19 Bor hotel pile

1297 26-Nov-15 1316 Ǿ500 12.00 TC-19 Bor hotel pile

1298 26-Nov-15 1317 Ǿ500 12.00 TC-19 Bor hotel pile

1299 26-Nov-15 1318 Ǿ500 12.00 TC-19 Bor hotel pile

1300 26-Nov-15 1319 Ǿ500 12.00 TC-19 Bor hotel pile

1301 26-Nov-15 1320 Ǿ500 12.00 TC-19 Bor hotel pile

1302 26-Nov-15 1321 Ǿ500 12.00 TC-19 Bor hotel pile

1303 26-Nov-15 1322 Ǿ500 12.00 TC-19 Bor hotel pile

1304 26-Nov-15 1323 Ǿ500 12.00 TC-19 Bor hotel pile

1305 26-Nov-15 1324 Ǿ500 12.00 TC-19 Bor hotel pile

1306 26-Nov-15 1325 Ǿ500 12.00 TC-19 Bor hotel pile

1307 26-Nov-15 1326 Ǿ500 12.00 TC-19 Bor hotel pile

1308 26-Nov-15 1327 Ǿ500 12.00 TC-19 Bor hotel pile

1309 26-Nov-15 1328 Ǿ500 12.00 TC-19 Bor hotel pile

1310 26-Nov-15 1329 Ǿ500 12.00 TC-19 Bor hotel pile

1311 26-Nov-15 1330 Ǿ500 12.00 TC-19 Bor hotel pile

1312 26-Nov-15 1331 Ǿ500 12.00 TC-19 Bor hotel pile

1313 26-Nov-15 1332 Ǿ500 12.00 TC-19 Bor hotel pile

1314 26-Nov-15 1333 Ǿ500 12.00 TC-19 Bor hotel pile

1897 15-Dec-15 1334 Ǿ500 12.00 TC-53 Bor hotel pile

1896 15-Dec-15 1335 Ǿ500 12.00 TC-53 Bor hotel pile

1895 15-Dec-15 1337 Ǿ500 12.00 TC-53 Bor hotel pile

1894 15-Dec-15 1338 Ǿ500 12.00 TC-53 Bor hotel pile

1893 15-Dec-15 1339 Ǿ500 12.00 TC-53 Bor hotel pile

1892 15-Dec-15 1340 Ǿ500 12.00 TC-53 Bor hotel pile

1891 15-Dec-15 1341 Ǿ500 12.00 TC-53 Bor hotel pile

1890 15-Dec-15 1342 Ǿ500 12.00 TC-53 Bor hotel pile

1889 15-Dec-15 1343 Ǿ500 12.00 TC-53 Bor hotel pile

1888 15-Dec-15 1344 Ǿ500 12.00 TC-53 Bor hotel pile

1887 15-Dec-15 1345 Ǿ500 12.00 TC-53 Bor hotel pile

1886 15-Dec-15 1346 Ǿ500 12.00 TC-53 Bor hotel pile

1885 15-Dec-15 1347 Ǿ500 12.00 TC-53 Bor hotel pile

1884 15-Dec-15 1348 Ǿ500 12.00 TC-53 Bor hotel pile

1883 15-Dec-15 1349 Ǿ500 12.00 TC-53 Bor hotel pile

1882 15-Dec-15 1350 Ǿ500 12.00 TC-53 Bor hotel pile

1881 15-Dec-15 1351 Ǿ500 12.00 TC-53 Bor hotel pile

1758 12-Dec-15 1360 Ǿ500 12.00 TC-53 Bor hotel pile

1759 12-Dec-15 1361 Ǿ500 12.00 TC-53 Bor hotel pile

1760 12-Dec-15 1362 Ǿ500 12.00 TC-53 Bor hotel pile

1412 27-Nov-15 1380 Ǿ500 12.00 TC-19 Bor hotel pile

1413 27-Nov-15 1381 Ǿ500 12.00 TC-19 Bor hotel pile

1414 27-Nov-15 1382 Ǿ500 12.00 TC-19 Bor hotel pile

1415 27-Nov-15 1383 Ǿ500 12.00 TC-19 Bor hotel pile

1416 27-Nov-15 1384 Ǿ500 12.00 TC-19 Bor hotel pile

1417 27-Nov-15 1385 Ǿ500 12.00 TC-19 Bor hotel pile

1321 26-Nov-15 1386 Ǿ500 12.00 TC-19 Bor hotel pile

1322 26-Nov-15 1387 Ǿ500 12.00 TC-19 Bor hotel pile

1323 26-Nov-15 1388 Ǿ500 12.00 TC-19 Bor hotel pile

1324 26-Nov-15 1389 Ǿ500 12.00 TC-19 Bor hotel pile

1325 26-Nov-15 1390 Ǿ500 12.00 TC-19 Bor hotel pile

1326 26-Nov-15 1391 Ǿ500 12.00 TC-19 Bor hotel pile

1315 26-Nov-15 1392 Ǿ500 12.00 TC-19 Bor hotel pile

1316 26-Nov-15 1393 Ǿ500 12.00 TC-19 Bor hotel pile

1317 26-Nov-15 1394 Ǿ500 12.00 TC-19 Bor hotel pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1318 26-Nov-15 1395 Ǿ500 12.00 TC-19 Bor hotel pile

1319 26-Nov-15 1396 Ǿ500 12.00 TC-19 Bor hotel pile

1320 26-Nov-15 1397 Ǿ500 12.00 TC-19 Bor hotel pile

1211 24-Nov-15 1398 Ǿ500 12.00 TC-19 Bor hotel pile

1212 24-Nov-15 1399 Ǿ500 12.00 TC-19 Bor hotel pile

1213 24-Nov-15 1400 Ǿ500 12.00 TC-19 Bor hotel pile

1214 24-Nov-15 1401 Ǿ500 12.00 TC-19 Bor hotel pile

1215 24-Nov-15 1402 Ǿ500 12.00 TC-19 Bor hotel pile

1216 24-Nov-15 1403 Ǿ500 12.00 TC-19 Bor hotel pile

1327 26-Nov-15 1415 Ǿ500 12.00 TC-19 Bor hotel pile

1328 26-Nov-15 1416 Ǿ500 12.00 TC-19 Bor hotel pile

1329 26-Nov-15 1417 Ǿ500 12.00 TC-19 Bor hotel pile

1330 26-Nov-15 1418 Ǿ500 12.00 TC-19 Bor hotel pile

1331 26-Nov-15 1419 Ǿ500 12.00 TC-19 Bor hotel pile

1217 24-Nov-15 1420 Ǿ500 12.00 TC-19 Bor hotel pile

1218 24-Nov-15 1421 Ǿ500 12.00 TC-19 Bor hotel pile

1219 24-Nov-15 1422 Ǿ500 12.00 TC-19 Bor hotel pile

1220 24-Nov-15 1423 Ǿ500 12.00 TC-19 Bor hotel pile

1221 24-Nov-15 1424 Ǿ500 12.00 TC-19 Bor hotel pile

982 10-Nov-15 1430 Ǿ500 12.00 TC-19 Bor hotel pile

983 10-Nov-15 1431 Ǿ500 12.00 TC-19 Bor hotel pile

984 10-Nov-15 1432 Ǿ500 12.00 TC-19 Bor hotel pile

985 10-Nov-15 1433 Ǿ500 12.00 TC-19 Bor hotel pile

986 10-Nov-15 1434 Ǿ500 12.00 TC-19 Bor hotel pile

987 10-Nov-15 1435 Ǿ500 12.00 TC-19 Bor hotel pile

988 10-Nov-15 1436 Ǿ500 12.00 TC-19 Bor hotel pile

989 10-Nov-15 1437 Ǿ500 12.00 TC-19 Bor hotel pile

990 10-Nov-15 1438 Ǿ500 12.00 TC-19 Bor hotel pile

991 10-Nov-15 1439 Ǿ500 12.00 TC-19 Bor hotel pile

992 10-Nov-15 1440 Ǿ500 12.00 TC-19 Bor hotel pile

993 10-Nov-15 1441 Ǿ500 12.00 TC-19 Bor hotel pile

994 10-Nov-15 1442 Ǿ500 12.00 TC-19 Bor hotel pile

995 10-Nov-15 1443 Ǿ500 12.00 TC-19 Bor hotel pile

996 10-Nov-15 1444 Ǿ500 12.00 TC-19 Bor hotel pile

997 10-Nov-15 1445 Ǿ500 12.00 TC-19 Bor hotel pile

998 10-Nov-15 1446 Ǿ500 12.00 TC-19 Bor hotel pile

999 10-Nov-15 1447 Ǿ500 12.00 TC-19 Bor hotel pile

1000 10-Nov-15 1448 Ǿ500 12.00 TC-19 Bor hotel pile

1001 10-Nov-15 1449 Ǿ500 12.00 TC-19 Bor hotel pile

922 7-Nov-15 1450 Ǿ500 12.00 TC-19 Bor hotel pile

921 7-Nov-15 1451 Ǿ500 12.00 TC-19 Bor hotel pile

920 7-Nov-15 1452 Ǿ500 12.00 TC-19 Bor hotel pile

919 7-Nov-15 1453 Ǿ500 12.00 TC-19 Bor hotel pile

918 7-Nov-15 1454 Ǿ500 12.00 TC-19 Bor hotel pile

917 7-Nov-15 1455 Ǿ500 12.00 TC-19 Bor hotel pile

916 7-Nov-15 1456 Ǿ500 12.00 TC-19 Bor hotel pile

915 7-Nov-15 1457 Ǿ500 12.00 TC-19 Bor hotel pile

914 7-Nov-15 1458 Ǿ500 12.00 TC-19 Bor hotel pile

913 7-Nov-15 1459 Ǿ500 12.00 TC-19 Bor hotel pile

912 7-Nov-15 1460 Ǿ500 12.00 TC-19 Bor hotel pile

911 7-Nov-15 1461 Ǿ500 12.00 TC-19 Bor hotel pile

910 7-Nov-15 1462 Ǿ500 12.00 TC-19 Bor hotel pile

909 7-Nov-15 1463 Ǿ500 12.00 TC-19 Bor hotel pile

908 7-Nov-15 1464 Ǿ500 12.00 TC-19 Bor hotel pile

907 7-Nov-15 1465 Ǿ500 12.00 TC-19 Bor hotel pile

906 7-Nov-15 1466 Ǿ500 12.00 TC-19 Bor hotel pile

905 7-Nov-15 1467 Ǿ500 12.00 TC-19 Bor hotel pile

875 5-Nov-15 1468 Ǿ500 12.00 TC-19 Bor hotel pile

876 5-Nov-15 1469 Ǿ500 12.00 TC-19 Bor hotel pile

877 5-Nov-15 1470 Ǿ500 12.00 TC-19 Bor hotel pile

878 5-Nov-15 1471 Ǿ500 12.00 TC-19 Bor hotel pile

879 5-Nov-15 1472 Ǿ500 12.00 TC-19 Bor hotel pile

880 5-Nov-15 1473 Ǿ500 12.00 TC-19 Bor hotel pile


PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

881 5-Nov-15 1474 Ǿ500 12.00 TC-19 Bor hotel pile

882 5-Nov-15 1475 Ǿ500 12.00 TC-19 Bor hotel pile

883 5-Nov-15 1476 Ǿ500 12.00 TC-19 Bor hotel pile

1604 8-Dec-15 1477 Ǿ500 12.00 TC-53 Bor hotel pile

1605 8-Dec-15 1478 Ǿ500 12.00 TC-53 Bor hotel pile

1606 8-Dec-15 1479 Ǿ500 12.00 TC-53 Bor hotel pile

1607 8-Dec-15 1480 Ǿ500 12.00 TC-53 Bor hotel pile

1608 8-Dec-15 1481 Ǿ500 12.00 TC-53 Bor hotel pile

1609 8-Dec-15 1482 Ǿ500 12.00 TC-53 Bor hotel pile

1610 8-Dec-15 1483 Ǿ500 12.00 TC-53 Bor hotel pile

1611 8-Dec-15 1484 Ǿ500 12.00 TC-53 Bor hotel pile

TOTAL PREBORING 2304.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


SITE ENGINEER PROJECT ENGINEER SITE ENGINEER
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : BENTONITE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 15 - 31 OKTOBER 2015

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1 15-Oct-15 Bentonaite 1 Ǿ270 15.00 TI-08


2 15-Oct-15 Bentonaite 2 Ǿ270 15.00 TI-08
3 16-Oct-15 Bentonaite 3 Ǿ270 15.00 TI-08
4 16-Oct-15 Bentonaite 4 Ǿ270 15.00 TI-08
5 16-Oct-15 Bentonaite 5 Ǿ270 15.00 TI-08
6 16-Oct-15 Bentonaite 6 Ǿ270 15.00 TI-08
7 17-Oct-15 Bentonaite 7 Ǿ270 15.00 TI-08
8 17-Oct-15 Bentonaite 8 Ǿ270 15.00 TI-08
9 19-Oct-15 Bentonaite 9 Ǿ270 15.00 TI-08
10 19-Oct-15 Bentonaite 10 Ǿ270 15.00 TI-08
11 19-Oct-15 Bentonaite 11 Ǿ270 15.00 TI-08
12 21-Oct-15 Bentonaite 12 Ǿ270 15.00 TI-08
13 21-Oct-15 Bentonaite 13 Ǿ270 15.00 TI-08
14 21-Oct-15 Bentonaite 14 Ǿ270 15.00 TI-08
15 26-Oct-15 Bentonaite 15 Ǿ270 15.00 TI-08
16 26-Oct-15 Bentonaite 16 Ǿ270 15.00 TI-08
17 26-Oct-15 Bentonaite 17 Ǿ270 15.00 TI-08
18 26-Oct-15 Bentonaite 18 Ǿ270 15.00 TI-08
19 27-Oct-15 Bentonaite 19 Ǿ270 15.00 TI-08
20 27-Oct-15 Bentonaite 20 Ǿ270 15.00 TI-08
21 27-Oct-15 Bentonaite 21 Ǿ270 15.00 TI-08
22 28-Oct-15 Bentonaite 22 Ǿ270 15.00 TI-08
23 28-Oct-15 Bentonaite 23 Ǿ270 15.00 TI-08
24 28-Oct-15 Bentonaite 24 Ǿ270 15.00 TI-08
25 28-Oct-15 Bentonaite 25 Ǿ270 15.00 TI-08
26 28-Oct-15 Bentonaite 26 Ǿ270 15.00 TI-08
27 29-Oct-15 Bentonaite 27 Ǿ270 16.00 TI-08
28 29-Oct-15 Bentonaite 28 Ǿ270 16.00 TI-08
29 29-Oct-15 Bentonaite 29 Ǿ270 16.00 TI-08
30 29-Oct-15 Bentonaite 30 Ǿ270 16.00 TI-08
31 29-Oct-15 Bentonaite 31 Ǿ270 16.00 TI-08
32 29-Oct-15 Bentonaite 32 Ǿ270 16.00 TI-08
33 30-Oct-15 Bentonaite 33 Ǿ270 16.00 TI-08
34 30-Oct-15 Bentonaite 34 Ǿ270 16.00 TI-08
35 30-Oct-15 Bentonaite 35 Ǿ270 16.00 TI-08
36 30-Oct-15 Bentonaite 36 Ǿ270 16.00 TI-08
37 30-Oct-15 Bentonaite 37 Ǿ270 16.00 TI-08
38 30-Oct-15 Bentonaite 38 Ǿ270 16.00 TI-08
39 30-Oct-15 Bentonaite 39 Ǿ270 16.00 TI-08
40 30-Oct-15 Bentonaite 40 Ǿ270 16.00 TI-08
41 31-Oct-15 Bentonaite 41 Ǿ270 16.00 TI-08
42 31-Oct-15 Bentonaite 42 Ǿ270 16.00 TI-08
43 31-Oct-15 Bentonaite 43 Ǿ270 16.00 TI-08
44 31-Oct-15 Bentonaite 44 Ǿ270 16.00 TI-08
45 31-Oct-15 Bentonaite 45 Ǿ270 16.00 TI-08
46 31-Oct-15 Bentonaite 46 Ǿ270 16.00 TI-08
47 31-Oct-15 Bentonaite 47 Ǿ270 16.00 TI-08
48 31-Oct-15 Bentonaite 48 Ǿ270 16.00 TI-08
49 2-Nov-15 Bentonaite 49 Ǿ270 16.00 TI-08
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

50 2-Nov-15 Bentonaite 50 Ǿ270 16.00 TI-08


51 2-Nov-15 Bentonaite 51 Ǿ270 16.00 TI-08
52 2-Nov-15 Bentonaite 52 Ǿ270 16.00 TI-08
53 2-Nov-15 Bentonaite 53 Ǿ270 16.00 TI-08
54 2-Nov-15 Bentonaite 54 Ǿ270 16.00 TI-08
55 2-Nov-15 Bentonaite 55 Ǿ270 16.00 TI-08
56 2-Nov-15 Bentonaite 56 Ǿ270 16.00 TI-08
57 2-Nov-15 Bentonaite 57 Ǿ270 16.00 TI-08
58 3-Nov-15 Bentonaite 58 Ǿ270 16.00 TI-08
59 3-Nov-15 Bentonaite 59 Ǿ270 16.00 TI-08
60 3-Nov-15 Bentonaite 60 Ǿ270 16.00 TI-08
61 3-Nov-15 Bentonaite 61 Ǿ270 16.00 TI-08
62 3-Nov-15 Bentonaite 62 Ǿ270 16.00 TI-08
63 3-Nov-15 Bentonaite 63 Ǿ270 16.00 TI-08
64 3-Nov-15 Bentonaite 64 Ǿ270 16.00 TI-08
65 4-Nov-15 Bentonaite 65 Ǿ270 16.00 TI-08
66 4-Nov-15 Bentonaite 66 Ǿ270 16.00 TI-08
67 4-Nov-15 Bentonaite 67 Ǿ270 16.00 TI-08
68 4-Nov-15 Bentonaite 68 Ǿ270 16.00 TI-08
69 5-Nov-15 Bentonaite 69 Ǿ270 16.00 TI-08
70 5-Nov-15 Bentonaite 70 Ǿ270 16.00 TI-08
71 5-Nov-15 Bentonaite 71 Ǿ270 16.00 TI-08
72 5-Nov-15 Bentonaite 72 Ǿ270 16.00 TI-08
73 5-Nov-15 Bentonaite 73 Ǿ270 16.00 TI-08
74 5-Nov-15 Bentonaite 74 Ǿ270 16.00 TI-08
75 5-Nov-15 Bentonaite 75 Ǿ270 16.00 TI-08
76 5-Nov-15 Bentonaite 76 Ǿ270 16.00 TI-08
77 5-Nov-15 Bentonaite 77 Ǿ270 16.00 TI-08
78 5-Nov-15 Bentonaite 78 Ǿ270 16.00 TI-08
79 6-Nov-15 Bentonaite 79 Ǿ270 18.00 TI-08
80 6-Nov-15 Bentonaite 80 Ǿ270 18.00 TI-08
81 6-Nov-15 Bentonaite 81 Ǿ270 18.00 TI-08
82 6-Nov-15 Bentonaite 82 Ǿ270 18.00 TI-08
83 6-Nov-15 Bentonaite 83 Ǿ270 18.00 TI-08
84 6-Nov-15 Bentonaite 84 Ǿ270 18.00 TI-08
85 6-Nov-15 Bentonaite 85 Ǿ270 18.00 TI-08
86 6-Nov-15 Bentonaite 86 Ǿ270 18.00 TI-08
87 6-Nov-15 Bentonaite 87 Ǿ270 18.00 TI-08
88 6-Nov-15 Bentonaite 88 Ǿ270 18.00 TI-08
89 7-Nov-15 Bentonaite 89 Ǿ270 18.00 TI-08
90 7-Nov-15 Bentonaite 90 Ǿ270 18.00 TI-08
91 7-Nov-15 Bentonaite 91 Ǿ270 18.00 TI-08
92 7-Nov-15 Bentonaite 92 Ǿ270 18.00 TI-08
93 7-Nov-15 Bentonaite 93 Ǿ270 18.00 TI-08
94 7-Nov-15 Bentonaite 94 Ǿ270 18.00 TI-08
95 7-Nov-15 Bentonaite 95 Ǿ270 18.00 TI-08
96 7-Nov-15 Bentonaite 96 Ǿ270 18.00 TI-08
97 9-Nov-15 Bentonaite 97 Ǿ270 18.00 TI-08
98 9-Nov-15 Bentonaite 98 Ǿ270 18.00 TI-08
99 9-Nov-15 Bentonaite 99 Ǿ270 18.00 TI-08
100 9-Nov-15 Bentonaite 100 Ǿ270 18.00 TI-08
101 9-Nov-15 Bentonaite 101 Ǿ270 18.00 TI-08
102 9-Nov-15 Bentonaite 102 Ǿ270 18.00 TI-08
103 9-Nov-15 Bentonaite 103 Ǿ270 18.00 TI-08
104 9-Nov-15 Bentonaite 104 Ǿ270 18.00 TI-08
105 9-Nov-15 Bentonaite 105 Ǿ270 18.00 TI-08
106 9-Nov-15 Bentonaite 106 Ǿ270 18.00 TI-08
107 10-Nov-15 Bentonaite 107 Ǿ270 18.00 TI-08
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

108 10-Nov-15 Bentonaite 108 Ǿ270 18.00 TI-08


109 10-Nov-15 Bentonaite 109 Ǿ270 18.00 TI-08
110 10-Nov-15 Bentonaite 110 Ǿ270 18.00 TI-08
111 10-Nov-15 Bentonaite 111 Ǿ270 18.00 TI-08
112 11-Nov-15 Bentonaite 112 Ǿ270 18.00 TI-08
113 11-Nov-15 Bentonaite 113 Ǿ270 18.00 TI-08
114 11-Nov-15 Bentonaite 114 Ǿ270 18.00 TI-08
115 11-Nov-15 Bentonaite 115 Ǿ270 18.00 TI-08
116 11-Nov-15 Bentonaite 116 Ǿ270 18.00 TI-08
117 11-Nov-15 Bentonaite 117 Ǿ270 18.00 TI-08
118 11-Nov-15 Bentonaite 118 Ǿ270 18.00 TI-08
119 15-Nov-15 Bentonaite 119 Ǿ270 18.00 TI-08
120 15-Nov-15 Bentonaite 120 Ǿ270 18.00 TI-08
121 15-Nov-15 Bentonaite 121 Ǿ270 18.00 TI-08
122 15-Nov-15 Bentonaite 122 Ǿ270 18.00 TI-08
123 15-Nov-15 Bentonaite 123 Ǿ270 18.00 TI-08
124 15-Nov-15 Bentonaite 124 Ǿ270 18.00 TI-08
125 15-Nov-15 Bentonaite 125 Ǿ270 18.00 TI-08
126 15-Nov-15 Bentonaite 126 Ǿ270 18.00 TI-08
127 16-Nov-15 Bentonaite 127 Ǿ270 18.00 TI-08
128 16-Nov-15 Bentonaite 128 Ǿ270 18.00 TI-08
129 16-Nov-15 Bentonaite 129 Ǿ270 18.00 TI-08
130 16-Nov-15 Bentonaite 130 Ǿ270 18.00 TI-08
131 16-Nov-15 Bentonaite 131 Ǿ270 18.00 TI-08
132 16-Nov-15 Bentonaite 132 Ǿ270 18.00 TI-08
133 16-Nov-15 Bentonaite 133 Ǿ270 18.00 TI-08
134 16-Nov-15 Bentonaite 134 Ǿ270 18.00 TI-08
135 16-Nov-15 Bentonaite 135 Ǿ270 18.00 TI-08
136 16-Nov-15 Bentonaite 136 Ǿ270 18.00 TI-08
137 16-Nov-15 Bentonaite 137 Ǿ270 18.00 TI-08
138 17-Nov-15 Bentonaite 138 Ǿ270 18.00 TI-08
139 17-Nov-15 Bentonaite 139 Ǿ270 18.00 TI-08
140 17-Nov-15 Bentonaite 140 Ǿ270 18.00 TI-08
141 17-Nov-15 Bentonaite 141 Ǿ270 18.00 TI-08
142 17-Nov-15 Bentonaite 142 Ǿ270 18.00 TI-08
143 17-Nov-15 Bentonaite 143 Ǿ270 18.00 TI-08
144 17-Nov-15 Bentonaite 144 Ǿ270 18.00 TI-08
145 17-Nov-15 Bentonaite 145 Ǿ270 18.00 TI-08
146 17-Nov-15 Bentonaite 146 Ǿ270 18.00 TI-08
147 17-Nov-15 Bentonaite 147 Ǿ270 18.00 TI-08
148 17-Nov-15 Bentonaite 148 Ǿ270 18.00 TI-08
149 17-Nov-15 Bentonaite 149 Ǿ270 18.00 TI-08
150 18-Nov-15 Bentonaite 150 Ǿ270 18.00 TI-08
151 18-Nov-15 Bentonaite 151 Ǿ270 18.00 TI-08
152 18-Nov-15 Bentonaite 152 Ǿ270 18.00 TI-08
153 18-Nov-15 Bentonaite 153 Ǿ270 18.00 TI-08
154 18-Nov-15 Bentonaite 154 Ǿ270 18.00 TI-08
155 18-Nov-15 Bentonaite 155 Ǿ270 18.00 TI-08
156 18-Nov-15 Bentonaite 156 Ǿ270 18.00 TI-08
157 18-Nov-15 Bentonaite 157 Ǿ270 18.00 TI-08
158 19-Nov-15 Bentonaite 158 Ǿ270 18.00 TI-08
159 19-Nov-15 Bentonaite 159 Ǿ270 18.00 TI-08
160 19-Nov-15 Bentonaite 160 Ǿ270 18.00 TI-08
161 19-Nov-15 Bentonaite 161 Ǿ270 18.00 TI-08
162 19-Nov-15 Bentonaite 162 Ǿ270 18.00 TI-08
163 19-Nov-15 Bentonaite 163 Ǿ270 18.00 TI-08
164 19-Nov-15 Bentonaite 267 Ǿ270 18.00 TI-12
165 19-Nov-15 Bentonaite 268 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

166 19-Nov-15 Bentonaite 269 Ǿ270 18.00 TI-12


167 20-Nov-15 Bentonaite 164 Ǿ270 18.00 TI-08
168 20-Nov-15 Bentonaite 165 Ǿ270 18.00 TI-08
169 20-Nov-15 Bentonaite 166 Ǿ270 18.00 TI-08
170 20-Nov-15 Bentonaite 167 Ǿ270 18.00 TI-08
171 20-Nov-15 Bentonaite 168 Ǿ270 18.00 TI-08
172 20-Nov-15 Bentonaite 169 Ǿ270 18.00 TI-08
173 20-Nov-15 Bentonaite 170 Ǿ270 18.00 TI-08
174 20-Nov-15 Bentonaite 171 Ǿ270 18.00 TI-08
175 20-Nov-15 Bentonaite 172 Ǿ270 18.00 TI-08
176 20-Nov-15 Bentonaite 263 Ǿ270 18.00 TI-12
177 20-Nov-15 Bentonaite 264 Ǿ270 18.00 TI-12
178 20-Nov-15 Bentonaite 265 Ǿ270 18.00 TI-12
179 20-Nov-15 Bentonaite 266 Ǿ270 18.00 TI-12
180 21-Nov-15 Bentonaite 173 Ǿ270 18.00 TI-08
181 21-Nov-15 Bentonaite 174 Ǿ270 18.00 TI-08
182 21-Nov-15 Bentonaite 175 Ǿ270 18.00 TI-08
183 21-Nov-15 Bentonaite 176 Ǿ270 18.00 TI-08
184 21-Nov-15 Bentonaite 177 Ǿ270 18.00 TI-08
185 21-Nov-15 Bentonaite 262 Ǿ270 18.00 TI-12
186 23-Nov-15 Bentonaite 178 Ǿ270 18.00 TI-08
187 23-Nov-15 Bentonaite 179 Ǿ270 18.00 TI-08
188 23-Nov-15 Bentonaite 180 Ǿ270 18.00 TI-08
189 23-Nov-15 Bentonaite 181 Ǿ270 18.00 TI-08
190 23-Nov-15 Bentonaite 182 Ǿ270 18.00 TI-08
191 23-Nov-15 Bentonaite 183 Ǿ270 18.00 TI-08
192 23-Nov-15 Bentonaite 184 Ǿ270 18.00 TI-08
193 23-Nov-15 Bentonaite 185 Ǿ270 18.00 TI-08
194 23-Nov-15 Bentonaite 186 Ǿ270 18.00 TI-08
195 23-Nov-15 Bentonaite 187 Ǿ270 18.00 TI-08
196 24-Nov-15 Bentonaite 188 Ǿ270 18.00 TI-08
197 24-Nov-15 Bentonaite 189 Ǿ270 18.00 TI-08
198 24-Nov-15 Bentonaite 190 Ǿ270 18.00 TI-08
199 24-Nov-15 Bentonaite 191 Ǿ270 18.00 TI-08
200 24-Nov-15 Bentonaite 192 Ǿ270 18.00 TI-08
201 24-Nov-15 Bentonaite 193 Ǿ270 18.00 TI-08
202 24-Nov-15 Bentonaite 194 Ǿ270 18.00 TI-08
203 24-Nov-15 Bentonaite 195 Ǿ270 18.00 TI-08
204 24-Nov-15 Bentonaite 196 Ǿ270 18.00 TI-08
205 24-Nov-15 Bentonaite 197 Ǿ270 18.00 TI-08
206 24-Nov-15 Bentonaite 198 Ǿ270 18.00 TI-08
207 24-Nov-15 Bentonaite 258 Ǿ270 18.00 TI-12
208 24-Nov-15 Bentonaite 259 Ǿ270 18.00 TI-12
209 24-Nov-15 Bentonaite 260 Ǿ270 18.00 TI-12
210 24-Nov-15 Bentonaite 261 Ǿ270 18.00 TI-12
211 25-Nov-15 Bentonaite 199 Ǿ270 18.00 TI-08
212 25-Nov-15 Bentonaite 200 Ǿ270 18.00 TI-08
213 25-Nov-15 Bentonaite 201 Ǿ270 18.00 TI-08
214 25-Nov-15 Bentonaite 202 Ǿ270 18.00 TI-08
215 25-Nov-15 Bentonaite 203 Ǿ270 18.00 TI-08
216 25-Nov-15 Bentonaite 204 Ǿ270 18.00 TI-08
217 26-Nov-15 Bentonaite 205 Ǿ270 18.00 TI-08
218 26-Nov-15 Bentonaite 206 Ǿ270 18.00 TI-08
219 26-Nov-15 Bentonaite 207 Ǿ270 18.00 TI-08
220 26-Nov-15 Bentonaite 208 Ǿ270 18.00 TI-08
221 26-Nov-15 Bentonaite 209 Ǿ270 18.00 TI-08
222 26-Nov-15 Bentonaite 210 Ǿ270 18.00 TI-08
223 30-Nov-15 Bentonaite 249 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

224 30-Nov-15 Bentonaite 250 Ǿ270 18.00 TI-12


225 30-Nov-15 Bentonaite 251 Ǿ270 18.00 TI-12
226 30-Nov-15 Bentonaite 252 Ǿ270 18.00 TI-12
227 30-Nov-15 Bentonaite 253 Ǿ270 18.00 TI-12
228 30-Nov-15 Bentonaite 254 Ǿ270 18.00 TI-12
229 30-Nov-15 Bentonaite 255 Ǿ270 18.00 TI-12
230 30-Nov-15 Bentonaite 256 Ǿ270 18.00 TI-12
231 30-Nov-15 Bentonaite 257 Ǿ270 18.00 TI-12
232 1-Dec-15 Bentonaite 211 Ǿ270 18.00 TI-08
233 1-Dec-15 Bentonaite 222 Ǿ270 18.00 TI-08
234 1-Dec-15 Bentonaite 223 Ǿ270 18.00 TI-08
235 1-Dec-15 Bentonaite 224 Ǿ270 18.00 TI-08
236 1-Dec-15 Bentonaite 225 Ǿ270 18.00 TI-08
237 1-Dec-15 Bentonaite 226 Ǿ270 18.00 TI-08
238 1-Dec-15 Bentonaite 227 Ǿ270 18.00 TI-08
239 1-Dec-15 Bentonaite 228 Ǿ270 18.00 TI-08
240 1-Dec-15 Bentonaite 229 Ǿ270 18.00 TI-08
241 1-Dec-15 Bentonaite 230 Ǿ270 18.00 TI-08
242 1-Dec-15 Bentonaite 231 Ǿ270 18.00 TI-08
243 2-Dec-15 Bentonaite 240 Ǿ270 18.00 TI-12
244 2-Dec-15 Bentonaite 241 Ǿ270 18.00 TI-12
245 2-Dec-15 Bentonaite 242 Ǿ270 18.00 TI-12
246 2-Dec-15 Bentonaite 243 Ǿ270 18.00 TI-12
247 2-Dec-15 Bentonaite 244 Ǿ270 18.00 TI-12
248 2-Dec-15 Bentonaite 245 Ǿ270 18.00 TI-12
249 2-Dec-15 Bentonaite 246 Ǿ270 18.00 TI-12
250 2-Dec-15 Bentonaite 247 Ǿ270 18.00 TI-12
251 2-Dec-15 Bentonaite 248 Ǿ270 18.00 TI-12
252 3-Dec-15 Bentonaite 220 Ǿ270 18.00 TI-12
253 3-Dec-15 Bentonaite 221 Ǿ270 18.00 TI-12
254 3-Dec-15 Bentonaite 232 Ǿ270 18.00 TI-12
255 3-Dec-15 Bentonaite 233 Ǿ270 18.00 TI-12
256 3-Dec-15 Bentonaite 234 Ǿ270 18.00 TI-12
257 3-Dec-15 Bentonaite 235 Ǿ270 18.00 TI-12
258 3-Dec-15 Bentonaite 236 Ǿ270 18.00 TI-12
259 3-Dec-15 Bentonaite 237 Ǿ270 18.00 TI-12
260 3-Dec-15 Bentonaite 238 Ǿ270 18.00 TI-12
261 3-Dec-15 Bentonaite 239 Ǿ270 18.00 TI-12
262 4-Dec-15 Bentonaite 212 Ǿ270 18.00 TI-12
263 4-Dec-15 Bentonaite 213 Ǿ270 18.00 TI-12
264 4-Dec-15 Bentonaite 214 Ǿ270 18.00 TI-12
265 4-Dec-15 Bentonaite 215 Ǿ270 18.00 TI-12
266 4-Dec-15 Bentonaite 216 Ǿ270 18.00 TI-12
267 4-Dec-15 Bentonaite 217 Ǿ270 18.00 TI-12
268 4-Dec-15 Bentonaite 218 Ǿ270 18.00 TI-12
269 4-Dec-15 Bentonaite 219 Ǿ270 18.00 TI-12
270 5-Dec-15 Bentonaite 270 Ǿ270 18.00 TI-12
271 5-Dec-15 Bentonaite 271 Ǿ270 18.00 TI-12
272 5-Dec-15 Bentonaite 272 Ǿ270 18.00 TI-12
273 5-Dec-15 Bentonaite 273 Ǿ270 18.00 TI-12
274 5-Dec-15 Bentonaite 274 Ǿ270 18.00 TI-12
275 5-Dec-15 Bentonaite 275 Ǿ270 18.00 TI-12
276 5-Dec-15 Bentonaite 276 Ǿ270 18.00 TI-12
277 7-Dec-15 Bentonaite 277 Ǿ270 18.00 TI-12
278 7-Dec-15 Bentonaite 278 Ǿ270 18.00 TI-12
279 7-Dec-15 Bentonaite 279 Ǿ270 18.00 TI-12
280 7-Dec-15 Bentonaite 280 Ǿ270 18.00 TI-12
281 7-Dec-15 Bentonaite 281 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

282 7-Dec-15 Bentonaite 282 Ǿ270 18.00 TI-12


283 7-Dec-15 Bentonaite 283 Ǿ270 18.00 TI-12
284 7-Dec-15 Bentonaite 284 Ǿ270 18.00 TI-12
285 7-Dec-15 Bentonaite 507 Ǿ270 18.00 TI-08
286 7-Dec-15 Bentonaite 508 Ǿ270 18.00 TI-08
287 7-Dec-15 Bentonaite 509 Ǿ270 18.00 TI-08
288 7-Dec-15 Bentonaite 510 Ǿ270 18.00 TI-08
289 7-Dec-15 Bentonaite 511 Ǿ270 18.00 TI-08
290 7-Dec-15 Bentonaite 512 Ǿ270 18.00 TI-08
291 7-Dec-15 Bentonaite 513 Ǿ270 18.00 TI-08
292 7-Dec-15 Bentonaite 514 Ǿ270 18.00 TI-08
293 7-Dec-15 Bentonaite 515 Ǿ270 18.00 TI-08
294 7-Dec-15 Bentonaite 516 Ǿ270 18.00 TI-08
295 7-Dec-15 Bentonaite 517 Ǿ270 18.00 TI-08
296 7-Dec-15 Bentonaite 518 Ǿ270 18.00 TI-08
297 8-Dec-15 Bentonaite 519 Ǿ270 18.00 TI-08
298 8-Dec-15 Bentonaite 520 Ǿ270 18.00 TI-08
299 8-Dec-15 Bentonaite 521 Ǿ270 18.00 TI-08
300 8-Dec-15 Bentonaite 522 Ǿ270 18.00 TI-08
301 8-Dec-15 Bentonaite 523 Ǿ270 18.00 TI-08
302 8-Dec-15 Bentonaite 524 Ǿ270 18.00 TI-08
303 8-Dec-15 Bentonaite 525 Ǿ270 18.00 TI-08
304 8-Dec-15 Bentonaite 526 Ǿ270 18.00 TI-08
305 8-Dec-15 Bentonaite 527 Ǿ270 18.00 TI-08
306 8-Dec-15 Bentonaite 528 Ǿ270 18.00 TI-08
307 8-Dec-15 Bentonaite 529 Ǿ270 18.00 TI-08
308 8-Dec-15 Bentonaite 530 Ǿ270 18.00 TI-08
309 8-Dec-15 Bentonaite 285 Ǿ270 18.00 TC-12
310 8-Dec-15 Bentonaite 286 Ǿ270 18.00 TC-12
311 8-Dec-15 Bentonaite 287 Ǿ270 18.00 TC-12
312 8-Dec-15 Bentonaite 288 Ǿ270 18.00 TC-12
313 8-Dec-15 Bentonaite 289 Ǿ270 18.00 TC-12
314 8-Dec-15 Bentonaite 290 Ǿ270 18.00 TC-12
315 8-Dec-15 Bentonaite 291 Ǿ270 18.00 TC-12
316 8-Dec-15 Bentonaite 292 Ǿ270 18.00 TC-12
317 8-Dec-15 Bentonaite 293 Ǿ270 18.00 TC-12
318 8-Dec-15 Bentonaite 294 Ǿ270 18.00 TC-12
319 8-Dec-15 Bentonaite 295 Ǿ270 18.00 TC-12
320 10-Dec-15 Bentonaite 531 Ǿ270 18.00 TI-08
321 10-Dec-15 Bentonaite 532 Ǿ270 18.00 TI-08
322 10-Dec-15 Bentonaite 533 Ǿ270 18.00 TI-08
323 10-Dec-15 Bentonaite 534 Ǿ270 18.00 TI-08
324 10-Dec-15 Bentonaite 535 Ǿ270 18.00 TI-08
325 10-Dec-15 Bentonaite 536 Ǿ270 18.00 TI-08
326 10-Dec-15 Bentonaite 537 Ǿ270 18.00 TI-08
327 10-Dec-15 Bentonaite 538 Ǿ270 18.00 TI-08
328 10-Dec-15 Bentonaite 539 Ǿ270 18.00 TI-08
329 10-Dec-15 Bentonaite 540 Ǿ270 18.00 TI-08
330 10-Dec-15 Bentonaite 541 Ǿ270 18.00 TI-08
331 10-Dec-15 Bentonaite 542 Ǿ270 18.00 TI-08
332 10-Dec-15 Bentonaite 296 Ǿ270 18.00 TC-12
333 10-Dec-15 Bentonaite 297 Ǿ270 18.00 TC-12
334 10-Dec-15 Bentonaite 298 Ǿ270 18.00 TC-12
335 10-Dec-15 Bentonaite 299 Ǿ270 18.00 TC-12
336 10-Dec-15 Bentonaite 300 Ǿ270 18.00 TC-12
337 10-Dec-15 Bentonaite 301 Ǿ270 18.00 TC-12
338 10-Dec-15 Bentonaite 302 Ǿ270 18.00 TC-12
339 10-Dec-15 Bentonaite 303 Ǿ270 18.00 TC-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

340 10-Dec-15 Bentonaite 304 Ǿ270 18.00 TC-12


341 10-Dec-15 Bentonaite 305 Ǿ270 18.00 TC-12
342 10-Dec-15 Bentonaite 306 Ǿ270 18.00 TC-12
343 11-Dec-15 Bentonaite 543 Ǿ270 18.00 TI-08
344 11-Dec-15 Bentonaite 544 Ǿ270 18.00 TI-08
345 11-Dec-15 Bentonaite 545 Ǿ270 18.00 TI-08
346 11-Dec-15 Bentonaite 546 Ǿ270 18.00 TI-08
347 11-Dec-15 Bentonaite 547 Ǿ270 18.00 TI-08
348 11-Dec-15 Bentonaite 548 Ǿ270 18.00 TI-08
349 11-Dec-15 Bentonaite 549 Ǿ270 18.00 TI-08
350 11-Dec-15 Bentonaite 550 Ǿ270 18.00 TI-08
351 11-Dec-15 Bentonaite 551 Ǿ270 18.00 TI-08
352 11-Dec-15 Bentonaite 552 Ǿ270 18.00 TI-08
353 11-Dec-15 Bentonaite 553 Ǿ270 18.00 TI-08
354 11-Dec-15 Bentonaite 307 Ǿ270 18.00 TC-12
355 11-Dec-15 Bentonaite 308 Ǿ270 18.00 TC-12
356 11-Dec-15 Bentonaite 309 Ǿ270 18.00 TC-12
357 11-Dec-15 Bentonaite 310 Ǿ270 18.00 TC-12
358 11-Dec-15 Bentonaite 311 Ǿ270 18.00 TC-12
359 11-Dec-15 Bentonaite 312 Ǿ270 18.00 TC-12
360 11-Dec-15 Bentonaite 313 Ǿ270 18.00 TC-12
361 11-Dec-15 Bentonaite 314 Ǿ270 18.00 TC-12
362 11-Dec-15 Bentonaite 315 Ǿ270 18.00 TC-12
363 11-Dec-15 Bentonaite 316 Ǿ270 18.00 TC-12
364 11-Dec-15 Bentonaite 317 Ǿ270 18.00 TC-12
365 11-Dec-15 Bentonaite 318 Ǿ270 18.00 TC-12
366 12-Dec-15 Bentonaite 554 Ǿ270 18.00 TI-08
367 12-Dec-15 Bentonaite 555 Ǿ270 18.00 TI-08
368 12-Dec-15 Bentonaite 556 Ǿ270 18.00 TI-08
369 12-Dec-15 Bentonaite 557 Ǿ270 18.00 TI-08
370 12-Dec-15 Bentonaite 558 Ǿ270 18.00 TI-08
371 12-Dec-15 Bentonaite 559 Ǿ270 18.00 TI-08
372 12-Dec-15 Bentonaite 560 Ǿ270 18.00 TI-08
373 12-Dec-15 Bentonaite 561 Ǿ270 18.00 TI-08
374 12-Dec-15 Bentonaite 562 Ǿ270 18.00 TI-08
375 12-Dec-15 Bentonaite 563 Ǿ270 18.00 TI-08
376 12-Dec-15 Bentonaite 319 Ǿ270 18.00 TC-12
377 12-Dec-15 Bentonaite 320 Ǿ270 18.00 TC-12
378 12-Dec-15 Bentonaite 321 Ǿ270 18.00 TC-12
379 12-Dec-15 Bentonaite 322 Ǿ270 18.00 TC-12
380 12-Dec-15 Bentonaite 323 Ǿ270 18.00 TC-12
381 12-Dec-15 Bentonaite 324 Ǿ270 18.00 TC-12
382 12-Dec-15 Bentonaite 325 Ǿ270 18.00 TC-12
383 12-Dec-15 Bentonaite 326 Ǿ270 18.00 TC-12
384 12-Dec-15 Bentonaite 327 Ǿ270 18.00 TC-12
385 12-Dec-15 Bentonaite 328 Ǿ270 18.00 TC-12
386 12-Dec-15 Bentonaite 329 Ǿ270 18.00 TC-12
387 14-Dec-15 Bentonaite 564 Ǿ270 18.00 TI-08
388 14-Dec-15 Bentonaite 565 Ǿ270 18.00 TI-08
389 14-Dec-15 Bentonaite 566 Ǿ270 18.00 TI-08
390 14-Dec-15 Bentonaite 567 Ǿ270 18.00 TI-08
391 14-Dec-15 Bentonaite 568 Ǿ270 18.00 TI-08
392 14-Dec-15 Bentonaite 569 Ǿ270 18.00 TI-08
393 14-Dec-15 Bentonaite 570 Ǿ270 18.00 TI-08
394 14-Dec-15 Bentonaite 571 Ǿ270 18.00 TI-08
395 14-Dec-15 Bentonaite 330 Ǿ270 18.00 TC-12
396 14-Dec-15 Bentonaite 331 Ǿ270 18.00 TC-12
397 14-Dec-15 Bentonaite 332 Ǿ270 18.00 TC-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

398 14-Dec-15 Bentonaite 333 Ǿ270 18.00 TC-12


399 14-Dec-15 Bentonaite 334 Ǿ270 18.00 TC-12
400 14-Dec-15 Bentonaite 335 Ǿ270 18.00 TC-12
401 14-Dec-15 Bentonaite 336 Ǿ270 18.00 TC-12
402 14-Dec-15 Bentonaite 337 Ǿ270 18.00 TC-12
403 14-Dec-15 Bentonaite 338 Ǿ270 18.00 TC-12
404 15-Dec-15 Bentonaite 572 Ǿ270 18.00 TI-08
405 15-Dec-15 Bentonaite 573 Ǿ270 18.00 TI-08
406 15-Dec-15 Bentonaite 574 Ǿ270 18.00 TI-08
407 15-Dec-15 Bentonaite 575 Ǿ270 18.00 TI-08
408 15-Dec-15 Bentonaite 576 Ǿ270 18.00 TI-08
409 15-Dec-15 Bentonaite 577 Ǿ270 18.00 TI-08
410 15-Dec-15 Bentonaite 578 Ǿ270 18.00 TI-08
411 15-Dec-15 Bentonaite 579 Ǿ270 18.00 TI-08
412 15-Dec-15 Bentonaite 580 Ǿ270 18.00 TI-08
413 15-Dec-15 Bentonaite 581 Ǿ270 18.00 TI-08
414 15-Dec-15 Bentonaite 582 Ǿ270 18.00 TI-08
415 15-Dec-15 Bentonaite 583 Ǿ270 18.00 TI-08
416 16-Dec-15 Bentonaite 584 Ǿ270 18.00 TI-08
417 16-Dec-15 Bentonaite 585 Ǿ270 18.00 TI-08
418 16-Dec-15 Bentonaite 586 Ǿ270 18.00 TI-08
419 16-Dec-15 Bentonaite 587 Ǿ270 18.00 TI-08
420 16-Dec-15 Bentonaite 588 Ǿ270 18.00 TI-08
421 16-Dec-15 Bentonaite 589 Ǿ270 18.00 TI-08
422 16-Dec-15 Bentonaite 590 Ǿ270 18.00 TI-08
423 16-Dec-15 Bentonaite 591 Ǿ270 18.00 TI-08
424 16-Dec-15 Bentonaite 592 Ǿ270 18.00 TI-08
425 16-Dec-15 Bentonaite 593 Ǿ270 18.00 TI-08
426 16-Dec-15 Bentonaite 594 Ǿ270 18.00 TI-08
427 16-Dec-15 Bentonaite 595 Ǿ270 18.00 TI-08
428 16-Dec-15 Bentonaite 596 Ǿ270 18.00 TI-08
429 18-Dec-15 Bentonaite 339 Ǿ270 18.00 TI-12
430 18-Dec-15 Bentonaite 340 Ǿ270 18.00 TI-12
431 18-Dec-15 Bentonaite 341 Ǿ270 18.00 TI-12
432 18-Dec-15 Bentonaite 342 Ǿ270 18.00 TI-12
433 18-Dec-15 Bentonaite 343 Ǿ270 18.00 TI-12
434 18-Dec-15 Bentonaite 344 Ǿ270 18.00 TI-12
435 18-Dec-15 Bentonaite 345 Ǿ270 18.00 TI-12
436 18-Dec-15 Bentonaite 346 Ǿ270 18.00 TI-12
437 18-Dec-15 Bentonaite 347 Ǿ270 18.00 TI-12
438 18-Dec-15 Bentonaite 348 Ǿ270 18.00 TI-12
439 18-Dec-15 Bentonaite 349 Ǿ270 18.00 TI-12
440 18-Dec-15 Bentonaite 350 Ǿ270 18.00 TI-12
441 18-Dec-15 Bentonaite 351 Ǿ270 18.00 TI-12
442 19-Dec-15 Bentonaite 352 Ǿ270 18.00 TI-12
443 19-Dec-15 Bentonaite 353 Ǿ270 18.00 TI-12
444 19-Dec-15 Bentonaite 354 Ǿ270 18.00 TI-12
445 19-Dec-15 Bentonaite 355 Ǿ270 18.00 TI-12
446 19-Dec-15 Bentonaite 356 Ǿ270 18.00 TI-12
447 19-Dec-15 Bentonaite 357 Ǿ270 18.00 TI-12
448 19-Dec-15 Bentonaite 358 Ǿ270 18.00 TI-12
449 19-Dec-15 Bentonaite 359 Ǿ270 18.00 TI-12
450 19-Dec-15 Bentonaite 360 Ǿ270 18.00 TI-12
451 19-Dec-15 Bentonaite 361 Ǿ270 18.00 TI-12
452 19-Dec-15 Bentonaite 362 Ǿ270 18.00 TI-12
453 19-Dec-15 Bentonaite 363 Ǿ270 18.00 TI-12
454 19-Dec-15 Bentonaite 364 Ǿ270 18.00 TI-12
455 19-Dec-15 Bentonaite 365 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

456 20-Dec-15 Bentonaite 597 Ǿ270 18.00 TI-08


457 20-Dec-15 Bentonaite 598 Ǿ270 18.00 TI-08
458 20-Dec-15 Bentonaite 599 Ǿ270 18.00 TI-08
459 20-Dec-15 Bentonaite 600 Ǿ270 18.00 TI-08
460 20-Dec-15 Bentonaite 601 Ǿ270 18.00 TI-08
461 20-Dec-15 Bentonaite 602 Ǿ270 18.00 TI-08
462 20-Dec-15 Bentonaite 603 Ǿ270 18.00 TI-08
463 20-Dec-15 Bentonaite 604 Ǿ270 18.00 TI-08
464 20-Dec-15 Bentonaite 605 Ǿ270 18.00 TI-08
465 20-Dec-15 Bentonaite 606 Ǿ270 18.00 TI-08
466 20-Dec-15 Bentonaite 607 Ǿ270 18.00 TI-08
467 20-Dec-15 Bentonaite 608 Ǿ270 18.00 TI-08
468 21-Dec-15 Bentonaite 609 Ǿ270 18.00 TI-08
469 21-Dec-15 Bentonaite 610 Ǿ270 18.00 TI-08
470 21-Dec-15 Bentonaite 611 Ǿ270 18.00 TI-08
471 21-Dec-15 Bentonaite 612 Ǿ270 18.00 TI-08
472 21-Dec-15 Bentonaite 613 Ǿ270 18.00 TI-08
473 21-Dec-15 Bentonaite 614 Ǿ270 18.00 TI-08
474 21-Dec-15 Bentonaite 615 Ǿ270 18.00 TI-08
475 21-Dec-15 Bentonaite 616 Ǿ270 18.00 TI-08
476 21-Dec-15 Bentonaite 617 Ǿ270 18.00 TI-08
477 21-Dec-15 Bentonaite 618 Ǿ270 18.00 TI-08
478 21-Dec-15 Bentonaite 619 Ǿ270 18.00 TI-08
479 21-Dec-15 Bentonaite 620 Ǿ270 18.00 TI-08
480 21-Dec-15 Bentonaite 366 Ǿ270 18.00 TI-12
481 21-Dec-15 Bentonaite 367 Ǿ270 18.00 TI-12
482 21-Dec-15 Bentonaite 368 Ǿ270 18.00 TI-12
483 21-Dec-15 Bentonaite 369 Ǿ270 18.00 TI-12
484 21-Dec-15 Bentonaite 370 Ǿ270 18.00 TI-12
485 21-Dec-15 Bentonaite 371 Ǿ270 18.00 TI-12
486 21-Dec-15 Bentonaite 372 Ǿ270 18.00 TI-12
487 21-Dec-15 Bentonaite 373 Ǿ270 18.00 TI-12
488 21-Dec-15 Bentonaite 374 Ǿ270 18.00 TI-12
489 21-Dec-15 Bentonaite 375 Ǿ270 18.00 TI-12
490 21-Dec-15 Bentonaite 376 Ǿ270 18.00 TI-12
491 21-Dec-15 Bentonaite 377 Ǿ270 18.00 TI-12
492 22-Dec-15 Bentonaite 621 Ǿ270 18.00 TI-08
493 22-Dec-15 Bentonaite 622 Ǿ270 18.00 TI-08
494 22-Dec-15 Bentonaite 623 Ǿ270 18.00 TI-08
495 22-Dec-15 Bentonaite 624 Ǿ270 18.00 TI-08
496 22-Dec-15 Bentonaite 625 Ǿ270 18.00 TI-08
497 22-Dec-15 Bentonaite 626 Ǿ270 18.00 TI-08
498 22-Dec-15 Bentonaite 627 Ǿ270 18.00 TI-08
499 22-Dec-15 Bentonaite 628 Ǿ270 18.00 TI-08
500 22-Dec-15 Bentonaite 629 Ǿ270 18.00 TI-08
501 22-Dec-15 Bentonaite 630 Ǿ270 18.00 TI-08
502 22-Dec-15 Bentonaite 631 Ǿ270 18.00 TI-08
503 22-Dec-15 Bentonaite 632 Ǿ270 18.00 TI-08
504 22-Dec-15 Bentonaite 378 Ǿ270 18.00 TI-12
505 22-Dec-15 Bentonaite 379 Ǿ270 18.00 TI-12
506 22-Dec-15 Bentonaite 380 Ǿ270 18.00 TI-12
507 22-Dec-15 Bentonaite 381 Ǿ270 18.00 TI-12
508 22-Dec-15 Bentonaite 382 Ǿ270 18.00 TI-12
509 22-Dec-15 Bentonaite 383 Ǿ270 18.00 TI-12
510 22-Dec-15 Bentonaite 384 Ǿ270 18.00 TI-12
511 22-Dec-15 Bentonaite 385 Ǿ270 18.00 TI-12
512 22-Dec-15 Bentonaite 386 Ǿ270 18.00 TI-12
513 22-Dec-15 Bentonaite 387 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

514 23-Dec-15 Bentonaite 633 Ǿ270 18.00 TI-08


515 23-Dec-15 Bentonaite 634 Ǿ270 18.00 TI-08
516 23-Dec-15 Bentonaite 635 Ǿ270 18.00 TI-08
517 23-Dec-15 Bentonaite 636 Ǿ270 18.00 TI-08
518 23-Dec-15 Bentonaite 637 Ǿ270 18.00 TI-08
519 23-Dec-15 Bentonaite 638 Ǿ270 18.00 TI-08
520 23-Dec-15 Bentonaite 639 Ǿ270 18.00 TI-08
521 24-Dec-15 Bentonaite 640 Ǿ270 18.00 TI-08
522 24-Dec-15 Bentonaite 641 Ǿ270 18.00 TI-08
523 24-Dec-15 Bentonaite 642 Ǿ270 18.00 TI-08
524 24-Dec-15 Bentonaite 643 Ǿ270 18.00 TI-08
525 24-Dec-15 Bentonaite 644 Ǿ270 18.00 TI-08
526 24-Dec-15 Bentonaite 645 Ǿ270 18.00 TI-08
527 24-Dec-15 Bentonaite 646 Ǿ270 18.00 TI-08
528 24-Dec-15 Bentonaite 647 Ǿ270 18.00 TI-08
529 24-Dec-15 Bentonaite 648 Ǿ270 18.00 TI-08
530 24-Dec-15 Bentonaite 649 Ǿ270 18.00 TI-08
531 25-Dec-15 Bentonaite 650 Ǿ270 18.00 TI-08
532 25-Dec-15 Bentonaite 651 Ǿ270 18.00 TI-08
533 25-Dec-15 Bentonaite 652 Ǿ270 18.00 TI-08
534 25-Dec-15 Bentonaite 653 Ǿ270 18.00 TI-08
535 25-Dec-15 Bentonaite 654 Ǿ270 18.00 TI-08
536 25-Dec-15 Bentonaite 655 Ǿ270 18.00 TI-08
537 25-Dec-15 Bentonaite 656 Ǿ270 18.00 TI-08
538 26-Dec-15 Bentonaite 657 Ǿ270 18.00 TI-08
539 26-Dec-15 Bentonaite 658 Ǿ270 18.00 TI-08
540 26-Dec-15 Bentonaite 659 Ǿ270 18.00 TI-08
541 26-Dec-15 Bentonaite 660 Ǿ270 18.00 TI-08
542 26-Dec-15 Bentonaite 661 Ǿ270 18.00 TI-08
543 26-Dec-15 Bentonaite 662 Ǿ270 18.00 TI-08
544 26-Dec-15 Bentonaite 663 Ǿ270 18.00 TI-08
545 26-Dec-15 Bentonaite 664 Ǿ270 18.00 TI-08
546 26-Dec-15 Bentonaite 665 Ǿ270 18.00 TI-08
547 26-Dec-15 Bentonaite 666 Ǿ270 18.00 TI-08
548 26-Dec-15 Bentonaite 388 Ǿ270 18.00 TI-12
549 26-Dec-15 Bentonaite 389 Ǿ270 18.00 TI-12
550 26-Dec-15 Bentonaite 390 Ǿ270 18.00 TI-12
551 26-Dec-15 Bentonaite 391 Ǿ270 18.00 TI-12
552 26-Dec-15 Bentonaite 392 Ǿ270 18.00 TI-12
553 26-Dec-15 Bentonaite 393 Ǿ270 18.00 TI-12
554 26-Dec-15 Bentonaite 394 Ǿ270 18.00 TI-12
555 26-Dec-15 Bentonaite 395 Ǿ270 18.00 TI-12
556 26-Dec-15 Bentonaite 396 Ǿ270 18.00 TI-12
557 26-Dec-15 Bentonaite 397 Ǿ270 18.00 TI-12
558 26-Dec-15 Bentonaite 398 Ǿ270 18.00 TI-12
559 26-Dec-15 Bentonaite 399 Ǿ270 18.00 TI-12
560 26-Dec-15 Bentonaite 400 Ǿ270 18.00 TI-12
561 26-Dec-15 Bentonaite 401 Ǿ270 18.00 TI-12
562 27-Dec-15 Bentonaite 402 Ǿ270 18.00 TI-12
563 27-Dec-15 Bentonaite 403 Ǿ270 18.00 TI-12
564 27-Dec-15 Bentonaite 404 Ǿ270 18.00 TI-12
565 27-Dec-15 Bentonaite 405 Ǿ270 18.00 TI-12
566 27-Dec-15 Bentonaite 406 Ǿ270 18.00 TI-12
567 27-Dec-15 Bentonaite 407 Ǿ270 18.00 TI-12
568 28-Dec-15 Bentonaite 408 Ǿ270 18.00 TI-12
569 28-Dec-15 Bentonaite 409 Ǿ270 18.00 TI-12
570 28-Dec-15 Bentonaite 410 Ǿ270 18.00 TI-12
571 28-Dec-15 Bentonaite 411 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

572 28-Dec-15 Bentonaite 412 Ǿ270 18.00 TI-12


573 28-Dec-15 Bentonaite 413 Ǿ270 18.00 TI-12
574 28-Dec-15 Bentonaite 414 Ǿ270 18.00 TI-12
575 28-Dec-15 Bentonaite 667 Ǿ270 18.00 TI-08
576 28-Dec-15 Bentonaite 668 Ǿ270 18.00 TI-08
577 28-Dec-15 Bentonaite 669 Ǿ270 18.00 TI-08
578 28-Dec-15 Bentonaite 670 Ǿ270 18.00 TI-08
579 28-Dec-15 Bentonaite 671 Ǿ270 18.00 TI-08
580 28-Dec-15 Bentonaite 672 Ǿ270 18.00 TI-08
581 28-Dec-15 Bentonaite 673 Ǿ270 18.00 TI-08
582 28-Dec-15 Bentonaite 674 Ǿ270 18.00 TI-08
583 28-Dec-15 Bentonaite 675 Ǿ270 18.00 TI-08
584 28-Dec-15 Bentonaite 676 Ǿ270 18.00 TI-08
585 28-Dec-15 Bentonaite 677 Ǿ270 18.00 TI-08
586 28-Dec-15 Bentonaite 678 Ǿ270 18.00 TI-08
587 28-Dec-15 Bentonaite 679 Ǿ270 18.00 TI-08
588 28-Dec-15 Bentonaite 680 Ǿ270 18.00 TI-08
589 29-Dec-15 Bentonaite 415 Ǿ270 18.00 TI-12
590 29-Dec-15 Bentonaite 416 Ǿ270 18.00 TI-12
591 29-Dec-15 Bentonaite 417 Ǿ270 18.00 TI-12
592 29-Dec-15 Bentonaite 418 Ǿ270 18.00 TI-12
593 29-Dec-15 Bentonaite 419 Ǿ270 18.00 TI-12
594 29-Dec-15 Bentonaite 420 Ǿ270 18.00 TI-12
595 29-Dec-15 Bentonaite 421 Ǿ270 18.00 TI-12
596 29-Dec-15 Bentonaite 422 Ǿ270 18.00 TI-12
597 29-Dec-15 Bentonaite 423 Ǿ270 18.00 TI-12
598 29-Dec-15 Bentonaite 424 Ǿ270 18.00 TI-12
599 29-Dec-15 Bentonaite 425 Ǿ270 18.00 TI-12
600 29-Dec-15 Bentonaite 426 Ǿ270 18.00 TI-12
601 29-Dec-15 Bentonaite 427 Ǿ270 18.00 TI-12
602 29-Dec-15 Bentonaite 681 Ǿ270 18.00 TI-08
603 29-Dec-15 Bentonaite 682 Ǿ270 18.00 TI-08
604 29-Dec-15 Bentonaite 683 Ǿ270 18.00 TI-08
605 29-Dec-15 Bentonaite 684 Ǿ270 18.00 TI-08
606 29-Dec-15 Bentonaite 685 Ǿ270 18.00 TI-08
607 29-Dec-15 Bentonaite 686 Ǿ270 18.00 TI-08
608 29-Dec-15 Bentonaite 687 Ǿ270 18.00 TI-08
609 29-Dec-15 Bentonaite 688 Ǿ270 18.00 TI-08
610 29-Dec-15 Bentonaite 689 Ǿ270 18.00 TI-08
611 29-Dec-15 Bentonaite 690 Ǿ270 18.00 TI-08
612 29-Dec-15 Bentonaite 691 Ǿ270 18.00 TI-08
613 29-Dec-15 Bentonaite 692 Ǿ270 18.00 TI-08
614 29-Dec-15 Bentonaite 693 Ǿ270 18.00 TI-08
615 29-Dec-15 Bentonaite 694 Ǿ270 18.00 TI-08
616 30-Dec-15 Bentonaite 428 Ǿ270 18.00 TI-12
617 30-Dec-15 Bentonaite 429 Ǿ270 18.00 TI-12
618 30-Dec-15 Bentonaite 430 Ǿ270 18.00 TI-12
619 30-Dec-15 Bentonaite 431 Ǿ270 18.00 TI-12
620 30-Dec-15 Bentonaite 432 Ǿ270 18.00 TI-12
621 30-Dec-15 Bentonaite 433 Ǿ270 18.00 TI-12
622 30-Dec-15 Bentonaite 434 Ǿ270 18.00 TI-12
623 2-Jan-16 Bentonaite 695 Ǿ270 18.00 TC-08
624 2-Jan-16 Bentonaite 696 Ǿ270 18.00 TC-08
625 2-Jan-16 Bentonaite 697 Ǿ270 18.00 TC-08
626 2-Jan-16 Bentonaite 698 Ǿ270 18.00 TC-08
627 2-Jan-16 Bentonaite 699 Ǿ270 18.00 TC-08
628 2-Jan-16 Bentonaite 700 Ǿ270 18.00 TC-08
629 2-Jan-16 Bentonaite 701 Ǿ270 18.00 TC-08
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

630 2-Jan-16 Bentonaite 435 Ǿ270 18.00 TC-12


631 2-Jan-16 Bentonaite 436 Ǿ270 18.00 TC-12
632 2-Jan-16 Bentonaite 437 Ǿ270 18.00 TC-12
633 2-Jan-16 Bentonaite 438 Ǿ270 18.00 TC-12
634 2-Jan-16 Bentonaite 439 Ǿ270 18.00 TC-12
635 2-Jan-16 Bentonaite 440 Ǿ270 18.00 TC-12
636 2-Jan-16 Bentonaite 441 Ǿ270 18.00 TC-12
637 3-Jan-16 Bentonaite 442 Ǿ270 18.00 TC-12
638 3-Jan-16 Bentonaite 443 Ǿ270 18.00 TC-12
639 3-Jan-16 Bentonaite 444 Ǿ270 18.00 TC-12
640 3-Jan-16 Bentonaite 445 Ǿ270 18.00 TC-12
641 3-Jan-16 Bentonaite 446 Ǿ270 18.00 TC-12
642 3-Jan-16 Bentonaite 447 Ǿ270 18.00 TC-12
643 3-Jan-16 Bentonaite 448 Ǿ270 18.00 TC-12
644 4-Jan-16 Bentonaite 702 Ǿ270 18.00 TC-08
645 4-Jan-16 Bentonaite 703 Ǿ270 18.00 TC-08
646 4-Jan-16 Bentonaite 704 Ǿ270 18.00 TC-08
647 4-Jan-16 Bentonaite 705 Ǿ270 18.00 TC-08
648 4-Jan-16 Bentonaite 706 Ǿ270 18.00 TC-08
649 4-Jan-16 Bentonaite 707 Ǿ270 18.00 TC-08
650 4-Jan-16 Bentonaite 708 Ǿ270 18.00 TC-08
651 4-Jan-16 Bentonaite 709 Ǿ270 18.00 TC-08
652 4-Jan-16 Bentonaite 710 Ǿ270 18.00 TC-08
653 4-Jan-16 Bentonaite 711 Ǿ270 18.00 TC-08
654 4-Jan-16 Bentonaite 712 Ǿ270 18.00 TC-08
655 4-Jan-16 Bentonaite 713 Ǿ270 18.00 TC-08
656 4-Jan-16 Bentonaite 714 Ǿ270 18.00 TC-08
657 4-Jan-16 Bentonaite 715 Ǿ270 18.00 TC-08
658 5-Jan-16 Bentonaite 716 Ǿ270 18.00 TC-08
659 5-Jan-16 Bentonaite 717 Ǿ270 18.00 TC-08
660 5-Jan-16 Bentonaite 718 Ǿ270 18.00 TC-08
661 5-Jan-16 Bentonaite 719 Ǿ270 18.00 TC-08
662 5-Jan-16 Bentonaite 720 Ǿ270 18.00 TC-08
663 5-Jan-16 Bentonaite 721 Ǿ270 18.00 TC-08
664 5-Jan-16 Bentonaite 722 Ǿ270 18.00 TC-08
665 5-Jan-16 Bentonaite 723 Ǿ270 18.00 TC-08
666 5-Jan-16 Bentonaite 724 Ǿ270 18.00 TC-08
667 5-Jan-16 Bentonaite 725 Ǿ270 18.00 TC-08
668 5-Jan-16 Bentonaite 726 Ǿ270 18.00 TC-08
669 6-Jan-16 Bentonaite 449 Ǿ270 18.00 TC-12
670 6-Jan-16 Bentonaite 450 Ǿ270 18.00 TC-12
671 6-Jan-16 Bentonaite 451 Ǿ270 18.00 TC-12
672 6-Jan-16 Bentonaite 452 Ǿ270 18.00 TC-12
673 6-Jan-16 Bentonaite 453 Ǿ270 18.00 TC-12
674 6-Jan-16 Bentonaite 454 Ǿ270 18.00 TC-12
675 7-Jan-16 Bentonaite 455 Ǿ270 18.00 TI-12
676 7-Jan-16 Bentonaite 456 Ǿ270 18.00 TI-12
677 7-Jan-16 Bentonaite 457 Ǿ270 18.00 TI-12
678 7-Jan-16 Bentonaite 458 Ǿ270 18.00 TI-12
679 7-Jan-16 Bentonaite 459 Ǿ270 18.00 TI-12
680 7-Jan-16 Bentonaite 460 Ǿ270 18.00 TI-12
681 7-Jan-16 Bentonaite 461 Ǿ270 18.00 TI-12
682 7-Jan-16 Bentonaite 462 Ǿ270 18.00 TI-12
683 7-Jan-16 Bentonaite 463 Ǿ270 18.00 TI-12
684 7-Jan-16 Bentonaite 464 Ǿ270 18.00 TI-12
685 7-Jan-16 Bentonaite 465 Ǿ270 18.00 TI-12
686 7-Jan-16 Bentonaite 466 Ǿ270 18.00 TI-12
687 7-Jan-16 Bentonaite 467 Ǿ270 18.00 TI-12
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

688 7-Jan-16 Bentonaite 468 Ǿ270 18.00 TI-12


689 8-Jan-16 Bentonaite 469 Ǿ270 18.00 TI-12
690 8-Jan-16 Bentonaite 470 Ǿ270 18.00 TI-12
691 8-Jan-16 Bentonaite 471 Ǿ270 18.00 TI-12
692 8-Jan-16 Bentonaite 472 Ǿ270 18.00 TI-12
693 8-Jan-16 Bentonaite 473 Ǿ270 18.00 TI-12
694 8-Jan-16 Bentonaite 474 Ǿ270 18.00 TI-12
695 8-Jan-16 Bentonaite 475 Ǿ270 18.00 TI-12
696 8-Jan-16 Bentonaite 476 Ǿ270 18.00 TI-12
697 8-Jan-16 Bentonaite 477 Ǿ270 18.00 TI-12
698 8-Jan-16 Bentonaite 478 Ǿ270 18.00 TI-12
699 8-Jan-16 Bentonaite 479 Ǿ270 18.00 TI-12
700 8-Jan-16 Bentonaite 480 Ǿ270 18.00 TI-12
701 8-Jan-16 Bentonaite 481 Ǿ270 18.00 TI-12
702 8-Jan-16 Bentonaite 482 Ǿ270 18.00 TI-12
703 8-Jan-16 Bentonaite 727 Ǿ270 18.00 TI-08
704 8-Jan-16 Bentonaite 728 Ǿ270 18.00 TI-08
705 8-Jan-16 Bentonaite 729 Ǿ270 18.00 TI-08
706 8-Jan-16 Bentonaite 730 Ǿ270 18.00 TI-08
707 8-Jan-16 Bentonaite 731 Ǿ270 18.00 TI-08
708 8-Jan-16 Bentonaite 732 Ǿ270 18.00 TI-08
709 8-Jan-16 Bentonaite 733 Ǿ270 18.00 TI-08
710 8-Jan-16 Bentonaite 734 Ǿ270 18.00 TI-08
711 8-Jan-16 Bentonaite 735 Ǿ270 18.00 TI-08
712 8-Jan-16 Bentonaite 736 Ǿ270 18.00 TI-08
713 8-Jan-16 Bentonaite 737 Ǿ270 18.00 TI-08
714 8-Jan-16 Bentonaite 738 Ǿ270 18.00 TI-08
715 8-Jan-16 Bentonaite 739 Ǿ270 18.00 TI-08
716 9-Jan-16 Bentonaite 483 Ǿ270 18.00 TI-12
717 9-Jan-16 Bentonaite 484 Ǿ270 18.00 TI-12
718 9-Jan-16 Bentonaite 485 Ǿ270 18.00 TI-12
719 9-Jan-16 Bentonaite 486 Ǿ270 18.00 TI-12
720 9-Jan-16 Bentonaite 487 Ǿ270 18.00 TI-12
721 9-Jan-16 Bentonaite 488 Ǿ270 18.00 TI-12
722 9-Jan-16 Bentonaite 489 Ǿ270 18.00 TI-12
723 9-Jan-16 Bentonaite 490 Ǿ270 18.00 TI-12
724 9-Jan-16 Bentonaite 740 Ǿ270 18.00 TI-08
725 9-Jan-16 Bentonaite 741 Ǿ270 18.00 TI-08
726 9-Jan-16 Bentonaite 742 Ǿ270 18.00 TI-08
727 9-Jan-16 Bentonaite 743 Ǿ270 18.00 TI-08
728 9-Jan-16 Bentonaite 744 Ǿ270 18.00 TI-08
729 9-Jan-16 Bentonaite 745 Ǿ270 18.00 TI-08
730 9-Jan-16 Bentonaite 746 Ǿ270 18.00 TI-08
731 11-Jan-16 Bentonaite 491 Ǿ270 18.00 TI-12
732 11-Jan-16 Bentonaite 492 Ǿ270 18.00 TI-12
733 11-Jan-16 Bentonaite 493 Ǿ270 18.00 TI-12
734 11-Jan-16 Bentonaite 494 Ǿ270 18.00 TI-12
735 11-Jan-16 Bentonaite 495 Ǿ270 18.00 TI-12
736 11-Jan-16 Bentonaite 496 Ǿ270 18.00 TI-12
737 11-Jan-16 Bentonaite 497 Ǿ270 18.00 TI-12
738 11-Jan-16 Bentonaite 498 Ǿ270 18.00 TI-12
739 11-Jan-16 Bentonaite 499 Ǿ270 18.00 TI-12
740 11-Jan-16 Bentonaite 500 Ǿ270 18.00 TI-12
741 11-Jan-16 Bentonaite 501 Ǿ270 18.00 TI-12
742 11-Jan-16 Bentonaite 747 Ǿ270 18.00 TI-08
743 11-Jan-16 Bentonaite 748 Ǿ270 18.00 TI-08
744 11-Jan-16 Bentonaite 749 Ǿ270 18.00 TI-08
745 11-Jan-16 Bentonaite 750 Ǿ270 18.00 TI-08
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

746 11-Jan-16 Bentonaite 751 Ǿ270 18.00 TI-08


747 11-Jan-16 Bentonaite 752 Ǿ270 18.00 TI-08
748 11-Jan-16 Bentonaite 753 Ǿ270 18.00 TI-08
749 11-Jan-16 Bentonaite 754 Ǿ270 18.00 TI-08
750 11-Jan-16 Bentonaite 755 Ǿ270 18.00 TI-08
751 11-Jan-16 Bentonaite 756 Ǿ270 18.00 TI-08
752 11-Jan-16 Bentonaite 757 Ǿ270 18.00 TI-08
753 11-Jan-16 Bentonaite 758 Ǿ270 18.00 TI-08
754 11-Jan-16 Bentonaite 759 Ǿ270 18.00 TI-08
755 11-Jan-16 Bentonaite 760 Ǿ270 18.00 TI-08
756 11-Jan-16 Bentonaite 761 Ǿ270 18.00 TI-08
757 12-Jan-16 Bentonaite 762 Ǿ270 18.00 TI-08
758 12-Jan-16 Bentonaite 763 Ǿ270 18.00 TI-08
759 12-Jan-16 Bentonaite 764 Ǿ270 18.00 TI-08
760 12-Jan-16 Bentonaite 765 Ǿ270 18.00 TI-08
761 12-Jan-16 Bentonaite 766 Ǿ270 18.00 TI-08
762 12-Jan-16 Bentonaite 767 Ǿ270 18.00 TI-08
763 12-Jan-16 Bentonaite 768 Ǿ270 18.00 TI-08
764 12-Jan-16 Bentonaite 769 Ǿ270 18.00 TI-08
765 12-Jan-16 Bentonaite 770 Ǿ270 18.00 TI-08
766 12-Jan-16 Bentonaite 771 Ǿ270 18.00 TI-08
767 12-Jan-16 Bentonaite 772 Ǿ270 18.00 TI-08
768 12-Jan-16 Bentonaite 773 Ǿ270 18.00 TI-08
769 12-Jan-16 Bentonaite 774 Ǿ270 18.00 TI-08
770 13-Jan-16 Bentonaite 775 Ǿ270 18.00 TI-08
771 13-Jan-16 Bentonaite 776 Ǿ270 18.00 TI-08
772 13-Jan-16 Bentonaite 777 Ǿ270 18.00 TI-08
773 13-Jan-16 Bentonaite 778 Ǿ270 18.00 TI-08
774 13-Jan-16 Bentonaite 779 Ǿ270 18.00 TI-08
775 13-Jan-16 Bentonaite 780 Ǿ270 18.00 TI-08
776 13-Jan-16 Bentonaite 781 Ǿ270 18.00 TI-08
777 13-Jan-16 Bentonaite 782 Ǿ270 18.00 TI-08
778 13-Jan-16 Bentonaite 783 Ǿ270 18.00 TI-08
779 13-Jan-16 Bentonaite 784 Ǿ270 18.00 TI-08
780 13-Jan-16 Bentonaite 785 Ǿ270 18.00 TI-08
781 14-Jan-16 Bentonaite 786 Ǿ270 18.00 TI-08
782 14-Jan-16 Bentonaite 787 Ǿ270 18.00 TI-08
783 14-Jan-16 Bentonaite 788 Ǿ270 18.00 TI-08
784 14-Jan-16 Bentonaite 789 Ǿ270 18.00 TI-08
785 14-Jan-16 Bentonaite 790 Ǿ270 18.00 TI-08
786 14-Jan-16 Bentonaite 791 Ǿ270 18.00 TI-08
787 14-Jan-16 Bentonaite 792 Ǿ270 18.00 TI-08
788 14-Jan-16 Bentonaite 793 Ǿ270 18.00 TI-08
789 14-Jan-16 Bentonaite 794 Ǿ270 18.00 TI-08
790 14-Jan-16 Bentonaite 795 Ǿ270 18.00 TI-08
791 15-Jan-16 Bentonaite 796 Ǿ270 18.00 TI-08
792 15-Jan-16 Bentonaite 797 Ǿ270 18.00 TI-08
793 15-Jan-16 Bentonaite 798 Ǿ270 18.00 TI-08
794 15-Jan-16 Bentonaite 799 Ǿ270 18.00 TI-08
795 15-Jan-16 Bentonaite 800 Ǿ270 18.00 TI-08
796 15-Jan-16 Bentonaite 801 Ǿ270 18.00 TI-08
797 15-Jan-16 Bentonaite 802 Ǿ270 18.00 TI-08
798 15-Jan-16 Bentonaite 803 Ǿ270 18.00 TI-08
799 15-Jan-16 Bentonaite 804 Ǿ270 18.00 TI-08
800 15-Jan-16 Bentonaite 805 Ǿ270 18.00 TI-08
801 15-Jan-16 Bentonaite 806 Ǿ270 18.00 TI-08
802 15-Jan-16 Bentonaite 807 Ǿ270 18.00 TI-08
803 15-Jan-16 Bentonaite 808 Ǿ270 18.00 TI-08
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

804 15-Jan-16 Bentonaite 809 Ǿ270 18.00 TI-08


805 15-Jan-16 Bentonaite 810 Ǿ270 18.00 TI-08
806 16-Jan-16 Bentonaite 811 Ǿ270 18.00 TI-08
807 16-Jan-16 Bentonaite 812 Ǿ270 18.00 TI-08
808 16-Jan-16 Bentonaite 813 Ǿ270 18.00 TI-08
809 16-Jan-16 Bentonaite 814 Ǿ270 18.00 TI-08
810 16-Jan-16 Bentonaite 815 Ǿ270 18.00 TI-08
811 16-Jan-16 Bentonaite 816 Ǿ270 18.00 TI-08
812 18-Jan-16 Bentonaite 817 Ǿ270 18.00 TI-08
813 18-Jan-16 Bentonaite 818 Ǿ270 18.00 TI-08
814 18-Jan-16 Bentonaite 819 Ǿ270 18.00 TI-08
815 18-Jan-16 Bentonaite 820 Ǿ270 18.00 TI-08
816 18-Jan-16 Bentonaite 821 Ǿ270 18.00 TI-08
817 18-Jan-16 Bentonaite 822 Ǿ270 18.00 TI-08
818 18-Jan-16 Bentonaite 823 Ǿ270 18.00 TI-08
819 18-Jan-16 Bentonaite 824 Ǿ270 18.00 TI-08
820 19-Jan-16 Bentonaite 825 Ǿ270 18.00 TI-08
821 19-Jan-16 Bentonaite 826 Ǿ270 18.00 TI-08
822 19-Jan-16 Bentonaite 827 Ǿ270 18.00 TI-08
823 19-Jan-16 Bentonaite 828 Ǿ270 18.00 TI-08
824 19-Jan-16 Bentonaite 829 Ǿ270 18.00 TI-08
825 19-Jan-16 Bentonaite 830 Ǿ270 18.00 TI-08
826 19-Jan-16 Bentonaite 831 Ǿ270 18.00 TI-08
827 19-Jan-16 Bentonaite 832 Ǿ270 18.00 TI-08
828 19-Jan-16 Bentonaite 502 Ǿ270 18.00 TI-08
829 19-Jan-16 Bentonaite 503 Ǿ270 18.00 TI-08
830 19-Jan-16 Bentonaite 504 Ǿ270 18.00 TI-08
831 19-Jan-16 Bentonaite 505 Ǿ270 18.00 TI-08
832 19-Jan-16 Bentonaite 506 Ǿ270 18.00 TI-08

Total Pemancangan Bentonite 14794.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA NUGROHO BINTORO TONI CAHYONO


SITE ENGINEER SITE ENGINEER SUPERVISOR
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : BENTONITE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 15 - 31 OKTOBER 2015

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1 28-Dec-15 Soil Mix 7043 Ǿ500 3.00 TC-05


2 28-Dec-15 Soil Mix 7074 Ǿ500 3.00 TC-05
3 28-Dec-15 Soil Mix 7059 Ǿ500 3.00 TC-05
4 28-Dec-15 Soil Mix 7046 Ǿ500 3.00 TC-05
5 28-Dec-15 Soil Mix 7044 Ǿ500 3.00 TC-05
6 28-Dec-15 Soil Mix 7075 Ǿ500 3.00 TC-05
7 28-Dec-15 Soil Mix 7045 Ǿ500 3.00 TC-05
8 28-Dec-15 Soil Mix 7060 Ǿ500 3.00 TC-05
9 28-Dec-15 Soil Mix 7061 Ǿ500 3.00 TC-05
10 29-Dec-15 Soil Mix 7041 Ǿ500 3.00 TC-05
11 29-Dec-15 Soil Mix 7056 Ǿ500 3.00 TC-05
12 29-Dec-15 Soil Mix 7071 Ǿ500 3.00 TC-05
13 29-Dec-15 Soil Mix 7072 Ǿ500 3.00 TC-05
14 29-Dec-15 Soil Mix 7062 Ǿ500 3.00 TC-05
15 29-Dec-15 Soil Mix 7058 Ǿ500 3.00 TC-05
16 29-Dec-15 Soil Mix 7073 Ǿ500 3.00 TC-05
17 29-Dec-15 Soil Mix 7042 Ǿ500 3.00 TC-05
18 29-Dec-15 Soil Mix 7047 Ǿ500 3.00 TC-05
19 29-Dec-15 Soil Mix 7057 Ǿ500 3.00 TC-05
20 30-Dec-15 Soil Mix 7068 Ǿ500 3.00 TC-05
21 30-Dec-15 Soil Mix 7040 Ǿ500 3.00 TC-05
22 30-Dec-15 Soil Mix 7048 Ǿ500 3.00 TC-05
23 30-Dec-15 Soil Mix 7055 Ǿ500 3.00 TC-05
24 30-Dec-15 Soil Mix 7063 Ǿ500 3.00 TC-05
25 30-Dec-15 Soil Mix 7070 Ǿ500 3.00 TC-05
26 30-Dec-15 Soil Mix 7039 Ǿ500 3.00 TC-05
27 30-Dec-15 Soil Mix 7054 Ǿ500 3.00 TC-05
28 30-Dec-15 Soil Mix 7069 Ǿ500 3.00 TC-05
29 4-Jan-16 Soil Mix 7066 Ǿ500 3.00 TC-05
30 4-Jan-16 Soil Mix 7067 Ǿ500 3.00 TC-05
31 4-Jan-16 Soil Mix 7052 Ǿ500 3.00 TC-05
32 4-Jan-16 Soil Mix 7037 Ǿ500 3.00 TC-05
33 4-Jan-16 Soil Mix 7064 Ǿ500 3.00 TC-05
34 4-Jan-16 Soil Mix 7038 Ǿ500 3.00 TC-05
35 4-Jan-16 Soil Mix 7049 Ǿ500 3.00 TC-05
36 4-Jan-16 Soil Mix 7053 Ǿ500 3.00 TC-05
37 5-Jan-16 Soil Mix 7036 Ǿ500 3.00 TC-05
38 5-Jan-16 Soil Mix 7050 Ǿ500 3.00 TC-05
39 5-Jan-16 Soil Mix 7051 Ǿ500 3.00 TC-05
40 5-Jan-16 Soil Mix 7065 Ǿ500 3.00 TC-05
41 5-Jan-16 Soil Mix 7090 Ǿ500 3.00 TC-05
42 5-Jan-16 Soil Mix 7105 Ǿ500 3.00 TC-05
43 5-Jan-16 Soil Mix 7076 Ǿ500 3.00 TC-05
44 5-Jan-16 Soil Mix 7089 Ǿ500 3.00 TC-05
45 5-Jan-16 Soil Mix 7091 Ǿ500 3.00 TC-05
46 5-Jan-16 Soil Mix 7104 Ǿ500 3.00 TC-05
47 5-Jan-16 Soil Mix 7088 Ǿ500 3.00 TC-05
48 5-Jan-16 Soil Mix 7103 Ǿ500 3.00 TC-05
49 6-Jan-16 Soil Mix 7077 Ǿ500 3.00 TC-05
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

50 6-Jan-16 Soil Mix 7087 Ǿ500 3.00 TC-05


51 6-Jan-16 Soil Mix 7092 Ǿ500 3.00 TC-05
52 6-Jan-16 Soil Mix 7102 Ǿ500 3.00 TC-05
53 6-Jan-16 Soil Mix 7101 Ǿ500 3.00 TC-05
54 6-Jan-16 Soil Mix 7086 Ǿ500 3.00 TC-05
55 6-Jan-16 Soil Mix 7100 Ǿ500 3.00 TC-05
56 6-Jan-16 Soil Mix 7093 Ǿ500 3.00 TC-05
57 6-Jan-16 Soil Mix 7085 Ǿ500 3.00 TC-05
58 6-Jan-16 Soil Mix 7078 Ǿ500 3.00 TC-05
59 6-Jan-16 Soil Mix 7099 Ǿ500 3.00 TC-05
60 6-Jan-16 Soil Mix 7084 Ǿ500 3.00 TC-05
61 7-Jan-16 Soil Mix 7079 Ǿ500 3.00 TC-05
62 7-Jan-16 Soil Mix 7083 Ǿ500 3.00 TC-05
63 7-Jan-16 Soil Mix 7094 Ǿ500 3.00 TC-05
64 7-Jan-16 Soil Mix 7098 Ǿ500 3.00 TC-05
65 7-Jan-16 Soil Mix 7082 Ǿ500 3.00 TC-05
66 7-Jan-16 Soil Mix 7097 Ǿ500 3.00 TC-05
67 7-Jan-16 Soil Mix 7080 Ǿ500 3.00 TC-05
68 7-Jan-16 Soil Mix 7081 Ǿ500 3.00 TC-05
69 7-Jan-16 Soil Mix 7095 Ǿ500 3.00 TC-05
70 7-Jan-16 Soil Mix 7096 Ǿ500 3.00 TC-05
71 8-Jan-16 Soil Mix 7137 Ǿ500 3.00 TC-05
72 8-Jan-16 Soil Mix 7120 Ǿ500 3.00 TC-05
73 8-Jan-16 Soil Mix 7135 Ǿ500 3.00 TC-05
74 8-Jan-16 Soil Mix 7106 Ǿ500 3.00 TC-05
75 8-Jan-16 Soil Mix 7119 Ǿ500 3.00 TC-05
76 8-Jan-16 Soil Mix 7121 Ǿ500 3.00 TC-05
77 8-Jan-16 Soil Mix 7134 Ǿ500 3.00 TC-05
78 8-Jan-16 Soil Mix 7136 Ǿ500 3.00 TC-05
79 8-Jan-16 Soil Mix 7118 Ǿ500 3.00 TC-05
80 8-Jan-16 Soil Mix 7133 Ǿ500 3.00 TC-05
81 9-Jan-16 Soil Mix 7116 Ǿ500 3.00 TC-05
82 9-Jan-16 Soil Mix 7107 Ǿ500 3.00 TC-05
83 9-Jan-16 Soil Mix 7117 Ǿ500 3.00 TC-05
84 9-Jan-16 Soil Mix 7122 Ǿ500 3.00 TC-05
85 9-Jan-16 Soil Mix 7132 Ǿ500 3.00 TC-05
86 9-Jan-16 Soil Mix 7131 Ǿ500 3.00 TC-05
87 11-Jan-16 Soil Mix 7139 Ǿ500 3.00 TC-05
88 11-Jan-16 Soil Mix 7108 Ǿ500 3.00 TC-05
89 11-Jan-16 Soil Mix 7115 Ǿ500 3.00 TC-05
90 11-Jan-16 Soil Mix 7123 Ǿ500 3.00 TC-05
91 11-Jan-16 Soil Mix 7130 Ǿ500 3.00 TC-05
92 11-Jan-16 Soil Mix 7138 Ǿ500 3.00 TC-05
93 11-Jan-16 Soil Mix 7114 Ǿ500 3.00 TC-05
94 11-Jan-16 Soil Mix 7129 Ǿ500 3.00 TC-05
95 11-Jan-16 Soil Mix 7109 Ǿ500 3.00 TC-05
96 12-Jan-16 Soil Mix 7111 Ǿ500 3.00 TC-05
97 12-Jan-16 Soil Mix 7124 Ǿ500 3.00 TC-05
98 12-Jan-16 Soil Mix 7110 Ǿ500 3.00 TC-05
99 12-Jan-16 Soil Mix 7113 Ǿ500 3.00 TC-05
100 12-Jan-16 Soil Mix 7128 Ǿ500 3.00 TC-05
101 12-Jan-16 Soil Mix 7112 Ǿ500 3.00 TC-05
102 12-Jan-16 Soil Mix 7127 Ǿ500 3.00 TC-05
103 12-Jan-16 Soil Mix 7140 Ǿ500 3.00 TC-05
104 13-Jan-16 Soil Mix 7125 Ǿ500 3.00 TC-05
105 13-Jan-16 Soil Mix 7126 Ǿ500 3.00 TC-05
106 13-Jan-16 Soil Mix 7027 Ǿ500 3.00 TC-05
107 13-Jan-16 Soil Mix 7030 Ǿ500 3.00 TC-05
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

108 13-Jan-16 Soil Mix 7016 Ǿ500 3.00 TC-05


109 13-Jan-16 Soil Mix 7029 Ǿ500 3.00 TC-05
110 13-Jan-16 Soil Mix 7031 Ǿ500 3.00 TC-05
111 13-Jan-16 Soil Mix 7028 Ǿ500 3.00 TC-05
112 13-Jan-16 Soil Mix 7032 Ǿ500 3.00 TC-05
113 13-Jan-16 Soil Mix 7017 Ǿ500 3.00 TC-05
114 15-Jan-16 Soil Mix 7011 Ǿ500 3.00 TC-05
115 15-Jan-16 Soil Mix 7026 Ǿ500 3.00 TC-05
116 15-Jan-16 Soil Mix 7002 Ǿ500 3.00 TC-05
117 15-Jan-16 Soil Mix 7012 Ǿ500 3.00 TC-05
118 15-Jan-16 Soil Mix 7013 Ǿ500 3.00 TC-05
119 15-Jan-16 Soil Mix 7014 Ǿ500 3.00 TC-05
120 15-Jan-16 Soil Mix 7001 Ǿ500 3.00 TC-05
121 15-Jan-16 Soil Mix 7015 Ǿ500 3.00 TC-05
122 15-Jan-16 Soil Mix 7020 Ǿ500 3.00 TC-05
123 15-Jan-16 Soil Mix 7021 Ǿ500 3.00 TC-05
124 15-Jan-16 Soil Mix 7035 Ǿ500 3.00 TC-05
125 15-Jan-16 Soil Mix 7022 Ǿ500 3.00 TC-05
126 15-Jan-16 Soil Mix 7034 Ǿ500 3.00 TC-05
127 15-Jan-16 Soil Mix 7023 Ǿ500 3.00 TC-05
128 15-Jan-16 Soil Mix 7019 Ǿ500 3.00 TC-05
129 15-Jan-16 Soil Mix 7024 Ǿ500 3.00 TC-05
130 15-Jan-16 Soil Mix 7033 Ǿ500 3.00 TC-05
131 15-Jan-16 Soil Mix 7025 Ǿ500 3.00 TC-05
132 15-Jan-16 Soil Mix 7018 Ǿ500 3.00 TC-05
133 16-Jan-16 Soil Mix 7003 Ǿ500 3.00 TC-05
134 16-Jan-16 Soil Mix 7004 Ǿ500 3.00 TC-05
135 16-Jan-16 Soil Mix 7005 Ǿ500 3.00 TC-05
136 16-Jan-16 Soil Mix 7006 Ǿ500 3.00 TC-05
137 16-Jan-16 Soil Mix 7007 Ǿ500 3.00 TC-05
138 16-Jan-16 Soil Mix 7008 Ǿ500 3.00 TC-05
139 16-Jan-16 Soil Mix 7009 Ǿ500 3.00 TC-05
140 16-Jan-16 Soil Mix 7010 Ǿ500 3.00 TC-05

Total Pemancangan Bentonite 420.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA NUGROHO BINTORO TONI CAHYONO


SITE ENGINEER SITE ENGINEER SUPERVISOR
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : REDRIVE (RE-JACK)

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 15 JAN 2016 - 29 JAN 2016


TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

85 Total bentonaite progres 1


1 15-Jan-16 main pile 2005 Ǿ600 420.00 TI-07 REDRIVE
2 15-Jan-16 main pile 2003 Ǿ600 420.00 TI-07 REDRIVE
3 15-Jan-16 main pile 2006 Ǿ600 420.00 TI-07 REDRIVE
4 15-Jan-16 main pile 2007 Ǿ600 420.00 TI-07 REDRIVE
5 15-Jan-16 main pile 2009 Ǿ600 420.00 TI-07 REDRIVE
6 15-Jan-16 main pile 2011 Ǿ600 420.00 TI-07 REDRIVE
7 15-Jan-16 main pile 2010 Ǿ600 420.00 TI-07 REDRIVE
8 15-Jan-16 main pile 2001 Ǿ600 420.00 TI-07 REDRIVE
9 15-Jan-16 main pile 2002 Ǿ600 420.00 TI-07 REDRIVE
10 15-Jan-16 main pile 2074 Ǿ600 420.00 TI-07 REDRIVE
11 15-Jan-16 main pile 2075 Ǿ600 420.00 TI-07 REDRIVE
12 15-Jan-16 main pile 2127 Ǿ600 420.00 TI-07 REDRIVE
13 15-Jan-16 main pile 1998 Ǿ600 420.00 TI-07 REDRIVE
14 15-Jan-16 main pile 1999 Ǿ600 420.00 TI-07 REDRIVE
15 15-Jan-16 main pile 2013 Ǿ600 420.00 TI-07 REDRIVE
16 15-Jan-16 main pile 2014 Ǿ600 420.00 TI-07 REDRIVE
17 15-Jan-16 main pile 2018 Ǿ600 420.00 TI-07 REDRIVE
18 15-Jan-16 main pile 2015 Ǿ600 420.00 TI-07 REDRIVE
19 15-Jan-16 main pile 2020 Ǿ600 420.00 TI-07 REDRIVE
20 15-Jan-16 main pile 2026 Ǿ600 420.00 TI-07 REDRIVE
21 15-Jan-16 main pile 2027 Ǿ600 420.00 TI-07 REDRIVE
22 15-Jan-16 main pile 2031 Ǿ600 420.00 TI-07 REDRIVE
23 15-Jan-16 main pile 2030 Ǿ600 420.00 TI-07 REDRIVE
24 15-Jan-16 main pile 2032 Ǿ600 420.00 TI-07 REDRIVE
25 15-Jan-16 main pile 2033 Ǿ600 420.00 TI-07 REDRIVE
26 15-Jan-16 main pile 2034 Ǿ600 420.00 TI-07 REDRIVE
27 15-Jan-16 main pile 2038 Ǿ600 420.00 TI-07 REDRIVE
28 15-Jan-16 main pile 2037 Ǿ600 420.00 TI-07 REDRIVE
29 15-Jan-16 main pile 2039 Ǿ600 420.00 TI-07 REDRIVE
30 16-Jan-16 main pile 2046 Ǿ600 420.00 TI-07 REDRIVE
31 16-Jan-16 main pile 2047 Ǿ600 420.00 TI-07 REDRIVE
32 16-Jan-16 main pile 2043 Ǿ600 420.00 TI-07 REDRIVE
33 16-Jan-16 main pile 2060 Ǿ600 420.00 TI-07 REDRIVE
34 16-Jan-16 main pile 2061 Ǿ600 420.00 TI-07 REDRIVE
35 16-Jan-16 main pile 2057 Ǿ600 420.00 TI-07 REDRIVE
36 16-Jan-16 main pile 2058 Ǿ600 420.00 TI-07 REDRIVE
37 16-Jan-16 main pile 2056 Ǿ600 420.00 TI-07 REDRIVE
38 16-Jan-16 main pile 1978 Ǿ600 420.00 TI-07 REDRIVE
39 16-Jan-16 main pile 1976 Ǿ600 420.00 TI-07 REDRIVE
40 16-Jan-16 main pile 1979 Ǿ600 420.00 TI-07 REDRIVE
41 16-Jan-16 main pile 1980 Ǿ600 420.00 TI-07 REDRIVE
42 16-Jan-16 main pile 1984 Ǿ600 420.00 TI-07 REDRIVE
43 16-Jan-16 main pile 1982 Ǿ600 420.00 TI-07 REDRIVE
44 16-Jan-16 main pile 1983 Ǿ600 420.00 TI-07 REDRIVE
45 16-Jan-16 main pile 2029 Ǿ600 420.00 TI-07 REDRIVE
46 16-Jan-16 main pile 2028 Ǿ600 420.00 TI-07 REDRIVE

Page 342
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

47 16-Jan-16 main pile 2035 Ǿ600 420.00 TI-07 REDRIVE


48 16-Jan-16 main pile 2040 Ǿ600 420.00 TI-07 REDRIVE
49 16-Jan-16 main pile 2036 Ǿ600 420.00 TI-07 REDRIVE
50 16-Jan-16 main pile 2042 Ǿ600 420.00 TI-07 REDRIVE
51 16-Jan-16 main pile 2041 Ǿ600 420.00 TI-07 REDRIVE
52 16-Jan-16 main pile 2045 Ǿ600 420.00 TI-07 REDRIVE
53 16-Jan-16 main pile 2044 Ǿ600 420.00 TI-07 REDRIVE
54 16-Jan-16 main pile 2603 Ǿ600 420.00 TI-03 REDRIVE
55 16-Jan-16 main pile 2545 Ǿ600 420.00 TI-03 REDRIVE
56 16-Jan-16 main pile 2426 Ǿ600 420.00 TI-03 REDRIVE
57 16-Jan-16 main pile 2427 Ǿ600 420.00 TI-03 REDRIVE
58 16-Jan-16 main pile 2428 Ǿ600 420.00 TI-03 REDRIVE
59 16-Jan-16 main pile 2420 Ǿ600 420.00 TI-03 REDRIVE
60 16-Jan-16 main pile 2424 Ǿ600 420.00 TI-03 REDRIVE
61 16-Jan-16 main pile 2422 Ǿ600 420.00 TI-03 REDRIVE
62 16-Jan-16 main pile 2435 Ǿ600 420.00 TI-03 REDRIVE
63 16-Jan-16 main pile 2439 Ǿ600 420.00 TI-03 REDRIVE
64 16-Jan-16 main pile 2438 Ǿ600 420.00 TI-03 REDRIVE
65 18-Jan-16 main pile 1987 Ǿ600 420.00 TI-07 REDRIVE
66 18-Jan-16 main pile 1986 Ǿ600 420.00 TI-07 REDRIVE
67 18-Jan-16 main pile 1985 Ǿ600 420.00 TI-07 REDRIVE
68 18-Jan-16 main pile 1990 Ǿ600 420.00 TI-07 REDRIVE
69 18-Jan-16 main pile 1989 Ǿ600 420.00 TI-07 REDRIVE
70 18-Jan-16 main pile 1988 Ǿ600 420.00 TI-07 REDRIVE
71 18-Jan-16 main pile 1993 Ǿ600 420.00 TI-07 REDRIVE
72 18-Jan-16 main pile 1991 Ǿ600 420.00 TI-07 REDRIVE
73 18-Jan-16 main pile 1992 Ǿ600 420.00 TI-07 REDRIVE
74 18-Jan-16 main pile 1996 Ǿ600 420.00 TI-07 REDRIVE
75 18-Jan-16 main pile 1995 Ǿ600 420.00 TI-07 REDRIVE
76 18-Jan-16 main pile 1994 Ǿ600 420.00 TI-07 REDRIVE
77 19-Jan-16 main pile 2394 Ǿ600 420.00 TI-03 REDRIVE
78 19-Jan-16 main pile 2388 Ǿ600 420.00 TI-03 REDRIVE
79 19-Jan-16 main pile 2391 Ǿ600 420.00 TI-03 REDRIVE
80 19-Jan-16 main pile 2392 Ǿ600 420.00 TI-03 REDRIVE
81 19-Jan-16 main pile 2368 Ǿ600 420.00 TI-03 REDRIVE
82 19-Jan-16 main pile 2371 Ǿ600 420.00 TI-03 REDRIVE
83 19-Jan-16 main pile 2370 Ǿ600 420.00 TI-03 REDRIVE
84 19-Jan-16 main pile 2372 Ǿ600 420.00 TI-03 REDRIVE
85 19-Jan-16 main pile 2369 Ǿ600 420.00 TI-03 REDRIVE
86 19-Jan-16 main pile 2374 Ǿ600 420.00 TI-03 REDRIVE
87 19-Jan-16 main pile 2377 Ǿ600 420.00 TI-03 REDRIVE
88 19-Jan-16 main pile 2376 Ǿ600 420.00 TI-03 REDRIVE
89 19-Jan-16 main pile 2378 Ǿ600 420.00 TI-03 REDRIVE
90 19-Jan-16 main pile 2393 Ǿ600 420.00 TI-03 REDRIVE
91 19-Jan-16 main pile 2396 Ǿ600 420.00 TI-03 REDRIVE
92 19-Jan-16 main pile 2395 Ǿ600 420.00 TI-03 REDRIVE
93 19-Jan-16 main pile 2397 Ǿ600 420.00 TI-03 REDRIVE
94 20-Jan-16 main pile 2444 Ǿ600 420.00 TI-03 REDRIVE
95 20-Jan-16 main pile 2441 Ǿ600 420.00 TI-03 REDRIVE
96 20-Jan-16 main pile 2418 Ǿ600 420.00 TI-03 REDRIVE
97 20-Jan-16 main pile 2416 Ǿ600 420.00 TI-03 REDRIVE
98 20-Jan-16 main pile 2414 Ǿ600 420.00 TI-03 REDRIVE
99 20-Jan-16 main pile 2410 Ǿ600 420.00 TI-03 REDRIVE
100 20-Jan-16 main pile 2412 Ǿ600 420.00 TI-03 REDRIVE
101 20-Jan-16 main pile 2408 Ǿ600 420.00 TI-03 REDRIVE

Page 343
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

102 20-Jan-16 main pile 2383 Ǿ600 420.00 TI-03 REDRIVE


103 20-Jan-16 main pile 2381 Ǿ600 420.00 TI-03 REDRIVE
104 20-Jan-16 main pile 2382 Ǿ600 420.00 TI-03 REDRIVE
105 20-Jan-16 main pile 2380 Ǿ600 420.00 TI-03 REDRIVE
106 20-Jan-16 main pile 2405 Ǿ600 420.00 TI-03 REDRIVE
107 20-Jan-16 main pile 2404 Ǿ600 420.00 TI-03 REDRIVE
108 20-Jan-16 main pile 2403 Ǿ600 420.00 TI-03 REDRIVE
109 20-Jan-16 main pile 2402 Ǿ600 420.00 TI-03 REDRIVE
110 20-Jan-16 main pile 2400 Ǿ600 420.00 TI-03 REDRIVE
111 20-Jan-16 main pile 2399 Ǿ600 420.00 TI-03 REDRIVE
112 20-Jan-16 main pile 2398 Ǿ600 420.00 TI-03 REDRIVE
113 21-Jan-16 main pile 2584 Ǿ600 420.00 TI-03 REDRIVE
114 21-Jan-16 main pile 2532 Ǿ600 420.00 TI-03 REDRIVE
115 21-Jan-16 main pile 2521 Ǿ600 420.00 TI-03 REDRIVE
116 21-Jan-16 main pile 2460 Ǿ600 420.00 TI-03 REDRIVE
117 21-Jan-16 main pile 2458 Ǿ600 420.00 TI-03 REDRIVE
118 21-Jan-16 main pile 2461 Ǿ600 420.00 TI-03 REDRIVE
119 21-Jan-16 main pile 2463 Ǿ600 420.00 TI-03 REDRIVE
120 21-Jan-16 main pile 2475 Ǿ600 420.00 TI-03 REDRIVE
121 21-Jan-16 main pile 2481 Ǿ600 420.00 TI-03 REDRIVE
122 21-Jan-16 main pile 2059 Ǿ600 420.00 TI-07 REDRIVE
123 21-Jan-16 main pile 2055 Ǿ600 420.00 TI-07 REDRIVE
124 21-Jan-16 main pile 2135 Ǿ600 420.00 TI-07 REDRIVE
125 21-Jan-16 main pile 2132 Ǿ600 420.00 TI-07 REDRIVE
126 21-Jan-16 main pile 2983 Ǿ600 420.00 TI-07 REDRIVE
127 21-Jan-16 main pile 2982 Ǿ600 420.00 TI-07 REDRIVE
128 21-Jan-16 main pile 1975 Ǿ600 420.00 TI-07 REDRIVE
129 21-Jan-16 main pile 2094 Ǿ600 420.00 TI-07 REDRIVE
130 21-Jan-16 main pile 2096 Ǿ600 420.00 TI-07 REDRIVE
131 21-Jan-16 main pile 2100 Ǿ600 420.00 TI-07 REDRIVE
132 21-Jan-16 main pile 2099 Ǿ600 420.00 TI-07 REDRIVE
133 21-Jan-16 main pile 2101 Ǿ600 420.00 TI-07 REDRIVE
134 21-Jan-16 main pile 2102 Ǿ600 420.00 TI-07 REDRIVE
135 21-Jan-16 main pile 2104 Ǿ600 420.00 TI-07 REDRIVE
136 21-Jan-16 main pile 2106 Ǿ600 420.00 TI-07 REDRIVE
137 21-Jan-16 main pile 2165 Ǿ600 420.00 TI-07 REDRIVE
138 21-Jan-16 main pile 2168 Ǿ600 420.00 TI-07 REDRIVE
139 21-Jan-16 main pile 2166 Ǿ600 420.00 TI-07 REDRIVE
140 21-Jan-16 main pile 2167 Ǿ600 420.00 TI-07 REDRIVE
141 22-Jan-16 main pile 2691 Ǿ600 420.00 TI-03 REDRIVE
142 22-Jan-16 main pile 2692 Ǿ600 420.00 TI-03 REDRIVE
143 22-Jan-16 main pile 2694 Ǿ600 420.00 TI-03 REDRIVE
144 22-Jan-16 main pile 2693 Ǿ600 420.00 TI-03 REDRIVE
145 22-Jan-16 main pile 2698 Ǿ600 420.00 TI-03 REDRIVE
146 22-Jan-16 main pile 2699 Ǿ600 420.00 TI-03 REDRIVE
147 22-Jan-16 main pile 2700 Ǿ600 420.00 TI-03 REDRIVE
148 22-Jan-16 main pile 2701 Ǿ600 420.00 TI-03 REDRIVE
149 22-Jan-16 main pile 2702 Ǿ600 420.00 TI-03 REDRIVE
150 22-Jan-16 main pile 2703 Ǿ600 420.00 TI-03 REDRIVE
151 22-Jan-16 main pile 2704 Ǿ600 420.00 TI-03 REDRIVE
152 22-Jan-16 main pile 2705 Ǿ600 420.00 TI-03 REDRIVE
153 22-Jan-16 main pile 2690 Ǿ600 420.00 TI-03 REDRIVE
154 22-Jan-16 main pile 2689 Ǿ600 420.00 TI-03 REDRIVE
155 22-Jan-16 main pile 2687 Ǿ600 420.00 TI-03 REDRIVE
156 22-Jan-16 main pile 2688 Ǿ600 420.00 TI-03 REDRIVE

Page 344
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

157 22-Jan-16 main pile 2645 Ǿ600 420.00 TI-03 REDRIVE


158 22-Jan-16 main pile 2646 Ǿ600 420.00 TI-03 REDRIVE
159 22-Jan-16 main pile 2644 Ǿ600 420.00 TI-03 REDRIVE
160 22-Jan-16 main pile 2643 Ǿ600 420.00 TI-03 REDRIVE
161 26-Jan-16 main pile 1467 Ǿ600 509.00 TI-16 REDRIVE
162 26-Jan-16 main pile 1472 Ǿ600 509.00 TI-16 REDRIVE
163 26-Jan-16 main pile 1474 Ǿ600 509.00 TI-16 REDRIVE
164 26-Jan-16 main pile 1433 Ǿ600 509.00 TI-16 REDRIVE
165 26-Jan-16 main pile 1429 Ǿ600 509.00 TI-16 REDRIVE
166 26-Jan-16 main pile 1398 Ǿ600 509.00 TI-16 REDRIVE
167 26-Jan-16 main pile 1371 Ǿ600 509.00 TI-16 REDRIVE
168 26-Jan-16 main pile 1357 Ǿ600 509.00 TI-16 REDRIVE
169 26-Jan-16 main pile 1346 Ǿ600 509.00 TI-16 REDRIVE
170 26-Jan-16 main pile 1345 Ǿ600 509.00 TI-16 REDRIVE
171 26-Jan-16 main pile 1327 Ǿ600 509.00 TI-16 REDRIVE
172 26-Jan-16 main pile 1322 Ǿ600 509.00 TI-16 REDRIVE
173 26-Jan-16 main pile 1309 Ǿ600 509.00 TI-16 REDRIVE
174 26-Jan-16 main pile 1273 Ǿ600 509.00 TI-16 REDRIVE
175 26-Jan-16 main pile 1274 Ǿ600 509.00 TI-16 REDRIVE
176 26-Jan-16 main pile 1290 Ǿ600 509.00 TI-16 REDRIVE
177 26-Jan-16 main pile 1270 Ǿ600 509.00 TI-16 REDRIVE
178 26-Jan-16 main pile 1269 Ǿ600 509.00 TI-16 REDRIVE
179 26-Jan-16 main pile 1268 Ǿ600 509.00 TI-16 REDRIVE
180 26-Jan-16 main pile 1267 Ǿ600 509.00 TI-16 REDRIVE
181 26-Jan-16 main pile 1266 Ǿ600 509.00 TI-16 REDRIVE
182 26-Jan-16 main pile 1265 Ǿ600 509.00 TI-16 REDRIVE
183 26-Jan-16 main pile 1264 Ǿ600 509.00 TI-16 REDRIVE
184 26-Jan-16 main pile 1263 Ǿ600 509.00 TI-16 REDRIVE
185 26-Jan-16 main pile 1279 Ǿ600 509.00 TI-16 REDRIVE
186 26-Jan-16 main pile 1281 Ǿ600 509.00 TI-16 REDRIVE
187 26-Jan-16 main pile 1282 Ǿ600 509.00 TI-16 REDRIVE
188 26-Jan-16 main pile 1283 Ǿ600 509.00 TI-16 REDRIVE
189 26-Jan-16 main pile 1284 Ǿ600 509.00 TI-16 REDRIVE
190 26-Jan-16 main pile 1292 Ǿ600 509.00 TI-16 REDRIVE
191 26-Jan-16 main pile 1294 Ǿ600 509.00 TI-16 REDRIVE
192 26-Jan-16 main pile 1295 Ǿ600 509.00 TI-16 REDRIVE
193 26-Jan-16 main pile 1298 Ǿ600 509.00 TI-16 REDRIVE
194 26-Jan-16 main pile 1300 Ǿ600 509.00 TI-16 REDRIVE
195 26-Jan-16 main pile 1301 Ǿ600 509.00 TI-16 REDRIVE
196 26-Jan-16 main pile 1313 Ǿ600 509.00 TI-16 REDRIVE
197 26-Jan-16 main pile 1314 Ǿ600 509.00 TI-16 REDRIVE
198 26-Jan-16 main pile 1315 Ǿ600 509.00 TI-16 REDRIVE
199 26-Jan-16 main pile 1307 Ǿ600 509.00 TI-16 REDRIVE
200 26-Jan-16 main pile 1324 Ǿ600 509.00 TI-16 REDRIVE
201 26-Jan-16 main pile 1323 Ǿ600 509.00 TI-16 REDRIVE
202 26-Jan-16 main pile 1326 Ǿ600 509.00 TI-16 REDRIVE
203 26-Jan-16 main pile 1325 Ǿ600 509.00 TI-16 REDRIVE
204 26-Jan-16 main pile 1331 Ǿ600 509.00 TI-16 REDRIVE
205 27-Jan-16 main pile 2359 Ǿ600 420.00 TI-16 REDRIVE
206 27-Jan-16 main pile 2354 Ǿ600 420.00 TI-16 REDRIVE
207 27-Jan-16 main pile 2340 Ǿ600 420.00 TI-16 REDRIVE
208 27-Jan-16 main pile 2345 Ǿ600 420.00 TI-16 REDRIVE
209 27-Jan-16 main pile 2343 Ǿ600 420.00 TI-16 REDRIVE
210 27-Jan-16 main pile 2352 Ǿ600 420.00 TI-16 REDRIVE
211 27-Jan-16 main pile 2294 Ǿ600 420.00 TI-16 REDRIVE

Page 345
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

212 27-Jan-16 main pile 2291 Ǿ600 420.00 TI-16 REDRIVE


213 27-Jan-16 main pile 2290 Ǿ600 420.00 TI-16 REDRIVE
214 27-Jan-16 main pile 2289 Ǿ600 420.00 TI-16 REDRIVE
215 27-Jan-16 main pile 2292 Ǿ600 420.00 TI-16 REDRIVE
216 27-Jan-16 main pile 2234 Ǿ600 420.00 TI-16 REDRIVE
217 27-Jan-16 main pile 2232 Ǿ600 420.00 TI-16 REDRIVE
218 27-Jan-16 main pile 2298 Ǿ600 420.00 TI-16 REDRIVE
219 27-Jan-16 main pile 2297 Ǿ600 420.00 TI-16 REDRIVE
220 27-Jan-16 main pile 2302 Ǿ600 420.00 TI-16 REDRIVE
221 27-Jan-16 main pile 2301 Ǿ600 420.00 TI-16 REDRIVE
222 27-Jan-16 main pile 2304 Ǿ600 420.00 TI-16 REDRIVE
223 27-Jan-16 main pile 2309 Ǿ600 420.00 TI-16 REDRIVE
224 27-Jan-16 main pile 2306 Ǿ600 420.00 TI-16 REDRIVE
225 27-Jan-16 main pile 2307 Ǿ600 420.00 TI-16 REDRIVE
226 27-Jan-16 main pile 2305 Ǿ600 420.00 TI-16 REDRIVE
227 27-Jan-16 main pile 2337 Ǿ600 420.00 TI-16 REDRIVE
228 27-Jan-16 main pile 2336 Ǿ600 420.00 TI-16 REDRIVE
229 27-Jan-16 main pile 2331 Ǿ600 420.00 TI-16 REDRIVE
230 27-Jan-16 main pile 2329 Ǿ600 420.00 TI-16 REDRIVE
231 27-Jan-16 main pile 2325 Ǿ600 420.00 TI-16 REDRIVE
232 27-Jan-16 main pile 2324 Ǿ600 420.00 TI-16 REDRIVE
233 27-Jan-16 main pile 2327 Ǿ600 420.00 TI-16 REDRIVE
234 27-Jan-16 main pile 2363 Ǿ600 420.00 TI-16 REDRIVE
235 27-Jan-16 main pile 2366 Ǿ600 420.00 TI-16 REDRIVE
236 27-Jan-16 main pile 2364 Ǿ600 420.00 TI-16 REDRIVE
237 27-Jan-16 main pile 2367 Ǿ600 420.00 TI-16 REDRIVE
238 27-Jan-16 main pile 2275 Ǿ600 420.00 TI-16 REDRIVE
239 27-Jan-16 main pile 2952 Ǿ600 420.00 TI-16 REDRIVE
Total Pemancangan Bentonite 0.00

Diperiksa Oleh : Disetujui Oleh : Dibuat Oleh :


CV.MANAJEMEN KONSTRUKSI UTAMA PT.SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA DENY TEDJA ANWAR ISNAINI


PROJECT MANAGEMENT PROJECT ENGINEER SITE ENGINEER

Page 346
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : BENTONITE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date : 15 - 31 OKTOBER 2015

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

391 14-Apr-16 Redrive 1166 Ǿ600 504.00 TI-18 Redrive


392 14-Apr-16 Redrive 1206 Ǿ600 504.00 TI-18 Redrive
279 26-Jan-16 main pile 1263 Ǿ600 509.00 TI-16 REDRIVE
278 26-Jan-16 main pile 1264 Ǿ600 509.00 TI-16 REDRIVE
277 26-Jan-16 main pile 1265 Ǿ600 509.00 TI-16 REDRIVE
276 26-Jan-16 main pile 1266 Ǿ600 509.00 TI-16 REDRIVE
275 26-Jan-16 main pile 1267 Ǿ600 509.00 TI-16 REDRIVE
274 26-Jan-16 main pile 1268 Ǿ600 509.00 TI-16 REDRIVE
273 26-Jan-16 main pile 1269 Ǿ600 509.00 TI-16 REDRIVE
272 26-Jan-16 main pile 1270 Ǿ600 509.00 TI-16 REDRIVE
269 26-Jan-16 main pile 1273 Ǿ600 509.00 TI-16 REDRIVE
270 26-Jan-16 main pile 1274 Ǿ600 509.00 TI-16 REDRIVE
280 26-Jan-16 main pile 1279 Ǿ600 509.00 TI-16 REDRIVE
281 26-Jan-16 main pile 1281 Ǿ600 509.00 TI-16 REDRIVE
282 26-Jan-16 main pile 1282 Ǿ600 509.00 TI-16 REDRIVE
283 26-Jan-16 main pile 1283 Ǿ600 509.00 TI-16 REDRIVE
284 26-Jan-16 main pile 1284 Ǿ600 509.00 TI-16 REDRIVE
271 26-Jan-16 main pile 1290 Ǿ600 509.00 TI-16 REDRIVE
285 26-Jan-16 main pile 1292 Ǿ600 509.00 TI-16 REDRIVE
286 26-Jan-16 main pile 1294 Ǿ600 509.00 TI-16 REDRIVE
287 26-Jan-16 main pile 1295 Ǿ600 509.00 TI-16 REDRIVE
288 26-Jan-16 main pile 1298 Ǿ600 509.00 TI-16 REDRIVE
289 26-Jan-16 main pile 1300 Ǿ600 509.00 TI-16 REDRIVE
290 26-Jan-16 main pile 1301 Ǿ600 509.00 TI-16 REDRIVE
294 26-Jan-16 main pile 1307 Ǿ600 509.00 TI-16 REDRIVE
268 26-Jan-16 main pile 1309 Ǿ600 509.00 TI-16 REDRIVE
291 26-Jan-16 main pile 1313 Ǿ600 509.00 TI-16 REDRIVE
292 26-Jan-16 main pile 1314 Ǿ600 509.00 TI-16 REDRIVE
293 26-Jan-16 main pile 1315 Ǿ600 509.00 TI-16 REDRIVE
267 26-Jan-16 main pile 1322 Ǿ600 509.00 TI-16 REDRIVE
296 26-Jan-16 main pile 1323 Ǿ600 509.00 TI-16 REDRIVE
295 26-Jan-16 main pile 1324 Ǿ600 509.00 TI-16 REDRIVE
298 26-Jan-16 main pile 1325 Ǿ600 509.00 TI-16 REDRIVE
297 26-Jan-16 main pile 1326 Ǿ600 509.00 TI-16 REDRIVE
266 26-Jan-16 main pile 1327 Ǿ600 509.00 TI-16 REDRIVE
299 26-Jan-16 main pile 1331 Ǿ600 509.00 TI-16 REDRIVE
265 26-Jan-16 main pile 1345 Ǿ600 509.00 TI-16 REDRIVE
264 26-Jan-16 main pile 1346 Ǿ600 509.00 TI-16 REDRIVE
263 26-Jan-16 main pile 1357 Ǿ600 509.00 TI-16 REDRIVE
262 26-Jan-16 main pile 1371 Ǿ600 509.00 TI-16 REDRIVE
261 26-Jan-16 main pile 1398 Ǿ600 509.00 TI-16 REDRIVE
260 26-Jan-16 main pile 1429 Ǿ600 509.00 TI-16 REDRIVE
259 26-Jan-16 main pile 1433 Ǿ600 509.00 TI-16 REDRIVE
256 26-Jan-16 main pile 1467 Ǿ600 509.00 TI-16 REDRIVE
257 26-Jan-16 main pile 1472 Ǿ600 509.00 TI-16 REDRIVE
258 26-Jan-16 main pile 1474 Ǿ600 509.00 TI-16 REDRIVE
359 6-Mar-16 main pile 1499 Ǿ600 23.70 421.10 TI-21 Redrive
358 6-Mar-16 main pile 1501 Ǿ600 23.70 421.10 TI-21 Redrive
357 6-Mar-16 main pile 1503 Ǿ600 23.70 421.10 TI-21 Redrive
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

361 6-Mar-16 main pile 1510 Ǿ600 23.70 421.10 TI-21 Redrive
360 6-Mar-16 main pile 1512 Ǿ600 23.70 421.10 TI-21 Redrive
362 6-Mar-16 main pile 1514 Ǿ600 23.70 421.10 TI-21 Redrive
373 28-Mar-16 Main Pile 1537 Ǿ600 23.70 420.00 TI-07 Redive
374 28-Mar-16 Main Pile 1538 Ǿ600 23.70 420.00 TI-07 Redive
372 28-Mar-16 Main Pile 1543 Ǿ600 23.70 420.00 TI-07 Redive
369 25-Mar-16 Main Pile 1584 Ǿ600 23.70 421.10 TI-21A Redive
388 28-Mar-16 Main Pile 1676 Ǿ600 420.00 TI-07 Redive
370 25-Mar-16 Main Pile 1704 Ǿ600 23.70 421.10 TI-21A Redive
353 3-Mar-16 main pile 1722 Ǿ600 - 23.70 421.10 TI-21 Redrive
354 3-Mar-16 main pile 1723 Ǿ600 - 23.70 421.10 TI-21 Redrive
352 3-Mar-16 main pile 1725 Ǿ600 - 23.70 421.10 TI-21 Redrive
356 3-Mar-16 main pile 1731 Ǿ600 - 23.70 421.10 TI-21 Redrive
387 28-Mar-16 Main Pile 1755 Ǿ600 23.70 420.00 TI-07 Redive
382 28-Mar-16 Main Pile 1764 Ǿ600 23.70 420.00 TI-07 Redive
381 28-Mar-16 Main Pile 1765 Ǿ600 23.70 420.00 TI-07 Redive
363 25-Mar-16 Main Pile 1794 Ǿ600 23.70 420.00 TI-07 Redive
375 28-Mar-16 Main Pile 1800 Ǿ600 23.70 420.00 TI-07 Redive
380 28-Mar-16 Main Pile 1805 Ǿ600 23.70 420.00 TI-07 Redive
384 28-Mar-16 Main Pile 1813 Ǿ600 23.70 420.00 TI-07 Redive
383 28-Mar-16 Main Pile 1814 Ǿ600 23.70 420.00 TI-07 Redive
350 3-Mar-16 main pile 1848 Ǿ600 - 23.70 421.10 TI-21 Redrive
351 3-Mar-16 main pile 1849 Ǿ600 - 23.70 421.10 TI-21 Redrive
349 3-Mar-16 main pile 1851 Ǿ600 - 23.70 421.10 TI-21 Redrive
355 3-Mar-16 main pile 1857 Ǿ600 - 23.70 421.10 TI-21 Redrive
386 28-Mar-16 Main Pile 1882 Ǿ600 23.70 420.00 TI-07 Redive
385 28-Mar-16 Main Pile 1884 Ǿ600 23.70 420.00 TI-07 Redive
376 28-Mar-16 Main Pile 1897 Ǿ600 23.70 420.00 TI-07 Redive
377 28-Mar-16 Main Pile 1898 Ǿ600 23.70 420.00 TI-07 Redive
365 25-Mar-16 Main Pile 1905 Ǿ600 23.70 420.00 TI-07 Redive
364 25-Mar-16 Main Pile 1906 Ǿ600 23.70 420.00 TI-07 Redive
367 25-Mar-16 Main Pile 1914 Ǿ600 23.70 420.00 TI-07 Redive
368 25-Mar-16 Main Pile 1915 Ǿ600 23.70 420.00 TI-07 Redive
366 25-Mar-16 Main Pile 1921 Ǿ600 23.70 420.00 TI-07 Redive
378 28-Mar-16 Main Pile 1922 Ǿ600 23.70 420.00 TI-07 Redive
379 28-Mar-16 Main Pile 1923 Ǿ600 23.70 420.00 TI-07 Redive
371 25-Mar-16 Main Pile 1950 Ǿ600 23.70 421.10 TI-21A Redive
347 3-Mar-16 main pile 1963 Ǿ600 - 23.70 421.10 TI-21 Redrive
348 3-Mar-16 main pile 1966 Ǿ600 - 23.70 421.10 TI-21 Redrive
213 21-Jan-16 main pile 1975 Ǿ600 420.00 TI-07 REDRIVE
124 16-Jan-16 main pile 1976 Ǿ600 420.00 TI-07 REDRIVE
123 16-Jan-16 main pile 1978 Ǿ600 420.00 TI-07 REDRIVE
125 16-Jan-16 main pile 1979 Ǿ600 420.00 TI-07 REDRIVE
126 16-Jan-16 main pile 1980 Ǿ600 420.00 TI-07 REDRIVE
128 16-Jan-16 main pile 1982 Ǿ600 420.00 TI-07 REDRIVE
129 16-Jan-16 main pile 1983 Ǿ600 420.00 TI-07 REDRIVE
127 16-Jan-16 main pile 1984 Ǿ600 420.00 TI-07 REDRIVE
152 18-Jan-16 main pile 1985 Ǿ600 420.00 TI-07 REDRIVE
151 18-Jan-16 main pile 1986 Ǿ600 420.00 TI-07 REDRIVE
150 18-Jan-16 main pile 1987 Ǿ600 420.00 TI-07 REDRIVE
155 18-Jan-16 main pile 1988 Ǿ600 420.00 TI-07 REDRIVE
154 18-Jan-16 main pile 1989 Ǿ600 420.00 TI-07 REDRIVE
153 18-Jan-16 main pile 1990 Ǿ600 420.00 TI-07 REDRIVE
157 18-Jan-16 main pile 1991 Ǿ600 420.00 TI-07 REDRIVE
158 18-Jan-16 main pile 1992 Ǿ600 420.00 TI-07 REDRIVE
156 18-Jan-16 main pile 1993 Ǿ600 420.00 TI-07 REDRIVE
161 18-Jan-16 main pile 1994 Ǿ600 420.00 TI-07 REDRIVE
160 18-Jan-16 main pile 1995 Ǿ600 420.00 TI-07 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

159 18-Jan-16 main pile 1996 Ǿ600 420.00 TI-07 REDRIVE


98 15-Jan-16 main pile 1998 Ǿ600 420.00 TI-07 REDRIVE
99 15-Jan-16 main pile 1999 Ǿ600 420.00 TI-07 REDRIVE
93 15-Jan-16 main pile 2001 Ǿ600 420.00 TI-07 REDRIVE
94 15-Jan-16 main pile 2002 Ǿ600 420.00 TI-07 REDRIVE
87 15-Jan-16 main pile 2003 Ǿ600 420.00 TI-07 REDRIVE
86 15-Jan-16 main pile 2005 Ǿ600 420.00 TI-07 REDRIVE
88 15-Jan-16 main pile 2006 Ǿ600 420.00 TI-07 REDRIVE
89 15-Jan-16 main pile 2007 Ǿ600 420.00 TI-07 REDRIVE
90 15-Jan-16 main pile 2009 Ǿ600 420.00 TI-07 REDRIVE
92 15-Jan-16 main pile 2010 Ǿ600 420.00 TI-07 REDRIVE
91 15-Jan-16 main pile 2011 Ǿ600 420.00 TI-07 REDRIVE
100 15-Jan-16 main pile 2013 Ǿ600 420.00 TI-07 REDRIVE
101 15-Jan-16 main pile 2014 Ǿ600 420.00 TI-07 REDRIVE
103 15-Jan-16 main pile 2015 Ǿ600 420.00 TI-07 REDRIVE
102 15-Jan-16 main pile 2018 Ǿ600 420.00 TI-07 REDRIVE
104 15-Jan-16 main pile 2020 Ǿ600 420.00 TI-07 REDRIVE
105 15-Jan-16 main pile 2026 Ǿ600 420.00 TI-07 REDRIVE
106 15-Jan-16 main pile 2027 Ǿ600 420.00 TI-07 REDRIVE
131 16-Jan-16 main pile 2028 Ǿ600 420.00 TI-07 REDRIVE
130 16-Jan-16 main pile 2029 Ǿ600 420.00 TI-07 REDRIVE
108 15-Jan-16 main pile 2030 Ǿ600 420.00 TI-07 REDRIVE
107 15-Jan-16 main pile 2031 Ǿ600 420.00 TI-07 REDRIVE
109 15-Jan-16 main pile 2032 Ǿ600 420.00 TI-07 REDRIVE
110 15-Jan-16 main pile 2033 Ǿ600 420.00 TI-07 REDRIVE
111 15-Jan-16 main pile 2034 Ǿ600 420.00 TI-07 REDRIVE
132 16-Jan-16 main pile 2035 Ǿ600 420.00 TI-07 REDRIVE
134 16-Jan-16 main pile 2036 Ǿ600 420.00 TI-07 REDRIVE
113 15-Jan-16 main pile 2037 Ǿ600 420.00 TI-07 REDRIVE
112 15-Jan-16 main pile 2038 Ǿ600 420.00 TI-07 REDRIVE
114 15-Jan-16 main pile 2039 Ǿ600 420.00 TI-07 REDRIVE
133 16-Jan-16 main pile 2040 Ǿ600 420.00 TI-07 REDRIVE
136 16-Jan-16 main pile 2041 Ǿ600 420.00 TI-07 REDRIVE
135 16-Jan-16 main pile 2042 Ǿ600 420.00 TI-07 REDRIVE
117 16-Jan-16 main pile 2043 Ǿ600 420.00 TI-07 REDRIVE
138 16-Jan-16 main pile 2044 Ǿ600 420.00 TI-07 REDRIVE
137 16-Jan-16 main pile 2045 Ǿ600 420.00 TI-07 REDRIVE
115 16-Jan-16 main pile 2046 Ǿ600 420.00 TI-07 REDRIVE
116 16-Jan-16 main pile 2047 Ǿ600 420.00 TI-07 REDRIVE
208 21-Jan-16 main pile 2055 Ǿ600 420.00 TI-07 REDRIVE
122 16-Jan-16 main pile 2056 Ǿ600 420.00 TI-07 REDRIVE
120 16-Jan-16 main pile 2057 Ǿ600 420.00 TI-07 REDRIVE
121 16-Jan-16 main pile 2058 Ǿ600 420.00 TI-07 REDRIVE
207 21-Jan-16 main pile 2059 Ǿ600 420.00 TI-07 REDRIVE
118 16-Jan-16 main pile 2060 Ǿ600 420.00 TI-07 REDRIVE
119 16-Jan-16 main pile 2061 Ǿ600 420.00 TI-07 REDRIVE
95 15-Jan-16 main pile 2074 Ǿ600 420.00 TI-07 REDRIVE
96 15-Jan-16 main pile 2075 Ǿ600 420.00 TI-07 REDRIVE
85 14-Jan-16 main pile 2082 Ǿ600 420.00 TI-07 REDRIVE
84 14-Jan-16 main pile 2083 Ǿ600 420.00 TI-07 REDRIVE
78 14-Jan-16 main pile 2085 Ǿ600 420.00 TI-07 REDRIVE
79 14-Jan-16 main pile 2086 Ǿ600 420.00 TI-07 REDRIVE
82 14-Jan-16 main pile 2088 Ǿ600 420.00 TI-07 REDRIVE
81 14-Jan-16 main pile 2091 Ǿ600 420.00 TI-07 REDRIVE
83 14-Jan-16 main pile 2092 Ǿ600 420.00 TI-07 REDRIVE
214 21-Jan-16 main pile 2094 Ǿ600 420.00 TI-07 REDRIVE
215 21-Jan-16 main pile 2096 Ǿ600 420.00 TI-07 REDRIVE
217 21-Jan-16 main pile 2099 Ǿ600 420.00 TI-07 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

216 21-Jan-16 main pile 2100 Ǿ600 420.00 TI-07 REDRIVE


218 21-Jan-16 main pile 2101 Ǿ600 420.00 TI-07 REDRIVE
219 21-Jan-16 main pile 2102 Ǿ600 420.00 TI-07 REDRIVE
220 21-Jan-16 main pile 2104 Ǿ600 420.00 TI-07 REDRIVE
221 21-Jan-16 main pile 2106 Ǿ600 420.00 TI-07 REDRIVE
80 14-Jan-16 main pile 2111 Ǿ600 420.00 TI-07 REDRIVE
76 14-Jan-16 main pile 2116 Ǿ600 420.00 TI-07 REDRIVE
77 14-Jan-16 main pile 2117 Ǿ600 420.00 TI-07 REDRIVE
97 15-Jan-16 main pile 2127 Ǿ600 420.00 TI-07 REDRIVE
210 21-Jan-16 main pile 2132 Ǿ600 420.00 TI-07 REDRIVE
209 21-Jan-16 main pile 2135 Ǿ600 420.00 TI-07 REDRIVE
61 13-Jan-16 main pile 2144 Ǿ600 420.00 TI-07 REDRIVE
65 13-Jan-16 main pile 2147 Ǿ600 420.00 TI-07 REDRIVE
66 13-Jan-16 main pile 2148 Ǿ600 420.00 TI-07 REDRIVE
64 13-Jan-16 main pile 2149 Ǿ600 420.00 TI-07 REDRIVE
62 13-Jan-16 main pile 2150 Ǿ600 420.00 TI-07 REDRIVE
63 13-Jan-16 main pile 2151 Ǿ600 420.00 TI-07 REDRIVE
67 13-Jan-16 main pile 2152 Ǿ600 420.00 TI-07 REDRIVE
69 13-Jan-16 main pile 2154 Ǿ600 420.00 TI-07 REDRIVE
68 13-Jan-16 main pile 2155 Ǿ600 420.00 TI-07 REDRIVE
70 13-Jan-16 main pile 2156 Ǿ600 420.00 TI-07 REDRIVE
71 13-Jan-16 main pile 2158 Ǿ600 420.00 TI-07 REDRIVE
74 13-Jan-16 main pile 2161 Ǿ600 420.00 TI-07 REDRIVE
73 13-Jan-16 main pile 2162 Ǿ600 420.00 TI-07 REDRIVE
72 13-Jan-16 main pile 2163 Ǿ600 420.00 TI-07 REDRIVE
75 13-Jan-16 main pile 2164 Ǿ600 420.00 TI-07 REDRIVE
222 21-Jan-16 main pile 2165 Ǿ600 420.00 TI-07 REDRIVE
224 21-Jan-16 main pile 2166 Ǿ600 420.00 TI-07 REDRIVE
225 21-Jan-16 main pile 2167 Ǿ600 420.00 TI-07 REDRIVE
223 21-Jan-16 main pile 2168 Ǿ600 420.00 TI-07 REDRIVE
54 12-Jan-16 main pile 2170 Ǿ600 420.00 TI-07 REDRIVE
53 12-Jan-16 main pile 2173 Ǿ600 420.00 TI-07 REDRIVE
52 12-Jan-16 main pile 2175 Ǿ600 420.00 TI-07 REDRIVE
51 12-Jan-16 main pile 2176 Ǿ600 420.00 TI-07 REDRIVE
49 12-Jan-16 main pile 2177 Ǿ600 420.00 TI-07 REDRIVE
50 12-Jan-16 main pile 2178 Ǿ600 420.00 TI-07 REDRIVE
48 12-Jan-16 main pile 2180 Ǿ600 420.00 TI-07 REDRIVE
57 12-Jan-16 main pile 2182 Ǿ600 420.00 TI-07 REDRIVE
58 12-Jan-16 main pile 2183 Ǿ600 420.00 TI-07 REDRIVE
56 12-Jan-16 main pile 2184 Ǿ600 420.00 TI-07 REDRIVE
55 12-Jan-16 main pile 2186 Ǿ600 420.00 TI-07 REDRIVE
39 12-Jan-16 main pile 2214 Ǿ600 420.00 TI-07 REDRIVE
38 12-Jan-16 main pile 2215 Ǿ600 420.00 TI-07 REDRIVE
41 12-Jan-16 main pile 2216 Ǿ600 420.00 TI-07 REDRIVE
40 12-Jan-16 main pile 2217 Ǿ600 420.00 TI-07 REDRIVE
42 12-Jan-16 main pile 2219 Ǿ600 420.00 TI-07 REDRIVE
43 12-Jan-16 main pile 2223 Ǿ600 420.00 TI-07 REDRIVE
44 12-Jan-16 main pile 2224 Ǿ600 420.00 TI-07 REDRIVE
45 12-Jan-16 main pile 2225 Ǿ600 420.00 TI-07 REDRIVE
46 12-Jan-16 main pile 2226 Ǿ600 420.00 TI-07 REDRIVE
47 12-Jan-16 main pile 2228 Ǿ600 420.00 TI-07 REDRIVE
312 27-Jan-16 main pile 2232 Ǿ600 420.00 TI-16 REDRIVE
311 27-Jan-16 main pile 2234 Ǿ600 420.00 TI-16 REDRIVE
31 11-Jan-16 main pile 2236 Ǿ600 420.00 TI-07 REDRIVE
29 11-Jan-16 main pile 2240 Ǿ600 420.00 TI-07 REDRIVE
30 11-Jan-16 main pile 2241 Ǿ600 420.00 TI-07 REDRIVE
28 11-Jan-16 main pile 2243 Ǿ600 420.00 TI-07 REDRIVE
27 11-Jan-16 main pile 2246 Ǿ600 420.00 TI-07 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

35 11-Jan-16 main pile 2247 Ǿ600 420.00 TI-07 REDRIVE


34 11-Jan-16 main pile 2248 Ǿ600 420.00 TI-07 REDRIVE
33 11-Jan-16 main pile 2249 Ǿ600 420.00 TI-07 REDRIVE
32 11-Jan-16 main pile 2250 Ǿ600 420.00 TI-07 REDRIVE
37 11-Jan-16 main pile 2254 Ǿ600 420.00 TI-07 REDRIVE
36 11-Jan-16 main pile 2255 Ǿ600 420.00 TI-07 REDRIVE
60 13-Jan-16 main pile 2258 Ǿ600 420.00 TI-07 REDRIVE
59 13-Jan-16 main pile 2259 Ǿ600 420.00 TI-07 REDRIVE
17 9-Jan-16 main pile 2267 Ǿ600 420.00 TI-07 Redrive
16 9-Jan-16 main pile 2268 Ǿ600 420.00 TI-07 Redrive
18 9-Jan-16 main pile 2270 Ǿ600 420.00 TI-07 Redrive
19 11-Jan-16 main pile 2272 Ǿ600 420.00 TI-07 REDRIVE
15 9-Jan-16 main pile 2274 Ǿ600 420.00 TI-07 Redrive
333 27-Jan-16 main pile 2275 Ǿ600 420.00 TI-16 REDRIVE
20 11-Jan-16 main pile 2276 Ǿ600 420.00 TI-07 REDRIVE
21 11-Jan-16 main pile 2277 Ǿ600 420.00 TI-07 REDRIVE
22 11-Jan-16 main pile 2278 Ǿ600 420.00 TI-07 REDRIVE
23 11-Jan-16 main pile 2279 Ǿ600 420.00 TI-07 REDRIVE
24 11-Jan-16 main pile 2280 Ǿ600 420.00 TI-07 REDRIVE
26 11-Jan-16 main pile 2282 Ǿ600 420.00 TI-07 REDRIVE
25 11-Jan-16 main pile 2283 Ǿ600 420.00 TI-07 REDRIVE
1 7-Jan-16 main pile 2287 Ǿ600 420.00 TI-07 Redrive
2 7-Jan-16 main pile 2288 Ǿ600 420.00 TI-07 Redrive
309 27-Jan-16 main pile 2289 Ǿ600 420.00 TI-16 REDRIVE
308 27-Jan-16 main pile 2290 Ǿ600 420.00 TI-16 REDRIVE
307 27-Jan-16 main pile 2291 Ǿ600 420.00 TI-16 REDRIVE
310 27-Jan-16 main pile 2292 Ǿ600 420.00 TI-16 REDRIVE
306 27-Jan-16 main pile 2294 Ǿ600 420.00 TI-16 REDRIVE
314 27-Jan-16 main pile 2297 Ǿ600 420.00 TI-16 REDRIVE
313 27-Jan-16 main pile 2298 Ǿ600 420.00 TI-16 REDRIVE
316 27-Jan-16 main pile 2301 Ǿ600 420.00 TI-16 REDRIVE
315 27-Jan-16 main pile 2302 Ǿ600 420.00 TI-16 REDRIVE
317 27-Jan-16 main pile 2304 Ǿ600 420.00 TI-16 REDRIVE
321 27-Jan-16 main pile 2305 Ǿ600 420.00 TI-16 REDRIVE
319 27-Jan-16 main pile 2306 Ǿ600 420.00 TI-16 REDRIVE
320 27-Jan-16 main pile 2307 Ǿ600 420.00 TI-16 REDRIVE
318 27-Jan-16 main pile 2309 Ǿ600 420.00 TI-16 REDRIVE
6 8-Jan-16 main pile 2310 Ǿ600 420.00 TI-07 Redrive
5 8-Jan-16 main pile 2311 Ǿ600 420.00 TI-07 Redrive
4 8-Jan-16 main pile 2313 Ǿ600 420.00 TI-07 Redrive
3 8-Jan-16 main pile 2314 Ǿ600 420.00 TI-07 Redrive
10 8-Jan-16 main pile 2315 Ǿ600 420.00 TI-07 Redrive
9 8-Jan-16 main pile 2316 Ǿ600 420.00 TI-07 Redrive
7 8-Jan-16 main pile 2317 Ǿ600 420.00 TI-07 Redrive
8 8-Jan-16 main pile 2318 Ǿ600 420.00 TI-07 Redrive
11 8-Jan-16 main pile 2320 Ǿ600 420.00 TI-07 Redrive
12 8-Jan-16 main pile 2321 Ǿ600 420.00 TI-07 Redrive
13 8-Jan-16 main pile 2322 Ǿ600 420.00 TI-07 Redrive
14 8-Jan-16 main pile 2323 Ǿ600 420.00 TI-07 Redrive
327 27-Jan-16 main pile 2324 Ǿ600 420.00 TI-16 REDRIVE
326 27-Jan-16 main pile 2325 Ǿ600 420.00 TI-16 REDRIVE
328 27-Jan-16 main pile 2327 Ǿ600 420.00 TI-16 REDRIVE
325 27-Jan-16 main pile 2329 Ǿ600 420.00 TI-16 REDRIVE
324 27-Jan-16 main pile 2331 Ǿ600 420.00 TI-16 REDRIVE
323 27-Jan-16 main pile 2336 Ǿ600 420.00 TI-16 REDRIVE
322 27-Jan-16 main pile 2337 Ǿ600 420.00 TI-16 REDRIVE
302 27-Jan-16 main pile 2340 Ǿ600 420.00 TI-16 REDRIVE
304 27-Jan-16 main pile 2343 Ǿ600 420.00 TI-16 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

303 27-Jan-16 main pile 2345 Ǿ600 420.00 TI-16 REDRIVE


305 27-Jan-16 main pile 2352 Ǿ600 420.00 TI-16 REDRIVE
301 27-Jan-16 main pile 2354 Ǿ600 420.00 TI-16 REDRIVE
300 27-Jan-16 main pile 2359 Ǿ600 420.00 TI-16 REDRIVE
329 27-Jan-16 main pile 2363 Ǿ600 420.00 TI-16 REDRIVE
331 27-Jan-16 main pile 2364 Ǿ600 420.00 TI-16 REDRIVE
330 27-Jan-16 main pile 2366 Ǿ600 420.00 TI-16 REDRIVE
332 27-Jan-16 main pile 2367 Ǿ600 420.00 TI-16 REDRIVE
166 19-Jan-16 main pile 2368 Ǿ600 420.00 TI-03 REDRIVE
170 19-Jan-16 main pile 2369 Ǿ600 420.00 TI-03 REDRIVE
168 19-Jan-16 main pile 2370 Ǿ600 420.00 TI-03 REDRIVE
167 19-Jan-16 main pile 2371 Ǿ600 420.00 TI-03 REDRIVE
169 19-Jan-16 main pile 2372 Ǿ600 420.00 TI-03 REDRIVE
171 19-Jan-16 main pile 2374 Ǿ600 420.00 TI-03 REDRIVE
173 19-Jan-16 main pile 2376 Ǿ600 420.00 TI-03 REDRIVE
172 19-Jan-16 main pile 2377 Ǿ600 420.00 TI-03 REDRIVE
174 19-Jan-16 main pile 2378 Ǿ600 420.00 TI-03 REDRIVE
190 20-Jan-16 main pile 2380 Ǿ600 420.00 TI-03 REDRIVE
188 20-Jan-16 main pile 2381 Ǿ600 420.00 TI-03 REDRIVE
189 20-Jan-16 main pile 2382 Ǿ600 420.00 TI-03 REDRIVE
187 20-Jan-16 main pile 2383 Ǿ600 420.00 TI-03 REDRIVE
163 19-Jan-16 main pile 2388 Ǿ600 420.00 TI-03 REDRIVE
164 19-Jan-16 main pile 2391 Ǿ600 420.00 TI-03 REDRIVE
165 19-Jan-16 main pile 2392 Ǿ600 420.00 TI-03 REDRIVE
175 19-Jan-16 main pile 2393 Ǿ600 420.00 TI-03 REDRIVE
162 19-Jan-16 main pile 2394 Ǿ600 420.00 TI-03 REDRIVE
177 19-Jan-16 main pile 2395 Ǿ600 420.00 TI-03 REDRIVE
176 19-Jan-16 main pile 2396 Ǿ600 420.00 TI-03 REDRIVE
178 19-Jan-16 main pile 2397 Ǿ600 420.00 TI-03 REDRIVE
197 20-Jan-16 main pile 2398 Ǿ600 420.00 TI-03 REDRIVE
196 20-Jan-16 main pile 2399 Ǿ600 420.00 TI-03 REDRIVE
195 20-Jan-16 main pile 2400 Ǿ600 420.00 TI-03 REDRIVE
194 20-Jan-16 main pile 2402 Ǿ600 420.00 TI-03 REDRIVE
193 20-Jan-16 main pile 2403 Ǿ600 420.00 TI-03 REDRIVE
192 20-Jan-16 main pile 2404 Ǿ600 420.00 TI-03 REDRIVE
191 20-Jan-16 main pile 2405 Ǿ600 420.00 TI-03 REDRIVE
186 20-Jan-16 main pile 2408 Ǿ600 420.00 TI-03 REDRIVE
184 20-Jan-16 main pile 2410 Ǿ600 420.00 TI-03 REDRIVE
185 20-Jan-16 main pile 2412 Ǿ600 420.00 TI-03 REDRIVE
183 20-Jan-16 main pile 2414 Ǿ600 420.00 TI-03 REDRIVE
182 20-Jan-16 main pile 2416 Ǿ600 420.00 TI-03 REDRIVE
181 20-Jan-16 main pile 2418 Ǿ600 420.00 TI-03 REDRIVE
144 16-Jan-16 main pile 2420 Ǿ600 420.00 TI-03 REDRIVE
146 16-Jan-16 main pile 2422 Ǿ600 420.00 TI-03 REDRIVE
145 16-Jan-16 main pile 2424 Ǿ600 420.00 TI-03 REDRIVE
141 16-Jan-16 main pile 2426 Ǿ600 420.00 TI-03 REDRIVE
142 16-Jan-16 main pile 2427 Ǿ600 420.00 TI-03 REDRIVE
143 16-Jan-16 main pile 2428 Ǿ600 420.00 TI-03 REDRIVE
147 16-Jan-16 main pile 2435 Ǿ600 420.00 TI-03 REDRIVE
149 16-Jan-16 main pile 2438 Ǿ600 420.00 TI-03 REDRIVE
148 16-Jan-16 main pile 2439 Ǿ600 420.00 TI-03 REDRIVE
180 20-Jan-16 main pile 2441 Ǿ600 420.00 TI-03 REDRIVE
179 20-Jan-16 main pile 2444 Ǿ600 420.00 TI-03 REDRIVE
202 21-Jan-16 main pile 2458 Ǿ600 420.00 TI-03 REDRIVE
201 21-Jan-16 main pile 2460 Ǿ600 420.00 TI-03 REDRIVE
203 21-Jan-16 main pile 2461 Ǿ600 420.00 TI-03 REDRIVE
204 21-Jan-16 main pile 2463 Ǿ600 420.00 TI-03 REDRIVE
205 21-Jan-16 main pile 2475 Ǿ600 420.00 TI-03 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

206 21-Jan-16 main pile 2481 Ǿ600 420.00 TI-03 REDRIVE


200 21-Jan-16 main pile 2521 Ǿ600 420.00 TI-03 REDRIVE
199 21-Jan-16 main pile 2532 Ǿ600 420.00 TI-03 REDRIVE
140 16-Jan-16 main pile 2545 Ǿ600 420.00 TI-03 REDRIVE
198 21-Jan-16 main pile 2584 Ǿ600 420.00 TI-03 REDRIVE
139 16-Jan-16 main pile 2603 Ǿ600 420.00 TI-03 REDRIVE
245 22-Jan-16 main pile 2643 Ǿ600 420.00 TI-03 REDRIVE
244 22-Jan-16 main pile 2644 Ǿ600 420.00 TI-03 REDRIVE
242 22-Jan-16 main pile 2645 Ǿ600 420.00 TI-03 REDRIVE
243 22-Jan-16 main pile 2646 Ǿ600 420.00 TI-03 REDRIVE
246 25-Jan-16 main pile 2647 Ǿ600 420.00 TI-03 REDRIVE
247 25-Jan-16 main pile 2648 Ǿ600 420.00 TI-03 REDRIVE
248 25-Jan-16 main pile 2649 Ǿ600 420.00 TI-03 REDRIVE
249 25-Jan-16 main pile 2650 Ǿ600 420.00 TI-03 REDRIVE
250 25-Jan-16 main pile 2651 Ǿ600 420.00 TI-03 REDRIVE
335 3-Mar-16 main pile 2653 Ǿ600 - 24.20 421.00 TI-03 Redrive
337 3-Mar-16 main pile 2655 Ǿ600 - 24.20 421.00 TI-03 Redrive
336 3-Mar-16 main pile 2656 Ǿ600 - 24.20 421.00 TI-03 Redrive
338 3-Mar-16 main pile 2658 Ǿ600 - 24.20 421.00 TI-03 Redrive
339 3-Mar-16 main pile 2661 Ǿ600 - 24.20 421.00 TI-03 Redrive
340 3-Mar-16 main pile 2681 Ǿ600 - 24.20 421.00 TI-03 Redrive
251 25-Jan-16 main pile 2682 Ǿ600 420.00 TI-03 REDRIVE
252 25-Jan-16 main pile 2683 Ǿ600 420.00 TI-03 REDRIVE
253 25-Jan-16 main pile 2684 Ǿ600 420.00 TI-03 REDRIVE
254 25-Jan-16 main pile 2685 Ǿ600 420.00 TI-03 REDRIVE
255 25-Jan-16 main pile 2686 Ǿ600 420.00 TI-03 REDRIVE
240 22-Jan-16 main pile 2687 Ǿ600 420.00 TI-03 REDRIVE
241 22-Jan-16 main pile 2688 Ǿ600 420.00 TI-03 REDRIVE
239 22-Jan-16 main pile 2689 Ǿ600 420.00 TI-03 REDRIVE
238 22-Jan-16 main pile 2690 Ǿ600 420.00 TI-03 REDRIVE
226 22-Jan-16 main pile 2691 Ǿ600 420.00 TI-03 REDRIVE
227 22-Jan-16 main pile 2692 Ǿ600 420.00 TI-03 REDRIVE
229 22-Jan-16 main pile 2693 Ǿ600 420.00 TI-03 REDRIVE
228 22-Jan-16 main pile 2694 Ǿ600 420.00 TI-03 REDRIVE
230 22-Jan-16 main pile 2698 Ǿ600 420.00 TI-03 REDRIVE
231 22-Jan-16 main pile 2699 Ǿ600 420.00 TI-03 REDRIVE
232 22-Jan-16 main pile 2700 Ǿ600 420.00 TI-03 REDRIVE
233 22-Jan-16 main pile 2701 Ǿ600 420.00 TI-03 REDRIVE
234 22-Jan-16 main pile 2702 Ǿ600 420.00 TI-03 REDRIVE
235 22-Jan-16 main pile 2703 Ǿ600 420.00 TI-03 REDRIVE
236 22-Jan-16 main pile 2704 Ǿ600 420.00 TI-03 REDRIVE
237 22-Jan-16 main pile 2705 Ǿ600 420.00 TI-03 REDRIVE
341 3-Mar-16 main pile 2714 Ǿ600 - 24.20 421.00 TI-03 Redrive
342 3-Mar-16 main pile 2715 Ǿ600 - 24.20 421.00 TI-03 Redrive
343 3-Mar-16 main pile 2717 Ǿ600 - 24.20 421.00 TI-03 Redrive
344 3-Mar-16 main pile 2718 Ǿ600 - 24.20 421.00 TI-03 Redrive
390 31-Mar-16 main pile 2730 Ǿ600 17.10 420.70 TI-18 Redrive
345 3-Mar-16 main pile 2738 Ǿ600 - 24.20 421.00 TI-03 Redrive
346 3-Mar-16 main pile 2742 Ǿ600 - 24.20 421.00 TI-03 Redrive
389 31-Mar-16 main pile 2787 Ǿ600 17.10 420.70 TI-18 Redrive
334 27-Jan-16 main pile 2952 Ǿ600 420.00 TI-16 REDRIVE
212 21-Jan-16 main pile 2982 Ǿ600 420.00 TI-07 REDRIVE
211 21-Jan-16 main pile 2983 Ǿ600 420.00 TI-07 REDRIVE
PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC
Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

Total Pemancangan Bentonite 0.00

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA NUGROHO BINTORO TONI CAHYONO


SITE ENGINEER SITE ENGINEER SUPERVISOR
PT. SINAR GALAXY DAILY REPORT
PROYEK PEMBANGUNAN ONE GALAXY
SURABAYA
INSPECTION TYPE : Subject : BENTONITE

SUMMARY DAY OF PILE DRIVING RECORD Location : JL.IR SOEKARNO - SURABAYA

Date 25-27 NOVEMBER 2015

TYPE OF MACHINE DRIVING COMMENT / NOTE No. of Page

INJECTION 900 ……1….. Of ……1…..

PILE DATA Final Dolly / Dolly / Total PILE CHARACTERISTIC


Axis ID Pile Section Pile Total Pene- Ruyung Ruyung Dolly/ Potong Unit
oil pressing
No. Date Pile Cap No. Type Length tration of Awal Akhir Ruyung Joint Pile Rig REMARK
1 2 3 4 pressure force
Pile
(mm) Bot Mid Mid Mid (m) (m) (m) (m) (m) (jnt) (nos) (Mpa) (ton) (code)

1 25-Nov-15 Soldier pile 4712 Ǿ800 12 16 28.00 15.00 1 1 21.00 527.40 TI-26 potong tiang
2 26-Nov-15 Soldier pile 4719 Ǿ800 12 16 28.00 20.00 1 1 14.50 546.30 TI-26 potong tiang
3 27-Nov-15 soldier pile 4722 Ǿ800 12 16 28.00 22.00 1 1 21.00 527.40 TI-26 potong tiang
4 27-Nov-15 soldier pile 4726 Ǿ800 12 16 28.00 22.50 1 1 21.50 540.00 TI-26 potong tiang
5 28-Nov-15 soldier pile 4733 Ǿ800 12 16 28.00 22.00 1 1 21.50 540.00 TI-26 potong tiang

Total Pemancangan Bentonite 101.50

Diperiksa & Disetujui Oleh : Dibuat Oleh :


PT. SINAR GALAXY PT. TENO TRACT INDONESIA

HENDY SANJAYA NUGROHO BINTORO TONI CAHYONO


SITE ENGINEER SITE ENGINEER SUPERVISOR