PROJECT: DEPLOYMENT 12KM OF CABLE UNDERGROUND 24


FIBERS FROM MIREBALAIS TO GEMBALLE

Haiti, year 2022


1 1 MirMir

Mirebalais
NATCOM SA

Project:

Start Point DEPLOYMENT 12KM OF


(18.821844, -72.105551) CABLE UNDERGROUND FROM
MIREBALAIS TO GIMBALLE

is
V. DIRECTOR:

bala
Mire
LE THANH TRUNG

Router National #3
No Start Point End point Lengh VERYFIED BY:
A
1 Mirebalais Gimballe 12km A NGO MINH GIANG

2 (18.821844, -72.105551) (18.754224, -72.147771) 12km


DRAWN BY:

TUAN BIC

CHECKED BY:
Trout
Cheuchou

Router
Nationa
l #3

DRAWING NAME:

The overall design of the


router underground cable
nce
Gimballe pri
t au
End Point Por
(18.754224, -72.147771)

DATE
PAGE
01
14-04-2022
NATCOM SA

Project:

DEPLOYMENT 12KM OF
CABLE UNDERGROUND FROM
MIREBALAIS TO GIMBALLE

V. DIRECTOR:

LE THANH TRUNG

VERYFIED BY:

NGO MINH GIANG

DRAWN BY:

TUAN BIC

CHECKED BY:

Asphalts
roadside gutter
roadside gutter

A A

A A

DRAWING NAME:
15cm

5cm
Designing underground cables to cut
roads and return concrete
Return Concrete No Descriptions Job Unit Volume
Cable Natcom
1 Cut asphalt km 12

2 Demolition of asphalt m3 90
Cable Natcom DATE
3 Return concrete, MAC 200 m3 90