The document is an inspection and test plan for excavation works. It outlines 2 key activities - approvals/preliminaries and work progress. For work progress, it specifies that the engineer will visually inspect excavation preparation of each completed area and test/verify compaction every 500 square meters by comparing test results to required compaction degrees in project specifications. The contractor is responsible for execution while the engineer and employer are responsible for witnessing, reviewing documentation, and approving that inspection and testing acceptance criteria are met at various hold points throughout the excavation works.
The document is an inspection and test plan for excavation works. It outlines 2 key activities - approvals/preliminaries and work progress. For work progress, it specifies that the engineer will visually inspect excavation preparation of each completed area and test/verify compaction every 500 square meters by comparing test results to required compaction degrees in project specifications. The contractor is responsible for execution while the engineer and employer are responsible for witnessing, reviewing documentation, and approving that inspection and testing acceptance criteria are met at various hold points throughout the excavation works.
The document is an inspection and test plan for excavation works. It outlines 2 key activities - approvals/preliminaries and work progress. For work progress, it specifies that the engineer will visually inspect excavation preparation of each completed area and test/verify compaction every 500 square meters by comparing test results to required compaction degrees in project specifications. The contractor is responsible for execution while the engineer and employer are responsible for witnessing, reviewing documentation, and approving that inspection and testing acceptance criteria are met at various hold points throughout the excavation works.
Inspection & Test Plan Title/ Description of work Installation of Excavation works Unit Area: Foundation and Boundary wall Descipline Activity No Inspection Test Requirements Reference Documentation Inspection/ Verification Test or Verification Documents Activity/ Description Inspection with Reference performed Stage Code/ SpecsAcceptance criteriaContractor Engineer Employer numbers 1 Approval / Permits/ Preliminaries 1.1 Preparation of
1.1.1 ITP Prior to
Specific 1.1.2 Method Statement Approved start of Status E W R Approved Submittals section 1.1.3 Material Submittal work 1.1.4 Designs 2 Work Progress 2.1 Excavation Every 02 clause Approved drawing, Complete section E W R method statement, 2.1.1 Preparation Visual d area 0000 * Level of excavation Drawing no * The engineer shall check the results of the tests for the adequacy of ITP & Checklist E W R degree of compaction test compaction by 3 tests per 02 clause comparsion with every 500 section degree of 2.2.2 Testing / compactingActual test sq mtrs 0000 compaction Legend Inspection, T- Test; W- witness piont; H Mandatory Hold point; R- Document review; S- Survellaince; E- Execution; RE- record