JASA PEMBORONG (Design and Build )

PEKERJAAN PEMBANGUNAN JALAN TOL BALIKPAPAN - SAMARINDA


SEKSI 2,SEKSI 3,SEKSI 4

RINGKASAN HASIL PENGUJIAN


PILE DRIVING ANALYSIS (PDA) TEST

Tanggal Jenis T. Pancang Lokasi Station Titik Kedalaman (m) Berat Hammer (Ton) Tinggi Jatuh (m) SLSult (Ton) Rmax (Ton) Penurunan (mm) Hasil Keterangan
02 December 2017 Spun Pile D50 Ramp 1 0+810 23 - c 6.5 1 230 Pass -
03 December 2017 Spun Pile D50 Ramp 1 0+790 19 - b 6.5 1 100 Pass -
06 December 2017 Spun Pile D50 Ramp 1 0+810 15 - b 6.5 1 157 Pass -
07 December 2017 Spun Pile D50 Ramp 1 0+770 15 - b 6.5 1 98 Pass -
13 December 2017 Spun Pile D50 Ramp 1 0+780 17 - d 6.5 1 117 Pass -
13 December 2017 Spun Pile D50 Ramp 1 0+725 6-b 6.5 1 193 Pass -
13 December 2017 Spun Pile D50 Ramp 1 0+745 10 - b 6.5 1 173 Pass -
28 December 2017 Spun Pile D50 Ramp 1 0+860 33 - b 6.5 1 206 Pass -
28 December 2017 Spun Pile D50 Ramp 1 0+885 38 - b 6.5 1 270 Pass -
28 December 2017 Spun Pile D50 Ramp 1 0+905 42 - a 6.5 1 251 Pass -
05 January 2018 Bore Pile D80 Ramp 4 A2 21 6.9 2 292 264 7 Fail -
08 January 2018 Bore Pile D80 Ramp 4 P11 21 6.9 1.5 302 521 11 Pass -
19 January 2018 Spun Pile D50 Ramp 1 0+935 48 - d 6.5 1 234 Pass -
30 January 2018 Spun Pile D50 Ramp 1 1+110 83 - a 6.5 1 192 Pass -
30 January 2018 Spun Pile D50 Ramp 1 1+120 85 - d 6.5 1 242 Pass -
30 January 2018 Spun Pile D50 Ramp 1 0+885 38 - c 6.5 1 280 Pass -
07 February 2018 Spun Pile D50 Ramp 1 1+145 90 - c 24 6.5 1 109 133 32 Pass -
07 February 2018 Bore Pile D80 Ramp 4 A2 16 20.6 6.9 1.5 292 596 7 Pass RePDA
23 February 2018 Bore Pile D80 Ramp 4 P8 8 6.9 1.5 325 385 6 Pass -
23 February 2018 Spun Pile D50 Ramp 1 1+178 96' - b 23.5 6.5 1 202 Pass -
07 March 2018 Spun Pile D60 Ramp 4 0+675 11 - a 38 6.5 1 150 258 14 Pass -
07 March 2018 Spun Pile D60 Ramp 4 0+675 6-a 34.5 6.5 1 150 360 20 Pass -
07 March 2018 Spun Pile D60 Ramp 4 0+675 2-a 35 6.5 1 150 305 18 Pass -
10 March 2018 Bore Pile D80 Ramp 4 P2 11 6.9 1.5 343 296 6 Fail -
26 March 2018 Spun Pile D60 Ramp 4 16 -d 30 6.5 1 150 342 22 Pass -
26 March 2018 Spun Pile D60 Ramp 4 19 -d 30 6.5 1 150 235 25 Pass -
02 April 2018 Bore Pile D80 Ramp 4 P2 15 6.9 2.5 343 608 3 Invalid RePDA
06 April 2018 Bore Pile D80 Ramp 4 A1 12 6.9 2.5 358 215 12 Fail RePDA
11 April 2018 Bore Pile D80 Ramp 4 A1 12 21 6.9 2.5 358 276 11 Fail RePDA
11 April 2018 Bore Pile D80 Ramp 4 P2 11 32.2 6.9 2.5 343 160 7 Fail RePDA
19 April 2018 Bore Pile D80 Ramp 4 P4 23 30,2 6.9 2 242 360 7 PASS -
19 April 2018 Bore Pile D80 Ramp 4 P2 18 32,2 6.9 2 343 361 6 PASS -
19 April 2018 Bore Pile D80 Ramp 4 A1 11 22,2 6.9 2 358 371 2 PASS -
21 May 2018 Bore Pile D80 Ramp 4 P6 18 29 6.9 2 311 367 4 PASS -
21 May 2018 Spun Pile D50 Ramp 1 58-D 36 6.5 2 150 293 2 PASS -
21 May 2018 Spun Pile D50 Ramp 1 51-B 36 6.5 2 150 278 2 PASS -
21 May 2018 Spun Pile D50 Ramp 1 63-D 35 6.5 2 150 289 2 PASS -
21 May 2018 Spun Pile D50 Ramp 1 68-D 34 6.5 2 150 368 20 PASS -
21 May 2018 Spun Pile D50 Ramp 1 73-D 35 6.5 2 150 296 23 PASS
30 May 2018 Spun Pile D60 Ramp 4 0+125 25-C 33 6.5 2 150 250 17 PASS
30 May 2018 Spun Pile D60 Ramp 4 0+075 15-A 28.5 6.5 2 150 352 15 PASS
30 May 2018 Spun Pile D60 Ramp 4 0+100 20-C 31.5 6.5 2 150 272 18 PASS
30 May 2018 Spun Pile D60 Ramp 4 0+050 10-B 27.8 6.5 2 150 290 15 PASS
30 May 2018 Spun Pile D60 Ramp 4 0+150 30-D 33 6.5 2 150 243 18 PASS
30 June 2018 Bore Pile D80 Ramp 4 P5 20 6.9 2 263 284 8 PASS -
30 June 2018 Bore Pile D80 Ramp 4 A1 JMR RAMP 1 12 6.9 2 269 321 6 PASS -
30 June 2018 Bore Pile D80 Ramp 4 A1 JMR RAMP 4 11 6.9 2 334 391 8 PASS -
01 July 2018 Spun Pile D60 Ramp 4 0+200 40-D 38 6.5 2 200 273 20 PASS
01 July 2018 Spun Pile D60 Ramp 4 0+225 45-D 37 6.5 2 200 248 21 PASS
01 July 2018 Spun Pile D60 Ramp 4 0+250 50-D 34.5 6.5 2 200 279 22 PASS
19 July 2018 Spun Pile D60 Ramp 4 0+360 72-B 35 6.5 2 179 272 22 PASS
19 July 2018 Spun Pile D60 Ramp 4 0+335 67-D 6.5 2 179 241 21 PASS
20 July 2018 Spun Pile D60 Ramp 4 0+370 74-A 34 6.5 2 179 230 20 PASS
20 July 2018 Spun Pile D60 Ramp 4 0+310 62-A 6.5 2 179 280 19 PASS
20 July 2018 Spun Pile D60 Ramp 4 0+290 58-A 6.5 2 179 277 20 PASS
20 July 2018 Bore Pile D80 Ramp 4 A2 JMR RAMP 4 12 39 6.9 2 348 358 8 PASS
20 July 2018 Bore Pile D80 Ramp 4 A2 JMR RAMP 1 12 23 6.9 2 290 299 11 PASS
30 July 2018 Spun Pile D60 Ramp 4 0+395 79-B 6.5 2 179 293 19 PASS
30 July 2018 Spun Pile D60 Ramp 4 0+415 83-B 6.5 2 179 259 15 PASS
30 July 2018 Spun Pile D60 Ramp 4 0+435 87-B 6.5 2 179 291 18 PASS
31 July 2018 Spun Pile D60 Ramp 4 0+515 103-A 6.5 2 179 281 23 PASS

515