5 Nov 2023rfi Request Coating

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

BR. CAT INTERNATIONAL CO. LTD.

( HUGRS)

SL# EPM RFI # DATE TIME LOCATION WBS/BI/JO NO ACTIVITY # INSPECTIO 2032 SAIC # ACTIVITY EQUIPMENT DESCRIPTION INSPECTOR DRAWING # STATUS PRIMARY SAPID REPLY
N LEVEL #

ARJUN QC CAT- SURFACE PREPARATION OF


HUGRS- 1404970997 5-Nov-23 7:15 AM 30"RE-Production 10-14224-0003 3.1 W
SATIP-H- SAIC-H-2059 Surface Preparation of Pipe Joints for PIPE JOINTS FOR FIELD INTERNAL COATING ARJUN VARIOUS YOUSSEF M. RIAZ
COAT-6678 T/L GGM TO GSF 002-08 Field Internal Coating PRIOR TO WELDING AT 30" TRUNK LINE FROM HASSAN
GGM TO GSF

ARJUN QC CAT-VERIFICATION/CALIBRATION OF
HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2059 Verification/Calibration of CRAWLER+INTERNAL MECHANICAL BLASTING YOUSSEF M.
1404963977 4-Nov-23 9:00 AM 3.2 W Crawler+internal mechanical blasting HEAD ON "TEST PUP" 30" AT 30" TRUNK LINE ARJUN VARIOUS RIAZ
COAT-6665 T/L GGM TO GSF 002-08 head on "TEST PUP"
HASSAN
FROM GGM TO GSF
RESCHEDULE TO 05-11-2023 DUE TO ICM BREACK DOWN
Verification/Calibration of ARJUN QC CAT-VERIFICATION/CALIBRATION OF
HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2060 Crawler+Powder spray head on "TEST CRAWLER+POWDER SPRAY HEAD ON "TEST YOUSSEF M.
1404963951 4-Nov-23 9:15 AM 3.3 W
PUP" Prior to internal of production PUP" 30" PRIOR TO INTERNAL OF PRODUCTION ARJUN VARIOUS RIAZ
COAT-6666 T/L GGM TO GSF 002-08 WELDS AT 30" TRUNK LINE FROM GGM TO
HASSAN
welds
GSF RESCHEDULE TO 05-11-2023 DUE TO ICM BREACK DOWN
ARJUN QC CAT-INTERNAL LIQUID COATING
HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2060 INTERNAL LIQUID COATING APCS-120 APCS-120 APPLICATION ON FIELD GIRTH YOUSSEF M.
1404963952 4-Nov-23 10:00 AM 3.4 W Application on Field Girth Welds WELDS INCLUDING REPAIRS ON FIELD GIRTH ARJUN VARIOUS RIAZ
COAT-6667 T/L GGM TO GSF 002-08 Including Repairs WELD JOINTS AT 30" TRUNK LINE FROM GGM
HASSAN
TO GSF RESCHEDULE TO 05-11-2023 DUE TO ICM BREACK DOWN
ARJ QC CAT FINAL INSPECTION AND
30"RE-Production ACCEPTANCE (USING VIDEO CAMERA) LIQUID
HUGRS- SATIP-H- SAIC-H-2060 Final Inspection and Acceptance (Using COATING APCS-120 ON FIELD GIRTH WELDS YOUSSEF M. RESCHEDULE TO 06-11-2023 DUE TO
COAT-6668
1404963979 4-Nov-23 11:00 AM T/L 06 GGM TO 10-14224-0003 3.5 H
002-08 Video Camera) INCLUDING REPAIRS ON FIELD GIRTH WELD ARJUN VARIOUS
HASSAN
RIAZ
NO ACCESS
GSF
JOINTS AT 30 INCH TRUNK LINE FROM GGM
TO GSF

ARJUN QC CAT-PRE-CLEANING, SURFACE PREP


HUGRS- 1404971025 5-Nov-23 8:00 AM 30"RE-Production 10-14224-0003 3.1 H*
SATIP-H- SAIC-H-2014 Pre-Cleaning, Surface Prep Inspection, INSPECTION, CHLORIDE* CONTENT TESTING &
Chloride* Content Testing & CONTAMINATION PREVENTION ON FIELD ARJUN VARIOUS YOUSSEF M. RIAZ
COAT-6679 T/L GGM TO GSF 002-02 Contamination Prevention GIRTH WELD JOINTS AT 30" TRUNK LINE FROM HASSAN
GGM TO GSF

ARJUN QC CAT-IN-PROCESS INSPECTION OF


SATIP-H- SAIC-H-2015 In-Process Inspection of FBE coating FBE COATING APPLICATION ON EXT FIELD
HUGRS- 30"RE-Production 10-14224-0003 YOUSSEF M.
1404971051 5-Nov-23 8:15 AM 3.2 W Application on Ext Field Girth Welds GIRTH WELDS [INCLUDES REPAIR / PATCH-UP ARJUN VARIOUS RIAZ
COAT-6680 T/L GGM TO GSF 002-02 [Includes Repair / Patch-up coating] COATING AND CP AREA) AT 30" TRUNK LINE HASSAN
FROM GGM TO GSF

HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2009 ARJUN QC CAT-CURING TESTING ON FIELD YOUSSEF M.
1404971098 5-Nov-23 8:30 AM 3.3 W Curing testing GIRTH WELD JOINTS AT 30" TRUNK LINE FROM ARJUN VARIOUS RIAZ
COAT-6681 T/L GGM TO GSF 002-02 GGM TO GSF
HASSAN

HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2010 ARJUN QC CAT-ADHESION TESTING ON FIELD YOUSSEF M.
1404971071 5-Nov-23 8:45 AM 3.4 W Adhesion Testing GIRTH WELD JOINTS AT 30" TRUNK LINE FROM ARJUN VARIOUS RIAZ
COAT-6682 T/L GGM TO GSF 002-02 GGM TO GSF
HASSAN

ARJ QC CAT FINAL COATING INSPECTION AND


HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2050 Final coating Inspection and testing: a) TESTING: A) VISUAL B) DRY FILM THICKNESS YOUSSEF M.
COAT-6683
1404971136 5-Nov-23 11:15 AM
T/L GGM TO GSF
3.3 H
002-06 Visual b) Dry Film Thickness (DFT) (DFT) ON ON TRANSITION AREA APCS 113A, ARJUN VARIOUS
HASSAN
RIAZ
SPOOL & JOINTS

ARJ QC CAT HOLIDAY TESTING OF


30"RE-
HUGRS- 10-14224- SATIP-H- SAIC-H- EXTERNAL COATINGS ON PIPELINES AT YOUSSEF M.
1404971126 5-Nov-23 9.00AM Production T/L 3.5 H Holiday Testing ARJUN VARIOUS RIAZ
COAT-6684 0003 002-02 2016 30 INCH RE-PRODUCTION T/L GGM TO HASSAN
GGM TO GSF
GSF

ARJ QC CAT FINAL INSPECTION OF


30"RE-
HUGRS- 10-14224- SATIP-H- SAIC-H- EXTERNAL FBE COATED FIELD GIRTH YOUSSEF M.
1404971144 5-Nov-23 9.30AM Production T/L 3.6 H Final Inspection Prior to backfill* ARJUN VARIOUS RIAZ
COAT-6685 0003 002-02 2018 WELDS BEFORE BACKFILL AT 30 INCH HASSAN
GGM TO GSF
RE-PRODUCTION T/L GGM TO GSF

HUGRS- HWYH UNYZ GAS SATIP-H- Inspection of Repair/Touch-up of GIP QC CAT TOUCH UP AND REPAIR OF APCS- YOUSSEF M.
COAT-6674
1404964089 4-Nov-23 7.40AM RESERVOIR 10-14224-0003 3.6 W
100-01
SAIC-H-2032
Coatings 2C, ON 20 INCH 8 INCH PIPES AND JOINTS GIPSON VARIOUS
HASSAN
RIAZ
RESCHEDULE TO 05-11-2023 DUE
STORAGE GGM
TO NO MECHANICAL CLEARENCE
HUGRS- HWYH UNYZ GAS SATIP-H- GIP QC CAT-SURFACE PREPARATION FOR YOUSSEF M.
COAT-6686
1404971172 5-Nov-23 9.00AM RESERVOIR 10-14224-0003 3.1 W
100-01
SAIC-H-2027 Surface Preparation APCS-2C APPLICATION OF APCS-2C PRIMER ON 8 INCH GIPSON VARIOUS
HASSAN
RIAZ
STORAGE GGM AND 20 INCH JOINTS

HUGRS- HWYH UNYZ GAS SATIP-H- GIP QC CAT APPLICATION APCS-2C PRIMER ON YOUSSEF M.
COAT-6687
1404971110 5-Nov-23 9.30AM RESERVOIR 10-14224-0003 3.2 W
100-01
SAIC-H-2028 Application of APCS-2C
8 INCH AND 20 INCH JOINTS GIPSON VARIOUS
HASSAN
RIAZ
STORAGE GGM
GIP QC CAT FINAL COATING INSPECTION AND
HUGRS- 30"RE-Production 10-14224-0003 SATIP-H- SAIC-H-2050 Final coating Inspection and testing: a) TESTING: A) VISUAL B) DRY FILM THICKNESS YOUSSEF M.
COAT-6688
1404971139 5-Nov-23 11:15 AM
T/L GGM TO GSF
3.3 H
002-06 Visual b) Dry Film Thickness (DFT) (DFT) ON ON TRANSITION AREA APCS 113A, GIPSON VARIOUS
HASSAN
RIAZ
SPOOL & JOINTS

You might also like