Professional Documents
Culture Documents
Murisemar To Chatra - P1
Murisemar To Chatra - P1
Murisemar To Chatra - P1
+00
12+000
150
138+000
18+000
JORI KALAN
PHASE 1 Recommended 0
ALIGNMENT
0
30+000
00
66+000
00
Start point
0 00 2+
16
6+
MURI SEMAR 00 +0
42+000
0+ 78
12
0+000
36+000
0
000
00 0
00
4+ 00
4+PHASE 2
0
11
+0
90+
ALIGNMENT 2
00
000
30 6+ 1 7
CHATRA
102+
0
000 0 + 00
0
B MORE +00 0
00
30+
00
150
00
+
+0
+
42
0
00
18
188+00
6
18
+0
0
PANDAWA
0
2
ALIGNMET 3
+0
16
54
0
+00
144
0
+00
GARHWA
174
00
114+000
66+0
90+000
0
00
102+00
000
+0
72
126+
MEDNINAGAR
Office of the Executive Engineer Planning & Investigation Division, TITLE : ALIGNMENT OPTION STUDY
Road Construction Department,Nirupan Bhawan, Third Floor, Doranda, DWG. NO. CET/4668/RCD/PKG-I/EWC/AOS
H-1:2000 Phase-1
C:\Users\gourab.b\Desktop\logo.png
Ranchi-834002 (KM 0+00 TO KM 182+000) CE TESTING COMPANY PVT. LTD. SHEET NO. - 5
REVISION MKD. - R0
PACKAGE-1/CORRIDORS CONSULTANCY SERVICES FOR FEASIBILITY STUDY SUBMISSION TYPE: 124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. ISSUED BY.
AND DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION TO 2-LANE WITH KOLKATA - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. SEP, 2023 PAVED SHOULDER/4-LANE CONFIGURATION OF PROPOSED CORRIDOR FEASIBILITY REPORT
EAST-WEST CORRIDORS:- MURISEMAR- CHATRA-BARHI-BENGABAD-
REVISIONS MADHUPUR-SARATH-PALAJORI-DUMKA HIGHWAY CORRIDOR PACKAGE -I G.B M.B S.C S.B