BURGAN MAINTENANCE

2010

BURGAN

QUALITY SYSTEM

MAINTENANCE MANUAL

LEVEL 2: PROCEDURE

TITLE: MONTHLY REPORT

NOTES: 1. This document is not valid unless authorized by the Department Manager.
2. The latest revision on any one page is sidelined in the right hand margin.
3. Any queries on this document are to be made to the Department Manager or Quality Representative.
4. Document content authorized by department head.
5. Document approved for distribution by Quality Department.
6. Note, any paper copy of a quality document is considered an UNCONTROLLED COPY unless it is
printed on yellow colored paper and carries both approval and authorization signatures.

APPROVED & AUTHORISED NETWORK


VERSION - CONTROLLED COPY
APPROVED BY: Aramis Guerra DATE: 15-Jul-2010

AUTHORISED BY: Spyros Christophidies DATE: 15-Jul-2010 NUMBER OF PAGES 4

*NUMBER OF APPENDICES NONE


* If NONE, write "NONE"
CONTENTS

1.0 PURPOSE

2.0 APPLICATION

3.0 RESPONSIBILITY

4.0 SUBMITTAL AND FILING

5.0 PREPARATION AND POSTING

6.0 APPLICABLE FORMS


1.0 PURPOSE

This procedure and form number Monthly Equipment Report, serves as a means of reporting the
overall condition, PM being carried out, and performance of a rig.

2.0 APPLICATION

This procedure applies to all Burgan Wafra drilling rigs.

3.0 RESPONSIBILITY

The Maintenance Representative is responsible for ensuring that the report is completed and
submitted in an accurate and timely manner.

The Rig Mechanic, Electrician is responsible for maintaining suitable records, so that the report
may be completed accurately every month.

4.0 SUBMITTAL AND FILING

At the rig and end of the month, the form shall be checked for completeness before submittal and
filing of the appropriate copies.

An electronic copy of this form needs to be sent to the Maintenance Superintendent by the fist of
the month. Signed copies can be sent via courier to Area Manager and Maintenance
Superintendent.

The previous six (6) months shall be held on file. All others may be disposed of.

5.0 PREPARATION AND POSTING

This is available as a triplicate copy form (or an electronic format may also be used) and should
be filled out at the rig with the Senior Rig Electrician. The information is to be taken from several
sources and should give a general overview of the rig’s equipment performance during the
reporting period.

6.0 APPLICABLE FORMS

6.1 Monthly Equipment Report