Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT: PROPOSED 2-STOREY RESIDENCE

SUBJECT : ADDITIVE / DEDUCTIVE COST FOR REVISION OF TRUSSES


ARCHITECT : AR. PAOLO VALENCIA
OWNER : ALVIN UY
DATE : JANUARY 20, 2022

In compliance with your request appertaining to construction of the aforementioned project, please find herewith our proposal for undertaking the following scope of works for Change orders
/ Additional works.
MATERIAL LABOR
NO DESCRIPTION QTY UNIT MATERIAL COST LABOR COST AMOUNT
UNIT PRICE UNIT PRICE
I ADDITIONAL WORKS (REVISED PLAN)
1 Roof Framing
a. 2.5" x 2.5" x 1/4" Angle Bars - pcs 1,961.54 - 1,275.00 - -
b. 2" x 2" x 1/4" Angle Bars (Web Members) 247.00 pcs OSM OSM 944.17 233,209.99 233,209.99
c. 2" x 4" x 1.5mm C-Purlins 101.00 pcs OSM OSM 793.33 80,126.33 80,126.33
2 Corbels 26.00 sets 850.00 22,100.00 450.00 11,700.00 33,800.00
3 12mm Diameter Bolts 736.00 pcs OSM OSM 27.00 19,872.00 19,872.00
4 Cleats 184.00 sets OSM OSM 82.50 15,180.00 15,180.00
5 12mm Round Bar Sagrod 25.00 pcs OSM OSM 267.87 6,696.63 6,696.63
6 Consumables 1.00 lot 20,000.00 20,000.00 7,500.00 7,500.00 27,500.00
8 Epoxy Primer of Trusses & Purlins 1,897.00 l.m 40.00 75,880.00 30.00 56,910.00 132,790.00
Additive cost ----------------------------------------------------------------------------------------Php 549,174.95

OVERALL COST 549,174.95


15% ADDITIONAL CONTRACTOR'S PROFIT FOR ADDITIONAL TRUSSES 29,955.95
10% RETAINED FROM DEDUCTIVE MATERIAL DUE TO OSM 37,316.89
OVERALL COST 616,447.79
AMOUNT IN WORDS: (ADDITIVE COST)
SIX HUNDRED SIXTEEN THOUSAND FOUR HUNDRED FORTY SEVEN & 79/100 PESOS ONLY.

Very truly yours,

___________________
Engr. Paul Vincent Go
Go Squared Contractors Inc.

Received and Acknowledged by,

________________________
Alvin Uy
Owner
Date:

You might also like