BQ-FORCONT-SHOP DRAWING ACCESORIS BOX HYDRANT

To DJASA UBER SAKTI (DU) Date : 7-Sep-22

No : SMM-DU/IAN/DAMKAR/I/2022 Scoup : BOX HYDRANT

BQ FORCONT
NO DESCRIPTION SPEK MERK
QTY UNIT QTY
A GEDUNG KULIAH
Indoor Hydrant Box (Buka Pintu Kanan) LT.1 Dilengkapi Landing Valve 2.1/2 Inchi, Landing Valve
1.1/2 Inchi, Rubber Fire House diameter 1.1/2 Inchi
panjang 30 mtr, Hornstrobe, dan Manual Call Point
1 (Dibuat Hole untuk Hornstrobe) OSEAN FIRE 2 Unit 2

Indoor Hydrant Box (Buka Pintu Kanan) LT.2 Dilengkapi Landing Valve 2.1/2 Inchi, Landing Valve
1.1/2 Inchi, Rubber Fire House diameter 1.1/2 Inchi
panjang 30 mtr, Hornstrobe, dan Manual Call Point
2 (Dibuat Hole untuk Hornstrobe) OSEAN FIRE 5 Unit 5

3 Fire Exhatinguser (APAR) LT.2 ABC Dry Chemical Fire Exhatinguser, kap 6kg OSEAN FIRE 5 Unit 0

B GEDUNG AUDIOTORIUM

Dilengkapi Landing Valve 2.1/2 Inchi, Landing Valve


1.1/2 Inchi, Rubber Fire House diameter 1.1/2 Inchi
panjang 30 mtr, Hornstrobe, dan Manual Call Point
1 Indoor Hydrant Box (Buka Pintu Kanan) LT.1 (Dibuat Hole untuk Hornstrobe) OSEAN FIRE 0 Unit 2

Dilengkapi Landing Valve 2.1/2 Inchi, Landing Valve


1.1/2 Inchi, Rubber Fire House diameter 1.1/2 Inchi
panjang 30 mtr, Hornstrobe, dan Manual Call Point
2 Indoor Hydrant Box (Buka Pintu Kanan) LT.2 (Dibuat Hole untuk Hornstrobe) OSEAN FIRE 2 Unit 4

3 Fire Exhatinguser (APAR) LT.1 ABC Dry Chemical Fire Exhatinguser, kap 6kg OSEAN FIRE 0 Unit 0

4 Fire Exhatinguser (APAR) LT.2 ABC Dry Chemical Fire Exhatinguser, kap 6kg OSEAN FIRE 2 Unit 4

C GEDUNG TKK

1 Fire Exhatinguser (APAR) LT.2 ABC Dry Chemical Fire Exhatinguser, kap 6kg OSEAN FIRE 2 Unit 1

D AREA LINGKUNGAN

Outdoor Hydrant Box Dilengkapi Rubber Fire Hose 2.1/2 Inchi, panjang 30 mtr
1 OSEAN FIRE 4 Unit 6

Hydrant Pillar Hydrant Pillar, model 2 Way, machino coupling, kap 30


2 Bar OSEAN FIRE 4 Unit 6

3 Siemes Connection Siemes Connection model 2 Way Machino Coup GENIRO 2 Unit 2

PT. SINDANG MULTI MEGATAMA PT. DJAS

Prepared by Approved by Checked by

DRAFTER/ENGINEERING PROJECT MANAGER ENGINEERING


OX HYDRANT
Area :
LINGKUNGAN & GEDUNG

Revision
0

FORCONT S.DRAWING DEVIASI


REMARK
UNIT QTY UNIT QTY UNIT

Di BQ Landing valve tidak ada 2.1/2


Unit 2 Unit 0 Unit
Inc

Unit 4 Unit 1 Unit

Unit 4 Unit 1 Unit

Unit 1 Unit -1 Unit

Unit 5 Unit -3 Unit

Unit 1 Unit -1 Unit

Unit 5 Unit -3 Unit

Unit 1 Unit 1 Unit

Unit 5 Unit -1 Unit

Unit 5 Unit -1 Unit

Unit 3 Unit -1 Unit

PT. DJASA UBER SAKTI

Checked by Approved by

ENGINEERING PROJECT MANAGER